+ All Categories
Home > Documents > Copy of 13.0 Business Process

Copy of 13.0 Business Process

Date post: 03-Apr-2018
Category:
Upload: gururaj-parvatikar
View: 215 times
Download: 0 times
Share this document with a friend

of 775

Transcript
  • 7/28/2019 Copy of 13.0 Business Process

    1/773

    FrameworxProcess

    Name

    1256 Administer the Tender Process

    1199 Agree Marketing InfrastructureRequirements

    1184 Agree Product InfrastructureRequirements

    1233 Agree Resource InfrastructureRequirements

    1211 Agree Service InfrastructureRequirements

    1253 Analyze Potential Suppliers/Partners

    31 Approve Product Business Case

  • 7/28/2019 Copy of 13.0 Business Process

    2/773

    1416 Approve Resource CapabilityInvestment

    1261 Approve Service Capability Investment

    1198 Capture Marketing InfrastructureRequirements

    147 Capture Product Capability Shortfalls

    1186 Capture Product Capacity Shortfalls

    1183 Capture Product InfrastructureRequirements

    1188 Capture Product Operational SupportShorfalls

    1187 Capture Product PerformanceShortfalls

    148 Capture Resource Capability Shortfalls

    1234 Capture Resource Capacity Shortfalls

  • 7/28/2019 Copy of 13.0 Business Process

    3/773

    1232 Capture Resource Demand &Performance Requirements

    1236 Capture Resource Operational SupportShorfalls

    1235 Capture Resource PerformanceShortfalls

    150 Capture Service Capability Shortfalls

    1213 Capture Service Capacity Shortfalls

    1210 Capture Service Demand &

    Performance Requirements

    1215 Capture Service Operational SupportShorfalls

    1214 Capture Service PerformanceShortfalls

  • 7/28/2019 Copy of 13.0 Business Process

    4/773

    1251 Capture Sourcing Requirements

    1203 Co-ordinate Marketing CapabilityDelivery

    1206 Co-ordinate Marketing OperationalHandover

    1191 Co-ordinate Product CapabilityDelivery

    1194 Co-ordinate Product OperationalHandover

    1244 Co-ordinate Resource CapabilityDelivery

    1248 Co-ordinate Resource OperationalHandover

  • 7/28/2019 Copy of 13.0 Business Process

    5/773

    1223 Co-ordinate Service Capability Delivery

    1229 Co-ordinate Service Operational

    Handover

    1260 Commit & Approve CmmercialArrangements

    1209 Define Marketing Capability DeliveryMethodology

    190 Define Marketing CapabilityRequirements

    1197 Define Product Capability DeliveryMethodology

  • 7/28/2019 Copy of 13.0 Business Process

    6/773

    192 Define Product CapabilityRequirements

    1238 Define Resource CapabilityRequirements

    1217 Define Service CapabilityRequirements

    203 Deliver Marketing Infrastructure

  • 7/28/2019 Copy of 13.0 Business Process

    7/773

    204 Deliver Product Capability

    205 Design Resource Capabilities

    1241 Design Resource Operational SupportProcess Improvements

  • 7/28/2019 Copy of 13.0 Business Process

    8/773

    206 Design Service Capabilities

    1220 Design Service Operational SupportProcess Improvements

    208 Determine PotentialSuppliers/Partners

  • 7/28/2019 Copy of 13.0 Business Process

    9/773

    211 Determine the Sourcing Requirements

    1201 Develop Marketing Capability BusinessCase

    1189 Develop Product Business Case

  • 7/28/2019 Copy of 13.0 Business Process

    10/773

    1237 Develop Resource CapabilityInvestment Proposals

    1216 Develop Service Capability InvestmentProposals

    1226 Develop Service Capability Tmetables

    232 Enable Resource Support & Operations

  • 7/28/2019 Copy of 13.0 Business Process

    11/773

    236 Enable Service Support & Operations

    1205 Ensure Marketing Capability Benefits

    1208 Ensure Marketing Handover Support

    1193 Ensure Product Capability Benefits &Operational Costs

    1196 Ensure Product Handover Support

    1245 Ensure Resource Capability Quality

    1250 Ensure Resource Handover Support

    1228 Ensure Service Capability Costs

    1224 Ensure Service Capability Quality

    1231 Ensure Service Handover Support

    1257 Establish Negotiating Strategy

    1247 Establish Resource Capability Sourcing

  • 7/28/2019 Copy of 13.0 Business Process

    12/773

    1225 Establish Service Capability Sourcing

    1252 Finalize Sourcing Requirements

    287 Gain Approval for CommercialArrangements

    293 Gain Marketing Capability Approval

    1202 Gain Marketing Capability Business

    Case Approval

    1190 Gain Product Business Case Approval

  • 7/28/2019 Copy of 13.0 Business Process

    13/773

    294 Gain Resource Capability InvestmentApproval

  • 7/28/2019 Copy of 13.0 Business Process

    14/773

    295 Gain Service Capability InvestmentApproval

    296 Gain Tender Decision Approval

    1259 Identify & Report to Stakeholders

    1242 Identify Resource Support Groups,Skills & Training

  • 7/28/2019 Copy of 13.0 Business Process

    15/773

    1243 Identify Resource SupportRequirements

    1221 Identify Service Support Groups, Skills& Training

    1222 Identify Service Support Requirements

    1246 Manage Commissioning of NewResource Infrastructure

    305 Manage Handover to MarketingOperations

    306 Manage Handover to ProductOperations

  • 7/28/2019 Copy of 13.0 Business Process

    16/773

    307 Manage Handover to ResourceOperations

    308 Manage Handover to ServiceOperations

    309 Manage Marketing Capability DeliveryMethodology

    1258 Manage Negotiations

  • 7/28/2019 Copy of 13.0 Business Process

    17/773

    310 Manage Product Capability DeliveryMethodology

    311 Manage Resource Capability Delivery

  • 7/28/2019 Copy of 13.0 Business Process

    18/773

    312 Manage Service Capability Delivery

    313 Manage the Tender Process

  • 7/28/2019 Copy of 13.0 Business Process

    19/773

    314 Map & Analyze ResourceRequirements

    315 Map & Analyze Service Requirements

  • 7/28/2019 Copy of 13.0 Business Process

    20/773

    33 Marketing & Offer Management

    191 Marketing Capability Delivery

  • 7/28/2019 Copy of 13.0 Business Process

    21/773

    316 Negotiate Commercial Arrangements

    34 Product & Offer Capability Delivery

    1200 Report Marketing InfrastructureRequirements

    1185 Report Product InfrastructureRequirements

    1212 Report Service InfrastructureRequirements

  • 7/28/2019 Copy of 13.0 Business Process

    22/773

    149 Resource Capability Delivery

    1240 Select Resource CapabilitySuppliers/Partners

    1219 Select Service CapabilitySuppliers/Partners

    151 Service Capability Delivery

  • 7/28/2019 Copy of 13.0 Business Process

    23/773

    46 Service Development & Management

    1254 Short List Potential Suppliers/Partners

    1239 Specify Resource CapabilityInfrastructure

    1218 Specify Service CapabilityInfrastructure

    1255 Specify the Tender Process

  • 7/28/2019 Copy of 13.0 Business Process

    24/773

    209 Supply Chain Capability Delivery

    1227 Track and Report Service CapabilityDelivery

    1204 Track Marketing Capability BusinessCase Costs

    1192 Track Product Capability Business CaseCosts

    1207 Validate Marketing InfrastructureDesign

    1195 Validate Product Infrastructure Design

    1249 Validate Resource InfrastructureDesign

  • 7/28/2019 Copy of 13.0 Business Process

    25/773

    1230 Validate Service Infrastructure Design

  • 7/28/2019 Copy of 13.0 Business Process

    26/773

    Category

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (3) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    27/773

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (3) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (3) eTOM Process Type

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    28/773

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (3) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    29/773

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    30/773

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (3) eTOM Process Type

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    31/773

    (3) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (3) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    32/773

    (3) eTOM Process Type

    (3) eTOM Process Type

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    33/773

    (3) eTOM Process Type

    (4) eTOM Process Type

    (3) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    34/773

    (3) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    35/773

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (3) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    36/773

    (3) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    37/773

    (4) eTOM Process Type

    (4) eTOM Process Type

    (3) eTOM Process Type

    (3) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    38/773

    (3) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    39/773

    (3) eTOM Process Type

    (3) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    40/773

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (3) eTOM Process Type

    (3) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    41/773

    (3) eTOM Process Type

    (3) eTOM Process Type

    (3) eTOM Process Type

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    42/773

    (3) eTOM Process Type

    (3) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    43/773

    (3) eTOM Process Type

    (3) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    44/773

    (3) eTOM Process Type

    (3) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    45/773

    (1) eTOM Process Type

    (2) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    46/773

    (3) eTOM Process Type

    (2) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    47/773

    (2) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (2) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    48/773

    (1) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    49/773

    (2) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    50/773

    (4) eTOM Process Type

  • 7/28/2019 Copy of 13.0 Business Process

    51/773

    Extended Description Frameworx Metric(assoc: FrameworxMetric to FrameworxProcess)

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    The Approve Product Business Case processes capture allactivities required to develop and gain the necessary level of

    approval for a business case to develop and deliver therequired capabilities, including identification of potentialsuppliers/partners. The business case should identify anyrequired product infrastructure components, developmentcosts and anticipated benefits, including revenue gains,productivity gains, performance improvements and/oroperational cost improvements. The business case should alsoinclude a general view of the types of product offers whichcould be developed and deployed using the productinfrastructure, but would not necessarily include a specificproposal to launch a specific product. This later activity is

    managed by the PLM processes. The processes include anycross-enterprise co-ordination and management functions toensure that the business case is supported by all stakeholders.

