I. Final Inspection 4030/AFI/31/CV/135 A
II. Punch List 008/PF-NPU/PN/2009
III. Preparation Work
III.1. Material Inspection
- Checker Plate 4030/AFI/31/CV/105
III.2. Inspeksi Bersama Bore Pile Tk. 1 s/d Tk. 4 05-Area 31
IV. Bore Pile
IV. 1. Pouring Concrete Tk. 4 4030/AFI/31/CV/022
- Compression Strength Test Tk. 4 (Age 7 day) 4030/AFI/31/CV/036
- Compression Strength Test Tk. 4 (Age 14 day) 4030/AFI/31/CV/047
- Compression Strength Test Tk. 4 (Age 28 day) 4030/AFI/31/CV/073
IV. 2. Pouring Concrete Tk. 2 4030/AFI/31/CV/023
- Compression Strength Test Tk. 2 (Age 7 day) 4030/AFI/31/CV/038
- Compression Strength Test Tk. 2 (Age 14 day) 4030/AFI/31/CV/052
- Compression Strength Test Tk. 2 (Age 27 day) 4030/AFI/31/CV/074
IV. 3. Pouring Concrete Tk. 1 4030/AFI/31/CV/025
- Compression Strength Test Tk. 1 (Age 7 day) 4030/AFI/31/CV/040
- Compression Strength Test Tk. 1 (Age 14 day) 4030/AFI/31/CV/053
- Compression Strength Test Tk. 1 (Age 29 day) 4030/AFI/31/CV/077
IV. 4. Pouring Concrete Tk. 3 4030/AFI/31/CV/028
- Compression Strength Test Tk. 3 (Age 7 day) 4030/AFI/31/CV/044
- Compression Strength Test Tk. 3 (Age 14 day) 4030/AFI/31/CV/056
- Compression Strength Test Tk. 3 (Age 28 day) 4030/AFI/31/CV/083
V. Foundation
V.1. Lean Concrete 4030/AFI/31/CV/042
V. 2. Pouring Concrete (Footing Foundation) 4030/AFI/31/CV/046
- Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/059
- Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/075
- Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/100
V. 3. Pouring Concrete (Column & Beam Elev. + 6900) 4030/AFI/31/CV/082
- Compression Strength Test (Column & Beam Elev. + 6900) (Age 7 day) 4030/AFI/31/CV/099
- Compression Strength Test (Column & Beam Elev. + 6900) (Age 14 day) 4030/AFI/31/CV/109
- Compression Strength Test (Column & Beam Elev. + 6900) (Age 28 day) 4030/AFI/31/CV/127
V. 4. Pouring Concrete (Column Elev. + 6900 to Elev. + 8200) 4030/AFI/31/CV/098
- Compression Strength Test (Column Elev. +6900 to Elev. +8200) (Age 7 day) 4030/AFI/31/CV/108- Compression Strength Test (Column Elev. +6900 to Elev. +8200) (Age 14 day) 4030/AFI/31/CV/120
- Compression Strength Test (Column Elev. +6900 to Elev. +8200) (Age 28 day) 4030/AFI/31/CV/134
Mechanical Completion Facilities as Per Discrete Unit
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI
BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE 31-E-113
Konsorsium KE - SBS
REMARKSDOCUMENTS
Page 1 of 26
7/29/2019 Content List Civil Structure
2/26
DOCUMENT No.
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI
BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE 31-E-113
Konsorsium KE - SBS
REMARKSDOCUMENTS
V. 5. Anchor Bolt Installation 4030/AFI/31/CV/095
V. 6. Padding Installation 4030/AFI/31/CV/176
V. 7. Grouting Inspection 4030/AFI/31/CV/208
VI. Steel Structure
VI.1. Steel Frame Structure ( Dimensional and Measurement ) 4030/AFI/31/CV/096
VI.2. Painting Inspection 4030/AFI/31/CV/114 A
Page 2 of 26
7/29/2019 Content List Civil Structure
3/26
DOCUMENT No.
I. Final Inspection 4030/AFI/31/CV/135 D
II. Punch List 003/PF-NPU/PN/2009
III. Preparation Work
III. 1. Material Inspection
- Anchor Bolt 4030/AFI/31/CV/082 A
III. 2. Inspection Manual Digging Tk. 19 s/d Tk. 24 02-Area 31
III. 3. Inspeksi Bersama Titik Pile Tk. 19 s/d Tk. 24 10-Area 31
IV. Pilling ( Hydrolic Pile Injection )
IV.1. Pile No. 19 10 B-Area 31
IV.2. Pile No. 20 10 B-Area 31
IV.3. Pile No. 21 10 B-Area 31
IV.4. Pile No. 22 12 B-Area 31
IV.5. Pile No. 23 12 B-Area 31
IV.6. Pile No. 24 12 B-Area 31
V. Foundation
V.1. Lean Concrete 4030/AFI/31/CV/032
V. 2. Pouring Concrete (Footing Foundation) 4030/AFI/31/CV/063- Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/078
- Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/091
- Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/118
V. 3. Pouring Concrete (Column & Beam ) 4030/AFI/31/CV/086
- Compression Strength Test (Column & Beam ) (Age 7 day) 4030/AFI/31/CV/103
- Compression Strength Test (Column & Beam ) (Age 14 day) 4030/AFI/31/CV/115
- Compression Strength Test (Column & Beam ) (Age 28 day) 4030/AFI/31/CV/130
V.4. Anchor Bolt Installation 4030/AFI/31/CV/093
V.5. Padding Installation 4030/AFI/31/CV/183
V. 6. Grouting Inspection 4030/AFI/31/CV/216
VI. Steel Structure
VI.1. Dimensional and Painting Inspection 4030/AFI/31/CV/223 C
CONTAIN LIST OF CIVIL STRUCTURE 31-E-111 A
DOCUMENTS
Mechanical Completion Facilities as Per Discrete Unit
REMARKS
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-
VI BALONGANKonsorsium KE - SBS
Page 3 of 26
7/29/2019 Content List Civil Structure
4/26
DOCUMENT No.
