S3
5
Report Date: 09/02/2003 Page 1 of 2
Contract Costs
DEAD CREEK AREA G, SAUGET. IL SITE ID = 05 8E
Site Costs from 1/1/1993 through 6/30/2003
SUPERFUND TECH. ASSISTANCE & RESPONSE TEAM (START)
Contractor Name:
EPA Contract Number:
Project Officer(s):
Dates of Service:
Summary of Service:
Total Costs:
TETRA TECH EM, INC.
68-WO-0129
KOSIK, LORRAINE C.NABASNY, GAIL
From: 07/30/2001 To: 06/30/2002
$29,527.36
VoucherNumberG9009-009G9009-010G9009-011G9009-012G9009-013G9009-017G9009-019
VoucherDate
09/07/200110/19/200111/19/200111/12/200101/10/200205/09/200207/11/2002
Voucher Treasury ScheduleAmount Number and Date
446,587.21 R2003470.834.79 R2084350,918.79 R2154447,624.71 R2195372,560.76 R2257586,108.78 R2475626,616.84 R2592
10/03/200111/15/200112/18/200101/10/200202/07/200206/06/200208/08/2002
SiteAmount6,429.358,516.814,109.811,141.32
108.44158.2688.93
AnnualAllocation
2,841.463,764.021,736.47
482.2345.8266.8737.57
Total: $20,552.92 $8,974.44
Report Date: 09/02/2003 Page 2 of 2
Contract Costs
DEAD CREEK AREA G, SAUGET, IL SITE ID = 05 8E
Site Costs from 1/1/1993 through 6/30/2003
SUPERFUND TECH. ASSISTANCE & RESPONSE TEAM (START)
Contractor Name:
EPA Contract Number:
Project Officers):
Dates of Service:
Summary of Service:
Total Costs:
TETRA TECH EM, INC.
68-WO-0129
KOSIK, LORRAINE C.NABASNY, GAIL
From: 07/30/2001 To: 06/30/2002
$29,527.36
Voucher NumberG9009-009G9009-010G9009-011G9009-012G9009-013G9009-017G9009-019
Schedule NumberR2003R2084R2154R2195R2257R2475R2592
Rate TypeNational - FinalNational - FinalContract Class -Contract Class -Contract Class -Contract Class -Contract Class -
ProvisionalProvisionalProvisionalProvisionalProvisional
AnnualAllocation Rate
0.4419520.4419520.4225190.4225190.4225190.4225190.422519
START2WorkAssignment Form
Tetra Tech
TDD ft S05-0108-004Amendment*: 1
Contract 68-W-00-129
EPAU.S. EPA Region 5Acquisition Section, MCC-10J77 West Jackson BoulevardChicago, IL 60604
Main Section - Signed by Lisa Smith/R5/USEPA/US on 11/01/2002 01:22:01 PM, according to Tom KourisHTEMIPurpose: Close-Out NotificationPriority: HighOvertime: No
Period: Base PeriodStart Date:08/02/2001Completion Date:09/15/2002
Project/Site Name: Dead Creek.Site GCity, State Zip: Sauget, ILSSID: 058E CERCLIS:
WorkArea: CERCLA ASSESSMENT ACTIVITIESActivity: Removal Site EvalutionsSection of SOW: II.A. 1Performance Based:No
Authorized TDD Ceiling: Cost/Fee LOEPrevious Action(s):
This Action:$16,250.00$4,302.92
250.038.0
New Total: $20,552.92 288.0Specific ElementsDescription of Work:
Under the START SOW II.A.1.this TOD is completed and closed. Additional charges were for thecompletion of the final report, including generating additional copiesof the final report and the CDwith site photos of activities and photos of recovered documents.
OSC- S.Borries
Accounting and Appropriation InformationSFO: 5
Line
1
DCN4
V
SDX008
IFMS
01
BiiagetfFY
01
AppTDpnsa
* ^f*"-CSSe •T
"BndgttQir*?*•*?;
5AFOP
^PiDgnun •>Element
501 02D
* Objectr Classr<£"2505
Site Project
0500JTOO
CostOrgCode
C003
Amount"\ f
$4,302.92
Funding CategoryProgram Support
Work Assignment Manager SectionI - Signed by Lorraine KosikVRS/USEPA/US on 10/28/2002 04:29:22 PM, according to Tom Kouris/TTEMI |Work Assignment Manager: Lorraine Kosik Date: 10/28/2002Project Officer Section - Signed by Lorraine Kosik/R5/USEPA/US on 10/28/2002 04:29:22 PM, according to TorjProject Officer: Lorraine Kosik Date: 10/28/2002Contracting Officer Section - Signed by Lisa Smith/R5/USEPA/US on 11/01/2002 01:22:01 PM. according to TolContracting Officer: Lisa Smith Date: 11/01/2002[Contractor Section - Signed by Tom Kouris/TTEMI on 12/04/2002 10:56:11 AM. according to /TTEMI 1 ~
S05-0108-004 -1 Dead Creek.Site G 12/04/2002
OCT-3B-01 14i07 FROH.Ua EPA REGION 5 ID.312 353 S2BS PAGE 3/11
START2WorkAaaignment Form
Tetra T«oh
TDD: S05-0108-004Contract: 68-W-00-129
EPAU.S. EPA Region 6Acquisition Section. MCC-10J77 West Jackson BoutavajdChi'caga, IL 806O4Main Section - Waned by lisa Smith/RS/USEPA/US on 1.0/30 2001 11:21:66 AM, acooiding to /RS/USEPA/USPurpose:'TDD Initiation " " """ Period: Sas« PeriodPriority: High Start Dat»:08/02/2001Overtime: No Completion Date: 10/30/2001Project/Site Name: Dead Creek.Site 3City, State Zip: Sauget ILSSID: 058E CERCUS:
WorkArea: CERCU ASSESSMENT ACTIVITIESActivity: Removal Site EvalutidnsSection of SOW: II.A.1Performance Bs*ed:No
Authorized TDD Cofllng: LOEPreytoua Aewma): $0.00
$16,250.000.0
250.0. . . . . . _ . . . . . * 18,250.00 ' 280.0Specific Element* 8. document §ite condition* witn written and viauar documentation (for oxampto. 36mm oamon and/or IVCftJ or 8mm video camcorder aketchee togbook description or digital earner*), 13. develop • health and Mfaty plan for field wsUvrttw whichcompliea with Office of Safety and Health Administration (OSHAI »nd local haatth and aefety r*qujnm«nu. IS. conduct both on-eiteand/or off-eite environmental sampling acthrftJea, 10. perform air monitoring, 27. dlapoee of Investigation derived waatea In accordancewith EPA guidance (Managing Investigation Derived Waetae for She inapMtlona • Office al Solid Waate and Emergency RMPOHM (OSWER] Directive 9345.3-02), 31. complete and maintain documentation of all contractor action* taken or aaeigned eonaittant with theNCP for oott rocoven/ purpoaae. Make available to federal truitees of arfactad natural reaaurcea information and documentation toa«*i<t the truateea i, • the aourea and circumstancee of the release, - the Identity of raaponalble partiaa, - the reepanea action takwv •an accounting of contractor costs Incurred in euppon of S"A response actions, - tha impaota and potential impaeta to the public healthand welfam and the environment., 32. locate and review existing site facility and/or release data. 38. provide aita communication* {forexample radio* repeater* eommereielly available radio ayatema telephonea pagers)Description of Work:
Under the START SOW U.A.I ..the contractor shall provide the taak* as statad above.FOSC- S.Boirlee
Accounting and Appropriation InformationSFO: 5
• n '.'.Coil*
SDXOOS 01 0] SAfOf 51020 2509 05001700 C003
Funding CategoryProgram Support
Work Assignment Manager Section! - Signed by forralhe K6snJc/RBAJ3EPAmS on 10/2972001 03:g2:QO PMraccdrdThg to /USEPAAIS jWork Assignment Manager; Lorraine Kosik Date: 10/29/2001[Project* Officer Section "Signed by Lorraine ffo'sWIRS/USEPA/US on rO/29/200T03:B2rOO PM. accordino to /U jProject Officer*: LorrSrwiKoajkl'] _ [_..„.(/ Data: 10/29/2001^•JM"' •*TJ'nJL' •-**-•-*"- . • "-J-j-ii""-'*—— feat=A-.i*•'•t'.XTI •i -li-'i-jt
ff|pt~oh ' •"•-•-— - -
Contractor
Contracting Officer:-ar SSettoh
S05-0108-004 Daad Creek, Site G 10/30/2001
TECHNICAL STATUS REPORT
Work Assignment Number: CA-01 Date: August 29,2001TDDNo.:S05-0108-004 Reporting Period: July 30 throughTDD Name: Dead Creek Site G August 26,2001EPA TDD Manager: Sam Borries TDD Completion Date: Not AssignedTetra Tech TDD Manager: Brian Williams Percent Work Completed (Hours): N/A
TDD Type: Removal Site Evaluation
Distribution: Lorraine Kosik, US EPA START Project OfficerLisa Smith, US EPA START Contracting OfficerThomas Kouris, Tetra Tech EM Inc. START Program Manager
1. Progress Made This Reporting Period
Tetra Tech was tasked by EPA region 5 to oversee the excavation of three drums containingevidence for PRP litigation, including documents and samples. Specific activities included layingout all the evidence to document and photodocument, and providing sample containers to splitsamples with the PRP, and packaging the samples to be submitted for laboratory analysis. TetraTech performed on-site activities form August 20-22, 2001. Computer usage charges alsoappear.
