CORRIGENDUM Erratum for Section B: Project Brief for Kuala Lumpur – Klang Bus Rapid Transit (BRT) Project Tender Reference No. SPAD/RFP/BRT/NKRA/01/2017 # RFP Section RFP Reference Refer Query # Item 1 B Table 2-3 Summary of Section 3 (Page 26-27) 80 Item 2 B Table 3-4 Minimum Requirement of Hub Station (Page 50) 77 Item 3 B Table 3-5 Minimum Requirement of Halt Station (Page 51) 53 Item 4 B Paragraph 5.4 (Page 73) Table 5-13 Affected Motorcycle lane (KL bound) (Page 74) 113 Item 5 B Paragraph 5.5 (Page 75 – 80) Table 5-14 Overall Affected Billboard (Page 75) Table 5-15 Affected Billboard (DBKL Jurisdiction Area) (Page 76) Table 5-16 Affected Billboard (MBPJ Jurisdiction Area) (Page 77) Table 5-17 Affected Billboard (MPSJ Jurisdiction Area) (Page 78) Table 5-18 Affected Billboard (MBSA Jurisdiction Area) (Page 79) Table 5-19 Affected Billboard (MPK Jurisdiction Area) (Page 80) 112 Item 6 B List of Appendices, #110 109 Item 7 B Appendix B8, in reference to Appendix B7.1 & B7.2 110 Item 8 B Appendix G1.3: Transit Signal Priority System (TSPS) 65 Issued by: PROCUREMENT DIVISION SURUHANJAYA PENGANGKUTAN AWAM DARAT (S.P.A.D)
Transcript
Page 1: CORRIGENDUM Erratum for Section B: Project Brief for … · based on Arahan Teknik (Jalan) 8/86 - A Guide on Geometric Design of Roads, Jabatan Kerja Raya Malaysia. Table 5-13 Affected

CORRIGENDUM

Erratum for Section B: Project Brief for

Kuala Lumpur – Klang Bus Rapid Transit (BRT) Project

Tender Reference No. SPAD/RFP/BRT/NKRA/01/2017

# RFP Section

RFP Reference Refer Query #

Item 1 B Table 2-3 Summary of Section 3 (Page 26-27) 80

Item 2 B Table 3-4 Minimum Requirement of Hub Station (Page 50) 77

Item 3 B Table 3-5 Minimum Requirement of Halt Station (Page 51) 53

Item 4 B Paragraph 5.4 (Page 73) Table 5-13 Affected Motorcycle lane (KL bound) (Page 74)

113

Item 5 B Paragraph 5.5 (Page 75 – 80) Table 5-14 Overall Affected Billboard (Page 75) Table 5-15 Affected Billboard (DBKL Jurisdiction Area) (Page 76) Table 5-16 Affected Billboard (MBPJ Jurisdiction Area) (Page 77) Table 5-17 Affected Billboard (MPSJ Jurisdiction Area) (Page 78) Table 5-18 Affected Billboard (MBSA Jurisdiction Area) (Page 79) Table 5-19 Affected Billboard (MPK Jurisdiction Area) (Page 80)

112

Item 6 B List of Appendices, #110 109

Item 7 B Appendix B8, in reference to Appendix B7.1 & B7.2 110

Item 8 B Appendix G1.3: Transit Signal Priority System (TSPS) 65

Issued by:

PROCUREMENT DIVISION

SURUHANJAYA PENGANGKUTAN AWAM DARAT (S.P.A.D)

Page 2: CORRIGENDUM Erratum for Section B: Project Brief for … · based on Arahan Teknik (Jalan) 8/86 - A Guide on Geometric Design of Roads, Jabatan Kerja Raya Malaysia. Table 5-13 Affected

Note: The areas highlighted in yellow denotes correction made

Item 1) Section B: Table 2-3 Summary of Section 3 (RFP Page 26-27)

Table 2-1 Summary of Section 3

Chainage Land Mark Busway Configuration Remark

23+300 – 25+300 Seksyen 13 – Shah Alam Station

Two-way at-grade segregated busway with flexible pavement

The busway will be in the median of the Federal Highway 2 (PLUS). Affected light poles will be relocated.