I. Final Inspection 4030/AFI/31/CV/135 C
II. Punch List 002/PF-NPU/PN/2009
III. Preparation Work
III. 1. Inspection Manual Digging Tk. 13 s/d Tk. 15 03-Area 31
III. 2. Inspection Manual Digging Tk. 16 s/d Tk. 18 07-Area 31
III. 3. Inspeksi Bersama Titik Pile Tk. 13 s/d Tk. 15 09-Area 31
III. 4. Inspeksi Bersama Titik Pile Tk. 16 s/d Tk. 18 11-Area 31
IV. Pilling ( Hydrolic Pile Injection )
IV.1. Pile No. 13 14 A-Area 31
IV.2. Pile No. 14 14 A-Area 31
IV.3. Pile No. 15 14 A-Area 31
IV.4. Pile No. 16 12 C-Area 31
IV.5. Pile No. 17 12 C-Area 31
IV.6. Pile No. 18 12 C-Area 31
V. Foundation
V.1. Lean Concrete 4030/AFI/31/CV/033
V. 2. Pouring Concrete (Footing Foundation) 4030/AFI/31/CV/064
- Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/079
- Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/092
- Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/119
V. 3. Pouring Concrete (Column & Beam ) 4030/AFI/31/CV/087
- Compression Strength Test (Column & Beam ) (Age 7 day) 4030/AFI/31/CV/104
- Compression Strength Test (Column & Beam ) (Age 14 day) 4030/AFI/31/CV/116
- Compression Strength Test (Column & Beam ) (Age 28 day) 4030/AFI/31/CV/131
V.4. Anchor Bolt Installation 4030/AFI/31/CV/094
V.5. Padding Installation 4030/AFI/31/CV/184
V.6. Grouting Inspection 4030/AFI/31/CV/209
VI. Steel Structure
VI.1. Dimensional and Painting Inspection 4030/AFI/31/CV/223 D
REMARKS
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-
VI BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE 31-E-111 B
DOCUMENTS
Mechanical Completion Facilities as Per Discrete Unit
PROYEK :
Konsorsium KE - SBS
Page 4 of 26
7/29/2019 Content List Civil Structure
5/26
DOCUMENT No
I. Final Inspection 4030/AFI/31/CV/2
II. Punch List N/A
III. Preparation Work
III. 1. Inspection Manual Digging Tk. 35 s/d Tk. 36 4030/AFI/31/CV/
IV. Bore PileIV. 1. Pouring Concrete Tk. 35 4030/AFI/31/CV/
- Compression Strength Test Tk. 35 (Age 7 day) 4030/AFI/31/CV/
- Compression Strength Test Tk. 35 (Age 14 day) 4030/AFI/31/CV/
- Compression Strength Test Tk. 35 (Age 28 day) 4030/AFI/31/CV/
IV. 2. Pouring Concrete Tk. 36 4030/AFI/31/CV/
- Compression Strength Test Tk. 36 (Age 7 day) 4030/AFI/31/CV/
- Compression Strength Test Tk. 36 (Age 14 day) 4030/AFI/31/CV/
- Compression Strength Test Tk. 36 (Age 27 day) 4030/AFI/31/CV/
V. Foundation
V.1. Lean Concrete 4030/AFI/31/CV/
V. 2. Pouring Concrete (Footing Foundation) 4030/AFI/31/CV/
- Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/
- Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/
- Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/
V.3. Padding Installation 4030/AFI/31/CV/
V.4. Grouting Inspection 4030/AFI/31/CV/
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI
BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE 31-P-113 A/B
Konsorsium KE - SBS
DOCUMENTS
Mechanical Completion Facilities as Per Discrete Unit
7/29/2019 Content List Civil Structure
6/26
DOCUMENT No.
I. Final Inspection 4030/AFI/31/CV/23
II. Punch List N/A
III. Preparation Work
III. 1. Inspection Manual Digging Tk. 31 s/d Tk. 34 4030/AFI/31/CV/0
IV. Bore Pile
IV. 1. Pouring Concrete Tk. 32 4030/AFI/31/CV/0
- Compression Strength Test Tk. 32 (Age 7 day) 4030/AFI/31/CV/0
- Compression Strength Test Tk. 32 (Age 14 day) 4030/AFI/31/CV/0
- Compression Strength Test Tk. 32 (Age 28 day) 4030/AFI/31/CV/0
IV. 2. Pouring Concrete Tk. 31 4030/AFI/31/CV/0
- Compression Strength Test Tk. 31 (Age 7 day) 4030/AFI/31/CV/0
- Compression Strength Test Tk. 31 (Age 14 day) 4030/AFI/31/CV/0
- Compression Strength Test Tk. 31 (Age 27 day) 4030/AFI/31/CV/0
IV. 3. Pouring Concrete Tk. 34 4030/AFI/31/CV/0
- Compression Strength Test Tk. 34 (Age 7 day) 4030/AFI/31/CV/0
- Compression Strength Test Tk. 34 (Age 14 day) 4030/AFI/31/CV/0
- Compression Strength Test Tk. 34 (Age 27 day) 4030/AFI/31/CV/0
IV. 4. Pouring Concrete Tk. 33 4030/AFI/31/CV/0
- Compression Strength Test Tk. 33 (Age 7 day) 4030/AFI/31/CV/0
- Compression Strength Test Tk. 33 (Age 14 day) 4030/AFI/31/CV/0
- Compression Strength Test Tk. 33 (Age 27 day) 4030/AFI/31/CV/0
V. Foundation
V.1. Lean Concrete 4030/AFI/31/CV/0
V. 2. Pouring Concrete (Footing Foundation) 4030/AFI/31/CV/0
- Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/0
- Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/0
- Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/1
V.3. Padding Installation 4030/AFI/31/CV/2
V.4. Grouting Inspection 4030/AFI/31/CV/2
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI
BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE 31-P-112 A/B
Konsorsium KE - SBS
DOCUMENTS
Mechanical Completion Facilities as Per Discrete Unit
7/29/2019 Content List Civil Structure
7/26
7/29/2019 Content List Civil Structure
8/26
DOCUMENT No.
