Convert Taco John's to Arby's Lackland AFB, Texas QAI# 16064 ESPN#3722-15-000001 ADDENDUM 02 19January 2017 PART I – SPECIFICATIONS N/A PART II – DRAWINGS 1. Sheet G001- a. Added AS/AI- AAFES Supplied/AAFES Installed’ to the Abbreviations table. b. Revised the issue dates for sheets G001, A202,A301, A801 to 19JAN2017 2. Sheet- A202 a. Added Paint color P2, Sherwin Williams SW6601 Tanager to the Arby’s Finish Material Legend. b. Detail 1- Revised Food Court Interior Elevation to remove WC-CB1 from the sign bulkhead and revise to P-2. c. Detail 1- Clarified the ‘Arby’s’ sign is to be white and Supplied and installed by AAFES. d. Detail 6-Revised the Elevation/section to indicate removal of WC-CB1 from the sign bulkhead and revise to P-2. 3. Sheet A301 a. Detail 3- Revised Food Court Interior Elevation to remove WC-CB1 from the sign bulkhead and revise to P-2. P-2 is to be installed on the bottom of the bulkhead and FRP is to installed on the serving side of the bulkhead. b. Detail #-Clarified that FRP is to be the finish on the bottom and rear side of the Menu board bulkhead. 4. Sheet A801 a. Added Note #3 “G.C. to use Base Roof Warranty Contractor for all for roof- related work’ to the Equipment Schedule notes. END OF DRAWINGS ITEMS PART III – Questions and Answers N/A A T T S X E T E F O S A 1 0 9 8 9 R E G I S T E R E D A R C H I T E C T D A V I D J . L E E
Transcript
Page 1: Convert Taco John's to Arby's D H › pz-s › construction › JBSA Lackland...Convert Taco John's to Arby's Lackland AFB, Texas H QAI# 16064 ESPN#3722-15-000001 A ADDENDUM 02 19January

Convert Taco John's to Arby's Lackland AFB, Texas QAI# 16064 ESPN#3722-15-000001 ADDENDUM 02 19January 2017 PART I – SPECIFICATIONS N/A

PART II – DRAWINGS 1. Sheet G001-

a. Added AS/AI- AAFES Supplied/AAFES Installed’ to the Abbreviations table. b. Revised the issue dates for sheets G001, A202,A301, A801 to 19JAN2017

2. Sheet- A202 a. Added Paint color P2, Sherwin Williams SW6601 Tanager to the Arby’s Finish

Material Legend. b. Detail 1- Revised Food Court Interior Elevation to remove WC-CB1 from the sign

bulkhead and revise to P-2. c. Detail 1- Clarified the ‘Arby’s’ sign is to be white and Supplied and installed by

AAFES. d. Detail 6-Revised the Elevation/section to indicate removal of WC-CB1 from the

sign bulkhead and revise to P-2. 3. Sheet A301

a. Detail 3- Revised Food Court Interior Elevation to remove WC-CB1 from the sign bulkhead and revise to P-2. P-2 is to be installed on the bottom of the bulkhead and FRP is to installed on the serving side of the bulkhead.

b. Detail #-Clarified that FRP is to be the finish on the bottom and rear side of the Menu board bulkhead.

4. Sheet A801 a. Added Note #3 “G.C. to use Base Roof Warranty Contractor for all for roof-

related work’ to the Equipment Schedule notes. END OF DRAWINGS ITEMS

PART III – Questions and Answers

N/A

AT

TS

XETE

FO

SA

10 9 8 9

REG

IS

TERED ARCH

ITEC

TDAV

ID J . L

EE

Page 2: Convert Taco John's to Arby's D H › pz-s › construction › JBSA Lackland...Convert Taco John's to Arby's Lackland AFB, Texas H QAI# 16064 ESPN#3722-15-000001 A ADDENDUM 02 19January

HAVAC HEATING, VENTILATING ANDAIR CONDITIONING

HW HOT WATERID INSIDE DIAMETERIF INSIDE/INTERIOR FACEINSUL INSULATIONINFO INFORMATIONJC JOB CAPTAINLC LICENSEELEED LEADERSHIP IN ENERGY AND

ENVIRONMENTAL DESIGNLL LANDLORDMAX MAXIMUMMECH MECHANICALMC MECHANICAL CONTRACTORMEP MECHANICAL, ELECTRICAL,

AND PLUMBINGMFR MANUFACTURERMIN MINIMUMMLDG MOLDINGMTL METALNAT NATURALNIC NOT IN CONTRACTNL NIGHT LIGHTNTS NOT TO SCALEOA OVER ALLOC ON CENTEROD OUTSIDE DIAMETEROF OUTSIDE FACEOPNG OPENINGPC PLUMBING CONTRACTORPLAM PLASTIC LAMINATEPLC PLACEPLYWD PLYWOODPM PROJECT MANAGERPT PAINTQT QUARRY TILER RADIUSREF REFERENCEREQ(‘D) REQUIRE(D)REV REVISED/ REVISIONRND ROUNDSC SOLID CORESF SQUARE FEETSHT SHEETSIM SIMILARSOL SOLIDSPECS SPECIFICATION(S)SQ SQUARESS STAINLESS STEELSTL STEELSTG STORAGESUSP SUSPENDEDTEL TELEPHONETEMP TEMPORARY3PY THIRD PARTY LOGISTICSTYP TYPICALUNO UNLESS NOTED OTHERWISEVCT VINYL COMPOSITE TILEVD VENDOR DIRECTVERT VERTICALVIF VERIFY IN FIELDWH WATER HEATERWD WOODWMV WHITE MAPLE VENEER

NORTH ARROW

BENCH MARK

X

X' XX"

X

XXXX AFF

SCALE BAR

DATUM POINT

EXTERIOR ELEVATION

INTERIOR ELEVATION

SECTION

DETAIL BUBBLE

REVISION TAG

APPLIED WALLTREATMENT TAG

AFF HEIGHT TAGS

DIMENSION

REVISION CLOUD

SHEET NUMBER

SECTION NUMBER

SHEET NUMBER

DETAIL NUMBER

CENTER LINE

0 1 8 102 3 4

PXXXX FINISH SCHEDULE

DXXX DOOR NUMBER

0' - 0"