25+600 – 27+300 Shah Alam Station to UiTM Station

Two-way at-grade segregated busway with flexible pavement

The busway will be in the median of the Federal Highway 2 (PLUS). Affected light poles will be relocated.

28+000 – 29+500 UiTM Station to Seksyen 7 IC

Two-way at-grade segregated busway with flexible pavement

The busway will be on the median of the Federal Highway 2 (PLUS). Affected light poles will be relocated.

Page 3: CORRIGENDUM Erratum for Section B: Project Brief for … · based on Arahan Teknik (Jalan) 8/86 - A Guide on Geometric Design of Roads, Jabatan Kerja Raya Malaysia. Table 5-13 Affected

Note: The areas highlighted in yellow denotes correction made

Item 2) Section B: Table 3-4 Minimum Requirement of Hub Station (RFP Page 50)

Table 3-4 Minimum Requirement of Hub Station

Hub Station Busbay -8 busbays (Stadium station)

-8 busbays (Pasar Seni Station)

-7 busbays (Bandar Klang Station)

-Minimum length of each bay 20m

-Kessel Curb along platform length

Page 4: CORRIGENDUM Erratum for Section B: Project Brief for … · based on Arahan Teknik (Jalan) 8/86 - A Guide on Geometric Design of Roads, Jabatan Kerja Raya Malaysia. Table 5-13 Affected

Note: The areas highlighted in yellow denotes correction made

Item 3) Section B: Table 3-5 Minimum Requirement of Halt Station (RFP Page 51)

Table 3-5 Minimum Requirement of Halt Station

Station Area Requirement

Halt station Concourse -Concourse area min 94.40 sq m

-Store, ICT & M&E Room min 10.45 sq m

-Kiosk min area 8.35 sq m

-Concourse area shall be secured during non-operation

hours

-Ticketing and ICT room shall be air-conditioned

-Minimum ceiling height 3000 mm

Page 5: CORRIGENDUM Erratum for Section B: Project Brief for … · based on Arahan Teknik (Jalan) 8/86 - A Guide on Geometric Design of Roads, Jabatan Kerja Raya Malaysia. Table 5-13 Affected

Note: The areas highlighted in yellow denotes correction made

Item 4) Section B: Paragraph 5.4 & Table 5-13 Affected Motorcycle lane (KL bound)

(RFP Pages 73-74)

5.4 Motorcycle Lane

The proposed BRT alignment will have an effect on the motorcycle lane at some of

the constraint areas. This is due to the expansion of the road to for the construction of

BRT busway and stations at some locations. A total length of about 2.975km

motorcycle lane (Klang bound road) will be affected. Meanwhile, for KL bound road,

there will be a 2.394km motorcycle lane affected. The detailed number of the affected

motorcycle lane is shown in Table 5-12 and 5-13. The affected motorcycle lanes along

the BRT alignment will be re-aligned and will follow the design guidelines and criteria

based on Arahan Teknik (Jalan) 8/86 - A Guide on Geometric Design of Roads,

Jabatan Kerja Raya Malaysia.

Table 5-13 Affected Motorcycle lane (KL bound)

Section Location Chainage Affected Motorcycle Lane (km)

2

Gasing 10+340 - 10+450 0.110

Seksyen 51 13+246 - 13+555 0.300

Setia Jaya 16+026 - 16+258 0.245

Kelana Jaya 16+737 - 17+648 0.911

3

Seksyen 13 23+000 - 23+400 0.398

Pusat Bandar Shah Alam 25+300 - 25+500 0.230

UiTM 27+500 - 27+800 0.200

Total 2.394

Page 6: CORRIGENDUM Erratum for Section B: Project Brief for … · based on Arahan Teknik (Jalan) 8/86 - A Guide on Geometric Design of Roads, Jabatan Kerja Raya Malaysia. Table 5-13 Affected

