Date post: | 03-Jun-2018 |
Category: |
Documents |
Upload: | matrixcruzadas |
View: | 215 times |
Download: | 0 times |
of 301
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
1/301
2012 ISACA. All rights reserved. No part of this publication may b
stored in a retrieval system or transmitted in any form by any mean#ithout the prior #ritten authorisation of ISACA. %se of this publicatattribution of the material&s source. No other right or permission is
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
2/301
used copied reproduced modi!ed distributed displayed
s "electronic mechanical photocopying recording or other#ise$ion is permitted solely for personal use and must include fullranted #ith respect to this #or'.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
3/301
Listed below are the practices associated with each of the governance and management processes in COBIT
)rocesses* (+
Area Domain Process Process Description Process Prpose !tatement "ew In
,overnance -/01
,overnance -/02
,overnance -/0(
,overnance -/0
,overnance -/0
The practices are sorted in the order in which the% appear in COBIT 5: Enabling Processes.
ProcessID
-valuateirect and/onitor
-nsure,overnance3rame#or'Setting and/aintenance
Analyse and articulate there4uirements for the governance ofenterprise I5 and put in place andmaintain e6ective enabling structuresprinciples processes and practices
#ith clarity of responsibilities andauthority to achieve the enterprise&smission goals and ob7ectives.
)rovide a consistent approach integratedand aligned #ith the enterprise governanceapproach. 5o ensure that I58related decisionsare made in line #ith the enterprise&sstrategies and ob7ectives ensure that I58
related processes are overseen e6ectivelyand transparently compliance #ith legaland regulatory re4uirements is con!rmedand the governance re4uirements for boardmembers are met.
-valuateirect and
/onitor
-nsure 9ene!tselivery
ptimise the value contribution to thebusiness from the business processes
I5 services and I5 assets resulting frominvestments made by I5 at acceptablecosts.
Secure optimal value from I58enabledinitiatives services and assets: cost8e;cient
delivery of solutions and services: and areliable and accurate picture of costs andli'ely bene!ts so that business needs aresupported e6ectively and e;ciently.
-valuateirect and/onitor
-nsure
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
4/301
Area Domain Process Process Description Process Prpose !tatement "ewProcess
ID
/anagement A)02 /anage Strategy
/anagement A)0( >es
/anagement A)0 >es
/anagement A)0 /anage )ortfolio >es
/anagement A)0? >es
Align )lan
and rganise
)rovide a holistic vie# of the current
business and I5 environment thefuture direction and the initiativesre4uired to migrate to the desiredfuture environment. @everageenterprise architecture building bloc'sand components including e=ternallyprovided services and related
Align strategic I5 plans #ith business
ob7ectives. Clearly communicate theob7ectives and associated accountabilitiesso they are understood by all #ith the I5strategic options identi!ed structured andintegrated #ith the business plans.
Align )lanand rganise
/anage-nterpriseArchitecture
-stablish a common architectureconsisting of business processinformation data application andtechnology architecture layers for
e6ectively and e;ciently realisingenterprise and I5 strategies by
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
5/301
Area Domain Process Process Description Process Prpose !tatement "ew IProcess
ID
/anagement A)0+
/anagement A)0B >es
/anagement A)0
/anagement A)10
/anagement A)11 /anage Duality
/anagement A)12 /anage
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
6/301
Area Domain Process Process Description Process Prpose !tatement "ew IProcess
ID
/anagement A)1( /anage Security >es
/anagement 9AI01
/anagement 9AI02
/anagement 9AI0(
/anagement 9AI0
Align )lan
and rganise
e!ne operate and monitor a system
for information security management.
Feep the impact and occurrence of
information security incidents #ithin theenterprise&s ris' appetite levels.
9uildAc4uire andImplement
/anage)rogrammes and)ro7ects
/anage all programmes and pro7ectsfrom the investment portfolio inalignment #ith enterprise strategy andin a co8ordinated #ay. Initiate plancontrol and e=ecute programmes andpro7ects and close #ith a post8implementation revie#.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
7/301
Area Domain Process Process Description Process Prpose !tatement "ew IProcess
ID
/anagement 9AI0? /anage Changes
/anagement 9AI0+
/anagement 9AI0B >es
/anagement 9AI0 /anage Assets >es
/anagement 9AI10
9uild
Ac4uire andImplement
/anage all changes in a controlled
manner including standard changesand emergency maintenance relatingto business processes applicationsand infrastructure. 5his includeschange standards and proceduresimpact assessment prioritisation andauthorisation emergency changestrac'ing reporting closure anddocumentation.
-nable fast and reliable delivery of change
to the business and mitigation of the ris' ofnegatively impacting the stability orintegrity of the changed environment.
9uildAc4uire andImplement
/anage ChangeAcceptance and5ransitioning
3ormally accept and ma'e operationalne# solutions includingimplementation planning system anddata conversion acceptance testingcommunication release preparationpromotion to production of ne# orchanged business processes and I5services early production support anda post8implementation revie#.
Implement solutions safely and in line #iththe agreed8on e=pectations and outcomes.
9uildAc4uire andImplement
/anageFno#ledge
/aintain the availability of relevantcurrent validated and reliable'no#ledge to support all processactivities and to facilitate decisionma'ing. )lan for the identi!cationgathering organising maintaining useand retirement of 'no#ledge.
)rovide the 'no#ledge re4uired to supportall sta6 in their #or' activities and forinformed decision ma'ing and enhancedproductivity.
9uildAc4uire andImplement
/anage I5 assets through their lifecycle to ma'e sure that their usedelivers value at optimal cost theyremain operational "!t for purpose$they are accounted for and physicallyprotected and those assets that arecritical to support service capabilityare reliable and available. /anage
Account for all I5 assets and optimise thevalue provided by these assets.
9uildAc4uire and
Implement
/anageCon!guration
e!ne and maintain descriptions andrelationships bet#een 'ey resources
and capabilities re4uired to deliver I58enabled services including collectingcon!guration information establishingbaselines verifying and auditing
)rovide su;cient information about serviceassets to enable the service to be e6ectively
managed assess the impact of changes anddeal #ith service incidents.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
8/301
Area Domain Process Process Description Process Prpose !tatement "ew IProcess
ID
/anagement SS02
/anagement SS0( /anage )roblems
/anagement SS0
/anagement SS0 >es
/ t SS0? >
eliver
Service andSupport
/anage Service
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
9/301
Area Domain Process Process Description Process Prpose !tatement "ew IProcess
ID
/anagement /-A01
/anagement /-A02
/anagement /-A0(
/onitor
-valuate andAssess
/onitor -valuate
and Assess)erformance andConformance
Collect validate and evaluate
business I5 and process goals andmetrics. /onitor that processes areperforming against agreed8onperformance and conformance goalsand metrics and provide reporting thatis systematic and timely.
)rovide transparency of performance and
conformance and drive achievement ofgoals.
/onitor-valuate andAssess
/onitor -valuateand Assess theSystem ofInternal Control
Continuously monitor and evaluate thecontrol environment including self8assessments and independentassurance revie#s. -nable
management to identify controlde!ciencies and ine;ciencies and toinitiate improvement actions. )lan
btain transparency for 'ey sta'eholders onthe ade4uacy of the system of internalcontrols and thus provide trust inoperations con!dence in the achievement
of enterprise ob7ectives and an ade4uateunderstanding of residual ris'.
/onitor-valuate andAssess
/onitor -valuateand AssessCompliance #ith-=ternal
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
10/301
Listed below are the practices associated with each of the governance and management processes in COBIT 5.
)rocesses* (+
)ractices* -rr*02
Area Domain Process Process Description Process Prpose !tatement Practice
/anagement 9AI01 9AI01.01
/anagement 9AI01 9AI01.02
/anagement 9AI01 9AI01.0(
/anagement 9AI01 9AI01.0
/anagement 9AI01 9AI01.0
The practices are sorted in the order in which the% appear in COBIT 5: Enabling Processes.
ProcessID
PracticeID
9uildAc4uire andImplement
/anage)rogrammes and)ro7ects
/anage all programmes and pro7ectsfrom the investment portfolio inalignment #ith enterprise strategy andin a co8ordinated #ay. Initiate plan
control and e=ecute programmes andpro7ects and close #ith a post8implementation revie#.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
11/301
Area Domain Process Process Description Process Prpose !tatement PrProcess
IDPractice
ID
/anagement 9AI01 9AI01.0?
