33
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Controlled Hydrogen Fleet and Infrastructure Analysis 2012 DOE Annual Merit Review and Peer Evaluation Meeting Keith Wipke, Sam Sprik, Jennifer Kurtz, Todd Ramsden, Chris Ainscough, Genevieve Saur May 17, 2012: Washington, DC This presentation does not contain any proprietary, confidential, or otherwise restricted information Project ID# TV001 V2, 4/5/12
Transcript
Page 1: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.

Controlled Hydrogen Fleet and Infrastructure Analysis

2012 DOE Annual Merit Review and Peer Evaluation Meeting

Keith Wipke, Sam Sprik, Jennifer Kurtz, Todd Ramsden, Chris Ainscough, Genevieve Saur

May 17, 2012: Washington, DC This presentation does not contain any proprietary, confidential, or otherwise restricted information

Project ID# TV001

V2, 4/5/12

Page 2: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

2

Fuel Cell Electric Vehicle Learning Demo Project Objectives, Relevance, and Targets • Objectives

– Validate H2 FC Vehicles and Infrastructure in Real-World Setting – Identify Current Status and Evolution of the Technology

• Relevance – Objectively Assess Progress Toward Targets and Market Needs – Provide Feedback to H2 Research and Development – Publish Results for Key Stakeholder Use and Investment Decisions

APC/Shell Pipeline station, Torrance, CA. Photo: NREL

Performance Measure Interim (2009)*

Ultimate (2020)

Fuel Cell Stack Durability 2000 hours 5000 hours

Vehicle Range 250+ miles 300+ miles

Hydrogen Cost at Station $3/gge $2-4/gge**

Key Targets

*Project extended 2 years through 2011; **Previously $2-3/gge for 2015

Outside review panel

Details of each of these 3 results in technical backup slides (previous AMR)

Page 3: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

3

Project Overview

• Project start: FY03 • Project end: FY12 • 98% of Task III complete (see timeline slide)

A. Vehicles – lack of controlled & on-road H2 vehicle and FC system data

B. Storage – technology does not yet provide necessary 300+ mile range

C. Hydrogen Refueling Infrastructure – cost and availability

D. Maintenance and Training Facilities – lack of facilities and trained personnel

E. Codes and Standards – lack of adoption/validation

H. Hydrogen Production from Renewables – need for cost, durability, efficiency data for vehicular application

I. H2 and Electricity Co-Production – cost and durability

• Funding prior to FY11 : $5517K • FY11 funding: $650K • Planned FY12 funding: $400K ($6,567K total over 10 fiscal years)*

Timeline

Budget

Tech. Val. Barriers

• See partner slide

Partners

*Related OEM/energy Learning Demonstration projects received $170M DOE funding and provided $189M cost-share for a total of $359M

Page 4: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

4

Approach and Accomplishments: Project Timeline and Major Milestones

Task I – Project Preparation [100% Complete]

Task II – Project Launch [100% Complete]

Task III – Data Analysis and Feedback to R&D activities (partial list) [98% Complete] 8 Publication of first “composite data products” 9 Evaluate FC stack time to 10% voltage degradation relative to 1000-hour target 10 Decision for purchase of additional vehicles based on performance, durability, cost 11 Preliminary evaluation of dominant real-world factors influencing FC degradation 12 Introduction of 2nd generation FC systems into vehicles begins 13 FCVs demonstrate 250-mile range without impacting passenger cargo compartment 14 Validate FCVs with 2,000 hour durability and $3.00/gge (based on volume production) 15 Data analysis continues with data from 2 of the 4 OEM/Energy teams plus CHIP stations 16 Conclusion of data submission to NREL on pre-commercial FCEVs (Sept. 2011) 17 DOE Milestone: Validate 40 adv. technology FCEVs with up to 600 hours operation 18 Final data analysis and report on Learning Demonstration 19 Preparation for next FCEV validation project

4

Task I 1 2 3

Task II 5 6

Task III 7 14 10

NREL Quarterly Analysis of Data

9

5/06

11

5/05

8

FY03 FY04 FY05 FY06 FY07 FY08 FY09

5/07

12 13

6/08 5/04

FY10

5/09

15

FY11

6/10

16 18

FY12

5/11

17

2 teams concluded their projects

5/12

19

Gen

1 G

en 1

+

Gen

2 2

OEM

s

Page 5: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

5

Project Approach

• Provide facility and staff for securing and analyzing industry sensitive data o NREL Hydrogen Secure Data Center (HSDC)

