Silvertown Tunnel
Volume 2 Plans, Drawings and Sections
Silvertown Tunnel
2.5 Works Plans
Planning Act 2008
Infrastructure Planning
The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009
Document Reference: ST150030-PLN-ZZZ-ZZ-DSD-ZZ-0096
Author: Transport for London
Rev. Date Approved By Signature Description
0 29/04/2016 David Rowe (TfL Lead Sponsor)
For DCO Application
1 26/01/2017 David Rowe (TfL Lead Sponsor)
Sheets 2 and 3 updated for deadline 3
2 05/04/2017 David Rowe (TfL Lead Sponsor)
Updated for deadline 6
Contents Drawing Title Drawing Number Rev
Works Plans Regulation 5(2)(j) Key Plan
ST150030-ATK-ZZZ-ZZ-DR-CE-3080 P03
Works Plans Regulation 5(2)(j) Sheet 1 of 3
ST150030-ATK-ZZZ-ZZ-DR-CE-3081 P03
Works Plans Regulation 5(2)(j) Sheet 2 of 3
ST150030-ATK-ZZZ-ZZ-DR-CE-3082 P04
Works Plans Regulation 5(2)(j) Sheet 3 of 3
ST150030-ATK-ZZZ-ZZ-DR-CE-3083 P04
C:\programdata\bentley\projectwise\brow3184\dms14408\STWTN-ATK-GEN-XXXX-DR-Z-3080.dwg: Plotted by: brow3184 Date: Apr 05, 2017 - 7:39pm
Drawing Status
DO
N
OT
S
CA
LE
Client
Suitability
Millim
etres
10
010
0
Date
Designed / Drawn
Revision
Scale
Project Drawing Number
Drawing Title
Project Title
Date Date Date
Checked Approved
Original Size
A1
Authorised
Drawn / Des DateCheckedRev Approved
Description
Atkins R
ef.
SILVERTOWN TUNNEL
WORKS PLANS
REGULATION 5(2) )
KEY PLAN
ST
WT
N-A
TK
-G
EN
-X
XX
X-D
R-Z
-30
80
P03
S8FOR DCO SUBMISSION
1:5000 SB
05/04/17
MB
05/04/17
MK
05/04/17
MK
05/04/17
P03 SB MB MK 05/04/17
For DCO Submission
P02 SB GB MK 26/04/16
For DCO Submission
P01 SB GB MK 01/03/16
First Issue
ST150030-ATK-ZZZ-ZZ-DR-CE-3080
(j
NOTES:
1. THIS PLAN SHOULD BE READ IN CONJUNCTION WITH
THE WORKS PLANS (SHEETS 1 TO 3) AND ALONGSIDE
OTHER PLANS AND DOCUMENTS IN THE
DEVELOPMENT CONSENT ORDER APPLICATION, IN
PARTICULAR SCHEDULE 1 (AUTHORISED
DEVELOPMENT) TO THE DEVELOPMENT CONSENT
ORDER.
2. THE PROPOSED TUNNEL ROUTE IS SHOWN HERE FOR
INDICATIVE PURPOSES TO IDENTIFY THE LOCATION
OF THE SCHEME.
THE
O2
GREENWICH
PENINSULA
SILVERTOWN
BLACKWALL
TUNNEL
A1020
A1020
THAMES WHARF
DLR
THIS MAP IS REPRODUCED FROM ORDNANCE SURVEY MATERIAL WITH
THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE
CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE. © CROWN
COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN
COPYRIGHT AND MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS.
