CORTE MADERA TOWN COUNCIL
STAFF REPORT
REPORT DATE: May 28, 2019
MEETING DATE: June 4, 2019
TO: Honorable Mayor and Members of the Town Council
FROM: Jared Barrilleaux, Senior Civil Engineer
Peter Brown, Public Works Director
SUBJECT: Review and Comment on the Draft Capital Improvement Program and Budget for
Fiscal Years 2019-2020 and 2020-2021
RECOMMENDED ACTION:
Review and provide direction to staff to amend, if needed, the Fiscal Year (FY) 2019-2020 and
FY 2020-2021 CIP and return to Town Council with final CIP for adoption during a public hearing
at the June 18th Town Council meeting.
BACKGROUND:
The state of the practice in Public Works improvements for most municipalities in California is to
have both a long-range vision (typically 5 to 20+ years) for capital needs, as well as a short-term
(1-4 years) plan and budget for capital improvement projects. The Corte Madera CIP attempts to
do both; it includes on-going projects that may be in the planning (PID/PSR), environmental
(PA/ED), engineering/design (PS&E), or construction phases (CON), as well as projects that have
not begun but may need to be started within the next 5 years.
The current Fiscal Year 2018-2019 CIP (effective through June 30, 2019) is wrapping up this
month. However the proposed FY 2019-2020 CIP is based on a budgeted two-year cycle, which
will be reevaluated going into FY 2020-2021, but can also be done on an as-needed basis. A
“Projects Completed” category has been added at the end of the FY2019-2020 CIP, which
highlights projects completed during the current fiscal year and notes the estimated cost spent for
each item.
Longer term projects can be found in the tables at the back of the CIP and would be indicated by
having cost estimates for years 2022-2024, and no dollars budgeted in 2020-2021. Additionally,
shorter term projects that are at various stages of development have a portion of their budget
estimated for the upcoming two fiscal years and larger amounts needed for completion by 2024.
2
Staff plans to implement as much of the Fiscal Year 2019-2020 CIP as is warranted given the
primary constraints; staff time for project management/delivery between now and June 30, 2020,
available budget, environmental/engineering/permitting constraints, and Council direction and
authorization. Council approval of the CIP allows decision makers, staff and members of the public
to move forward with project implementation and Town priorities for improvements. Any projects
not included in the CIP, would need to be amended into the plan by the Town Council prior to
moving forward to the construction phase.
DISCUSSION:
Provide direction to staff on the adequacy and content of the proposed Draft Capital Improvement
Program (CIP) for the upcoming two fiscal years. The new CIP is a carryover of existing Town
projects that are in various phases of development and also includes new projects that may need
to be initiated in the coming one to five years. The CIP serves as the guiding document for ongoing
and needed capital improvements. Council is being asked to review and comment on the draft CIP
in this meeting, and formally adopt by resolution the final FY2019-2020 and FY2020-2021 CIP at
its June 18, 2019 meeting. The public is also encouraged to provide input to staff and council on
capital priorities.
FISCAL IMPACT:
The CIP is perhaps the most significant Town planning document in regard to fiscal impacts and
future infrastructure. The plan estimates up to $7,500,000 and $10,200,000 in need for capital
improvements in the coming year two fiscal years respectively, and $55,000,000 through 2024.
The bulk of the work is in Multimodal Transportation. The Flood Control budget is around
$800,000 each year, which exceeds the revenue previously collected for the Flood Control Parcel
Tax. The Town has various funding sources to pay for projects in all of the project categories.
These funding sources are detailed in the annual budget.
A separate Sanitary District No. 2 staff report is forthcoming for the Sanitary District No. 2 Board.
ENVIRONMENTAL IMPACT:
The activity (planning document) is covered by the general rule that CEQA does not apply where
it can be seen with certainty that there is no possibility that the activity will have a significant
effect on the environment (CEQA, Article 5, Section 15061(b)(3)).
OPTIONS:
1. Review and comment on the draft CIP, and direct staff to return with the final CIP on
June 18, 2019.
3
2. Provide comments to staff and direct that the item be brought back at a later date.
3. Take no action at this time.
ATTACHMENTS:
1. Attachment 1- Draft CIP
THIS ITEM HAS BEEN REVIEWED AND APPROVED BY THE TOWN MANAGER.
4
Attachment 1:
Draft CIP
1
Town of Corte Madera
Capital Improvement
Program CIP for 2020 & 2021
Department of Public Works
Town of Corte Madera Five Year Capital Improvement Program (CIP)
June 4, 2019 Page 1
INTRODUCTION TO THE TOWN OF CORTE MADERA CAPITAL
IMPROVEMENT PROGRAM
The term Capital Improvement Program, or CIP, refers a list of construction projects that are needed
to maintain and replace critical public infrastructure. Last year’s 2018/2019 CIP was adopted by
the Town Council in June 2018. The CIP should be updated every one to two years and is one of
the most critical documents for public safety, quality of life, and assurance of public services like
functional roadways, safe sidewalks, regular flood control measures and sewage delivery services.
Corte Madera is a community of approximately 10,000 people and is devoted to preserving its rich
history, maintaining high quality of life, and carefully planning its future. Corte Madera is located
in central Marin County, and has everything at its doorstep: access to a major urban city in San
Francisco, Sonoma County wine country, the San Francisco Bay, and the Pacific Ocean Coast.
The public services are provided through the work of the Town of Corte Madera and Sanitary
District Number 2 (“SD2”), otherwise referred to as “The Town” or “SD2.” The Town serves the
public through various departments: Administration; Central Marin Police Department; Finance;
the Central Marin Fire Department; Planning and Building; Public Works Engineering and
Maintenance; and Parks and Recreation. Overall, these departments, along with the Sanitary
District No. 2 (a subsidiary district of the Town of Corte Madera), work together to address the
concerns of the community through fiscal stability, capital project delivery and infrastructure
improvement.
Like all local jurisdictions, location is a significant factor in the planning and decision-making
process. Corte Madera is uniquely positioned between a forested picturesque hillside of Mount
Tamalpais to the west, a tidal-influenced drainage of Corte Madera Creek and the City of Larkspur
to the north, "Horse Hill" and the ridge delineating Mill Valley to the south, and most critically,
miles of San Francisco Bay Area shoreline and marshland to the east. This geography makes the
Town highly vulnerable to a wide-variety of climate change impacts: sea-level rise (SLR), deluge,
coastal and tidal flooding, drought and wildfires. Proximity to the San Andreas and Hayward Faults,
and underlying presence of bay mud cause Town concern for earthquakes, liquefaction and
differential settlement.
Additionally, many Californians, along with local residents, travel from or through Corte Madera
on a daily basis via the State Highway System on routes such as US 101, Highway 37 and Interstate
580. Transportation is a very important factor in the economic and environmental functioning of
the Town. Corte Madera is taking a proactive effort to mitigate the risks associated with climate
change and is also developing implementable strategies for successful adaptation of the Town’s
multi-modal transportation infrastructure. All of these factors create the need for a comprehensive
Capital Improvement Program that prioritizes investment in the repair and replacement of all Town
assets and infrastructure.
FUNDING CONSTRAINTS OF CIP DEVELOPMENT
State and federal transportation funding sources continue to diminish. Even with the passing of
President Obama’s Fixing America’s Surface Transportation (FAST) Act, which he signed into law
Town of Corte Madera Five Year Capital Improvement Program (CIP)
June 4, 2019 Page 2
in 2015, and the Road Repair and Accountability Act of 2017
(SB1) signed by Governor Brown in 2017, Corte Madera is
challenged by funding constraints to address considerable
infrastructure and maintenance needs. To be clear, asset and
infrastructure costs and needs exceed revenues.
