Core Strategy Dublin City Development Plan 2011- 2017
Awareness of location context across both Council boundaries
.
Dublin City Development Plan 2011 – 2017 designations
Development Plan designations mapped
How does the LAP relate to other resourcesin the North Central Area
4 key structuring principles : 8 principal elements of the spatial structure : 13 urban design proposals
North Fringe Action Area Plan 2000
Aerial View 2009
National Housing Development Survey 2010
Complete and occupied
Complete and vacant
Near complete-activity on site
Foundation level-no activity
No activity on site
Near completion-no Activity on site.
1907 (61%) 484 25 247 329 100
Granted Housing
2,496Apartments
460 terraced houses
136 duplex houses
Total: 3,092
11 Estates Surveyed : Clare Hall, Station Point, Blocks 12 & 16 Clongriffen, Burnell Green &Wood Northern Cross, Burnell Court , Marrsfield, Belmayne, Priory Hall, Belmayne Blocks P5&P7,Belmayne Block P20, Belmayne (Stanley Holdings).
National Housing Development Survey 2010
Infrastructure Provision:
Unfinished roads and lack of connections
Potential Issues for the LAP to address
1.Vacant sites: Explore temporary uses, improve visual character, open up pedestrian connections etc.
2.Blockages to connections: Deliver the main street/boulevard, the northern parkway and improve local movement east to west for residents (access to schools, the park, services etc).
3.Major infrastructural projects still need to be delivered: Malahide Road/ R017, Drumnigh Cross, connections to Baldoyle.
4.Extant permissions not yet commenced: Do we re-evaluate designs and land use proposals?
5.Building standards: Overview durability of external finishes used to date, success of design, road and footpath finishes , landscape design etc.
6.Compliance with past planning permissions ( provision of sports centre, library , completion of road connections etc)
7.Create pedestrian and cyclist through routes to improve integration
8.Progress river Mayne Linear Park- recreational route to the coast ?
Pre Draft Stage - February to July 2010
Presentation to Area Committee (21st Feb 2011)
On going analysis and research
Pre Draft Consultation & Workshops
Publish Issues Paper (6 week observation period). Week of 21st March target.
Community Consultation (early April target)
Managers Report on Issues Paper findings (present to Council in July)
On going SEA and AA work.
Draft LAP Stage July – November 2010
Build on Issues Paper research and submissions.
Prepare Draft LAP document
Updates to area committee and NF Forum.
Three Parts to LAP:1: Survey and Analysis 2: Proposals and Policy 3: Implementation and Monitoring
Publish Draft LAP (minimum 6 weeks- may be extended).
Community consultation on the Draft LAP document.
LAP Process and Next Steps
Final LAP Stage: Jan – April 2012 (Approximate).
Prepare managers report on public observations received (6 weeks maximum)
Council have 6 week period to make, amend or revoke the Draft LAP
Amendments require new public observation period and extend the timeline.
On Going SEA and AA work
Project Management:
Team led by Planning Department. Working group comprised of nominated persons from each key department of Dublin City Council. Regular schedule of working group meetings. Close Co-ordination with North Central Area Office Team. Programme of key community and stakeholder consultations. Regular feedback and update to North Central Area Committee, Council and NF Forum.
LAP Process
North Fringe
North Fringe
c200 ha