Note: The areas highlighted in yellow denotes correction made

Item 5) Section B: Paragraph 5.5 Billboard, Table 5-14 Overall Affected Billboard, Table 5-15

Affected Billboard (DBKL Jurisdiction Area), Table 5-16 Affected Billboard

(MBPJ Jurisdiction Area), Table 5-17 Affected Billboard (MPSJ Jurisdiction

Area), Table 5-18 Affected Billboard (MBSA Jurisdiction Area), & Table 5-19

Affected Billboard (MPK Jurisdiction Area)

(RFP Pages 75-80)

5.5 Billboard

The proposed BRT alignment will have an effect on the billboard along the proposed alignment

of KL BRT. This is due to expansion of the road and location of the alignment which is at the

middle of the road to fit in the BRT busway and station. In total, it is identified that about 76

advertisement billboards will be affected, as shown in Table 5-14. The LED advertisement

boxes installed at the lamp pole along the FH2 need to be identified and relocated

appropriately. Necessary action towards affected advertisement billboard along the

development BRT alignment will be decided by the bidder. For more details, please refer to

Appendix D5.1.1-D5.4.2.

Table 5-14 Overall Affected Billboard

Section Area Jurisdiction Affected Billboard

1 & 2

DBKL 24

MBPJ 29

MPSJ 3

3 & 4 MBSA 12

MPK 8

Total 76

5.5.1 Section 1: DBKL (Dewan Bandaraya Kuala Lumpur) Jurisdiction Area

Table 5-15 shows the affected billboard along the proposed alignment of KL—Klang BRT in

the DBKL jurisdiction area. The billboards are located at Pasar Seni, Kg Attap, along Jalan

Syed Putra, Kerinchi and Universiti area before Gerbang Kota Darul Ehsan. In total, there will

be 24 billboards will be affected by the development of BRT.

Table 5-15 Affected Billboard (DBKL Jurisdiction Area)

Section Area

Jurisdiction No Location Affected Billboard Billboard Type

1 DBKL

1 Syed Putra Future Music Gantry

2 Syed Putra SHARP Gantry

3 Syed Putra TM Gantry

4 Syed Putra UEM Sunrise Overhead Bridge

5 Syed Putra Advertiser Mini pole

Page 7: CORRIGENDUM Erratum for Section B: Project Brief for … · based on Arahan Teknik (Jalan) 8/86 - A Guide on Geometric Design of Roads, Jabatan Kerja Raya Malaysia. Table 5-13 Affected

Note: The areas highlighted in yellow denotes correction made

6 Syed Putra Nova Pantai Overhead Bridge

7 Syed Putra Advertiser Mini pole

8 Syed Putra Safira Sime Darby Overhead Bridge

9 Kg Attap Citroen Mini pole

10 Jalan Sultan Sulaiman Tune Mini pole

11 Pasar Seni Thesmos Mini pole

12 Pasar Seni Beras Jasmine Mini pole

13 Mid Valley Steak Station Overhead Bridge

14 Mid valley Advertiser Gantry

15 Mid Valley SHARP Gantry

16 Mid Valley MIGP Gantry

17 Kerinchi Bacfree Gantry

18 Kerinchi Konica Minolta Overhead Bridge

19 Universiti Firefly Gantry

20 Universiti Advertiser Gantry

21 Universiti Hitz fm Gantry

22 Universiti BP Health Care Gantry

23 Gasing Home Renovation Mini pole

24 Gasing AIA Gantry

Subtotal 24

5.5.2 Section 2: MBPJ (Majlis Bandaraya Petaling Jaya) Jurisdiction Area

Table 5-16 shows the affected billboard along the proposed alignment of KL—Klang BRT in

MBPJ jurisdiction area. The billboards are located at Gasing area, Taman Jaya, Asia Jaya,

Templer, SS 51, Sg Way, Kelana Jaya and Bandar Sunway area. In total, about 29 billboards

will be affected by the development of BRT.