/anagement 9AI01 9AI01.0+
/anagement 9AI01 9AI01.0B )la
/anagement 9AI01 9AI01.0
/anagement 9AI01 9AI01.10
/anagement 9AI01 9AI01.11
/anagement 9AI01 9AI01.12
9uildAc4uire andImplement
/anage)rogrammes and)ro7ects
/oandproout
9uildAc4uire andImplement
/anage)rogrammes and)ro7ects
Stainit#itpro
9uildAc4uire andImplement
/anage)rogrammes and)ro7ects
9uildAc4uire and
Implement
/anage)rogrammes and
)ro7ects
/apro
pro
9uildAc4uire andImplement
/anage)rogrammes and)ro7ects
/apropro
9uildAc4uire andImplement
/anage)rogrammes and)ro7ects
/ocon
9uildAc4uire andImplement
/anage)rogrammes and)ro7ects
/ares#or
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
12/301
Area Domain Process Process Description Process Prpose !tatement PProcess
IDPractice
ID
/anagement 9AI01 9AI01.1
/anagement 9AI02 9AI02.01
/anagement 9AI02 9AI02.02
/anagement 9AI02 9AI02.0(
/anagement 9AI02 9AI02.0
/anagement 9AI0( 9AI0(.01
9uildAc4uire andImplement
/anage)rogrammes and)ro7ects
Clopro
9uildAc4uire andImplement
/anage
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
13/301
Area Domain Process Process Description Process Prpose !tatement PrProcess
IDPractice
ID
/anagement 9AI0( 9AI0(.02
/anagement 9AI0( 9AI0(.0(
/anagement 9AI0( 9AI0(.0
/anagement 9AI0( 9AI0(.0 9ui
/anagement 9AI0( 9AI0(.0?
/anagement 9AI0( 9AI0(.0+
9uildAc4uire andImplement
/anage SolutionsIdenti!cation and9uild
essolucom
9uild
Ac4uire andImplement
/anage Solutions
Identi!cation and9uild
ev
com
9uildAc4uire and
Implement
/anage SolutionsIdenti!cation and
9uild
)rocom
9uildAc4uire andImplement
/anage SolutionsIdenti!cation and9uild
9uildAc4uire andImplement
/anage SolutionsIdenti!cation and9uild
)erass
9uildAc4uire andImplement
/anage SolutionsIdenti!cation and9uild
)resolu
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
14/301
Area Domain Process Process Description Process Prpose !tatement PProcess
IDPractice
ID
/anagement 9AI0( 9AI0(.10 /a
/anagement 9AI0( 9AI0(.11
/anagement 9AI0 9AI0.01
/anagement 9AI0 9AI0.02
/anagement 9AI0 9AI0.0(
/anagement 9AI0 9AI0.0
/anagement 9AI0 9AI0.0
9uildAc4uire andImplement
/anage SolutionsIdenti!cation and9uild
9uildAc4uire andImplement
/anage SolutionsIdenti!cation and9uild
eanse
9uildAc4uire and
Implement
/anageAvailability and
Capacity
9alance current and future needs foravailability performance and capacity
#ith cost8e6ective service provision.Include assessment of currentcapabilities forecasting of futureneeds based on businessre4uirements analysis of businessimpacts and assessment of ris' toplan and implement actions to meetthe identi!ed re4uirements.
/aintain service availability e;cientmanagement of resources and optimisation
of system performance through prediction offuture performance and capacityre4uirements.
Asav
pecacre
9uildAc4uire andImplement
/anageAvailability andCapacity
Asim
9uildAc4uire andImplement
/anageAvailability andCapacity
)lachre4
9uildAc4uire andImplement
/anageAvailability andCapacity
/oavca
9uild
Ac4uire andImplement
/anage
Availability andCapacity
Inv
adavpeca
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
15/301
Area Domain Process Process Description Process Prpose !tatement PrProcess
IDPractice
ID
/anagement 9AI0 9AI0.02
/anagement 9AI0 9AI0.0(
/anagement 9AI0 9AI0.0
/anagement 9AI0 9AI0.0
/anagement 9AI0 9AI0.0?
/anagement 9AI0 9AI0.0+ Su
/anagement 9AI0? /anage Changes 9AI0?.01
9uildAc4uire andImplement
/anagerganisationalChange-nablement
3oimtea
9uildAc4uire andImplement
/anagerganisationalChange-nablement
Code
9uildAc4uire andImplement
/anagerganisationalChange-nablement
-mplaide#in
9uildAc4uire and
Implement
/anagerganisational
Change-nablement
-nan
9uildAc4uire andImplement
/anagerganisationalChange-nablement
-map
9uild
Ac4uire andImplement
/anage
rganisationalChange-nablement
9uildAc4uire andImplement
/anage all changes in a controlledmanner including standard changesand emergency maintenance relatingto business processes applicationsand infrastructure. 5his includeschange standards and procedures
impact assessment prioritisation andauthorisation emergency changestrac'ing reporting closure anddocumentation
-nable fast and reliable delivery of changeto the business and mitigation of the ris' ofnegatively impacting the stability orintegrity of the changed environment.
-vancha
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
16/301
Area Domain Process Process Description Process Prpose !tatement PrProcess
IDPractice
ID
/anagement 9AI0? /anage Changes 9AI0?.0(
/anagement 9AI0? /anage Changes 9AI0?.0
/anagement 9AI0+ 9AI0+.01
/anagement 9AI0+ 9AI0+.02
/anagement 9AI0+ 9AI0+.0(
/anagement 9AI0+ 9AI0+.0
/anagement 9AI0+ 9AI0+.0
/anagement 9AI0+ 9AI0+.0?
9uildAc4uire andImplement
5racha
9uildAc4uire andImplement
Clodocha
9uildAc4uire andImplement
/anage ChangeAcceptance and5ransitioning
3ormally accept and ma'e operationalne# solutions includingimplementation planning system anddata conversion acceptance testingcommunication release preparationpromotion to production of ne# orchanged business processes and I5services early production support anda post8implementation revie#.
Implement solutions safely and in line #iththe agreed8on e=pectations and outcomes.
-stimpla
9uildAc4uire andImplement
/anage ChangeAcceptance and5ransitioning
)laproanco
9uildAc4uire andImplement
/anage ChangeAcceptance and5ransitioning
)lates
9uild
Ac4uire andImplement
/anage Change
Acceptance and5ransitioning
-st
en
9uildAc4uire andImplement
/anage ChangeAcceptance and5ransitioning
)eacc
9uild
Ac4uire andImplement
/anage Change
Acceptance and5ransitioning
)ro
proma
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
17/301
Area Domain Process Process Description Process Prpose !tatement PProcess
IDPractice
ID
/anagement 9AI0+ 9AI0+.0B
/anagement 9AI0B 9AI0B.01
/anagement 9AI0B 9AI0B.02
/anagement 9AI0B 9AI0B.0(
/anagement 9AI0B 9AI0B.0
/anagement 9AI0B 9AI0B.0
/anagement 9AI0 /anage Assets 9AI0.01
9uildAc4uire andImplement
/anage ChangeAcceptance and5ransitioning
)eimrev
9uildAc4uire andImplement
/anageFno#ledge
/aintain the availability of relevantcurrent validated and reliable'no#ledge to support all processactivities and to facilitate decisionma'ing. )lan for the identi!cation
gathering organising maintaining useand retirement of 'no#ledge.
)rovide the 'no#ledge re4uired to supportall sta6 in their #or' activities and forinformed decision ma'ing and enhancedproductivity.
Nufac'ncu
9uildAc4uire andImplement
/anageFno#ledge
Ideclainf
9uildAc4uire and
Implement
/anageFno#ledge
rco
inf'n
9uildAc4uire andImplement
/anageFno#ledge
%s'n
9uild
Ac4uire andImplement
/anage
Fno#ledge
-v
inf
9uildAc4uire andImplement
/anage I5 assets through their lifecycle to ma'e sure that their usedelivers value at optimal cost theyremain operational "!t for purpose$they are accounted for and physicallyprotected and those assets that arecritical to support service capabilityare reliable and available. /anage
soft#are licences to ensure that theoptimal number are ac4uired retainedand deployed in relation to re4uiredb i d h f
Account for all I5 assets and optimise thevalue provided by these assets.
Idecu
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
18/301
Area Domain Process Process Description Process Prpose !tatement PrProcess
IDPractice
ID
/anagement 9AI0 /anage Assets 9AI0.0(
/anagement 9AI0 /anage Assets 9AI0.0
/anagement 9AI0 /anage Assets 9AI0.0 /a
/anagement 9AI10 9AI10.01
/anagement 9AI10 9AI10.02
/anagement 9AI10 9AI10.0(
/anagement 9AI10 9AI10.0
/anagement 9AI10 9AI10.0
9uildAc4uire and
Implement
/alife
9uildAc4uire andImplement
pcos
9uildAc4uire andImplement
9uildAc4uire andImplement
/anageCon!guration
e!ne and maintain descriptions andrelationships bet#een 'ey resourcesand capabilities re4uired to deliver I58enabled services including collectingcon!guration information establishingbaselines verifying and auditingcon!guration information andupdating the con!guration repository.
)rovide su;cient information about serviceassets to enable the service to be e6ectivelymanaged assess the impact of changes anddeal #ith service incidents.
-stmaconmo
9uildAc4uire andImplement
/anageCon!guration
-stmaconrepbas
9uildAc4uire andImplement
/anageCon!guration
/aconconite
9uildAc4uire andImplement
/anageCon!guration
)roconrep
9uildAc4uire andImplement
/anageCon!guration
Heintconrep
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
19/301
&overnance Practice
/aintain a standard approach for programme and pro7ectmanagement that enables governance and managementrevie# and decision ma'ing and delivery managementactivities focussed on achieving value and goals"re4uirements ris' costs schedule 4uality$ for thebusiness in a consistent manner.
