0 158 214
1
Cooperation of EIB with Danube-countries
Chisinau
26 October 2017
European Investment Bank Group 26/10/2017
0 158 214
2
EIB at a Glance 1
Cooperation of EIB with Danube-
countries
European Investment Bank Group
EIB products
EIB’s Contribution to Danube Initiative
26/10/2017
0 158 214
3
The EIB: the EU bank
• Natural financing partner for the EU
institutions since 1958
• Largest multilateral lender and
borrower in the world
• Shareholders: 28 EU Member States
• HQ in Luxembourg with 44 local
offices
• Around 3000 staff (finance
professionals, engineers, sector
economists and socio-environmental
experts)
• Around 450 projects each year in
over 160 countries
• AAA-rated by the three major rating
agencies
European Investment Bank Group 26/10/2017
0 158 214
4
Scale of Bonds Issuance
Volume of issuance is
larger than all other
major supranational
banks …
… and compares with
that of certain EU
Governments
*Gross financing requirement for FY2015-16 / 2016-17
**Fiscal years from 1 July to 30 June
Source: Barclays research/ best efforts estimates as of 25 January 2017
Data collated from a mixture of official reports and bond market analysis systems such as Dealogic
European Investment Bank Group 26/10/2017
The EIB Capital Breakdown
European Investment Bank Group 5 26/10/2017
0 158 214
6
EIB Priorities in 2016
SMEs Infrastructure Environment Innovation
EUR
16.9bn
EUR
19.7bn
EUR
13.5bn
EUR
33.6bn
European Investment Bank Group 26/10/2017
0 158 214
7
EIB Group Activity Outside EU
Outside EU Lending EIB Group
EUR 83.8bn
Outside
EU
EUR
8.38bn
Eastern
Neighbours
EUR 1.65bn
Africa,
Caribbean,
Pacific, South
Africa
EUR 0.77bn
EFTA &
Enlargement
Countries
EUR 3.35bn
Southern
Neighbours
EUR 1.63bn
Asia and
Latin America
EUR 0.98bn
• The EIB finances projects in some 140 non-EU countries
• EIB lending outside the EU accounts for some 10% of its global activity
EIF in 2016:
EUR 9.45bn
European Investment Bank Group 26/10/2017
0 158 214
8
EIB in 2015:
EUR 77.5bn
Eastern Partnership Portfolio
EIB Investments per Country in Eastern
Partnership
EIB Investments per Sectors in Eastern
Partnership
Eastern
Partnership
Portfolio
2010 - 2016
EUR 7.0bn
2016
EUR
1.65bn
26/10/2017 European Investment Bank Group
0 158 214
9
EIB Products 2
European Investment Bank Group
EIB at a Glance
EIB’s Contribution to Danube Initiative
26/10/2017
Cooperation of EIB with Danube-
countries
EIB Products overview
26/10/2017 European Investment Bank Group 10
Product Concept Eligibility Counterpart
Lending
Direct Loan individual loan to one
borrower min. approx. EUR 25m
public and private
entities
Intermediated
loan
one financial intermediary
with one or multi-
Beneficiaries
SME and Midcaps loan
should be < EUR 12.5m
Programme
Loan
individual loans to several
borrowers
individual loans should be <
EUR 100m
Framework
loan
individual loans awarded
to multiple beneficiaries
through one borrower
individual loans should be <
EUR 50m (but can be less)
Blending Connecting
Europe Facility
(CEF)
grants for innovation and
new technologies for
transport
award is contingent on co-
financing with EIB, national
promotional bank or private
finance
EU Member
States/ promoters
with support from
Member State
Advisory
European
Advisory Hub
help to identify investment
needs, prepare and
structure projects in EU
