Sl.
No.Clause no
Page
noClause Query Bank Response
1 6.5 10
The bidder should have relevant experience in
terms of MIS-ADF reporting/XBRL/similar solution
implementation in at least one scheduled
commercial banks/Public sector organisation/State
Government/Central Government in India. The
bidder has to submit Purchase order /Certificate of
performance for the same from clients.
We request bank to consider, " The bidder/OEM should
have relevant experience in terms of MIS-ADF
reporting/XBRL/similar solution implementation in at
least one scheduled commercial banks/Public sector
organisation/State Government/Central Government
in India. The bidder/OEM has to submit Purchase order
/Certificate of performance for the same from
clients."
The clause should be read as "The
bidder/OEM should have relevant experience
in terms of MIS-ADF reporting/XBRL/similar
solution implementation in at least one
scheduled commercial banks/Public sector
organisation/State Government/Central
Government in India. The bidder/OEM has to
submit Purchase order /Certificate of
performance for the same from clients."
2 7.1 11
The Bidder should be able to develop TRANCHE1,
CRILIC, NRLM, NULM and SLBC reports in addition to
the CIMS-ADF reports.
These are independent systems having wide data
reporting requirement like TRANCH1 has
approximately 600+ data points and SLBC reports of all
state's numbers around 1200 format. Kindly confirm.
NRLM,NULM & CRILIC are part of ADF
reports. SLBC is required to capture targets
under NRLM/NULM. RBI has recently
standarized all SLBC reports numbering
approx 40
3 7.2 11
Bank‟s MIS system hosts around 150+ legacy reports
for RBI and other Regulatory/Statutory Authorities,
around 500+ reports for internal use. 25+ Returns
are being submitted through XBRL to RBI.
Under the current RFP scope, does the bank expect us
to deliver 500+ reports or the scope is limited to
development of only ADF - CIMS reports.Please be guided by RFP
Corrigendum to RFP for Supply, Installation, Configuration, Integration, Maintenance and Support of CIMS-ADF (Centralized Information
Management System) Solution
Page 1 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
4 7.2 12
Bank's MIS system hosts around 150+ legacy reports
for RBI and other Regulatory/Statutory Authorities,
around 500+ reports for internal use. 25+ Returns
are being submitted through XBRL to RBI
Along with ADF-CIMS, do we have to create 150+
legacy reports as well as 500+ MIS reports afresh for
internal use or do we have to maintain them using the
existing system / setup.
If we have to maintain existing system also then will
we be handed over source code and documentation of
the system?
Please be guided by RFP
5 7.6.1 12
The data from the various existing source systems
including but not limited to CBS, ATM Switch,
Treasury, ALM, IRM etc. will be extracted,
transformed and loaded into the CIMS Database in
an automatic process without any manual
intervention. Before loading data to the CIMS
Database, the data is to be cleaned and enriched.
The primary focus of Bank is on data cleansing and
data enriching. Hence the bidder has to provide a
tool for cleansing and enriching not limited to a
few fields or patterns.
As per the clause, before loading the data into the
CIMS database it needs to be cleansed. It may delay
the delivery of report till cleansed data is not made
available.
We will suggest while loading the data , errors are
shown to Bank and data extraction excercise to be
completed . Meanwhile , Bank can cleansed the data
and data can be loaded on next extraction cycle.
Kindly confirm.
Please be guided by RFP
Page 2 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
6 7.7.2. 13
Sizing of the CIMS-ADF Database with reference to
hardware will have to be taken by the bidder to
ensure high availability, scalability, redundancy
and performance of the solution, and to meet
technical and functional requirements of CIMS-ADF
Database as per the terms of the RFP within the
timeframe prescribed by the Bank. Sizing,
Estimation, Software, Hardware and Operating
System specifications are to be provided by the
bidder. While sharing the sizing of Hardware, the
bidder should consider that the CPU Utilization or
Database size should not exceed 70% of total space
quoted at any point during the contract period. The
same will be verified using daily system logs and a
Quarterly Resource Performance Review will be
conducted by the vendor and report for the same
will need to be shared within 2 weeks after
conducting the review. The Resource Performance
Report will recommend any precautions or any
resource augmentation, if needed along with
hardware sizing to be implemented by bank to
optimize the performance. The successful bidder
shall confirm/certify that the hardware, software
& Database licenses, etc. as specified by the bidder
is adequate to fulfil bank‟s requirements for the
whole period of TCO and is as per industry best
practices. For sizing, the following information
Request bank to provide the clarity on the following;
1) Procurement & Maintenance of the hardware i.e.