Corte Madera currently has dedicated funding sources that are
insufficient for the capital needs identified. However, in 2013
Corte Madera voters approved a general transaction and use tax
(local sales tax) which is used to maintain essential services
including but not limited to flood control, street repairs, and safe
routes to school. Corte Madera staff, elected officials, and voters
worked hard to renew the local sales tax in 2018. This sales tax
renewal, otherwise known as Measure F, increased revenue by
raising the sales tax rate from ½ cents to ¾ cents to help meet the
Town’s current and future infrastructure needs, fortify the Town,
build in resiliency, anticipate maintenance needs, prolong the
useful life of current assets, and allow the Town of Corte Madera
to become a model for how to fund and implement Public Works
transportation improvements and flood control systems.
ASSET INVENTORY
In order to provide information on the long-term viability of all
of the infrastructure assets within the Town, the findings from
the Government Accounting Standings Board, or GASB
Statement 34 can be referenced. GASB 34 provides updated
infrastructure asset reports by adding construction, replacement
information, and current value of the Town’s infrastructure
assets. Based on the findings of GASB 34, the following assets
represent a total replacement value of about $200 million in 2017
dollars. While illustrative, the more pertinent figure is the $55
million in needed investments in the Town between 2020 and
2024.
Examples of Town-owned assets:
Flood control systems – Levees, ten (10) pump stations,
lagoons, and both the “high” and “low” canals
Sanitary District – Nineteen (19) pump stations, manhole
covers, mains, and related subterranean conveyances
Roadways - Pavement, curbs/gutters, sidewalks, ADA
ramps, walls and barriers
This CIP is planning
document that contains a
five-year list of capital
improvements. It is
connected to, and informs
the budgets of both the
Town and Sanitary
District Number 2.
However, there are key
distinctions.
First, the CIP project
listing typically contains
total project cost by phase,
whereas the budget
document only allocates
funds controlled by the
Town or SD2. Sometimes
total costs of projects
exceed the impact to the
budget when for example,
project partners contribute
to funding completion.
Secondly, the first two
years are estimates of
costs and every attempt is
made to allocate funds by
appropriate source to each
project. Fiscal years 2020
and 2021 can be described
as “fiscally constrained.”
The last 3 years, 2022-
2024 however, better
describe need than
anticipated budget impacts
and are unconstrained,
meaning full funding has
not been identified.
How does the CIP
relate to the
Budget?
Town of Corte Madera Five Year Capital Improvement Program (CIP)
June 4, 2019 Page 3
Streetlights for nighttime multimodal safety
Traffic signals – The Town owns and maintains fourteen (14) traffic signals
Guardrails – The Town owns and maintains approximately 2,800 linear feet of guardrails
Retaining walls
Pedestrian bridges – two (2) pedestrian bridges
Storm-drain system – Forty-seven (47) linear miles of pipes: Consists of pipe mains, manholes,
ditches, vaults, catch basins, and other assets
Recreational facilities – three (3) park and recreation facilities including the land
Bike paths and trails – twenty (20) trails and paths
Hanging baskets – nineteen (19) baskets on nine (9) non-lighted poles, thirty-three (33)
baskets, and one basket in a planter box
Buildings network – fifty (50) building structures, from Town Hall and the Corp Yard, to the
Community Center and many pump station buildings
Although GASB 34 estimates the replacement costs for all assets to be about $200 million, the
Public Works Capital Improvement Program (CIP) must prioritize the most-needed projects that
require replacement and rehabilitation. This means that Corte Madera will be focusing on a list of
fiscally constrained projects at a value of approximately $15 to $20 million through 2021. It is
important to note that the unconstrained list of projects is estimated $50-$55 million that will be
needed by 2024.
PURPOSE OF THE CIP
The primary purpose of the CIP is to ensure that elected officials, the public, and all staff within the
Town are clear about the Town’s capital priorities. This is critical to ensuring that capital projects
are coordinated to deliver capital improvements in the most cost and time efficient manner possible.
It also serves to inform the Town’s bond holders and funding partners of the capital priorities.
Including a capital project in the CIP is typically a precursor to submitting funding requests and
applying for grant opportunities. Finally, it provides the Town’s stakeholders and the public with a
clear description of its capital needs, as well as the process used to determine the order and timing
of the Town’s capital investments.
The CIP is the catalogue of the Town of Corte Madera’s anticipated capital project needs for the
upcoming five years. Many of the Town’s investment decisions, grant applications, and project
prioritization rely upon the information described in this plan. Included are capital projects to
replace, rehabilitate, and enhance flood control infrastructure; the transportation system; bicycle
and pedestrian amenities; as well as improve system safety. The plan describes the capital projects
Town of Corte Madera Five Year Capital Improvement Program (CIP)
June 4, 2019 Page 4
needed to enhance and expand the transportation and flood control systems along with the facilities
and technologies that support them.
Completing projects within the CIP strengthens the Town’s ability to achieve many of its strategic
goals, including: safeguarding and improving public transportation infrastructure, extending the life
of assets, and improving safety conditions for Corte Madera’s residents and visitors. The Plan
serves as the basis for developing the fiscally constrained two-year CIP and the Operating Budget
and Work Plan. Given limited funding availability, the Town will prioritize the capital projects
which can be advanced during each five-year CIP and programmed during the two-year budget.
The CIP has a five-year horizon and has a two-year fiscally constrained budget which will be
formally updated every other year, and reviewed and revised if needed along the way.
HOW WAS IT DEVELOPED?
The capital projects included in this CIP were identified through a number of sources; existing lists
of capital projects, assessments of infrastructure by PW staff, engineers and maintenance crew,
community requests, regional project priorities, and grant funding opportunities.
As previously discussed, the premise of the CIP is to maintain the Town’s existing capital assets as
identified in the state of good repair programs and prioritize capital projects given constrained
resources. In addition, there are a large number of projects that were identified as part of a formal
planning process. These include the Casa Buena Complete Streets Project, the Tamal Vista
Complete Streets Project, the Paradise Drive Complete Streets project between Ring Mt. trailhead
and Robin Drive, and the Redwood Highway Multi-use Pathway. Prior to the end of the fiscal year
the Town holds a public hearing where resident comments are considered regarding capital needs
and priorities. Finally, the Town has established a process to add capital needs to the CIP which is
led by the Department of Public Works.
CAPITAL PROGRAMS
The CIP is organized by Capital Programs and the relative rank of each capital project within its
capital program. Rank is indicated by whether or not a project has funding allocated in year one
or two. The Finance Department of the Town of Corte Madera uses these categories to organize
and allocate funding for programs. The Public Works Department oversees the capital program to
ensure that projects are prioritized and moving forward based on stage of completion, funding
availability, readiness, and Town goals.
Capital Program Description
Flood Control and Storm
Drainage
Addresses storm drain replacements, repairs, and
improvements, pump station modifications and flood
control infrastructure management.
Multimodal Transportation Focuses on bike and pedestrian improvements like ramp
improvements, sidewalk replacements, bike lanes and
traffic signal updates. Includes automobile circulation.
Planning and Building Includes updates to the Zoning Ordinance/General Plan,
and fee programs, including any necessary studies.
Town of Corte Madera Five Year Capital Improvement Program (CIP)
June 4, 2019 Page 5
Parks Pathway repairs, replacement of stairs/railings, improved
basketball courts, and resurfacing of tennis courts.
Environmental Implements projects and programs to increase diversion
of waste and for overall reduction of environmental.
impacts
Sanitary District No. 2 Reduce inflow and infiltration (I&I) of ground water into
the sewer system, the replacement of aging gravity mains
and the improvement of the level of maintenance
conducted to reduce the number of sewer stoppages.
