1/3/2013 1 Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE Presentation Topics: KMA plant characteristics; Foamed bitumen; Technology fail criteria; Jobsite presentation: Rod. dos Bandeirantes - SP; Rod. BR-101 – RJ; Rod. Ayrton Senna – SP; Av. Sapopemba - SP.
Transcript
Page 1: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

1

Construction Practices and Techniques

Eng. Valmir Bonfim, M.Sc.Grupo ANE

Presentation Topics:

KMA plant characteristics;

Foamed bitumen;

Technology fail criteria;

Jobsite presentation:

Rod. dos Bandeirantes - SP;

Rod. BR-101 – RJ;

Rod. Ayrton Senna – SP;

Av. Sapopemba - SP.

Page 2: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

2

Mobile plant Cold recycling Emulsion and

foamed bitumen

KMA 220 plant

Characteristics:

Page 3: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

3

Foamed Bitumen Technology

Foam Bitumen is the result of the asphalt binder at approximately 170°C, which expands when in contact with air and water at room temperature inside

expansion chambers.

Foamed Bitumen Technology

Page 4: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

4

Finally,What is foamed RAP?

RAP = Reclaimed Asphalt Pavement

Finally,What is foamed RAP?

Page 5: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

5

Foamed RAP = is the product ofmixing milled pavement with foamedasphalt

Finally,What is foamed RAP?

RAP = Reclaimed Asphalt Pavement

Expansion Chamber

Foamed asphalt process

Page 6: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

6

Quality control of foamedasphalt

- Expansion rate- Half-life

Half-life is the time measured between themaximum expansion and a half of that expansion.

Quality control of foamedbitumen

- Expansion rate- Half-life

Page 7: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

7

Foamed bitumen = expanded bitumen binder

WLB10S machine and mini Pug-mill mixer

Design of bitumen binder % in lab

Page 8: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

8

RAP aggregate gradation

Curva Granulométrica - Esp. = 8 cm - Vel. = 10 m/min

0

10

20

30

40

50

60

70

80

90

100

0,01 0,1 1 10 100

Diâmetr o dos gr ãos (mm)

Mat erial or iginal, ant es da f resagem

Mat erial f resado, sem ext ração de

bet ume

Mat erial f resado, com ext ração de

bet ume

Peneiras

200 100 80 50 40 30 10 8 4 3/8” 1/2” ¾” 1” 1 ½” 2”

Fonte: Livro Fresagem de Pavimentos Asfálticos

Curva Granulométrica - Esp. = 8 cm - Vel. = 10 m/min

0

10

20

30

40

50

60

70

80

90

100

0,01 0,1 1 10 100

Diâmetr o dos gr ãos (mm)

Mat erial or iginal, ant es da f resagem

Mat erial f resado, sem ext ração de

bet ume

Mat erial f resado, com ext ração de

bet ume

Peneiras

200 100 80 50 40 30 10 8 4 3/8” 1/2” ¾” 1” 1 ½” 2”

Fonte: Livro Fresagem de Pavimentos Asfálticos

ISSUES HAPPENING WHENUSING RAP

Undesired Lumps

Not enough fines

RAP aggregate gradation

Page 9: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

9

Adequate gradation of foamed RAP

Wirtgen Cold Recyclig Manual

Pavement failure criteria

Fatigue cracking

• HMA• Cemented layers

Crack

Rutting

20mm

BSM´s

No crack

Page 10: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

10

Rutting:

Lower maintenance cost compared with greater depth interventions.

Procedure: Cold milling and overlay.

Pavement failure criteria

Basic steps:

1st step:- Pavement evaluation;

Functional and structural conditions, drainage etc.

2ª step: Design- Choice of the adequate solution (in place, plant);- Economical analysis;- Layers thickness design;- Selection of new materials (crusher dust, bitumen binder etc);- Recycled mix design;- Lab tests.

3ª step: Jobsite execution- Choice of adequate equipment;- Quality control;

Foam quality, mix condition, compaction etc.