Servers in DC & DR of the Bank.
2) Procurement & Maintenance of Software; OS DB &
other related software to make the proposed solution
live.
3) Any kind of Facility Management services required
Specifically for the proposed hardware & software
componets/
The proposed solution will be hosted on
Bank's on premises private cloud
(Hyperconverged)
7 7.7.1 13
The proposed CIMS Database should also cater to
any additional applications/ requirements that the
Bank may acquire/implement during the course of
the project. The CIMS-ADF Database should support
Adhoc Queries, Stored procedures and Reports
among various other features for viewing and
downloading data in addition to standard reports.
Our understanding is that the Bidder only needs to
expose the datamart to the Bank for these additonal
reports and Bank will use its own BI tool for such
report generation. The Bidder is expected to deliver
only CIMS-ADF returns. Please confirm.
Please be guided by RFP
Page 3 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
8 7.7.2 13
While sharing the sizing of Hardware, the bidder
should consider that the CPU Utilization or
Database size should not exceed 70% of total space
quoted at any point during the contract period.
We request the bank to relax this clause. While the
hardware sizing would be optimal considering solution
and data projections shared by the client, there are
multiple factors which are responsible for exceeding
utiization thresholds.
Please be guided by RFP
9 7.7.2.8 14
2000 Concurrent users logged in, concurrent
generation of reports, etc.
Please share the number of concurrent users for ADF
as out of our experience 2000 concurrency seems too
high for ADF
Please be guided by RFP
10 7.7.2.17. 14
DC & DR Setup including replication. Request bank to clarify the following point is about
solution capablity or bidder is responsible to carry out
the activity.Please be guided by RFP
11 7.9.1 14
After implementation of the project, the bidder
has to provide onsite support by providing adequate
onsite resources on any given day and time, that
are qualified and experienced during the whole
contract period for system administration,
database management, application
development/customization. The onsite team will
be point of contact to Bank for all service requests,
incidents and problems.
Request bank to clarify the no. of resources required
for the facility management services with the no. of
shifts in a day.
Please be guided by RFP
Page 4 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
12 7.10.1 14
The Bank will provide hardware required for
installation of software. The Bidder has to create
maintain a development, test & production
environment separately to conduct end-to-end User
Acceptance Tests during project implementation
and thereafter during the contract period. The
Development server sizing should be appropriately
done to ensure smooth development activities to
meet the scope and timelines. The testing should
be appropriately sized to ensure all types of testing
including load testing. However, all the servers
except the production server can be leveraged for
load testing. The test and development servers
should be physically separated from production
server. No data from the production should be
taken for testing, the data used for the testing
should be masked data. The solution provided by
the bidder should support Bank‟s DC-DR setup and
the DR should be exact replica of DC. The licences
for OS, Database Software, middleware etc. are to
be factored by the bidder.
Request bank to provide the clarity on the following;
1) Procurement & Maintenance of the hardware i.e.
Servers in DC & DR of the Bank.
2) Procurement & Maintenance of Software; OS DB &
other related software to make the proposed solution
live.
3) Any kind of Facility Management services required
Specifically for the proposed hardware & software
componets.
Please refer to point No. 6
13 7.7.2.8 14
2000 Concurrent users logged in, concurrent
generation of
reports, etc
As per our experience, ADF reporting solutions do not
need more than 50 concurrent users. No of users may
be more, however users logging in concurrently is
usually not more than 50 for an ADF solution. Request
the bank the review this requirement.
Please be guided by RFP
Page 5 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
14 7.9 14
After implementation of the project, the bidder
has to provide onsite support by providing adequate
onsite resources on any given day and time, that
are qualified and experienced during the whole
contract period for system administration,
database management, application
development/customization.
Does the bank expect onsite support or remote. Please
confirm onsite support would be during banking
working hours. Please be guided by RFP.
Facility Management is expected to work for
eight hours as per the requirement of the
Bank.
15 7.16.3. 15
Bidders should provide comprehensive onsite
support during the warranty period of 1 year and
subsequent ATS period of 4 years with back to back
arrangements with respective OEMs and with
response time of 30 minutes and resolution time of
2 hours. The on-site support may be extended
further, during the contract period depending on
the Bank‟s requirement.
Request bank to provide the clarity, no. of resources
& Shifts required under the scope of on-site support
resources required specifically for the proposed
solution Please be guided by RFP
16 8.2 21
The vendor shall provide service/support on the
basis of 24x7 on L3 basis.