Initiate a programme to con!rm the e=pected bene!tsand obtain authorisation to proceed. 5his includesagreeing on programme sponsorship con!rming theprogramme mandate through approval of the conceptual
business case appointing programme board orcommittee members producing the programme briefrevie#ing and updating the business case developing abene!ts realisation plan and obtaining approval fromsponsors to proceed.
/anage sta'eholder engagement to ensure an activee=change of accurate consistent and timely informationthat reaches all relevant sta'eholders. 5his includes
planning identifying and engaging sta'eholders andmanaging their e=pectations.
3ormulate a programme to lay the initial ground#or' andto position it for successful e=ecution by formalising thescope of the #or' to be accomplished and identifying thedeliverables that #ill satisfy its goals and deliver value./aintain and update the programme plan and businesscase throughout the full economic life cycle of theprogramme ensuring alignment #ith strategic ob7ectives
and reecting the current status and updated insightsgained to date.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
20/301
&overnance Practice
/onitor and control programme "solution delivery$ andenterprise "valueGoutcome$ performance against plan
throughout the full economic life cycle of the investment.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
21/301
&overnance Practice
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
22/301
&overnance Practice
evelop document and elaborate detailed designsprogressively using agreed8on and appropriate phased or
rapid agile development techni4ues addressing allcomponents "business processes and related automatedand manual controls supporting I5 applicationsinfrastructure services and technology products andpartnersGsuppliers$. -nsure that the detailed designincludes internal and e=ternal S@As and @As.
evelop solution components progressively in
accordance #ith detailed designs follo#ing developmentmethods and documentation standards 4ualityassurance "DA$ re4uirements and approval standards.-nsure that all control re4uirements in the businessprocesses supporting I5 applications and infrastructureservices services and technology products andpartnersGsuppliers are addressed.
)rocure solution components based on the ac4uisitionplan in accordance #ith re4uirements and detailed
designs architecture principles and standards and theenterprise&s overall procurement and contractprocedures DA re4uirements and approval standards.-nsure that all legal and contractual re4uirements areidenti!ed and addressed by the supplier.
Install and con!gure solutions and integrate #ithbusiness process activities. Implement control securityand auditability measures during con!guration andduring integration of hard#are and infrastructural
soft#are to protect resources and ensure availability anddata integrity. %pdate the services catalogue to reectthe ne# solutions.
evelop resource and e=ecute a DA plan aligned #iththe D/S to obtain the 4uality speci!ed in there4uirements de!nition and the enterprise&s 4ualitypolicies and procedures.
-stablish a test plan and re4uired environments to test
the individual and integrated solution componentsincluding the business processes and supporting servicesapplications and infrastructure.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
23/301
&overnance Practice
evelop and e=ecute a plan for the maintenance ofsolution and infrastructure components. Include periodic
revie#s against business needs and operationalre4uirements.
e!ne and agree on ne# or changed I5 services andservice level options. ocument ne# or changed servicede!nitions and service level options to be updated in theservices portfolio.
Assess availability performance and capacity of servicesand resources to ensure that cost87usti!able capacity andperformance are available to support business needs anddeliver against S@As. Create availability performance andcapacity baselines for future comparison.
Identify important services to the enterprise mapservices and resources to business processes andidentify business dependencies. -nsure that the impactof unavailable resources is fully agreed on and acceptedby the customer. -nsure that for vital business functionsthe S@A availability re4uirements can be satis!ed.
)lan and prioritise availability performance and capacityimplications of changing business needs and servicere4uirements.
/onitor measure analyse report and revie# availabilityperformance and capacity. Identify deviations fromestablished baselines.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
24/301
&overnance Practice
-stablish an e6ective implementation team byassembling appropriate members creating trust and
establishing common goals and e6ectiveness measures.
Communicate the desired vision for the change in thelanguage of those a6ected by it. 5he communicationshould be made by senior management and include therationale for and bene!ts of the change the impacts ofnot ma'ing the change: and the vision the road map andthe involvement re4uired of the various sta'eholders.
-mpo#er those #ith implementation roles by ensuringthat accountabilities are assigned providing training andaligning organisational structures and E< processes.Identify and communicate short8term #ins that can berealised and are important from a change enablementperspective.
)lan and implement all technical operational and usageaspects such that all those #ho are involved in the future
state environment can e=ercise their responsibility.
-mbed the ne# approaches by trac'ing implementedchanges assessing the e6ectiveness of the operationand use plan and sustaining ongoing a#areness throughregular communication. 5a'e corrective measures asappropriate #hich may include enforcing compliance.
Sustain changes through e6ective training of ne# sta6
ongoing communication campaigns continued topmanagement commitment adoption monitoring andsharing of lessons learned across the enterprise.
-valuate all re4uests for change to determine the impacton business processes and I5 services and to assess#hether change #ill adversely a6ect the operationalenvironment and introduce unacceptable ris'. -nsurethat changes are logged prioritised categorisedassessed authorised planned and scheduled.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
25/301
&overnance Practice
/aintain a trac'ing and reporting system to documentre7ected changes communicate the status of approved
and in8process changes and complete changes. /a'ecertain that approved changes are implemented asplanned.
henever changes are implemented update accordinglythe solution and user documentation and the proceduresa6ected by the change.
-stablish an implementation plan that covers system anddata conversion acceptance testing criteriacommunication training release preparation promotionto production early production support afallbac'Gbac'out plan and a post8implementation revie#.btain approval from relevant parties.
)repare for business process I5 service data andinfrastructure migration as part of the enterprise&sdevelopment methods including audit trails and arecovery plan should the migration fail.
-stablish a test plan based on enterprise#ide standardsthat de!ne roles responsibilities and entry and e=itcriteria. -nsure that the plan is approved by relevantparties.
e!ne and establish a secure test environment
representative of the planned business process and I5operations environment performance and capacitysecurity internal controls operational practices data4uality and privacy re4uirements and #or'loads.
5est changes independently in accordance #ith thede!ned test plan prior to migration to the live operationalenvironment.
)romote the accepted solution to the business and
operations. here appropriate run the solution as a pilotimplementation or in parallel #ith the old solution for ade!ned period and compare behaviour and results. If
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
26/301
&overnance Practice
Conduct a post8implementation revie# to con!rmoutcome and results identify lessons learned and
develop an action plan. -valuate and chec' the actualperformance and outcomes of the ne# or changedservice against the predicted performance and outcomes"i.e. the service e=pected by the user or customer$.
evise and implement a scheme to nurture and facilitatea 'no#ledge8sharing culture.
Identify validate and classify diverse sources of internaland e=ternal information re4uired to enable e6ective useand operation of business processes and I5 services.
rganise information based on classi!cation criteria.Identify and create meaningful relationships bet#een
information elements and enable use of information.Identify o#ners and de!ne and implement levels ofaccess to 'no#ledge resources.
)ropagate available 'no#ledge resources to relevantsta'eholders and communicate ho# these resources canbe used to address di6erent needs "e.g. problem solvinglearning strategic planning and decision ma'ing$.
/easure the use and evaluate the currency and
relevance of information.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
27/301
&overnance Practice
/anage assets from procurement to disposal to ensurethat assets are utilised as e6ectively and e;ciently as
possible and are accounted for and physically protected.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
28/301
2B of (01
Listed below are the activities associated with each of the governance and
Activities* -rr*02
Area Domain Process Practice ID Practice "ame
,overnance -/01 -/01.01
,overnance -/01 -/01.01
,overnance -/01 -/01.01
,overnance -/01 -/01.01
,overnance -/01 -/01.01
,overnance -/01 -/01.01
The activities are sorted in the order in which the% appear in COBIT 5: Ena
ProcessID
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
-valuate thegovernance system.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
-valuate thegovernance system.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
-valuate thegovernance system.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
-valuate thegovernance system.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
-valuate thegovernance system.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
-valuate thegovernance system.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
29/301
2 of (01
Area Domain Process Practice ID Practice "ameProcess
ID
,overnance -/01 -/01.01
,overnance -/01 -/01.01
,overnance -/01 -/01.02
,overnance -/01 -/01.02
,overnance -/01 -/01.02
,overnance -/01 -/01.02
,overnance -/01 -/01.02
,overnance -/01 -/01.02
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
-valuate thegovernance system.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
-valuate thegovernance system.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
irect the governancesystem.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
irect the governancesystem.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
irect the governancesystem.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
irect the governancesystem.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
irect the governancesystem.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
irect the governancesystem.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
30/301
(0 of (01
Area Domain Process Practice ID Practice "ameProcess
ID
,overnance -/01 -/01.0(
,overnance -/01 -/01.0(
,overnance -/01 -/01.0(
,overnance -/01 -/01.0(
,overnance -/01 -/01.0(
,overnance -/01 -/01.0(
,overnance -/02 -/02.01
,overnance -/02 -/02.01
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
/onitor thegovernance system.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
/onitor thegovernance system.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
/onitor thegovernance system.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
/onitor thegovernance system.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
/onitor thegovernance system.
-valuate irectand /onitor
-nsure ,overnance3rame#or' Settingand /aintenance
/onitor thegovernance system.