Plans that will lead to future
Capital Investments
Climate Adaptation Plan
CIP IMPLEMENTATION
Any capital project that seeks Town or outside funding must be included in the CIP. However,
because the plan has not been fiscally constrained, but rather represents agency needs instead of
existing resources, an additional step is needed. The CIP provides the basis for creating a Five-year
CIP which looks at anticipated capital resources. Further refinement comes in the development of
the two-year operating and capital budgets. These documents must be financially constrained and
only projects and phases which are fully funded can move forward in the first year or two.
The Town Council has the ultimate responsibility to fund and implement capital projects from the
CIP to advance through the process for funding, inclusion in the CIP and implementation, based on
the following factors:
Project priority;
Project readiness (safety concerns, environmental clearance, public support, etc.);
Funding opportunities;
Coordination with other capital improvements;
Special conditions (regulatory requirements and project dependencies); and
Available funding
Project Priority – Staff uses a qualitative and quantitative methodology to assess the demand of
an investment relative to other improvement needs. Factors such as state of good repair, safety and
security, funding, and alignment with Town goals impact a project’s priority.
Project Readiness - Readiness is a measure of all of the appropriate preliminary requirements for
project implementation. Preliminary requirements include environmental clearance and public
support. It also considers project interdependencies, that is if a project must proceed prior to or after
Town of Corte Madera Five Year Capital Improvement Program (CIP)
June 4, 2019 Page 6
another project. For example, the Town cannot construct a platform to service the gate at the
Shorebird Marsh Pump Station without first replacing the inside gate of the pump station.
Funding Alignment and Opportunities – The Town Manager can approve these projects to
advance through the capital budget process for inclusion into the Council-Adopted five-year CIP if
coordination with other projects or funding proposals provides the opportunity for advancement.
The multimodal nature of the Town of Corte Madera allows for the combining of several projects
into singular programs for several reasons:
Proximity to other projects to avoid multiple construction disruptions in the same
location;
Enhancing multi-modal traffic and quality of life;
Cost savings through economies of scale; and
Project management and oversight cost savings
Special Conditions - Some projects satisfy legal requirements to provide facilities and equipment
of a certain nature, such as the ADA requirements for the physically-disadvantaged population; or
some grants that require project implementation and construction to occur within a given time
frame.
CIP SUMMARY AND NEXT STEPS
In last year’s CIP there was a total of 61 projects. In an attempt to address all Town and District
needs, Public Works Staff have increased the number of Capital Improvements needed. Summaries
of the 83 projects included in the CIP, categorized by capital program, and investment type are
included in Appendix A. The critical next steps are the development of the five-year CIP based
upon constrained and anticipated revenues. The CIP will be a living document and will be updated
through the Department of Public Works.
APPENDIX A Town of Corte Madera: Tables of Project Summaries and Cost Estimates
2019
-202
020
20-2
021
3 Y
ear
2022
-202
4$7
,540
,000
$10,
250,
000
$37,
613,
000
Proj
ect N
ame
Proj
ect D
escr
iptio
nPr
ojec
t Ph
ase
2019
-202
020
20-2
021
3 Y
ear
Nee
d20
22-2
024
#
Plan
ning
En
viro
nmen
tal
Engi
neer
ing
Con
struc
tion
$785
,000
$810
,000
$21,
950,
000
1M
orni
ngsi
de D
rive
Stor
m D
rain
R
epla
cem
ent
Rep
lace
cor
rode
d 15
inch
cor
ruga
ted
met
al p
ipe
(CM
P) c
ross
ing
Mor
ning
side
Driv
eC
ON
$60,
000
2St
orm
Dra
in A
sses
smen
tR
evie
w st
orm
dra
in n
etw
ork
and
prio
ritiz
e im
prov
emen
ts n
eede
dPL
AN
$1
00,0
00
3La
goon
1 P
ump
Stat
ion
Insi
de
Gat
e Tr
ash
Rac
ksR
emov
e ex
istin
g ru
sted
tras
h ra
cks a
nd re
plac
e w
ith n
ew ra
cks
ENG
, CO
N$4
5,00
0
4La
goon
1 P
ump
Stat
ions
U
pgra
de th
e ex
istin
g pu
mp
stat
ion
at L
agoo
n 1
ENG
$200
,000
$2
,000
,000
5G
olde
n H
ind
at E
bbtid
e Pa
ssag
e Pu
mp
Stat
ion
and
Dra
inag
e Im
prov
emen
ts
Con
stru
ct a
pum
p st
atio
n on
Gol
den
Hin
d at
Ebb
tide
Pass
age
alon
g w
ith sl
otte
d dr
ains
to e
limin
ate
curb
pon
ding
in th
e ar
ea su
rroun
ding
th
at in
ters
ectio
nC
ON
$2,2
00,0
00
6Ti
dal B
arrie
rs a
nd L
evee
U
pgra
des
Mar
ina
Vill
age
and
Mar
iner
Cov
e Lo
ng T
erm
Tid
al a
nd F
lood
pr
otec
tion.
Pos
sibl
e pr
ojec
t to
be c
onsi
dere
dPL
AN
, EN
V,
ENG
, CO
N$1
5,00
0,00
0
7El
Cam
ino
Stor
m D
rain
R
epla
cem
ent
Stor
m d
rain
repl
acem
ent o
n El
Cam
ino
betw
een
Estra
da a
nd G
rana
daEN
G, C
ON
$120