Does the bank expect onsite support or remote. Please
confirm onsite support would be during banking
working hours.
Please be guided by RFP
17 7.10.2. 15
Bank is already using SQL suite for MIS application.
SSIS is the ETL tool & SSRS is the reporting tool.
Sharepoint is the web application. The Bidder
should leverage the existing setup and take over
the Support & Maintenance of existing MIS
application
We are planning to use the existing stack which bank
has for the Data Warehouse project. Please suggest if
we could use the same
Please be guided by RFP
Page 6 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
18 7.10.2. 15
Bank is already using SQL suite for MIS application.
SSIS is the ETL tool & SSRS is the reporting tool.
Sharepoint is the web application. The Bidder
should leverage the existing setup and take over
the Support & Maintenance of existing MIS
application.
Request bank to clarify, dose any additionalor New MIS
application needs to be provided by the bidder or the
existing MIS application can be leveraged to deliver
the project.
If the exixting MIS can be used which is already
procured by the bank , request bank to provide traing
to the onsite supoort resources of the bidder for the
same under existing contract with the vendor for MIS
tool.
Please be guided by RFP
19 7.13.1. 15
The proposed solution must allow the users from
Branches/Zonal Offices/Head Office to build and
generate adhoc reports/data based on the
aggregated and granular data maintained in CIMS
Database. The reports should be made available
through Web Portal. Also various daily Reports
along with automated Account Statements for
internal usage or to customers sending over Email
under various frequency such as
Daily/Weekly/Monthly or Adhoc.
Request bank to provide the clarity on the following;
1) Procurement & Maintenance of the hardware i.e.
Servers in DC & DR of the Bank for hosting the web
portal
2) Procurement & Maintenance of Software; OS DB &
other related software to make the Web-portal live.Please be guided by RFP
20 7.10.2. 15
Bank is already using SQL suite for MIS application.
SSIS is the ETL tool & SSRS is the reporting tool.
Sharepoint is the web application. The Bidder
should leverage the existing setup and take over
the Support & Maintenance of existing MIS
application.
What is the SQL version being used and how many SQL
licenses are available and if we will use existing setup
then how pricing would be worked out.
Do we have to maintain existing reports or do we have
to create these reports afresh. Kindly inform.
The SQL version is MSSQL 2012.
21 7.13.1. 15
Also various daily Reports along with automated
Account Statements for internal usage or to
customers sending over Email under various
frequency such as Daily/Weekly/Monthly or Adhoc.
Do we need to generate Account statement of Saving /
Current account ? Kindly confirm.
Please be guided by RFP
Page 7 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
22 7.10.1 15
The licences for OS, Database Software,
middleware etc. are to
be factored by the bidder.
Request the bank to restrict the scope to delivery of
CIMS-ADF software solution. We believe the bank
would be in a better position to negotiate and get a
better deal with the hardware/DB vendors given the
size of the bank. Please confirm which licenses would
be provided by the Bank.
Please be guided by RFP
23 7.14.1 16
The solution is expected to have the features to
cover Audit Process including Pre- MOC for all
locations, Post- Zone MOC, Post-Head Office MOC
and generate Quarterly/Half-Yearly/Yearly reports.
Is Audit reports and Audit process in scope of RFP or do
we have to provide functionality to upload MOCs?
Kindly inform.Please be guided by RFP
24 7.15.7 17
The solution should have facility to facilitate
digital signature to enable bank to submit/
transmit data to regulatory authorities.
As per our ADF-CIMS implementation exp in other bank
,Digital Signature facilities is not requirement for ADF-
CIMS project, would request bank to kinldy relax this
point
Please be guided by RFP
25 7. Scope of Work 17
7.15.7. "The solution should have facility to facilitate digital
signature to enable bank to submit/ transmit data to
regulatory authorities.", What types of interaction of
digital signatures has to be done? Please explain in
detail what needs to be integrated?