-valuate irectand /onitor
-nsure 9ene!tselivery
-valuate valueoptimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
-valuate valueoptimisation.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
31/301
(1 of (01
Area Domain Process Practice ID Practice "ameProcess
ID
,overnance -/02 -/02.01
,overnance -/02 -/02.01
,overnance -/02 -/02.01
,overnance -/02 -/02.01
,overnance -/02 -/02.01
,overnance -/02 -/02.01
,overnance -/02 -/02.02
,overnance -/02 -/02.02
-valuate irectand /onitor
-nsure 9ene!tselivery
-valuate valueoptimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
-valuate valueoptimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
-valuate valueoptimisation.
-valuate irect
and /onitor
-nsure 9ene!ts
elivery
-valuate value
optimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
-valuate valueoptimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
-valuate valueoptimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
irect valueoptimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
irect valueoptimisation.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
32/301
(2 of (01
Area Domain Process Practice ID Practice "ameProcess
ID
,overnance -/02 -/02.02
,overnance -/02 -/02.02
,overnance -/02 -/02.02
,overnance -/02 -/02.02
,overnance -/02 -/02.02
,overnance -/02 -/02.0(
,overnance -/02 -/02.0(
-valuate irectand /onitor
-nsure 9ene!tselivery
irect valueoptimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
irect valueoptimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
irect valueoptimisation.
-valuate irect
and /onitor
-nsure 9ene!ts
elivery
irect value
optimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
irect valueoptimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
/onitor valueoptimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
/onitor valueoptimisation.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
33/301
(( of (01
Area Domain Process Practice ID Practice "ameProcess
ID
,overnance -/02 -/02.0(
,overnance -/02 -/02.0(
,overnance -/02 -/02.0(
,overnance -/0( -/0(.01
,overnance -/0( -/0(.01
,overnance -/0( -/0(.01
,overnance -/0( -/0(.01
,overnance -/0( -/0(.01
,overnance -/0( -/0(.01
,overnance -/0( -/0(.02
,overnance -/0( -/0(.02
,overnance -/0( -/0(.02
-valuate irectand /onitor
-nsure 9ene!tselivery
/onitor valueoptimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
/onitor valueoptimisation.
-valuate irectand /onitor
-nsure 9ene!tselivery
/onitor valueoptimisation.
-valuate irectand /onitor
-nsure
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
34/301
( of (01
Area Domain Process Practice ID Practice "ameProcess
ID
,overnance -/0( -/0(.02
,overnance -/0( -/0(.02
,overnance -/0( -/0(.02
,overnance -/0( -/0(.0(
,overnance -/0( -/0(.0(
,overnance -/0( -/0(.0(
,overnance -/0( -/0(.0(
,overnance -/0 -/0.01
,overnance -/0 -/0.01
,overnance -/0 -/0.01
,overnance -/0 -/0.01
-valuate irectand /onitor
-nsure
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
35/301
( of (01
Area Domain Process Practice ID Practice "ameProcess
ID
,overnance -/0 -/0.01
,overnance -/0 -/0.02
,overnance -/0 -/0.02
,overnance -/0 -/0.02
,overnance -/0 -/0.02
,overnance -/0 -/0.02
,overnance -/0 -/0.0(
,overnance -/0 -/0.0(
,overnance -/0 -/0.0(
,overnance -/0 -/0.01
,overnance -/0 -/0.01
,overnance -/0 -/0.01
,overnance -/0 -/0.02
-valuate irectand /onitor
-nsure
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
36/301
(? of (01
Area Domain Process Practice ID Practice "ameProcess
ID
,overnance -/0 -/0.02
,overnance -/0 -/0.02
,overnance -/0 -/0.02
,overnance -/0 -/0.0(
,overnance -/0 -/0.0(
,overnance -/0 -/0.0(
/anagement A)01 A)01.01
/anagement A)01 A)01.01
/anagement A)01 A)01.01
/anagement A)01 A)01.01
/anagement A)01 A)01.01
/anagement A)01 A)01.01
-valuate irectand /onitor
-nsure Sta'eholder5ransparency
irect sta'eholdercommunication andreporting.
-valuate irectand /onitor -nsure Sta'eholder5ransparency irect sta'eholdercommunication andreporting.
-valuate irectand /onitor
-nsure Sta'eholder5ransparency
irect sta'eholdercommunication andreporting.
-valuate irectand /onitor
-nsure Sta'eholder5ransparency
/onitor sta'eholdercommunication.
-valuate irect
and /onitor
-nsure Sta'eholder
5ransparency
/onitor sta'eholder
communication.
-valuate irectand /onitor
-nsure Sta'eholder5ransparency
/onitor sta'eholdercommunication.
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne theorganisationalstructure.
Align )lan and
rganise
/anage the I5
/anagement3rame#or'
e!ne the
organisationalstructure.
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne theorganisationalstructure.
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne theorganisationalstructure.
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne theorganisationalstructure.
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne theorganisationalstructure.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
37/301
(+ of (01
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)01 A)01.01
/anagement A)01 A)01.01
/anagement A)01 A)01.01
/anagement A)01 A)01.01
/anagement A)01 A)01.01
/anagement A)01 A)01.01
/anagement A)01 A)01.02
/anagement A)01 A)01.02
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne theorganisationalstructure.
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne theorganisationalstructure.
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne theorganisationalstructure.
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne theorganisationalstructure.
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne theorganisationalstructure.
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne theorganisationalstructure.
Align )lan and
rganise
/anage the I5
/anagement3rame#or'
-stablish roles and
responsibilities.
Align )lan andrganise
/anage the I5/anagement3rame#or'
-stablish roles andresponsibilities.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
38/301
(B of (01
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)01 A)01.02
/anagement A)01 A)01.02
/anagement A)01 A)01.02
/anagement A)01 A)01.02
/anagement A)01 A)01.02
/anagement A)01 A)01.0(
/anagement A)01 A)01.0(
/anagement A)01 A)01.0(
/anagement A)01 A)01.0(
Align )lan andrganise
/anage the I5/anagement3rame#or'
-stablish roles andresponsibilities.
Align )lan andrganise
/anage the I5/anagement3rame#or'
-stablish roles andresponsibilities.
Align )lan andrganise
/anage the I5/anagement3rame#or'
-stablish roles andresponsibilities.
Align )lan andrganise
/anage the I5/anagement3rame#or'
-stablish roles andresponsibilities.
Align )lan andrganise
/anage the I5/anagement3rame#or'
-stablish roles andresponsibilities.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/aintain the enablersof the managementsystem.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/aintain the enablersof the managementsystem.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/aintain the enablersof the managementsystem.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/aintain the enablersof the managementsystem.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
39/301
( of (01
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)01 A)01.0(
/anagement A)01 A)01.0(
/anagement A)01 A)01.0(
/anagement A)01 A)01.0(
/anagement A)01 A)01.0(
/anagement A)01 A)01.0
/anagement A)01 A)01.0
/anagement A)01 A)01.0
Align )lan andrganise
/anage the I5/anagement3rame#or'
/aintain the enablersof the managementsystem.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/aintain the enablersof the managementsystem.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/aintain the enablersof the managementsystem.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/aintain the enablersof the managementsystem.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/aintain the enablersof the managementsystem.
Align )lan and
rganise
/anage the I5
/anagement3rame#or'
Communicate
managementob7ectives anddirection.
Align )lan andrganise
/anage the I5/anagement3rame#or'
Communicatemanagementob7ectives anddirection.
Align )lan andrganise
/anage the I5/anagement3rame#or'
Communicatemanagementob7ectives anddirection.
P
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
40/301
0 of (01
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)01 A)01.0
/anagement A)01 A)01.0
/anagement A)01 A)01.0
/anagement A)01 A)01.0?
/anagement A)01 A)01.0?
/anagement A)01 A)01.0?
/anagement A)01 A)01.0?
/anagement A)01 A)01.0+
Align )lan andrganise
/anage the I5/anagement3rame#or'
ptimise theplacement of the I5function.
Align )lan andrganise
/anage the I5/anagement3rame#or'
ptimise theplacement of the I5function.
Align )lan andrganise
/anage the I5/anagement3rame#or'
ptimise theplacement of the I5function.
Align )lan and
rganise
/anage the I5
/anagement3rame#or'
e!ne information
"data$ and systemo#nership.
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne information"data$ and systemo#nership.
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne information"data$ and systemo#nership.
Align )lan andrganise
/anage the I5/anagement3rame#or'
e!ne information"data$ and systemo#nership.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/anage continualimprovement ofprocesses.
Process
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
41/301
1 of (01
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)01 A)01.0+
/anagement A)01 A)01.0+
/anagement A)01 A)01.0+
/anagement A)01 A)01.0+
/anagement A)01 A)01.0B
/anagement A)01 A)01.0B
/anagement A)01 A)01.0B
/anagement A)01 A)01.0B
/anagement A)01 A)01.0B
/anagement A)02 /anage Strategy A)02.01
Align )lan andrganise
/anage the I5/anagement3rame#or'
/anage continualimprovement ofprocesses.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/anage continualimprovement ofprocesses.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/anage continualimprovement ofprocesses.