X WALL TYPE TAG

XXXX EQUIPMENT TAG

ACC ACCESSIBLEA/C AIR CONDITIONINGACT ACOUSTICAL CEILING TILEADJ ADJUSTABLEAFF ABOVE FINISHED FLOORAMP AMPEREARCH ARCHITECTAS/AI AAFES SUPPLIED/ AAFES INSTALLEDBLK BLOCKINGBOB BOTTOM OF BEAMBOH BACK OF HOUSEBLDG BUILDINGCAB CABINETCLG CEILINGCLR CLEAR/CLEARANCECMU CONCRETE MASONRY UNITCTR CENTERC.L. CENTER LINECOL COLUMNCONC CONCRETECONT CONTINUOUSCONST CONSTRUCTIONCT CERAMIC TILECW COLD WATERDEG DEGREEDET DETAILDIA DIAMETERDIM DIMENSIONDISP DISPENSERDN DOWNDWG(S)DRAWING(S)EA EACHEL ELEVATIONELEC ELECTRICALEQUIP EQUIPMENTEQ EQUALEXIST EXISTINGEXPEXPOSEDEXT EXTERIORFC FIXTURE CONTRACTORFFE FINISH FLOOR ELEVATIONFF&E FURNITURE, FIXTURE, AND EQUIPMENTFOC FACE OF CABINETFOG FACE OF GLAZINGFOS FACE OF STUDFRP FIBERGLASS REINFORCED PANELFIO FURNISHED & INSTALLED BY OWNERFOIC FURNISHED BY OWNER

INSTALLED BY CONTRACTORFLRFLOORFS FLOOR SINKFOH FRONT OF HOUSEFT FOOT/FEETGA GAUGEGALV GALVANIZEDG GROUNDGC GENERAL CONTRACTORGWB GYPSUM WALL BOARDHC HOLLOW COREHDR HEADERHDW HARDWAREHDWD HARDWOODHM HOLLOW METALHORIZ HORIZONTALHR HOURHT HEIGHT

AT

TS

XETE

FO

SA

10 9 8 9

RE

GIS

TE

RED ARCH

ITE

CTD

AV

IDJ .

LE

E

SCALE:

AAFES Project Number:

DATE:

SHEET:

PROJECT NUMBER

DRAWING TITLE:

D es ig n . Sp aces . Peo p le .

7 0 7 W . V ickery B lvd . # 1 0 1

Fort W orth , T exas 7 6 1 0 4

p h . (8 1 7 ) 7 3 8 -8 0 9 5

fx . (8 1 7 ) 7 3 8 - 9 5 2 4

w w w .q arch .com

DRAWN BY:

CHECKED BY:

1 2 3 4 5

1 2 3 4 5

A

B

C

D

PROJECT:

EXCHANGE

EXCHANGE

CONSTRUCTION TYPE:

STORE TYPE:

CONVERT:

A

B

C

D

As indicated

1/1

9/2

01

7 3

:08

:33

PM -G-0001

COVER SHEET

28 NOVEMBER 2016

LWL

AGL

16064

ISSUE FORSOLICITATION

TACO JOHN TO ARBY'S

LACKLAND AFB, TEXAS

THE EXCHANGE (ARMY & AIR FORCEEXCHANGE SERVICE)

TENANT REMODEL

3722-15-000001

CONVERT:

PROJECT NO.

TACO JOHN TO ARBY'SLACKLAND AFB, TEXAS

THE EXCHANGE (ARMY & AIR FORCE EXCHANGE SERVICE)

28 NOVEMBER 2016

ISSUE FOR SOLICITATION

3722-15-000001

SHEET SHEET TITLE

Sheet

Issue Date

Current

Revision

Date

GENERAL

-G-0001 COVER SHEET 11/28/16 01/19/2017

-G-0002 ACCESSIBILITY STANDARDS 11/28/16

-G-0003 ACCESSIBILITY STANDARDS 11/28/16

DEMOLITION

.D101 DEMOLITION FLOOR PLAN 11/28/16

.D102 DEMOLITION REFLECTED CEILING PLAN 11/28/16 11/28/2016

ARCHITECTURAL

A101 FLOOR PLAN 11/28/16

A102 FINISH FLOOR PLAN 11/28/16

A201 REFLECTED CEILING PLAN 11/28/16

A202 INTERIOR ELEVATIONS 11/28/16 01/19/2017

A203 PERSPECTIVE VIEWS 11/28/16

A301 ARBY'S DETAILS 11/28/16 01/19/2017

A801 EQUIPMENT SCHEDULE 11/28/16 01/19/2017

MECHANICAL

M101 HVAC PLAN 11/08/16

M201 HVAC SCHEDULES & DETAILS 11/08/16

PLUMBING

P101 PLUMBING PLANS 11/08/16

P201 PLUMBING SCHEDULES & DETAILS 11/08/16

ELECTRICAL

E101 ELECTRICAL PLANS 11/08/16

E201 ELECTRICAL SCHEDULES & DETAILS 11/08/16

GENERAL NOTES

1. GENERAL CONTRACTOR SHALL FIELD SURVEY THE LOCATION AND VERIFY ALLEXISTING CONDITIONS AND DIMENSIONS PRIOR TO CONSTRUCTION. ANYDISCREPANCIES SHALL BE REPORTED TO THE OWNER AND ARCHITECT. A SITE VISITDATE AND TIME WILL BE SCHEDULED TO AFFORD ALL PROSPECTIVE GENERALCONTRACTORS THE OPPORTUNITY TO VISIT THE SITE PRIOR TO BIDDING.

2. GENERAL CONTRACTOR SHALL COMPLETE ALL WORK AS INDICATED ON THESEPLANS, UNLESS OTHERWISE NOTED. CONTACT CIVIL ENGINEERING AND OBTAIN ALLAVAILABLE AS-BUILT DRAWINGS BEFORE THE BEGINNING OF CONSTRUCTION.