Licence No. 100018928, 2014
KEY:
WORKS SHOWN INDICATIVELY
RIVER THAMES
A102
Scale 1:5000
100m 0m 100m 200m 300m
EMIRATES
AIRLINE
T
U
N
N
E
L
A
V
E
N
U
E
P
A
V
IL
IO
N
L
A
N
E
A
1
0
2
B
L
A
C
K
W
A
L
L
T
U
N
N
E
L
S
O
U
T
H
E
R
N
P
E
N
IN
S
U
L
A
S
Q
U
A
R
E
M
I
L
L
E
N
N
I
U
M
W
A
Y
W
E
S
T
P
A
R
K
S
ID
E
B
O
O
R
D
S
T
R
E
E
T
A
1
0
2
B
L
A
C
K
W
A
L
L
T
U
N
N
E
L
S
O
U
T
H
E
R
N
MO
RD
EN
W
HA
RF
R
OA
D
A
1
0
2
S
O
U
T
H
B
O
U
N
D
A
1
0
2
N
O
R
T
H
B
O
U
N
D
L
O
N
D
O
N
U
N
D
E
R
G
R
O
U
N
D
J
U
B
IL
E
E
L
IN
E
E
D
M
U
N
D
H
A
L
L
E
Y
W
A
Y
A
P
P
R
O
A
C
H
S
O
U
T
H
B
O
U
N
D
A
P
P
R
O
A
C
H
N
O
R
T
H
B
O
U
N
D
GREENWICH
T
U
N
N
E
L
A
V
E
N
U
E
O
L
Y
M
P
IA
N
W
A
Y
N
WORK
No. 5
WORK
No. 12
WORK
No. 3
WORK
No. 4
WORK
No. 11
WORK
No. 6
WORK
No. 7
WORK
No. 2
WORK
No. 13
WORK
No. 9
WORK
No. 14
WORK
No. 8
WORK
No. 1
WORK
No. 10
C:\programdata\bentley\projectwise\brow3184\dms14408\STWTN-ATK-GEN-XXXX-DR-Z-3081.dwg: Plotted by: brow3184 Date: Apr 05, 2017 - 7:40pm
Drawing Status
DO
N
OT
S
CA
LE
Client
Suitability
Millim
etres
10
010
0
Date
Designed / Drawn
Revision
Scale
Project Drawing Number
Drawing Title
Project Title
Date Date Date
Checked Approved
Original Size
A1
Authorised
Drawn / Des DateCheckedRev Approved
Description
Atkins R
ef.
SILVERTOWN TUNNEL
WORKS PLANS
REGULATION 5(2) )
SHEET 1 OF 3
ST
WT
N-A
TK
-G
EN
-X
XX
X-D
R-Z
-30
81
P03
S8FOR DCO SUBMISSION
1:1250 SB
05/04/17
MB
05/04/17
MK
05/04/17
MK
05/04/17
P03 SB MB MK 05/04/17
For DCO Submission
P02 SB GB MK 26/04/16
For DCO Submission
P01 SB GB MK 01/03/16
First Issue
ST150030-ATK-ZZZ-ZZ-DR-CE-3081
F
O
R
C
O
N
T
IN
U
A
T
IO
N
S
E
E
S
H
E
E
T
2
NOTES:
1. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE
STATED.
2. LINEAR AND NON-LINEAR WORKS ARE REFERENCES
TO WORKS IN SCHEDULE 1 (AUTHORISED
DEVELOPMENT) TO THE DEVELOPMENT CONSENT
ORDER.
3. THE WORKS WILL BE SUBJECT TO DETAILED DESIGN
DEVELOPMENT IN ACCORDANCE WITH THE
DEVELOPMENT CONSENT ORDER.
4. THESE WORKS PLANS SHOULD BE READ IN
CONJUNCTION WITH THE ENGINEERING SECTION
DRAWINGS AND PLANS; THE DEVELOPMENT CONSENT
ORDER PROVIDES FOR VERTICAL DEVIATION WITH
REFERENCE TO THE LEVELS OF THE WORKS SHOWN
ON THE ENGINEERING SECTION DRAWINGS AND
PLANS.
SHEET 1
SHEET 3
KEY PLAN
SHEET 2
SOUTH
PORTAL
EXISTING BLACKWALL
TUNNEL GATEHOUSE
EXISTING BOORD
STREET FOOTBRIDGE
TO BE REMOVED
EXISTING BLACKWALL
TUNNEL NORTHBOUND
SOUTH PORTAL
EXISTING BLACKWALL
TUNNEL SOUTHBOUND
SOUTH PORTAL
(j
Scale 1:1250
10m 0m 10m 30m 50m 70m 90m
THIS MAP IS REPRODUCED FROM ORDNANCE SURVEY MATERIAL WITH
THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE
CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE. © CROWN
COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN
COPYRIGHT AND MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS.
Licence No. 100018928, 2014
KEY:
ORDER LIMITS
LINEAR WORK CENTRELINE
AREA EXCLUDED FROM ORDER LIMITS
NON-LINEAR WORK LIMIT OF DEVIATION
START OF LINEAR WORK
END OF LINEAR WORK
POINT REFERENCE TO CO-ORDINATES WHICH OUTLINE
THE RIVER BOUNDARY WITHIN THE DCO LIMITS
N
WORK
No. 1
L
O
N
D
O
N
U
N
D
E
R
G
R
O
U
N
D
J
U
B
I
L
E
E
L
I
N
E
E
M
I
R
A
T
E
S
A
I
R
L
I
N
E
EM
IR
AT
ES
G
R
EE
N
W
IC
H
PE
N
IN
SU
LA
ST
AT
IO
N
W
E
S
T
P
A
R
K
S
ID
E
P
E
N
R
O
S
E
W
A
Y
P
IE
R
W
A
L
K
P
E
N
IN
S
U
L
A
S
Q
U
A
R
E
P
H
O
E
N
IX
A
V
E
N
U
E
M
IT
R
E
P
A
S
S
A
G
E
O
L
Y
M
P
IA
N
W
A
Y
E
A
S
T
P
A
R
K
S
ID
E
N
O
R
T
H
G
R
E
E
N
W
IC
H
P
IE
R
RIVER
THAMES
THE
O2
WORK
No. 20B
C:\programdata\bentley\projectwise\brow3184\dms14408\STWTN-ATK-GEN-XXXX-DR-Z-3082.dwg: Plotted by: brow3184 Date: Apr 05, 2017 - 7:43pm
Drawing Status
DO
N
OT
S
CA
LE
Client
Suitability
Millim
etres
10
010
0
Date
Designed / Drawn
Revision
Scale
Project Drawing Number
Drawing Title
Project Title
Date Date Date
Checked Approved
Original Size
A1
Authorised
Drawn / Des DateCheckedRev Approved
Description
Atkins R
ef.