  • 7/28/2019 Copy of 13.0 Business Process

    52/773

    Not used for this process element

    Not used for this process element

    Not used for this process element

    The Capture Product Capability Shortfalls processes identifyspecific or imminent product capacity, product performanceand/or product operational support shortfalls. Theseprocesses take information available from the CustomerRelationship Management processes to establish detailedviews of anticipated product capacity and performanceshortfalls and support process issues.

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    The Capture Resource Capability Shortfalls processes identifyspecific or imminent resource capacity, resource performanceand/or resource operational support shortfalls. Theseprocesses take information available from the ResourceManagement & Operations processes to establish detailed

    views of anticipated resource and shortfalls and supportprocess issues.

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    53/773

    Not used for this process element

    Not used for this process element

    Not used for this process element

    The Capture Service Capability Shortfalls processes identifyspecific or imminent service capacity, service performanceand/or service operational support shortfalls. These processestake information available from the Service Management &Operations processes to establish detailed views of anticipated service capacity and performance shortfalls andsupport process issues.

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    54/773

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    55/773

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    The Define Marketing Capability Requirements processesdefine and agree the marketing infrastructure capabilityrequirements. The processes define and obtain agreement tothe detailed infrastructure requirements to support themarketing strategies and forecasts. The Define MarketingCapability Requirements processes provide requirements,including process performance targets, for the development of new and/or enhancement of existing marketing infrastructurewhich are captured by this process. These processes includeany cross-enterprise co-ordination and management functionsto ensure that the requirements capture the needs of allstakeholders.

    These processes provide input into the requirements captureprocesses in the Resource and Supply Chain horizontal processgroupings

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    56/773

    The Define Product Capability Requirements processes defineand obtain agreement to the detailed infrastructurerequirements to support the product portfolio and individualproduct plans. Product infrastructure requirements to supportnew product initiatives in the PLM vertical are captured in thisprocess, as well as any product infrastructure requirements

    needed to support the specific offers being made to customersthrough the sales channels. These processes also identify theservice infrastructure capabilities required to deliver theproduct infrastructure. The processes include any cross-enterprise co-ordination and management functions to ensurethat the requirements capture the needs of all stakeholders.These processes provide input into the requirements captureprocesses in the Service and Supply Chain, and potentially theResource, horizontal process groupings.

    Not used for this process element

    Not used for this process element

    The Deliver Marketing Infrastructure processes manage thecoordinated delivery of all marketing infrastructure

    deliverables across the enterprise. The processes ensure theco-coordinated delivery in line with the approved businesscase of all required infrastructure capabilities for that businesscase across the enterprise. The processes track and ensurethat the business case cost parameters, and anticipatedbenefits are achieved. The Deliver Marketing Infrastructureprocesses are predominantly program/project managementprocesses, with the detailed management of individualinfrastructure component delivery managed through separateprocesses in the relevant eTOM horizontal process groupings.

  • 7/28/2019 Copy of 13.0 Business Process

    57/773

    The Deliver Product Capability processes ensure the co-coordinated delivery in line with the approved business caseof all required product infrastructure capabilities for thatbusiness case across the enterprise. It is predominantly aprogram/project management function, with the detailedmanagement of individual infrastructure component delivery

    managed through separate processes. The processes track andensure that the business case cost parameters are met, andanticipated benefits and ongoing operational costs are likely tobe achieved

    The Design Resource Capabilities processes manage the designof the resource infrastructure to meet the requirements in anyapproved investment proposals. These processes ensure thecollation and coordination of requirements from all approvedinvestment proposals, assess the most appropriate resourceinfrastructure, develop the tactical/solution architecture anddesign specifications to be used to build or source thenecessary resource infrastructure components, and select themost appropriate resource infrastructure suppliers/partners tosupport the resource requirements. A key element of theoverall design is the integration approach between theexisting legacy resource infrastructure and any proposed newresource infrastructure. This integration design is managedwithin the architecture and specification processes.Note that the actual management of the sourcing process ishandled within the Supply Chain Development & Management

    processes.

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    58/773

    The Design Service Capabilities processes manage the designof the service infrastructure to meet the requirements in anyapproved investment proposals approved through the GainService Capability Investment Approval processes. Theseprocesses ensure the collation and coordination of requirements from all approved investment proposals, assess

    the most appropriate service infrastructure, develop thetactical/solution architecture and design specifications to beused to build or source the necessary service infrastructurecomponents, and select the most appropriate serviceinfrastructure suppliers/partners to support the servicerequirements.Note that the actual management of the sourcing process ishandled within the Supply Chain Development & Managementprocesses.

    Not used for this process element

    The Determine Potential Suppliers/Partners processesdetermine the appropriate short list of suppliers to meet thespecific enterprise requirements (for example, expectedtechnical capability, anticipated delivery timeframes,anticipated costs, etc..). The processes provide detailedanalysis of potential partners/suppliers, leveraginginformation available from the Gather & Analyze Supply ChainInformation processes, as well as other specific inputs

    available from within the enterprise, or from external supplierresearch organizations at the specific time the need arises.The processes include any cross-enterprise coordination andmanagement functions to ensure that the selected short listmeets the needs of all stakeholders

  • 7/28/2019 Copy of 13.0 Business Process

    59/773

    The Determine the Sourcing Requirements processes managethe collection and finalization of the specific requirements tobe achieved from the sourcing process including achronological timetable for anticipated sourcing activities.These requirements take into account the required functional,technical and/or operational specifications produced by the

    area seeking the sourcing activity and assuring thatappropriately aligned commercial aspects (such as specialcommercial terms, tender timing, cost parameters, etc.) arecatered for. The requirements will be determined from therequirements specified in the various business or investmentproposals, and any subsequent detailed specificationsdeveloped as a part of the architecture design activity, withinthe product, market, service or resource capability deliveryprocesses. The actual range of requirements are dependent onthe needs of the sourcing initiator, but are likely to include, ata minimum, technical, operational, training and specificsupplier support requirements.The Supply Chain Strategy and Planning processes will alsoprovide a set of enterprise level requirements that thesourcing process will need to satisfy.The processes include any cross-enterprise coordination andmanagement functions to ensure that the requirements meetsthe needs of all stakeholders

    Not used for this process element

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    60/773

    Not used for this process element

    Not used for this process element

    Not used for this process element

    The Enable Resource Support & Operations processes managethe design of any improvements or changes required to theresource operational support processes to support the

    investment proposals and new resource capabilities andinfrastructure. The processes ensure the identification of operational support groups, required skill sets, and availabilityof appropriate training programs. These processes ensure theidentification, collation and coordination of supportrequirements from all approved investment proposals, andfrom any operational support shortfalls identified in theCapture Resource Capability Shortfalls processes.

  • 7/28/2019 Copy of 13.0 Business Process

    61/773

    The Enable Service Support & Operations processes managethe design of any improvements or changes required to theservice operational support processes to support theinvestment proposals and new service capabilities andinfrastructure. The processes ensure the identification of operational support groups, required skill sets, and availability

    of appropriate training programs. These processes ensure theidentification, collation and coordination of supportrequirements from all approved investment proposals, andfrom any operational support shortfalls identified in theCapture Service Capability Shortfalls processes.

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    62/773

    Not used for this process element

    Not used for this process element

    The Gain Approval for Commercial Arrangements processesgain enterprise commitment to the negotiated commercialarrangements, and provide authorization to sign commercialagreements. These processes include all aspects of identification of stakeholders and regular reporting to gainstakeholder approval.

