+ All Categories
Home > Documents > Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task...

Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task...

Date post: 25-May-2020
Category:
Upload: others
View: 18 times
Download: 0 times
Share this document with a friend
28
7174 Manufacturing Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION JUNE 2011 General Certificate of Secondary Education 2011 INSTRUCTIONS FOR THE CONTROLLED ASSESSMENT TASK You have a total of 25 hours to complete the task. You must choose one of the tasks provided and are expected to manufacture the product from the drawings supplied within the allocated timeframe.
Transcript
Page 1: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174

Manufacturing

Controlled Assessment Task

(Revised Version)

Unit 2: Manufacturing Production [GMA21]

SEPTEMBER 2009 – FOR SUBMISSION JUNE 2011

General Certificate of Secondary Education2011

INSTRUCTIONS FOR THE CONTROLLED ASSESSMENT TASK

• You have a total of 25 hours to complete the task.

• You must choose one of the tasks provided and are expected to manufacture the product from the drawings supplied within the allocated timeframe.

Page 2: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 2

Unit 2: Manufacturing Production (30%)

Instructions for teachers and students

This unit is compulsory for all students. Students have 25 hours to complete the task. It carries a weighting of 30%. The task aims to help develop an understanding of the process of designing a product and producing it. Techniques to produce a production plan should be taught along with techniques used to select appropriate materials and components and processes to produce products.

Students are not expected to have occupational competencies at this level or to be working to commercially accepted standards.

The unit introduces candidates to:

• seven aspects of designing and producing a product; • using product specifi cations; • reading and interpreting engineering drawings and diagrams; • selecting suitable materials, parts and components for a product; • creating a production plan, using processes, tools and equipment, including Computer Aided Manufacture (CAM), required to make an engineered product; • manufacturing a product; • checking the quality of their work to ensure it conforms to the standards required; and • applying health and safety procedures.

Page 3: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 3

Unit 2: Manufacturing Production

Candidates entering this component in the summer 2011 series must choose one of the following tasks and are expected to manufacture the product from the drawings supplied within the allocated timeframe:

Page 4: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 4

Task 1

Toy Car

Page 5: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 5

Toy

Car

Page 6: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 6

Page 7: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 7

Page 8: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 8

Page 9: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 9

Page 10: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 10

Page 11: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 11

Page 12: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 12

Page 13: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 13

Page 14: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 14

Page 15: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 15

Page 16: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 16

Task 2

Rocking Horse

Page 17: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 17

Page 18: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 18

Page 19: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 19

Rocke

r

Item

Numb

erPa

rt No /

Name

Descr

iption

QTY.

1.Ro

cker

Profile

as to

Draw

ing2.

All dim

ensio

ns in m

m.Ma

terial:

Woo

dCC

EA.

700

R30

R 35

R1228

350

R210

240

R 210

350

210

215

280

77.5

1

15

Page 20: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 20

Page 21: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 21

Page 22: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 22

Page 23: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 23

Item

No.

Part N

umbe

r / Na

meDe

scripti

onQT

C.6.

Tail

Blank:

160 x

80 x 1

7mm

1.Ma

terial:

Woo

dAll

dimen

sions

in mm.

CCEA

.

R 50

150

75

Ø10

35

35

100

R5

6

Tail

15

Page 24: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 24

Page 25: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 25

Page 26: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 26

Page 27: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 27

Hand

le

Item

No.

Part N

umbe

r / Na

meDe

scripti

onQT

Y.9.

Hand

le / Do

wel

Blank

150 x

221.

All dim

ensio

ns in m

m.Wo

odCC

EA.

125

3

9

Ø24

Page 28: Controlled Assessment Task (Revised Version) Unit 2: …€¦ · Controlled Assessment Task (Revised Version) Unit 2: Manufacturing Production [GMA21] SEPTEMBER 2009 – FOR SUBMISSION

7174 28


Recommended