CONSTRUCTION PROGRESS UPDATE Vol. 08 July 2016 TO VALUED BUYERS OF BODAIJU RESIDENCES
Transcript
Page 1: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp-content/uploads/2016/07/Bodaiju-Site... · In conclusion we already complete the 1st Floor Concreting Work

CONSTRUCTION PROGRESS

UPDATE

Vol. 08July 2016

TO VALUED BUYERS OF

BODAIJU RESIDENCES

Page 2: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp-content/uploads/2016/07/Bodaiju-Site... · In conclusion we already complete the 1st Floor Concreting Work

©Torreya Asset Holdings Co., Ltd.

Bodaiju Site Progress Report - Building A and B -

1

Dear valued buyers of Bodaiju Residences,

It is with great pleasure that I’m writing to you to share with you on the construction

progress for Bodaiju Residences.

Since the sales of Bodaiju Residences on 22nd August 2015, we had received over-

whelming support and much better than expected sales of Bodaiju Residences. With the

strong support, my construction team has been working endlessly to meet the construction

progress. After completing the UXO clearance and test piling works, we are currently

carrying out piling works in full force.

As part of our continuous engagement with you, I’m pleased to provide you with the

details of the construction in this report and endeavor to provide you with an update on

the construction every quarter.

Thank you for all the great support extended thus far.

Sincerely,

Toshihiko Muneyoshi

Founder/ Manager Director

Creed Group

Page 3: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp-content/uploads/2016/07/Bodaiju-Site... · In conclusion we already complete the 1st Floor Concreting Work

©Torreya Asset Holdings Co., Ltd.

Construction Schedule Payment Schedule

Jul

Mar

Apr

May

Jun

Aug

Sep

Oct

Nov

Dec

2017

Jan

Feb

Mar

Nov.

2015

Oct.

Dec

2016

Jan

Feb

Vol. 08 June 2016

Bodaiju Site Progress Report - Building A and B -

2

GENERAL SCHEDULE (October 2015 – June 2017) CONSTRUCTION PROGRESS

We are completed the 1st Floor Structure Work by end of

this June 2016.

Piling works

Architectural

works

Interior works

MEP

works

Completion of

7th floor structure

Completion of

RF floor structure

preliminary

works - Mine investigation

- Ultimate load test, etc.

RC

Superstructure

※Construction’s Schedule might vary to take weather conditions and other factors into account.

Building ABuilding B

※The diagram above only serves to illustrate the construction progress. Actual construction may not be

carried out as per the illustration.

P1

P2

1F

2F

3F

5F

6F

7F

8F

9F

10F

11F

12F

13F

RF

P1

P2

1F

2F

3F

5F

6F

7F

8F

9F

10F

11F

12F

13F

RF

FOUNDATION WORK

COMPLETED. MARCH-2016

Completion of

foundation

Parking 1

Parking 2

Garden Deck

1st FLOOR STRUCTURE

COMPLETED. JUNE-2016

Completion of

1st floor structure

Page 4: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp-content/uploads/2016/07/Bodaiju-Site... · In conclusion we already complete the 1st Floor Concreting Work

©Torreya Asset Holdings Co., Ltd. Vol. 08 June 2016

Bodaiju Site Progress Report - Building A and B -

3

FOUNDATION COMPLETION – March 2016 PHOTOS OF PROGRESS COMPLETION

Page 5: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp-content/uploads/2016/07/Bodaiju-Site... · In conclusion we already complete the 1st Floor Concreting Work

©Torreya Asset Holdings Co., Ltd. Vol. 08 June 2016

Bodaiju Site Progress Report - Building A and B -

4

1 FL. SUPER-STRUCTURE COMPLETION-June 2016 PHOTOS OF PROGRESS COMPLETION

Page 6: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp-content/uploads/2016/07/Bodaiju-Site... · In conclusion we already complete the 1st Floor Concreting Work