,000
8Sh
oreb
ird M
arsh
Pum
p St
atio
n
Rep
lace
the
grat
es a
nd fr
ame
at th
e pu
mp
stat
ion
ENG
, CO
N$2
00,0
00
9Sh
oreb
ird M
arsh
Pum
p St
atio
n En
clos
ure
Impr
ovem
ents
Rep
lace
the
insi
de g
ate
of th
e Sh
oreb
ird M
arsh
Pum
p St
atio
n an
d co
nstru
ct a
pla
tform
to se
rvic
e th
e ga
te. R
econ
stru
ct m
etal
bui
ldin
g en
clos
ure
arou
nd p
ump
stat
ion
ENG
, CO
N$4
00,0
00
10M
arqu
art L
agoo
n In
side
Gat
e R
epla
cem
ent
Insi
de g
ate
is in
oper
able
, nee
ds re
plac
emen
t.C
ON
$40,
000
11M
arqu
art L
agoo
n Pu
mp
Stat
ion
Out
fall
Plat
form
Pum
p st
atio
n pl
atfo
rm is
rust
ing
and
need
s tem
pora
ry su
rface
re
stor
atio
nC
ON
$10,
000
12M
arin
a V
illag
e Pu
mp
Stat
ion
Inst
all a
pum
p st
atio
n at
the
end
of H
arbo
r Driv
e in
the
Mar
ina
Vill
age
subd
ivis
ion
ENG
, CO
N$1
,000
,000
13Sa
n C
lem
ente
Pum
p St
atio
n En
clos
ure
Cra
ckin
g R
epai
rEx
terio
r pum
p st
atio
n en
clos
ure
conc
rete
at p
ump
inte
rface
is c
rack
ing
and
dist
ress
ed. R
emov
e cr
acke
d/sp
allin
g co
ncre
te a
nd re
stor
e w
ith
inje
cted
gro
ut o
r epo
xy fo
r fur
ther
pro
tect
ion
ENG
, CO
N$2
0,00
0
14To
wnw
ide
Floo
d C
ontro
l Sys
tem
A
sses
sem
ent
Dev
elop
a P
lan
for u
pgra
ding
or r
epla
cing
floo
d pr
otec
tion
syst
ems
PLA
N, E
NG
$150
,000
15Fl
ood
Con
trol S
yste
m
Ass
esse
men
t Im
prov
emen
tsD
esig
n an
d im
plem
ent v
ario
us fl
ood
cont
rol i
mpr
ovem
ents
resu
lting
fro
m T
ownw
ide
syst
em a
sses
smen
tPL
AN
, EN
G,
CO
N$5
0,00
0 $2
00,0
00
$1,0
00,0
00
TO
TA
L A
ntic
ipat
ed N
eeds
for
CIP
(all
tabs
, exc
ludi
ng S
anita
ry D
istr
ict 2
)
Cap
ital P
rogr
am: F
lood
Con
trol
and
Sto
rm D
rain
age
Proj
ect N
ame
Proj
ect D
escr
iptio
nPr
ojec
t Ph
ase
2019
-202
020
20-2
021
3 Y
ear
Nee
d20
22-2
024
16H
igh
Can
al E
mba
nkem
ent
Rep
airs
Rep
air e
arth
en sl
opes
alo
ng th
e H
igh
Can
al d
rain
age
ease
men
t tha
t fa
iled
in th
e 20
17 w
inte
r sto
rms
ENG
, CO
N$2
50,0
00
1Em
erge
ncy
Dra
in R
epai
rs a
nd
Cor
ruga
ted
Met
al P
ipe
(CM
P)
Rep
lace
men
t
Ann
ually
set a
side
for u
nexp
ecte
d em
erge
ncy
repa
irs to
the
exis
ting
stor
m d
rain
infra
stru
ctur
e an
d to
repl
ace
dete
riora
ted
CM
P us
ed fo
r st
orm
dra
in in
frast
ruct
ure
ENG
,CO
N$5
0,00
0 $5
0,00
0 $3
00,0
00
2M
arin
er C
ove
Che
ck V
alve
In
stal
latio
nIn
stal
l che
ck v
alve
s in
the
rem
aini
ng o
utfa
lls in
Mar
iner
Cov
e w
here
hi
gh ti
des c
ause
floo
ding
CO
N$5
0,00
0 $5
0,00
0
AS
NEE
DED
PR
OJE
CTS
:
Proj
ect N
ame
Proj
ect D
escr
iptio
nPr
ojec
t Ph
ase
2019
-202
020
20-2
021
3 Y
ear
Nee
d20
22-2
024
#
Plan
ning
En
viro
nmen
tal
Engi
neer
ing
Con
stru
ctio
n
$3,5
55,0
00$6
,710
,000
$12,
293,
000
1Ta
mal
Vis
ta B
oule
vard
C
ompl
ete
Stre
ets I
mpr
ovem
ents
From
Mad
era
to F
ifer:
repa
ve ro
ad, a
dd b
ike
lane
s, en
hanc
ed
pede
stria
n cr
ossi
ngs,
stor
m d
rain
impr
ovem
ents
, and
impr
oved
si
dew
alks
alo
ng th
e co
rrid
orC
ON
$700
,000
$2
,000
,000
2M
ader
a/Ta
mal
Vis
ta B
oule
vard
R
ound
abou
t Th
e ad
ditio
n of
a ro
unda
bout
at t
he M
ader
a/Ta
mal
Vis
ta in
ters
ectio
n to
incr
ease
safe
ty, t
raff
ic fl
ow e
ffic
ienc
yEN
G, C
ON
$900
,000
3.1
Cen
tral M
arin
Reg
iona
l Pa
thw
ays G
ap C
losu
re P
roje
ctIn
stal
l som
e or
all
of th
e fo
llow
ing;
reha
bilit
ate
the
Wor
num
Driv
e m
ulti-
use
path
bet
wee
n Ta
mal
Vis
ta a
nd R
edw
ood
Hw
y., i
nsta
ll a
dedi
cate
d bi
ke fa
cilit
y on
Nel
len
Ave
nue,
impr
ove
pede
stria
n cr
ossi
ng
at F
ifer,
inst
all a
roun
dabo
ut a
t Nel
len/
Wor
num
and
inst
all a
veh
icul
ar
slip
lane
bet
wee
n ea
stbo
und
Fife
r and
Nel
len
ENG
$390
,000
3.2
Cen
tral M
arin
Gap
Clo
sure
Pr
ojec
tC
onst
ruct
the
Cen
tral M
arin
Gap
Clo
sure
Pro
ject
, add
ing
a tw
o-w
ay
cycl
e tra
ck o
n N
elle
n, m
ini-r
ound
abou
t at N
elle
n/W
arnu
m, i
mpr
oved
bi
ke p
ath
alon
g W
arnu
m, p
ed c
ross
ing
at F
ifer
CO
N$1
,600
,000
3.3
Wor
num
Driv
e B
ike
Path
R
ehab
ilita
tion
(sub
set o
f C
entra
l Mar
in G
ap C
losu
re)
Reh
abili
tate
the
path
way
, and
add
ress
Fife
r Ped
estri
an c
ross
ing
impr
ovem
ents
EN
G/ C
ON
$80,
000
$400
,000
4En
deav
or C
ove
Slid
e R
epai
rG
eote
chni
cal d
esig
n se
rvic
es to
forti
fy th
e de
bris
cat
chm
ent f
enci
ng
and
rem
oval
of l
oose
deb
risEN
G, C
ON
$300
,000
5.1
2019
Pav
emen
t Reh
abili
tatio
n Pr
ojec
tR
oad
reha
bilit
atio
n of
prio
rty st
reet
s in
Tow
nEN
G, C
ON
$1,4
00,0
00
5.2
2020
Pav
emen
t Pre
vent
ativ
e M
aint
enan
ce P
roje
ctM
aint
enan
ce a
nd w
earin
g co
urse
resu
rfac
ing
(Slu
rry
Seal
s)EN
G, C
ON
$1,2
00,0
00
5.3
2021
-23
Pave
men
t R
ehab
ilita
tion
Proj
ect
Roa
d re
habi
litat
ion
of p
riorty
stre
ets i
n To
wn
ENG
, CO
N$4
,500
,000
6C
asa
Bue
na C
ompl
ete
Stre
ets
Proj
ect
Con
stru
ct C
asa
Bue
na D
rive
from
San
ford
Stre
et to
Mea
dow
Val
ley
Roa
d in
an
effo
rt to
incl
ude
cont
inuo
us p
edes
trian
and
bik
e fa
cilit
ies
CO
N$2
,400
,000
7.1
Para
dise
Driv
e - R
ing
Mtn
Tra
il H
ead
to R
obin
Dr
Para
dise
Driv
e B
ikew
ay a
nd P
edes
trian
Enh
ance
men
ts: A
dditi
on o
f C
lass
2 b
ike
lane
s bot