2. Problems Encountered and Resolved
None
3. Deliverables Submitted
Deliverable Date Submitted
None
4. Activities Planned Next Reporting Period
Tetra Tech will finish and submit a trip report to the EPA and copy all to a CD ROMs to besubmitted to appropriate parties.
5. Costs Incurred But Not Invoiced
Charges from Eagle Instruments for rental and expendable equipment will appear in a subsequentinvoice.
Work Assignment Number: S05-0108-004Page 2
6. Monthly Charges and Budget
Tetra Tech has expended 168.5 level-of-effort (LOE) hours and $6,429.35 during the reportingperiod. The cumulative expenditure through the reporting period is 168.5 LOE hours and$6,429.35. The approved expenditure limit for the work assignment is 200 LOE hours.
000-*3€
Tetra Tech EM Inc.TDD Financial Summary
START Region 5 ContractProgress Table 3
Reporting Month - August 2001
S05-0108-004
DEAD CREEK SITETDD Name
HOURS:
LOE Hours
Clerical HoursTotal Labor Hours
Direct LaborTotal Direct Labor, Fringe & Overhead
CurrentMonth
ProjectTo Date Budget
% of BudgetedLOE HoursExpended
Other Direct Cost:
Other Direct Costs 124.37 124.37
Team Subcontractors:
G& A
Provisional Fee
Total Charges 6,429.35 6,429.35 0.00 0.00%
Average Charge per LOE Houro.oo
38.16
Report: N:\CP_TOOLS\6.0 Custom Reports\START 5\Financial Summary by Task.imr
38.16
iA/.J,*
Page 158 of 171
Tetra Tech EM Inc.
START Region V Contract 68-W-00129
Progress Table 1
Total Labor for the Period November 22,2000 through August 26,2001
Date: 09/05/2001
TDD# S05-0108-004
DEAD CREEK SITE G
Name Title
Current
Hours
Cumulative
Hours
Tetra Tech Labor
Connors, Jennifer L.Giedeman, Sara M.Kouris, Thomas A.Mueller, Jennifer S.Parish, Joseph M.Postiglione, Lavette D.Richey, Robin K.Wagner, Judith L.Wendt, Mary FrancesWilliams, Bryan L.
Administrative AssistantEnvironmental TechnicianProgram Manager / Civil EngineerEnvironmental TechnicianProject Manager / GeophysicistFinancial ManagerWord ProcessorHealth & Safety DirectorLibrarianSenior Environmental Scientist
Subtotal S05-0108-004 170.00 170.00
Total for TDD# S05-0108-004 170.00 170.00
Report: N:\CP_TOOLS\6.0 Custom Reports\START 5\LABOR.imrPage 125
oo°
Tetra Tech EM IDC.Progress Table 2
Period Ending 08/26/01Project Non-Labor Detail
Date: 08/30/2001
Name Invoice Transaction Description Amount
Project Description: DEAD CREEK SITETDD#No: S05-0 108-004
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
- Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
7.00
1.02
8.52
5.11
1.23
2.60
0.13
1.39
0.04
0.70
0.11
1.04
0.88
0.87
1.51
1.98
1.93
1.44
0.95
0.13
0.59
5.00
12.98
2.16
0.66
0.25
0.35
0.23
0.98
10.37
1.81
2.96
3.32
1.53
2.04
4.28
13.77
1.55
0.27
0.58
2.20
1.77
12.47
0.34
Report: N:\CP_TOOLS\6.0 Custom Reports\START 5\Proj Non-Labor Detail.imr Page 95 000^3'
Tetra Tech EM Inc. Date: 08/30/2001Progress Table 2
Period Ending 08/26/01Project Non-Labor Detail
Name Invoice Transaction Description AmountProject Description: DEAD CREEK SITETDD#No: S05-0108-004
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Total Computer
0.31
2.26
0.40
0.36
124.37
Total DEAD CREEK SITE S05-0108-004 124.37
Repon: N:VCP_TOOLS\6.0 Custom Repons\START 5\Pn>j Non-Labor DeuiUmr PaEC 96
0004.4.C
SITE SPECIFIC DETAIL ATTACHMENT
CONTRACT*INVOICE *
68-W-00-129G9009-009
CONTRACTOR NAME TETRA TECH EM, INC.INVOICE PERIOD OF PERFORMANCE 07/30/01-08/26/01
SITES W/ SSID(continued)
SUBTOTAL
(Optional) .TOO* or WorkAukmment*
S05-0104-021S05-0104-023S06-0104-024S05-0104-025SOS-0104-026SOS-0104-027S05-0104-031S05-0104-032305-01054)05S05-0105-006SOS-0105-011S05-0105-012SOS-0105-013S05-0105-016SOS-0105-017SOS-0105-01BSOS-0106-002S05-0106-014S05-0106-015S05-0107-007S05-0107-011S06-0106-004SOS-0108-007S05-0108-0145054)108-024S05-0108-026
«2
Region SSID
B5W7B5U7B5V1
BSU6B5W7BSW7B5Y4B5H6B5Y6BSH60692B579B588B588B552B5P8B5Y8BSZ3BSZ3OSCDBS1A058EOS4QBSZ6BSF3BSJ8
#3
ActionCod*
RSRSRSRSRSRSRVRVRVRVRSRSRSRSBBBBRVRVRVRSRVRSRSRSBBRS
*4
OperableUmigPOSl
0000000000000000000000000000000000000000000000
000000
#5
Site NameSite Description
Non-
SWIFT CHEMICAL & AGRICULTURALWESTERN FORGE WORKS
DERANEK4SONEAGLE PITCHER RESIDENTIALINTERCOASTAL PA! NT CORP
SWIFT CHEMOCAL AND AGRICULTURALROSEMARIE AVE MERCURY
ROBERT BETS MEMORAL TRUSTJEFFERSON AVENUE CAUSTI C SPILL
ROBERT BETS MEMORAL TRUSTH&R LANDFILL
WAUCONDA WETLANDSILLINOIS CENTRAL SPRINGILLINOIS CENTRAL SPRI NG
MICHCON H100 SECOND STREET
LAKE COUNTY MOTOR HOME MERCURYSAGE AVE MERCURY SPILLSAGE AVE MERCURY SPILL
HOPKINS AIRPORTGINGER AVE. MERCURY SPILL
DEAD CREEK SI TEGJOHNSON IRON AND METAL
KALEY STREET DRUMKIRBY TIRE FIRE
VERMICUUTE PROCESSING 1
*6
ActonSequence*
(3POS)
C001
C001C001C001C001C001C001C001
C001C001C001
C001C001cooiC001C001COOIC001COOIC001C001C001C001
C001C001
C001
IFMSUna
Reference
AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA
#8
Invoice*
#9
CurrentAdjustment
Amount
#10
Cumulative Charge
120.173.81 786,862.611
PAGE 3 OF 6
TECHNICAL STATUS REPORT
Work Assignment Number: CA-01 Date: October 19, 2001TDD No.: S05-0108-004 Reporting Period: August 27 throughTDD Name: Dead Creek Site G September 30,2001EPA TDD Manager: Sam Berries TDD Completion Date: Not AssignedTetra Tech TDD Manager: Bryan Williams Percent Work Completed (Hours): N/A
TDD Type: Removal Site Evaluation
Distribution: Lorraine Kosik, US EPA START Project OfficerLisa Smith, US EPA START Contracting OfficerThomas Kouris, Tetra Tech EM he. START Program Manager
1. Progress Made This Reporting Period
Tetra Tech was tasted by EPA to oversee the excavation of three drums containing evidence forPRP litigation, including documents and samples. Specific activities included laying out all theevidence to document and photodocument, and providing sample containers to split samples withthe PRP, and packaging the samples to be submitted for laboratory analysis. Tetra Techperformed on-site activities from August 20-22, 2001. ODC chargps include computer, vehiclerental, Federal Express (equipment), copier, mower rental, travel, Tent/tables/chair rental, drumtools, decontamination supplies, sample bottles, tent/chairs, and protective clothing. A charge forexcavation services from Excel Environmental appear in this invoice.
