+ All Categories
Home > Documents > CONSTRUCTION NOTICE AND MAP Day Time Right-Turn...

CONSTRUCTION NOTICE AND MAP Day Time Right-Turn...

Date post: 20-Mar-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
1
Toll-Free Helpline: 844.332.3717 Website: lqcompletestreets.com Email: [email protected] Legend Sidewalk closed. Please use other side. Pedestrian Detour Toll-Free Helpline: 844.332.3717 Website: lqcompletestreets.com Email: [email protected] Circle K Cunard’s Sandbar Old Town La Quinta AVENIDA NAVARRO AVENIDA VILLA AVENIDA MENDOZA AVENIDA MARTINEZ Tampico Meat Market AVENIDA LA FONDA CALLE TAMPICO CALLE TAMPICO AVENIDA BERMUDAS AVENIDA BERMUDAS DESERT CLUB DRIVE Driveway Open EISENHOWER DRIVE Chapellis Italian Restaurant Open Open John Adams Elementary School and Early Childhood Learning Center Benjamin Franklin Elementary School AVENID A L A FONDA Domino’s Pizza WASHINGTON ST WASHINGTON ST DESERT CLUB DRIVE Embassy Suites by Hilton Suggested Detour Open Open Open Open Open Open *Note: Due to inclement weather or unforeseen issues, these dates and times are subject to change without notice. SCHEDULE UPDATE: Stage 1 is expected to be completed Mid-February 2020. Right turn closed. Right turn closed. CONSTRUCTION NOTICE AND MAP Day Time Right-Turn Restrictions Monday, January 27 - Avenida Bermudas and Tuesday, January 28, Desert Club Drive from 7a.m. to 3p.m. This work will be managed by Coachella Valley Water District (CVWD) Please use Avenida Navarro or Desert Club Drive for business access (except for Tuesday, January 28)
Transcript
Page 1: CONSTRUCTION NOTICE AND MAP Day Time Right-Turn ...lqcompletestreets.com/updates/1-27-28-20-La-Quinta-Construction-Map.pdf · Monday, January 27 - Avenida Bermudas and Tuesday, January

Toll-Free Helpline: 844.332.3717 Website: lqcompletestreets.com Email: [email protected]

Legend

Sidewalk closed. Please use other side.

Pedestrian Detour

Toll-Free Helpline: 844.332.3717 Website: lqcompletestreets.com Email: [email protected]

Circle K Cunard’s Sandbar

Old Town La Quinta

AVEN

IDA N

AVARRO

AV

ENID

A V

ILLA

AVEN

IDA M

END

OZA

AVEN

IDA M

ART

INEZ

Tampico Meat

Market

CALLE TAMPICO

AVENIDA LA FONDA

CALLE TAMPICO

CALLE TAMPICO

AVEN

IDA B

ERM

UD

AS

AVEN

IDA B

ERM

UD

AS

DES

ERT

CLU

B D

RIV

E

Driveway Open

EISEN

HO

WER

DRIV

E

Chapellis Italian

Restaurant

Open Open

John Adams Elementary School and Early Childhood Learning Center

Benjamin Franklin Elementary School

AVENIDA LA FONDA

Domino’s Pizza

WASH

ING

TON

ST

WASH

ING

TON

ST

DES

ERT

CLU

B D

RIV

E

Embassy Suites by

Hilton

Suggested Detour

Open Open Open Open Open

Open

*Note: Due to inclement weather or unforeseen issues, these dates and times are subject to change without notice.

SCHEDULE UPDATE:Stage 1 is expected to be completed Mid-February 2020.

Right turn closed. Right turn closed.

CONSTRUCTION NOTICE AND MAPDay Time Right-Turn Restrictions

Monday, January 27 - Avenida Bermudas and Tuesday, January 28, Desert Club Drive from 7a.m. to 3p.m.This work will be managed by

Coachella Valley Water District (CVWD)

Please use Avenida Navarro or Desert Club Drive for business access

(except for Tuesday, January 28)

Recommended