3. GENERAL CONTRACTOR SHALL OBTAIN PERMITS, APPROVALS, INSPECTIONS,CERTIFICATE FOR COMPLIANCE AND CERTIFICATE OF OCCUPANCY AS REQUIRED,UNLESS OTHERWISE NOTED. SEE NOTE 18.

4. GENERAL CONTRACTOR SHALL CHECK IN WITH AND COORDINATE ALL WORK WITHTHE BASE CIVIL ENGINEERING PROJECT MANAGER.

MEP ENGINEER

5. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY CONSTRUCTION BARRICADESAND TEMPORARY POWER, LIGHT AND TELEPHONE IN ACCORDANCE WITH ALLREQUIREMENTS OF BASE / POST. GENERAL CONTRACTOR SHALL REMOVE ALL OFTHESE ITEMS AT THE COMPLETION OF WORK.

6. GENERAL CONTRACTOR SHALL HAVE ENTIRE PROJECT SITE CLEANED UPONCOMPLETION OF WORK BY A PROFESSIONAL CLEANING SERVICE. CONTRACTORSHALL CLEAN AND SECURE ENTIRE PROJECT SITE ON A DAILY BASIS.

7. GENERAL CONTRACTOR SHALL MAINTAIN ON SITE AT ALL TIMES, ALL APPROVED &AS-BUILT DRAWINGS INCLUDING REVISIONS AND ADDENDA.

8. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAFETY & OSHAPRECAUTIONS AND BASE SAFETY REQUIREMENTS DURING CONSTRUCTION.

9. GENERAL CONTRACTOR SHALL COMPLETE ALL WORK IN A NEAT AND PROFESSIONALMANNER.

10. GENERAL CONTRACTOR SHALL PROVIDE A ONE (1) YEAR WARRANTY ON ALL WORKAND MATERIALS FROM DATE OF ACCEPTANCE BY OWNER. (ALSO SEE OWNER'SMECHANICAL PLANS FOR ADDITIONAL WARRANTY REQUIREMENTS.) GENERALCONTRACTOR'S WARRANTY MUST ALSO INCLUDE LABOR WHEN MANUFACTURER'SWARRANTY IS "PARTS ONLY."

11. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE RECEIPT, UNLOADING,AND STORAGE OF ALL OWNER SUPPLIED MATERIALS AND EQUIPMENT. GENERALCONTRACTOR SHALL NOTIFY OWNER IF ANY MATERIALS OR EQUIPMENT HAS NOTARRIVED AT THE JOB SITE IN A TIMELY MANNER. ALL SHIPMENTS SHALL BEINSPECTED UPON ARRIVAL FOR DAMAGES, SHORTAGES AND INCORRECTMATERIALS. ALL PROBLEMS SHALL BE REPORTED TO OWNER'S PURCHASINGDEPARTMENT IMMEDIATELY. GENERAL CONTRACTOR SHALL NOTIFY THE CARRIERIMMEDIATELY OF ALL DAMAGES AND/OR SHORTAGES AND OBTAIN A RECEIPT FORSUCH. AT THE COMPLETION OF THE PROJECT, GENERAL CONTRACTOR SHALLNOTIFY OWNER'S PURCHASING DEPARTMENT OF ANY SURPLUS EQUIPMENT FORPROPER DISPOSITION.

12. CONTRACTOR PERSONNEL SHALL HAVE VALID, CURRENT I.D.'s. EVERY VEHICLE OFTHE CONTRACTOR SHALL OBTAIN A BASE PASS AND ALL GC PERSONEL TO OBTAINA PERSONAL PASS.

13. GENERAL CONTRACTOR SHALL COORDINATE ALL TRADES NECESSARY TOCOMPLETE THE WORK OUTLINED IN THESE DOCUMENTS.

14. AT THE COMPLETION OF THE PROJECT, GENERAL CONTRACTOR SHALL PROVIDEONE (1) EXTRA CARTON OF EACH CEILING TILE AND CERAMIC TILE USED.

15. IT IS STRONGLY RECOMMENDED THAT NO CONTRACTUAL AGREEMENTS OF ANYKIND BE SIGNED PRIOR TO RECEIVING AND THOROUGHLY REVIEWING ALLAPPROVALS FROM ALL OF THE REGULATORY AUTHORITIES HAVING JURISDICTIONOVER THIS PROJECT & BASE FIRE DEPARTMENT.

16. DUE TO THE NATURE OF THE WORK, ALL DIMENSIONS SHOWN SHALL BECONSIDERED APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONSPRIOR TO BEGINNING CONSTRUCTION. SHOP DRAWINGS SHALL BE SUBMITTED TOARCHITECT FOR APPROVAL PRIOR TO FABRICATION OR INSTALLATION OF ANY ITEM.FAILURE TO ADHERE TO THIS PROCEDURE SHALL PLACE FULL RESPONSIBILITY FORANY ERRORS DIRECTLY UPON THE CONTRACTOR.

17. ARCHITECT WILL NOT HAVE CONTROL OVER OR CHARGE OF AND WILL NOT BERESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCESOR PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTIONWITH THE WORK, SINCE THESE ARE SOLELY THE CONTRACTOR'S RESPONSIBILITY.ARCHITECT WILL NOT BE RESPONSIBLE FOR CONTRACTOR'S FAILURE TO CARRYOUT THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. THE ARCHITECTWILL NOT HAVE CONTROL OR CHARGE OF AND WILL NOT BE RESPONSIBLE FOR ACTSOR OMISSIONS OF THE CONTRACTOR, SUBCONTRACTORS OR THEIR AGENTS OREMPLOYEES, OR OF ANY OTHER PERSONS PERFORMING PORTIONS OF THE WORK.

18. THERE ARE UNDERGROUND UTILITIES ON THE SITE NEAR OR IN THE AREA OF NEWCONSTRUCTION. CONTRACTOR TO OBTAIN AN APPROVED DIGGING PERMIT (AFFORM 103) PRIOR TO ANY SITE WORK.

19. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE CAUSED TO EXISTINGCOMMUNICATIONS FACILITIES AND WILL BE RESPONSIBLE FOR REPAIR OF DAMAGEDFACILITIES AT NO COST TO THE GOVERNMENT. IF ANY COMMUNICATIONS CABLESSHOULD BE DAMAGED, CALL THE BASE COMMUNICATION SQUADRON.

20. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING THEIR OWN TELEPHONESERVICE DURING CONSTRUCTION AT NO COST TO THE GOVERNMENT.

EXCHANGE PROJECT MANAGER

NAME T. A. JONESADDRESS 3911 S. WALTON WALKER BLVD.

DALLAS, TEXAS 75236-1509PHONE (214) 312-2312MOBILE (469) 515-6865

ARCHITECT

NAME QUORUM ARCHITECTS, INC.ADDRESS 707 W. VICKERY BLVD.

FORT WORTH, TX 76104CONTACT DAVID LEE, AIAPHONE (817) 738-8095 x 6318FAX (817) 738-9524EMAIL [email protected]

PROJECT LOCATION

SITE LOCATION NO SCALE

LACKLAND AFB, TEXAS

GENERAL MANAGER

ABBREVIATIONS INDEX OF DRAWINGS

21. THIS SPACE IS PROTECTED BY A BUILDING-WIDE FIRE SPRINKLER SYSTEM ANDMODIFICATION WILL BE REQUIRED IN THIS SPACE. MODIFICATIONS WILLREQUIRE WORKING DRAWINGS AND CALCULATIONS TO BE PREPARED ANDSUBMITTED BY A REGISTERED PROFESSIONAL FIRE PROTECTION ENGINEER.

22. GENERAL CONTRACTOR TO PROVIDE WALL BLOCKING FOR ALL CASEWORK,EQUIPMENT, SHELVING, ETC.

PROJECT TEAM VICINITY MAP

SITE LOCATION

PROJECT LOCATION

SITE LOCATION NO SCALE

LACKLAND AFB, TEXAS

NAME CONWAY DUNCANADDRESS 3015 SOUTH FORT AVENUE, SUITE D

SPRINGFIELD, MISSOURI 65807CONTACT MP ENGINEER - CHRIS DUNCAN, PE

E ENGINEER - KEVIN CONWAYPHONE (417) 881-1586FAX (417) 881-8390

NAME JBSA-LCK AFB EXCHADDRESS 2180 KENLY AVE BLDG 1251

LACKLAND AFB, TEXAS 78236CONTACT LORENZO SALGADOPHONE (210) 674-8917FAXEMAIL [email protected]

SYMBOL LEGEND

APPLICABLE CODES-

USE THE LATEST

EDITION

DOD UFC (UNIFIED FACILITY CRITERIA)

INTERNATIONAL BUILDING CODE

INTERNATIONAL EXISTING BUILDING CODE

INTERNATIONAL PLUMBING CODE

INTERNATIONAL MECHANICAL CODE

NFPA 90A, NFPA 90B

NATIONAL ELECTRIC CODE

NFPA 70

INTERNATIONAL FUEL GAS CODE

NFPA 54

ADDAAG

NFPA 101-2001

LIFE SAFETY CODE

IES/ASHRAE STANDARD 62

IES/ASHRAE STANDARD 90.1.89

EXCHANGE DESIGN CRITERIA MANUAL

LACKLAND INSTALLATION DESIGN GUIDELINES

23. GENERAL CONTRACTOR IS TO OBTAIN A COPY OF AS-BUILT DRAWINGS FOR THEEXISTING BUILDING. HE IS TO BE RESPONSIBLE FOR HAVING KNOWLEDGE OFEXISTING CONDITIONS AND MAKE ALLOWANCES FOR NEW CONSTRUCTION ASREQUIRED. THIS INCLUDES HIDDEN/BURIED STRUCTURE, UTILITIES,EQUIPMENT, FITTINGS, FIXTURES, UTILITIES, ETC.

DATE

REVISION NO. &

DESCRIPTION BY

01/19/2017 ADDENDUM NO. 2 LWL

1

1

1

Page 3: Convert Taco John's to Arby's D H › pz-s › construction › JBSA Lackland...Convert Taco John's to Arby's Lackland AFB, Texas H QAI# 16064 ESPN#3722-15-000001 A ADDENDUM 02 19January

ELEVATION NOTES

NEW FRP PANELS ON NEW WALLS.FRP TO MATCH EXISTING.

NEW BASE TILE. TILE AND GROUT TOMATCH EXISTING

REFER TO SHEET A301 FOR FINISHES

1.

2.

3.

2

SS-1

WT-1 PROVIDE 6" S.S.BASE PANEL

WP-1EXISTING FINISHTO REMAIN

BOTTOM OF EXIST.BULKHEAD

P-2

WP-1

OPENBEYOND

AS/AIARBY'S SIGN(WHITE)

1' -

10

"7

' - 1

1"

ARBY'S 'HAT'SIGN

EXISTINGDOOR TOREMAIN

CASHREGISTER

EXISTINGWALL TOREMAIN

SS-2

ON SIDEWALL

CG-1

P-2

2

QB-1

SS-1

P.O.S. BYOWNER

WC-CB1

FRP-1BOTTOM OF EXIST.BULKHEAD

CG-1CG-1

QUAD POS OUTLETS(RE: MEP DRAWINGS)

POS DATAOUTLETS

OPEN TO LOBBY

2' -

10

"5

' - 1

"1

' - 1

0"

STEEL FRAME TOSUPPORT COUNTER

CASHREGISTER

C

9 3/8" QB-1

FRP-1FRP

WP-1 CG-1

OPEN

ARBY'S MENUREFER TO A801

QB-1

FRP-1

QB-1

CG-1

OPEN

C

QB-1

CG-1 HOOD HOOD

CG-1

FRP-1

MENU BOARDSREFER TO A801

OPEN

QB-1

BOTTOMOF EXIST.BULKHEAD

FRP-1

MP-1

7

A102

7

A102 FIRE SUPPRESSIONSYSTEM MONITOR

QB-1

P-2

P-2

FRP-1

QB-1

CG-1CG-1

FRP-1

QB-1

CG-1

OPEN

2

P-1

FRP

QB-1

MENU BOARDSREFER TO A801

EXISTINGELECTRICALPANEL

2' -

3 1

/2"

+/-

LARGE CABINETSMALL CABINET(S)

6' -

8"

A.F

.F.