Table 5-16 Affected Billboard (MBPJ Jurisdiction Area)

Section Area Jurisdiction No Location Affected Billboard Billboard Type

2 MBPJ

25 Gasing Advertiser Mini pole

26 Gasing MILO Uni pole

27 Taman Jaya Honda Gantry

28 Taman Jaya Pro Balance Uni pole

29 Taman Jaya MAHSA University Gantry

30 Asia Jaya PRUDENTIAL Overhead Bridge

31 Asia Jaya Asia Metropolitan University Gantry

32 Templer Hotlink Overhead Bridge

33 SS 51 Eden Catering Gantry

Page 8: CORRIGENDUM Erratum for Section B: Project Brief for … · based on Arahan Teknik (Jalan) 8/86 - A Guide on Geometric Design of Roads, Jabatan Kerja Raya Malaysia. Table 5-13 Affected

Note: The areas highlighted in yellow denotes correction made

34 SS 51 Mitsubishi Uni pole

35 SS 51 BRANDS Overhead Bridge

36 SS 51 Carmix Mini pole

37 SS 51 TM Gantry

38 Sg Way Maggi Uni pole

39 Sg Way Personal Pension Uni pole

40 Sg Way Z Storm Mini pole

41 Kelana Jaya Tropicana Metropark Overhead Bridge

42 Kelana Jaya Advance Tertiary College Gantry

43 Kelana Jaya Sunway Overhead Bridge

44 Kelana Jaya Beras Jasmine Mini pole

45 Kelana Jaya Sunway Mini pole

46 Kelana Jaya Advertiser Gantry

47 Kelana Jaya KPJ Selangor Gantry

48 Kelana jaya Advertiser Gantry

49 Kelana Jaya Advertiser Gantry

50 Kelana Jaya Kyocera Overhead Bridge

51 Bandar Sunway MAZ International School Gantry

52 Bandar Sunway Open University Gantry

53 Bandar Sunway Empty Gantry

Subtotal 29

5.5.3 Section 2: MBSJ (Majlis Pembandaran Subang Jaya) Jurisdiction Area

Table 5-17 shows the affected billboard along the proposed alignment of KL—Klang BRT in

MPSJ jurisdiction area. The billboards are located at Subang Jaya area along the Federal

Highway. In total, there will be 3 billboard will be affected by the development of BRT.

Table 5-17 Affected Billboard (MPSJ Jurisdiction Area)

Section Area Jurisdiction No Location Affected Billboard Billboard Type

3

MPSJ

54 Subang Jaya ORIS Watch Gantry

55 Subang Jaya Pusat Pakar Kulit KO Overhead Bridge

56 Subang Jaya MAA Assurance Mini pole

Subtotal 3

5.5.4 Section 3: MBSA (Majlis Bandaraya Shah Alam) Jurisdiction Area

Table 5-18 shows the affected billboard along the proposed alignment of KL—Klang BRT in

MBSA jurisdiction area. The billboards are located at Batu 3, Seksyen 13, Seksyen 11,

Page 9: CORRIGENDUM Erratum for Section B: Project Brief for … · based on Arahan Teknik (Jalan) 8/86 - A Guide on Geometric Design of Roads, Jabatan Kerja Raya Malaysia. Table 5-13 Affected

Note: The areas highlighted in yellow denotes correction made

Seksyen 2, Seksyen 16 and Seksyen 7 area along the Federal Highway. In total, there will be

12 billboards affected by the development of BRT.