I. Final Inspection 4030/AFI/31/CV/135 B
II. Punch List 004/PF-NPU/PN/2009
III. Preparation Work
III. 1. Inspection Manual Digging Tk. 5 s/d Tk. 12 01-Area 31
III. 2. Inspeksi Bersama Titik Pile Tk. 5 s/d Tk. 12 08 A-Area 31
IV. Pilling ( Hydrolic Pile Injection )IV.1. Pile No. 5 08 C-Area 31
IV.2. Pile No. 6 08 B-Area 31
IV.3. Pile No. 7 10 A-Area 31
IV.4. Pile No. 8 10 A-Area 31
IV.5. Pile No. 9 10 A-Area 31
IV.6. Pile No. 10 10 A-Area 31
IV.7. Pile No. 11 08 C-Area 31
IV.8. Pile No. 12 08 C-Area 31
V. Foundation
V.1. Lean Concrete 4030/AFI/31/CV/030
V. 2. Pouring Concrete (Footing Foundation) 4030/AFI/31/CV/051
- Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/060
- Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/076
- Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/101
V. 3. Pouring Concrete (Slab Elev. + 4000) 4030/AFI/31/CV/112
- Compression Strength Test (Slab Elev. + 4000) (Age 7 day) 4030/AFI/31/CV/125
- Compression Strength Test (Slab Elev. + 4000) (Age 14 day) 4030/AFI/31/CV/133
- Compression Strength Test (Slab Elev. + 4000) (Age 28 day) 4030/AFI/31/CV/141
V. 4. Pouring Concrete (Ring Pedestal Elev. + 5300) 4030/AFI/31/CV/123
- Compression Strength Test (Ring Pedestal Elev. + 5300) (Age 7 day) 4030/AFI/31/CV/129- Compression Strength Test (Ring Pedestal Elev. + 5300) (Age 14 day) 4030/AFI/31/CV/136
- Compression Strength Test (Ring Pedestal Elev. + 5300) (Age 28 day) 4030/AFI/31/CV/148
V. 5. Anchor Bolt Installation 4030/AFI/31/CV/106
V. 6. Padding Installation 4030/AFI/31/CV/195
4030/AFI/31/CV/213 A
V. 7. Grouting Inspection 4030/AFI/31/CV/215
V. 8. Fire Proofing Inspection 4030/AFI/31/CV/225
VI. Steel Structure
VI.1. Dimensional and Painting Inspection 4030/AFI/31/CV/223 B
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE 31-C-104
Konsorsium KE - SBS
DOCUMENTS
Mechanical Completion Facilities as Per Discrete Unit
REMA
Page 8 of 26
7/29/2019 Content List Civil Structure
9/26
KS
Page 9 of 26
7/29/2019 Content List Civil Structure
10/26
DOCUMENT No.
I. Punch List 007/PF-NPU/PN/2009
II. Preparation Work
II.1. Welder Test PT. Purba Karya Baja (for AWS D1.1 Plat A 36 Posisi 3 G) 4030/AFI/31/L/014
II.2. Material Inspection
- Material Inspection For Steel Structure 4030/AFI/31/CV/150 A
II.3. Material Inspection
- Chemical Bolt 4030/AFI/31/CV/197
II.4. Material Inspection
- Material Fire Proofing 4030/AFI/31/CV/219
III. Steel Structure
III.1. Anchor Installation Inspection 4030/AFI/42/CV/201
III.2. Anchor Installation Inspection 4030/AFI/42/CV/207
III.3. Fire Proofing Inspection 4030/AFI/42/CV/220
III.4. Dimensional and Painting Inspection 4030/AFI/42/CV/223 A
REMARKSDOCUMENTS
Mechanical Completion Facilities as Per Discrete Unit
Konsorsium KE - SBS
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI
BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE 31-E-112
Page 10 of 26
7/29/2019 Content List Civil Structure
11/26
DOCUMENT No.
I. Final Inspection 4030/AFI/31/CV/211 A
II. Punch List 006/PF-NPU/PN/2009
III. Preparation Work
III. 1. Material Inspection
- Rebar D 10 (P) ; Rebar D 13 (S) ; Rebar D 16 (S) 4030/AFI/31/CV/138
III.2. Material Inspection
- Anchor Bolt (400 x dia. 24) mm 4030/AFI/31/CV/173
III.3. Inspection Manual Digging Tk. 39, Tk. 40, Tk. 42 4030/AFI/31/CV/139
III.4. Inspection Manual Digging Tk. 41, Tk. 43 , Tk. 44, Tk. 45, Tk. 46 4030/AFI/31/CV/140
IV. Bore Pile
IV. 1. Pouring Concrete Tk. 39 4030/AFI/31/CV/143
- Compression Strength Test Tk. 39 (Age 7 day) 4030/AFI/31/CV/152
- Compression Strength Test Tk. 39 (Age 14 day) 4030/AFI/31/CV/164
- Compression Strength Test Tk. 39 (Age 28 day) 4030/AFI/31/CV/186
IV. 2. Pouring Concrete Tk. 40 4030/AFI/31/CV/145
- Compression Strength Test Tk. 40 (Age 7 day) 4030/AFI/31/CV/155
- Compression Strength Test Tk. 40 (Age 14 day) 4030/AFI/31/CV/172
- Compression Strength Test Tk. 40 (Age 27 day) 4030/AFI/31/CV/187
IV. 3. Pouring Concrete Tk. 41 4030/AFI/31/CV/146
- Compression Strength Test Tk. 41 (Age 7 day) 4030/AFI/31/CV/157
- Compression Strength Test Tk. 41 (Age 14 day) 4030/AFI/31/CV/174
- Compression Strength Test Tk. 41 (Age 29 day) 4030/AFI/31/CV/185
IV. 4. Pouring Concrete Tk. 42 4030/AFI/31/CV/150
- Compression Strength Test Tk. 42 (Age 7 day) 4030/AFI/31/CV/158
- Compression Strength Test Tk. 42 (Age 14 day) 4030/AFI/31/CV/177
- Compression Strength Test Tk. 42 (Age 28 day) 4030/AFI/31/CV/188
IV. 5. Pouring Concrete Tk. 44 4030/AFI/31/CV/151
- Compression Strength Test Tk. 44 (Age 7 day) 4030/AFI/31/CV/163
- Compression Strength Test Tk. 44 (Age 14 day) 4030/AFI/31/CV/179
- Compression Strength Test Tk. 44 (Age 28 day) 4030/AFI/31/CV/189
IV. 6. Pouring Concrete Tk. 43 4030/AFI/31/CV/153
- Compression Strength Test Tk. 43 (Age 7 day) 4030/AFI/31/CV/169
- Compression Strength Test Tk. 43 (Age 14 day) 4030/AFI/31/CV/180
- Compression Strength Test Tk. 43 (Age 28 day) 4030/AFI/31/CV/191
IV. 7. Pouring Concrete Tk. 46 4030/AFI/31/CV/154
- Compression Strength Test Tk. 46 (Age 7 day) 4030/AFI/31/CV/171
- Compression Strength Test Tk. 46 (Age 14 day) 4030/AFI/31/CV/181
- Compression Strength Test Tk. 46 (Age 28 day) 4030/AFI/31/CV/192
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI
BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE East Pipe Rack
DOCUMENTS
Konsorsium KE - SBS
Mechanical Completion Facilities as Per Discrete Unit
REMA
Page 11 of 26
7/29/2019 Content List Civil Structure
12/26
DOCUMENT No.