©Torreya Asset Holdings Co., Ltd. Vol. 08 June 2016

Bodaiju Site Progress Report - Building A and B -

5

PHOTOS OF PROGRESS COMPLETION - 1 PHOTOS OF PROGRESS COMPLETION - 2

Page 7: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp-content/uploads/2016/07/Bodaiju-Site... · In conclusion we already complete the 1st Floor Concreting Work

©Torreya Asset Holdings Co., Ltd. Vol. 08 June 2016

Bodaiju Site Progress Report - Building A and B -

6

PHOTOS OF PROGRESS COMPLETION - 3 PHOTOS OF PROGRESS COMPLETION – 4

Page 8: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp-content/uploads/2016/07/Bodaiju-Site... · In conclusion we already complete the 1st Floor Concreting Work

©Torreya Asset Holdings Co., Ltd.

Bodaiju Site Progress Report - Building A and B -

7

RE-BAR FABRICATION (BUILDING A & B) FORM-WORK FABRICATION (BUILDING A & B)

Form-Work fabrication was completed for 1FL Super-StructureWork and we keep continue to fabricate for upper floor.

Re-Bar fabrication activities at our workshop in construction sitewhich completed the 1FL Super-Structure and we keep continuefor upper floor.

Vol. 08 June 2016

Page 9: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp-content/uploads/2016/07/Bodaiju-Site... · In conclusion we already complete the 1st Floor Concreting Work

©Torreya Asset Holdings Co., Ltd.

Bodaiju Site Progress Report - Building A and B -

8

1FL-BEAM & SLAB FORM WORK (BUILDING A & B) 1FL-BEAM & SLAB REINFORCEMENT (BUILDING A & B)

Reinforcement Work site activities of Building A & B on 1FLLevel of the buildings which completed.

1FL Beam and Slab Form Work installation activities in ourconstruction site. Currently we are preparing the Form Work forthe upper floor.

Vol. 08 June 2016

Page 10: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp-content/uploads/2016/07/Bodaiju-Site... · In conclusion we already complete the 1st Floor Concreting Work

©Torreya Asset Holdings Co., Ltd.

Bodaiju Site Progress Report - Building A and B -

9

1FL-RE-BAR CHECK & CLEANING (BUILDING A & B) 1FL-CONCRETE TEST AT SITEMixed Concrete was tested at site before concreting of 1FLLevel. We are following the quality standard to verify thequality from steps to steps in our construction site.

Our engineers are doing the proper check and cleaning beforecasting concrete. We keep checking to bring quality for ourvalued clients.

Vol. 08 June 2016

Page 11: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp-content/uploads/2016/07/Bodaiju-Site... · In conclusion we already complete the 1st Floor Concreting Work

©Torreya Asset Holdings Co., Ltd.

Bodaiju Site Progress Report - Building A and B -

10

1FL-MEP WORK (BUILDING A & B) 1F-CONCRETE WORK AT SITEConcrete Work for 1st Floor Level of Building A & B wascompleted in June 2016. This is our concrete casting activitiesat our construction site during night time.

Our engineer are laying the pipe for electricity in 1FL Slab beforeconcreting. This is MEP Work activity after checking and waitingfor concrete casting.

Vol. 08 June 2016

Page 12: CONSTRUCTION PROGRESS UPDATE - Bodaiju Residencesbodaiju-residences.com/wp-content/uploads/2016/07/Bodaiju-Site... · In conclusion we already complete the 1st Floor Concreting Work

©Torreya Asset Holdings Co., Ltd.

Bodaiju Site Progress Report - Building A and B -

11

SITE VIEWS (BUILDING A & B)

In conclusion we already complete the 1st Floor Concreting Work (1FL Super-Structure Work) for Building A & B by 30th June 2016 as we plan inour schedule. We keep working hard with the standard quality and on our schedule for our valued clients.

Vol. 08 June 2016

A1

A2

B1

B2

B1 View – Building B

B2 View – Building B

A1 View – Building A

A2 View – Building A


Recommended