Contents: Project Overview Page 1 Door Installation Page 2 Door Installation Page 3 Walk-on Ceilings Page 4 Ceiling Bulkheads Page 3 Equipment Integration Page 5 Equipment Integration Page 6 Bump Rails & Bollards Page 7 Fournier - Project Profile
Transcript
Page 1: Contents: Project Overview Page 1 Door InstallationPage 2 Door InstallationPage 3 Walk-on CeilingsPage 4 Ceiling BulkheadsPage 3 Equipment IntegrationPage.

Contents:

Project Overview Page 1

Door Installation Page 2

Door Installation Page 3

Walk-on Ceilings Page 4

Ceiling Bulkheads Page 3

Equipment Integration Page 5

Equipment Integration Page 6

Bump Rails & Bollards Page 7

Fournier - Project Profile

Page 2: Contents: Project Overview Page 1 Door InstallationPage 2 Door InstallationPage 3 Walk-on CeilingsPage 4 Ceiling BulkheadsPage 3 Equipment IntegrationPage.

Project Overview

This € 1,400,000 project included walk-on panel ceilings, interior cleanroom walls, Phenolic resin sliding doors, Rapid roller doors, hinged doors and interlocking, Epoxy floors, and various items of furniture and barriers.

Scope of Works

Ceilings – 2,500m2 of 50mm thick walk-on ceiling flush panels.

• Partitions – 3,000m2 of metal faced fully flush FM approved panelling 50mm thick

• Doorsets – Provision of approx 10 hinged, 20 sliding, and 10 Rapid Roll Doors.

• Interlocking – Design, supply, installation and commissioning of interlocking to 10 doorsets

• Furniture – Design, manufacture and installation of recessed access panels to safe change units and utility stations.

•Bump rails - Supply & installation of stainless steel bump rails 50mm diameter.

• Structural – Design, supply and installation of all steel support structures for the support of the rapid roll doors.

• HVAC – Low level air extract casings.

•Flooring - Supply and installation of MCDur Epoxy flooring.

Fournier – Project Overview

Page 3: Contents: Project Overview Page 1 Door InstallationPage 2 Door InstallationPage 3 Walk-on CeilingsPage 4 Ceiling BulkheadsPage 3 Equipment IntegrationPage.

HPL faced sliding doorset

Fournier – Door Installation

Rapid roll door integrated into wall panels.

Page 4: Contents: Project Overview Page 1 Door InstallationPage 2 Door InstallationPage 3 Walk-on CeilingsPage 4 Ceiling BulkheadsPage 3 Equipment IntegrationPage.

Corridor with sliding doors

Fournier – Door Installation

Interlocked rapid roll door s.

Page 5: Contents: Project Overview Page 1 Door InstallationPage 2 Door InstallationPage 3 Walk-on CeilingsPage 4 Ceiling BulkheadsPage 3 Equipment IntegrationPage.

Flush Walk-on Ceiling

Fournier – Walk-on Ceiling

Ceiling Suspension Detail.

Page 6: Contents: Project Overview Page 1 Door InstallationPage 2 Door InstallationPage 3 Walk-on CeilingsPage 4 Ceiling BulkheadsPage 3 Equipment IntegrationPage.

Ceiling Bulkheads

Fournier – Ceiling Bulkheads

Page 7: Contents: Project Overview Page 1 Door InstallationPage 2 Door InstallationPage 3 Walk-on CeilingsPage 4 Ceiling BulkheadsPage 3 Equipment IntegrationPage.

Integration with wall and ceiling panels

Fournier – Equipment Integration

Ceiling Junction Detail.

Page 8: Contents: Project Overview Page 1 Door InstallationPage 2 Door InstallationPage 3 Walk-on CeilingsPage 4 Ceiling BulkheadsPage 3 Equipment IntegrationPage.

Autoclave Integration into wall panels

Fournier – Equipment Integration

Large Vessel Integration

Page 9: Contents: Project Overview Page 1 Door InstallationPage 2 Door InstallationPage 3 Walk-on CeilingsPage 4 Ceiling BulkheadsPage 3 Equipment IntegrationPage.

Bollards to Rapid Roll Doors

Fournier – Bollards & Bump Rails

Floor Mounted Bump Rails