Table 5-18 Affected Billboard (MBSA Jurisdiction Area)

Section Area Jurisdiction No Location Affected Billboard Billboard Type

3 MBSA

57 Batu 3 Honda Mini pole

58 Batu 3 MAHSA University Gantry

59 Batu 3 Secret Garden Overhead Bridge

60 Batu 3 Maxxis Overhead Bridge

61 Seksyen 13 Plusmile Gantry

62 Seksyen 13 Advertiser Gantry

63 Seksyen 11 Plusmile Gantry

64 Seksyen 2 KPJ Klang Mini pole

65 Seksyen 16 Sime Darby Overhead Bridge

66 Seksyen 16 Sime Darby Overhead Bridge

67 Seksyen 16

Hospital Wanita

Metro Gantry

68 Seksyen 7 Advertiser Mini pole

Sub Total 12

5.5.4 Section 4: MPK (Majlis Pembandaran Klang) Jurisdiction Area

Table 5-19 shows the affected billboard along the proposed alignment of KL—Klang BRT in

MPK jurisdiction area. The billboards are located at Sg Rasau, Bukit Raja, Berkeley, and Klang

area along the Federal Highway. In total, there will be 8 billboards affected by the development

of BRT.

Table 5-19 Affected Billboard (MPK Jurisdiction Area)

Section Area Jurisdiction No Location Affected Billboard Billboard Type

4 MPK

69 Berkeley Advertiser Mini pole

70 Berkeley Advertiser Mini pole

71 Berkeley Advertiser Mini pole

72 Berkeley MAHSA University Gantry

73 Klang MAHSA University Gantry

74 Klang PSM Gantry

75 Klang SYM Motor Mini pole

76 Klang Gayathiri Mini pole

Sub Total 8

Page 10: CORRIGENDUM Erratum for Section B: Project Brief for … · based on Arahan Teknik (Jalan) 8/86 - A Guide on Geometric Design of Roads, Jabatan Kerja Raya Malaysia. Table 5-13 Affected

Note: The areas highlighted in yellow denotes correction made

Item 6) Section B: List of Appendices, #110. (RFP Appendix B8)

LIST OF APPENDICES FOR SECTION B-PROJECT BRIEF

NO. APPENDIX DESCRIPTION

B BRT BUSWAY ALIGNMENT

110. B8 Cross section A-A at chainage 07+300

Page 11: CORRIGENDUM Erratum for Section B: Project Brief for … · based on Arahan Teknik (Jalan) 8/86 - A Guide on Geometric Design of Roads, Jabatan Kerja Raya Malaysia. Table 5-13 Affected

Note: The areas highlighted in yellow denotes correction made

Item 7) Section B: Appendix B8, in reference to Appendix B7.1 & B7.2

Appendix B8: Cross section A-A at chainage 07+300

Page 12: CORRIGENDUM Erratum for Section B: Project Brief for … · based on Arahan Teknik (Jalan) 8/86 - A Guide on Geometric Design of Roads, Jabatan Kerja Raya Malaysia. Table 5-13 Affected

KUALA LUMPUR TO KLANG BUS RAPID TRANSIT (BRT) PROJECT (TENDER NO.: SPAD/RFP/BRT/NKRA/01/2017)

TENDER CORRIGENDUM

Note: The areas highlighted in yellow denotes correction made

Item 8) Section B: Appendix G1.3

DESCRIPTION SYSTEM DESCRIPTION

GENERAL

SPECIFICATIONS &

STANDARD

Transit Signal Priority

System

• On-Board TSP

Transmitter

• Roadside TSP Sensor

• TSP Controller

• Traffic Signal System

including Signal Light,

Pole & Traffic

Controller

• The TSPS consist of a high-level integration between

the Traffic Signal System and the Bus Management

System. It is software based and it will require

detection equipment to be installed in the streets

and/or the buses.

• The TSPS will configure the chosen junctions related to

the Bus Routes that cross them and will create a

reporting chain for all the possibilities.

• The TSPS will generate priority requests from the

Buses whose headway is longer than expected

(delayed buses).

• The TSPS will evaluate based on a priority system if

the buses receive the priority or not.

• There must be a reporting tool where the user can view

the different interactions between the Bus Management

System and the Traffic Signal System.

• The TSPS will have priorities pedestrian crossing

functionality.

• Radio-Frequency-

based (RF)

• Automatic Vehicle

Identification (AVI) as

the means of

detection

• Compatible to

Sydney Coordinated

Adaptive Traffic

Control System

(SCATS)


Recommended