Construction Update Oct, 2019 Sector- 73, Gurgaon Architecture & Design by:: UHA London the principal architect of this architectural masterpiece possess notably expertise in high rise structure and large scale mixed use developments.
Transcript
Page 1: Construction Update - Spaceworkx International · Today Callidora CHD Avenue 71 ILC Sattva. Entry/Exit ramp Completed 1. Ground floor -40% cast. 2. Ground Floor-90% shuttering done.

Construction UpdateOct, 2019

Sector- 73, Gurgaon

Architecture & Design by::UHA London – the principal architect of this architectural masterpiece possess notably expertise in high rise structure and large scale mixed use developments.

Page 2: Construction Update - Spaceworkx International · Today Callidora CHD Avenue 71 ILC Sattva. Entry/Exit ramp Completed 1. Ground floor -40% cast. 2. Ground Floor-90% shuttering done.

TATA PrimantiSignum71ILC SattvaCHD Avenue 71Today Callidora

Page 3: Construction Update - Spaceworkx International · Today Callidora CHD Avenue 71 ILC Sattva. Entry/Exit ramp Completed 1. Ground floor -40% cast. 2. Ground Floor-90% shuttering done.

Entry/Exit ramp Completed

1. Ground floor -40% cast.2. Ground Floor-90% shuttering done.

Page 4: Construction Update - Spaceworkx International · Today Callidora CHD Avenue 71 ILC Sattva. Entry/Exit ramp Completed 1. Ground floor -40% cast. 2. Ground Floor-90% shuttering done.

Suraj Public School

BMW Trainning

CenterM3M Experia Sales

Gallery

Page 5: Construction Update - Spaceworkx International · Today Callidora CHD Avenue 71 ILC Sattva. Entry/Exit ramp Completed 1. Ground floor -40% cast. 2. Ground Floor-90% shuttering done.

Staircase Area

Escalator