2. Problems Encountered and Resolved
None
3. Deliverables Submitted
Deliverable Date Submitted
Technical Status Report 09710/01
4. Activities Planned Next Reporting Period
Tetra Tech will finish and submit a trip report to the EPA and copy all photos to a CD ROM to besubmitted to appropriate parties.
5. Costs Incurred But Not Invoiced
None
Work Assignment Number: S05-0108-004Page 2
6. Monthly Charges and Budget
Tetra Tech has expended 62.5 level of effort (LOE) hours and $8,516.81 during the reportingperiod. The cumulative expenditure through the reporting period is 231 LOE hours and$ 14,946.16. The approved expenditure limit for the work assignment is undetermined LOE hours.
OOOG59
Tetra Tech EM Inc.TDD Financial Summary
START Region 5 ContractProgress Table 3
Reporting Month - SEPTEMBER 2001
S05-0108-004
DEAD CREEK SITETDD Name
HOURS:
LOE Hours
Clerical HoursTotal Labor Hours
Direct LaborTotal Direct Labor, Fringe & Overhead
CurrentMonth
2,619.21
ProjectTo Date
7,721.84
Budget
% of BudgetedLOE HoursExpended
0.00 0.00%
Other Direct Cost:
Other Direct CostsSubcontractorsTravel
2,948.841,579.16
252.06
3,073.211,579.16
252.06
Team Subcontractors:
G& AProvisional Fee
Total Charges 8,516.81 14,946.16 0.00 0.00%
Average Charge per LOE Hour0.00
136.27
Report N \Cf TOOLS\6 0 Custom ReportsNSTART 5\Financial Summary by Task imr
64.70
00^660Page I63ol'
Tetra Tech EM Inc.
START Region V Contract 68-W-00129
Progress Table 1
Total Labor for the Period December 31,2000 through September 30,2001
Date: 10/1(1/2001
TDD# S05-0108-004
DEAD CREEK SITE G
Name Title
Current Cumulative
Hours Hours
Tetrs Tech Labor
Connors, Jennifer L.Giedeman, Sara M.Kennedy, Mark A.Kirchner, KarenKouris, Thomas A.Luckey, Shirley D.Mueller, Jennifer S.Parish, Joseph M.Postiglione, Lavette D.Richey, Robin K.Wagner, Judith L.Wendt, Mary FrancesWilliams, Bryan L.
Administrative AssistantEnvironmental TechnicianComputer Graphics TechnicianEnvironmental ScientistProgram Manager / Civil EngineerAccounting ClerkEnvironmental TechnicianProject Manager / GeophysicistFinancial ManagerWord Processor •Health & Safety DirectorLibrarianSenior Environmental Scientist
Subtotal S05-0108-004 62.50 232.50
Total for TDD# S05-0108-004 62.50 232.50
Report: N:\CP_TOOLS\6.0 Custom Reports\START 5\LABOR.imrPage 125
Tetra Tech EM Inc.Progress Table 2
Period Ending 09-30-01Project Non-Labor Detail
Date: 10/11/2001
Name Invoice Transaction Description Amount
Project Description: DEAD CREEK SITETDD# No: S05-0108-004
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
5.28
1383.99
6.07
1.02
13.73
1.59
6.05
0.63
14.38
0.99
0.21
0.28
5.45
1.87
0.91
0.73
8.09
43.46
1884
1.38
1.10
1 89
1.42
3.97
0460,10
6905.69
1 68
0.39
0.62
0.07
1.64
9.63
11.65
0.43
1.53
0.78
12.33
8.480.94
0.22
0.96
Report NACP_TOOLS\6 0 Custom ReportsVSTART 5\Proj Non-Labor Detail imr Page 145
Tetra Tech EM Inc.Progress Table 2
Period Ending 09-30-01
Project Non-Labor Detail
Date: 10/11/2001
Name Invoice ' Transaction Description Amount
Project Description: DEAD CREEK SITETDD# No: S05-0108-004
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
\ Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Total Computer
1.52
21.87
0.71
21.04
1.87
0.82
11.09
5.20
5.17
8.83
2.42
13.63
0.59
11.21
25.04
0.72
37.69
0.76
5.39
3.50
3.53
8.7513.17
21.57
0.90
21.5014.90
6.60
479.20
Equipment
Giedeman, Sara M.
Mueller, Jennifer S.
EXPS. 08/26/01
EXPS. 08/12/01
BRUSH MOWER RENTAL
TENTJABLE, CHAIRS - RENTAL
Total Equipment
145.00
393.25
538.25
Field Supplies
Mueller, Jennifer S.
Parish, Joseph M.
Giedeman, Sara M.
Giedeman, Sara M.
TOTAL SAFETY/ HAZCO, INC.
TOTAL SAFETY/ HAZCO, INC.
TOTAL SAFETY/ HAZCO, INC.
EXPS 08/12/01 SPRAYER, DRUM TOOLS
EXPS. 08/26/01 FOAM.BATTERIES.ICE, GLOVES
EXPS 08/19/01 COOLER, WATER,CLIPBOARDS,STA>
EXPS. 08/26/01 FOIL,WATER,GAS,SPOONS,BGSPRY
2601024-001 MSA,DEC POWDER, NITR1LLE GLOV
2601024-002 (18) TYVEK COVERALLS
2601732-001 SAMPLE JARS
261.07
38.95
158.09
102.88
602.32
80.85
79.35
Q0r663Report N \CP_TOOLS\6 0 Custom Rtpom\START SNProj Non-Libor Detail imt Page 146
Tetra Tech EM Inc.Progress Table 2
Period Ending 09-30-01
Project Non-Labor Detail
Date: 10/11/2001
Name Invoice ' Transaction Description AmountProject Description: DEAD CREEK SITETDD# No: S05-0108-004
TOTAL SAFETY/ HAZCO, INC.