• Perform analysis using detailed data in HSDC to: o Evaluate current status and progress toward targets o Feed back current technical challenges and

opportunities into DOE H2 R&D program o Provide originating companies with analytical

results on their own data (detailed data products) o Collaborate with industry partners on new analyses

• Publish/present progress of project to public and stakeholders (composite data products)

Page 6: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

6

CDPs

DDPs

Public

Composite Data Products (CDPs) • Aggregated data across multiple systems,

sites, and teams • Publish analysis results every six months

without revealing proprietary data2

Detailed Data Products (DDPs) • Individual data analyses

• Identify individual contribution to CDPs • Shared every six months only with the

partner who supplied the data1

1) Data exchange may happen more frequently based on data, analysis, & collaboration 2) Results published via NREL Tech Val website, conferences, and reports (http://www.nrel.gov/hydrogen/proj_learning_demo.html)

Project Approach (cont.) Supporting Both DOE/Public as Well as Technology Developers

Results

Bundled data (operation & maintenance/safety) delivered

to NREL quarterly

Internal analysis completed quarterly

Page 7: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

7

Industry Partners: Collaborative Relationship, Working Through Details of Analysis, was Critical to Success

Gen 1 & 2 Gen 1 Gen 2

Ford/BP and Chevron/Hyundai-Kia Participated Through 2009

Gen 1

Gen 2 Gen 2

Gen 1

Collaboration with Daimler, GM, and Air Products;

(CHIP)*

*CHIP = California Hydrogen Infrastructure Project

Data in the Last Year (through Sept.) came from These 3 Companies

Page 8: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

8

4

83

45

51

-

20

40

60

80

100

120

140

160

180

200

Cum

ulat

ive

Vehi

cles

Dep

loye

d/R

etire

d1

Vehicle Deployment by On-Board Hydrogen Storage Type

700 bar on-road350 bar on-roadLiquid H2 on-road700 bar retired350 bar retiredLiquid H2 retired

(1) Retired vehicles have left DOE fleet and are no longer providing data to NREL(2) Two project teams concluded in Fall/Winter 2009Created Dec-13-11 3:12 PM

183

NREL cdp_fcev_25

(2)

Vehicle Status: All Project Vehicles in the Last Two Years Were Using 700 bar Storage

51 vehicles on road 132 retired

Large # vehicles required for statistical

significance

Page 9: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

9

7

12

6

0

5

10

15

20

25

Num

ber o

f Sta

tions

Reporting Period

Cumulative Stations

Continuing Outside of ProjectRetired StationsCurrent Project Stations

NREL cdp_fcev_31Created Dec-9-11 9:15 AM

Infrastructure Status: Out of 25 Project Stations, 13 Are Still Operational* (6 outside of DOE project)

Jan-31-2012

2 Online 3 Future

54 Online 15 Future

6 Online

SF Bay Area

DC to New York

3 Online

Detroit Area

Los Angeles Area

16 Online 11 Future

3 mile radius

6 mile radius

12

7

6

**

** Funded by state of CA or others, outside of this project

* CDP station status is as of 9/30/11

Page 10: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

10

0

1

2

3

4

5

6

7

8

9

Compressed Liquid Pipeline Reforming Electrolysis

Num

ber o

f Sta

tions

Learning Demonstration Hydrogen Stations by Type

Operating Outside of ProjectOperating Within ProjectHistorical 2005-2009*

NREL cdp_fcev_32Created Dec-9-11 9:15 AM

Delivered On-Site Production

*Some project teams concluded Fall/Winter 2009. Markers show the cumulative stations operated during the 2005-2009 period

Accomplishment: Project Evaluated Many Types of Hydrogen Stations and Made Results Public

Note: Many demonstration stations were taken offline as

planned at conclusion of demo. Some stayed open and/or

received upgrades (CA and NY).

