+ All Categories
Home > Documents > Contents of talk May 2 nd 2006 Y. Muraki on behalf of the LHCf

Contents of talk May 2 nd 2006 Y. Muraki on behalf of the LHCf

Date post: 11-Jan-2016
Category:
Upload: brand
View: 20 times
Download: 0 times
Share this document with a friend
Description:
Contents of talk May 2 nd 2006 Y. Muraki on behalf of the LHCf. 1. Physics goal 2. The BRAN detector 3. The particle distribution inside the BRAN 4. In case the BRAN will be located at 5 th slot (30cm Cu, 3.85cm W, 10cm W). - PowerPoint PPT Presentation
Popular Tags:
25
Contents of talk May 2 nd 2006 Y. Muraki on behalf of the LHCf 1. Physics goal 2. The BRAN detector 3. The particle distribution inside the BRAN 4. In case the BRAN will be located at 5 th slot (30cm Cu, 3.85cm W, 10cm W)
Transcript
Page 1: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

Contents of talk May 2nd 2006

Y. Muraki on behalf of the LHCf

1. Physics goal 2. The BRAN detector3. The particle distribution inside the BRAN4. In case the BRAN will be located at 5th slot

(30cm Cu, 3.85cm W, 10cm W)

Page 2: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

Our Physics Goal The exposure time is only a few hours

Page 3: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

  The BRAN detector

Luminosity detector in TAN

Page 4: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

Luminosity detector in its case“Guts” of the luminosity

detector that is inserted into caseDetail view of bottom

Ionization chamber

Copper mounting

plate

Printed circuit board

BEAM

Page 5: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

Cross section detail, parallel to beam

Case wall

copper filler

copper filler

Case wall

copper mounting

plate

Macor chamber

wall

Macor chamber

wall

Ground plane comb (in blue)

signal comb (in orange)

Ceramic printed circuit

board

Page 6: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

Cross section detail, normal to beam

Case wallCase wall

Macor chamber

wall

Macor chamber

wall

Ground plane comb (in blue

and red)

signal comb (in orange)

Page 7: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

Configuration of LHCf-BRAN

Page 8: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

Particle distribution in BRAN as a function of beam center

Page 9: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

The ratio of particles detected by the 4   parts of the BRAN detector

Page 10: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

The threshold of BRAN is set at > 500 particles

Page 11: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

  Particle distribution of Arm #2

Page 12: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

Particle distribution of Arm 2 The threshold of BARN >500 ptls.

Page 13: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

Ratio of particles detected by each BRAN sensor

Page 14: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf
Page 15: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

The position resolution of the LHCf for Arm #1

Page 16: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

The particle distribution in BRAN for original Cu 30 cm

Page 17: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

The particle distribution in BARN for 3.85cm tungsten (W) plate

Page 18: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

Particle distribution in BRAN without LHCf (linear scale)

Page 19: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

Particle distribution in BRAN without LHCf (log scale)

Page 20: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

In the case the BRAN is set at the 5th slot

Page 21: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

The particle distribution in BRAN for 10cm thick tungsten block is used

Page 22: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

Summary of talks

1. The LHCf experiment can resolve the highest energy cosmic ray problems.

2. Present configuration of LHCf-BRAN can measure the beam neutral center by both detectors independently.

3. However installation of the BRAN at the 5th

slot will provide us a better result.

Page 23: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

  The Arm #1 beam pipe structure

Page 24: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

The Arm #2 beam pipe structure

Page 25: Contents of talk May 2 nd  2006 Y. Muraki on behalf of the LHCf

Position identification by the LHCf


Recommended