    The Gain Marketing Capability Approval processes capture allactivities required to develop and gain the necessary level of approval for a business case to develop and deliver therequired capabilities, including identification of potentialsuppliers/partners. The business case developed by theseprocesses should identify development costs and anticipatedbenefits, including productivity gains and/or operational costimprovements. These processes include any cross-enterpriseco-ordination and management functions to ensure that thebusiness case is supported by all stakeholders.

    Not used for this process element

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    63/773

    The Gain Resource Capability Investment Approval processescapture all activities required to develop and gain necessaryapproval for investment proposals to develop and deliver therequired resource capabilities, including identification of potential suppliers/partners. These processes take the inputfrom the Map & Analyze Resource Requirements, the Capture

    Resource Capability Shortfalls and the Map & Analyze ServiceRequirements processes to develop and gain approval for anybusiness proposals arising. In some cases the businessproposal may require the creation and approval of a formalbusiness case, in other cases the business proposal approvalmay be delegated to local management. In any event the costestimates for delivering the resource infrastructure, includingcosts for materials (equipment and tools), labor and trainingare part of the investment proposal.The rules and procedures outlining the necessary approvalprocess to be used are also part of these processes.The processes include any cross-enterprise coordination andmanagement functions to ensure that the investmentproposals capture the needs of, and are supported by, allstakeholders

  • 7/28/2019 Copy of 13.0 Business Process

    64/773

    The Gain Service Capability Investment Approval processescapture all activities required to develop and gain necessaryapproval for business proposals to develop and deliver therequired service capabilities, including identification of potential suppliers/partners. These processes take the inputfrom the Map & Analyze Service Requirements, the Capture

    Service Capability Shortfalls and the Define Product CapabilityRequirements processes to develop and gain approval for anybusiness proposals arising. In some cases the businessproposal may require the creation and approval of a formalbusiness case, in other cases the business proposal approvalmay be delegated to local management. In any eventrequirements for the service infrastructure, identification of required Resource infrastructure capabilities, the costestimates for delivering the service and supporting resourceinfrastructure, including costs for materials (equipment andtools), labor and training are part of the investment proposal.The rules and procedures outlining the necessary approvalprocess to be used are also part of these processes.The processes include any cross-enterprise coordination andmanagement functions to ensure that the investmentproposals capture the needs of, and are supported by, allstakeholders

    The Gain Tender Decision Approval processes capture allactivities required to provide management oversight on thetender process and gain approval for the sourcing decision andsupplier/partner selection. These processes cover theestablishment of any tender selection boards, the reportingprocesses and timetables, and the final approval of the tenderdecisions.The processes include any cross-enterprise coordination andmanagement functions to ensure that the tender decisions aresupported by all stakeholders

    Not used for this process element

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    65/773

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    The Manage Handover to Marketing Operations processesmanage the processes involved in handover of deployedmarketing infrastructure to operational control. Theseprocesses ensure that all operational and processperformance design requirements have been met by theinstalled marketing infrastructure, and that all tools, testequipment, operational procedures, support groups, andtraining is in place to allow for successful operation. Theseprocesses include the management and coordination of allstakeholders required to gain approval and acceptance of thehandover to operational control.

    The Manage Handover to Product Operations processesmanage the processes involved in handover of deployedproduct infrastructure to operational control. These processes

    ensure that all performance and operational designrequirements have been met by the installed productinfrastructure, and that all tools, test equipment, operationalprocedures, support groups, and training is in place to allowfor successful operation. These processes include themanagement and coordination of all stakeholders required togain approval and acceptance of the handover to operationalcontrol.

  • 7/28/2019 Copy of 13.0 Business Process

    66/773

    The Manage Handover to Resource Operations processesmanage the processes involved in handover of deployedresource infrastructure to operational control. Theseprocesses ensure that all operational and performance designrequirements have been met by the installed resourceinfrastructure, and that all tools, test equipment, operational

    procedures, support groups, and training is in place to allowfor successful operation. These processes include themanagement and coordination of all stakeholders required togain approval and acceptance of the handover to operationalcontrol.

    The Manage Handover to Service Operations processesmanage the processes involved in handover of deployedservice infrastructure to operational control. These processesensure that all operational and performance designrequirements have been met by the installed serviceinfrastructure, and that all tools, test equipment, operationalprocedures, support groups, and training is in place to allowfor successful operation. These processes include themanagement and coordination of all stakeholders required togain approval and acceptance of the handover to operationalcontrol.

    The Manage Marketing Capability Delivery Methodologyprocesses define and manage the methodology to be adoptedfor marketing capability delivery across the enterprise. The

    processes define the procedures and steps to follow to ensurethat all project activities across the enterprise to developinfrastructure capability are co-coordinated, visible andcontrolled. These processes define the steps in themethodology, and approval process or gates to be passed byindividual marketing capability delivery projects, and maymaintain a repository of all activities as a part of thecoordination aspects.

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    67/773

    The Manage Product Capability Delivery Methodologyprocesses define and manage the methodology to be adoptedfor product capability delivery across the enterprise. Theprocesses define the procedures and steps to follow to ensurethat all project activities across the enterprise to developinfrastructure capability are co-coordinated, visible and

    controlled. These processes define the steps in themethodology, and approval process or gates to be passed byindividual product capability delivery projects, and maymaintain a repository of all activities as a part of thecoordination aspects.

    The Manage Resource Capability Delivery processes managethe provision, implementation, commissioning and roll-out of the new or enhanced resource capability and associatedoperational support processes. These processes arepredominantly program/project management processfunctions, and require the detailed management and co-ordination of the delivery of individual resource infrastructurecomponents to achieve the delivery of the overall resourcecapability. Within the Manage Resource Capability Deliveryprocesses separate suppliers/partners may be responsible forthe delivery of the resource capability, and othersuppliers/partners for the installation and construction. TheManage Resource Capability Delivery processes ensure thatthe roles and responsibilities of all parties are identified,managed and coordinated.

    These processes are responsible to ensure that the quality of the implemented resource capability meets the designspecifications. These processes manage the commissioning of the new resource infrastructure by ensuring the availability of test programs and specifications against which to test the newresource infrastructure meets the design requirements.These processes leverage the Supply Chain Development &Management processes as necessary to establish any newsourcing arrangements for the delivery of resourcecomponents.

  • 7/28/2019 Copy of 13.0 Business Process

    68/773

    The Manage Service Capability Delivery processes manage theprovision, implementation and roll-out of the new orenhanced service capability and associated operationalsupport processes. These processes are predominantlyprogram/project management process functions, and requirethe detailed management and co-ordination of the delivery of

    individual service infrastructure components, and anyunderlying resource infrastructure capability delivery, toachieve the delivery of the overall service capability. Theseprocesses are responsible to ensure that the quality of theimplemented service capability meets the designspecifications. These processes leverage the Supply ChainDevelopment & Management processes as necessary toestablish any new sourcing arrangements for the delivery of service components.These processes develop the detailed delivery,implementation and roll-out timetables, and track theexpenditure and staff resource usage to deliver the servicecomponents, and provide any reporting necessary to keepstakeholders informed of progress. They are responsible forensuring that the financial aspects of the approved businessproposals are met.

    The Manage the Tender Process processes manage andadminister the mechanics of the tender process. Theprocesses determine the engagement interactions withpotential suppliers/partners, the timing of the process, bring

    together the commercial and functional requirements into thetender documentation, the analysis and scoring mechanismsfor tender analysis based on the functional, technical,operational and commercial requirements, and manage thetender analysis team engagement approach.These processes are invoked by the S/P RequisitionManagement processes in the event that the requisitionprocess requires a tender to select between previouslycontracted suppliers.These processes also manage the analysis of the strategicsourcing factors used at the commencement of the process

    including the industry and competitive analysis, and adetermination of the minimum acceptable outcomes from thesourcing process.

  • 7/28/2019 Copy of 13.0 Business Process

    69/773

    The Map & Analyze Resource Requirements processes definethe detailed resource infrastructure requirements to supportthe service capabilities required by the enterprise. Theprocesses provide detailed analysis of new resourcerequirements linked to relevant geographic distributions.These processes also establish the detailed performance

    requirements. These processes take the forecast informationavailable from the Produce Resource Business Plans andrequirements information from the Map & Analyze ServiceRequirements processes, as well as resource infrastructurerequirements developed by the Develop Detailed ResourceSpecifications processes, to establish detailed views of anticipated resource demand and performance requirements.These processes manage the capacity planning for theresource infrastructure, and identify capacity requirementsbased on service forecasts and appropriate resource relatedmetrics, i.e., transaction volumes, storage requirements,traffic volumes, port availabilities, etc.The processes include any cross-enterprise coordination andmanagement functions to ensure that the demanddistributions capture the needs of all stakeholders.

