© Copyright 2013, First Solar, Inc.
Transcript
Page 1: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

© Copyright 2013, First Solar, Inc.

Page 2: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

© Copyright 2013, First Solar, Inc.

Context

Soiling

Cleaning

First Solar Advantage

Context

Page 3: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

3

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

First Solar at a Glance

Driving innovation across entire value chain and plant solution

Cost competitive with conventional energy sources today

Partner of choice for leading utilities and global power buyers

Over 8GW installed worldwide and over 3GW contracted pipeline

Founded in 1999 and publicly traded on Nasdaq (FSLR)

Strongest financial stability & bankability in the industry

Page 4: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

5

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

TOPAZ SOLAR FARM

Largest investment grade renewable bond in history

Page 5: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

6

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

AGUA CALIENTE

Reliable bulk power generation utilizing advanced plant controls and forecasting

Page 6: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

7

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

COPPER MOUNTAIN 1

Co-located with existing gas combined cycle power plant

Page 7: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

8

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

GREENOUGH RIVER

Displacing the energy requirements of a desalination plant

Page 8: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

9

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

PHALODI

Providing energy security to India and displacing 1 million tons of coal

Page 9: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

10

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

DEWA SOLAR PLANT

1st phase of landmark 1GW Solar Park in the UAE

Page 10: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

11

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Power Conversion System (PCS)

Power Plant Area Potential Issue and Action

Inverter 1. Inverter installation should comply with Manufacturer high temperature application notes

2. Inverters may require canopy if above 45°C per published manufacturer requirements 3. There is significant potential for air recirculation from the hot air discharge port of one

inverter to the ambient intake port of the other and is also in proximity of the transformer radiator bank.

4. Inverter unit Heat exchanger design basis should be verified during design

Transformer Unit’s rating for degree rise should be factored in during design qualifications and verifications

Building and thermal management 1. The cooling design may not provide adequate cooling due to short circuiting of air flow to the exhaust fan.

2. Air intake for cooling should face proper direction to reduce fouling rate due to prevailing wind direction

3. Proper maintenance needs to be performed to verify if PCS filters are clean and not clogged to ensure proper airflow

4. Proper dust control should be ensure in sandy conditions

Page 11: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

12

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Other Execution/ BOS items

Power Plant Area Potential Issue and Action

Mounting Structure 1. Corrosivity study should be completed prior to specifying coatings, hardware and other components

2. For large power plants the wind loads may vary between the outer rows and inner rows (also depends on fencing type); This needs to be considered during design of foundation, overhangs, and module height

3. Due to potential thermal gradients it is imperative that expansion provisions are provided on long structures such as beams, cable trays etc. that consider grounding/bonding impacts.

4. Wire management should be designed-in to ensure connectors do not get exposed to too much dust; Use of wire-ties capable of withstanding site extreme temperatures

Site Development Ensure sufficient sampling of geotechnical studies are done prior to design to ensure we capture all prevalent underground conditions and avoid unforeseen delays.

Site Construction 1. Proper & periodic dust control at site and inventory locations to ensure safe working environment

2. Warehouse and storage procedures should consider temperature onsite

Page 12: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

© Copyright 2013, First Solar, Inc.

Context

Soiling

Cleaning

First Solar Advantage

Soiling

Page 13: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

14

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Energy Conversion Losses from Light to Delivered Energy

LOSS FACTORS DESCRIPTION OF LOSS FACTORS Transposition on POA Irradiance gain due to module tilt Far Shadings / Horizon Irradiance loss due to horizon shading Near Shading on Global Irradiance loss due to row-on-row shading IAM Factor on Global Irradiance loss due to glass reflection & absorption Soiling Average annual energy loss due to soiled modules Spectral Shift Correction for AM1.5 spectral Non-STC Operation Energy loss due to operation other than at STC DC Health Energy loss due to DC array variability Module Mismatch Energy loss due to module manufacturing variability DC Wiring Loss Energy loss due DC wiring resistance Tracker wind stow losses Loss due to wind-stow of the tracker Inverter Efficiency Energy loss due to inverter efficiency Inverter Limitation Energy loss due to off-MPP tracking (clipping, etc.) Inverter Cooling Energy consumed by inverter cooling & heating Tracker Motor losses Energy consumed by the tracker motors and controllers Data Acquisition & Aux Daytime energy consumed by DAS and auxiliary loads MV Transformers Daytime energy lost in medium-voltage transformers AC Collection Lines Energy lost due to AC wiring resistance within the plant HV Transformer Daytime energy lost in high-voltage transformer Transmission Line #1 Energy lost in first transmission line to grid interconnect AC Interconnection Capacity Limitation Energy lost to control the output at the LGIA limit Utility Line Loss Credit Credit for energy lost in transmission line(s)