* CDP station status is as of 9/30/11

Page 11: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

11

122429

508441

0

100000

200000

300000

400000

500000

600000

0

25000

50000

75000

100000

125000

# Tr

ips

Size

of D

ata

(MB

)

Cumulative On-Road Data Received for Fuel Cell Vehicle Learning Demonstration

MB of data

# trips

Accomplishment: 27 Quarters (7 years) of Data Analyzed to Date, Two New Sets of Composite Data Products Published Since Last AMR

2005 Review

2006 Review

2007 Review

2010 Review

= Composite Data Products Published

Through September 2011: 500,000 individual vehicle trips

122 GB of on-road data 151,000 kg H2 produced/dispensed

3,500,000 miles driven

2008 Review

2011 Review

2012 Review

2004 Review

2009 Review

Page 12: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

12

Accomplishment: Total of 99 CDPs Published (40 Winter 2011 CDPs)

Only selected highlights (mostly from the last year) will be covered

Page 13: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

13

0 50 100 150 200 250 3000

5

10

Perc

enta

ge o

f Ref

uelin

gs

Distance between refuelings [Miles]2

Distance Driven Between Refuelings: All OEMs

Gen1Gen2After 2009Q4

NREL cdp_fcev_80

1. Some refueling events are not detected/reported due to data noise or incompleteness.2. Distance driven between refuelings is indicative of driver behavior and does not represent the full range of the vehicle.

Gen1 Refuelings1 = 18941 Median distance between refuelings = 56 Miles Gen2 Refuelings1 = 6870 Median distance between refuelings = 81 Miles

Created: Dec-13-11 3:57 PM

Refuelings after 2009Q41 = 9937 Median distance between refuelings = 98 Miles

Accomplishment: Vehicles Show Continued Improvement in Real-World Driving Range

+45% improvement Gen 1 to Gen 2

+75% improvement in real-world driving

range with latest adv. tech. vehicles

Note: Actual range possible >200 miles

2

2

2

Page 14: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

14

Sun Mon Tues Wed Thur Fri Sat0

2

4

6

8

10

12

14

16

18

20

Dis

pens

ed H

ydro

gen

[% o

f tot

al]

Day of Week

Dispensed Hydrogen per Day of Week

0

3

6

9

12

15

18

21

24

27

30

Dai

ly A

vera

ge [k

g]

27 kg/day avgAll StationsIndividual Stations

NREL cdp_fcev_83Created: Dec-15-11 1:20 PM

Accomplishment: New Infrastructure CDP Gives Insight Into Specific Fueling Usage Patterns

Several stations are serving >5

vehicles/day on average

Some stations still significantly under- utilized but helping provide coverage Vehicle OEMs state that coverage is

more important right now than capacity

(Data from stations operating after 2009Q4)

Page 15: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

15

1 2 3 4 5 6 70

50

100

150

200

250

Station (Sorted By Increasing Station Capacity)

Cap

acity

Util

izat

ion

1 [%]

Demonstration Station Capacity Utilization

58.9%

Maximum Daily Utilization

Maximum Quarterly Utilization2

Average Daily Utilization2

NREL cdp_fcev_91Created: Jan-10-12 11:38 AM

Note: Learning Demonstrationpriority was for good stationcoverage not high station utilization

1Station nameplate capacity reflects a variety of system design consderations including system capacity, throughput, system reliability and durability, and maintenance. Actual daily usage may exceed nameplate capacity.2Maximum quarterly utilization considers all days; average daily utilization considers only days when at least one filling occurred

Accomplishment: While Station Focus is on Coverage, We’ve Tracked Capacity Usage as Baseline for Future

Some stations being utilized 40-60% on

average, and are on path to higher utilization

(Data from stations operating after 2009Q4)

Page 16: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

16

Accomplishment: Instantaneous MTBF Improved for 5 of the 7 Sites for the Last 20% of Maintenance Events

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

Shap

e Pa

ram

eter

)1

Overall Site Reliability Growth: Infrastructure3

Site: 1 Site: 2 Site: 3 Site: 4 Site: 5 Site: 6 Site: 7

1. IEC 61164:2004(E)., Reliability Growth - Statistical Test and Evaluation Methods, IEC. 2004.

2.% change in instantaneous MTBF

3. Includes data from stations operating after 2009 Q4.

Entire historyLast 20% of eventsFirst 120 Days

NREL cdp_fcev_97Created: Jan-09-12 4:23 PM

Sites Sorted by Increasing Age (Calendar Days)

Failu

re R

ate

Incr

easi

ngFa

ilure

Rat

e D

ecre

asin

g

Instantaneous MTBF improved for 5 of 7 sites for the last 20% of events.

