JOINT MEASUREMENT SHEET (JMS) We request your attendance to Joint Measurement to the following works:- Subject: Site Clearing Scope/Location/Structure: STA 91+700 ~ STA 97+700 Date: 02 March 2012 to Description / Remarks / Sketch Summary Measurement of Site Clearing 2.01.(01) Clearing and grubbing classified dense field free area and rubber plantation 14,933.157 Sq.m 12,639.822 Sq.m 44,685.564 Sq.m Subtotal = 1.250 m = 72,258.543 Sq.m 2.01.(02) Clearing and grubbing classified scattered free area and village area 2.01.(03) Clearing and grubbing classified rice field swampy area, cultivated area and grass field 4,952.095 Sq.m 34,885.834 Sq.m 18,654.622 Sq.m 15,463.449 Sq.m 4,762.884 Sq.m 42,262.822 Sq.m 52,918.471 Sq.m 103,391.590 Sq.m 35,318.853 Sq.m Subtotal = 3.500 m = 312,610.620 Sq.m With Attachment Without Attachment Jointly Measured By Veri Prepared By: Checked By: KGNRC CONSULTANT Signature : Signature : Signature Name : Name : Name : Designation : Designation CIKAMPEK – PALIMANAN TOLL ROAD PROJECT REF: CIPAL Pay Item No : · STA 92+500 ~ 92+850 = 350 m = · STA 93+000 ~ 93+200 = 200 m = · STA 93+200 ~ 93+900 = 700 m = · STA 91+700 – 91+800 = 100 m = · STA 91+800 – 92+250 = 450 m = · STA 92+300 – 92+500 = 200 m = · STA 93+900 ~ 94+250 = 350 m = · STA 95+300 ~ 95+400 = 100 m = · STA 95+400 ~ 96+000 = 600 m = · STA 96+000 ~ 96+700 = 700 m = · STA 96+700 ~ 97+400 = 700 m = · STA 97+400 ~ 97+700 = 300 m = Please tick (√) where necessary; Designation KG -NRC CONSO RTIUM KG -NRC CONSO RTIUM
Transcript
Page 1: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

JOINT MEASUREMENT SHEET (JMS)

We request your attendance to Joint Measurement to the following works:-

Subject: Site Clearing

Scope/Location/Structure: STA 91+700 ~ STA 97+700 Date: 02 March 2012 to 10 March 2012

Description / Remarks / Sketch

Summary Measurement of Site Clearing

2.01.(01) Clearing and grubbing classified dense field free area and rubber plantation

14,933.157 Sq.m

12,639.822 Sq.m

44,685.564 Sq.m

Subtotal = 1.250 m = 72,258.543 Sq.m

2.01.(02) Clearing and grubbing classified scattered free area and village area

2.01.(03) Clearing and grubbing classified rice field swampy area, cultivated area and grass field

4,952.095 Sq.m

34,885.834 Sq.m

18,654.622 Sq.m

15,463.449 Sq.m

4,762.884 Sq.m

42,262.822 Sq.m

52,918.471 Sq.m

103,391.590 Sq.m

35,318.853 Sq.m

Subtotal = 3.500 m = 312,610.620 Sq.m

With Attachment Without Attachment

Jointly Measured By Verified By:

Prepared By: Checked By:PMC

KGNRC CONSULTANT

Signature : Signature : Signature

Name : Name : Name

Designation : Designation : Designation

CIKAMPEK – PALIMANAN TOLL ROAD PROJECT

REF: CIPAL/JMS/01_____________

Pay Item No :

·         STA 92+500 ~ 92+850 = 350 m =

·         STA 93+000 ~ 93+200 = 200 m =

·         STA 93+200 ~ 93+900 = 700 m =

·         STA 91+700 – 91+800 = 100 m =

·         STA 91+800 – 92+250 = 450 m =

·         STA 92+300 – 92+500 = 200 m =

·         STA 93+900 ~ 94+250 = 350 m =

·         STA 95+300 ~ 95+400 = 100 m =

·         STA 95+400 ~ 96+000 = 600 m =

·         STA 96+000 ~ 96+700 = 700 m =

·         STA 96+700 ~ 97+400 = 700 m =

·         STA 97+400 ~ 97+700 = 300 m =

Please tick (√) where necessary;

√  

KG - NRC CONSORTIUMKG - NRC CONSORTIUM

Page 2: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

Date : Date : Date

* The JMS’s running no. shall be controlled, recorded and maintain by KGNRC.