SILVERTOWN TUNNEL
WORKS PLANS
REGULATION 5(2) )
SHEET 2 OF 3
ST
WT
N-A
TK
-G
EN
-X
XX
X-D
R-Z
-30
82
P04
S8FOR DCO SUBMISSION
1:1250 SB
05/04/17
MB
05/04/17
MK
05/04/17
MK
05/04/17
P04 SB MB MK 05/04/17
For DCO Submission
P03 SB RW MB 25/01/17
For DCO Submission
P02 SB GB MK 26/04/16
For DCO Submission
P01 SB GB MK 01/03/16
First Issue
ST150030-ATK-ZZZ-ZZ-DR-CE-3082
F
O
R
C
O
N
T
IN
U
A
T
IO
N
S
E
E
S
H
E
E
T
3
F
O
R
C
O
N
T
IN
U
A
T
IO
N
S
E
E
S
H
E
E
T
1
SHEET 1
SHEET 3
SHEET 2
KEY PLAN
EMIRATES AIRLINE
TOWER
EXISTING
RIVER WALL
EMIRATES AIRLINE SHIP IMPACT
PROTECTION PONTOONS
EMIRATES AIRLINE SHIP IMPACT
PROTECTION PONTOONS
(j
Scale 1:1250
10m 0m 10m 30m 50m 70m 90m
THIS MAP IS REPRODUCED FROM ORDNANCE SURVEY MATERIAL WITH
THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE
CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE. © CROWN
COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN
COPYRIGHT AND MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS.
Licence No. 100018928, 2014
NOTES:
1. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE
STATED.
2. LINEAR AND NON-LINEAR WORKS ARE REFERENCES
TO WORKS IN SCHEDULE 1 (AUTHORISED
DEVELOPMENT) TO THE DEVELOPMENT CONSENT
ORDER.
3. THE WORKS WILL BE SUBJECT TO DETAILED DESIGN
DEVELOPMENT IN ACCORDANCE WITH THE
DEVELOPMENT CONSENT ORDER.
4. THESE WORKS PLANS SHOULD BE READ IN
CONJUNCTION WITH THE ENGINEERING SECTION
DRAWINGS AND PLANS; THE DEVELOPMENT CONSENT
ORDER PROVIDES FOR VERTICAL DEVIATION WITH
REFERENCE TO THE LEVELS OF THE WORKS SHOWN
ON THE ENGINEERING SECTION DRAWINGS AND
PLANS.