12%2 522%2

43%2

127%2

-64%2 -20%2

379%2

Most stations have shown improved

reliability recently

got better

got better got better got better got better

got worse

got worse

(MTBF = mean time between failure)

(Data from stations operating after 2009Q4)

(Crow-AMSAA Technique)

Page 17: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

17

0 200 400 600 800 1000 1200 1400 1600 1800 2000 >20000

5

10

15

20

25Fuel Cell Stack4 Operation Hours

FC S

tack

s [%

]

Operation Hours

25% of FC Stacks > 937 hoursM

edia

n (6

20 h

ours

)

In Service1

Retired2

Not in Service3

NREL cdp_fcev_86Created: Dec-15-11 12:32 PM

1) Stacks that are in service and accumulating operation hours.2) Stacks retired due to low-performance or catastrophic failure.3) Indicates stacks that are no longer accumulating hours either a) temporarily or b) have been retired for non- stack performancerelated issues or c)removed from DOE program.4) Only includes systems operating after 2009Q4.

Accomplishment: Evaluated FC Durability Data from FCEVs After 2009Q4 – Fuel Cell Stack Operation Hours and Max Power Degradation

Some stacks operated over 1,400 hours, but half were still below 600 hours

0

20

40

60

80

100

120

0 100 200 300 400 500 600 700 800 900 10001100120013001400150016001700180019002000Stack Op Hour Segments2

% P

ower

1

Max Fuel Cell Stack3 Power Degradation Over Operation

1) Normalized by fleet median value at 200 hours.2) Each segment point is median FC power (+-50 hrs). Box not drawn if fewer than 3 points in segment.3) Only includes systems operated after 2009Q4.

Data Range25th & 75th PercentilesGroup MedianOutlier

NREL cdp_fcev_90Created: Jan-10-12 10:29 AM

Median power differencefrom 0 hour segment to1300 hour segment = -18.2%

Recent data from stacks shows knee

in FC power degradation curve

at ~200 hours

Page 18: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

18

0 300 600 900 1200 1500 1800 2100 2400 2700 3000 >30000102030405060

Fuel Cell Stacks4 Projected Hours to 10% Voltage Degradation

1,74

8

FC S

tack

s [%

]

Time 0 Fit (In Service)Time 0 Fit (Retired or Not in Service)2

Weighted Average (Fleet)

0 300 600 900 1200 1500 1800 2100 2400 2700 3000 >30000102030405060

2,26

1

Projected Hours to 10% Voltage Degradation 1,3

FC S

tack

s [%

]

Steady Operation Fit (In Service)5

Steady Operation Fit (Retired or Not in Service)2, 5Weighted Average (Fleet)

NREL cdp_fcev_87Created: Jan-10-12 10:28 AM

1) Projection using field data, calculated at high stack current, from operation hour 0 or a steady operation period. Projected hours may differ from an OEM's end-of-life criterion and does not address "catastrophic" failure modes.2) Indicates stacks that are no longer accumulating hours either a) temporarily or b) have been retired for non- stack performance related issues or c) removed from DOE program.3) Projected hours limited based on demonstrated hours.4) Only includes systems operating after 2009Q4.5) Not all stacks have a steady operation fit which is calculated from data after 200 hr break-in period. The steady operation starting hour is an approximation of the period after initial break-in where degradation levels to a more steady rate.

