CORRIGENDUM-V March 17, 2016 Sub : Tender for Construction of New Hostel Block for Girls with remolding of Existing Staff Quarters at NID, Ahmedabad Ref : NIT NO. EPI/WRO/CON/NID/691A/0102 dtd 01.02.2016 --------------------------------------------------------------------------------------------------------------- BIDDERS SHOULD NOTE THE FOLLOWING : 1. a. Pre Bid Clarifications b. Annexure-1 to pre bid clarification c. Annexure 2 to pre bid clarification. Files are uploaded as attachment. (Corrigendum V) 2. All other terms and conditions remain same. GROUP GENERAL MANAGER-CONTRACTS
Transcript

CORRIGENDUM-V March 17, 2016 Sub : Tender for Construction of New Hostel Block for Girls with remolding of Existing Staff Quarters at NID, Ahmedabad Ref : NIT NO. EPI/WRO/CON/NID/691A/0102 dtd 01.02.2016 --------------------------------------------------------------------------------------------------------------- BIDDERS SHOULD NOTE THE FOLLOWING :

1. a. Pre Bid Clarifications b. Annexure-1 to pre bid clarification c. Annexure – 2 to pre bid clarification.

Files are uploaded as attachment. (Corrigendum – V) 2. All other terms and conditions remain same.

GROUP GENERAL MANAGER-CONTRACTS

Signature of EPIL 1 Signature of Bidder

PRE BID CLARIFICATIONS FOR THE CONSTRUCTION OF NEW HOSTEL BLOCK FOR GIRLS WITH REMOLDING OF EXISTING STAFF QUARTERS AT NID AHMEDABAD

Sr. No.

Bidders Queries Reply

1 Free water and electricity to be provided NID will provide electricity upon special request from contractor @0.5% of contract value, Contractor shall take power from the available panel at their own cost through proper protection arrangement. Only supply from Electricity board will be provided to contractor. In case of power failure, contractor shall arrange the electricity on their own. No claim to contractor or any account of idling & including extension of time will be eligible and this shall not be considered if NID is not able to supply the power. Recovery of electricity charges will be made in each RA bill by EPI & replenished to NID in each case. The contractor shall have the option and discretion of taking electricity power from NID or arranging themselves. It is also advised that the option shall be exercised by contractor upon due diligence and evaluation of the requirement. However, water is to be arranged by the contractor on their own.

2 GPR Survey to be in whose scope Bidders have to assess the cost GPR survey, Bidders to be consider cost while Quoting. Shifting of services if so required upon GRP Survey shall be in the scope of Contractor and assessment of quantity of these works will be jointly done by contractor, EPI & NID. Such works shall be separately paid to contractor as per cl. 69 of GCC.

3 Bidder desired the scope of CCTV and its detailed specification of cameras and length of cable

Refer Annexure 1

4 Demolition item has been considered as Non DSR, Bidders have requested to consider the same as DSR Items

Tender condition shall prevail

Signature of EPIL 2 Signature of Bidder

Sr. No.

Bidders Queries Reply

5 Pleas define Service Tax is consider or not?

Bidders to consider all taxes, please refer clause no 5.1 and 5.2 of ACC

6 Whether to consider Facilities provided to EPIL

Not to be considered

7 Bidders requested to specify lead for Disposed of excavated material

To be disposed within NID Premises at location (s) decided by EPI / NID.

8 Payment of Extra Items Refer clause no 69 of GCC

9 Cordoned area Pre coated metal sheet with metal framing as directed and height is to be 14 feet

10 Approved Makes New additional Approved makes as suggested by NID

1. Cement – JK , Ambuja

2. UPVC Pipe – Astral, Ashirwad

3. S. S .Sink – Nirali

4. Vitrified Tiles – Asian, Simpolo

5. RCC Pipe- Alcock, Garuda, Buildcon or any ISI mark

6. Sanitary – Jaquar, Cera, Hindware or equivalent

11 Paint Please consider Weather proof epoxy paint Makes – Asian, Nerolac, Berger, ICICI

Signature of EPIL 3 Signature of Bidder

Sr. No.