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI
BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE East Pipe Rack
DOCUMENTS
Konsorsium KE - SBS
REMA
IV. 8. Pouring Concrete Tk. 45 4030/AFI/31/CV/156
- Compression Strength Test Tk. 45 (Age 7 day) 4030/AFI/31/CV/175
- Compression Strength Test Tk. 45 (Age 14 day) 4030/AFI/31/CV/182
- Compression Strength Test Tk. 45 (Age 28 day) 4030/AFI/31/CV/194
V. Foundation
V.1. Lean Concrete
- Lean Concrete Tk. 39 4030/AFI/31/CV/159
- Lean Concrete Tk. 40 4030/AFI/31/CV/160
- Lean Concrete Tk. 41 4030/AFI/31/CV/161
- Lean Concrete Tk. 42 4030/AFI/31/CV/162
- Lean Concrete Tk. 43 4030/AFI/31/CV/165
- Lean Concrete Tk. 44 4030/AFI/31/CV/166
- Lean Concrete Tk. 45 4030/AFI/31/CV/167
- Lean Concrete Tk. 46 4030/AFI/31/CV/168
V. 2. Pouring Concrete Tk.39-Tk.44, Tk.46 (Footing Foundation) 4030/AFI/31/CV/170
- Compression Strength Test Tk.39-Tk.42 (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/193
- Compression Strength Test Tk.43-Tk.46 (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/196
- Compression Strength Test Tk.39-Tk.42 (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/199
- Compression Strength Test Tk.43-Tk.46 (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/200
- Compression Strength Test Tk.39-Tk.42 (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/205
- Compression Strength Test Tk.43-Tk.46 (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/206
V. 3. Pouring Concrete Tk. 45 (Footing Foundation) 4030/AFI/31/CV/198
- Compression Strength Test Tk. 45 (Footing Foundation) (Age 7 day) 4030/AFI/31/CV/203
- Compression Strength Test Tk. 45 (Footing Foundation) (Age 14 day) 4030/AFI/31/CV/204
- Compression Strength Test Tk. 45 (Footing Foundation) (Age 28 day) 4030/AFI/31/CV/211
V. 4. Padding Installation 4030/AFI/31/CV/214
V. 5. Grouting Inspection 4030/AFI/31/CV/221
VI. Steel Structure
VI.1. Dimensional and Painting Inspection 4030/AFI/31/CV/223 E
Page 12 of 26
7/29/2019 Content List Civil Structure
13/26
KS
Page 13 of 26
7/29/2019 Content List Civil Structure
14/26
KS
Page 14 of 26
7/29/2019 Content List Civil Structure
15/26
DOCUMENT No.
I. Preparation Work
I. 1. Material Inspection
- Pipa Bertulang kelas B 01 - Area 31
I.2. Manual Digging at Crossing Road 14 4030/AFI/31/CV/005
I.3. Back Fill ( Sub Grade ) 4030/AFI/31/CV/019
- CBR Test 4030/AFI/31/CV/018
I.4. Back Fill ( Sub Base Course ) 4030/AFI/31/CV/024- CBR Test 4030/AFI/31/CV/025
I.5. Back Fill ( Base Course ) 4030/AFI/31/CV/020
- CBR Test 4030/AFI/31/CV/028
I.6. Asphalt Inspection 4030/AFI/31/CV/029
II. Pouring Concrete
II.1. Pouring Concrete Open Ditch Road 14 03 - Area 31
- Compression Strength Test Open Ditch Road 14 (Age 7 day) 04 - Area 31
- Compression Strength Test Open Ditch Road 14 (Age 14 day) 4030/AFI/31/CV/006
- Compression Strength Test Open Ditch Road 14 (Age 28 day) 4030/AFI/31/CV/007
II.2. Pouring Concrete Cable Protection ( Instrument & Cable Optic ) 4030/AFI/31/CV/008
- Compression Strength Test Cable Protect ion ( Instrument & Cable Optic ) (Age 7 day) 4030/AFI/31/CV/010
- Compression Strength Test Cable Protection ( Instrument & Cable Optic ) (Age 14 day) 4030/AFI/31/CV/013
- Compression Strength Test Cable Protection ( Instrument & Cable Optic ) (Age 28 day) 4030/AFI/31/CV/021
II.3. Pouring Concrete New Drainage & Cable Protection 4030/AFI/31/CV/009
- Compression Strength Test New Drainage & Cable Protection (Age 7 day) 4030/AFI/31/CV/012
- Compression Strength Test New Drainage & Cable Protection (Age 14 day) 4030/AFI/31/CV/015
- Compression Strength Test New Drainage & Cable Protection (Age 28 day) 4030/AFI/31/CV/022
II.4. Pouring Concrete New Drainage & Cable Protection ( Slab ) 4030/AFI/31/CV/011
- Compression Strength Test New Drainage & Cable Protection ( Slab ) (Age 7 day) 4030/AFI/31/CV/014
- Compression Strength Test New Drainage & Cable Protection ( Slab ) (Age 14 day) 4030/AFI/31/CV/017
- Compression Strength Test New Drainage & Cable Protection ( Slab ) (Age 28 day) 4030/AFI/31/CV/026
II.5. Pouring Concrete Talud 4030/AFI/31/CV/031
- Compression Strength Test Talud (Age 7 day) 4030/AFI/31/CV/032
- Compression Strength Test Talud (Age 14 day) 4030/AFI/31/CV/033
- Compression Strength Test Talud (Age 28 day) 4030/AFI/31/CV/034
II.6. Pouring Concrete Pavement 31-E-113 4030/AFI/31/CV/226
- Compression Strength Test Pavement 31-E-113 (Age 7 day) 4030/AFI/31/CV/227
- Compression Strength Test Pavement 31-E-113 (Age 14 day) 4030/AFI/31/CV/232
- Compression Strength Test Pavement 31-E-113 (Age 28 day) 4030/AFI/31/CV/244
Konsorsium KE - SBS
DOCUMENTS
Mechanical Completion Facilities as Per Discrete Unit
REMA
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE (Civil Work Area-31)
Page 15 of 26
7/29/2019 Content List Civil Structure
16/26
DOCUMENT No.