    The Map & Analyze Service Requirements processes definethe detailed service infrastructure requirements to support

    the product capabilities required by the enterprise. Theprocesses provide detailed analysis of new service demandforecasts linked to service relevant geographic distributions.The processes also establish the detailed performancerequirements. These processes take the forecast informationavailable from the Produce Service Business Plans andrequirements information from the Define Product CapabilityRequirements processes, as well as service infrastructurerequirements developed by the Develop Detailed ServiceSpecifications processes, to establish detailed views of anticipated service demand and performance requirements.

    The processes include any cross-enterprise coordination andmanagement functions to ensure that the demanddistributions capture the needs of all stakeholders.These processes provide input into the requirements captureprocesses in the Resource and Supply Chain horizontal processgroupings

  • 7/28/2019 Copy of 13.0 Business Process

    70/773

    This horizontal functional process grouping focuses on theknowledge of running and developing the core business for anInformation & Communication Service Provider enterprise. Itincludes functionalities necessary for defining strategies,developing new products, managing existing products andimplementing marketing and offering strategies especially

    suitable for information and communications productsMarketing and offer management are well known businessprocesses, especially in the more competitive ebusinessenvironment, where the rate of innovation and brandrecognition determine success. Although most companiescarry out all these activities, depending upon the size of thecompany, they are combined in a variety of ways. Theseprocesses are enabling processes, but also the key processesthat are accountable for commitment to the enterprise forrevenue, overall product results and profit and loss. Theseprocesses deal with the creation of product, markets andchannels; they manage market and product strategies, pricing,sales, channels, new product development (and retirement),marketing communications and promotion

    Based on the market strategy for the enterprise, theMarketing Capability Delivery processes manage the deliveryand build of new or changed market capabilities (e.g. on-linechannels and sales channels) or customer-related capabilities(e.g. ability to identify, save, manipulate and retrieve andapply new types of knowledge about customers). Thesecapabilities are created and delivered in line with the MarketStrategy, for example, one strategy may be to create more on-line channels to allow for customer self-service.

  • 7/28/2019 Copy of 13.0 Business Process

    71/773

    The Negotiate Commercial Arrangements processes managethe commercial negotiations between the enterprisenegotiation team and the selected supplier/partner, or withcompetitors in a regulated market. These processes managethe establishment of the commercial negotiating strategy, andthe determination of the negotiating parameters. The

    processes also manage the negotiating timetables anddetermination of the enterprise negotiating team.

    Based on the Product strategy for the enterprise, the Product& Offer Capability Delivery processes manage the delivery andbuild of new or changed Product offering and deliverycapabilities within an enterprise. It also handles their requisiteinfrastructure, where the technologies, scope or type/depth of infrastructure is significantly different to that currentlyemployed in the enterprise. e.g. introduction of Third-generation Mobile Telephony networks.

    Not used for this process element

    Not used for this process element

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    72/773

    Resource Capability Delivery processes use the capabilitydefinition or requirements to deploy new and/or enhancedtechnologies and associated resources.

    The objectives of these processes is to ensure that network,application and computing resources are deployed, according

    to the plans set by Resource Development. They deliver thephysical resource capabilities necessary for the ongoingoperations, and long term well-being of the enterprise, andensure the basis on which all resources and services will bebuilt.

    Responsibilities of the Resource Capability Delivery processesinclude, but are not limited to:

    Planning resource supply logistics (warehousing, transport,etc) Planning the Resource Installation Contracting and Directing the Resource Construction whereneeded Verifying the Resource Installation Handover the Resource Capability to Operations throughinteractions with the Manage Resource Class Configuration

    Logical network configurations (such as resource elementsintegration) are as important to the network resources as thephysical aspects. All aspects must be planned and considered

    Not used for this process element

    Not used for this process element

    Service Capability Delivery processes plan and deliver the totalcapabilities required to deliver changes to service, asnecessary. This involves integration of capability deliveredfrom within the enterprise, and capability delivered from apartner/supplier.Service demand forecasting and capturing of newopportunities, are both essential to ensure that the enterprisecan implement the services necessary for the future needs of their customers and potential customers.

  • 7/28/2019 Copy of 13.0 Business Process

    73/773

    Responsibilities of the Service Configuration & Activationprocesses include, but are not limited to:

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    74/773

    Supply Chain Capability Delivery processes manage theevaluation of new supplier/partners, to determine those withthe goods and services that best meet the enterprises needs.These processes also initiate and complete businessagreements with the supply chain, to allow the delivery of business and technical capabilities required by the enterprise.

    For example, through these processes, the enterprise mightcontract with a supplier of a Third-generation Mobile Networkand put in place links between the IT Systems of the Supplierand the enterprise, ready to allow specific processes andproducts to be developed. Another example might becontracts for the supply of personal computers or officesupplies for the enterprise. Supply Chain Capability Deliveryprocesses manage the sourcing of infrastructure components,consumables, etc required to support the capabilityrequirements of the enterprise, evaluate and select newsupplier/partners, and establish commercial arrangementswith selected suppliers/partners. The processes manage thespecific evaluation of new supplier/partners to determinethose with the best capabilities to meet the enterprisesspecific needs (for infrastructure, consumables, etc), andestablish commercial arrangements with selectedsuppliers/partners. These processes manage the activitiesassociated with developing tender documents, running tenderprocesses, gaining enterprise agreement to tender decisions,and negotiating commercial arrangements as a result of thetender decisions.

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    75/773

    Not used for this process element

  • 7/28/2019 Copy of 13.0 Business Process

    76/773

    Frameworx Information(Secondary eTOM to SID)

    Frameworx Information(Primary eTOM to SID)

    Frameworx Process(horizontal grouping of)

  • 7/28/2019 Copy of 13.0 Business Process

    77/773

  • 7/28/2019 Copy of 13.0 Business Process

    78/773

  • 7/28/2019 Copy of 13.0 Business Process

    79/773

  • 7/28/2019 Copy of 13.0 Business Process

    80/773

  • 7/28/2019 Copy of 13.0 Business Process

    81/773

  • 7/28/2019 Copy of 13.0 Business Process

    82/773

  • 7/28/2019 Copy of 13.0 Business Process

    83/773

  • 7/28/2019 Copy of 13.0 Business Process

    84/773

  • 7/28/2019 Copy of 13.0 Business Process

    85/773

  • 7/28/2019 Copy of 13.0 Business Process

    86/773

  • 7/28/2019 Copy of 13.0 Business Process

    87/773

  • 7/28/2019 Copy of 13.0 Business Process

    88/773

  • 7/28/2019 Copy of 13.0 Business Process

    89/773

  • 7/28/2019 Copy of 13.0 Business Process

    90/773

  • 7/28/2019 Copy of 13.0 Business Process

    91/773

  • 7/28/2019 Copy of 13.0 Business Process

    92/773

  • 7/28/2019 Copy of 13.0 Business Process

    93/773

  • 7/28/2019 Copy of 13.0 Business Process

    94/773

  • 7/28/2019 Copy of 13.0 Business Process

    95/773

    Approve Product BusinessCaseAssess Performance of Existing ProductsCapture Product CapabilityShortfalls

    Define Marketing CapabilityRequirementsDefine Product CapabilityRequirementsDefine Product MarketingPromotion StrategyDeliver MarketingInfrastructureDeliver Product CapabilityDevelop Detailed ProductSpecificationsDevelop New ProductBusiness ProposalDevelop New Sales Channels& ProcessesDevelop Product &Campaign MessageDevelop ProductCommercialization StrategyDevelop PromotionalCollateral

  • 7/28/2019 Copy of 13.0 Business Process

    96/773

  • 7/28/2019 Copy of 13.0 Business Process

    97/773

  • 7/28/2019 Copy of 13.0 Business Process

    98/773

    Assess Performance of Existing ServicesCapture Service CapabilityShortfallsDefine Service SupportStrategies

    Design Service CapabilitiesDevelop Detailed ServiceSpecificationsDevelop New ServiceBusiness ProposalDevelop Service PartnershipRequirementsEnable Service Support &OperationsEstablish Service Strategy &GoalsGain EnterpriseCommitment to ServiceStrategiesGain Service CapabilityInvestment ApprovalGather & Analyze NewService IdeasGather & Analyze ServiceInformationManage Handover to

  • 7/28/2019 Copy of 13.0 Business Process

    99/773

  • 7/28/2019 Copy of 13.0 Business Process

    100/773

  • 7/28/2019 Copy of 13.0 Business Process

    101/773

    Frameworx Process (belongs tohorizontal grouping of)

    Frameworx Process (parent of this process)