Please be guided by RFP
26 7.16.18. 19
The proposed solution should support integration
with Finacle 10 and any future version of Finacle
Request bank to consider," The proposed solution
should support integration with Finacle 10 and any
future version of Finacle at the mutually agreed cost." Please be guided by RFP
Page 8 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
27 9.1 22
SRS of CIMS solution - 1 Month
Delivery of software/hardware and Enterprise wide
perpetual license, installation, customization,
configuration and integration - 1 Month
Development of CIMS solution - 2 Months
User Acceptance testing (UAT), Pilot Run along
with Audit review and submission of final report. -
1 Month
Full Project
implementation/documentation/training and Go-
Live - 1 Month
As elsewhere mentioned in RFP there are TRANCHE1,
CRILIC, NRLM, NULM and SLBC reports also and we
have to maintain 150+ legacy reports for RBI and other
Regulatory / Statutory Authorities, around 500+
reports for internal use , the timelines suggested is
very less. We would like to suggest following timeline
SRS of CIMS solution - 3 Months
Delivery of software/hardware and Enterprise wide
perpetual license, installation, customization,
configuration and integration - 1 Month
Development of CIMS solution - 6 Months
User Acceptance testing (UAT), Pilot Run along with
Audit review and submission of final report. - 3 Months
Full Project implementation/documentation/training
and Go-Live - 1 Month
For CIMS final guidelines from RBI may take more time
then the above schedule, then how UAT will be
attempted for those reports which are not covered in
CIMS at that point of time.
Please be guided by RFP
28
19. Annual
Technical
Support
Agreement
36
Any regulatory /statutory changes or updates or
guidelines as required under the directive of
Government of India, Reserve Bank of India or any
other regulatory/statutory authority must be
provided/ upgraded to the Bank free of cost by
Bidder during warranty or ATS tenure.
Request bank to consider," Any regulatory /statutory
changes or updates or guidelines as required under the
directive of Government of India, Reserve Bank of
India or any other regulatory/statutory authority must
be provided/ upgraded to the Bank free of cost for the
maximum rffort of 20 man days futher to 20 mandays
bank would follow the change request process during
warranty or ATS tenure."
Please be guided by RFP
Page 9 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
29 19 36
Any regulatory /statutory changes or updates or
guidelines as required under the directive of
Government of India, Reserve Bank of India or any
other regulatory/statutory authority must be
provided/ upgraded to the Bank free of cost by
Bidder during warranty or ATS tenure
Some time these change may be entailing major work
in terms of effort and change in data design / system.
We thus suggest and submit that the said clause may
please be modified as under: "Regulatory /statutory
changes or updates or guidelines as required under the
directive of Government of India, Reserve Bank of
India or any other regulatory/statutory authority must
be provided/ upgraded to the Bank free of cost by
Bidder during warranty or ATS tenure. However
changes / upgradations that would entail major rework
and involve a revisit to the data base design / system,
shall on case to case basis, be examined between the
Bank & Vendor and a decision of costing will be taken
as per discussions"
Please be guided by RFP
30 19 36
Any regulatory /statutory changes or updates or
guidelines as required under the directive of
Government of India, Reserve Bank of India or any
other regulatory/ statutory authority must be
provided/ upgraded to the Bank free of cost by
Bidder during warranty or ATS tenure.
Scope is not fixed as no one can anticipate the
changes by regulatory authorities. Considering bidders
have to provide a fixed quote, request bank to
consider limiting the scope to any regulatory changes
to the product during the implementation period to be
provided.
Please be guided by RFP
Page 10 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
31 22 37
System Requirement Study, Delivery of Software
and Enterprise wide perpetual License, Installation,
Customization, configuration. - 40%
CIMS Implementation - 40%
UAT Sign off, Training & Go Live - 10%
After 3 months of successful implementation and
against Performance bank guarantee - 10%
UAT sign of will precede implementation hence we
request to reconsider the Payment schedule as
System Requirement Study - 20%
Delivery of Software and Enterprise wide perpetual
License, Installation, Customization, configuration. -
20%
UAT of CIMS - 40%
Training & Go Live - 10%
After 3 months of successful implementation and
against Performance bank guarantee - 10%
Generally , such big projects are implemented in
phases and we request Bank to consider the delivery
and payment phase wise
Please be guided by RFP
32 33 44
Any gaps identified during product demonstration,
functional requirements specifications study,
system testing, user acceptance testing, and pilot
implementation should be included by the
Successful bidder as Implementation efforts. The
Bank will not pay the Successful bidder any
additional charges for all such customizations. The
Successful bidder shall take up all such
functionality as required by the Bank on a priority
basis.
Being MIS system, the full module facilitating day to
day operations are not envisaged as scope of work like
Risk Management system, ALM system, Treasury
system etc.
We request and submit that development of a full
fledged system for day to day operations should not be
part for scope and clause should be restricted to
within the scope of RFP
Please be guided by RFP
Page 11 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
33 39 48
The Bidder‟s aggregate liability (whether in
contract, tort or otherwise), shall not
exceed the total contract value provided that this
limitation shall not apply to any
of the obligation of the bidder to the bank arising
from clauses Liquidated
Damages, Indemnity, Penalty and Confidentiality /
Non Disclosure Agreement of
the RFP.