CG-1

3 1

/2"

OPEN

FIRE SUPPRESSIONSYSTEM MONITOR

ARBY'S FINISH MATERIAL LEGEND

REFERENCE ITEM MANUFACTURER/ PRODUCT

COLOR / SIZE FINISH / DESCRIPTION / PATTERN

SS-1 SOLID SURFACE CORIAN 1/2" X 30" X 276"VERIFY LENGTH IN FIELD

ARCTIC ICE FRONT SERVING CORIAN COUNTER TOP

CONTACTNAME

CONTACTPHONE

WP-1 SOLID WOOD WALL BOARDS APA COLOR GRAPHICS SIZE: 8'-0" X 6" PLANKS NOTE: GC TO STAGGER INSTALLATION OF THE MULTI-TONEWOOD PLANKS. EQUAL AMOUNTS OF EACH TYPE OF PLANKSHOULD BE ORDERED TO MEET DESIGN STANDARD.

PATTERN: CUSTOM / RANDOM STAIN

CHUCK BOGLE 404-355-1355

WT-1 SUBWAY WALL TILE CROSSVILLE TILE COLOR BY NUMBERS WT02 "TEAFOR TWO" GLOSS

SIZE: 4" X 8"

GROUT: CUSTOM BUILDING PRODUCTS #60 CHARCOAL DANIEL LOPEZ 770-570-9050

P-1 PAINT SHERWIN WILLIAMS MATCH SUBWAY WALL TILE MENU BOARD BULKHEAD

FRP-1 FIBERGLAS REINFORCED PANEL MARLITE / PANOLAM COLOR: WHITE EMBOSSED

B-1 4" VINYL COVE BASE MATCH EXISTING VINYL COVE BASE MATCH EXISTING FOR REPAIRS AND PATCHING

CLG-1 SUSPENDED ACOUSTIC CEILINGTILE AND SUPPORT GRID

ARMSTRONG 605 CERAMAGUARD SCRUBABLETILE AND GRID TO MATCH EXISTING

WHITE TO MATCH EXISTING,SIZE: 2'X2'

QB-1 QUARRY TILE BASE & GROUT MATCH EXISTING QUARRY TILE ANDGROUT IN ALL ASPECTS SEAL GROUT.

MATCH EXISTING AT BACK OF HOUSEMATCH EXISTING

MP-1 QUILTED 18 GA. STAINLESSSTEEL PANEL

STAINLESS SUPPLY, CO. 877.484.0088FAX:704.220.0208 307 NORTH SECRESTAVENUE, MONROE, NC 28110

FULL WALL HEIGHT-FROM QUARRY TILE BASETO BOTTOM OF CEILING

PATTERN D3B, POLISHED FINISH

WC-CB1 CUSTOM ACCENT WALL VINYL APA COLOR GRAPHICS CUSTOM "CHALKBOARD VINTAGE ARBY'SCUSTOM WIDTH: 50" CHUCK BOGLE 404-355-1355

SS-2 STAINLESS STEEL BASE SATIN/ BRUSHEDSTAINLESS STEEL BASE CONTRACTOR SUPPLIED/ INSTALLED

P-2 PAINT SHERWIN WILLIAMS SW 6601'TANAGER'

MALL/ FOOD COURTSIGN BULKHEAD

FRP-1

OPEN

C

CG-1 CG-1

OPEN

ARBY'S MENUREFER TO A801

FRP

OPEN

CG-1

FRP-1

QB-1

AT

TS

XETE

FO

SA

10 9 8 9

RE

GIS

TE

RED ARCH

ITE

CTD

AV

IDJ .

LE

E

SCALE:

AAFES Project Number:

DATE:

SHEET:

PROJECT NUMBER

DRAWING TITLE:

D es ig n . Sp aces . Peo p le .

7 0 7 W . V ickery B lvd . # 1 0 1

Fort W orth , T exas 7 6 1 0 4

p h . (8 1 7 ) 7 3 8 -8 0 9 5

fx . (8 1 7 ) 7 3 8 - 9 5 2 4

w w w .q arch .com

DRAWN BY:

CHECKED BY:

1 2 3 4 5

1 2 3 4 5

A

B

C

D

PROJECT:

EXCHANGE

EXCHANGE

CONSTRUCTION TYPE:

STORE TYPE:

CONVERT:

A

B

C

D

As indicated

1/1

9/2

01

7 3

:08

:37

PM A202

INTERIOR ELEVATIONS

28 NOVEMBER 2016

LWL

AGL

16064

ISSUE FORSOLICITATION

TACO JOHN TO ARBY'S

LACKLAND AFB, TEXAS

THE EXCHANGE (ARMY & AIR FORCEEXCHANGE SERVICE)

TENANT REMODEL

3722-15-000001

1/4" = 1'-0"1

INTERIOR ELEVATION

1/4" = 1'-0"2

INTERIOR ELEVATION

1/4" = 1'-0"3

INTERIOR ELEVATION

1/4" = 1'-0"6

INTERIOR ELEVATION

1/4" = 1'-0"7

INTERIOR ELEVATION

1/4" = 1'-0"9

INTERIOR ELEVATION

1/4" = 1'-0"10

INTERIOR ELEVATION

1/4" = 1'-0"8

INTERIOR ELEVATION

1/4" = 1'-0"5

INTERIOR ELEVATION

1/4" = 1'-0"4

INTERIOR ELEVATION

1/4" = 1'-0"11

INTERIOR ELEVATION

DATE

REVISION NO. &

DESCRIPTION BY

01/19/2017 ADDENDUM NO. 2 LWL

1

1

1

Page 4: Convert Taco John's to Arby's D H › pz-s › construction › JBSA Lackland...Convert Taco John's to Arby's Lackland AFB, Texas H QAI# 16064 ESPN#3722-15-000001 A ADDENDUM 02 19January

1FRP

1WT

1QB

1SS

3/4" PLYWOOD UNDER SS-1

AN1.50X1.50X.25-304S.SANGLE FRAME ALL FOURSIDES-GRIND ALL WELDSSMOOTH

NEW KNEE WALLFOR NEW COUNTERDESIGN

6"

P.O.S. BY OWNER

3'-0"

2 1/2"

1 1

/2"

2'-10

"

2SS

A102

6

1FRP

1WT

1QB

1SS

3/4" PLYWOODUNDER SS-1

NEW KNEE WALLFOR NEW COUNTERDESIGN

6"

5/8" CEMENT BOARD BOTHSIDES AS SUBSTRATE FORFINISHES

ARBY'S CONDIMENTTOPPER #111 WITH THEARBY'S SAUCEDISPENSER #95 ON THEFRONT COUNTER. THECONDIMENT TOPPER ISRECESSED BY THEKES.