Konsorsium KE - SBS
DOCUMENTS REMA
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE (Civil Work Area-31)
II.7. Pouring Concrete Cable Trench 4030/AFI/31/CV/228- Compression Strength Test Cable Trench (Age 7 day) 4030/AFI/31/CV/235
- Compression Strength Test Cable Trench (Age 14 day) 4030/AFI/31/CV/240
- Compression Strength Test Cable Trench (Age 28 day) 4030/AFI/31/CV/250
II.8. Pouring Concrete Cable Trench 4030/AFI/31/CV/231
- Compression Strength Test Cable Trench (Age 7 day) 4030/AFI/31/CV/238
- Compression Strength Test Cable Trench (Age 14 day) 4030/AFI/31/CV/241
- Compression Strength Test Cable Trench (Age 28 day) 4030/AFI/31/CV/254
II.9. Pouring Concrete Pavement 31-V-108 4030/AFI/31/CV/233
- Compression Strength Test Pavement 31-V-108 (Age 7 day) 4030/AFI/31/CV/239 A
- Compression Strength Test Pavement 31-V-108 (Age 14 day) 4030/AFI/31/CV/245- Compression Strength Test Pavement 31-V-108 (Age 28 day) 4030/AFI/31/CV/256
II.10. Pouring Concrete Pipe Sleeper 4030/AFI/31/CV/239
- Compression Strength Test Pipe Sleeper (Age 7 day) 4030/AFI/31/CV/242
- Compression Strength Test Pipe Sleeper (Age 14 day) 4030/AFI/31/CV/247
- Compression Strength Test Pipe Sleeper (Age 28 day) 4030/AFI/31/CV/259
II.11. Pouring Concrete Pavement 31-E-111 A 4030/AFI/31/CV/243
- Compression Strength Test Pavement 31-E-111 A (Age 7 day) 4030/AFI/31/CV/252
- Compression Strength Test Pavement 31-E-111 A (Age 14 day) 4030/AFI/31/CV/257
- Compression Strength Test Pavement 31-E-111 A (Age 28 day) 4030/AFI/31/CV/261
II.12. Pouring Concrete Pavement 31-C-104 4030/AFI/31/CV/246
- Compression Strength Test Pavement 31-C-104 (Age 7 day) 4030/AFI/31/CV/253
- Compression Strength Test Pavement 31-C-104 (Age 14 day) 4030/AFI/31/CV/258
- Compression Strength Test Pavement 31-C-104 (Age 28 day) 4030/AFI/31/CV/262
II.13. Pouring Concrete Pavement 31-E-111 B 4030/AFI/31/CV/248
- Compression Strength Test Pavement 31-E-111 B (Age 7 day) 4030/AFI/31/CV/255
- Compression Strength Test Pavement 31-E-111 B (Age 14 day) 4030/AFI/31/CV/260
- Compression Strength Test Pavement 31-E-111 B (Age 28 day) 4030/AFI/31/CV/263
Page 16 of 26
7/29/2019 Content List Civil Structure
17/26
KS
Page 17 of 26
7/29/2019 Content List Civil Structure
18/26
KS
Page 18 of 26
7/29/2019 Content List Civil Structure
19/26
DOCUMENT No.
I. Preparation Work
I.1. Material Inspection
- UNP 150x75x6,5 ; UNP 50x38x5 ; etc 4030/AFI/42/CV/018
I.2. Material Inspection
- Pipa Beton 1200 R x 2500 kelas L (BS), Rubber Ring 1200 Type NH 4030/AFI/42/CV/019
I.3. Material Inspection
- Rebar D 16 ; Rebar D 13 ; Rebar D 10 4030/AFI/42/CV/045
I.4. Material Inspection
- UNP 125 x 65 x 6 4030/AFI/42/CV/050
I.5. Material Inspection
- Rebar 13, Rebar 10, etc. 4030/AFI/42/CV/069 A
II. Pouring Concrete
II. 1. Pouring Concrete Box Culvert ( for Oil Spillway ) 4030/AFI/42/CV/020
- Compression Strength Test Box Culvert ( for Oil Spillway ) (Age 7 day) 4030/AFI/42/CV/022
- Compression Strength Test Box Culvert ( for Oil Spillway ) (Age 14 day) 4030/AFI/42/CV/025
- Compression Strength Test Box Culvert ( for Oil Spillway ) (Age 28 day) 4030/AFI/42/CV/028
II. 2. Pouring Concrete Oil Spillway Control Box ( South Side ) 4030/AFI/42/CV/027
- Compression Strength Test Oil Spillway ( South Side ) (Age 7 day) 4030/AFI/42/CV/033
- Compression Strength Test Oil Spillway ( South Side ) (Age 14 day) 4030/AFI/42/CV/036
- Compression Strength Test Oil Spillway ( South Side ) (Age 28 day) 4030/AFI/42/CV/042
II. 3. Pouring Concrete Oil Spillway Control Box ( South Side ) 4030/AFI/42/CV/030
- Compression Strength Test Oil Spillway ( South Side ) (Age 7 day) 4030/AFI/42/CV/034
- Compression Strength Test Oil Spillway ( South Side ) (Age 14 day) 4030/AFI/42/CV/037
- Compression Strength Test Oil Spillway ( South Side ) (Age 28 day) 4030/AFI/42/CV/043
II. 4. Pouring Concrete Oil Spillway Control Box ( North Side ) Elev. -1761 up to +450 4030/AFI/42/CV/031
- Compression Strength Test Oil Spillway ( North Side ) Elev. -1761 up to +450 (Age 7 day) 4030/AFI/42/CV/038
- Compression Strength Test Oil Spillway ( North Side ) Elev. -1761 up to +450 (Age 14 day) 4030/AFI/42/CV/039
- Compression Strength Test Oil Spillway ( North Side ) Elev. -1761 up to +450 (Age 28 day) 4030/AFI/42/CV/044
II. 5. Pouring Concrete Oil Spi llway Control Box ( North Side ) Elev. +450 up to + 1705 4030/AFI/42/CV/032 A
- Compression Strength Test Oil Spillway ( North Side ) Elev. +450 up to +1705 (Age 7 day) 4030/AFI/42/CV/035
- Compression Strength Test Oil Spillway ( North Side ) Elev. +450 up to +1705 (Age 14 day) 4030/AFI/42/CV/040
- Compression Strength Test Oil Spillway ( North Side ) Elev. +450 up to +1705 (Age 28 day) 4030/AFI/42/CV/046
II. 6. Pouring Concrete Box Culvert - Bottom ( for Pipe Sleeper ) 4030/AFI/42/CV/048
- Compression Strength Test Box Culvert - Bottom ( for Pipe Sleeper ) (Age 7 day) 4030/AFI/42/CV/051
- Compression Strength Test Box Culvert - Bottom ( for Pipe Sleeper ) (Age 14 day) 4030/AFI/42/CV/055
- Compression Strength Test Box Culvert - Bottom ( for Pipe Sleeper ) (Age 28 day) 4030/AFI/42/CV/065
II. 7. Pouring Concrete Box Culvert - Top ( for Pipe Sleeper ) 4030/AFI/42/CV/049
- Compression Strength Test Box Culvert - Top ( for Pipe Sleeper ) (Age 7 day) 4030/AFI/42/CV/052
- Compression Strength Test Box Culvert - Top ( for Pipe Sleeper ) (Age 14 day) 4030/AFI/42/CV/058
- Compression Strength Test Box Culvert - Top ( for Pipe Sleeper ) (Age 28 day) 4030/AFI/42/CV/070
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE (Civil Work Area-42)
Konsorsium KE - SBS
REMARKSDOCUMENTS
Mechanical Completion Facilities as Per Discrete Unit
Page 19 of 26
7/29/2019 Content List Civil Structure
20/26
DOCUMENT No.