projects can be appraised
by EIB
public and private
entities
ELENA
grants for technical
assistance for project
development
up to 90% of total technical
assistance costs
public and private
entities
EIB project cycle
26/10/2017 European Investment Bank Group 11
We support sound and sustainable projects
EIB project cycle
Step 1 Proposal
Step 2 Appraisal
Step 3 Approval
Step 4
Signature Step 5
Disbursement
Step 6 Monitoring
and reporting
Step 7 Repayment
• Financial
• Economic
• Social
• Environmental
• Technical assessment
• EIB
Management
Committee
• EFSI Investment
Committee
• EIB Board of
Directors
• Finance contract is signed
0 158 214
12
EIB’s Contribution to Danube Initiative 3
European Investment Bank Group
EIB at a Glance
EIB Products
26/10/2017
Cooperation of EIB with Danube-
countries
EIB Transport Lending Policy
• published in 2011
• Purpose: provide information regarding
project eligibility and appraisal
• http://www.eib.org/attachments/strategies
/transport_lending_policy_en.pdf
• EIB seeks to focus on activities likely to
have the greatest impact on furthering
EU policy goals
• Priority to technologies and
infrastructures with the objective of
developing a more efficient and
sustainable European transport
system:
• Further use of renewable sources
• Contributing to reducing oil
dependency
• Enhancing competitiveness of the
European industry
European Investment Bank Group 13 26/10/2017
14
0
2
4
6
8
10
12
14
16
18
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
Sig
ned
am
ou
nt,
EU
R b
n
Transport operations signed in EU Member States (2007-2016)
EUR 124bn
Air Maritime Other Rail Roads, Motorways Urban
Air 8%
Maritime 10%
Other 0%
Rail 36%
Roads, Motorways
21%
Urban 25%
Transport operations signed in EU Member States (2016) EUR 10.6bn
Recent EIB lending (signed operations) some EUR 70bn per year.
On average, transport projects have constituted some 15%-20% of total lending.
EIB Support to Transport
European Investment Bank Group 26/10/2017
Rhine-Danube TENT-T CNC
25/10/2017 European Investment Bank Group 15
Source: EC
Rhine-Danube Rail Alignment
25/10/2017 European Investment Bank Group 16
Rhine-Danube IWW Alignment
25/10/2017 European Investment Bank Group 17
Rhine-Danube Road Alignment
25/10/2017 European Investment Bank Group 18
EIB projects on the Rhine-Danube
TEN-T CNC
25/10/2017 European Investment Bank Group 19
20
Thank you for your attention!
European Investment Bank Group 26/10/2017
Austria (1/2)
Serapis N° Projects on RhD CNC Project Description EIB Loan Status Sector
2015-0779 HAFEN LINZ TEN-
INFRASTRUKTUR
Further development of the tri-modal (rail/road/inland
waterways) logistics platform in the inland Port of Linz 64.25 M€
Under
Appraisal
IWW/Multi-
modal
2014-0253 OEBB INFRASTRUKTUR
ERNEUERUNG Rehabilitation of rail infrastructure across Austria 600 M€
Fully
Disbursed Rail
2012-0198
OEBB AUSBAU
WESTBAHN PRIORITY
TEN-T
Expansion of capacity on the Westbahn railway (TEN-
T PP 17) corridor (St. Pölten, Ybbs, Linz) 600 M€
Fully
Disbursed Rail
2007-0460 OEBB WIEN
HAUPTBAHNHOF TEN
Construction of the new main railway station in
Vienna, at the junction of Priority TEN-T railway
corridors 17 (Paris-Vienna-Bratislava), 22
(Nürnberg/Dresden-Prague-Vienna-Budapest-
Athens/Constanta) and 23 (Gdansk-Warszawa-
Brno/Bratislava-Wien).