CIPAL/FORM/JMS/NOV 2011/REV.0

Page 3: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

JOINT MEASUREMENT SHEET (JMS)

We request your attendance to Joint Measurement to the following works:-

Subject: Site Clearing

Date: 02 March 2012 to 10 March 2012

Description / Remarks / Sketch

Summary Measurement of Site Clearing

2.01.(01) Clearing and grubbing classified dense field free area and rubber plantation

2.01.(02) Clearing and grubbing classified scattered free area and village area

2.01.(03) Clearing and grubbing classified rice field swampy area, cultivated area and grass field

With Attachment Without Attachment

Verified By:

PMC

Signature :

Name :

Designation :

REF: CIPAL/JMS/01_____________

Page 4: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

Date :

Page 5: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

JOINT MEASUREMENT SHEET (JMS)

We request your attendance to Joint Measurement to the following works:-

Subject: Site Clearing

Scope/Location/Structure: STA 91+700 ~ STA 97+700 Date: 02 March 2012 to 10 March 2012

Description / Remarks / Sketch

Summary Measurement of Site Clearing

2.01.(01) Clearing and grubbing classified dense field free area and rubber plantation

14,933.157 Sq.m

12,639.822 Sq.m

44,685.564 Sq.m

Subtotal = 1.250 m = 72,258.543 Sq.m

2.01.(02) Clearing and grubbing classified scattered free area and village area

2.01.(03) Clearing and grubbing classified rice field swampy area, cultivated area and grass field

4,952.095 Sq.m

34,885.834 Sq.m

18,654.622 Sq.m

15,463.449 Sq.m

4,762.884 Sq.m

42,262.822 Sq.m

52,918.471 Sq.m

103,391.590 Sq.m

35,318.853 Sq.m

Subtotal = 3.500 m = 312,610.620 Sq.m

With Attachment Without Attachment

Jointly Measured By Verified By:

Prepared By: Checked By:KG (PM)

SUBCON KG (SITE SUPERVISOR/ENGINEER)

Signature : Signature : Signature

Name : Name : Name

Designation : Designation : Designation

CIKAMPEK – PALIMANAN TOLL ROAD PROJECT

REF: CIPAL/JMS/01_____________

Pay Item No :

·         STA 92+500 ~ 92+850 = 350 m =

·         STA 93+000 ~ 93+200 = 200 m =

·         STA 93+200 ~ 93+900 = 700 m =

·         STA 91+700 – 91+800 = 100 m =

·         STA 91+800 – 92+250 = 450 m =

·         STA 92+300 – 92+500 = 200 m =

·         STA 93+900 ~ 94+250 = 350 m =

·         STA 95+300 ~ 95+400 = 100 m =

·         STA 95+400 ~ 96+000 = 600 m =

·         STA 96+000 ~ 96+700 = 700 m =

·         STA 96+700 ~ 97+400 = 700 m =

·         STA 97+400 ~ 97+700 = 300 m =

Please tick (√) where necessary;

√  

Page 6: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

Date : Date : Date

* The JMS’s running no. shall be controlled, recorded and maintain by KGNRC.

CIPAL/FORM/JMS/NOV 2011/REV.0

Page 7: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

JOINT MEASUREMENT SHEET (JMS)

We request your attendance to Joint Measurement to the following works:-

Subject: Site Clearing

Date: 02 March 2012 to 10 March 2012

Description / Remarks / Sketch

Summary Measurement of Site Clearing

2.01.(01) Clearing and grubbing classified dense field free area and rubber plantation

2.01.(02) Clearing and grubbing classified scattered free area and village area

2.01.(03) Clearing and grubbing classified rice field swampy area, cultivated area and grass field

With Attachment Without Attachment

Verified By:

KG (PM)

Signature :

Name :

Designation :

REF: CIPAL/JMS/01_____________

Page 8: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

Date :

Page 9: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

JOINT MEASUREMENT SHEET (JMS)

We request your attendance to Joint Measurement to the following works:-Subject: Site ClearingScope/Location/Structure: STA 91+700 ~ STA 97+975 Date: 02 March 2012 to 10 March 2012Description / Remarks / Sketch

Summary Measurement of Site Clearing

2.01.(01) Clearing and grubbing classified dense field free area and rubber plantation

14,395.628 Sq.m 14,933.157

13,373.088 Sq.m 12,639.822

50,736.334 Sq.m 44,685.564

Subtotal = 1.250 m = 78,505.050 Sq.m 72,258.543

2.01.(02) Clearing and grubbing classified scattered free area and village area

2.01.(03) Clearing and grubbing classified rice field swampy area, cultivated area and grass field

5,190.502 Sq.m 4,952.095

39,048.549 Sq.m 34,885.834

17,569.597 Sq.m 18,654.622

16,340.403 Sq.m 15,463.449

4,722.993 Sq.m 4,762.884

43,315.653 Sq.m 42,262.822

54,198.032 Sq.m 52,918.471

103,675.447 Sq.m 103,391.590

50,410.315 Sq.m 35,318.853

Subtotal = 3.500 m = 334,471.491 Sq.m 312,610.620

Please tick (ü) where necessary;

With Attachment Without Attachment

Jointly Measured By Verified By:

Prepared By: Checked By:KG (PM)

SUBCON KG (SITE SUPERVISOR/ENGINEER)Signature : Signature : Signature Name : Name : Name Designation : Designation : Designation Date : Date : Date

* The JMS’s running no. shall be controlled, recorded and maintain by KGNRC.