Page 11: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

11

Rodovia dos Bandeirantes

Grupo CCR - AutoBan / Engelog

Cement base recycled in KMA plant

Page 12: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

12

Plant placed near the road

1st step: Cold milling of HMA

Page 13: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

13

2nd step:Cold milling of cemented layer

Execution of the 1st cemented base layerNext steps: 2nd cemented base layer and 10cm HMA

Page 14: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

14

Rodovia BR-101

Section: Rio de Janeiro

Cement base recycling in KMA plant

Milled HMA recycled using polymerized emulsion in KMA plant

Subgrade

Existent cross-section

HMA

Deteriorated cemented layer

Page 15: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

15

Subgrade

Constructed cross-section

RAP recycled with polymerized emulsion

HMA

Deteriorated base recycled with cement

25/28 cm of the thickness were recycled

Subgrade

Constructed cross-section

HMA

RAP recycled with polymerized emulsion

Deteriorated base recycled with cement

Page 16: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

16

1st step:Cold milling of the HMA layer

2nd step:Cold milling of thecemented layer

Deflection measure and verification of the reminiscent pavement

Page 17: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

17

Plant installed near the jobsite

RAP mixing with polymerized emulsion in KMA plant

Page 18: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

18

Recycled layer open to traffic

Cold recycling in KMA plant with foamed bitumen

STRUCTURAL REHABILITATION

Page 19: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

19

Deteriorated cemented base High traffic volume Highway without weight control

TEST SECTION

Surface layer exposed to traffic after 10 months

TEST SECTION

Page 20: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

20

Mix design Mixture in KMA 220 Plant

Crushed RAP. . . . . . . . . . . . 84%Crusher dust . . . . . . . . . . . . 15%Hydrated Lime. . . . . . . . . . . 1%----------------------------------------------Total . . . . . . . . . . . . . . . . . . .100%

CAP 50-70 (bitumen binder): 2,2%

Mix design Mixture in KMA 220 Plant

Crushed RAP. . . . . . . . . . . . 84%Crusher dust . . . . . . . . . . . . 15%Hydrated Lime. . . . . . . . . . . 1%----------------------------------------------Total . . . . . . . . . . . . . . . . . . .100%

CAP 50-70 (bitumen binder): 2,2%

When lime is used as active filler: stockpiling is possible

Page 21: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

21

Existent cross-section

Deteriorated cemented layer

Deteriorated HMA

Crushed Stone Layer

Milling depth: 30 cm

Deteriorated cemented layer

Existent cross-section

Deteriorated HMA

Subgrade

Crushed Stone Layer

Page 22: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

22

BGTC deteriorada1st foamed RAP layer: thickness=13,5 cm

Execution steps

Milling depth: 30 cm Subgrade

Crushed Stone Layer

BGTC deteriorada

2nd foamed RAP layer: thickness=13,5 cm

Milling depth: 30 cm

1st foamed RAP layer: thickness=13,5 cm

Subgrade

Crushed Stone Layer

Execution steps

Page 23: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

23

BGTC deteriorada

2nd foamed RAP layer: thickness=13,5 cm

Milling depth: 30 cm

1st foamed RAP layer: thickness=13,5 cm

Gap Graded: thickness=3 cm

Subgrade

Crushed Stone Layer

Execution steps

Plant installed near the jobsite

Crushed RAP

Crusher dustKMA plant Foamed RAP

Page 24: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

24

Cold milling step

30 cm thickness in one passCold milling step

Page 25: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

25

Verification of the reminiscent pavement

thickness = 30 cm

In this section, not all the cracked layer wasmilled

HMA = 20 cm

Cemented Layer = 10 cm

Page 26: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

26

New milling process to takeaway reminiscent cracked

cemented layer

Deflection measures – Benkelmann beam

Execution of the 1st Foamed RAP and compaction

Page 27: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

27

Compaction verification test: SAND CONE

Execution of the 2nd Foamed RAP and compaction

Page 28: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

28

Execution of the gap graded surface layerThickness of 3 cm and compaction

Execution of the gap graded surface layerThickness of 3 cm and compaction

Page 29: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

29

SUSTAINABLE PAVEMENT

AVENIDA SAPOPEMBASection: Av. dos Sertanistas até Av. Bento Guelfi – São Paulo

Avenida Sapopemba

Crushed CDW layer

Foamed RAP base layer

HMA 5cm

20cm

25cm

Cross-section

Subgrade

Page 30: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

30

RAP . . . . . . . . . . . . . . . . . . 80%Crusher dust . . . . . . . . . . . 19%Hydrated lime. . . . . . . . . . . 1%----------------------------------------------Total . . . . . . . . . . . . . . . . . . .100%