h di
rect
ions
on
Para
dise
Driv
e, a
dditi
on o
f a
Cla
ss 1
pat
hway
alo
ng th
e so
uth
side
of t
he ro
ad, a
nd c
ircul
atio
n im
prov
emen
ts fo
r acc
ess t
o th
e sc
hool
s
ENG
, CO
N$2
00,0
00
$1,2
00,0
00
Cap
ital P
rogr
am: M
ultim
odal
Tra
nspo
rtat
ion
Proj
ect N
ame
Proj
ect D
escr
iptio
nPr
ojec
t Ph
ase
2019
-202
020
20-2
021
3 Y
ear
Nee
d20
22-2
024
7.2
Para
dise
Driv
e - S
an C
lem
ente
to
Sea
wol
fPa
radi
se D
rive
Side
wal
k R
epla
cem
ent,
San
Cle
men
te to
Sea
wol
f Pa
ssag
e: S
tudy
des
ign
and
cons
truct
a sa
fer s
idew
alk
and/
or a
pa
thw
ay fr
om S
an C
lem
ente
Driv
e to
Sea
wol
f Pas
sage
, wid
enin
g th
e pa
thw
ay to
8' w
here
pos
sibl
e
PLA
N, E
NG
, C
ON
$190
,000
$1
90,0
00
$673
,000
7.3
Para
dise
Driv
e - W
estw
ard
to
Rin
g M
tn -
Cla
ss 1
Pat
hPa
radi
se D
rive
Bik
eway
Ext
ensi
on: A
dditi
on o
f a C
lass
1 p
athw
ay
alon
g th
e so
uth
side
of P
arad
ise
Driv
e fr
om W
estw
ard
Driv
e to
U
pupa
nda
Way
. Thi
s are
a is
par
t of t
he S
an F
ranc
isco
Bay
Tra
il an
d fil
ls in
the
curr
ent g
ap in
the
Tow
n an
d B
ay T
rail
path
way
syst
em
PLA
N, E
NG
, C
ON
$2,0
00,0
00
8R
edw
ood
Hig
hway
Mul
ti-us
e Pa
thw
ayR
epav
e th
e ex
istin
g pa
thw
ay fr
om W
ornu
m D
rive
to th
e Sa
n C
lem
ente
/Tam
alpa
is in
ters
ectio
n, so
me
tree
rem
oval
requ
ired
CO
N$9
00,0
00
9M
isce
llane
ous S
treet
, Cur
b,
Gut
ter a
nd S
idew
alk
Rep
airs
Rep
air d
amag
ed c
urb,
gut
ter,
and
side
wal
k at
var
ious
loca
tions
CO
N$6
0,00
0 $6
0,00
0 $1
80,0
00
10M
isce
llane
ous S
treet
Rep
airs
Rep
air d
amag
ed p
avem
ent a
t var
ious
loca
tions
as n
eede
dC
ON
$30,
000
$30,
000
$90,
000
11Tr
affic
Sig
nal P
ed S
afet
y Im
prov
emen
tsU
pgra
de m
ultip
le si
gnal
hea
ds to
12"
, Ped
cou
ntdo
wns
and
add
ition
of
acce
ssib
le p
ed si
gnal
sEN
G, C
ON
$150
,000
$1
50,0
00
$450
,000
12Ta
mal
pais
Bik
e/Pe
d ac
cess
ov
er H
wy
101
Focu
s on
conn
ectin
g th
e tw
o m
ajor
Tow
n sh
oppi
ng c
ente
rs (T
own
Cen
ter a
nd T
he V
illag
e) w
ith a
bik
e an
d pe
dest
rian
acce
ssib
le
Hig
hway
101
ove
rcro
ssin
g ro
ute
PLA
NC
ALT
RA
NS
PRO
JEC
TTB
D
1357
Sum
mit
& 1
50 E
diso
n Sl
ide
Rep
airs
New
sold
ier p
ile re
tain
ing
wal
ls to
supp
ort t
he ro
adw
ay th
at w
as
com
prom
ised
in th
e w
inte
r sto
rms
ENG
, CO
N$1
35,0
00
Proj
ect N
ame
Proj
ect D
escr
iptio
nPr
ojec
t Ph
ase
2019
-202
020
20-2
021
3 Y
ear
Nee
d20
22-2
024
#
Plan
ning
En
viro
nmen
tal
Engi
neer
ing
Con
stru
ctio
n
$305
,000
$1
00,0
00
$250
,000
1U
pdat
e to
Zon
ing
Ord
inan
ceIm
plem
ent v
ario
us G
ener
al P
lan
polic
ies t
hrou
gh u
pdat
es to
the
Zoni
ng O
rdin
ance
; ado
pt n
ew o
rdin
ance
s to
com
ply
with
Sta
te
regu
latio
ns, a
nd m
ake
gene
ral i
mpr
ovem
ents
thro
ugh
clar
ifyin
g an
d "c
lean
ing
up"
exis
ting
ordi
nanc
es
PLA
N$5
0,00
0 $5
0,00
0 $1
50,0
00
2Tr
affic
Miti
gatio
n Fe
e U
pdat
eU
pdat
e a
nexu
s stu
dy th
at w
as p
repa
red
by F
ehr a
nd P
eers
for a
n up
date
of o
ur T
raffi
c Im
pact
Miti
gatio
n Im
prov
emen
t Fun
d O
rdin
ance
. The
exi
stin
g or
dina
nce
date
s bac
k to
198
2PL
AN
$30,
000
3H
ousi
ng E
lem
ent U
pdat
eU
pdat
e th
e To
wn'
s Hou
sing
Ele
men
t of t
he G
ener
al P
lan
in
com
plia
nce
with
Sta
te la
wPL
AN
$100
,000
4U
pdat
e C
limat
e A
ctio
n Pl
anU
pdat
e th
e To
wn'
s Clim
ate
Act
ion
Plan
in o
rder
to e
nsur
e th
at it
is
com
plia
nt w
ith th
e st
ate
of th
e pr
actic
ePL
AN
$50,
000
5C
limat
e A
dapt
atio
n Pl
anA
dded
$50
K in
mat
ch in
Dec
201
8, C
altra
ns g
rant
in th
e am
ount
of
$200
,000
and
Tow
n m
atch
in a
mou
nt o
f $17
5,00
0PL
AN
$175
,000
6G
ener
al P
lan
Upd
ate
Upd
ate
the
Tow
n's G
ener
al P
lan
PLA
N$5
0,00
0
Cap
ital P
rogr
am: P
lann
ing
and
Bui
ldin
g
Proj
ect N
ame
Proj
ect D
escr
iptio
nPr
ojec
t Pha
se20
19-2
020
2020
-202
13
Yea
r N
eed
2022
-202
4
#
Plan
ning
En
viro
nmen
tal
Engi
neer
ing
Con
stru
ctio
n
$560
,000
$2
10,0
00
$650
,000
1B
aske
tbal
l Cou
rtsR
esur
face
exi
stin
g ba
sket
ball
cour
ts.
CO
N$9
5,00
0 2
Rem
odel
of G
reen
room
for P
arks
an
d R
ec A
dmin
istra
tive
Off
ices
Inte
rior t
enan
t im
prov
emen
ts fo
r Par
ks a
nd R
ecre
atio
n st
aff t
o up
date
of
fice
layo
ut, H
VA
C, l
ight
ing,
ele
ctric
al, a
nd im
prov
e st
aff
wor
kspa
ces a
nd a
dd A
DA
CO
N$1
75,0
00
3A
DA
Impr
ovem
ents
of
Com
mun
ity R
ec C
ente
rA
DA
fron
tage
and
inte
rior i
mpr
ovem
ents
ENG
, CO
N$4
0,00
0 $2
10,0
00
4To
wn
Park
Arti
ficia
l Tur
f Fie
ldTo
wn
Park
arti
ficia
l tur
f fie
ldPL
AN
, CO
N$5
0,00
0 $5
00,0
00
5Sk
unk
Hol
low
Min
i Par
kU
pdat
e an
d re
plac
emen
t of e
xist
ing
play
grou
nd st
ruct
ure
with
site
im
prov
emen
ts a
nd p
athw
ay u
pgra
des f
or a
cces
sibi
lity
PLA
N, C
ON
$150
,000
6B
occe
Bal
l Cou
rtsTo
wn
Park
Boc
ce B
all C
ourt
to b
e lo
cate
d on
the
Tow
n Pa
rk p
rope
rty.
Adj
acen
t to
Caf
é V
erde
. Fa
cilit
y w
ould
pro
vide
the
oppo
rtuni
ty to
pl
ay B
occe
Bal
l yea
r rou
ndPL
AN
, CO
N$5
0,00
0
7D
og P
ark
Onc
e a
suita
ble
loca
tion
is fo
und,
a d
og p
ark
wou
ld b
e co
nstru
cted
for
both
larg
e an
d sm
all d
ogs t
o en
joy.