Align )lan andrganise
/anage the I5/anagement
3rame#or'
/anage continualimprovement of
processes.Align )lan andrganise
/anage the I5/anagement3rame#or'
/aintain compliance#ith policies andprocedures.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/aintain compliance#ith policies andprocedures.
Align )lan and
rganise
/anage the I5
/anagement3rame#or'
/aintain compliance
#ith policies andprocedures.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/aintain compliance#ith policies andprocedures.
Align )lan andrganise
/anage the I5/anagement3rame#or'
/aintain compliance#ith policies andprocedures.
Align )lan andrganise
%nderstand enterprisedirection.
Process
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
42/301
2 of (01
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)02 /anage Strategy A)02.01
/anagement A)02 /anage Strategy A)02.01
/anagement A)02 /anage Strategy A)02.01
/anagement A)02 /anage Strategy A)02.01
/anagement A)02 /anage Strategy A)02.01
/anagement A)02 /anage Strategy A)02.02
/anagement A)02 /anage Strategy A)02.02
/anagement A)02 /anage Strategy A)02.02
/anagement A)02 /anage Strategy A)02.02
Align )lan andrganise
%nderstand enterprisedirection.
Align )lan andrganise
%nderstand enterprisedirection.
Align )lan andrganise
%nderstand enterprisedirection.
Align )lan andrganise
%nderstand enterprisedirection.
Align )lan and
rganise
%nderstand enterprise
direction.
Align )lan andrganise
Assess the currentenvironmentcapabilities andperformance.
Align )lan andrganise
Assess the currentenvironmentcapabilities andperformance.
Align )lan andrganise
Assess the currentenvironmentcapabilities andperformance.
Align )lan andrganise
Assess the currentenvironmentcapabilities andperformance.
Process
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
43/301
( of (01
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)02 /anage Strategy A)02.0(
/anagement A)02 /anage Strategy A)02.0(
/anagement A)02 /anage Strategy A)02.0(
/anagement A)02 /anage Strategy A)02.0(
/anagement A)02 /anage Strategy A)02.0(
/anagement A)02 /anage Strategy A)02.0(
/anagement A)02 /anage Strategy A)02.0
/anagement A)02 /anage Strategy A)02.0
/anagement A)02 /anage Strategy A)02.0
/anagement A)02 /anage Strategy A)02.0
/anagement A)02 /anage Strategy A)02.0
/anagement A)02 /anage Strategy A)02.0
Align )lan andrganise
e!ne the target I5capabilities.
Align )lan andrganise
e!ne the target I5capabilities.
Align )lan andrganise
e!ne the target I5capabilities.
Align )lan andrganise
e!ne the target I5capabilities.
Align )lan andrganise e!ne the target I5capabilities.
Align )lan andrganise
e!ne the target I5capabilities.
Align )lan andrganise
Conduct a gapanalysis.
Align )lan andrganise
Conduct a gapanalysis.
Align )lan andrganise
Conduct a gapanalysis.
Align )lan andrganise
Conduct a gapanalysis.
Align )lan andrganise
e!ne the strategicplan and road map.
Align )lan andrganise
e!ne the strategicplan and road map.
Process
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
44/301
of (01
Area Domain Process Practice ID Practice "ameID
/anagement A)02 /anage Strategy A)02.0
/anagement A)02 /anage Strategy A)02.0
/anagement A)02 /anage Strategy A)02.0
/anagement A)02 /anage Strategy A)02.0
/anagement A)02 /anage Strategy A)02.0
/anagement A)02 /anage Strategy A)02.0?
/anagement A)02 /anage Strategy A)02.0?
/anagement A)02 /anage Strategy A)02.0?
/anagement A)02 /anage Strategy A)02.0?
/anagement A)0( A)0(.01
/anagement A)0( A)0(.01
/anagement A)0( A)0(.01
Align )lan andrganise
e!ne the strategicplan and road map.
Align )lan and
rganise
e!ne the strategic
plan and road map.
Align )lan andrganise
e!ne the strategicplan and road map.
Align )lan andrganise
e!ne the strategicplan and road map.
Align )lan andrganise
e!ne the strategicplan and road map.
Align )lan andrganise
Communicate the I5strategy and direction.
Align )lan andrganise
Communicate the I5strategy and direction.
Align )lan andrganise
Communicate the I5strategy and direction.
Align )lan andrganise
Communicate the I5strategy and direction.
Align )lan andrganise
/anage -nterpriseArchitecture
evelop theenterprisearchitecture vision.
Align )lan and
rganise
/anage -nterprise
Architecture
evelop the
enterprisearchitecture vision.
Align )lan andrganise
/anage -nterpriseArchitecture
evelop theenterprisearchitecture vision.
Process
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
45/301
of (01
Area Domain Process Practice ID Practice "ameID
/anagement A)0( A)0(.01
/anagement A)0( A)0(.01
/anagement A)0( A)0(.01
/anagement A)0( A)0(.01
/anagement A)0( A)0(.01
/anagement A)0( A)0(.01
/anagement A)0( A)0(.01
/anagement A)0( A)0(.01
/anagement A)0( A)0(.01
Align )lan andrganise
/anage -nterpriseArchitecture
evelop theenterprisearchitecture vision.
Align )lan and
rganise
/anage -nterprise
Architecture
evelop the
enterprisearchitecture vision.
Align )lan andrganise
/anage -nterpriseArchitecture
evelop theenterprisearchitecture vision.
Align )lan andrganise
/anage -nterpriseArchitecture
evelop theenterprisearchitecture vision.
Align )lan andrganise
/anage -nterpriseArchitecture
evelop theenterprisearchitecture vision.
Align )lan andrganise
/anage -nterpriseArchitecture
evelop theenterprisearchitecture vision.
Align )lan andrganise
/anage -nterpriseArchitecture
evelop theenterprisearchitecture vision.
Align )lan andrganise
/anage -nterpriseArchitecture
evelop theenterprisearchitecture vision.
Align )lan and
rganise
/anage -nterprise
Architecture
evelop the
enterprisearchitecture vision.
Process
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
46/301
? of (01
Area Domain Process Practice ID Practice "ameID
/anagement A)0( A)0(.02
/anagement A)0( A)0(.02
/anagement A)0( A)0(.02
/anagement A)0( A)0(.02
/anagement A)0( A)0(.02
/anagement A)0( A)0(.02
Align )lan andrganise
/anage -nterpriseArchitecture
e!ne referencearchitecture.
Align )lan andrganise
/anage -nterpriseArchitecture
e!ne referencearchitecture.
Align )lan andrganise
/anage -nterpriseArchitecture
e!ne referencearchitecture.
Align )lan andrganise /anage -nterpriseArchitecture e!ne referencearchitecture.
Align )lan andrganise
/anage -nterpriseArchitecture
e!ne referencearchitecture.
Align )lan andrganise
/anage -nterpriseArchitecture
e!ne referencearchitecture.
A D i P P ti ID P ti "Process
ID
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
47/301
+ of (01
Area Domain Process Practice ID Practice "ameID
/anagement A)0( A)0(.02
/anagement A)0( A)0(.02
/anagement A)0( A)0(.02
/anagement A)0( A)0(.0(
/anagement A)0( A)0(.0(
/anagement A)0( A)0(.0(
/anagement A)0( A)0(.0(
/anagement A)0( A)0(.0(
Align )lan andrganise
/anage -nterpriseArchitecture
e!ne referencearchitecture.
Align )lan andrganise
/anage -nterpriseArchitecture
e!ne referencearchitecture.
Align )lan andrganise
/anage -nterpriseArchitecture
e!ne referencearchitecture.
Align )lan andrganise
/anage -nterpriseArchitecture
Select opportunitiesand solutions.
Align )lan andrganise
/anage -nterpriseArchitecture
Select opportunitiesand solutions.
Align )lan andrganise
/anage -nterpriseArchitecture
Select opportunitiesand solutions.
Align )lan and
rganise
/anage -nterprise
Architecture
Select opportunities
and solutions.
Align )lan andrganise
/anage -nterpriseArchitecture
Select opportunitiesand solutions.
Area Domain Process Practice ID Practice "ameProcess
ID
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
48/301
B of (01
Area Domain Process Practice ID Practice "ameID
/anagement A)0( A)0(.0(
/anagement A)0( A)0(.0(
/anagement A)0( A)0(.0(
/anagement A)0( A)0(.0(
/anagement A)0( A)0(.0(
/anagement A)0( A)0(.0
/anagement A)0( A)0(.0
/anagement A)0( A)0(.0
/anagement A)0( A)0(.0
/anagement A)0( A)0(.0
/anagement A)0( A)0(.0
Align )lan andrganise
/anage -nterpriseArchitecture
Select opportunitiesand solutions.
Align )lan andrganise
/anage -nterpriseArchitecture
Select opportunitiesand solutions.
Align )lan andrganise
/anage -nterpriseArchitecture
Select opportunitiesand solutions.
Align )lan andrganise
/anage -nterpriseArchitecture
Select opportunitiesand solutions.
Align )lan andrganise
/anage -nterpriseArchitecture
Select opportunitiesand solutions.