TOTAL SAFETY/ HAZCO, INC.
2601731-001
2601858-001
SAMPLE BOTTLES
(12) RESPIRATOR CARTRIDGES
Total Field Supplies
54.42
119.00
1,496.93
Freight/Postage
FEDERAL EXPRESS CORPORATI
FEDERAL EXPRESS CORPORATI
FEDERAL EXPRESS CORPORATI
FEDERAL EXPRESS CORPORATI
FEDERAL EXPRESS CORPORATI
FEDERAL EXPRESS CORPORATI
FEDERAL EXPRESS CORPORATI
FEDERAL EXPRESS CORPORATI
FEDERAL EXPRESS CORPORATI
FEDERAL EXPRESS CORPORATI
FEDERAL EXPRESS CORPORATI
FEDERAL EXPRESS CORPORATI
FEDERAL EXPRESS CORPORATI
FEDERAL EXPRESS CORPORATI
589188569
593282384
593282384
593313514
593853772
593853772
593853772
593313514
593853772
593853772
593853772
592724933
592724933
593882189
Postage/Delivery/Freight
Postage/Delivery/Freight
Postage/Delivery/Freight
Postage/Delivery/Freight
Postage/Delivery/Freight
Postage/Delivery/Freight
Postage/Delivery/Freight
Postage/Delivery/Freight
Postage/Delivery/Freight
Postage/Delivery/Freight
Postage/Delivery/Freight
TRKNGMZ4317041837
TRKNG#4243I7041870
Postage/Delivery/Freight
Total Freight/Postage
3.62
7.02
29.63
6.83
58.70
17.25
6.57
5.16
32.64
17.25
4.90
15.96
169.67
23.18
398.38
Reproduction
MO copier period 11
MO copier period 11
Internal Copy Realloc
Total Reproduction
14.76
14.76
6.56
36.08
Non Team Subs
EXCEL ENVIRONMENTAL 01-3052 EXCAVATION SERVICES
Total Non Team Subs
1,579.16
1,579.16
Personal Car Mileage
Mueller, Jennifer S. EXPS. 08/26/01 Travel-Ground-Pers Car
Total Personal Car Mileage
34.50
34.50
Rental Car
Giedeman, Sara M. EXPS. 08/26/01 Travel-Ground-Rental Car 38.01
Report N \CP_TOOLS\6 0 Custom ReporuVSTART 5\Proj Non-Labor Deuil imr Page 147
SITE SPECIFIC DETAIL ATTACHMENT
CONTRACT*INVOICE #
66-W-00-129G9009-010
CONTRACTOR NAME TETRA TECH EMJNC.INVOICE PERIOD OF PERFORMANCE 08/27/01 • 09rcO<01
SITES w; SSID(continued)
SUBTOTAL
(Optional)TOOK or Work
«nt«
ActionS«qu«nc« *
(3P08)
CumnlAdjustment
AmountB5W7B5U7B5V1
B5U6B5W7B5W7B5Y4B5H6B5Y6B5H60592B579B588B588B552BSP8B5YBBS24B524B525B5Z5B5Z3B5Z305CDB51A
05CDB5Z7B579
C003C003COOSCOOSCOOSCOOSC003C003C003COOSCOOSC003COOSCOOScoosC003C003C003COOScooscooscooscoosC003cooscoosC003C003cooscooscoosC003coosC003C003COOScoosC003coosC003C003COOSCOOSC003C003C003C003C003
6,570.781,895.611,868.763,200521,202.884,591.354.968.40
10,745.8514,780551,920.316.590186.298.116.951.84
665.8823,54911
829.553,078.79
21,492252,244.66
29.1476328.264675,01947
225.5418.332877.098.844,627.225.444.084.134.90
14,946.1615:491234.19263
618626,602073.59790
177216.975464,891 003.91389
535209.78978
4.0116113425
5,624827598526383172.15
5,447 167490
4.56
0.00
0.00
0000.00
0.00
0.00
1,62257304.38
000386.59
1,890.741.24750
0.00
9.795.47000328
4,693.49(20.66
7,558.115,548281,155.17
0005,415.301.323944,627.223,541914.13490811681
10,953.604.19263
6186263355
00017721
4,147714.891.003.913 89
462447,725133.98072
134255.62482
759.852638317215
5,4471674.90
058E05400540B5S3B51O
B51D
A529B5Z6BSZ6B552B5F3B51J
B5J8OSSG05VG05YT0521
A56305NE05NE
203,213,12 1,078.979.58
3 OF 6
TECHNICAL STATUS REPORT
Work Assignment Number: CA-01 Date: November 19,2001TDD No.: S05-0108-004 Reporting Period: October 1 through 28,2001TDD Name: Dead Creek Site G TDD Completion Date: Not AssignedEPA TDD Manager: Sam Borries Percent Work Completed (Hours): N/ATetra Tech TDD Manager: Bryan Williams TDD Type: Removal Site Evaluation
Distribution: Lorraine Kosik, US EPA START Project OfficerLisa Smith, US EPA START Contracting OfficerThomas Kouris, Tetra Tech EM he. START Program Manager
1. Progress Made This Reporting Period
Tetra Tech completed the letter report during the reporting period. A CD was submitted prior toand separately from the letter report. ODC charges include computer, telephone, FederalExpress, and instrument rental.
2. Problems Encountered and Resolved
None
3. Deliverables Submitted
Deliverable Date Submitted
Technical Status Report 10/19/01
CD 10/20/01
Letter Report 10/25/01
4. Activities Planned Next Reporting Period
The project is complete.
5. Costs Incurred But Not Invoiced
None
6. Monthly Charges and Budget
Tetra Tech has expended 37 level of effort (LOE) hours and $4109.81 during the reportingperiod. The cumulative expenditure through the reporting period is 268.5 LOE hours and$ 19,055.97. The approved expenditure limit for the TDD has not been assigned.
000336
Tetra Tech EM Inc.TDD Financial Summary
START Region 5 ContractProgress Table 3
Reporting Month - October 2001
rnn a S05-0108-004
TDD Name DEAD CREEK SITE
HOURS:
LOE Hours
Clerical HoursTotal Labor Hours
Direct LaborTotal Direct Labor, Fringe & Overhead
CurrentMonth
ProjectTo Date Budget
% of BudgetedLOE HoursExpended
2,803.48 10,525.32
Other Direct Cost:
Other Direct CostsSubcontractorsTravel
205.150.000.00
3,278.361,579.16
252.06
Team Subcontractors:
Team Sub - Eagle 496.32 496.32
G& AProvisional Fee
Total Charges 4,109.81 19,055.97 0.00 0.00%
Average Charge per LOE Hour0.00
109.59 70.97
Report: N:\CP_TOOLS\6.0 Custom Rcports\START 5\f ujancia) Summary by Task.imr
00C 3«j.' of :
Tetra Tech EM Inc.
START Region V Contract 68-W-00129
Progress Table 1
Total Labor for the Period November 29,2000 through October 28,2001
Date: 11/15/2:001
TDD# S05-0108-004
DEAD CREEK SITE G
Name Tide
Cumulative
Hours
Tetra Tech Labor
Connors, Jennifer L.Giedeman, Sara M.Kennedy, Mark A.Kirchner, KarenKouris, Thomas A.Kowalski, Jeanne M.Labunski, Stanley A.Luckey, Shirley D.Mann, Jon S.Mueller, Jennifer S.Parish, Joseph M.Postiglione, Lavette D.Richey, Robin K.Stumpf, Laura LWagner, Judith L.Wendt, Mary FrancesWilliams, Bryan L.
