+ All Categories
Home > Documents > Construction Progress (Advance to the next slide by clicking your mouse) Photos provided by Karen...

Construction Progress (Advance to the next slide by clicking your mouse) Photos provided by Karen...

Date post: 30-Dec-2015
Category:
Upload: barrie-phelps
View: 216 times
Download: 1 times
Share this document with a friend
Popular Tags:
12
Construction Progress (Advance to the next slide by clicking your mouse) Photos provided by Karen Ressler, Board of Education Published 8/4/05
Transcript

Construction Progress(Advance to the next slide by clicking your mouse)

Photos provided by Karen Ressler, Board of EducationPublished 8/4/05

Bright SCC signs grace the front yards of all our schools

Tatem Classroom Classroom New Unit Ventilator

Tatem ExteriorBrick Re-pointing

HMHS A Wing Classroom Renovation

HMHS B GymAccess to new heating units on roof to be installed in this

opening.

Central-Middle SchoolRoof Work

Middle School ClassroomNew Unit Ventilator to be installed

Middle School Gym FloorOld Surface Removal

Middle School Restroom Renovation

Central School ClassroomThis classroom is getting a new unit ventilator installed.

Elizabeth Haddon RestroomThis group restroom is ready for new fixtures.


Recommended