+ All Categories
Home > Documents > Copy of Line List Preferred

Copy of Line List Preferred

Date post: 03-Dec-2015
Category:
Upload: sumeet-pade
View: 222 times
Download: 1 times
Share this document with a friend
Description:
Line List format
36
Line List Instruction # 1 Instruction # 2 Instruction # 3 Instruction # 4 Add additional line number rows by copy and paste at the bottom of the Instruction # 5 Instruction #6 User Advisory - Each individual sheet of this Excel Workbook "Tool" is password protected. The user may only enter date in the "yellow" cell form. Before starting, study the Form with the sample data. Consider the he data columns and the number of lines for the largest Unit. If you need to add columns or additional data boxes in the header area unlock the form. The password is jop Make whatever changes to the header block data fields and columns. Cha require is Deg. C vs. Deg F or Bar vs. psig. If you made modifications to the blank form it is recommended t changes be made to the "Sample" sheet also. After you have completed the modifications required to fit your projec password and protect the new "Project" or "Company" version.form.
Transcript
Page 1: Copy of Line List Preferred

Line List

Instruction # 1

Instruction # 2

Instruction # 3

Instruction # 4

Add additional line number rows by copy and paste at the bottom of the current form.

Instruction # 5

Instruction #6

User Advisory - Each individual sheet of this Excel Workbook "Tool" is locked and password protected. The user may only enter date in the "yellow" cells of the blank form.

Before starting, study the Form with the sample data. Consider the header data, the line data columns and the number of lines for the largest Unit.

If you need to add columns or additional data boxes in the header area then you must unlock the form. The password is jop

Make whatever changes to the header block data fields and columns. Changes you may require is Deg. C vs. Deg F or Bar vs. psig.

If you made modifications to the blank form it is recommended that the same changes be made to the "Sample" sheet also.

After you have completed the modifications required to fit your project, select a new password and protect the new "Project" or "Company" version.form.

Page 2: Copy of Line List Preferred

Line List

Add additional line number rows by copy and paste at the bottom of the current form.

- Each individual sheet of this Excel Workbook "Tool" is locked and password protected. The

Before starting, study the Form with the sample data. Consider the header data, the line data columns and the

If you need to add columns or additional data boxes in the header area then you must unlock the form. The

Make whatever changes to the header block data fields and columns. Changes you may require is Deg. C vs.

If you made modifications to the blank form it is recommended that the same changes be made to

After you have completed the modifications required to fit your project, select a new password and protect the

Page 3: Copy of Line List Preferred

Page 3 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.

101 1 A1A 18" IP - Process Vapours G Column 1501 HE1501 Yes

101 2 A1A 4" IP - Process Liquid L HE 1501 D 1501

101 3 A1A 3" IP - Process Liquid L D 1501 P1501 A/B

101 4 A1A 2" IP - Process Liquid L P 1501 A/B

101 5 A1A 1.5" IP - Process Liquid L 15-101-04-P-50-A1A COLUMN 1501

101 6 A1A 2" IP - Process Liquid L 15-101-04-P-50-A1A HE1502

Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

15-101-05-P-40-A1A 15-101-06-50-P-A1A

Page 4: Copy of Line List Preferred

Page 4 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 5: Copy of Line List Preferred

Page 5 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 6: Copy of Line List Preferred

Page 6 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 7: Copy of Line List Preferred

Page 7 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 8: Copy of Line List Preferred

Page 8 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 9: Copy of Line List Preferred

Page 9 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 10: Copy of Line List Preferred

Page 10 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 11: Copy of Line List Preferred

Page 11 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 12: Copy of Line List Preferred

Page 12 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 13: Copy of Line List Preferred

Page 13 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 14: Copy of Line List Preferred

Page 14 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 15: Copy of Line List Preferred

Page 15 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 16: Copy of Line List Preferred

Page 16 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 17: Copy of Line List Preferred

Page 17 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 18: Copy of Line List Preferred

Page 18 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 19: Copy of Line List Preferred

Page 19 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 20: Copy of Line List Preferred

Page 20 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 21: Copy of Line List Preferred

Page 21 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 22: Copy of Line List Preferred

Page 22 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 23: Copy of Line List Preferred

Page 23 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 24: Copy of Line List Preferred

Page 24 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 25: Copy of Line List Preferred

Page 25 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 26: Copy of Line List Preferred

Page 26 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 27: Copy of Line List Preferred

Page 27 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 28: Copy of Line List Preferred

Page 28 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 29: Copy of Line List Preferred

Page 29 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 30: Copy of Line List Preferred

Page 30 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 31: Copy of Line List Preferred

Page 31 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 32: Copy of Line List Preferred

Page 32 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 33: Copy of Line List Preferred

Page 33 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 34: Copy of Line List Preferred

Page 34 of 36

Project Name: Distillation of IPA

PIPING LINE LISTPME: Date:

Proj. Number: CKR: Date:

Unit Number: 15 Revision: By:

RE

V.

P&

ID Line Class

Line

Siz

e

Service or Commodity Line origin Line Destination PWHT Req'd.Line Number

Insu

latio

n T

ype Tracing

TypePhase

Gas/Liq

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

Page 35: Copy of Line List Preferred

Project Name: Jamnagar Cumine Upgrade

PIPING LINE LISTProj. Number: 2007-123455

Unit Number: 20 (And prefix for all line Numbers)

RE

V.

P&

ID Line Number Line Class

Line

Siz

e

20-21 2001 AGL1 3" Ih Unit Feed L

20-21 2002 AGL1 3" Ih Reactor #1 F L

20-21 2003 AGL1 3" Ih Reactor #2 F L

20-21 2004 AGL1 3" Ih Reactor #3 F L

3 20-21 2005 AGL1 2"& 1" Nitrogen Gas

20-21 2006 AGL1 6" Ih Product Liq

20-21 2007 AGL1 16" Process Vent Gas

SAMPLE

Insu

latio

n T

ype Tracing

TypeService or

CommodityPhase

Gas/Liq

Page 36: Copy of Line List Preferred

PIPING LINE LIST

PME: JOP Date: 17/10/07

CKR: ARL Date: 17/10/07

Revision: 3 By: JOP

Line origin

100 300

Reactor #1 100 300

Reactor #2 100 300

Reactor #3 100 300

100 300

Reactor #1 100 300

90 350 Yes

SAMPLE

Line Destination

Design Press (PSIG)

Design Temp

(oF)

Stress Anal.

Req'd.

PWHT Req'd.

Battery Limits

Reactor Feed

Line 20-2001AGL1

Line 20-2001AGL1

Line 20-2001AGL1

Line 20-2110AGL1

Reactor #1,2 & 3

Line 20-2007AGL1

Line 20-2006AGL1

Unit Relief Header - Line 20-2120AGL2