400 M€ Fully
Disbursed Rail
25/10/2017 European Investment Bank Group 21
• AT – ASFINAG and OEBB dominate road
and rail sectors respectively
• Limited appetite for further (road) PPPs at a
national level
• EIB - Development of Linz port tri-modal
logistics platform project in 2016
Austria (2/2)
Serapis N° Projects on RhD
CNC Project Description EIB Loan Status Sector
2005-0387 TEN KNOTEN ST
POELTEN
Capacity extension and upgrading (additional
tracks on limited sections, ERTMS/ETCS
introduction, strengthened power supply) of a
mainline railway node situated in Lower Austria
on a Priority TEN
140 M€ Fully
Disbursed Rail
2002-0622 BAHNHOFSOFFENSIV
E
Renovation and modernisation of 11 mainline
railway stations throughout Austria 77 M€
Fully
Disbursed Rail
2002-0518 LOGISTIK CENTER
LINZ
Construction of a road/rail logistics centre for
itemised freight in Linz, Upper Austria 63 M€
Fully
Reimbursed
Rail /
Roads
2005-0598 AUSBAU FLUGHAFEN
WIEN
Construction of new passenger terminal facilities
and associated airside and landside
infrastructure
400 M€ Fully
Disbursed Airports
2004-0554 PPP OSTREGION
AUTOBAHN - PAKET 1
Planning, construction, financing and operation
of the south of the A5 (Northern Motorway) and
sections of the S2 (Vienna Northern Perimeter
Expressway) and the S1 (Vienna Outer Ring
Expressway).
350 M€ Fully
Disbursed Roads
25/10/2017 European Investment Bank Group 22
Bulgaria / Croatia
Serapis N° Projects on RhD CNC EIB Loan Status Sector
No projects on Rhine – Danube TEN-T CNC
25/10/2017 European Investment Bank Group 23
Czech Republic (1/2)
Serapis N° Projects on RhD CNC Project Description EIB Loan Status Sector
2011-0585
OPTIMISATION OF
BEROUN-ZBIROH-
ROKYCANY LINE
Optimisation of the Beroun - Zbiroh - Rokycany
railway. 76.96 M€
Fully
Disbursed Rail
2011-0029
PRAGUE RAILWAY
STATION-PLATFORMS I-
IV
Modernization of western part of Prague Main
Railway Station, part 2, platforms I - IV. Major
project under SPL.
372.40 M€ Fully
Disbursed Rail
1995-2123 RAIL CORRIDOR II
WARSAW-VIENNA
Modernisation de l'axe Varsovie-Ostrava-Vienne
(Corridor 2). 200 M€
Fully
Disbursed Rail
2007-0045 S&CF TRANSPORT
FRAMEWORK FACILITY
Railway and road projects included in the
Operational Programme Transport (OPT), part of
the Czech National Strategic Reference
Framework (NSRF) 2007-13.
1,234.93
M€
Fully
Disbursed Rail/Roads
25/10/2017 European Investment Bank Group 24
• Operational Programme: Cohesion
Fund, ERDF and CEF dominate
• Framework loan/structural
programme loan operations?
Czech Republic (2/2)
Serapis N° Projects on RhD CNC Project Description EIB Loan Status Sector
2011-0033
ROAD
CONSTRUCTIONS D1
35 & R55 03
Motorway D1, construction 0135 Kromeriz East -
Rikovice, and Expressway R55, construction
5503 Skalka - Hulin. Major project under SPL.
160.51 M€ Fully
Disbursed Roads
2001-0252 PRAHA SOUTH-WEST
RING ROAD
Construction of the Southwest Section of the
Praha Ring Road and Related Links 315 M€
Fully
Disbursed Roads
1999-0292 PLZEN MOTORWAY BY-
PASS
Construction of the by-pass of the town of Plzen,
the missing link on the D5 motorway corridor
from Praha to Nürnberg
210 M€ Fully
Disbursed Roads
25/10/2017 European Investment Bank Group 25
Germany (1/2)
Serapis N° Projects on RhD CNC Project Description EIB Loan Status Sector
2012-0631
CARGO
INFRASTRUCTURE
FRANKFURT (TEN-T)
New Cargo Terminal Facility at Frankfurt
Airport (TEN-T), to be built 2013 - 2018,
operated by Deutsche Lufthansa AG
250 M€ Under
Appraisal
Airports
2008-0112 FRANKFURT AIRPORT
A380 EXTENSION
Extension of the airport facilities to
accommodate the Airbus A380 aircraft
460 M€ Fully
Disbursed Airports
2012-0310 FRANKFURT FLUGHAFEN
TERMINAL 3
Extension of the existing Frankfurt Airport by a
third terminal building 400 M€
Approved by
the BoD
Airports
2014-0765
PROGRAMM
NAHVERKEHR BADEN-
WUERTTEMBERG
Programme loan for rolling stock and related
infrastructure for local and regional public
transport in Baden-Württemberg.