Bidders Queries Reply

12 Use of site mixing concrete for less quantity

Allowed to use smaller quantity by using weigh batcher as per the approval of Engineer in charge and items shall be paid vide DSR Item No 5.33.1 & 5.33.2

13 Please provide Drawings of Brick Cladding Work

Refer Annexure 2

14 Quality and specifications of brick to be used

Brick strength to be obtained as per description mentioned in the BOQ

15 Removal of existing trees The same shall be done by NID

16 Removal of chain link fencing Refer Corrigendum III of ACC II

17 Please Note Vol Description In Place of Read As

Vol III PART II SR NO. 1

IN NEW GIRLS

HOSTEL

EXPOSED BRICK WORK

BRICK CLADDING WORK

Vol III PART II SR NO. 1 IN EXISTING STAFF QUARTERS REMOLDING

BRICK WORK

BRICK CLADDING WORK

18 Note: 1) Upon demolition & striping of plaster in existing of staff quarter there is possibility of additional work like retrofitting, rebarring, strenghting of structure etc. all these works or any other work required to be done for satisfactory completion of work the same shall be in the scope of contractor. However assessment of quantity of these works will be jointly done by contractor, EPI & NID. Such works shall be separately paid to contractor as per cl. 69 of GCC. 2) Property and premises of NID occupied, utilized by contractor for any purpose like storage of Material, Site establishment, enabling work etc. shall be fully removed and recovered to original for handing over to client i.e. NID upon completion and handing over of work.

Signature of EPIL 4 Signature of Bidder

Queries from Uday Buildcon Pvt. Ltd.

Sr. No.

Bidders Queries Reply

1 Service Tax in DSR rates is not included so we request for Service Tax to be kept extra as applicable

Refer Clarification Point No 5

2 We need the Qty of area to be Barricade incl. Ht. of the Barricade.

Bidders have to assess the cost of removing and refixing of Barricade work.

3 Majority of the Work shall be done by RMC. But every time RMC shall not be Practical. So it was discussed that RCC cast in situ with Weigh Bacher and Mixure Machine shall be allowed at site.

Refer Clarification Point No 12

4 It was discussed that Power shall be @ 0.5% or 1% of the contract or work done amount and shall be supplied by client.

Refer Clarification Point No 1

5 Water shall be arranged by contractor Water is to be arranged by the contractor on their own.

6 GPR Survey has to be done. Please reconfirm the same.

Refer Clarification Point No 2

7 Qty. in BOQ for CCTV is Lumpsum. It was discussed that Qty. of CCTV and length of cable shall be provided and along with qty. and its rate.

Refer Annexure 1

Signature of EPIL 5 Signature of Bidder

Sr. No.

Bidders Queries Reply

8 There will be no deviation in the BOQ. The item rates mentioned in the BOQ it be final. and in futue if and DSR rate is than also the itme rate mentioned in the BOQ will remain firm

Refer clause no 69 of GCC

9 The Facilities to be given to EPIL mentioned in the BOQ as per discussion is cancelled. It was discussed that contractor doesn’t hve to give any Car, or Site office or computer etc. to EPIL

Not to be considered

10 Surplus excavated earth shall be transported within the premises.

Refer Clarification Point No 7

11 Polish Kotah Stone shall be Green Polished Kotah Stone

Green Polished Kotah Stone as per ACC II

12 Cement Paint / Apex Paint to be done As per BOQ

13 Additional Brand of cement like JK laxmi, Binani, Ambuja, Siddhi, Sanghi etc

Refer Clarification Point No 10

14 Additional Brand of Tiles Asian, Simpolo etc.

Refer Clarification Point No 10

Signature of EPIL 6 Signature of Bidder

Sr. No.

Bidders Queries Reply

15 The Exposed Brick Masonry item shall be Exposed Brick on edge cladding as per existing NID patern

As per BOQ and sketch for Brick Cladding Work is enclosed as Annexure 2

16 In future if Vat Tax or Servie Tax is increased or any other additional Govt. Tax is levied same shall be reimbursed with respect to the existing Tax structure as on March 2016.

