Construction Milestone 1. BRMHS Power Generation Lab Kit Team Wired Up. Needs Statement. A system is needed to provide a hands-on teaching method of multiple renewable energy sources to high school students to further encourage their interest in STEM related topics. . Objectives. - PowerPoint PPT Presentation
Popular Tags:
15
Colle ge of ENGINEERING BRMHS Power Generation Lab Kit Team Wired Up 1 Construction Milestone 1
Transcript
Page 1: Construction Milestone 1

1

Collegeof ENGINEERING

BRMHS Power Generation Lab KitTeam Wired Up

Construction Milestone 1

Page 2: Construction Milestone 1

Needs Statement

A system is needed to provide a hands-on teaching method of multiple renewable energy sources to high school students to further encourage their interest in STEM related topics.

Page 3: Construction Milestone 1

Objectives

• To demonstrate clean energy principles to high school students

• To promote STEM programs to future college students

• To engage students in hands-on learning of various energy concepts related to the EBRP High school physics curriculum

Page 4: Construction Milestone 1

Objectives

• To implement a microcontroller to display the relevant power equations associated with the different energy sources

• To further our knowledge and understanding of the underlying concepts relating to renewable energy

• To learn how to work cohesively and effectively on a team to carry out a project from concept to design

Page 5: Construction Milestone 1

Progress – Power Supply

• The Power Supply and Charging Circuit are complete

• Bread boarded and tested• Added– On/Off switch– LEDs– Overcharging protection

Page 6: Construction Milestone 1

Circuits Bread Boarded

• Solar charger will charge battery to 6V and then cut off due to overcharge protection

• Provide backup power for microcontroller and LED

• Power supply will supply +5VDC to microcontroller (through mini USB)

• Currently performing heat and stress tests to make sure overheating is not an issue

Page 7: Construction Milestone 1

Progress - Power Measurement

Page 8: Construction Milestone 1

Progress - Power Measurement

Page 9: Construction Milestone 1

Progress - Power Measurement

Page 10: Construction Milestone 1

Updated PCB

Page 11: Construction Milestone 1

Meeting with Mr. Breedlove

Before• Lexan• Size: 3.25 ft x 1.5 ft x 0.75 ft• Windbelt fans• Circuit Connections: Metal

Contacts• Module Connections: L-

grooves and latches

After• Plexiglas• Size: 1.5 ft x 1 ft x 0.5 ft• Windbelt fans were omitted • Circuit Connections:

External Harness• Module Connections: Trunk

Latch

Page 12: Construction Milestone 1

Edited Design

18”

12”

6”

Page 13: Construction Milestone 1

Instruction Manual

• Lab experiments were completed for each model

• Proper instructions, warnings, and images will be added after completion of lab kit

Page 14: Construction Milestone 1

Experiments

Windbelt• Adjust the tautness of the belt

and measure while measuring the current and voltage with every adjustment.

• Graph the tautness vs. current• Graph the tautness vs. voltage• Compare acquired values with

estimated values

Solar• Record the current

produced when a lamp hovers above the solar panel.

• Graph the relation between lumens and the current

• Repeat process with lamps of varying watts

• Compare acquired values with estimated values

Page 15: Construction Milestone 1

Projected Work

• Have power and multimeter PCB completed and ordered by next milestone

• Complete programming for keypad and LCD interface

• Begin constructing mechanical energy sources• Begin constructing windbelt