Administrative AssistantEnvironmental TechnicianComputer Graphics TechnicianEnvironmental ScientistProgram Manager / Civil EngineerWord ProcessorCivil EngineerAccounting ClerkTechnical EditorEnvironmental TechnicianProject Manager / GeophysicistFinancial ManagerWord ProcessorWord ProcessorHealth & Safety DirectorLibrarianSenior Environmental Scientist
Subtotal S05-0108-004 47.00 279.50
Total for TDD# S05-0108-004 47.00 279.50
Report: N:\CP_TOOLS\6.0 Custom Reports\START 5\LABOR.imrPage 126
Tetra Tech EM Inc.Progress Table 2
Period Ending 10/28/01
Project Non-Labor Detail
Date: 11/14/2001
Name Invoice Transaction Description AmountProject Description: DEAD CREEK SITETDD# No: S05-0108-004
Computer Usage
Computer Usage
Computer Usagev Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Compiler Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Total Computer
13.66
0.39
4.26
0.69
6.41
0.23
0.12
5.69
0.23
2.07
6.74
0.07
9.99
6.83
3.89
5.%11.48
0.05
22.08
2.18
0.56
12.58
2.50
2.16
9.68
2.951.29
11.83
11.07
0.76
2.07
6.42
1.20
7.20
1.37
5.86
0.70
0.11
183.33
Report N:\CP_TOOLS\60 Custom ReportsNSTART 5\Proj Non-Ubor Dettil imr Page 67
Tetra Tech EM Inc.Progress Table 2
Period Ending 10/28/01
Project Non-Labor Detail
Date: 11/14/2001
Name Invoice Transaction Description AmountProject Description: DEAD CREEK. SITETDD# No: S05-0108-004
FEDERAL EXPRESS CORPORATI 598424966 TRKNG#461008642338
Total Freight/Postage
5.10
5.10
Telephone
MO phone period 12
Total Telephone
16.72
16.72
Equipment
EAGLE INSTRUMENTS 01-032928-05 580EX, MIN1RAM, METHANE
Total Equipment
496.32
496.32
Total DEAD CREEK SITE S05-0108-004 701.47
Repon N:\CP_TOOLS\6 0 Custom Reports\START 5\Proj Non-Labor Detail imr Page 68 OOC340
SITE SPECIFIC DETAIL ATTACHMENT
CONTRACT*INVOICE*
68-W-00-12BG8008-011
CONTRACTOR NAME TETRA TECH EM. NC.INVOICE PERIOD OF PERFORMANCE 10/01/01 - 10/26/01
srcs \HI SSD(cortfexd)
6.570.761.895811,666.783200.521202.884,591.354.866.40
10,722.1015,227441,897.178.843497208.688.88852
865.8643.113.01
829553.078.78
24,438.442.24488
38,950.848.75884
26264.675252.18
22S.5422,578.15
848187,350.884.82722
10,594884,134.80
18,055.8717,404.584,828.013,714.827.421.453.587.80
177218,875.484.891003,813.88
702.8811,813.184,135.58
134258.807.80
80,458.378,805.721,807.39
888201,780.388,820.322.557.031.881.54
11,547.082,803.88
0.008,478.888,578.11
22280.888.874.515.148,58
0.000.000.000.000.000.00
(23.55!448.8178.8853.31
810.581.73868
0.0018,583.80
0.000.00
2,847.180.00
7.80321274.71
0.00232.71
0.004248.48
0.00252.15
v 0.005,150.58
0.004,108.611,813.35
435.363,088.00
618.360.000.000.000.000.00
167.781,623.41
123.850.00
1282.7816.453.83
0.001.047.54
832.371.616244,173.16
388.141,472.116,143.732.528.88
0.008.478.816,578.11
22260.816.674515,148.5!
DEAD CREEK SfEG
1 1924*4.781 1.M7.M3.M)
TECHNICAL STATUS REPORT
Work Assignment Number: CA-01 Date: November 19,2001TDD No.: S05-0108-004 Reporting Period: October 29 throughTDD Name: Dead Creek Site G November 25,2001EPA TDD Manager: Sam Borries TDD Completion Date: October 30,2001Tetra Tech TDD Manager: Bryan Williams Percent Work Completed (Hours): 114%
TDD Type: Removal Site Evaluation
Distribution: Lorraine Kosik, US EPA START Project OfficerLisa Smith, US EPA START Contracting OfficerThomas Kouris, Tetra Tech EM Inc. START Program Manager
1. Progress Made This Reporting Period
Tetra Tech completed the letter report during the reporting period. A CD was submitted prior toand separately from the letter report. ODC charges include copier, CDs, computer, telephone,Federal Express, and instrument rental. A credit was issued to correct a respirator cartridgecharge previously made in error.
2. Problems Encountered and Resolved
A TDD amendment request has been submitted.
3. Deliverable; Submitted
Deliverable Date Submitted
Letter Report 10/30/01
Technical Status Report 11/19/01
4. Activities Planned Next Reporting Period
None
5. Costs Incurred But Not Invoiced
None
6. Monthly Charges and Budget
Tetra Tech has expended 16 level of effort (LOE) hours and $1,141.32 during the reportingperiod. The cumulative expenditure through the reporting period is 284.5 LOE hours and$20,197.29. The approved expenditure limit for the TDD is 250 LOE hours and $16,250.
000324
Tetra Tech EM Inc.TDD Financial Summary
START Region 5 Contract_ Progress Table 3
ting Month - November 2001
S05-0108-004
DEAD CREEK SITE
rnna
TDD Name
HOURS:
LOE Hours
Clerical HoursTotal Labor Hours
Direct LaborTotal Direct Labor, Fringe & Overhead
CurrentMonth
16.00
0.00
957.45
ProjectTo Date
284.50
11.00
Budget
% of BudgetedLOE HoursExpended
11,482.77
Other Direct Cost:
Other Direct CostsSubcontractorsTravel
(30.61)0.000.00
3,247.751,579.16
252.06
Team Subcontractors:
Team Sub - Eagle 0.00 496.32
G& AProvisional Fee
Total Charges 1,141.32 20,197.29 16,250.00 124.29%
Average Charge per LOE Hour0.00
71.33
Report: N :\CP_TOOLS\6.0 Custom ReporaxSTART SNFinucial Summary by Task-nnr
70.99
0003 Page I6Sof
Tetra Tech EM Inc.
START Region V Contract 68-W-00129
Progress Table 1
Total Labor for die Period November 29,2000 through
Date. 12/07/2001
November 25,2001
TDD# S05-0108-004
DEAD CREEK SITE G
Name TitleCumulative
Hours
Tetra Tech Labor
Anderson, Mechelle MConnors, Jennifer L.Giedeman, Sara M.Kennedy, Mark A.Kirchner, KarenKouris, Thomas A.Kowalski, Jeanne M.Labunski, Stanley A.Luckey, Shirley D.Mann, Jon S.Mueller, Jennifer S.Parish, Joseph M.Postiglione, Lavette D.Richey, Robin K.Stumpf, Laura LWagner, Judith L.Wendt, Mary FrancesWilliams, Bryan L.
Environmental ScientistAdministrative AssistantEnvironmental TechnicianComputer Graphics TechnicianEnvironmental ScientistProgram Manager / Civil EngineerWord ProcessorCivil EngineerAccounting ClerkTechnical EditorEnvironmental TechnicianProject Manager / GeophysicistFinancial ManagerWord ProcessorWord ProcessorHealth & Safety DirectorLibrarianSenior Environmental Scientist
Subtotal S05-0108-004 16.00 295.50
Total for TDD# S05-0108-004 16.00 295.50
Report. N:\CP_TOOLS\6.0 Custom Reports\START 5\LABOR.imr
Tetra Tech EM Inc.Progress Table 2
Period Ending 11/25/01
Project Non-Labor Detail
Date: 12/12/2001 i
Name Invoice Transaction Description Amount
Project Description: DEAD CREEK SITETDD# No: S05-0108-004
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Computer Usage
Total Computer
1.23
25.38
0.23
12.55
14.24
0.30
0.77
0.74
1.24
10.66
2.78
70.12
Field Supplies
US OFFICE PRODUCTS 33736455-001
BT OFFICE PRODUCTS INTERN 33391642-001
TOTAL SAFETY/ HAZCO, INC. 2601024-003
CDRWTBLECD'S
CD LABELS
RESPIRATOR CARTRIDGES- CORR.