Fen
cing
, wat
er, a
nd a
men
ities
w
ould
be
incl
uded
in th
e de
sign
PLA
N, C
ON
$150
,000
Cap
ital P
rogr
am: P
arks
& R
ecre
atio
n
Proj
ect N
ame
Proj
ect D
escr
iptio
nPr
ojec
t Ph
ase
2019
-202
020
20-2
021
3 Y
ear
Nee
d20
22-2
024
#
Plan
ning
En
viro
nmen
tal
Engi
neer
ing
Con
struc
tion
$365
,000
$2
50,0
00
$30,
000
1Ze
ro W
aste
Pro
ject
s / C
ycle
6Th
is fu
ndin
g w
ill b
e us
ed to
impl
emen
t pro
ject
s and
pro
gram
s to
incr
ease
div
ersi
on o
f was
te, a
nd it
s ove
rall
redu
ctio
nPL
AN
$15,
000
$15,
000
$15,
000
2B
ever
age
Con
tain
er R
ecyc
ling
Purc
hase
and
inst
all s
treet
and
par
k fu
rnitu
re m
ade
of re
cycl
ed p
last
ic
bottl
es a
nd/o
r can
s, pu
rcha
se c
loth
ing
of re
cycl
ed p
last
ic b
ottle
s, an
d pr
ovid
e ou
treac
h an
d ed
ucat
ion
to re
cycl
e be
vera
ge c
onta
iner
sPL
AN
$5,0
00
$5,0
00
$15,
000
3LE
D L
ight
ing
Con
vers
ion
Proj
ect
Rep
lace
our
exi
stin
g st
reet
ligh
ts w
ith L
ED li
ghts
PLA
N$2
70,0
00
$230
,000
4EV
Cha
rgin
g @
Tow
n H
all
Inst
all n
ew P
G&
E ut
ility
serv
ice
at T
own
Hal
l to
serv
e fu
ture
EV
ch
argi
ng in
frast
ruct
ure
CO
N$7
5,00
0
Cap
ital P
rogr
am: E
nvir
onm
enta
l
Proj
ect N
ame
Proj
ect D
escr
iptio
nPr
ojec
t Ph
ase
2019
-202
020
20-2
021
3 Y
ear
Nee
d20
22-2
024
#Pl
anni
ng
Envi
ronm
enta
l En
gine
erin
g C
onst
ruct
ion
$1,9
70,0
00$2
,170
,000
$2,4
40,0
00
1M
aint
ain
Tow
n H
all,
Fire
H
ouse
, Cor
p Y
ard,
Etc
. M
echa
nica
l/ele
ctric
al/p
lum
bing
repa
irs a
nd m
aint
enan
ce,
inte
rior/e
xter
ior m
inor
repa
irs, l
ands
capi
ng, d
oor h
ardw
are
mai
nten
ance
, etc
.C
ON
$70,
000
$70,
000
$200
,000
2.1
Tow
n H
all A
dditi
onPr
ovid
e ne
w o
ffic
e bu
ildin
g fo
r cus
tom
er se
rvic
e co
unte
r, an
d Pu
blic
W
orks
and
Pla
nnin
g an
d B
uild
ing
and
IT st
aff o
ffic
es. C
onsi
der a
new
en
try c
ourty
ard
and
addi
ng F
inan
ce/A
dmin
staf
f C
ON
$1
,800
,000
$1
,500
,000
2.2
Tow
n H
all R
emod
elR
emod
el T
own
Hal
l to
expa
nd C
ounc
il C
ham
bers
, add
con
fere
nce
room
, pro
vide
AD
A a
cces
sibi
lity
ENG
, CO
N$6
00,0
00
$600
,000
3Te
mpo
rary
Mod
ular
Off
ices
+
AD
APr
ocur
e an
d in
stal
l tem
pora
ry p
orta
ble
offic
e sp
ace
in th
e N
/W c
orne
r of
the
Tow
n H
all p
arki
ng lo
t to
relo
cate
Pub
lic W
orks
staf
f fro
m th
e Fi
re S
tatio
n of
fice
spac
eC
ON
$100
,000
$140
,000
4Fi
re S
tatio
n R
emod
elEx
pand
2nd
floo
r dor
mito
ry sp
ace
over
adj
acen
t exi
stin
g si
ngle
stor
y ro
of, r
emod
el a
ppar
atus
bay
s, in
terio
r rem
odel
PLA
N, E
NG
, C
ON
$1,5
00,0
00
Cap
ital P
rogr
am: T
own
Ow
ned
Faci
litie
s
Proj
ect N
ame
Proj
ect D
escr
iptio
nPr
ojec
t Ph
ase
2019
-202
020
20-2
021
3 Y
ear
Nee
d20
22-2
024
#
Plan
ning
En
viro
nmen
tal
Engi
neer
ing
Con
struc
tion
$6,6
70,0
00
$6,8
70,0
00
$24,
490,
000
1D
esig
n H
arbo
r Driv
e Se
wer
R
ehab
ilita
tion
Sani
tary
Dis
trict
No.
2 o
f Mar
in C
ount
y (S
D2)
shal
l des
ign
the
repl
acet
abo
ut 5
,000
feet
of s
anita
ry se
wer
syst
em m
ain
lines
and
ab
out 1
30 la
tera
lsEN
G$3
60,0
00
2C
onst
ruct
Har
bor D
rive
Sew
er
Reh
abili
tatio
nSD
2 sh
all c
onst
ruct
the
repl
acem
ent o
f the
sani
tary
sew
er sy
stem
m
ain
lines
and
late
rals
in T
ask
32. M
ust b
e co
mpl
eted
by
2021
CO
N
$1,5
00,0
00
$1,5
00,0
00
3D
esig
n El
Cam
ino
Driv
e Se
wer
R
ehab
ilita
tion
SD2
shal
l des
ign
the
repl
acem
ent o
f abo
ut 9
,000
feet
of s
anita
ry
sew
er sy
stem
mai
n lin
es a
nd a
bout
200
late
rals
ENG
$650
,000
4C
onst
ruct
El C
amin
o D
rive
Sew
er R
ehab
ilita
tion
Rep
lace
SS
mai
n an
d la
tera
l, SD
2 sh
all c
onst
ruct
the
repl
acem
ent o
f th
e sa
nita
ry se
wer
syst
em m
ain
lines
and
late
rals
in in
Tas
k 34
. Mus
t be
com
plet
ed b
y 20
22C
ON
$5,3
70,0
00
1Fi
fer P
ump
Stat
ion
(PS)
Rep
lace
pum
ps, e
lect
rical
, and
mec
hani
cal e
quip
men
t; ad
d flo
w
met
erC
ON
$720
,000
2Tr
inid
ad 2
PS
Upg
rade
age
d pu
mp
stat
ion
(bui
lt 19
60),
with
mod
ern
stan
dard
pum
p fa
cilit
ies t
o re
duce
mai
nten
ance
cos
ts a
nd in
crea
se p
ump
effic
ienc
yC
ON
$1,1
00,0
00
3A
RV
s Sei
smic
safe
tySD
2 Fo
rce
Mai
n si
esm
ic st
abili
zatio
nEN
G, C
ON
$50,
000
4A
RV
's &
ISO
Rep
lace
and
repa
ir 4
air r
elea
se v
alve
s (A
RV
'S) a
nd 1
Isol
atio
n V
alve
(I
SO) o
n th
e SD
2 pr
imar
y fo
rce
mai
n be
twee
n Pa
radi
se P
ump
Stat
ion
and
Sir F
ranc
is D
rake
CM
SA c
onne
ctio
n an
d sh
utdo
wn
FM fo
r rep
air
(Byp
ass)
ENG
, CO
N$5
00,0
00$5
00,0
00$1
,800
,000
5O
ld L
andi
ng P
SN
ew st
and
alon
e ge
nera
tor