Light — Array Interactions

DC Losses

Inverter

AC Losses

Utility Interactions

Page 14: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

15

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Proven Real World Performance Advantage vs. c-Si

All modules rated and labeled at STC

Additional First Solar energy for same nameplate power

Page 15: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

16

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

First Solar Energy Yield Advantage

Temperature (°C) Instantaneous Power (kW) Accumulated Energy (kWh)

Page 16: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

17

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Performance vs. c-Si in Hot Climates

Source: First Solar field array, US Desert Southwest, 2010 full year summary

• First Solar Has Energy Yield Advantage vs. c-Si Majority of Time

Firs

t So

lar

Co

nfi

den

tial

& P

rop

riet

ary

| ©

Co

pyr

igh

t 2

01

2

Page 17: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

18

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

11%

12%

13%

14%

15%

16%

17%

18%

Poly-Si (STC)

FS New (STC)

11%

12%

13%

14%

15%

16%

17%

18%

Poly-Si (STC)

FS New (STC)

Poly-Si (60C)

FS New (60C)

Efficiency Roadmap Normalized for Temperature

2013 2014 2015 2016

Page 18: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

19

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Observed Spectral Performance Trends

Diminished performance observed and predicted in dry winter months. Improved performance in wet summer months.

San Antonio, Texas, USA

PPI is temperature corrected DC power regressed to 1000 W/m2

Ontario, Canada

Blythe, California, USA

Improved performance during a 3-day thunderstorm system in the desert.

Improved performance observed in summer months with higher Pwat

Page 19: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

20

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Monthly Soiling Level and Rainfall for Period of Record

• Average soiling level: 2.6%

• Monthly soiling level does not exceed 8.7%

0

0.5

1

1.5

2

2.5

3

3.5

4

0

1

2

3

4

5

6

7

8

9

10

No

v-10

Dec

-10

Jan

-11

Feb

-11

Mar

-11

Ap

r-1

1

May

-11

Jun

-11

Jul-

11

Au

g-1

1

Sep

-11

Oct

-11

No

v-11

Dec

-11

Jan

-12

Feb

-12

Mar

-12

Ap

r-1

2

May

-12

Jun

-12

Jul-

12

Au

g-1

2

Sep

-12

Oct

-12

No

v-12

Dec

-12

Jan

-13

Feb

-13

Rai

nfa

ll (m

m)

Soil

leve

l (%

)

Rainfall

Soil level

Published in the

January 2013

Journal of Photovoltaics (Vol 3. No. 1)

Data from utility scale installation in the United States

Page 20: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

21

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Dust — Unique Concerns for a Unique Market

Primary Concerns:

• Accumulation of Soiling (energy loss)

• Surface Abrasion (‘sandblasting’)

• Ingress into sensitive electronic enclosures

• Shifting Sands

*Soiling is the 3rd most important PV performance factor, behind only insolation and temperature

Page 21: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

22

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Soiling Factors

Mani and Pallai, Renewable and Sustainable Energy Reviews 14 (2010) 3124-3131

Factors Influencing Dust Settlement

Site Characteristics

(vegetation, traffic, air pollution)

Ambient Temperature and Humidity

PV System Tilt-angle and Orientation

(includes exposure to sun and wind)

Glazing Characteristics

(texture and coating

Wind Velocity

Dust Properties

(type, shape, size, weight)

Page 22: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

23

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Field Images of Soiling Accumulation — DEWA Site

Day 5 6 7 8 9 10

Loss 2% 2.3% 2.7% 3% 3.3% 3.5%

Clean Module

Page 23: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

24

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Kingdom of Saudi Arabia Demo Facility

Outdoor Test Facility at the King Abdullah University of Science and Technology (KAUST) in Thuwal, KSA as part of KAUST’s New Energy Oasis program (NEO).