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE (Civil Work Area-42)
Konsorsium KE - SBS
REMARKSDOCUMENTS
II. 8. Pouring Concrete for Pipe Sleeper Type I 4030/AFI/42/CV/053- Compression Strength Test for Pipe Sleeper Type I (Age 7 day) 4030/AFI/42/CV/059
- Compression Strength Test for Pipe Sleeper Type I (Age 14 day) 4030/AFI/42/CV/064
- Compression Strength Test for Pipe Sleeper Type I (Age 28 day) 4030/AFI/42/CV/076
II. 9. Pouring Concrete for Pipe Sleeper Type I, II, III, IV, V, V A 4030/AFI/42/CV/057
- Compression Strength Test for Pipe Sleeper Type I, II, III, IV, V, V A (Age 7 day) 4030/AFI/42/CV/063
- Compression Strength Test for Pipe Sleeper Type I, II, III, IV, V, V A (Age 14 day) 4030/AFI/42/CV/071
- Compression Strength Test for Pipe Sleeper Type I, II, III, IV, V, V A (Age 28 day) 4030/AFI/42/CV/083
II. 10. Pouring Concrete for Pipe Sleeper Type I ( PS 1 - 15, 29 ) 4030/AFI/42/CV/060
- Compression Strength Test for Pipe Sleeper Type I ( PS 1 - 15, 29 ) (Age 7 day) 4030/AFI/42/CV/066
- Compression Strength Test for Pipe Sleeper Type I ( PS 1 - 15, 29 ) (Age 14 day) 4030/AFI/42/CV/073
- Compression Strength Test for Pipe Sleeper Type I ( PS 1 - 15, 29 ) (Age 28 day) 4030/AFI/42/CV/084
II. 11. Pouring Concrete for Pipe Sleeper Type I and Type II 4030/AFI/42/CV/061
- Compression Strength Test for Pipe Sleeper Type I and Type II (Age 7 day) 4030/AFI/42/CV/069
- Compression Strength Test for Pipe Sleeper Type I and Type II (Age 14 day) 4030/AFI/42/CV/074
- Compression Strength Test for Pipe Sleeper Type I and Type II (Age 28 day) 4030/AFI/42/CV/085
II.12. Pouring Concrete for Pipe Sleeper Type I and Type II 4030/AFI/42/CV/062
- Compression Strength Test for Pipe Sleeper Type I and Type II (Age 7 day) 4030/AFI/42/CV/072
- Compression Strength Test for Pipe Sleeper Type I and Type II (Age 14 day) 4030/AFI/42/CV/077
- Compression Strength Test for Pipe Sleeper Type I and Type II (Age 28 day) 4030/AFI/42/CV/087
II.13. Pouring Concrete for Pipe Sleeper Type F1, F2, II, VA, VI, VII, VIII, IX 4030/AFI/42/CV/068
- Compression Strength Test for Pipe Sleeper Type F1, F2, II, VA, VI, VII, VIII, IX (Age 7 day) 4030/AFI/42/CV/075
- Compression Strength Test for Pipe Sleeper Type F1, F2, II, VA, VI, VII, VIII, IX (Age 14 day) 4030/AFI/42/CV/079
- Compression Strength Test for Pipe Sleeper Type F1, F2, II, VA, VI, VII, VIII, IX (Age 28 day) 4030/AFI/42/CV/091
II.14. Pouring Concrete for Pipe Sleeper Type XIX 4030/AFI/42/CV/078
- Compression Strength Test for Pipe Sleeper Type XIX (Age 7 day) 4030/AFI/42/CV/081
- Compression Strength Test for Pipe Sleeper Type XIX (Age 14 day) 4030/AFI/42/CV/088
- Compression Strength Test for Pipe Sleeper Type XIX (Age 28 day) 4030/AFI/42/CV/099
II.15. Pouring Concrete for Pipe Sleeper Type XIX 4030/AFI/42/CV/079
- Compression Strength Test for Pipe Sleeper Type XIX (Age 7 day) 4030/AFI/42/CV/086
- Compression Strength Test for Pipe Sleeper Type XIX (Age 14 day) 4030/AFI/42/CV/092
- Compression Strength Test for Pipe Sleeper Type XIX (Age 28 day) 4030/AFI/42/CV/102
II.16. Pouring Concrete for Pipe Sleeper Type XIX, XVIII, XVII, XVI, XV 4030/AFI/42/CV/080
- Compression Strength Test for Pipe Sleeper Type XIX, XVIII, XVII, XVI, XV (Age 7 day) 4030/AFI/42/CV/089
- Compression Strength Test for Pipe Sleeper Type XIX, XVIII, XVII, XVI, XV (Age 14 day) 4030/AFI/42/CV/095
- Compression Strength Test for Pipe Sleeper Type XIX, XVIII, XVII, XVI, XV (Age 28 day) 4030/AFI/42/CV/104
II.17. Pouring Concrete for Pipe Sleeper Type XI, XII, XIII, XIV, XV, VI, XVII, V 4030/AFI/42/CV/082
- Compression Strength Test for Pipe Sleeper Type XI, XII, XIII, XIV, XV, VI, XVII, V (Age 7 day) 4030/AFI/42/CV/090
- Compression Strength Test for Pipe Sleeper Type XI, XII, XIII, XIV, XV, VI, XVII, V (Age 14 day) 4030/AFI/42/CV/096
- Compression Strength Test for Pipe Sleeper Type XI, XII, XIII, XIV, XV, VI, XVII, V (Age 28 day) 4030/AFI/42/CV/106
Page 20 of 26
7/29/2019 Content List Civil Structure
21/26
DOCUMENT No.