ENG
, CO
N$3
00,0
00
6Fl
ow m
eter
Vau
lt In
stal
a fl
ow m
eter
at t
he V
illag
e, T
raile
r Cou
rt an
d re
plac
e th
e Tr
aile
r cou
rt ge
nera
tor a
s pha
se 1
. Rep
lace
val
ves a
nd re
loca
tion
of
the
mai
n flo
w m
eter
ENG
, CO
N$4
80,0
00
$1,5
00,0
00
7M
eado
wsw
eet -
Nor
th
Reh
abili
tatio
n Pr
ojec
tR
ehab
ilita
tion
and
repl
acem
ent o
f mai
n gr
avity
trun
k se
wer
sEN
G, C
ON
$350
,000
$1
,500
,000
$2
,000
,000
8M
eado
wsw
eet/T
amal
pais
up
to
Will
owD
esig
n th
e re
habi
litat
ion
and
repl
acem
ent o
f mai
n gr
avity
trun
k se
wer
sEN
G$2
00,0
00$2
,500
,000
Cap
ital P
rogr
am: S
anita
ry D
istr
ict N
o. 2
RW
QC
B R
EQ
UIR
ED
CIP
PR
OJE
CT
S B
Y 2
022:
OT
HE
R S
D2
CIP
PR
OJE
CT
S:
Proj
ect N
ame
Proj
ect D
escr
iptio
nPr
ojec
t Ph
ase
2019
-202
020
20-2
021
3 Y
ear
Nee
d20
22-2
024
9Pa
radi
se V
aria
ble
Freq
uenc
y D
rive
(VFD
)Ex
istin
g V
FD a
re b
eyon
d th
eir u
sefu
l life
and
nee
d re
plac
ing
ENG
, CO
N$1
00,0
00
$100
,000
$1
00,0
00
10Se
awol
f and
Gol
denh
ind
PSEv
alua
te fo
r tid
al p
rote
ctio
n EN
G$2
00,0
00
11SD
2 Fo
rce
Mai
n B
ypas
s C
onst
ruct
per
man
ant b
ypas
s for
forc
e m
ain
redu
danc
y an
d sa
fety
ENG
, CO
N$3
00,0
00
$1,2
00,0
00
12Pr
e-Pa
ving
Sew
er R
ehab
ilita
tion
Proj
ect
Sew
er re
habi
litat
ion
in c
oord
inat
ion
with
pav
ing
(incl
. Tam
al V
ista
) to
repl
ace
vitri
fied
clay
pip
e fr
om m
ainl
ine
syst
emEN
G, C
ON
$2,0
00,0
00
$1,5
00,0
00
$5,0
00,0
00
13Pi
xley
& S
ausa
lito
PSR
epla
ce p
umps
, ele
ctric
al, a
nd m
echa
nica
l equ
ipm
ent;
add
flow
m
eter
and
upg
rade
stat
ion
(at S
ausa
lito)
ENG
, CO
N$1
50,0
00
$1,0
00,0
00
14La
kesi
de P
SC
orro
sion
, odo
r and
con
trol s
yste
m p
arts
ENG
, CO
N$4
0,00
0 $1
00,0
00
15Se
awol
f PS
Secu
rity
fenc
e re
pair
or re
plac
ed
CO
N$3
0,00
0 16
CM
SA C
apita
l Pro
gram
for P
S Im
prov
emen
tsC
apita
l rep
airs
, par
ts le
ad b
y C
MSA
for S
D2
Pum
p St
atio
n op
erat
ions
CO
N$1
50,0
00$1
50,0
00$4
50,0
00
17PS
L Pi
lot G
rant
Pro
gram
Pilo
t ass
ista
nce
prog
ram
off
erin
g $1
,500
to e
ach
prop
erty
ow
ner f
or
the
repa
ir/re
plac
emen
t of P
rivat
e Se
wer
Lat
eral
sC
ON
$250
,000
$2
50,0
00
$750
,000
18Lo
wer
Lat
eral
CIP
Pilo
t Pro
gram
Pilo
t pro
gram
off
erin
g to
ent
irely
repl
ace
only
the
Low
er L
ater
al o
f pr
oper
ty o
wne
rs' P
SL in
clud
ed a
s par
t of n
earb
y SD
2 C
IP p
roje
ctC
ON
$250
,000
$250
,000
$750
,000
19Lo
w In
com
e PS
L G
rant
Pro
gram
Off
ers g
rant
ass
itanc
e up
to 7
5% c
ost m
atch
up
to $
5,00
0 fo
r re
pair/
repl
acem
ent o
f qua
lifie
d lo
w-in
com
e pr
oper
ty o
wne
rs' P
SLC
ON
$40,
000
$20,
000
$20,
000
Proj
ect N
ame
Proj
ect D
escr
iptio
n20
19 P
roje
ct
Phas
eFY
201
93
Yea
r N
eed
2022
-202
4
#Pl
anni
ng
Envi
ronm
enta
l En
gine
erin
g C
onst
ruct
ion
$5,6
45,0
00$2
1,95
0,00
0
1G
olde
n H
ind
at C
ay P
assa
ge
Pum
p St
atio
n M
odifi
catio
ns
Rep
air/r
epla
ce th
e ch
eck
valv
es in
stal
led
at th
is e
xist
ing
pum
p st
atio
nC
ON
$40,
000
2G
olde
n H
ind
at E
bbtid
e Pa
ssag
e Pu
mp
Stat
ion
and
Dra
inag
e Im
prov
emen
ts
Con
stru
ct a
pum
p st
atio
n on
Gol
den
Hin
d at
Ebb
tide
Pass
age
alon
g w
ith
slot
ted
drai
ns to
elim
inat
e cu
rb p
ondi
ng in
the
area
surr
ound
ing
that
in
ters
ectio
nEN
G$1
65,0
00
3Sa
n C
lem
ente
Pum
p St
atio
n R
epai
rsR
emov
e, se
rvic
e &
repa
ir, a
nd re
plac
e pu
mp
#2
CO
N$8
5,00
0
4M
arin
er C
ove
Che
ck V
alve
In
stal
latio
nIn
stal
l che
ck v
alve
s in
the
rem
aini
ng o
utfa
lls in
Mar
iner
Cov
e w
here
hig
h tid
es c
ause
bay
wat
er to
bac
k up
into
the
stre
etPl
anni
ng
$25,
000
1Ta
mal
Vis
ta B
oule
vard
C
ompl
ete
Stre
ets I
mpr
ovem
ents
Add
bic
ycle
lane
s in
both
the
north
boun
d an
d so
uthb
ound
dire
ctio
n fr
om
Mad
era
Bou
leva
rd to
Wor
num
Driv
e, e
nhan
ced
pede
stria
n cr
ossi
ngs,
and
impr
oved
side
wal
ks a
long
the
corr
idor
. Bet
wee
n M
ader
a B
oule
vard
and
Fi
fer A
venu
e th
e pr
ojec
t wou
ld re
purp
ose
the
exis
ting
road
way
bet
wee
n cu
rbs
ENG
$550
,000
2M
ader
a/Ta
mal
Vis
ta B
oule
vard
R
ound
abou
t Des
ign
& F
utur
e co
nstru
ctio
n
The
addi
tion
of a
roun
dabo
ut a
t the
Mad
era/
Tam
al V
ista
inte
rsec
tion
to
incr
ease
safe
ty, t
raffi
c flo
w e
ffici
ency
, and
to in
trodu
ce th
e co
mm
unity
to
mod
ern
roun
dabo
uts
Plan
ning
co
mpl
ete
$85,
000
3W
ornu
m D
rive
Bik
e Pa
th
Reh
abili
tatio
n R
ehab
ilita
te th
e pa
thw
ay a
nd c
onst
ruct
cur
b op
enin
g/bi
cycl
e en
tranc
e im
prov
emen
ts a
t Wor
num
and
Tam
al V
ista