Site Specifications

Commissioning Date July 2012

Location Thuwal, KSA

System Size 3.2 kWp

Avg. Annual Insolation1 2206 kWh/m2

Avg./Max. Module Temp2 49.6/70.8 °C

Annual Spectral Adjustment +2.6%

System Design

Module Tilt 20°

Azimuth 0°

Manufacturer SMA

Model SB 3000HF-30

Inverter Efficiency 95.46%

Module Type FS-380

Manufacturing Year 2012

1 Values determined using MeteoNorm 7. 2 Energy weighted average module temperature.

Page 24: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

25

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

May Jun Jul0.7

0.75

0.8

0.85

0.9

0.95

1

1.05Energy Loss caused by Soil on PV modules

Norm

aliz

ed P

erf

orm

ance

PV System Performance

Soiling Impact on Energy

Direct measurements of soiling losses on PV systems

Soil accumulates when panels are not cleaned at a rate of ~13% power loss per month

System cleaned

Regular cleaning implemented

• First Solar’s ability to directly measure the impact of soil accumulation on PV modules can be used to evaluate the influence of soiling on PV system energy generation.

• This can be used in evaluating existing PV systems as well as predict soiling impacts on future PV plant energy generation.

Soiling impact measurement system

Caron, R., Littmann, B., Direct Monitoring of Energy Lost Due to Soiling on First Solar Modules in California, IEEE Journal Photovoltaics, Volume 3, Issue 1, January 2013

Page 25: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

26

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Performance in the Kingdom of Saudi Arabia

Performance is within 1.0% of expectation

0

100

200

300

400

500

600

4/1/2013 5/1/2013 6/1/2013 7/1/2013 8/1/2013

Ene

rgy

AC Energy Generation

Measured

Expected

* Expected Energy estimate is generated by running the energy prediction model following First Solar’s guidance using on-site measured meteorological data as the model input.

Page 26: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

27

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

-10.0%

-8.0%

-6.0%

-4.0%

-2.0%

0.0%

2.0%

4.0%

6.0%

8.0%

10.0%

0

500

1000

1500

2000

2500

3000

4/1/2013 5/1/2013 6/1/2013 7/1/2013 8/1/2013

Cu

mu

lati

ve E

ne

rgy

(kW

h)

Measured vs. Expected Cumulative Energy Generation

Measured Energy

Expected Energy

Difference (%)

Cumulative Energy Generation in the Kingdom of Saudi Arabia

Expected Performance Band

Page 27: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

© Copyright 2013, First Solar, Inc.

Context

Soiling

Cleaning

First Solar Advantage

Cleaning

Page 28: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

29

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Cleaning Solutions Portfolio

Low Cost High Availability

High Cost Low Availability

High Cost Low Availability

Low Cost High Availability

Robot Fleet

KAUST NOMADD

WATER WATER

LAB

OR

LA

BO

R Manual Dry

Brush Trolley

First Solar

Robot Fleet

Minimal Water

Manual

Wet Clean

Other Considerations:

• Night Cleaning Only

• Equipment Cost

• Plant Site Size

• Fixed Tilt & Tracker Structures

Page 29: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

30

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Wet vs. Dry Cleaning

• Starting from heavy soiling, initial wet cleaning is required

• Regular dry cleaning can be used moving forward

Dry Cleaning Wet Cleaning

Page 30: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

31

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Commissioning — Initial Wet Cleaning

• Heavy soiling due to construction traffic

• >2 months accumulation

Page 31: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

32

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Heavily Soiled vs. Wet Clean — 500kVA Inverter Power Output Curves