680 M€
Approved by
the
BoD/Partially
signed
Rail
25/10/2017 European Investment Bank Group 26
• Federally financed, non-PPP projects have
traditionally not used EIB loans
• Roads sector – strong pipeline of PPPs. In
2016 operations in Bavaria (A6, A94)
• Rail sector – DB dominates
• IWW – federal financing
• Ports sector competitive
Germany (2/2) Serapis N° Projects on RhD CNC Project Description EIB Loan Status Sector
2009-0296 AUTOBAHN AUGSBURG
ULM PPP TEN
The project concerns the widening of a 41 km
section of the A-8 motorway between Ulm and
Augsburg from 2x2 to the 2x3 lane standard.
The 30 years concession will also include the
operation and maintenance a stretch of further
17km.
252 M€ Fully Signed Roads
2006-0364 AUTOBAHN A-5 PPP TEN
The project concerns the widening of a 41.5km
section of the A-5 motorway between Baden-
Baden and Offenburg from 2x2 to the 2x3 lane
standard. The concession will also include the
operation and maintenance a stretch of further
18.3km (Malsch-Baden-Baden).
225 M€ Fully
Disbursed Roads
25/10/2017 European Investment Bank Group 27
France
Serapis N° Projects on RhD CNC Project Description EIB Loan Status Sector
2015-0234
GRAND
CONTOURNEMENT
OUEST DE STRASBOURG
(A355)
The project consists of the construction of a 24km
motorway by-passing the city of Strasbourg by the
west. It will connect the A4 motorway, located in the
north of Strasbourg, to the A35 and the A352, in the
south.
280.35 M€ Approved by
the BoD Roads
25/10/2017 European Investment Bank Group 28
Hungary (1/2)
Serapis N° Projects on RhD CNC Project Description EIB Loan Status Sector
2015-0371 ROAD NETWORK
MODERNIZATION
Rehabilitation, upgrade and construction of
priority sections of the national road network in
Hungary.
500 M€ Project
underway Road
2015-0042
INSTALLATION OF
GSM-R RADIO
NETWORK SYSTEM
GSM-R
GSM-R radio network system is planned to be
implemented along the main railway lines on a
length of 935 km, consisting of the main
international corridors and other TEN-T lines
(Phase 1 of GSM-R implementation on the
Hungarian railway network).
10.71 M€ Approved
BoD Rail
2015-0040
MODERNISATION
SZOLNOK - SZAJOL
RAILWAY LINE
The project is a major allocation under Cohesion
Fund FL III Phasing Rail Investments and
consists of the modernisation of the Szolnok -
Szajol railway line section.
11.34 M€ Approved
BoD Rail
25/10/2017 European Investment Bank Group 29
• Operational Programme and CEF
• No current political support for further PPPs
• New operations in 2016: • GYSEV Modernisation (rail),
• Road network modernisation (roads)
Hungary (2/2) Serapis N° Projects on RhD CNC Project Description EIB Loan Status Sector
2015-0203
MODERNISATION OF
GYOMA BEKESCSABA
LINE SECTION
The project is a major allocation under Cohesion
Fund FL III Phasing Rail Investments and
consists of the modernisation of Cegléd traction
substation, the line section Gyoma (excl.) -
Békécsaba (incl.) and the ETCS installation
between Budapest - Lokösháza, country border.
52.47 M€ Approved
BoD Rail
2015-0006 COHESION FUND FL IV
Co-financing priority investments under the
Transport and the Energy&Environment
Operational Programmes and CEF in the current
EU programming period (2014-2020).