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE (Civil Work Area-42)
Konsorsium KE - SBS
REMARKSDOCUMENTS
II.18. Pouring Concrete for Reinforcement Pipe Sleeper Type II 4030/AFI/42/CV/093- Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 7 day) 4030/AFI/42/CV/098
- Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 14 day) 4030/AFI/42/CV/103
- Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 28 day) 4030/AFI/42/CV/110 A
II.19. Pouring Concrete for Reinforcement Pipe Sleeper Type II 4030/AFI/42/CV/094
- Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 7 day) 4030/AFI/42/CV/100
- Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 14 day) 4030/AFI/42/CV/105
- Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 28 day) 4030/AFI/42/CV/112
II.20. Pouring Concrete for Reinforcement Pipe Sleeper Type II 4030/AFI/42/CV/097
- Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 7 day) 4030/AFI/42/CV/101
- Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 14 day) 4030/AFI/42/CV/107- Compression Strength Test for Reinforcement Pipe Sleeper Type II (Age 28 day) 4030/AFI/42/CV/114
II.21. Pouring Concrete for Maintenance Acces 4030/AFI/42/CV/109
- Compression Strength Test for Maintenance Acces (Age 7 day) 4030/AFI/42/CV/113
- Compression Strength Test for Maintenance Acces (Age 14 day) 4030/AFI/42/CV/116
- Compression Strength Test for Maintenance Acces (Age 28 day) 4030/AFI/42/CV/117
Page 21 of 26
7/29/2019 Content List Civil Structure
22/26
DOCUMENT
I. Final Inspection 4030/AFI/42/CV
II. Punch List N/A
III. Preparation Work
III. 1. Inspection Manual Digging Tk. 37 & Tk. 38 4030/AFI/42/C
IV. Bore PileIV. 1. Pouring Concrete Tk. 37 4030/AFI/42/C
- Compression Strength Test Tk. 37 (Age 7 day) 4030/AFI/42/C
- Compression Strength Test Tk. 37 (Age 14 day) 4030/AFI/42/C
- Compression Strength Test Tk. 37 (Age 28 day) 4030/AFI/42/C
IV. 2. Pouring Concrete Tk. 38 4030/AFI/42/C
- Compression Strength Test Tk. 38 (Age 7 day) 4030/AFI/42/C
- Compression Strength Test Tk. 38 (Age 14 day) 4030/AFI/42/C
- Compression Strength Test Tk. 38 (Age 28 day) 4030/AFI/42/C
V. Foundation
V. 1. Pouring Concrete (Footing Foundation) 4030/AFI/42/C
- Compression Strength Test (Footing Foundation) (Age 7 day) 4030/AFI/42/C
- Compression Strength Test (Footing Foundation) (Age 14 day) 4030/AFI/42/C
- Compression Strength Test (Footing Foundation) (Age 28 day) 4030/AFI/42/C
V. 2. Pouring Concrete (Pavement) 4030/AFI/42/C
- Compression Strength Test (Pavement) (Age 7 day) 4030/AFI/42/C
- Compression Strength Test (Pavement) (Age 14 day) 4030/AFI/42/C
- Compression Strength Test (Pavement) (Age 28 day) 4030/AFI/42/C
V. 3. Padding Installation 4030/AFI/42/C
V. 4. Grouting Inspection 4030/AFI/42/C
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE 42-P-107 D
Konsorsium KE - SBS
DOCUMENTS
Mechanical Completion Facilities as Per Discrete Unit
7/29/2019 Content List Civil Structure
23/26
DOCUMENT No.
I. Final Inspection 4030/AFI/42/CV/034
II. Punch List 001/PF-NPU/PN/2009
III. Preparation Work
III. 1. Material Inspection
- Pile Inspection 01-Pile InspectionIII. 2. Material Inspection
- Pile Inspection 02-Pile Inspection
III. 3. Material Inspection
- Pile Inspection 03-Pile Inspection
III. 4. Material Inspection
- Pile Inspection 04-Pile Inspection
III. 5. Material Inspection
- Pile Inspection 05-Pile Inspection
III. 6. Material Inspection
- Pile Inspection 06-Pile Inspection
III. 7. Material Inspection
- Pile Inspection 07-Pile InspectionIII. 8. Material Inspection
- Pile Inspection 08-Pile Inspection
III. 9. Material Inspection
- Pile Inspection 09-Pile Inspection
III. 10. Material Inspection
- Pile Inspection 10-Pile Inspection
III. 11. Material Inspection
- Pile Inspection 11-Pile Inspection
III. 12. Material Inspection
- Pile Inspection 12-Pile Inspection
III. 13. Material Inspection
- Pile Inspection 13-Pile InspectionIII. 14. Material Inspection
- Pile Inspection 14-Pile Inspection
III. 15. Material Inspection
- Pile Inspection 15-Pile Inspection
III. 16. Material Inspection
- Pile Inspection 16-Pile Inspection
III. 17. Material Inspection
- Pile Inspection 17-Pile Inspection
III. 18. Material Inspection
- Pile Inspection 18-Pile Inspection
III. 19. Material Inspection
- Pile Inspection 19-Pile Inspection
III. 20. Material Inspection
- Pile Inspection 20-Pile Inspection
III. 21. Material Inspection
- Pile Inspection 21-Pile Inspection
Konsorsium KE - SBS
DOCUMENTS
Mechanical Completion Facilities as Per Discrete Unit
REMARKS
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI
BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE 42-T-107 D
Page 23 of 26
7/29/2019 Content List Civil Structure
24/26
DOCUMENT No.