to p
rovi
de a
safe
r ent
ranc
e to
th
e Sa
ndra
Mar
ker T
rail
ENG
/ CO
N$8
0,00
0 $4
00,0
00
4Pe
dest
rian
Ram
p Im
prov
emen
ts
on M
ohaw
k at
Nei
l Cum
min
s Sc
hool
Rep
lace
Cur
b R
amps
on
Moh
awk
at N
eil C
umm
ins S
choo
l with
AD
A
com
plia
nt ra
mps
CO
N$7
5,00
0
520
18 P
avem
ent R
ehab
ilita
tion
Proj
ect
The
Tow
n ha
s a p
rogr
am to
spen
d $6
50,0
00 p
er y
ear,
whe
neve
r pos
sibl
e,
to re
habi
litat
e (d
esig
n an
d co
nstru
ct) i
ts st
reet
s so
that
they
are
impr
oved
to
a c
ondi
tion
whe
re th
ey c
an st
ill b
e m
aint
aine
d an
d do
not
nee
d to
be
repl
aced
ENG
, CO
N
$650
/850
K$9
00,0
00
$1,5
00,0
00
6C
asa
Bue
na C
ompl
ete
Stre
ets
Proj
ect
Com
plet
e 10
0% d
esig
n to
wid
en C
asa
Bue
na D
rive
from
San
ford
Stre
et
to M
eado
w V
alle
y R
oad
in a
n ef
fort
to in
clud
e co
ntin
uous
ped
estri
an a
nd
bike
faci
litie
sEN
G$2
50,0
00
$2,4
00,0
00
Cap
ital P
rogr
am: C
ompl
eted
Pro
ject
s
Cap
ital P
rogr
am: F
lood
Con
trol
and
Sto
rm D
rain
age
Cap
ital P
rogr
am: M
ultim
odal
Tra
nspo
rtat
ion
7R
edw
ood
Hig
hway
Mul
ti-us
e Pa
thw
ayTh
is p
roje
ct w
ill re
pave
the
exis
ting
path
way
from
Wor
num
Driv
e to
the
San
Cle
men
te/T
amal
pais
inte
rsec
tion
CO
N50
0000
Proj
ect N
ame
Proj
ect D
escr
iptio
n20
19 P
roje
ct
Phas
eFY
201
93
Yea
r N
eed
2022
-202
48
Tam
alpa
is a
t San
ford
& C
asa
Bue
na T
raffi
c C
onge
stio
n R
elie
f D
esig
n an
d co
nstru
ct n
eede
d im
prov
emen
ts in
clud
ing
clos
ing
north
bo
und
vehi
cula
r mov
emen
ts o
n Sa
nfor
d C
ON
$400
,000
9St
reet
Slu
rry
Seal
Pro
ject
Sl
urry
seal
and
repl
ace
strip
ing
on m
ultip
le st
reet
s with
in th
e To
wn.
Sl
urry
seal
is u
sed
to e
xten
d th
e lif
e of
pav
emen
tC
ON
$200
,000
10B
atte
ries f
or T
raffi
c Si
gnal
sPr
ovid
e ba
ttery
bac
k-up
syst
ems a
t crit
ical
traf
fic si
gnal
loca
tions
ENG
, CO
N$4
0,00
0 11
Pave
men
t Man
agem
ent P
lan
Upd
ate
The
Tow
n up
date
s its
pav
emen
t man
agem
ent p
lan
ever
y th
ree
year
s. T
he
plan
pro
vide
s rec
omm
enda
tions
for a
pav
emen
t ove
rlay
and
reha
bilit
atio
n st
rate
gy w
hich
is o
ften
a re
quire
men
t in
orde
r to
acqu
ire S
tate
and
Fed
eral
gr
ant f
undi
ng
PLA
N$1
0,00
0
12Em
erge
ncy
Veh
icle
Pre
-em
ptio
nR
epla
ce o
ur a
ging
Opt
icom
pre
-em
ptio
n sy
stem
with
a G
PS b
ased
EM
TRA
C (e
mer
genc
y ve
hicl
e pr
e-em
ptio
n eq
uipm
ent)
syst
em. T
hese
sy
stem
s are
use
d to
impr
ove
emer
genc
y re
spon
se ti
mes
PLA
N, E
NG
$25,
000
$100
,000
13R
ound
abou
t Fea
sibi
lity
Stud
y w
ith in
tent
of f
utur
e co
nstru
ctio
nR
evie
w u
p to
five
(4) s
igna
led
inte
rsec
tions
for f
easi
bilit
y to
con
vert
to
mod
ern
roun
dabo
uts b
ased
on
traffi
c flo
w d
eman
ds, p
ublic
righ
t of w
ay,
and
exis
ting
inte
rsec
tion
geom
etry
PLA
N$5
0,00
0 $3
,000
,000
1B
aske
tbal
l Cou
rtsO
ptio
n #1
: res
urfa
ce e
xist
ing
bask
etba
ll co
urts
. Opt
ion
#2: r
eloc
ate
bask
etba
ll co
urts
to a
mor
e ap
prop
riate
loca
tion
clos
er to
par
king
and
ot
her p
ark
faci
litie
sEN
G, C
ON
$75,
000
1To
wn
Hal
l Add
ition
Arc
hite
ctur
al a
nd E
ngin
eerin
g pl
anni
ng fo
r the
new
Tow
n H
all A
dditi
on
to a
ccom
odat
e Pl
anni
ng, B
uild
ing,
Pub
lic W
orks
, and
IT st
aff
PLA
N$3
0,00
0
1Fi
fer P
ump
Stat
ion
(PS)
Rep
lace
pum
ps, e
lect
rical
, and
mec
hani
cal e
quip
men
t; ad
d flo
w m
eter
ENG
, CO
N$6
00,0
00
2Tr
inid
ad 2
PS
Upg
rade
age
d pu
mp
stat
ion
(bui
lt 19
60),
with
mod
ern
stan
dard
pum
p fa
cilit
ies t
o re
duce
mai
nten
ance
cos
ts a
nd in
crea
se p
ump
effic
ienc
yEN
G, C
ON
$950
,000
3Sa
usal
ito P
SR
epla
ce p
umps
, ele
ctric
al, a
nd m
echa
nica
l equ
ipm
ent;
add
flow
met
er
and
upgr
ade
stat
ion
ENG
, CO
N$3
00,0
00
4Pa
radi
se P
SU
pgra
de m
echa
nica
l, el
ectri
cal,
and
cont
rols
syst
ems
ENG
$80,
000
$65,
000
Cap
ital P
rogr
am: S
anita
ry D
istr
ict N
o. 2
OT
HE
R S
D2
CIP
PR
OJE
CT
S:
Cap
ital P
rogr
am: T
own
Ow
ned
Faci
litie
s
Cap
ital P
rogr
am: P
arks
& R
ecre
atio
n
Proj
ect N
ame
Proj
ect D
escr
iptio
n20
19 P
roje
ct
Phas
eFY
201
93
Yea
r N
eed
2022
-202
45
Seaw
olf a
nd G
olde
nhin
d PS
Eval
uatio
n w
ith re
lativ
e hi
gh w
ater
- sea
leve
l ris
e- M
CC
ele
vatio
n re
lativ
e - S
tatio
n al
mos
t flo
oded
PLA
N$1
00,0
00
$100
,000
6Se
wer
Lat
eral
Ord
inan
ceC
reat
e m
unic
ipal
cod
e or
dina
nce
to g
over
n th
e he
alth
and
safe
ty
impr
ovem
ents
to P
rivat
e Se
wer
Lat
eral
syst
ems w
ithin
San
itary
Dis
trict
N
o. 2
7B
oard
wal
k A
,BEl
ectir
cal u
pgra
deC
ON
$30,
000