Accomplishment: Projected Fuel Stack Durability to 10% Voltage Degradation; Two Fits

Using all data from t0

Fitting after first 200 hours

See technical backup for additional details

in scatter plot

Average projections

Gen 1: 821 Gen 2: 1,062 Recent: 1,748

Many stacks have projections that we

limit to 2X to minimize extrapolation

Page 19: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

19

0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 20

100

200

300

400

500

600

700

Avg Fuel Rate (kg/min)

Num

ber o

f Fue

ling

Even

tsHistogram of Fueling Rates

All Light Duty by Year

5 minute fill of5 kg at 350 bar

3 minute fill of5 kg at 350 bar

Year Avg (kg/min) %>1 ------- ----------------- -------2005 0.66 16%2006 0.74 21%2007 0.81 26%2008 0.77 23%2009 0.77 22%2010 0.63 2%2011 0.68 12%

20052006200720082009201020112006 MYPP Tech Val Milestone2012 MYPP Tech Val Milestone

NREL cdp_fcev_52Created: Jan-10-12 11:49 AM

Accomplishment: Tracked Fueling Rates by Year – Analyzed Trends as Stations Move to 700 bar as Standard

Average fueling rate rose, up until 2009 when

some of the higher throughput stations

closed down

Page 20: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

20

0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 0

500

1000

1500

2000

2500

Avg Fuel Rate (kg/min)

Histogram of Fueling Rates350 vs 700 bar Fills

5 minute fill of5 kg at 350 bar

3 minute fill of5 kg at 350 bar

Fill Type Avg (kg/min) %>1 Count------------- ------------------ ------- --------Through 2009Q4350 bar 0.82 29% 19659700 bar 0.63 4% 5590------------- ------------------ ------- --------After 2009Q4350 bar 0.70 8% 2594700 bar 0.64 7% 5208

Num

ber o

f Fue

ling

Even

ts (T

hrou

gh 2

009Q

4)

350 bar (Through 2009Q4)700 bar (Through 2009Q4)700 bar (After 2009Q4)350 bar (After 2009Q4)2006 MYPP Tech Val Milestone2012 MYPP Tech Val Milestone

0

100

200

300

400

500

600

700

800

Num

ber o

f Fue

ling

Even

ts (A

fter

200

9Q4)

NREL cdp_fcev_14Created: Jan-10-12 10:23 AM

Accomplishment: Evaluated Fueling Rates by Fill Pressure and Communication vs. Non-Communication – Shifts Observed During Project

0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 0

500

1000

1500

2000

2500

Avg Fuel Rate (kg/min)

Histogram of Fueling RatesComm vs Non-Comm Fills

5 minute fill of5 kg at 350 bar

3 minute fill of5 kg at 350 bar

Fill Type Avg (kg/min) %>1 ------------- ------------------ -------Through 2009Q4Comm 0.86 30%Non-Comm 0.66 12%------------- ------------------ -------After 2009Q4Comm 0.58 3%Non-Comm 0.81 16%

Num

ber o

f Fue

ling

Even

ts (T

hrou

gh 2

009Q

4)

Comm (Through 2009Q4)Non-Comm (Through 2009Q4)Non-Comm (After 2009Q4)Comm (After 2009Q4)2006 MYPP Tech Val Milestone2012 MYPP Tech Val Milestone

0

100

200

300

400

500

600

700

800

Num

ber o

f Fue

ling

Even

ts (A

fter

200

9Q4)

NREL cdp_fcev_29Created: Jan-10-12 10:28 AM

700 bar fueling rates holding constant at ~0.63 kg/min

350 bar fueling rates dropped

from 0.82 to 0.70 kg/min

Comm. fill rates dropped while non-comm. fill rates increased

350 vs. 700 bar

Communication vs. non-communication

Fueling rates are still evolving due changes in technology and protocols

Page 21: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

21

Accomplishment: Leveraged Effort to Other Fuel Cell Applications; Cross-Application CDPs Expanding

Accomplishment: Significant leveraging of

this project to other evaluations

(e.g., ARRA/DOD: MHE, backup power)

Fueling rates vary by application, driven by constraints on nominal pressure,

volume, tank materials

Page 22: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

22

Accomplishment: Analysis Results Informed R&D Activities and Codes and Standards Development

-20 0 20 40 60-20

-10

0

10

20

30

40

50

60

Ambient Air Temperature [deg C]

Tank

Tem

pera

ture

[deg

C]

Tank vs. Ambient Air Temps Prior to Refueling

Freq

uenc

y

50

100

150

200

250

300

-40 -20 0 20 400

500

1000

1500

2000

Delta Temperature [deg C]