AN1.50X1.50X.25-304S.SANGLE FRAME ALL FOURSIDES-GRIND ALL WELDSSMOOTH

INCLUDES: - TWO SOUFFLE CUP DISPENSERS #91 INTEGRATED INTO THE TOPPER - TWO NAPKIN DISPENSER #94 INTEGRATED INTO THE TOPPER - THE ARBY'S SAUCE DISPENSER #95 INTEGRATED INTO THE TOPPER

3'-0"

2 1/2"

1 1

/2"

2'-10

"

2SS

A102

6

CD

A301

1

MENUBOARDS

"ARBY'S"SIGNAGE

1FRP

1WP

1P

1QB

1QB

2P

1FRP

S.SCORNERGUARD

OPENBEYOND

3/4" PLYWOOD BETWEEN STUDSFOR MENU BOARD BLOCKING

EXISTINGBULKHEAD

6'-8

"

3 5/8" MTL. BRACING AT32" O.C. - SECURE TOSTRUCTURE ABOVE

SUSPEND FROMSTRUCTURE ABOVE

LAY-IN CEILING

EXISTINGSTRUCTURE

LAY-IN CEILINGEXISTINGCEILING

1FRP

2P

1

1

AT

TS

XETE

FO

SA

10 9 8 9

RE

GIS

TE

RED ARCH

ITE

CTD

AV

IDJ .

LE

E

SCALE:

AAFES Project Number:

DATE:

SHEET:

PROJECT NUMBER

DRAWING TITLE:

D es ig n . Sp aces . Peo p le .

7 0 7 W . V ickery B lvd . # 1 0 1

Fort W orth , T exas 7 6 1 0 4

p h . (8 1 7 ) 7 3 8 -8 0 9 5

fx . (8 1 7 ) 7 3 8 - 9 5 2 4

w w w .q arch .com

DRAWN BY:

CHECKED BY:

1 2 3 4 5

1 2 3 4 5

A

B

C

D

PROJECT:

EXCHANGE

EXCHANGE

CONSTRUCTION TYPE:

STORE TYPE:

CONVERT:

A

B

C

D

1" = 1'-0"

1/1

9/2

01

7 3

:09

:13

PM A301

ARBY'S DETAILS

28 NOVEMBER 2016

LWL

AGL

16064

ISSUE FORSOLICITATION

TACO JOHN TO ARBY'S

LACKLAND AFB, TEXAS

THE EXCHANGE (ARMY & AIR FORCEEXCHANGE SERVICE)

TENANT REMODEL

3722-15-000001

1" = 1'-0"1

COUNTER DETAIL

1" = 1'-0"2

COUNTER DETAIL

1" = 1'-0"3

ENLARGED SECTION

DATE

REVISION NO. &

DESCRIPTION BY

01/19/2017 ADDENDUM NO. 2 LWL

Page 5: Convert Taco John's to Arby's D H › pz-s › construction › JBSA Lackland...Convert Taco John's to Arby's Lackland AFB, Texas H QAI# 16064 ESPN#3722-15-000001 A ADDENDUM 02 19January

NO QTY. ITEM MANUF. AND MODEL NO. REMARKS PROVIDED BY INSTALLED BY

1 2 CASH REGISTER BY OWNER (DEDICATED ELECTRICAL CIRCUIT) ISOLATED, DEDICATED ELEC. CIRCUIT REQUIRED AAFES AAFES

4 1ORDER CONFIRMATION SYSTEM

(NOT SHOWN)TECHKNOW - DFP300 - OCS300ARB AAFES AAFES

5 2 WALL MOUNTED HAND SINK KROWNE HS2 AAFES G.C.

12 1 SHAKE MACHINE - FULL UPRIGHT TAYLOR 60 32 1/2" D x 18 7/8" W x 59 7/8" H AAFES AAFES

12B 1 SHAKE CUP AND LID DISPENSER SAN JAMAR C8504WFD AAFES AAFES

16 4 COOK & HOLD CABINETALTO-SHAAM - 300TH-ARB1-SS

(WITH SITESAGE SPOD)16-13/16"W X 25-3/16"D X 18-15/16"H AAFES AAFES

16A 1 COOK & HOLD STAND SERTEK CF050004-45 45" W x 41 1/2" T MOBILE STAND TO HOLD (3) #16 AND (1) #17 AAFES AAFES

17 2DIGITAL COUNTERTOP ELECTRIC

CONVECTION OVENCADCO, MODEL XAFT-115A 28 1/8"D x 23 5/8"W x 16 7/8"H AAFES AAFES

17B 1 OVEN TIMER A.J. ANTUNES SOLAR TIMER MODEL #TTS-8 OT AAFES AAFES

19 1 3 COMPARTMENT SINK - EXISTING

INCLUDES (1) B231 FAUCET WITH 12" SPOUT, (1)

B133B FAUCET W/ BACKSPLASH MOUNT, (1) B-157

PRE-RINSE FAUCET AND (3) LEVER WASTES

EXISTING SINK NEW FITTINGS G.C. G.C.

20 3 LEVER DRAINS T&S BRASS B-3952-01 AAFES G.C.