Align )lan andrganise
/anage -nterpriseArchitecture
e!ne architectureimplementation.
Align )lan andrganise
/anage -nterpriseArchitecture
e!ne architectureimplementation.
Align )lan andrganise
/anage -nterpriseArchitecture
e!ne architectureimplementation.
Align )lan andrganise
/anage -nterpriseArchitecture
)rovide enterprisearchitecture services.
Align )lan andrganise
/anage -nterpriseArchitecture
)rovide enterprisearchitecture services.
Align )lan andrganise
/anage -nterpriseArchitecture
)rovide enterprisearchitecture services.
Area Domain Process Practice ID Practice "ameProcess
ID
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
49/301
of (01
Area Domain Process Practice ID Practice "ameID
/anagement A)0( A)0(.0
/anagement A)0( A)0(.0
/anagement A)0 /anage Innovation A)0.01
/anagement A)0 /anage Innovation A)0.01
/anagement A)0 /anage Innovation A)0.01
/anagement A)0 /anage Innovation A)0.01
/anagement A)0 /anage Innovation A)0.01
/anagement A)0 /anage Innovation A)0.02
Align )lan andrganise
/anage -nterpriseArchitecture
)rovide enterprisearchitecture services.
Align )lan andrganise
/anage -nterpriseArchitecture
)rovide enterprisearchitecture services.
Align )lan andrganise
Create anenvironmentconducive toinnovation.
Align )lan andrganise
Create anenvironmentconducive toinnovation.
Align )lan andrganise
Create anenvironmentconducive toinnovation.
Align )lan andrganise
Create anenvironmentconducive toinnovation.
Align )lan andrganise
Create anenvironmentconducive toinnovation.
Align )lan andrganise
/aintain anunderstanding of the
enterpriseenvironment.
Area Domain Process Practice ID Practice "ameProcess
ID
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
50/301
0 of (01
Area Domain Process Practice ID Practice "ameID
/anagement A)0 /anage Innovation A)0.02
/anagement A)0 /anage Innovation A)0.02
/anagement A)0 /anage Innovation A)0.0(
/anagement A)0 /anage Innovation A)0.0(
/anagement A)0 /anage Innovation A)0.0(
/anagement A)0 /anage Innovation A)0.0(
/anagement A)0 /anage Innovation A)0.0
/anagement A)0 /anage Innovation A)0.0
/anagement A)0 /anage Innovation A)0.0
Align )lan andrganise
/aintain anunderstanding of theenterpriseenvironment.
Align )lan andrganise
/aintain anunderstanding of theenterpriseenvironment.
Align )lan andrganise
/onitor and scan thetechnologyenvironment.
Align )lan andrganise
/onitor and scan thetechnologyenvironment.
Align )lan andrganise
/onitor and scan thetechnologyenvironment.
Align )lan andrganise
/onitor and scan thetechnologyenvironment.
Align )lan andrganise
Assess the potential ofemergingtechnologies andinnovation ideas.
Align )lan andrganise
Assess the potential ofemergingtechnologies andinnovation ideas.
Align )lan andrganise
Assess the potential ofemergingtechnologies andinnovation ideas.
Area Domain Process Practice ID Practice "ameProcess
ID
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
51/301
1 of (01
/anagement A)0 /anage Innovation A)0.0
/anagement A)0 /anage Innovation A)0.0
/anagement A)0 /anage Innovation A)0.0
/anagement A)0 /anage Innovation A)0.0
/anagement A)0 /anage Innovation A)0.0
/anagement A)0 /anage Innovation A)0.0
/anagement A)0 /anage Innovation A)0.0?
/anagement A)0 /anage Innovation A)0.0?
/anagement A)0 /anage Innovation A)0.0?
/anagement A)0 /anage Innovation A)0.0?
Align )lan andrganise
Assess the potential ofemergingtechnologies andinnovation ideas.
Align )lan andrganise
Assess the potential ofemergingtechnologies andinnovation ideas.
Align )lan andrganise
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
52/301
2 of (01
/anagement A)0 /anage )ortfolio A)0.01
/anagement A)0 /anage )ortfolio A)0.01
/anagement A)0 /anage )ortfolio A)0.01
/anagement A)0 /anage )ortfolio A)0.01
/anagement A)0 /anage )ortfolio A)0.01
/anagement A)0 /anage )ortfolio A)0.02
/anagement A)0 /anage )ortfolio A)0.02
/anagement A)0 /anage )ortfolio A)0.02
/anagement A)0 /anage )ortfolio A)0.0(
Align )lan andrganise
-stablish the targetinvestment mi=.
Align )lan andrganise
-stablish the targetinvestment mi=.
Align )lan andrganise
-stablish the targetinvestment mi=.
Align )lan andrganise
-stablish the targetinvestment mi=.
Align )lan andrganise
-stablish the targetinvestment mi=.
Align )lan andrganise
etermine theavailability andsources of funds.
Align )lan andrganise
etermine theavailability andsources of funds.
Align )lan andrganise
etermine theavailability andsources of funds.
Align )lan andrganise
-valuate and selectprogrammes to fund.
Area Domain Process Practice ID Practice "ameProcess
ID
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
53/301
( of (01
/anagement A)0 /anage )ortfolio A)0.0(
/anagement A)0 /anage )ortfolio A)0.0(
/anagement A)0 /anage )ortfolio A)0.0(
/anagement A)0 /anage )ortfolio A)0.0(
/anagement A)0 /anage )ortfolio A)0.0(
/anagement A)0 /anage )ortfolio A)0.0
/anagement A)0 /anage )ortfolio A)0.0
Align )lan andrganise
-valuate and selectprogrammes to fund.
Align )lan andrganise
-valuate and selectprogrammes to fund.
Align )lan andrganise
-valuate and selectprogrammes to fund.
Align )lan andrganise
-valuate and selectprogrammes to fund.
Align )lan andrganise
-valuate and selectprogrammes to fund.
Align )lan andrganise
/onitor optimise andreport on investmentportfolio performance.
Align )lan andrganise
/onitor optimise andreport on investmentportfolio performance.
Area Domain Process Practice ID Practice "ameProcess
ID
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
54/301
of (01
/anagement A)0 /anage )ortfolio A)0.0
/anagement A)0 /anage )ortfolio A)0.0
/anagement A)0 /anage )ortfolio A)0.0
/anagement A)0 /anage )ortfolio A)0.0
/anagement A)0 /anage )ortfolio A)0.0
/anagement A)0 /anage )ortfolio A)0.0
Align )lan andrganise
/onitor optimise andreport on investmentportfolio performance.
Align )lan andrganise
/onitor optimise andreport on investmentportfolio performance.
Align )lan and
rganise
/onitor optimise and
report on investmentportfolio performance.
Align )lan andrganise
/onitor optimise andreport on investmentportfolio performance.
Align )lan and
rganise
/onitor optimise and
report on investmentportfolio performance.
Align )lan andrganise
/onitor optimise andreport on investmentportfolio performance.
Area Domain Process Practice ID Practice "ameProcess
ID
/ A)0 / ) f li A)0 0 / i i f liAli )l d
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
55/301
of (01
/anagement A)0 /anage )ortfolio A)0.0 /aintain portfolios.
/anagement A)0 /anage )ortfolio A)0.0 /aintain portfolios.
/anagement A)0 /anage )ortfolio A)0.0 /aintain portfolios.
/anagement A)0 /anage )ortfolio A)0.0?
/anagement A)0 /anage )ortfolio A)0.0?
/anagement A)0 /anage )ortfolio A)0.0?
Align )lan andrganise
Align )lan andrganise
Align )lan andrganise
Align )lan andrganise
/anage bene!tsachievement.
Align )lan andrganise
/anage bene!tsachievement.
Align )lan andrganise
/anage bene!tsachievement.
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)0? A)0? 01Align )lan and /anage 9udget and /anage !nance and
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
56/301
? of (01
/anagement A)0? A)0?.01
/anagement A)0? A)0?.01
/anagement A)0? A)0?.01
/anagement A)0? A)0?.01
/anagement A)0? A)0?.01
/anagement A)0? A)0?.02
Align )lan andrganise
/anage 9udget andCosts
/anage !nance andaccounting.
Align )lan andrganise
/anage 9udget andCosts
/anage !nance andaccounting.
Align )lan andrganise
/anage 9udget andCosts
/anage !nance andaccounting.
Align )lan andrganise
/anage 9udget andCosts
/anage !nance andaccounting.
Align )lan andrganise
/anage 9udget andCosts
/anage !nance andaccounting.
Align )lan andrganise
/anage 9udget andCosts
)rioritise resourceallocation.
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)0? A)0? 02Align )lan and /anage 9udget and )rioritise resource
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
57/301
+ of (01
/anagement A)0? A)0?.02
/anagement A)0? A)0?.02
/anagement A)0? A)0?.02
/anagement A)0? A)0?.0(
/anagement A)0? A)0?.0(
/anagement A)0? A)0?.0(
/anagement A)0? A)0?.0(
Align )lan andrganise
/anage 9udget andCosts
)rioritise resourceallocation.
Align )lan andrganise
/anage 9udget andCosts
)rioritise resourceallocation.