Cou

nt

Delta Temperature: Tank minus Ambient

Delta Temp HistogramNormal Distribution Fit

0

0.02

0.04

0.06

0.08

Den

sity

Mean= -3.751Std Dev= 6.129

NREL CDP72Created: Mar-11-10 10:24 AM

-This CDP created in support of SAE J2601 related to refueling-Temperatures are prior to refueling and exclude data within 4 hours of a previous fill-The plot to the left excludes ambient temperatures less than -5 deg C

FCEVs arrive at station with a tank temperature

that is 3.8 degrees C colder than ambient

temp

This result allowed participants in J2601 to use validated/realistic

initial conditions to their computer models for tank

temperature rise

Page 23: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

23

Accomplishment: Communicated Final Project Results to Broad Audience via Multiple Paths

• Draft final report completed in March

• Final report published in April and posted on NREL’s web site

• Published EVS-26 paper for Los Angeles conference

• Held public webinar o 260 participants (400

registered) o Active Q&A

• Created more interactive way to access CDP results from web site

Link to sunburst

Page 24: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

24

Highlights of Interactions and Collaborations

• Auto/Energy Industry Partners o Detailed discussion of NREL results and methodology o Discussion of voltage degradation calculations; discussions of how to

do new/previous CDPs with fewer teams o Review of all results prior to publication

• U.S. DRIVE Technical Teams o Hydrogen Storage and Fuel Cell Tech Team Briefings Annually

• FCHEA Technical Working Groups o Transportation Working Group o Joint H2 Quality Task Force

• California Organizations o CaFCP and CHBC: NREL actively participating as member o CARB and CEC: New stations offer potential to provide future data to

NREL • Early FC Market Evaluations: DOD and ARRA

o Leveraged experience to evaluate FC forklifts, backup, and stationary power; begun analyzing PHVs for OEM

Page 25: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

25

Future Work • Remainder of FY12:

o Support DOE in launching new vehicle evaluation project – “Light-Duty Fuel Cell Electric Vehicle Validation Data” (FOA 625)

o Outside of this project (but related) – Transition H2 station analysis activity to new AOP activity “Next Generation

H2 Station Analysis” led by Sam Sprik (see poster TV017 for more info.) – Support DOE in launching new infrastructure validation project: “Validation

of Hydrogen Refueling Station Performance” (FOA 626, topic 1) • FY13:

o This project (Learning Demo) will conclude in FY12, so this project will not continue into FY13

o However, two separate projects on FC vehicles and H2 infrastructure validation will exist in FY13 (referenced above)

o Continue to leverage analysis capability to other validations o Identify and exploit new opportunities to document FC & H2

progress publicly

Page 26: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

26

Summary • Relevance

o Provided DOE and taxpayers strong return on investment made in this 7-year project, the largest single FCEV & infrastructure demonstration in the world to date

o Many system-level DOE program targets validated by this project

• Approach o Collaborative relationship to analysis with industry partners o Established core HSDC and analysis capability and tools o This project is the 1st time such comprehensive data was collected by an independent

3rd-party and consolidated for public dissemination

• Technical Accomplishments and Progress o 99 total CDP analysis results available (14 more than at last AMR); publication at

conferences every 6 months o Project achieved the two key technical targets on driving range (>250 miles) and FC

durability (>2,000 hours) [refer to technical backup slides and Final Report]

• Collaborations o Worked closely with industry partners to validate methodology, and with other key

stakeholders to ensure relevance of results

• Future Work o Support launch of new technology validation projects, including new opportunities to

objectively evaluate status of H2 & FC technology and other vehicle technology o HSDC and analysis capability will continue to be used on future projects

183 Vehicles: 154,000 hours, 3.5M miles, 500K trips 25 Stations: 151,000 kg produced/dispensed, 33K fuelings

Page 27: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

27

Questions and Discussion

All public Learning Demo papers and presentations are available online at http://www.nrel.gov/hydrogen/proj_tech_validation.html

Project Contact: Keith Wipke, National Renewable Energy Lab 303.275.4451 keith.wipke nrel.gov @

Page 28: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

Technical Backup Slides

Page 29: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

29

0 500 1000 1500 20000

500

1000

1500

2000

2500

3000

3500Comparison of Operation Hours and Projected Hours to 10% Voltage Degradation5

Proj

ecte

d H

ours

1,2,

4

Operation Hours

projected hrs = operation hrs

FC SystemFC System (Limited)2

FC System (Retired)3

Unity Line

NREL cdp_fcev_88Created: Jan-10-12 10:29 AM

25% of stacks arebelow the unity lineand have operatedpast 10% voltagedegradation.