    Manage the Tender Process

    Define Marketing Capability Requirements

    Define Product Capability Requirements

    Map & Analyze Resource Requirements

    Map & Analyze Service Requirements

    Determine Potential Suppliers/Partners

    Marketing & Offer Management Product & Offer Capability Delivery

  • 7/28/2019 Copy of 13.0 Business Process

    102/773

    Gain Resource Capability Investment Approval

    Gain Service Capability Investment Approval

    Define Marketing Capability Requirements

    Marketing & Offer Management Product & Offer Capability Delivery

    Capture Product Capability Shortfalls

    Define Product Capability Requirements

    Capture Product Capability Shortfalls

    Capture Product Capability Shortfalls

    Resource Development & Management Resource Capability Delivery

    Capture Resource Capability Shortfalls

  • 7/28/2019 Copy of 13.0 Business Process

    103/773

    Map & Analyze Resource Requirements

    Capture Resource Capability Shortfalls

    Capture Resource Capability Shortfalls

    Service Development & Management Service Capability Delivery

    Capture Service Capability Shortfalls

    Map & Analyze Service Requirements

    Capture Service Capability Shortfalls

    Capture Service Capability Shortfalls

  • 7/28/2019 Copy of 13.0 Business Process

    104/773

    Determine the Sourcing Requirements

    Deliver Marketing Infrastructure

    Manage Handover to Marketing Operations

    Deliver Product Capability

    Manage Handover to Product Operations

    Manage Resource Capability Delivery

    Manage Handover to Resource Operations

  • 7/28/2019 Copy of 13.0 Business Process

    105/773

    Manage Service Capability Delivery

    Manage Handover to Service Operations

    Gain Approval for Commercial Arrangements

    Manage Marketing Capability DeliveryMethodology

    Marketing & Offer Management Marketing Capability Delivery

    Manage Product Capability DeliveryMethodology

  • 7/28/2019 Copy of 13.0 Business Process

    106/773

    Marketing & Offer Management Product & Offer Capability Delivery

    Design Resource Capabilities

    Design Service Capabilities

    Marketing & Offer Management Marketing Capability Delivery

  • 7/28/2019 Copy of 13.0 Business Process

    107/773

    Marketing & Offer Management Product & Offer Capability Delivery

    Resource Development & Management Resource Capability Delivery

    Enable Resource Support & Operations

  • 7/28/2019 Copy of 13.0 Business Process

    108/773

    Service Development & Management Service Capability Delivery

    Enable Service Support & Operations

    Supply Chain Development &Management

    Supply Chain Capability Delivery

  • 7/28/2019 Copy of 13.0 Business Process

    109/773

    Supply Chain Development &Management

    Supply Chain Capability Delivery

    Gain Marketing Capability Approval

    Approve Product Business Case

  • 7/28/2019 Copy of 13.0 Business Process

    110/773

    Gain Resource Capability Investment Approval

    Gain Service Capability Investment Approval

    Manage Service Capability Delivery

    Resource Development & Management Resource Capability Delivery

  • 7/28/2019 Copy of 13.0 Business Process

    111/773

    Service Development & Management Service Capability Delivery

    Deliver Marketing Infrastructure

    Manage Handover to Marketing Operations

    Deliver Product Capability

    Manage Handover to Product Operations

    Manage Resource Capability Delivery

    Manage Handover to Resource Operations

    Manage Service Capability Delivery

    Manage Service Capability Delivery

    Manage Handover to Service Operations

    Negotiate Commercial Arrangements

    Manage Resource Capability Delivery

  • 7/28/2019 Copy of 13.0 Business Process

    112/773

    Manage Service Capability Delivery

    Determine the Sourcing Requirements

    Supply Chain Development &Management

    Supply Chain Capability Delivery

    Marketing & Offer Management Marketing Capability Delivery

    Gain Marketing Capability Approval

    Approve Product Business Case

  • 7/28/2019 Copy of 13.0 Business Process

    113/773

    Resource Development & Management Resource Capability Delivery

  • 7/28/2019 Copy of 13.0 Business Process

    114/773

    Service Development & Management Gain Service Capability Investment ApprovalService Capability Delivery

    Supply Chain Development &Management Supply Chain Capability Delivery

    Gain Approval for Commercial Arrangements

    Enable Resource Support & Operations

  • 7/28/2019 Copy of 13.0 Business Process

    115/773

    Enable Resource Support & Operations

    Enable Service Support & Operations

    Enable Service Support & Operations

    Manage Resource Capability Delivery

    Marketing & Offer Management Marketing Capability Delivery

    Marketing & Offer Management Product & Offer Capability Delivery

  • 7/28/2019 Copy of 13.0 Business Process

    116/773

    Resource Development & Management Resource Capability Delivery

    Service Development & Management Service Capability Delivery

    Marketing & Offer Management Marketing Capability Delivery

    Negotiate Commercial Arrangements

  • 7/28/2019 Copy of 13.0 Business Process

    117/773

    Marketing & Offer Management Product & Offer Capability Delivery

    Resource Development & Management Resource Capability Delivery

  • 7/28/2019 Copy of 13.0 Business Process

    118/773

    Service Development & Management Service Capability Delivery

    Supply Chain Development &Management

    Supply Chain Capability Delivery

  • 7/28/2019 Copy of 13.0 Business Process

    119/773

    Resource Development & Management Resource Capability Delivery

    Service Development & Management Service Capability Delivery

  • 7/28/2019 Copy of 13.0 Business Process

    120/773

    Marketing & Offer Management

  • 7/28/2019 Copy of 13.0 Business Process

    121/773

    Supply Chain Development &Management

    Supply Chain Capability Delivery

    Marketing & Offer Management

    Define Marketing Capability Requirements

    Define Product Capability Requirements

    Map & Analyze Service Requirements

  • 7/28/2019 Copy of 13.0 Business Process

    122/773

    Resource Development & Management

    Design Resource Capabilities

    Design Service Capabilities

    Service Development & Management

  • 7/28/2019 Copy of 13.0 Business Process

    123/773

    Determine Potential Suppliers/Partners

    Design Resource Capabilities

    Design Service Capabilities

    Manage the Tender Process

  • 7/28/2019 Copy of 13.0 Business Process

    124/773

    Supply Chain Development &Management

    Infrastructure Lifecycle ManagementStrategy, Infrastructure & ProductSupply Chain Development & Management

    Manage Service Capability Delivery

    Deliver Marketing Infrastructure

    Deliver Product Capability

    Manage Handover to Marketing OperationsManage Marketing Capability DeliveryMethodology

    Manage Handover to Product Operations

    Manage Handover to Resource Operations

  • 7/28/2019 Copy of 13.0 Business Process

    125/773

    Manage Handover to Service Operations

  • 7/28/2019 Copy of 13.0 Business Process

    126/773

    Frameworx Process (child of this process) Organizations (assoc:Frameworx ProcessOrganization Linkage)

    Develop Product Business CaseGain Product Business Case Approval

  • 7/28/2019 Copy of 13.0 Business Process

    127/773

    Capture Product Capacity ShortfallsCapture Product Operational SupportShorfallsCapture Product Performance Shortfalls

    Capture Resource Capacity ShortfallsCapture Resource Operational SupportShorfallsCapture Resource Performance Shortfalls

    Resource (Application,Computing and Network)

  • 7/28/2019 Copy of 13.0 Business Process

    128/773

    Capture Service Capacity ShortfallsCapture Service Operational SupportShorfallsCapture Service Performance Shortfalls

    Service

  • 7/28/2019 Copy of 13.0 Business Process

    129/773

  • 7/28/2019 Copy of 13.0 Business Process

    130/773

    Agree Marketing InfrastructureRequirementsCapture Marketing InfrastructureRequirementsReport Marketing InfrastructureRequirements

  • 7/28/2019 Copy of 13.0 Business Process

    131/773

    Agree Product Infrastructure RequirementsCapture Product Infrastructure RequirementsReport Product Infrastructure Requirements

    Co-ordinate Marketing Capability DeliveryEnsure Marketing Capability Benefits

    Track Marketing Capability Business CaseCosts

  • 7/28/2019 Copy of 13.0 Business Process

    132/773

    Co-ordinate Product Capability DeliveryEnsure Product Capability Benefits &Operational CostsTrack Product Capability Business Case Costs

    Define Resource Capability RequirementsSelect Resource Capability Suppliers/PartnersSpecify Resource Capability Infrastructure

    Resource (Application,Computing and Network)

  • 7/28/2019 Copy of 13.0 Business Process

    133/773

    Define Service Capability RequirementsSelect Service Capability Suppliers/PartnersSpecify Service Capability Infrastructure

    Service

    Analyze Potential Suppliers/PartnersShort List Potential Suppliers/Partners

    Supplier/ Partner

  • 7/28/2019 Copy of 13.0 Business Process

    134/773

    Capture Sourcing RequirementsFinalize Sourcing Requirements

  • 7/28/2019 Copy of 13.0 Business Process

    135/773

    Design Resource Operational SupportProcess ImprovementsIdentify Resource Support Groups, Skills &