340 M€ Approved
BoD
Rail /
Urban
transport
2014-0278
COHESION FUND FL III
PHASING RAIL
INVESTMENTS
Rehabilitation and reconstruction of various
investments in the railway sector benefitting from
Cohesion Fund phased in the transitory period
between 2007-13 and 2014-2020
184.91 M€ Fully
Signed Rail
2002-0164 RAILWAYS III (ISPA) Financing of rail rehabilitation investments on a
portion of Pan European Transport Corridor IV. 40 M€
Fully
Reimbursed Rail
2010-0634 M0 BUDAPEST RING
ROAD M1-M5 SECTION .
M0 Budapest Ring Road M0, section between
M1 and M5 motorways. 101.70 M€ Fully signed Roads
2010-0163
MOTORWAY M43
SZEGED-MAKO (FL
20040589)
Construction of the Motorway M43 between
Szeged and Makó. Operation related to the
Cohesion Fund Framework Loan (2004-0589) as
an individual allocation ("major project
procedure").
130.52 Fully
Disbursed Roads
2004-0042 BUDAPEST RINGROAD
M0
Further extension of Budapest's M0 ring road
connecting from the M5 to the M3 junction (incl.
the Gödöllö connection/M31).
70 M€ Fully
Disbursed Roads
25/10/2017 European Investment Bank Group 30
Romania (1/2)
Serapis N° Projects on RhD CNC Project Description EIB Loan Status Sector
2015-0712 EU-COFINANCING FOR
TRANSPORT 2014-20
Structural Programme Loan to co-finance
transport investments under the Large
Infrastructure Operational Programme 2014-
2020 in Romania.
1000 M€ Initiated Multi-
sector
2011-0290 RAIL BORDER-KM 614
(FL20080170)
Rehabilitation and upgrading of the existing line
between the Romanian-Hungarian border and
km 614 (Pan European Corridor IV), over
approximately 41km, increasing line speed from
120 to 160km/h.
49.60 M€ Underway Rail
2001-0413
RAILWAYS REHAB.
PROJECT ON
CORRIDOR IV
The project includes the rehabilitation and
modernization of the 184 km railway line from
Curtici (Hungarian border) to Simeria, along Pan-
European corridor IV, to reach maximum speeds
of 160 km/h.
300 M€ Fully
disbursed Rail
2000-0540 SULINA CANAL BANK
PROTECTION
Improvement of navigation conditions on the
Danube Delta 38 M€
Fully
disbursed
IWW
25/10/2017 European Investment Bank Group 31
• Operational Programme and CEF
• EU fund absorption and EIB loan
disbursement
• EIB Structural Programme Loan for 2014-
2020 OP Large Infrastructure transport
(signing in 2017)
• Bucarest Metro projects
Romania (2/2)
Serapis N° Projects on RhD CNC Project Description EIB Loan Status Sector
2015-0262 BUCHAREST SOUTH
RING ROAD PPP
Construction and operation of the Bucharest
South Ring Road and rehabilitation, operation
and maintenance of the Bucharest-Constanta
and the Bucharest-Pitesti Motorways
300 M€ Initiated Roads
2011-0287
CONSTRUCTION OF
NADLAC-ARAD
MOTORWAY
Construction of 39 km of dual two lane motorway
on a new alignment from Nadlac to Arad. 43 M€
Fully
disbursed Roads
2011-0289 LUGOJ-DEVA
MOTORWAY
Construction of 38 km of dual two lane motorway
on a new alignment from Lugoj to Dumbrava,
including an 11 km link road to Lugoj.
4.6 M€ Underway Roads
2011-0286 ORASTIE-SIBIU
MOTORWAY
Construction of 82 km of dual two lane motorway
on a new alignment from Orastie to Sibiu. 39.70 M€ Underway Roads
2011-0288
TIMISOARA-LUGOJ
MOTORWAY
(FL20080170)
Construction of 25 km of dual two lane motorway
on a new alignment from Timisoara to Lugoj and
a 9.5 km bypass of Timisoara to motorway
standards.