21 LOTSHELVING ABOVE 3

COMPARTMENT SINK

METRO

SMART WALL SYSTEM, ARBSW96

MOUNT WALL BRACKET @ 85" A.F.F. COMPONENTS INCLUDE: (4) WALL

UPRIGHTS, 56" WALL TRACK, 40" WALL TRACK, (4) SINGLE SHELF SUPPORTS, (2)

WALL GRIDS, (10) PRONG HOOKS, (1) DRY RACK, (2) 18"x 42"SE PRO SHELVES, (2)

6-PRONG BOTTLE HOLDER, (1) TRAY DRYING RACK, (5) LARGE BASKET

AAFES AAFES

23 1 KNIFE RACK SAN JAMAR, SAF-T-KNIFE STATION, STK1008 15"X15"X4.25", INCLUDED IN SMALLWARES PACKAGE AAFES AAFES

26 1 BEEF PORTION SCALE SMALLWARE ITEM SEE SMALLWARES LIST AAFES AAFES

30 1PREP TABLE W/ BACKSPLASH &

PREP SINK

KES, CUSTOM FAB ITEM, INCLUDES (1)B231 FAUCET

WITH 12" SPOUT AND (1) LEVER WASTE DRAIN108" X 36" X 36"H, 16" A.F.F. (CW & HW), 8" A.F.F. (W) AAFES AAFES

30A OPTLUNDERCOUNTER REFRIGERATION

W/ DRAWERSBEVERAGE AIR, UCRD48A-2 AAFES AAFES

31 1SERVICE TIMER SYSTEM 30 (NOT

SHOWN)HME - C11178 AAFES AAFES

34 LOTDRY STORAGE SHELVING,

BRIGHT ZINC FINISH

METRO

REFER TO PLAN FOR LOCATION, QUANTITY, & SIZE

OF SHELVING UNITS

SEE PLAN FOR SHELF LOCATION, ALL SHELVING UNITS TO BE (5) TIERED. PROVIDE

86" POSTS.AAFES AAFES

40 1 FRY BASKET TABLE KES, CUSTOM FAB ITEM 30" W x 30" D AAFES AAFES

41 1 FRY DUMPMARSHALL AIR THERMOGLO, MODEL RR5-48.5TL

(RR5-48.5TR FOR REVERSE LAYOUT)

59"H X 48.625"W X 32.75"D, 20 AMP, NEMA 6-20, W/ BUILT-IN FRY STATION

TIMERAAFES AAFES

41A 1 FRY CARTON SHELF(1) 12" x 36" SHELF WITH (4) 6" POSTS

BRIGHT ZINC FINISHSIT ON TOP OF FRY DUMP AAFES AAFES

42A 1 EXHAUST HOOD - FRYERCAPTIVE-AIRE, BD-2 SERIES, SEE MECHANICAL

PLANS

60" x 28" x 47"h, STAINLESS STEEL W/ UL LISTING, FILTERS, 4" BACKSPACER,

PROVIDE COMPLETE FIRE SUPPRESSION SYSTEM, ANSUL SYSTEMG.C. G.C.

42B 1 EXHAUST HOOD - OVENSCAPTIVE-AIRE, ND-2 SERIES. SEE MECHANICAL

PLANS48" X 54" x 24"h, STAINLES STEEL W/ UL LISTING, FILTERS, 4" BACKSPACER G.C. G.C.

43 1 3 BANK FRYER W/ NATURAL GAS

HENNY PENNY, EVOLUTION ELITE, 3 WELL OPEN

FRYER, EEG-143.35-ARG GAS WITH

DIRECT-CONNECT

GAS BURNERS, NATURAL OR LIQUID PETROLEUM GAS, 225,000 BTU/HR,

(66.2KW), 1" GAS CONNECTION, 14" A.F.F. G.C TO HOOK UP QUICK DISCONNECT

(SUPPLIED BY KES), INCLUDE DORMONT GAS HOSE KIT #16100-KIT-48. ALSO

INCLUDE DIRECT-CONNECT KIT TO ALLOW HOOK-UP TO DARLING 1500 H UNIT

AAFES AAFES

45 1 MENU BOARDHOWARD, 11 PANEL, PLATINUM MODULAR LED

MENU BOARD SYSTEMAAFES AAFES

46 1140" WORK SMART SLICER

COUNTERKES, CUSTOM FAB ITEM 125 AMP PANEL, POWER TO SUB PANEL BY G.C. AAFES AAFES

46A 1 60" ROLL-IN COLD WELL UNIT BEVERAGE AIR, SPE 24-60M AAFES AAFES

46D - TO-GO BAG HOLDER INTEGRATED INTO #46 SLICER COUNTER AAFES AAFES

46F -WARMER DRAWER (FUTURE

ADDITION)APW WYOTT, MODEL #HDDi-1B, 1-DRAWER

INTEGRATED INTO #46, SLICER COUNTER, INSTALLED ON SITE BY EQUIPMENT

INSTALLERAAFES AAFES

46H 1 BACKLINE TIMER A.J. ANTUNES SOLAR TIMER MODEL #TTS-8 PT MOUNTED ON SLICER COUNTER (ITEM #46) NEAR THE CHEESE PUMP (ITEM #56) AAFES AAFES