On average, thesestacks haveoperated for 990hours.

Stacks above theunity line have notoperated past 10%voltage degradation.

1) Indicates the projected hours to a 10% voltage degradation based upon curve fitting data from operation hour 0.2) Projected hours limited based on demonstrated hours.3) Stacks retired due to low-performance or catastrophic failure.4) Each projection has uncertainty based on the confidence intervals of the fit.5) Only includes systems operated after 2009Q4.

Accomplishment: Scatter Plot of Fuel Cell Operation Hours and Projected Hours to 10% Voltage Degradation

Many stacks have projections that we

limit to 2X to minimize extrapolation

Stacks consistently operating past 10% voltage degradation

Page 30: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

30

Project Achieved Both Technical Goals; Outside Analysis Used for Cost Evaluation (updated since 2011 AMR in blue)

Vehicle Performance Metrics Gen 1 Vehicle Gen 2 Vehicle 2009 Target After 2009Q4

Fuel Cell Stack Durability 2,000 hours

Max Team Projected Hours to 10% Voltage Degradation 1,807 hours 2,521 hours --

Average Fuel Cell Durability Projection 821 hours 1,062 hours 1,748 hours

Max Hours of Operation by a Single FC Stack to Date 2,375 hours 1,261 hours 1,582 hours

Driving Range 250 miles

Adjusted Dyno (Window Sticker) Range 103-190 miles 196-254 miles --

Median On-Road Distance Between Fuelings 56 miles 81 miles 98 miles

Fuel Economy (Window Sticker) 42 – 57 mi/kg 43 – 58 mi/kg no target --

Fuel Cell Efficiency at ¼ Power 51 – 58% 53 – 59% 60% --

Fuel Cell Efficiency at Full Power 30 – 54% 42 – 53% 50% --

Infrastructure Performance Metrics 2009 Target After 2009Q4

H2 Cost at Station (early market)

On-site natural gas reformation

$7.70 – $10.30/kg

On-site Electrolysis

$10.00 – $12.90/kg

$3/gge --

Average H2 Fueling Rate 0.77 kg/min 1.0 kg/min 0.65 kg/min

Outside of this project, DOE independent panels concluded at 500 replicate stations/year: Distributed natural gas reformation at 1500 kg/day: $2.75-$3.50/kg (2006) Distributed electrolysis at 1500kg/day: $4.90-$5.70 (2009)

Outside review panel

Page 31: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

31

1) FC Durability Target of 2000 Hours Met By Gen 2 Projections (2010 AMR)

Gen1 Gen2 Gen1 Gen2 Gen1 Gen20200400600800

1000120014001600180020002200240026002800

2006 Target

2009 Target

Actual Operating Hours Accumulated To-Date Projected Hours to 10% Voltage Degradation

Tim

e (H

ours

)

DOE Learning Demonstration Fuel Cell Stack Durability:Based on Data Through 2009 Q2

Max Hrs Accumulated1,2 Avg Hrs Accumulated1,3 Projection to 10% Voltage Degradation4,5,6

Max ProjectionAvg Projection

NREL CDP01Created: Mar-23-10 10:39 AM

(1) Range bars created using one data point for each OEM. Some stacks have accumulated hours beyond 10% voltage degradation.(2) Range (highest and lowest) of the maximum operating hours accumulated to-date of any OEM's individual stack in "real-world" operation.(3) Range (highest and lowest) of the average operating hours accumulated to-date of all stacks in each OEM's fleet.(4) Projection using on-road data -- degradation calculated at high stack current. This criterion is used for assessing progress against DOE targets, may differ from OEM's end-of-life criterion, and does not address "catastrophic" failure modes, such as membrane failure.(5) Using one nominal projection per OEM: "Max Projection" = highest nominal projection, "Avg Projection" = average nominal projection. The shaded projection bars represents an engineering judgment of the uncertainty on the "Avg Projection" due to data and methodology limitations. Projections will change as additional data are accumulated.(6) Projection method was modified beginning with 2009 Q2 data, includes an upper projection limit based on demonstrated op hours.