Total Field Supplies
20.20
15.10(172.47)
(137.17)
Freight/Postage
FEDERAL EXPRESS CORPORATI 598796610
FEDERAL EXPRESS CORPORATI 598796610
FEDERAL EXPRESS CORPORATI 598796610
FEDERAL EXPRESS CORPORATI 599741223
FEDERAL EXPRESS CORPORATI 599741223
Postage/Delivery/Freight
Postage/Delivery/Freight
Postage/Delivery/Freight
Postage/Delivery/Freight
Postage/Delivery/Freight
Total Freight/Postage
4.44
4.44
4.48
11.65
9.73
34.74
Reproduction
MO copier period 2
Total Reproduction
1.70
1.70
Total DEAD CREEK SITE S05-0108-004 (30.61)
Report N:\CP_TOOLS\6 0 Cuaom Reporu\STAJlT SVProj Non-Labor Detail imr Page 67
00032';
CONTRACT#INVOICE #
68-W-00-129G3009-OI2
CONTRACTOR NAME TETRATcCH EM.iNC.INVOICE PERIOD OF PERFORMANCE 10/2901-11/26/01
SITES VW SSID(oarrtirwed)
SUBTOTAL
OOpUon*) TDCMRiotan88tD(4
P08)058E064QOS4QB6S3B6IOBS1OA529BS26B5ZB8062651 CB61CB3F3B5IJB6J306SGOSVGWINB51N
OS21A563
B5W8asvoB5JBB51V851V05NEB5J8B524B924B51TBS1TB51UBfi24B524Bill)B51U851 UBS1QB5Z6OWEB51YB5H6B51U
AdnnCoda
OP08)RSRSRSRVRVRVB6RSRSBBRSRS8BRVRSBBRSRVRSRSRSRSRSRSRSRSRSRSRSRSRSRSRSRSRVRSRSRVRVRVRSRSBBRVRVRV
OpemU.UBMBPOB)
000000DO»00000000000000CODO0000000000000000CO00000000OD000000000000000000000000000000000000
SIM Ham Kon-
DEAD CREEK SITES
Seguinc*!0PQK00030003000300030003COOSCOQ3COMCOWcoonCOOS0003COOS0303CC03CC03C003COOO0009COWCOMC003COOSO003O0030003COOSC009C003COMCOCOcoosO003oooaO0030003COOOCOBSC003C003COOOcoo;>OD03OOT3C003COM
IFMSUh.
M>ram»ABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOABOADBADBAOBADBAOBACSAOBADBAOBADBAOBADBAOBADBABO
IratefUDMtf
Cunr«ttAOJudimnlAnauHl
I T4I.32839.63
5,69I.CO
630.00.00
18.130.000.00
1,863.191B9.83
1,177.13S3.03
2^05.51O.COaco
1,744.911. 614.84
0.001,881.094,188.89
934.795,224.392.303. ISI.432.9S1.91&93
6.4SI.M7,420.16
55.802,014.274,457.173.768.26t.002.712,917.15
521.47633.03
OU368L3312,7708627,66813112,69837fO.041.141,268.19
28.601.888,533.25UI2&76
124.187.43
M10
Cftams20.197.29(8,244.11W.6I9.W4,179.028^51.473.537.80
193,346.975,464.691.005.777.03
17,116.806,278.26
756.0213.918.704.135.56
134.258.85(2.51
82.071.219.905.723,76a455LOS&.792.725.18
14,844.7)4.660.1S1,632.653.998.47
J5.6Z9.628.451.94
10,024.0755.90
10,483.954^67.179,042.62«,002.7I9,498.26
SZ1.47833.03
30.819.3219,646.1732.7I6UB714,05113110.041.141.269.19
28,681.688^33.251,128.76
1.8M.13M7
PAGE 40F7
TECHNICAL STATUS REPORT
Work Assignment Number: CA-01 Date: November 19,2001TDD No.: S05-0108-004 Reporting Period: November 26 throughTDD Name: Dead Creek Site G December 30,2001EPA TDD Manager: Sam Borries TDD Completion Date: October 30,2001Tetra Tech TDD Manager: Bryan Williams Percent Work Completed (Hours): 114%
TDD Type: Removal Site Evaluation
Distribution: Lorraine Kosik, US EPA START Project OfficerLisa Smith, US EPA START Contracting OfficerThomas Kouris, Tetra Tech EM he. START Program Manager
1. Progress Made This Reporting Period
A 1 hour labor charge appears in error and will be credited in a subsequent invoice. A previoustelephone charge also appears.
2. Problems Encountered and Resolved
A TDD amendment request has been submitted.
3. Deliverables Submitted
Deliverable Date Submitted
Technical Status Report 12112/01
4. Activities Planned Next Reporting Period
None
5. Costs Incurred But Not Invoiced
None
6. Monthly Charges and Budgets
Tetra Tech has expended 1 level of effort (LOE) hours and $108.44 during the reporting period;all but the telephone charge will be credited. The cumulative expenditure through the reportingperiod is 285.5 LOE hours and $20,305.73. The approved expenditure limit for the TDD is 250LOE hours and $16,250.
000315
Tetra Tech EM Inc.TDD Financial Summary
START Region 5 ContractProgress Table 3
Reporting Month - December 2001
S05-0108-004
DEAD CREEK SITE
rnna
TDD Name
HOURS:
LOE Hours
Clerical HoursTotal Labor Hours
Direct LaborTotal Direct Labor, Fringe & Overhead
CurrentMonth
ProjectTo Date Budget
% of BudgetedLOE HoursExpended
90.25 11,573.02
Other Direct Cost:Other Direct CostsSubcontractorsTravel
2.220.000.00
3,249.971,579.16
252.06
Team Subcontractors:
Team Sub - Eagle 0.00 496.32
G& AProvisional Fee
Total Charges 108.44 20,305.73 16,250.00 124.96%
Average Charge per LOE Hour0.00
108.44
Retort: N:\CP_TOOLS\6.0 Ciaom ReporoVSTART 5\Rn*nti»l Summary by Tajtimr
71.12
OOC316 Page 164 of
Tetra Tech EM Inc.
START Region V Contract 68-W-00129
Progress Table 1
Total Labor for the Period November 29,2000 through
Date: 01/03/2002
December 30,2001
TDD# S05-0108-004
DEAD CREEK SITE G
Name TitleCumulative
Hours
Tetra Tech Labor
Anderson, Mechelle MConnors, Jennifer L.Giedeman, Sara M.Kennedy, Mark A.Kirchner, KarenKouris, Thomas A.Kowalski, Jeanne M.Labunski, Stanley A.Luckey, Shirley D.Mann, Jon S.Mueller, Jennifer S.Parish, Joseph M.Postiglione, Lavette D.Richey, Robin K.Stumpf, Laura LWagner, Judith L.Wendt, Mary FrancesWilliams, Bryan L.