Refer Clarification Point No 5

17 General notification for items ISI mark localy available for items. For example in DSR rate Yamuna sand is mentioned. It has to be Localy available river sand. Same can be applicable for many items

You may consider River Sand instead of Yamuna Sand

18 The contractor who have submitted tender on 16-2-16 need not submit the Technical Bid again. They shall submit only the revised Price-Bid and hence the rice Bid submitted on 16-2-16 shall be considered void

Bidders should submit Revised Price Bid / BOQ and all corrigendum documents, Clarification duly signed and stamped

19 The value of the revised Security deposit is decreased if contractor wish to continue with the BG submitted in the tender submitted on 16-2-2016 it is fine as the amount of that BG id more than the amount of BG with revised estimate of tender to be sumitted on 14-3-2016.

The query seems to be about EMD not Security deposits. If valid EMD is enclosed with the tender already submitted the same will be considered. Validity of EMD should be as per revised submission date.

Signature of EPIL 7 Signature of Bidder

Sr. No.

Bidders Queries Reply

20 We request for extension of date of submission of tender from 14-2-2016 to 16-2-2016 upto 4pm

22.03.2016 up to 1500 Hrs

We request for extension of date of submission of tender to 16-3-2016 upto 4pminstead of 14-3-2016.

Queries from Hetu Construction Pvt Ltd

1 Please clarify the applicability of Service tax and if it should be included in rates or paid separately?

Refer Clarification Point No 5

2 Power to be provided by NID at one point and 1%tobe deducted for power from billing

Refer Clarification Point No 1

3 All Trees cutting permissions and cutting to be taken by NID?

Refer Clarification Point No 15

4 Please give quantity of Barricading to be done

Bidders have to assess the cost of removing and refixing of Barricade work.

5 Please give area of GPR survey to be done

Refer Clarification Point No 2

6 We will be allowed to use tennis court for material storage while working?

YES, Also refer ACC II in Corrigendum III

Signature of EPIL 8 Signature of Bidder

Sr. No.

Bidders Queries Reply

7 Any changes/alterations in Government duties / taxes tobe paid as per actual by the client?

Refer Clarification Point No 5

8 No facility of Car/Office/etc to be given by the contractor to EPIL

Not to be considered

Annexure 1

SR.

NO.

DESCRIPTION UNIT QTY RATE AMOUNT

1.0 CCTV Camera (Total Passage length on ground floor

is 35 mts.)

1.1 1.3MPBulletIP:::,1/3’’ProgressiveScanCMOS,1.3MP(1280

x960P)HighResolution,Day&nightSurveillance,Fix3.6mm

BoardHDlens,36pcs.IRLEDs,Max.30Mtr.IR,Remoteviewa

ndmanagementbyIEandCMS,Supportmobileremoteview,C

ompatiblewithONVIFprotocols,Built-in802.3afPOE, IP66

nos.

3 15222 45,667

1.2 4CHH.264NVR:::,H.264dual codec decoding, 4ch HDIPC

inputs, Liveview:720P@30fps, 960P@30fps,

1080P@30fps, Playback:Max4ch960P@30fps, USB2.0,

VGA/HDMIoutput, 1HDD port, Max3TB, Supportmulti-

brandIPC:Dahua, Hikvision, ArecontVision, AXIS,

TIANSHITONG, Dynacolor, XIOMGMAI, SONYandetc,

Support mobile phone remote view, CMS centralized

network management software, 256 freeaccess, Support

P2P function (plug&play), freer outer setting, Onvifversion

2.0 compatible

nos.

1 5911.00 6,803

1.3 POE (Power on Ethernet) switch with 4 slots nos. 1 6000.00 6,906

1.4 CAT-6 cabling rmt 35 51.79 1,813

1.5 24" HD LED screen with HDMI input socket nos. 1 12000.00 13,811

Total 75,000.00