• Data taken halfway through first cleaning of plant

• Illustrates maximum soiling loss after 2 months without cleaning

Clean Arrays

Heavily soiled

~35% loss

Page 32: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

33

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Operational Cleaning — Trolley vs. Broom

Dubai is low-cost labor market with low water availability; two manual dry methods are appropriate:

Brush Trolley

• Double brush with suspension

• Requires two workers/unit

Dust Broom

• Velocity: 4 Workers = 1MW/night

Page 33: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

34

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Operational Cleaning — Trolley vs. Broom

Trolley

• 2:20/240′ Row

• +3.9% PPI

Broom

• .25MW/man/day

Site Demo I (Agua Caliente, 6/13)

Page 34: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

35

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Robotic Cleaning — Under Development

• 5:00/240′ Row

• Early Indications show PPI Improvements up to 9%

Site Demo I (Agua Caliente, 6/13)

Page 35: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

36

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Case Study — Masdar City, UAE

Source: http://www.thenational.ae/news/uae-news/environment/dust-clouds-sap-uaes-solar-panels-power

System Size: 5MW

Installed: Jan 2009

Commisioned: May 2009

Developer: Enviromena Power Systems

Module Type: FS-272, 275

Inverter: SMA SC 500

"There have been several sand storms since the plant was commissioned earlier this year (2009) though this has been one of the longest…suspended dust in the air was between 1,500 and 2,000 parts per million - more than 10 times higher than normal”

- Khaled Awad, director of Masdar City (August, 2009)

A few field sample modules have been returned and initially observed for any surface abrasion impact – none detected

Page 36: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

37

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Masdar City — 50X Surface Magnification

• Field modules sent to lab

• 50X Dino-Lite surface inspection

• No pitting observed under significant magnification after 18+ months

• Multiple sandstorms occurred during field deployment

Laser scribes between 2 cells

Page 37: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

38

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

First Solar R&D — Optimized Tracker Algorithm

• Steep nighttime stow position reduces soiling accumulation 30%+

• Tracker position can be optimized for cleaning

Tracker #1: 45 degrees Tracker #2:

30 degrees

Tracker #2: 30 degrees Tracker #3:

22 degrees

Tracker #3: 22 degrees Tracker #4:

0 degrees

Page 38: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

© Copyright 2013, First Solar, Inc.

Context

Soiling

Cleaning

First Solar Advantage First Solar Advantage

Page 39: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

40

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

40

Series 3 Black

Page 40: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

41

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

First Solar Series 3 Black PV Module

Reliability and Safety

Tested by leading international institutes and certified for reliability and safety

––Frameless

––Certified to IEC 61646

––Certified to IEC 61730

––Certified to IEC 61701 Salt Mist Corrosion Test

––Certified to IEC 60068-2-68 Environmental Testing—Dust and Sand

––FSEC Certification

––MCS Certification

––Thresher Test Certified

––TUV Long Term Sequential Test Certification

––CE Marking

––Safety Class II @ 1000 V

––Eligible CSI PV Module

––UL 1703 and ULC 1703 Listed Class B Fire Rating (Class A Spread of Flame)

Page 41: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

42

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Samples — Potential Failure Mode vs. Test (PRM and Certification)

Firs

t So

lar

Co

nfi

den

tial

& P

rop

riet

ary

| ©

Co

pyr

igh

t 2

01

2

Page 42: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

43

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Carbon and Water — PV Advantage

The only water consumption

during PV operations is drinking

water for workers and

kitchen/bathroom services

Page 43: © Copyright 2013, First Solar, Inc.saudi-sia.com/wp-content/uploads/2013/05/9-Lessons-learnt-from-PV... · First Solar at a Glance ... Reliable bulk power generation utilizing advanced

44

© C

op

yrig

ht

20

13

, Fi

rst

Sola

r, I

nc.

Takeaway

• Soiling is highly variable but not to be ignored in the Middle East

• Cleaning Methods are tailored to site specifics

• Water usage should be minimized

• Module Product Testing and Reliability Matters

• Frameless module gives better cleaning surface

• With proper cleaning regime, annual average soiling loss of <4% is realistic