Environmental ScientistAdministrative AssistantEnvironmental TechnicianComputer Graphics TechnicianEnvironmental ScientistProgram Manager / Civil EngineerWord ProcessorCivil EngineerAccounting ClerkTechnical EditorEnvironmental TechnicianProject Manager / GeophysicistFinancial ManagerWord ProcessorWord Processor ;
Health & Safety DirectorLibrarianSenior Environmental Scientist
Subtotal S05-0108-004 1.00 296.50
Total for TDD# S05-0108-004 1.00 296.50
Report: N:\CP_TOOLS\6.0 Custom ReportsVSTART 5\LABOR.irnrPage 126000317
Tetra Tech EM Inc. Date: 01/03/2002Progress Table 2
Period Ending 12/30/01
Project Non-Labor Detail
Name Invoice Transaction Description AmountProject Description: DEAD CREEK. SITETDD#No: S05-0108-004
CABLE & WIRELESS, INC. EMO8003119OCOI Telephone 122
Total Telephone 222
Total DEAD CREEK SITE S05-0108-004
Report N \CP_TOOLS\6 0 Custom Reporu\START 5\Proj Non-Labor Detail imr PagC 63
000318
SITE SPECIFIC DETAIL ATTACHMENT
CONTRACT #INVOICES
68-W-00-129G9009-013
RACTOR NAME TETRA TECH EM, INC.OD OF PERFORMANCE 11/26/01-12/30/01
SITES W/ SSID(continued)
SUBTOTAL
orWorKAtilanmanl*S05-0108-004
POS)058E054Q054QB5S3B510B51D
A529B5Z6B5Z6B552B51CB51CB5F3B51JB5J805SG05VGB51N
B51N05YT0521
A56305NEB5W805VGB5J8B51VB51V05NEB5J8B524B524B51TB51TB51UB524B524B51UB51UB51UB51Q
B5ZS059EB51YB5H6B51U
B5Z6B52H05RG
(2 POS)RSRSRSRVRVRVBBRSRSBBRSRSBBRVRSBBRSRVRSRSRSRSRSRSRSRSRSRSRSRSRSRSRSRSRVRSRSRVRVRVRSRSBBRVRVRVRSRVRS
Unit (2 POS)0000000000000000000000000000000000000000000000000000000000000000000000000000.0000000000000000000000
Site Damlptlen#7
ADBAOBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBAOBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADBADB
Amount106.44624.13
0.00541.8053.03
0.000.00
27.640.00
1,193.470.000.00
166.94905.87
0.000.00
3,384.875.633.13
0.00409.43
1,589.07410.48
4,422.243,728.05
0.00268.12
12,220.290.00
14,968.550.000.00
17,293.246,400.70
0.002,462.07
0.000.00
1,720.902,483.477,980.99
48,322.785,447.061,226.645,123.525,383.58
0.00
7,035.702,244.51
74.90
276,409.36>AQE 4 OF 8
Cumulative Charae20,305.7318,868.2410,519.014,720.828,304.503,597.90
193.347,003.104,891.006,970.55
17,115.806,273.26
922.9614,824.574,135.56
134.2512,037.3867,704.34
9,905.724,197.886,674.863,135.66
v 19,266.958,588.231,932.853,866.59
27,848.916,451.94
24,992.6255.90
10,493.9521.760.4115,443.321,002.71
11,958.33521.47833.03
32,340.2222,128.6440,699.8662,382.0915,488.202,495.83
33,715.1813,916.83
1,128.757,035.702,244.51
74.90
2.080,636.23
TECHNICAL STATUS REPORT
Work Assignment Number: CA-01 Date: May 7, 2002TDD No.: S05-0108-004 Reporting Period: April 1 through 28, 2002TDD Name: Dead Creek Site G TDD Completion Date: October 30, 2001EPA TDD Manager: Sam Borries Percent Work Completed (Hours): 115%Tetra Tech TDD Manager: Bryan Williams TDD Type: Removal Site Evaluation
Distribution: Lorraine Kosik, US EPA START Project OfficerLisa Smith, US EPA START Contracting OfficerThomas Kouris, Tetra Tech EM he. START Program Manager
1. Progress Made This Reporting Period
A request for additional copies of the final report and the photo log CD were received.Information was redirected to Sam Borries. Apportioned program management activites appearin this invoice.
2. Problems Encountered and Resolved
The report was kcated in the US EPA files in Chicago and the requested copies were made. The.copy of the submitted photo log has not been located in US EPA document control as of the dateof this report.
3. Deliverables Submitted
Deliverable Date Submitted
None
4. Activities Planned Next Reporting Period
A TDD amendment will be submitted to cover expended labor hours and costs.
5. Costs Incurred But Not Invoiced
None
6. Monthly Charges and Budget
Tetra Tech has expended 1.5 level of effort (LOE) hours and $158.26 during the reporting period.The cumulative expenditure through the reporting period is 287 LOE hours and $20,463.99. Theapproved expenditure limit for the TDD is 250 LOE hours and $16,250.
00^221
Tetra Tech EM Inc.TDD Financial Summary
START Regions ContractProgress Table 3
Reporting Month - April
S05-0108-004
DEAD CREEK SITE
mn*
TDD Name
HOURS:
LOE Hours
Clerical HoursTotal Labor Hours
Direct LaborTotal Direct Labor, Fringe & Overhead
CurrentMonth
1.50
0.00
ProjectTo Date
287.00
11.00
Budget
% of BudgetedLOE HoursExpended
136.03 11,709.05
Other Direct Cost:
Other Direct CostsSubcontractorsTravel
0.000.000.00
3,249.971,579.16
252.06
Team Subcontractors:
Team Sub - Eagle 0.00 496.32
G& AProvisional Fee
Total Charges 158.26 20,463.99 16,250.00 125.93%
Average Charge per LOE Hour0.00
105.51 71.30
Report: N:\Cr_TOOLStf.O Custom Repom\ST\RT financial Summary by TailumrPage 164 of 297
000222
Tetra Tech EM Inc.
START Region V Contract 68-W-00129
Progress Table t
Total Labor for the Period November 29,2000 through
Date: 05/01/2002
April 28,2002
TDD# SOS-0108-004
DEAD CREEK SITE G
Name Title
Cumulative
Hours
Tetra Tech Labor
Anderson, Mechelle MConnors, Jennifer L.Giedeman, Sara M.Kennedy, Mark A.Kirchner, KarenKouris, Thomas A.Kowalski, Jeanne M.Labunski, Stanley A.Luckey, Shirley D.Mann, Jon S.Mueller, Jennifer S.Parish, Joseph M.Postiglione, Lavette D.Richey, Robin K.Stumpf, Laura LWagner, Judith L.Wendt, Mary FrancesWilliams, Bryan L.
Environmental ScientistAdministrative AssistantEnvironmental TechnicianComputer Graphics TechnicianEnvironmental ScientistProgram Manager / Civil EngineerWord ProcessorCivil EngineerAccounting ClerkTechnical EditorEnvironmental TechnicianProject Manager / GeophysicistFinancial ManagerWord ProcessorWord ProcessorHealth & Safety DirectorLibrarianSenior Environmental Scientist
Subtotal S05-0108-004 1.50 298.00
Total for TDD# S05-0108-004 1.50 298.00
Report: N:\CP_TOOLS\6.0 Custom ReportsVSTART 5\LABOR.imrPage 126
000223
SITE SPECIFIC DETAIL ATTACHMENT
CONTRACT #
INVOICE #
68-W-00-129
G9009-017CONTRACTOR NAME TETRA TECH EM, INC.