We request the bank to limit the liability to TCO under
all circumstances
Please be guided by RFP
34 26 48
Indemnity We request the bank to limit the indemnity to IP
infringement and gross negligence, wilful misconduct
of bidders employees/representativesPlease be guided by RFP
35 43.2.4 49
The progress regarding the execution of the order
accepted by the selected bidder is found to be
unsatisfactory or delay in execution of the
contract, the Bank reserves the right to get the
balance contract executed by the another party of
its choice by giving one month‟s notice for the
same . In this event, the selected bidder is bound
to make good the additional expenditure, which
Bank may have to incur in executing the balance
contract. This clause is applicable, if for any
reason, the contract is cancelled.
Request bank to remove this clause
Please be guided by RFP
36
54. Annexure H
63
Cost of CIMS Solution along with all components at
DC & DR Site and any other software license such
as SQL etc, if any with Enterprise wide perpetual
Licenses with One year warranty
Kindly arrange to confirm the scope of RFP as
elsewhere it is mentioned in RFP that there are
TRANCHE1, CRILIC, NRLM, NULM and SLBC reports also
and we have to maintain 150+ legacy reports for RBI
and other Regulatory/Statutory Authorities, around
500+ reports for internal use along with ADF-CIMS
reports.
Is convertor for ADF-CIMS in scope?
Please be guided by RFP
Page 12 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
37
54. Annexure H
63
Cost of CIMS Solution along with all components at
DC & DR Site and any other software license such
as SQL etc, if any with Enterprise wide perpetual
Licenses with One year warranty
Do we have to factor existing SQL Licenses while
quoting . If yes then please inform the no of licenses
available and their Version - Standard / Enterprise ? Please be guided by RFP
38
54. Annexure H
63
Total number of reports to be developed in CIMS-
ADF are approximately 200 which are only
indicative and not exhaustive. The signoff for
implementation of CIMS-ADF will be given only
after successful development and implementation
of reports. Detailed report formats will be shared
with successful bidder during system requirement
study/Implementation phase.
Kindly arrange to confirm the scope of RFP as
elsewhere it is mentioned in RFP that there are
TRANCHE1, CRILIC, NRLM, NULM and SLBC reports also
and we have to maintain 150+ legacy reports for RBI
and other Regulatory/ Statutory Authorities, around
500+ reports for internal use. Please be guided by RFP
39
58
Sr. No. 375
Is it compatible with multiple databases? Does it
support Big data?
Do we have to source Unstructured data for some
reports and quote for storage / systems etc for
Unstructured ( Big Data )Please be guided by RFP
40
General Query
--
Please let us know Current Core Banking data volume
Will be shared with successful bidder
41General Query
--
Please share the Total Data Size from other source
system Will be shared with successful bidder
Page 13 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
42 NA We request addition of clauses in RFP document
1. Intellectual Property Rights and Ownership of
Software:
(a) The Client shall not be entitled to claim any
proprietary rights (including IPR rights) in the said
Software or any version or Documentation thereof and
recognises the right of Pragmatix and Pragmatix
Affiliate in the said Software.
(b) Notwithstanding anything to the contrary contained
herein, except for the limited license rights expressly
provided herein, Pragmatix shall have and will retain
all rights, title and interest (including, without
limitation, all patent, copyright, trademark, trade
secret and other intellectual property rights) in and to
the Software, Source Code, Object Code, Microcode,
Sample Code, Documentation, Services, and all
versions, copies, modifications and derivative works
thereof (including any changes which incorporate any
of the Client ideas, feedback or suggestions). The
Client acknowledges that the Client is obtaining only a
limited license right to the Software, Object Code,
Documentation and Services if any and no ownership
rights are being conveyed to the Client under this
Agreement or otherwise.
(c) Notwithstanding the above, the Client
acknowledges that all or part of the Software and/or
the Services may contain general know-how and prior
Please be guided by RFP
43
55. Annexure I -
Indicative
Commercial Bid
General Request bank to add a row for putting Man Day Rate
for Change request process for any future
customiation.Please be guided by RFP
Page 14 of 15
Sl.
No.Clause no
Page
noClause Query Bank Response
44
General Request bank to provide the existing data size which
would help bidder to size the storage & DB
accordingly.
Also request bank to provide the online data storage &
back-up policy
Please refer to point No. 40
Page 15 of 15