*

Durability is defined by DOE as projected hours to 10% voltage degradation *

Page 32: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

32

Dyno Range (2) Window-Sticker Range (3) On-Road Range (4)(5)0

50

100

150

200

250

300

Vehi

cle

Ran

ge (m

iles)

Vehicle Range1

2015 Target2009 Target Gen 1 Gen 2

NREL CDP02Created: Mar-10-10 1:18 PM

(1) Range is based on fuel economy and usable hydrogen on-board the vehicle. One data point for each make/model.(2) Fuel economy from unadjusted combined City/Hwy per DRAFT SAE J2572.(3) Fuel economy from EPA Adjusted combined City/Hwy (0.78 x Hwy, 0.9 x City).(4) Excludes trips < 1 mile. One data point for on-road fleet average of each make/model.(5) Fuel economy calculated from on-road fuel cell stack current or mass flow readings.

2) Vehicle Range Achieved 2009 Target of 250 Miles with Gen 2 Adjusted Fuel Economy (2010 AMR)

Page 33: Controlled Hydrogen Fleet and Infrastructure Analysis · 2012. 5. 4. · 2012 DOE Annual Merit Review and Peer Evaluation Meeting . Keith Wipke, Sam Sprik, Jennifer ... – Objectively

33

0

2

4

6

8

10

12

14

16Projected Early Market 1500 kg/day Hydrogen Cost1

$/kg

Natural Gas Reforming2 Electrolysis2

2015 DOE Hydrogen Program Goal Range3

Median25th & 75th Percentile10th & 90th Percentile

Created: Jan-19-10 11:08 AM

(1) Reported hydrogen costs are based on estimates of key cost elements from Learning Demonstration energy company partners and represent thecost of producing hydrogen on-site at the fueling station, using either natural gas reformation or water electrolysis, dispensed to the vehicle. Costsreflect an assessment of hydrogen production technologies, not an assessment of hydrogen market demand.(2) Hydrogen production costs for 1500 kg/day stations developed using DOE’s H2A Production model, version 2.1. Cost modeling represents thelifetime cost of producing hydrogen at fueling stations installed during an early market rollout of hydrogen infrastructure and are not reflective of thecosts that might be seen in a fully mature market for hydrogen installations. Modeling uses default H2A Production model inputs supplemented withfeedback from Learning Demonstration energy company partners, based on their experience operating on-site hydrogen production stations. H2A-based Monte Carlo simulations (2,000 trials) were completed for both natural gas reforming and electrolysis stations using default H2A values and10th percentile to 90th percentile estimated ranges for key cost parameters as shown in the table. Capacity utilization range is based on the capabilitiesof the production technologies and could be significantly lower if there is inadequate demand for hydrogen.(3) DOE has a hydrogen cost goal of $2-$3/kg for future (2015) 1500 kg/day hydrogen production stations installed at a rate of 500 stations per year.

Key H2 Cost Elements and Ranges

Input Parameter Minimum (P10)

Maximum (P90)

Facility Direct Capital Cost $10M $25M

Facility Capacity Utilization 85% 95%

Annual Maintenance & Repairs $150K $600K

Annual Other O&M $100K $200K

Annual Facility Land Rent $50K $200K

Natural Gas Prod. Efficiency (LHV) 65% 75%

Electrolysis Prod. Efficiency (LHV) 35% 62%

NREL CDP15

3) Projected Early Market H2 Production Cost from Learning Demo Energy Partners’ Inputs (2010 AMR)

*

*

This project provides an excellent learning opportunity, but stations were not meant to emulate high volume replicate

stations of the future. Permitting was in transition.

Outside of this project, DOE independent panels concluded at 500 replicate stations/year: Distributed natural gas reformation at 1500 kg/day: $2.75-$3.50/kg (2006)

Distributed electrolysis at 1500kg/day: $4.90-$5.70 (2009)


Recommended