Align )lan and
rganise
/anage 9udget and
Costs
)rioritise resource
allocation.
Align )lan andrganise
/anage 9udget andCosts
Create and maintainbudgets.
Align )lan andrganise
/anage 9udget andCosts
Create and maintainbudgets.
Align )lan andrganise /anage 9udget andCosts Create and maintainbudgets.
Align )lan andrganise
/anage 9udget andCosts
Create and maintainbudgets.
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)0? A)0? 0(Align )lan and /anage 9udget and Create and maintain
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
58/301
B of (01
/anagement A)0? A)0?.0(
/anagement A)0? A)0?.0(
/anagement A)0? A)0?.0(
/anagement A)0? A)0?.0
/anagement A)0? A)0?.0
/anagement A)0? A)0?.0
/anagement A)0? A)0?.0
/anagement A)0? A)0?.0
/anagement A)0? A)0?.0
Align )lan andrganise
/anage 9udget andCosts
Create and maintainbudgets.
Align )lan andrganise
/anage 9udget andCosts
Create and maintainbudgets.
Align )lan andrganise
/anage 9udget andCosts
Create and maintainbudgets.
Align )lan andrganise
/anage 9udget andCosts
/odel and allocatecosts.
Align )lan andrganise
/anage 9udget andCosts
/odel and allocatecosts.
Align )lan andrganise
/anage 9udget andCosts
/odel and allocatecosts.
Align )lan andrganise
/anage 9udget andCosts
/odel and allocatecosts.
Align )lan andrganise
/anage 9udget andCosts
/odel and allocatecosts.
Align )lan andrganise
/anage 9udget andCosts
/odel and allocatecosts.
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)0? A)0?.0 /anage costs.Align )lan and /anage 9udget and
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
59/301
of (01
/anagement A)0? A)0?.0 /anage costs.
/anagement A)0? A)0?.0 /anage costs.
/anagement A)0? A)0?.0 /anage costs.
/anagement A)0? A)0?.0 /anage costs.
/anagement A)0? A)0?.0 /anage costs.
/anagement A)0? A)0?.0 /anage costs.
/anagement A)0? A)0?.0 /anage costs.
Align )lan andrganise
/anage 9udget andCosts
Align )lan andrganise
/anage 9udget andCosts
Align )lan andrganise
/anage 9udget andCosts
Align )lan andrganise
/anage 9udget andCosts
Align )lan andrganise
/anage 9udget andCosts
Align )lan andrganise
/anage 9udget andCosts
Align )lan andrganise
/anage 9udget andCosts
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)0? A)0?.0 /anage costs.Align )lan and /anage 9udget and
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
60/301
?0 of (01
g g
/anagement A)0? A)0?.0 /anage costs.
/anagement A)0+ A)0+.01
/anagement A)0+ A)0+.01
/anagement A)0+ A)0+.01
/anagement A)0+ A)0+.01
/anagement A)0+ A)0+.01
/anagement A)0+ A)0+.02
grganise
g gCosts
Align )lan and
rganise
/anage 9udget and
Costs
Align )lan andrganise
/anage Euman
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
61/301
?1 of (01
/anagement A)0+ A)0+.02
/anagement A)0+ A)0+.02
/anagement A)0+ A)0+.0(
/anagement A)0+ A)0+.0(
/anagement A)0+ A)0+.0(
/anagement A)0+ A)0+.0(
/anagement A)0+ A)0+.0(
/anagement A)0+ A)0+.0(
/anagement A)0+ A)0+.0(
/anagement A)0+ A)0+.0
rganise
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
62/301
?2 of (01
/anagement A)0+ A)0+.0
/anagement A)0+ A)0+.0
/anagement A)0+ A)0+.0
/anagement A)0+ A)0+.0
/anagement A)0+ A)0+.0
/anagement A)0+ A)0+.0
/anagement A)0+ A)0+.0
/anagement A)0+ A)0+.0
rganise
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
63/301
?( of (01
/anagement A)0+ A)0+.0
/anagement A)0+ A)0+.0? /anage contract sta6.
/anagement A)0+ A)0+.0? /anage contract sta6.
/anagement A)0+ A)0+.0? /anage contract sta6.
/anagement A)0+ A)0+.0? /anage contract sta6.
/anagement A)0+ A)0+.0? /anage contract sta6.
/anagement A)0+ A)0+.0? /anage contract sta6.
/anagement A)0+ A)0+.0? /anage contract sta6.
rganise
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
64/301
? of (01
/anagement A)0B A)0B.01
/anagement A)0B A)0B.01
/anagement A)0B A)0B.01
/anagement A)0B A)0B.01
/anagement A)0B A)0B.01
/anagement A)0B A)0B.01
/anagement A)0B A)0B.01
/anagement A)0B A)0B.02
rganise
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
65/301
? of (01
/anagement A)0B A)0B.02
/anagement A)0B A)0B.02
/anagement A)0B A)0B.02
/anagement A)0B A)0B.0(
/anagement A)0B A)0B.0(
/anagement A)0B A)0B.0(
rganise
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
66/301
?? of (01
/anagement A)0B A)0B.0(
/anagement A)0B A)0B.0
/anagement A)0B A)0B.0
/anagement A)0B A)0B.0
/anagement A)0B A)0B.0
/anagement A)0B A)0B.0
/anagement A)0B A)0B.0
/anagement A)0B A)0B.0
g p p
Align )lan andrganise
/anage
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
67/301
?+ of (01
/anagement A)0 A)0.01 Identify I5 services.
/anagement A)0 A)0.01 Identify I5 services.
/anagement A)0 A)0.01 Identify I5 services.
/anagement A)0 A)0.01 Identify I5 services.
/anagement A)0 A)0.01 Identify I5 services.
/anagement A)0 A)0.02
/anagement A)0 A)0.02
/anagement A)0 A)0.02
/anagement A)0 A)0.0(
Align )lan andrganise
/anage ServiceAgreements
Align )lan andrganise
/anage ServiceAgreements
Align )lan andrganise
/anage ServiceAgreements
Align )lan andrganise
/anage ServiceAgreements
Align )lan andrganise
/anage ServiceAgreements
Align )lan and
rganise
/anage Service
Agreements
Catalogue I58enabled
services.
Align )lan andrganise
/anage ServiceAgreements
Catalogue I58enabledservices.
Align )lan andrganise
/anage ServiceAgreements
Catalogue I58enabledservices.
Align )lan andrganise
/anage ServiceAgreements
e!ne and prepareservice agreements.
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)0 A)0.0(Align )lan andrganise
/anage ServiceAgreements
e!ne and prepareservice agreements.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
68/301
?B of (01
/anagement A)0 A)0.0(
/anagement A)0 A)0.0(
/anagement A)0 A)0.0(
/anagement A)0 A)0.0
/anagement A)0 A)0.0
/anagement A)0 A)0.0
/anagement A)0 A)0.0
/anagement A)0 A)0.0
/anagement A)0 A)0.0
/anagement A)10 /anage Suppliers A)10.01
/anagement A)10 /anage Suppliers A)10.01
Align )lan and
rganise
/anage Service
Agreements
e!ne and prepare
service agreements.
Align )lan andrganise
/anage ServiceAgreements
e!ne and prepareservice agreements.
Align )lan andrganise
/anage ServiceAgreements
e!ne and prepareservice agreements.
Align )lan and
rganise
/anage Service
Agreements
/onitor and report
service levels.Align )lan andrganise
/anage ServiceAgreements
/onitor and reportservice levels.
Align )lan andrganise
/anage ServiceAgreements
/onitor and reportservice levels.
Align )lan andrganise
/anage ServiceAgreements
/onitor and reportservice levels.
Align )lan andrganise
/anage ServiceAgreements
/onitor and reportservice levels.
Align )lan andrganise
/anage ServiceAgreements
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
69/301
? of (01
/anagement A)10 /anage Suppliers A)10.01
/anagement A)10 /anage Suppliers A)10.02 Select suppliers.
/anagement A)10 /anage Suppliers A)10.02 Select suppliers.
/anagement A)10 /anage Suppliers A)10.02 Select suppliers.
/anagement A)10 /anage Suppliers A)10.02 Select suppliers.
and contracts.
Align )lan andrganise Identify and evaluatesupplier relationshipsand contracts.
Align )lan andrganise
Align )lan andrganise
Align )lan andrganise
Align )lan andrganise
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)10 /anage Suppliers A)10.02 Select suppliers.Align )lan andrganise
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
70/301
+0 of (01
/anagement A)10 /anage Suppliers A)10.02 Select suppliers.
/anagement A)10 /anage Suppliers A)10.02 Select suppliers.
/anagement A)10 /anage Suppliers A)10.0(
/anagement A)10 /anage Suppliers A)10.0(
/anagement A)10 /anage Suppliers A)10.0(
/anagement A)10 /anage Suppliers A)10.0(
Align )lan andrganise
Align )lan andrganise
Align )lan andrganise
/anage supplierrelationships andcontracts.
Align )lan andrganise
/anage supplierrelationships andcontracts.
Align )lan andrganise
/anage supplierrelationships andcontracts.