CAP 50-70 (bitumen binder): 2,5%

Mix design Mixture in KMA 220 Plant

CONSTRUCTION STEPS

Kerb and gutter

Page 31: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

31

Mill and replace structural layers

CONSTRUCTION STEPS

CDW Sub-base

CONSTRUCTION STEPS

Page 32: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

32

Sub-base compaction

CONSTRUCTION STEPS

Foamed RAP base

CONSTRUCTION STEPS

Page 33: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

33

Base compaction

CONSTRUCTION STEPS

HMA surface layer

CONSTRUCTION STEPS

Page 34: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

34

Compaction

CONSTRUCTION STEPS

CONSTRUCTION STEPS

Compaction

Page 35: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

35

Construction finished

CONSTRUCTION STEPS

All lab tests the presented projects were conductedat the Laboratório de Tecnologia de Pavimentação da Escola Politécnica da Universidade de São PauloLTP-EPUSP

- Rutting (ornierage);

- Resilient Modulus.

Lab tests:

Page 36: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

36

Foamed RAP – Rutting80% RAP + 19% crushed dust + 1% cement

+ 2,5% bitumen binder

3,16% 3,78% 4,59% 5,49% 6,67% 7,97%

0%

1%

10%

100%

100 1000 10000 100000

Porcentagem de afundam

ento

na trilha de roda 

N. de ciclos

Afund. (A ‐ Esq.‐…

1000

10000

100000

0,1 1 10

MR ‐(kgf/cm2)

Tensão de Confinamento (kgf/cm2)

MR = 10603 * 30,3902

Foamed RAP – Resilient Modulus80% RAP + 19% crushed dust + 1% cement

+ 2,5% bitumen binder

Page 37: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

37

Foamed CDW – Rutting

0,7%0,8%

1,1%1,3%

1,7%2,1%

0%

1%

10%

100%

100 1000 10000 100000

Po

rcen

tag

em d

e af

un

dam

ento

na

tril

ha

de

rod

a

N. de ciclos

Rutting x # of cycles

CDW + 1% cement + 3,4% foamed asphalt72 h cure in oven at 60ºC and 72 h at room temperature - test temperature = 60ºC

Afund. (A - Esq. - P-2046)

100

1000

10000

100000

0,1 1,0 10,0

MR

-(k

gf/c

m²)

Tensão de Confinamento (kgf/cm²)

CDW + 1% cement + 3,4% foamed bitumenEnergia de Moldagem E.M. - Ensaio realizado na umidade de moldagem = 11,9%

Cura: 72 hs. em estufa 60ºC e 72 hs. ao ar

MR = 10.557* 30,4526

Ensaio realizado conforme o que preconiza a norma DNER-ME 131/94 - Determinação do módulo de resiliência

Foamed CDW – Resilient Modulus

Page 38: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

38

Foamed crushed stone – Rutting

0,47%0,60%

0,78%0,99%

1,28%1,62%

0%

1%

10%

100%

100 1000 10000 100000

Porcentagem de afundam

ento

na trilha de roda 

N. de ciclos

Afund. (A ‐ Esq. ‐ P‐1246)Afund. (B ‐ Dir. ‐ P‐1247)

99% crushed stone + 1% cement + 3% foamed bitumen

1000

10000

100000

0,1 1 10

MR ‐(kgf/cm2)

Tensão  Confinamento (kgf/cm2)

MR = 14719 * 30,2509

Crushed Stone

Foamed crushed stone – Resilient Modulus99% crushed stone + 1% cement + 3% foamed bitumen

Page 39: Construction Practices and Techniques - rknet.it · Construction Practices and Techniques Eng. Valmir Bonfim, M.Sc. Grupo ANE ... betume Material fresado,c om extração de betume

1/3/2013

39

Bibliography

Valmir BonfimDiretor TécnicoCel.: (11) [email protected]

FREMIX ENGENHARIA E COMÉRCIO LTDA.Rua Vitorino, 25 - Jardim Mutinga

Fone (11) 4196-5533Barueri/SP- CEP 06463-290

Grato pela atenção!