    TrainingIdentify Resource Support Requirements

    Resource (Application,Computing and Network)

  • 7/28/2019 Copy of 13.0 Business Process

    136/773

    Design Service Operational Support ProcessImprovementsIdentify Service Support Groups, Skills &TrainingIdentify Service Support Requirements

    Service

  • 7/28/2019 Copy of 13.0 Business Process

    137/773

    Commit & Approve Cmmercial ArrangementsIdentify & Report to Stakeholders

    Develop Marketing Capability Business CaseGain Marketing Capability Business CaseApproval

  • 7/28/2019 Copy of 13.0 Business Process

    138/773

    Approve Resource Capability InvestmentDevelop Resource Capability InvestmentProposals

    Resource (Application,Computing and Network)

  • 7/28/2019 Copy of 13.0 Business Process

    139/773

    Approve Service Capability InvestmentDevelop Service Capability InvestmentProposalsGain Service Capability Investment Approval

    Service

    Approve Tender DecisionsProvide Management Oversight on Tenders

  • 7/28/2019 Copy of 13.0 Business Process

    140/773

    Co-ordinate Marketing Operational HandoverEnsure Marketing Handover SupportValidate Marketing Infrastructure Design

    Co-ordinate Product Operational HandoverEnsure Product Handover SupportValidate Product Infrastructure Design

  • 7/28/2019 Copy of 13.0 Business Process

    141/773

    Co-ordinate Resource Operational HandoverEnsure Resource Handover SupportValidate Resource Infrastructure Design

    Resource (Application,Computing and Network)

    Co-ordinate Service Operational HandoverEnsure Service Handover SupportValidate Service Infrastructure Design

    Service

    Define Marketing Capability DeliveryMethodologyValidate Marketing Infrastructure Design

  • 7/28/2019 Copy of 13.0 Business Process

    142/773

    Define Product Capability DeliveryMethodologyMaintain Product Capability DeliveryRepository

    Co-ordinate Resource Capability DeliveryEnsure Resource Capability QualityEstablish Resource Capability SourcingManage Commissioning of New ResourceInfrastructure

    Resource (Application,Computing and Network)

  • 7/28/2019 Copy of 13.0 Business Process

    143/773

    Co-ordinate Service Capability DeliveryDevelop Service Capability TmetablesEnsure Service Capability CostsEnsure Service Capability QualityEstablish Service Capability SourcingTrack and Report Service Capability Delivery

    Service

    Administer the Tender ProcessSpecify the Tender Process

  • 7/28/2019 Copy of 13.0 Business Process

    144/773

    Agree Resource Infrastructure RequirementsCapture Resource Demand & PerformanceRequirements

    Resource (Application,Computing and Network)

    Agree Service Infrastructure RequirementsCapture Service Demand & Performance

    RequirementsReport Service Infrastructure Requirements

    Service

  • 7/28/2019 Copy of 13.0 Business Process

    145/773

    Define Marketing Capability RequirementsDeliver Marketing InfrastructureGain Marketing Capability ApprovalManage Handover to Marketing OperationsManage Marketing Capability DeliveryMethodology

    Market Product & Customer

  • 7/28/2019 Copy of 13.0 Business Process

    146/773

    Establish Negotiating StrategyManage Negotiations

    Approve Product Business CaseCapture Product Capability ShortfallsDefine Product Capability RequirementsDeliver Product CapabilityManage Handover to Product OperationsManage Product Capability DeliveryMethodology

    Market Product & CustomerService

  • 7/28/2019 Copy of 13.0 Business Process

    147/773

    Capture Resource Capability ShortfallsDesign Resource CapabilitiesEnable Resource Support & OperationsGain Resource Capability InvestmentApprovalManage Handover to Resource Operations

    Manage Resource Capability DeliveryMap & Analyze Resource Requirements

    Resource (Application,Computing and Network)

    Capture Service Capability ShortfallsDesign Service CapabilitiesEnable Service Support & OperationsGain Service Capability Investment ApprovalManage Handover to Service OperationsManage Service Capability DeliveryMap & Analyze Service Requirements

    Service

  • 7/28/2019 Copy of 13.0 Business Process

    148/773

  • 7/28/2019 Copy of 13.0 Business Process

    149/773

    Determine Potential Suppliers/PartnersDetermine the Sourcing RequirementsGain Approval for Commercial ArrangementsGain Tender Decision ApprovalManage the Tender ProcessNegotiate Commercial Arrangements

    Supplier/ Partner

  • 7/28/2019 Copy of 13.0 Business Process

    150/773

  • 7/28/2019 Copy of 13.0 Business Process

    151/773

    Frameworx Process (belongs tovertical grouping)

    Frameworx Process (vertical group of)

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    152/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    153/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    154/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    155/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    156/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    157/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    158/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    159/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    160/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    161/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    162/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    163/773

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    164/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    165/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    166/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    167/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    168/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    169/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    170/773

    Infrastructure Lifecycle ManagementProduct Lifecycle ManagementStrategy & Commit

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    171/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    172/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    173/773

    Infrastructure Lifecycle ManagementProduct Lifecycle ManagementStrategy & Commit

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    174/773

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    175/773

    Infrastructure Lifecycle Management

  • 7/28/2019 Copy of 13.0 Business Process

    176/773

    Process (assoc: Process To Frameworx Process) Frameworx Application (Partial eTOM to TAM)

  • 7/28/2019 Copy of 13.0 Business Process

    177/773

  • 7/28/2019 Copy of 13.0 Business Process

    178/773

  • 7/28/2019 Copy of 13.0 Business Process

    179/773

  • 7/28/2019 Copy of 13.0 Business Process

    180/773

  • 7/28/2019 Copy of 13.0 Business Process

    181/773

  • 7/28/2019 Copy of 13.0 Business Process

    182/773

  • 7/28/2019 Copy of 13.0 Business Process

    183/773

  • 7/28/2019 Copy of 13.0 Business Process

    184/773

  • 7/28/2019 Copy of 13.0 Business Process

    185/773

  • 7/28/2019 Copy of 13.0 Business Process

    186/773

  • 7/28/2019 Copy of 13.0 Business Process

    187/773

  • 7/28/2019 Copy of 13.0 Business Process

    188/773

  • 7/28/2019 Copy of 13.0 Business Process

    189/773

  • 7/28/2019 Copy of 13.0 Business Process

    190/773

  • 7/28/2019 Copy of 13.0 Business Process

    191/773

  • 7/28/2019 Copy of 13.0 Business Process

    192/773

  • 7/28/2019 Copy of 13.0 Business Process

    193/773

  • 7/28/2019 Copy of 13.0 Business Process

    194/773

  • 7/28/2019 Copy of 13.0 Business Process

    195/773

  • 7/28/2019 Copy of 13.0 Business Process

    196/773

  • 7/28/2019 Copy of 13.0 Business Process

    197/773

  • 7/28/2019 Copy of 13.0 Business Process

    198/773

  • 7/28/2019 Copy of 13.0 Business Process

    199/773

    Supplier/Partner Relationship Management

  • 7/28/2019 Copy of 13.0 Business Process

    200/773

  • 7/28/2019 Copy of 13.0 Business Process

    201/773

    Frameworx Application (Automated eTOM to TAM)