INVOICE PERIOD OF PERFORMANCE 04/01/02 - 04/28/02
SITES VW SSID(continued)
#1
(Optional)TDD* or WorkAssignment*
S05-0108-004
#2
RegionSSID (4
POS1
058E0540054QB5S3B51D
BS1D
AS29B5Z6BSZ6BS52B51C
IB51C
BSF3
B51J
B5J8
OSSG05VGBS1N
BS1N
05YT
0521
AS6305NEB5W8OSNE
BSW8
05VGB5J8B51V
B51V
OSNEB5J8
BS24B51T
B51T
B51U
B524B524
ActionCode
(2POSI
RSRSRSRVRVRVBBRSRSBBRSRSBBRVRSBBRSRVRSRSRSRSRSRSRSRSRSRSRSRSRSRSRSRSRSRVRSRSRV
OperableUnit (2 POS)
000000000000000000000000
00000000
0000
000000000000000000000000
00000000
00000000no
Site Name Non-SiteDescription
DEAD CREEK SITE G
ActionSequence*
(3POS1C001
COOIC001
C001
C001
C001
C001
C001
C001
C001
C001
C001
C001
C001
C001
C001
C001
C001
COQ1
C001
C001
C001
COOI
C001
C001
C001
C001
C001
C001
C001
C001
C001
C001
C001
C001
C001
C001
C001
COOi
#7
IFMSUna
Reference
ADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADRADR
Invoice *Legend
CurrentAdjustment
Amount
158.26
158.26
0.000.00
0.00
0.00
0.00
0.00
0.00
1,168.28183.84
0.00
0.00
813.550.00
868.545,470.38
165.000.00
0.00
0.00
0.00
0.00
0.00
139.530.00
11,828.700.00
5,673.071,391.11
0.00
385.010.00
0.00
86.96
*10
Cumulative Charge
20,463.9925,282.84
10,519.01
7,349.98
9,292.33
3,597.90
1,256.60
7,012.09
4,891.00
10,040.75
17,119.21
6,273.26
6,584.69
16,824.08
4,135.58
134.25
12,402.95
69,845.02
9,905.72
8,333.27
15.492.92
5,008.10
20,274.15
9,748.27
5,675.78
814.52
1,932.85
3,866.59
40,511.13
6,451.94
79,432.01
55.90
51,992.37
18,042.79
1,002.71
13,878.03
521 47633.03
33327.71
TECHNICAL STATUS REPORT
Work Assignment Number: CA-01 Date: July 9,2002TDD No.: S05-0108-004 Reporting Period: May 27 through June 30,TDD Name: Dead Creek Site G 2002EPA TDD Manager: Sam Borries TDD Completion Date: October 30,2001Tetra Tech TDD Manager: Bryan Williams Percent Work Completed (Hours): 115%
TDD Type: Removal Site Evaluation
Distribution: Lorraine Kosik, US EPA START Project OfficerLisa Smith, US EPA START Contracting OfficerThomas Kouris, Tetra Tech EM he. START Program Manager
1. Progress Made This Reporting Period
Tetra Tech performed file maintenance and reviewed financial data.
2. Problems Encountered and Resolved
A TDD amendment is forthcoming.
3. Deliverable Submitted
Deliverable Date Submitted
None
4. Activities Planned Next Reporting Period
None
5. Costs Incurred But Not Invoiced
None
6. Monthly Charges and Budget
Tetra Tech has expended 1 level of effort (LOE) hours and $88.93 during the reporting period.The cumulative expenditure through the reporting period is 288 LOE hours and $20,552.92. Theapproved expenditure limit for the TDD is 250 LOE hours and $16,250.
000259
Tetra Tech EM Inc.
TDD Financial SummarySTART RegionS Contract
Progress Table 3Reporting Month - June 2002
S05-0108-004
DEAD CREEK SITE
rnn*
TDD Name
HOURS:
LOE Hours
Clerical HoursTotal Labor Hours
Direct LaborTotal Direct Labor, Fringe & Overhead
CurrentMonth
75.27
ProjectTo Date
11,784.32
Budget
% of BudgetedLOE HoursExpended
Other Direct Cost:
Other Direct CostsSubcontractorsTravel
0.000.000.00
3,249.971,579.16
252.06
Team Subcontractors:
Team Sub - Eagle 0.00 496.32
G& AProvisional Fee
Total Charges 88.93 20,552.92 16,250.00 126.48%
Average Charge per LOE Houro.oo
88.93
Report: N:\CP_TOOLS\6.0 Custom Rcpom\START financial Summary by Tastin
71.36
00^260 P i sc l64of35
Tetra Tech EM Inc.START Region V Contract 68-W-00129
Progress Table I
Total Labor for the Period November 29,2000 through
Date: 07/08/2002
June 30,2002
TDD# S05-0108-004
DEAD CREEK SITE G
Name Tide
Cumulative
Hours
Tetra Tech Labor
Anderson, Mechelle MConnors, Jennifer L.Giedeman, Sara M.Kennedy, Mark A.Kirchner, KarenKouris, Thomas A.Kowalski, Jeanne M.Labunski, Stanley A.Luckey, Shirley D.Mann, Jon S.Mueller, Jennifer S.Parish, Joseph M.Postiglione, Lavette D.Richey, Robin K.Stumpf, Laura LWagner, Judith L.Wendt, Mary FrancesWilliams, Bryan L.
Environmental ScientistAdministrative AssistantEnvironmental TechnicianComputer Graphics TechnicianEnvironmental ScientistProgram Manager / Civil EngineerWord ProcessorCivil EngineerAccounting ClerkTechnical EditorEnvironmental TechnicianProject Manager / GeophysicistFinancial ManagerWord ProcessorWord ProcessorHealth & Safety DirectorLibrarianSenior Environmental Scientist
Subtotal S05-0108-004 1.00 299.00
Total for TDD# S05-0108-004 1.00 299.00
Report: N:\CP_TOOLS\6.0 Custom ReportsXSTART SNLABOR.imrPage 128
00^261
SITE SPECIFIC DETAIL ATTACHMENT
CONTRACT tt
INVOICE tt
66-W-00-129
G9009-019
CONTRACTOR NAME 7?!?* TECH EM, INC.
INVOICE PERIOD OF PERFORM ANCE 65/27/62-6/30/02
SITES W/SSID
(continued)
#1
(OpSon«l)TOOK or Work
S05-0108-004
#2
RegionSSIO (4
POS1058E
054Q
054Q
B5S3B51DB51D
A529B5Z6BSZ6B552B51C
B51C
B5F3
B51J
B5J8B5J8
OSSG
05VG
B51NB51N05YT0521A563OSNEB5W8
OSNEB5W805VG
B5J8B51V
B51V
OSNE
B5J8
B524
B51T
B51T
B51U
B524
B524
B51U
#3
ActionCode
(2 POS)
RS
RS
RSRV
RV
RV
BB
RS
RSBB
RS
RS
BB
RV
RS
RS
BB
RS
RV
RS
RS
RS
RS
RS
RS
RS
RS
RS
RS
RS
RS
RS
RS
RS
RS
RSRV
RS
RS
RV
OperableUnit (2 POS)
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
00
#5
Site NameDescription
Non-Site
DEAD CREEK SIT EG
ActionSequence!*
OPOS1C002
C002
C002C002C002C002
C002C002
C002C002
C002C002C002C002
C002C002
C002C002C002
C002C002
C002C002
C002
• C002C002C002
C002C002
C002C002
C002
C002C002
C002C002
C002
C002
C002C002
#7
IFMSUne
Reference
AG6AG6
AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AG6AGS
Invoice ttLegend
CurrentAdjustment
Amount88.93
277.15
0.000.00
0.00
0.00
967.680.000.00
0.00
0.00
0.00
200.19238.70
0.00
0.00
0.00
0.00
730.000.00
1,523.730.00
248.24
0.000.00
0.000.00
0.00
0.00
105.500.00
12,547.49
0.00
417.060.00
0.00
49340
0.00
0.000.00
#10
Cumulative- Charge
20,552.92
25,672.23
10,519.017.349.98
9,292.33
3.597.90
2,224.287,012.094,891.00
10,040.75
17,119.216,273.26
7,544.1017,175.02
4,093.63
41.93
134.25
12,402.95
70,740.02
9,905.72
9,969.24
18,231.70
5,603.58
20,274.15
9,748.275.675.78
814.52
1,932.85
3,866.5940,722.13
6.451.94
104,450.5255.90
55,041.1418,042.791,002.71
14,721.15
521.4783303
33,32771
PAGE 4 OF 11