Align )lan andrganise
/anage supplierrelationships andcontracts.
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)10 /anage Suppliers A)10.0(Align )lan andrganise
/anage supplierrelationships andcontracts
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
71/301
+1 of (01
/anagement A)10 /anage Suppliers A)10.0(
/anagement A)10 /anage Suppliers A)10.0(
/anagement A)10 /anage Suppliers A)10.0(
/anagement A)10 /anage Suppliers A)10.0 /anage supplier ris'.
/anagement A)10 /anage Suppliers A)10.0 /anage supplier ris'.
/anagement A)10 /anage Suppliers A)10.0
/anagement A)10 /anage Suppliers A)10.0
/anagement A)10 /anage Suppliers A)10.0
contracts.
Align )lan and
rganise
/anage supplier
relationships andcontracts.
Align )lan andrganise
/anage supplierrelationships andcontracts.
Align )lan andrganise
/anage supplierrelationships andcontracts.
Align )lan andrganise
Align )lan andrganise
Align )lan andrganise
/onitor supplierperformance andcompliance.
Align )lan andrganise
/onitor supplierperformance andcompliance.
Align )lan andrganise
/onitor supplierperformance andcompliance.
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)10 /anage Suppliers A)10.0Align )lan andrganise
/onitor supplierperformance andcompliance.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
72/301
+2 of (01
/anagement A)10 /anage Suppliers A)10.0
/anagement A)10 /anage Suppliers A)10.0
/anagement A)11 /anage Duality A)11.01
/anagement A)11 /anage Duality A)11.01
/anagement A)11 /anage Duality A)11.01
/anagement A)11 /anage Duality A)11.01
/anagement A)11 /anage Duality A)11.01
/anagement A)11 /anage Duality A)11.01
/anagement A)11 /anage Duality A)11.01
/anagement A)11 /anage Duality A)11.01
compliance.
Align )lan andrganise
/onitor supplierperformance andcompliance.
Align )lan andrganise
/onitor supplierperformance andcompliance.
Align )lan andrganise
-stablish a 4ualitymanagement system"D/S$.
Align )lan andrganise
-stablish a 4ualitymanagement system"D/S$.
Align )lan andrganise
-stablish a 4ualitymanagement system"D/S$.
Align )lan andrganise
-stablish a 4ualitymanagement system"D/S$.
Align )lan andrganise
-stablish a 4ualitymanagement system"D/S$.
Align )lan andrganise
-stablish a 4ualitymanagement system"D/S$.
Align )lan andrganise -stablish a 4ualitymanagement system"D/S$.
Align )lan andrganise
-stablish a 4ualitymanagement system"D/S$.
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)11 /anage Duality A)11.02Align )lan andrganise
e!ne and manage4uality standardspractices and
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
73/301
+( of (01
/anagement A)11 /anage Duality A)11.02
/anagement A)11 /anage Duality A)11.0(
/anagement A)11 /anage Duality A)11.0(
/anagement A)11 /anage Duality A)11.0(
/anagement A)11 /anage Duality A)11.0(
/anagement A)11 /anage Duality A)11.0(
/anagement A)11 /anage Duality A)11.0(
pprocedures.
Align )lan andrganise
e!ne and manage4uality standardspractices andprocedures.
Align )lan andrganise
3ocus 4ualitymanagement oncustomers.
Align )lan andrganise
3ocus 4ualitymanagement oncustomers.
Align )lan and
rganise
3ocus 4uality
management oncustomers.
Align )lan andrganise
3ocus 4ualitymanagement oncustomers.
Align )lan andrganise
3ocus 4ualitymanagement oncustomers.
Align )lan andrganise
3ocus 4ualitymanagement oncustomers.
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)11 /anage Duality A)11.0Align )lan andrganise
)erform 4ualitymonitoring controland revie#s.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
74/301
+ of (01
/anagement A)11 /anage Duality A)11.0
/anagement A)11 /anage Duality A)11.0
/anagement A)11 /anage Duality A)11.0
/anagement A)11 /anage Duality A)11.0
/anagement A)11 /anage Duality A)11.0
/anagement A)11 /anage Duality A)11.0
/anagement A)11 /anage Duality A)11.0
/anagement A)11 /anage Duality A)11.0
Align )lan andrganise )erform 4ualitymonitoring controland revie#s.
Align )lan andrganise
)erform 4ualitymonitoring controland revie#s.
Align )lan andrganise
)erform 4ualitymonitoring control
and revie#s.
Align )lan andrganise
)erform 4ualitymonitoring controland revie#s.
Align )lan andrganise
)erform 4ualitymonitoring controland revie#s.
Align )lan andrganise
)erform 4ualitymonitoring controland revie#s.
Align )lan andrganise
Integrate 4ualitymanagement intosolutions fordevelopment andservice delivery.
Align )lan andrganise
Integrate 4ualitymanagement intosolutions fordevelopment andservice delivery.
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)11 /anage Duality A)11.0Align )lan andrganise
Integrate 4ualitymanagement intosolutions ford l t d
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
75/301
+ of (01
/anagement A)11 /anage Duality A)11.0?
/anagement A)11 /anage Duality A)11.0?
/anagement A)11 /anage Duality A)11.0?
/anagement A)11 /anage Duality A)11.0?
/anagement A)11 /anage Duality A)11.0?
/anagement A)11 /anage Duality A)11.0?
/anagement A)11 /anage Duality A)11.0?
/anagement A)11 /anage Duality A)11.0?
/anagement A)12 /anage
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
76/301
+? of (01
/anagement A)12 /anage
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
77/301
++ of (01
/anagement A)12 /anage
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
78/301
+B of (01
/anagement A)12 /anage
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
79/301
+ of (01
/anagement A)12 /anage
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
80/301
B0 of (01
/anagement A)1( /anage Security A)1(.01
/anagement A)1( /anage Security A)1(.01
/anagement A)1( /anage Security A)1(.02
/anagement A)1( /anage Security A)1(.02
/anagement A)1( /anage Security A)1(.02
/anagement A)1( /anage Security A)1(.02
/anagement A)1( /anage Security A)1(.02
rganise an IS/S.
Align )lan andrganise
-stablish and maintainan IS/S.
Align )lan andrganise
-stablish and maintainan IS/S.
Align )lan andrganise
e!ne and manage aninformation securityris' treatment plan.
Align )lan andrganise
e!ne and manage aninformation securityris' treatment plan.
Align )lan andrganise
e!ne and manage aninformation securityris' treatment plan.
Align )lan andrganise
e!ne and manage aninformation securityris' treatment plan.
Align )lan and
rganise
e!ne and manage an
information securityris' treatment plan.
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement A)1( /anage Security A)1(.02Align )lan andrganise
e!ne and manage aninformation securityris' treatment plan.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
81/301
B1 of (01
/anagement A)1( /anage Security A)1(.02
/anagement A)1( /anage Security A)1(.0(
/anagement A)1( /anage Security A)1(.0(
/anagement A)1( /anage Security A)1(.0(
/anagement A)1( /anage Security A)1(.0(
/anagement A)1( /anage Security A)1(.0(
Align )lan andrganise
e!ne and manage aninformation securityris' treatment plan.
Align )lan andrganise
/onitor and revie#the IS/S.
Align )lan andrganise
/onitor and revie#the IS/S.
Align )lan andrganise
/onitor and revie#the IS/S.
Align )lan andrganise
/onitor and revie#the IS/S.
Align )lan andrganise
/onitor and revie#the IS/S.
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement 9AI01 9AI01.019uild Ac4uire andImplement
/anage)rogrammes and)ro7ects
/aintain a standardapproach forprogramme andpro7ect management.
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
82/301
B2 of (01
/anagement 9AI01 9AI01.01
/anagement 9AI01 9AI01.02 Initiate a programme.
/anagement 9AI01 9AI01.02 Initiate a programme.
/anagement 9AI01 9AI01.02 Initiate a programme.
9uild Ac4uire andImplement
/anage)rogrammes and)ro7ects
/aintain a standardapproach forprogramme andpro7ect management.
9uild Ac4uire andImplement
/anage)rogrammes and)ro7ects
9uild Ac4uire and
Implement
/anage
)rogrammes and)ro7ects
9uild Ac4uire andImplement
/anage)rogrammes and)ro7ects
Area Domain Process Practice ID Practice "ameProcess
ID
/anagement 9AI01 9AI01.02 Initiate a programme.9uild Ac4uire andImplement
/anage)rogrammes and)ro7ects
8/12/2019 Cpia de 12.COBIT5 Governance and Management Practices Activities_April2014
83/301
B( of (01
/anagement 9AI01 9AI01.02 Initiate a programme.
/anagement 9AI01 9AI01.02 Initiate a programme.
/anagement 9AI01 9AI01.0(
/anagement 9AI01 9AI01.0(
/anagement 9AI01 9AI01.0(
/anagement 9AI01 9AI01.0(
/anagement 9AI01 9AI01.0
9uild Ac4uire andImplement
/anage)rogrammes and)ro7ects
9uild Ac4uire andImplement
/anage)rogrammes and)ro7ects
9uild Ac4uire andImplement
/anage