Konsorsium KE - SBS
DOCUMENTS REMARKS
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI
BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE 42-T-107 D
III. 22. Material Inspection
- Pile Inspection 22-Pile Inspection
III. 23. Material Inspection
- Pile Inspection 23-Pile Inspection
III. 24. Material Inspection
- Pile Inspection 24-Pile Inspection
III. 25. Material Inspection
- Pile Inspection 25-Pile Inspection
III. 26. Material Inspection
- Pile Inspection 26-Pile InspectionIII. 27. Material Inspection
- Pile Inspection 27-Pile Inspection
III. 28. Material Inspection
- Pile Inspection 28-Pile Inspection
III. 29. Material Inspection
- Pile Inspection 28 A-Pile Inspection
III. 30. Material Inspection
- Pile Inspection 29-Pile Inspection
III. 31. Material Inspection
- Pile Inspection 30-Pile Inspection
III. 32. Material Inspection
- Pile Inspection 31-Pile Inspection
III. 33. Material Inspection
- Pile Inspection 32-Pile Inspection
III. 34. Material Inspection
- Pile Inspection 33-Pile Inspection
III. 35. Material Inspection
- Pile Inspection 34-Pile Inspection
III. 36. Material Inspection
- Pile Inspection 35-Pile Inspection
III. 37. Material Inspection
- Pile Inspection 36-Pile Inspection
III. 38. Material Inspection
- Pile Inspection 37-Pile Inspection
III. 39. Material Inspection
- Pile Inspection 38-Pile Inspection
III. 40. Material Inspection
- Pile Inspection 39-Pile Inspection
III. 41. Material Inspection
- Rebar 10 (P-10) ; Rebar 13 (S-13) ; Rebar 16 (S-16) 01-Area 42
III. 42. Material Inspection
- Rebar 19 (S-19) 02-Area 42
III. 43. Summary Ritase Tanah
III. 44. Finish Stripping 01-AFI
02-AFI
III. 45. Soil Test - Sand Cone (Test Layer-1) 03-AFI
III. 46. Soil Test - Sand Cone (Test Layer-2) 04-AFI
Page 24 of 26
7/29/2019 Content List Civil Structure
25/26
DOCUMENT No.
Konsorsium KE - SBS
DOCUMENTS REMARKS
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI
BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE 42-T-107 D
IV. Pilling
IV.1. Penetrant Test 01-AFI
IV.2. Penetrant Test 02-AFI
IV.3. Penetrant Test 03-AFI
IV.4. Penetrant Test 04-AFI
IV.5. Penetrant Test 05-AFI
IV.6. Penetrant Test 06-AFI
IV.7. Penetrant Test 07-AFI
IV.8. Penetrant Test 08-AFI
IV.9. Penetrant Test 09-AFIIV.10. Penetrant Test 10-AFI
IV.11. Penetrant Test 11-AFI
IV.12. Penetrant Test 12-AFI
IV.13. Penetrant Test 13-AFI
IV.14. Penetrant Test 14-AFI
IV.15. Penetrant Test 15-AFI
IV.16. Penetrant Test 16-AFI
IV.17. Penetrant Test 17-AFI
IV.18. Penetrant Test 18-AFI
IV.19. Penetrant Test 19-AFI
IV.20. Penetrant Test 20-AFI
IV.21. Penetrant Test 21-AFIIV.22. Penetrant Test 22-AFI
IV.23. Penetrant Test 23-AFI
IV.24. Penetrant Test 24-AFI
IV.25. Penetrant Test 25-AFI
IV.26. Penetrant Test 26-AFI
IV.27. Penetrant Test 27-AFI
IV.28. Penetrant Test 28-AFI
IV.29. Penetrant Test 29-AFI
IV.30. Penetrant Test 30-AFI
IV.31. Penetrant Test 31-AFI
IV.32. Penetrant Test 32-AFI
IV.33. Penetrant Test 33-AFI
IV.34. Penetrant Test 34-AFI
IV.35. Penetrant Test 35-AFI
IV.36. Penetrant Test 36-AFI
IV.37. Penetrant Test 37-AFI
IV.38. Penetrant Test 38-AFI
IV.39. Penetrant Test 39-AFI
IV.40. Penetrant Test 40-AFI
IV.41. Penetrant Test 41-AFI
IV.42. Penetrant Test 42-AFI
IV.43. PDA Test 01-PDA
IV.44. PDA Test 02-PDA
IV.45. PDA Test 03-PDA
Page 25 of 26
7/29/2019 Content List Civil Structure
26/26
DOCUMENT No.
Konsorsium KE - SBS
DOCUMENTS REMARKS
PROYEK :
EPC PROYEK PENINGKATAN FLEKSIBILITAS OPERASI NPU RU-VI
BALONGAN
CONTAIN LIST OF CIVIL STRUCTURE 42-T-107 D
V. Foundation
V.1. Trial Mix Concrete K-300 03-Area 42
- Compression Strength Test Trial Mix Concrete K-300 (Age 7 day) 05-Area 42
- Compression Strength Test Trial Mix Concrete K-300 (Age 14 day) 10-Area 42
- Compression Strength Test Trial Mix Concrete K-300 (Age 21 day) 11-Area 42
- Compression Strength Test Trial Mix Concrete K-300 (Age 28 day) 13-Area 42
V.2. Soil Test - Sand Cone 04-Area 42
V.3. Compact and Levelling 06-Area 42
V.4. Urugan Pasir and Levelling 07-Area 42
V.5. Lean Concrete 08-Area 42
V.6. Install Rebar 09-Area 42
V.7. Pre-Pouring Concrete (Slab Concrete) 12-Area 42
- Compression Strength Test Slab Concrete (Age 7 day) 4030/QC/42/CV/016
- Compression Strength Test Slab Concrete (Age 13 day) 4030/AFI/42/CV/020
- Compression Strength Test Slab Concrete (Age 28 day) 4030/AFI/42/CV/027
- Compression Strength Test Slab Concrete (Age 7 day) 4030/QC/42/CV/017
- Compression Strength Test Slab Concrete (Age 14 day) 4030/AFI/42/CV/021
- Compression Strength Test Slab Concrete (Age 28 day) 4030/AFI/42/CV/029
- Compression Strength Test Slab Concrete (Age 7 day) 4030/QC/42/CV/018
- Compression Strength Test Slab Concrete (Age 14 day) 4030/AFI/42/CV/022
- Compression Strength Test Slab Concrete (Age 28 day) 4030/AFI/42/CV/031
- Compression Strength Test Slab Concrete (Age 7 day) 4030/QC/42/CV/019
- Compression Strength Test Slab Concrete (Age 14 day) 4030/AFI/42/CV/023
- Compression Strength Test Slab Concrete (Age 28 day) 4030/AFI/42/CV/032
V.8. Pre-Pouring Concrete (Ring Pedestal) 4030/QC/42/CV/014
- Compression Strength Test Slab Concrete (Age 7 day) 4030/AFI/42/CV/021
- Compression Strength Test Slab Concrete (Age 14 day) 4030/AFI/42/CV/024
- Compression Strength Test Slab Concrete (Age 28 day) 4030/AFI/42/CV/033
V.9. Back Fill and Asphalt 4030/AFI/42/CV/025