KEY:
ORDER LIMITS
AREA EXCLUDED FROM ORDER LIMITS
POINT REFERENCE TO CO-ORDINATES WHICH OUTLINE
THE RIVER BOUNDARY WITHIN THE DCO LIMITS
0
LINEAR WORK CENTRELINE
NON-LINEAR WORK LIMIT OF DEVIATION
START OF LINEAR WORK
END OF LINEAR WORK
TIDAL BASIN
ROUNDABOUT
A1011 SILVERTOWN WAY
TIDAL BASIN
ROUNDABOUT
A1011 SILVERTOWN WAY
M
e
a
n
H
i
g
h
W
a
t
e
r
B
o
r
o
C
o
n
s
t
&
W
a
r
d
B
d
y
N
WORK
No. 16
WORK
No. 15
WORK
No. 18
WORK
No. 17
WORK
No. 1
WORK
No. 19
A
1
0
2
0
L
O
W
E
R
L
E
A
C
R
O
S
S
I
N
G
SILVERTOWN
B
E
LL LA
N
E
N
O
R
T
H
W
O
O
L
W
I
C
H
R
O
A
D
H
A
N
O
V
E
R
A
V
E
N
U
A1020 S
ILV
ER
TO
WN
WA
Y
T
H
E
C
R
Y
S
T
A
L
A1011 SILVERTOWN WAY
SC
AR
AB
CLO
SE
DOCKLANDS LIGHT RAILWAY WOOLWICH BRANCH
D
O
C
K
L
A
N
D
S
L
I
G
H
T
R
A
I
L
W
A
Y
B
E
C
K
T
O
N
B
R
A
N
C
H
T
I
D
A
L
B
A
S
I
N
R
O
A
D
D
O
C
K
R
O
A
D
TIDAL BASIN
ROUNDABOUT
RIVER THAMES
M
e
a
n
H
i
g
h
W
a
t
e
r
B
o
r
o
C
o
n
s
t
&
W
a
r
d
B
d
y
WORK
No. 18
WORK
No. 15
END OF WORK
No. 1 & END OF
WORK No. 15
WORK
No. 18
WORK
No. 15
WORK
No. 1
WORK
No. 20B
WORK
No. 20A
14
15
29
J1
J2
J3
J4
16
17
18
19
20
21
22
23
24
25
26
27
31
30
C:\programdata\bentley\projectwise\brow3184\dms14408\STWTN-ATK-GEN-XXXX-DR-Z-3083.dwg: Plotted by: brow3184 Date: Apr 05, 2017 - 7:45pm
Drawing Status
DO
N
OT
S
CA
LE
Client
Suitability
Millim
etres
10
010
0
Date
Designed / Drawn
Revision
Scale
Project Drawing Number
Drawing Title
Project Title
Date Date Date
Checked Approved
Original Size
A1
Authorised
Drawn / Des DateCheckedRev Approved
Description
Atkins R
ef.
SILVERTOWN TUNNEL
WORKS PLANS
REGULATION 5(2) )
SHEET 3 OF 3
ST
WT
N-A
TK
-G
EN
-X
XX
X-D
R-Z
-30
83
P04
S8FOR DCO SUBMISSION
1:1250 SB
05/04/17
MB
05/04/17
MK
05/04/17
MK
05/04/17
P04 SB MB MK 05/04/17
For DCO Submission
P03 SB RW MB 25/01/17
For DCO Submission
P02 SB GB MK 26/04/16
For DCO Submission
P01 SB GB MK 01/03/16
First Issue
ST150030-ATK-ZZZ-ZZ-DR-CE-3083
F
O
R
C
O
N
T
IN
U
A
T
IO
N
S
E
E
S
H
E
E
T
2
SHEET 1
SHEET 3
SHEET 2
KEY PLAN
NORTH
PORTAL
EMIRATES AIRLINE
TOWER
EMIRATES
AIRLINE
TOWER
DLR EMBANKMENT
1+2
SEE INSET
(j
Scale 1:1250
10m 0m 10m 30m 50m 70m 90m
THIS MAP IS REPRODUCED FROM ORDNANCE SURVEY MATERIAL WITH
THE PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE
CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE. © CROWN
COPYRIGHT. UNAUTHORISED REPRODUCTION INFRINGES CROWN
COPYRIGHT AND MAY LEAD TO PROSECUTION OR CIVIL PROCEEDINGS.
Licence No. 100018928, 2014
NOTES:
1. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE
STATED.
2. LINEAR AND NON-LINEAR WORKS ARE REFERENCES
TO WORKS IN SCHEDULE 1 (AUTHORISED
DEVELOPMENT) TO THE DEVELOPMENT CONSENT
ORDER.
3. THE WORKS WILL BE SUBJECT TO DETAILED DESIGN
DEVELOPMENT IN ACCORDANCE WITH THE
DEVELOPMENT CONSENT ORDER.
4. THESE WORKS PLANS SHOULD BE READ IN
CONJUNCTION WITH THE ENGINEERING SECTION
DRAWINGS AND PLANS; THE DEVELOPMENT CONSENT
ORDER PROVIDES FOR VERTICAL DEVIATION WITH
REFERENCE TO THE LEVELS OF THE WORKS SHOWN
ON THE ENGINEERING SECTION DRAWINGS AND
PLANS.
1
-
2
-
1
-
2
-
LOWER LEVEL PLAN
TIDAL BASIN ROUNDABOUT
UPPER LEVEL PLAN
TIDAL BASIN ROAD LEADING
TO A1011 SILVERTOWN WAY
POINT REFERENCE TO CO-ORDINATES WHICH OUTLINE
THE RIVER BOUNDARY WITHIN THE DCO LIMITS
KEY:
ORDER LIMITS
LINEAR WORK CENTRELINE
AREA EXCLUDED FROM ORDER LIMITS
NON-LINEAR WORK LIMIT OF DEVIATION
START OF LINEAR WORK
END OF LINEAR WORK