46M - TURNOVER DISPLAY KES, CUSTOM FAB ITEM NTEGRATED INTO #46 SLICER COUNTER AAFES AAFES

48 1SANDWICH SLIDE / ORGANIZER

STANDKES, CUSTOM FAB ITEM AAFES AAFES

51 1 PREP-SLICER GLOBE G12A, MEDIUM DUTY SLICER20 1/8"W x 24 5/8 x 20 1/4" H. THE OWNER CAN CHOOSE TO USE A SECOND #52

AS THE PREP SLICER. SEE ITEM #52.AAFES AAFES

52 1 SLICER GLOBE 4219N AAFES AAFES

52A 1 SLICER HEAT LAMP MARSHAL AIR THERMO GLO BW4B-1 24.875 X 28 X 24.75 STAINLESS STEEL CONSTRUCTION AAFES AAFES

53 1 PORTION SCALE (NOT SHOWN) TAYLOR, MODEL #THD32D SEE SMALLWARES LIST AAFES AAFES

53A 1 PORTION SCALE (NOT SHOWN) TAYLOR, MODEL #THD50 SEE SMALLWARES LIST AAFES AAFES

54 1 VERTICAL TOASTER ROUNDUP VCT2000 3350-4462 WATTS, 16-18 AMP, INCLUDES RETROFIT KIT (PART NO. 7000707) AAFES AAFES

56 1 DUAL CHEESE PUMP STAR MFGR. #SPDE-2ARB 10.75"W X 21.38"D X 32.25"H AAFES AAFES

56A 1 WIRE SOUFFLE CUP HOLDER QUADRATEC, DISPWAR 0001 COLOR: BLACK AAFES AAFES

60A 2WORK SMART DRIVE-THRU

STAGING CARTMETRO, #ARB1430SC

14" X 30" X 36"H CART ON CASTERS. USED WITH WORK SMART DT CASHIER

STANDAAFES AAFES

61 3 MICROWAVE OVEN MENUMASTER COMMERCIAL MODEL MOC24 USED WITH WORK SMART AND FRONT LINE SLICER COUNTER AAFES AAFES

62 1 HEATED HOLDING MARSHALL AIR, 3 TIER, 3x2 HOLDING UNIT 19.75"H X 15.375"W X 15.625"D AAFES AAFES

65 1 COUNTER G.C. G.C.

76 2 MOBILE BREAD RACK, ON CASTERS METRO, #ARB243060BR 21" X 24" X 60"H, 10 SHELVES AAFES AAFES

77 1 AU JUS SERVERSERVER, MODEL SY 1.0 ARBY'S #85503,

1 GAL AU JUS SERVERAAFES AAFES

78 2 PAPER TOWEL DISPENSER BY OWNER SEE SHEET A6.1 FOR MOUNTING HEIGHTS, 1 FOR EACH HAND SINK, SEE #5 AAFES AAFES

79 2 LIQUID SOAP DISPENSER BY OWNER SEE SHEET A6.1 FOR MOUNTING HEIGHTS, 1 FOR EACH HAND SINK, SEE #5 AAFES AAFES

80 1 SINGLE DOOR UPRIGHT FREEZER TRAULSEN G12000 AAFES AAFES

89 LOTFRONT COUNTER SHELVING,

BRIGHT ZINC FINISH

INTERMETRO

REFER TO PLAN FOR LOCATION, QUANTITY, & SIZE

OF SHELVING UNITS

SEE PLAN FOR SHELF LOCATION AAFES AAFES

90 1UNDER COUNTER, S/S CUP

DISPENSER16"H X 17"W X 4 3/4"D AAFES AAFES

97 LOT WALL MOUNTED SHELVINGMETRO

24x36, (2) TIER SHELVING, BRIGHT ZINC FINISHAAFES AAFES

109 LOTS/S OUTSIDE CORNER GUARD

(NOT SHOWN)KES, CUSTOM FAB ITEM

2" x 2" x 108" 18 GAUGE. S.S. PROVIDE 2X2 FULL HEIGHT STAINLESS STEEL

CORNER GUARDS ON ALL OUTSIDE CORNERS IN KITCHEN. KITCHEN EQUIPMENT

SUPPLIER (KES) TO SUPPLY AND INSTALL ALL S.S. GUARDS.

G.C. G.C.

111 1 CONDIMENT TOPPER KES, CUSTOM FAB ITEM HOLDS ITEMS #91, #94 AND #95 AAFES AAFES

KES, CUSTOM FAB ITEM

FD

FD

FD

FD

FD

C D

2

141

WORK AREA

138

HSKP

130

130

12

89

89

1

90

54

5

79

78

1

89

76

80

60A97 97

76

30 30A 51

79

78

5

17

17B

46 26

56 46F

56A 52

46H 52A61626161

40

16A

42A

43

77

46D

48

82

12B

16 (4)

109

109

109

109

109 109

109

109109

109

109

109

109 109

41

41A

60A

24"x42"

24"x42"

24"x42"

65

89

111

24"x30"

46A21

19

20

23

(2)

42B

FCO

FS

FCO

FS

EXHAUST HOODFOR OVENS(ABOVE)

EXHAUST HOODFOR FRYER(ABOVE)1) ALL FINAL CONNECTIONS TO BE

BY GENERAL CONTRACTOR.

2) GENERAL CONTRACTOR TO INSTALL ALL BLOCKING FOR SHELVING AND EQUIPMENT. SEE 02/A-101.

3) G.C. TO USE BASE ROOF WARRANTY CONTRACTOR FOR ALL ROOF - RELATED WORK.

NOTES: REMARKS KEY:

AAFES = ARMY & AIR FORCE EXCHANGE SERVICES

G.C. = GENERAL CONTRACTOR

AT

TS

XETE

FO

SA

10 9 8 9

RE

GIS

TE

RED ARCH

ITE

CTD

AV

IDJ .

LE

E

SCALE:

AAFES Project Number:

DATE:

SHEET:

PROJECT NUMBER

DRAWING TITLE:

D es ig n . Sp aces . Peo p le .

7 0 7 W . V ickery B lvd . # 1 0 1

Fort W orth , T exas 7 6 1 0 4

p h . (8 1 7 ) 7 3 8 -8 0 9 5

fx . (8 1 7 ) 7 3 8 - 9 5 2 4

w w w .q arch .com

DRAWN BY:

CHECKED BY:

1 2 3 4 5

1 2 3 4 5

A

B

C

D

PROJECT:

EXCHANGE

EXCHANGE

CONSTRUCTION TYPE:

STORE TYPE:

CONVERT:

A

B

C

D

As indicated

1/1

9/2

01

7 3

:09

:14

PM A801

EQUIPMENT SCHEDULE

28 NOVEMBER 2016

LWL

AGL

16064

ISSUE FORSOLICITATION

TACO JOHN TO ARBY'S

LACKLAND AFB, TEXAS

THE EXCHANGE (ARMY & AIR FORCEEXCHANGE SERVICE)

TENANT REMODEL

3722-15-000001

3/8" = 1'-0"1

EQUIPMENT PLAN

DATE

REVISION NO. &

DESCRIPTION BY

01/19/2017 ADDENDUM NO. 2 LWL

1


Recommended