CIKAMPEK – PALIMANAN TOLL ROAD PROJECT

REF: CIPAL/JMS/01_____________

Pay Item No :

·         STA 92+500 ~ 92+850 = 350 m =

·         STA 93+000 ~ 93+200 = 200 m =

·         STA 93+200 ~ 93+900 = 700 m =

·         STA 91+700 – 91+800 = 100 m =

·         STA 91+800 – 92+250 = 450 m =

·         STA 92+300 – 92+500 = 200 m =

·         STA 93+900 ~ 94+250 = 350 m =

·         STA 95+300 ~ 95+400 = 100 m =

·         STA 95+400 ~ 96+000 = 600 m =

·         STA 96+000 ~ 96+700 = 700 m =

·         STA 96+700 ~ 97+400 = 700 m =

·         STA 97+400 ~ 97+700 = 300 m =

√  

Page 10: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

CIPAL/FORM/JMS/NOV 2011/REV.0

Page 11: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

JOINT MEASUREMENT SHEET (JMS)

We request your attendance to Joint Measurement to the following works:-Subject: Site Clearing

Date: 02 March 2012 to 10 March 2012Description / Remarks / Sketch

Summary Measurement of Site Clearing

2.01.(01) Clearing and grubbing classified dense field free area and rubber plantation

2.01.(02) Clearing and grubbing classified scattered free area and village area

2.01.(03) Clearing and grubbing classified rice field swampy area, cultivated area and grass field

Please tick (ü) where necessary;

With Attachment Without Attachment

Verified By:

KG (PM)

::::

REF: CIPAL/JMS/01_____________

Page 12: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

JOINT MEASUREMENT SHEET (JMS)

We request your attendance to Joint Measurement to the following works:-Subject: Site Clearing

Scope/Location/Structure: STA 91+700 ~ STA 97+975 Date: 02 March 2012 to 10 March 2012Description / Remarks / Sketch

Summary Measurement of Site Clearing

2.01.(01) Clearing and grubbing classified dense field free area and rubber plantation

14,395.628 Sq.m

6,529.877 Sq.m

13,373.088 Sq.m

50,736.334 Sq.m

Subtotal = 1.100 m = 85,034.927 Sq.m

2.01.(02) Clearing and grubbing classified scattered free area and village area

2.01.(03) Clearing and grubbing classified rice field swampy area, cultivated area and grass field

5,190.502 Sq.m

39,048.549 Sq.m

17,569.597 Sq.m

16,340.403 Sq.m

4,722.993 Sq.m

43,315.653 Sq.m

54,198.032 Sq.m

103,675.447 Sq.m

50,410.315 Sq.m

Subtotal = 3.810 m = 334,471.491 Sq.m

Please tick (ü) where necessary;

With Attachment Without Attachment

Jointly Measured By Verified By:

Prepared By: Checked By:KG (PM)

SUBCON KG (SITE SUPERVISOR/ENGINEER)Signature : Signature : Signature Name : Name : Name Designation : Designation : Designation Date : Date : Date

CIKAMPEK – PALIMANAN TOLL ROAD PROJECT

REF: CIPAL/JMS/01_____________

Pay Item No :

·         STA 92+500 ~ 92+700 = 200 m =

·         STA 92+700 ~ 92+850 = 150 m =

·         STA 93+000 ~ 93+200 = 200 m =

·         STA 93+200 ~ 93+900 = 700 m =

·         STA 91+700 – 91+800 = 100 m =

·         STA 91+800 – 92+250 = 450 m =

·         STA 92+300 – 92+500 = 200 m =

·         STA 93+900 ~ 94+285 = 385 m =

·         STA 95+300 ~ 95+400 = 100 m =

·         STA 95+400 ~ 96+000 = 600 m =

·         STA 96+000 ~ 96+700 = 700 m =

·         STA 96+700 ~ 97+400 = 700 m =

·         STA 97+400 ~ 97+975 = 575 m =

√  

Page 13: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

* The JMS’s running no. shall be controlled, recorded and maintain by KGNRC.

CIPAL/FORM/JMS/NOV 2011/REV.0

Page 14: Copy of Final Rekapitulasi Perhitungan Site ClearingREv1

JOINT MEASUREMENT SHEET (JMS)

We request your attendance to Joint Measurement to the following works:-Subject: Site Clearing

Date: 02 March 2012 to 10 March 2012Description / Remarks / Sketch

Summary Measurement of Site Clearing

2.01.(01) Clearing and grubbing classified dense field free area and rubber plantation

2.01.(02) Clearing and grubbing classified scattered free area and village area

2.01.(03) Clearing and grubbing classified rice field swampy area, cultivated area and grass field

Please tick (ü) where necessary;

With Attachment Without Attachment

Verified By:

KG (PM)

::::

REF: CIPAL/JMS/01_____________


Recommended