25.60 M€ Fully
disbursed Roads
2004-0605
MOTORWAY
CERNAVODA -
CONSTANTA
The project consists of the construction of 52.1
km of a 2x2 motorway on the Pan-European
corridor IV between the cities of Cernavoda and
the Black Sea port of Constanta and a 22.2 km
2x2 motorway by-pass of Constanta.
250 M€ Fully
disbursed Roads
2002-0091 ARAD-TIMISOARA-
LUGOJ MOTORWAY AFI
Construction of a motorway including one bypass
along Pan European Corridor IV 200 M€
Fully
disbursed Roads
1999-0068 ROMANIAN
MOTORWAYS
Rehabilitation and completion of the construction
of 247km of motorway on Pan-European corridor
IV.
210 M€ Fully
Disbursed Roads
25/10/2017 European Investment Bank Group 32
Slovakia (1/2)
Serapis N° Projects on RhD CNC Project Description EIB
Loan Status Sector
1999-0136 SLOVAKIAN RAILWAYS
MODERNISATION
Upgrading of railway network infrastructure (including
TENs corridors V and VI) and rolling stock, and
upgrading of telecommunications network.
200 M€ Fully
reimbursed Rail
2012-0023 ZILINA TEPLICKA
MARSHALLING YARD Subproject under NDP Framework Loan II 15.40 M€
Fully
disbursed Rail
2011-0396 RAILWAY ZILINA -
KRASNO
Major project under framework loan "NDP Framework
Loan II" (20060030) 15.15 M€
Fully
disbursed Rail
25/10/2017 European Investment Bank Group 33
• SK – OP and CEF
• D4R7 PPP
• Financial close in 2016
• Potential use of Operational
Programme Financial Instruments
(3% of OP)
• Station upgrades, D1 motorway,
Bratislava port
• Potential operations: Future road PPPs,
rolling stock, airport-rail link (Bratislava),
urban transport in municipalities?
Slovakia (2/2) Serapis N° Projects on RhD CNC Project Description EIB Loan Status Sector
2014-0465 SLOVAKIA TRANSPORT
FRAMEWORK FACILITY
Co-financing of investments in the transport sector
under Slovakia's Operational Programme Integrated
Infrastructure and CEF 2014-2020
669.60 Approved
BoD
Rail/Roads/
IWW
2015-0059 D4R7 SLOVAKIA PPP
Design, construction and financing of approximately
27 km of the D4 motorway around Bratislava, which
will connect to the R7 expressway and is to be
procured as part of the D4R7 PPP.
427 M€
Approved
BoD
Roads
2014-0157 D1 HUBOVA - IVACHNOVA
(FWL 2006-0030)
The project consists of the construction of a new 15.3
km section of the D1 motorway between Hubova and
Ivachnova in Slovakia.
10.63 M€ Under
Appraisal Roads
2012-0165 D1 JANOVCE-JABLONOV
(FWL 2006-0030)
Construction of a new 18.5 km section of the D1
motorway between Janovce and Jablonov in Slovakia. 70 M€
Fully
disbursed Roads
2012-0166 D1 FRICOVCE-SVINIA
Construction of approximately 11 km of a new dual
carriageway motorway section, as part of the D1
motorway, between Fricovce and Svinia in eastern
Slovakia.
15 M€ Fully
disbursed Roads
2004-0430 SLOVAK NATIONAL
MOTORWAY COMPANY
The project aims at completing the motorway
connection from Bratislava to Zilina and concerns a
section of 9.6 km on the D1.
180 M€ Fully
Reimbursed Roads
2001-0588
MOTORWAY AND
EXPRESSWAY
PROGRAMME
Programme of improvements to the road
infrastructure. 350 M€
Fully
Disbursed Roads
2000-0234 EUROPEAN ROADS V Construction of 4 km of dual 2-lane urban motorway
(D 61) in the south of the city of Bratislava 40 M€
Fully
Disbursed Roads
25/10/2017 European Investment Bank Group 34