  • 7/28/2019 Copy of 13.0 Business Process

    202/773

  • 7/28/2019 Copy of 13.0 Business Process

    203/773

    Service Design/Assign

  • 7/28/2019 Copy of 13.0 Business Process

    204/773

  • 7/28/2019 Copy of 13.0 Business Process

    205/773

  • 7/28/2019 Copy of 13.0 Business Process

    206/773

  • 7/28/2019 Copy of 13.0 Business Process

    207/773

  • 7/28/2019 Copy of 13.0 Business Process

    208/773

    Service Design/Assign

  • 7/28/2019 Copy of 13.0 Business Process

    209/773

  • 7/28/2019 Copy of 13.0 Business Process

    210/773

  • 7/28/2019 Copy of 13.0 Business Process

    211/773

  • 7/28/2019 Copy of 13.0 Business Process

    212/773

  • 7/28/2019 Copy of 13.0 Business Process

    213/773

  • 7/28/2019 Copy of 13.0 Business Process

    214/773

  • 7/28/2019 Copy of 13.0 Business Process

    215/773

  • 7/28/2019 Copy of 13.0 Business Process

    216/773

    Service Design/Assign

  • 7/28/2019 Copy of 13.0 Business Process

    217/773

  • 7/28/2019 Copy of 13.0 Business Process

    218/773

  • 7/28/2019 Copy of 13.0 Business Process

    219/773

  • 7/28/2019 Copy of 13.0 Business Process

    220/773

  • 7/28/2019 Copy of 13.0 Business Process

    221/773

  • 7/28/2019 Copy of 13.0 Business Process

    222/773

  • 7/28/2019 Copy of 13.0 Business Process

    223/773

  • 7/28/2019 Copy of 13.0 Business Process

    224/773

  • 7/28/2019 Copy of 13.0 Business Process

    225/773

  • 7/28/2019 Copy of 13.0 Business Process

    226/773

    Remarks

  • 7/28/2019 Copy of 13.0 Business Process

    227/773

  • 7/28/2019 Copy of 13.0 Business Process

    228/773

  • 7/28/2019 Copy of 13.0 Business Process

    229/773

  • 7/28/2019 Copy of 13.0 Business Process

    230/773

  • 7/28/2019 Copy of 13.0 Business Process

    231/773

  • 7/28/2019 Copy of 13.0 Business Process

    232/773

  • 7/28/2019 Copy of 13.0 Business Process

    233/773

  • 7/28/2019 Copy of 13.0 Business Process

    234/773

  • 7/28/2019 Copy of 13.0 Business Process

    235/773

  • 7/28/2019 Copy of 13.0 Business Process

    236/773

  • 7/28/2019 Copy of 13.0 Business Process

    237/773

  • 7/28/2019 Copy of 13.0 Business Process

    238/773

  • 7/28/2019 Copy of 13.0 Business Process

    239/773

  • 7/28/2019 Copy of 13.0 Business Process

    240/773

  • 7/28/2019 Copy of 13.0 Business Process

    241/773

  • 7/28/2019 Copy of 13.0 Business Process

    242/773

  • 7/28/2019 Copy of 13.0 Business Process

    243/773

  • 7/28/2019 Copy of 13.0 Business Process

    244/773

  • 7/28/2019 Copy of 13.0 Business Process

    245/773

  • 7/28/2019 Copy of 13.0 Business Process

    246/773

  • 7/28/2019 Copy of 13.0 Business Process

    247/773

  • 7/28/2019 Copy of 13.0 Business Process

    248/773

  • 7/28/2019 Copy of 13.0 Business Process

    249/773

  • 7/28/2019 Copy of 13.0 Business Process

    250/773

  • 7/28/2019 Copy of 13.0 Business Process

    251/773

    Process Identifier

    1.2.4.2.3.2

    1.2.1.4.1.2

    1.2.1.3.1.2

    1.2.3.2.1.2

    1.2.2.2.1.2

    1.2.4.2.2.1

    1.2.1.3.3

  • 7/28/2019 Copy of 13.0 Business Process

    252/773

    1.2.3.2.3.2

    1.2.2.2.3.2

    1.2.1.4.1.1

    1.2.1.3.2

    1.2.1.3.2.1

    1.2.1.3.1.1

    1.2.1.3.2.3

    1.2.1.3.2.2

    1.2.3.2.2

    1.2.3.2.2.1

  • 7/28/2019 Copy of 13.0 Business Process

    253/773

    1.2.3.2.1.1

    1.2.3.2.2.3

    1.2.3.2.2.2

    1.2.2.2.2

    1.2.2.2.2.1

    1.2.2.2.1.1

    1.2.2.2.2.3

    1.2.2.2.2.2

  • 7/28/2019 Copy of 13.0 Business Process

    254/773

    1.2.4.2.1.1

    1.2.1.4.3.1

    1.2.1.4.4.1

    1.2.1.3.4.1

    1.2.1.3.5.1

    1.2.3.2.6.1

    1.2.3.2.7.1

  • 7/28/2019 Copy of 13.0 Business Process

    255/773

    1.2.2.2.6.1

    1.2.2.2.7.1

    1.2.4.2.6.2

    1.2.1.4.5.1

    1.2.1.4.1

    1.2.1.3.6.1

  • 7/28/2019 Copy of 13.0 Business Process

    256/773

    1.2.1.3.1

    1.2.3.2.4.1

    1.2.2.2.4.1

    1.2.1.4.3

  • 7/28/2019 Copy of 13.0 Business Process

    257/773

    1.2.1.3.4

    1.2.3.2.4

    1.2.3.2.5.1

  • 7/28/2019 Copy of 13.0 Business Process

    258/773

    1.2.2.2.4

    1.2.2.2.5.1

    1.2.4.2.2

  • 7/28/2019 Copy of 13.0 Business Process

    259/773

    1.2.4.2.1

    1.2.1.4.2.1

    1.2.1.3.3.1

  • 7/28/2019 Copy of 13.0 Business Process

    260/773

    1.2.3.2.3.1

    1.2.2.2.3.1

    1.2.2.2.6.4

    1.2.3.2.5

  • 7/28/2019 Copy of 13.0 Business Process

    261/773

    1.2.2.2.5

    1.2.1.4.3.3

    1.2.1.4.4.3

    1.2.1.3.4.3

    1.2.1.3.5.3

    1.2.3.2.6.2

    1.2.3.2.7.3

    1.2.2.2.6.6

    1.2.2.2.6.2

    1.2.2.2.7.3

    1.2.4.2.5.1

    1.2.3.2.6.4

  • 7/28/2019 Copy of 13.0 Business Process

    262/773

    1.2.2.2.6.3

    1.2.4.2.1.2

    1.2.4.2.6

    1.2.1.4.2

    1.2.1.4.2.2

    1.2.1.3.3.2

  • 7/28/2019 Copy of 13.0 Business Process

    263/773

    1.2.3.2.3

  • 7/28/2019 Copy of 13.0 Business Process

    264/773

    1.2.2.2.3

    1.2.4.2.4

    1.2.4.2.6.1

    1.2.3.2.5.2

  • 7/28/2019 Copy of 13.0 Business Process

    265/773

    1.2.3.2.5.3

    1.2.2.2.5.2

    1.2.2.2.5.3

    1.2.3.2.6.3

    1.2.1.4.4

    1.2.1.3.5

  • 7/28/2019 Copy of 13.0 Business Process

    266/773

    1.2.3.2.7

    1.2.2.2.7

    1.2.1.4.5

    1.2.4.2.5.2

  • 7/28/2019 Copy of 13.0 Business Process

    267/773

    1.2.1.3.6

    1.2.3.2.6

  • 7/28/2019 Copy of 13.0 Business Process

    268/773

    1.2.2.2.6

    1.2.4.2.3

  • 7/28/2019 Copy of 13.0 Business Process

    269/773

    1.2.3.2.1

    1.2.2.2.1

  • 7/28/2019 Copy of 13.0 Business Process

    270/773

    1.2.1

    1.2.1.4

  • 7/28/2019 Copy of 13.0 Business Process

    271/773

    1.2.4.2.5

    1.2.1.3

    1.2.1.4.1.3

    1.2.1.3.1.3

    1.2.2.2.1.3

  • 7/28/2019 Copy of 13.0 Business Process

    272/773

    1.2.3.2

    1.2.3.2.4.3

    1.2.2.2.4.3

    1.2.2.2

  • 7/28/2019 Copy of 13.0 Business Process

    273/773

    1.2.2

    1.2.4.2.2.2

    1.2.3.2.4.2

    1.2.2.2.4.2

    1.2.4.2.3.1

  • 7/28/2019 Copy of 13.0 Business Process

    274/773

    1.2.4.2

    1.2.2.2.6.5

    1.2.1.4.3.2

    1.2.1.3.4.2

    1.2.1.4.5.2

    1.2.1.3.5.2

    1.2.3.2.7.2

  • 7/28/2019 Copy of 13.0 Business Process

    275/773

    1.2.2.2.7.2

  • 7/28/2019 Copy of 13.0 Business Process

    276/773

    References

  • 7/28/2019 Copy of 13.0 Business Process

    277/773

  • 7/28/2019 Copy of 13.0 Business Process

    278/773

  • 7/28/2019 Copy of 13.0 Business Process

    279/773

  • 7/28/2019 Copy of 13.0 Business Process

    280/773

  • 7/28/2019 Copy of 13.0 Business Process

    281/773

  • 7/28/2019 Copy of 13.0 Business Process

    282/773

  • 7/28/2019 Copy of 13.0 Business Process

    283/773

  • 7/28/2019 Copy of 13.0 Business Process

    284/773

  • 7/28/2019 Copy of 13.0 Business Process

    285/773

  • 7/28/2019 Copy of 13.0 Business Process

    286/773

  • 7/28/2019 Copy of 13.0 Business Process

    287/773

  • 7/28/2019 Copy of 13.0 Business Process

    288/773

  • 7/28/2019 Copy of 13.0 Business Process

    289/773

  • 7/28/2019 Copy of 13.0 Business Process

    290/773

  • 7/28/2019 Copy of 13.0 Business Process

    291/773

  • 7/28/2019 Copy of 13.0 Business Process

    292/773

  • 7/28/2019 Copy of 13.0 Business Process

    293/773

  • 7/28/2019 Copy of 13.0 Business Process

    294/773

  • 7/28/2019 Copy of 13.0 Business Process

    295/773

  • 7/28/2019 Copy of 13.0 Business Process

    296/773

  • 7/28/2019 Copy of 13.0 Business Process

    297/773

  • 7/28/2019 Copy of 13.0 Business Process

    298/773

  • 7/28/2019 Copy of 13.0 Business Process

    299/773

  • 7/28/2019 Copy of 13.0 Business Process

    300/773

  • 7/28/2019 Copy of 13.0 Business Process

    301/773

    Notes from previous development

  • 7/28/2019 Copy of 13.0 Business Process

    302/773

  • 7/28/2019 Copy of 13.0 Business Process

    303/773

  • 7/28/2019 Copy of 13.0 Business Process

    304/773

  • 7/28/2019 Copy of 13.0 Business Process

    305/773

  • 7/28/2019 Copy of 13.0 Business Process

    306/773

  • 7/28/2019 Copy of 13.0 Business Process

    307/773

  • 7/28/2019 Copy of 13.0 Business Process

    308/773

  • 7/28/2019 Copy of 13.0 Business Process

    309/773

  • 7/28/2019 Copy of 13.0 Business Process

    310/773

  • 7/28/2019 Copy of 13.0 Business Process

    311/773

  • 7/28/2019 Copy of 13.0 Business Process

    312/773

  • 7/28/2019 Copy of 13.0 Business Process

    313/773

  • 7/28/2019 Copy of 13.0 Business Process

    314/773

  • 7/28/2019 Copy of 13.0 Business Process

    315/773

  • 7/28/2019 Copy of 13.0 Business Process

    316/773

  • 7/28/2019 Copy of 13.0 Business Process

    317/773

  • 7/28/2019 Copy of 13.0 Business Process

    318/773

  • 7/28/2019 Copy of 13.0 Business Process

    319/773

  • 7/28/2019 Copy of 13.0 Business Process

    320/773

  • 7/28/2019 Copy of 13.0 Business Process

    321/773

  • 7/28/2019 Copy of 13.0 Business Process

    322/773

  • 7/28/2019 Copy of 13.0 Business Process

    323/773

  • 7/28/2019 Copy of 13.0 Business Process

    324/773

  • 7/28/2019 Copy of 13.0 Business Process

    325/773

  • 7/28/2019 Copy of 13.0 Business Process

    326/773

    Alternate Name

    1.2.4.2.3.2 Administer the Tender Process

    1.2.1.4.1.2 Agree Marketing Infrastructure Requirements

    1.2.1.3.1.2 Agree Product Infrastructure Requirements

    1.2.3.2.1.2 Agree Resource Infrastructure Requirements

    1.2.2.2.1.2 Agree Service Infrastructure Requirements

    1.2.4.2.2.1 Analyze Potential Suppliers/Partners

    1.2.1.3.3 Approve Product Business Case

  • 7/28/2019 Copy of 13.0 Business Process

    327/773

    1.2.3.2.3.2 Approve Resource Capability Investment

    1.2.2.2.3.2 Approve Service Capability Investment

    1.2.1.4.1.1 Capture Marketing Infrastructure Requirements

    1.2.1.3.2 Capture Product Capability Shortfalls

    1.2.1.3.2.1 Capture Product Capacity Shortfalls

    1.2.1.3.1.1 Capture Product Infrastructure Requirements

    1.2.1.3.2.3 Capture Product Operational Support Shorfalls

    1.2.1.3.2.2 Capture Product Performance Shortfalls

    1.2.3.2.2 Capture Resource Capability Shortfalls

    1.2.3.2.2.1 Capture Resource Capacity Shortfalls

  • 7/28/2019 Copy of 13.0 Business Process

    328/773

    1.2.3.2.1.1 Capture Resource Demand & Performance Requirements

    1.2.3.2.2.3 Capture Resource Operational Support Shorfalls

    1.2.3.2.2.2 Capture Resource Performance Shortfalls

    1.2.2.2.2 Capture Service Capability Shortfalls

    1.2.2.2.2.1 Capture Service Capacity Shortfalls

    1.2.2.2.1.1 Capture Service Demand & Performance Requirements

    1.2.2.2.2.3 Capture Service Operational Support Shorfalls

    1.2.2.2.2.2 Capture Service Performance Shortfalls

  • 7/28/2019 Copy of 13.0 Business Process

    329/773

    1.2.4.2.1.1 Capture Sourcing Requirements

    1.2.1.4.3.1 Co-ordinate Marketing Capability Delivery

    1.2.1.4.4.1 Co-ordinate Marketing Operational Handover

    1.2.1.3.4.1 Co-ordinate Product Capability Delivery

    1.2.1.3.5.1 Co-ordinate Product Operational Handover

    1.2.3.2.6.1 Co-ordinate Resource Capability Delivery

    1.2.3.2.7.1 Co-ordinate Resource Operational Handover

  • 7/28/2019 Copy of 13.0 Business Process

    330/773

    1.2.2.2.6.1 Co-ordinate Service Capability Delivery

    1.2.2.2.7.1 Co-ordinate Service Operational Handover

    1.2.4.2.6.2 Commit & Approve Cmmercial Arrangements

    1.2.1.4.5.1 Define Marketing Capability Delivery Methodology

    1.2.1.4.1 Define Marketing Capability Requirements

    1.2.1.3.6.1 Define Product Capability Delivery Methodology

  • 7/28/2019 Copy of 13.0 Business Process

    331/773

    1.2.1.3.1 Define Product Capability Requirements

    1.2.3.2.4.1 Define Resource Capability Requirements

    1.2.2.2.4.1 Define Service Capability Requirements

    1.2.1.4.3 Deliver Marketing Infrastructure

  • 7/28/2019 Copy of 13.0 Business Process

    332/773

    1.2.1.3.4 Deliver Product Capability

    1.2.3.2.4 Design Resource Capabilities

    1.2.3.2.5.1 Design Resource Operational Support Process Improvements

  • 7/28/2019 Copy of 13.0 Business Process

    333/773

    1.2.2.2.4 Design Service Capabilities

    1.2.2.2.5.1 Design Service Operational Support Process Improvements

    1.2.4.2.2 Determine Potential Suppliers/Partners

  • 7/28/2019 Copy of 13.0 Business Process

    334/773

    1.2.4.2.1 Determine the Sourcing Requirements

    1.2.1.4.2.1 Develop Marketing Capability Business Case

    1.2.1.3.3.1 Develop Product Business Case

  • 7/28/2019 Copy of 13.0 Business Process

    335/773

    1.2.3.2.3.1 Develop Resource Capability Investment Proposals

    1.2.2.2.3.1 Develop Service Capability Investment Proposals

    1.2.2.2.6.4 Develop Service Capability Tmetables

    1.2.3.2.5 Enable Resource Support & Operations

  • 7/28/2019 Copy of 13.0 Business Process

    336/773

    1.2.2.2.5 Enable Service Support & Operations

    1.2.1.4.3.3 Ensure Marketing Capability Benefits

    1.2.1.4.4.3 Ensure Marketing Handover Support

    1.2.1.3.4.3 Ensure Product Capability Benefits & Operational Costs

    1.2.1.3.5.3 Ensure Product Handover Support

    1.2.3.2.6.2 Ensure Resource Capability Quality

    1.2.3.2.7.3 Ensure Resource Handover Support

    1.2.2.2.6.6 Ensure Service Capability Costs

    1.2.2.2.6.2 Ensure Service Capability Quality

    1.2.2.2.7.3 Ensure Service Handover Support

    1.2.4.2.5.1 Establish Negotiating Strategy

    1.2.3.2.6.4 Establish Resource Capability Sourcing

  • 7/28/2019 Copy of 13.0 Business Process

    337/773

    1.2.2.2.6.3 Establish Service Capability Sourcing

    1.2.4.2.1.2 Finalize Sourcing Requirements

    1.2.4.2.6 Gain Approval for Commercial Arrangements

    1.2.1.4.2 Gain Marketing Capability Approval

    1.2.1.4.2.2 Gain Marketing Capability Business Case Approval

    1.2.1.3.3.2 Gain Product Business Case Approval

  • 7/28/2019 Copy of 13.0 Business Process

    338/773

    1.2.3.2.3 Gain Resource Capability Investment Approval

  • 7/28/2019 Copy of 13.0 Business Process

    339/773

    1.2.2


Recommended