    Party name

    Address

    Contact details (phone, email id)

    Sub: Estimate for new power connection: 11k !olta"e "rade

    #tem $uantity Amount11k! cable % %

    11k! &ointin" % %

    11k! termination indoor % %

    11k! termination outdoor % %

    PSC pole ' %

    AS and *+ 1 %

    S an"le and S -at 1.. %

    /0 % %

    eterin" unit % %

    Earthin" pe" % %Chemical earthin" % %

    # -at for earthin" % %

    /oad borin" % %

    2ume pipe % %

    # riser pipe 1' %

    us post insulator 3 %

    Aluminium busbar % %

    Ener"y meter % %

    E4 1C5'6.s7mm Cu cable % %

    4otal amount %

    Stora"e char"es 8 39 %

    4ransportaion char"es 8 '9 %

    4estin" char"es 8 '9 %

    *!erhead char"es 8 39 %

    4*4A SE/#CE #;E C2A/ES %

  • 7/23/2019 Cost Data Book

    2/501

    $uantity /ate

    material erection material erection

    11k! cable

    .%?1

    @%>'%?1

    '%>1%?1

    Earthin" pe"

    Chemical earthin"

    # -at for earthin"

    /oad borin"

    2ume pipe

    # riser pipe 1' 1'

    us post insulator 3 3

    Aluminium busbar

    Ener"y meter 1

    E4 1C5'6.s7mm Cu cable

    Stora"e char"es 8 39

    4ransportaion char"es 8 '9

    4estin" char"es 8 '9

    *!erhead char"es 8 39

  • 7/23/2019 Cost Data Book

    3/501

    Amount

    material erection

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

    % %

  • 7/23/2019 Cost Data Book

    4/501

    Pa"e @ of .%'

    COST DATA SHEET FOR POWER SUPPLY TO NEW CONSUMERS IN ADITYAPUR REV 12 Effective From

    Sl Cat aterial $4F 0* aterial Price /ef6 *rder SAP 0C escription $

    1

    ' Supply Hume Pipe 9"

    3 Ro! ou#i$% 6" &i

    @ C 11'V 3C(240)*mm+E,R-HE& 1.0 M 694 694 2100006178 100062272 1%

    . C 1.0 M 578 578 2100006178 100061208 @%

    D C 11'V 3C(120)*mm+E,R-HE& 1.0 M 444 444 2100006859 100064342 1%

    C 11'V 3C(95)*mm+E,R-HE& 1.0 M 391 391 2100006859 100064343 '%

    = C 1.0 M 1563 1563 2100009055 100060741 1%

    < C 1.0 M 276 276 2300001253 100075008 1%

    1% C ,,,C &/ Co$!uo# 1.0 M 39 39 2300001263 100059123 1%,,,C &/ Co$!uo#

    11 C 1.0 209 209 2300000756 100058242 3%

    1' C 4C ( 4 S*mm o$#ol le 1.0 121 121 2300000767 100065198 '% 4C ( 4 S*mm o$#ol le

    13 C 1.0 115 115 2300001028 110020542 1%

    1@ C 2C(10S*mm ,l C,LE PVC, 1.0 42 @' 3700110952 100063633 3%

    1. C 3.5C ( 185 )*mm L- le PVC, 1.0 370 3% 3700111068 100065790 1%

    1D C 2C(6S*mm ,l C,LE PVC, 1.0 35 35 4700003986 100061162 '%

    1 C 3.5C ( 25 )*mm L- le PVC, 1.0 78 = 4700003986 110005976 @%

    1= C 3.5C ( 70 )*mm L- le PVC, 1.0 162 1D' 4700003986 110000668 D%

    1< C 1.0 124 1'@ 4700004008 110000315 '%

    '% C

    '1 C

    '' C

    '3 &i) o , )i

    '@ &i) o &/ u)e

    '. &i) o H- le

    'D &i) o Mee#i$% $i

    ' 4 11.415'V -#$)o#me# 63 'V, 1.0 ;*S 123827 123827 2300001095 100074737 1%

    '= 4 11.415'V -#$)o#me# 100 'V, 1.0 ;*S 153095 153095 2300001095 100062442 '%

    '< 4 11.415'V -#$)o#me# 250 'V, 1.0 ;*S 284801 284801 2300001095 100062443 3%

    3% E 11'V & Mee#i$% $i 1.0 ;*S 78627 78627 2100006239 100064345 1%

    0nit rate(i!c$ t%&' f%i(

    ine;o

    4" &,.&RLLN :-H S;E /MM 3(1C+3C

    L,=.H.-. 11'V P-/.120+S>MM 3(1C+3C

    3C ( 300)*mm 33 @V ?LPECle

    33'V 1L 3C240+300S>MMC,LE L,=N

    1C?150MM2 33'V AEB ?LPEC,LE

    33'V 3L 1C150+240S>MMC,LE L,=N

    C/N-R/L C,LE 12C ? 2.5 S>MM 1.1 'V R,

    -EMP L,= -R,= M-L- P-/6S>.MM P-/12C

    L- ,e#il u$e! Co$!.+4C(70)*mm

    L,=./N.C,-.MM234C

    L,=./N.C,-.MM 234+1C

    L,=./N.C,-.MM 234+1C

    L,=./N M-L-,/VE 50+120S>.MM 234C

    C, 3.5 C/RE 50 S>.MM.,LPVC,

    L,=./N M-L-,/VE 50+120S>.MM 234C

    L,=. 2L.M-L-.,/VE50+120S>MM 234C

    &S.C,-.MM

    &S./N.-R,=. M-L- P-/6S>.MM P-/ 27C

    NS-,L. -R,NS

  • 7/23/2019 Cost Data Book

    5/501

    Pa"e . of .%'

    Sl Cat aterial $4F 0* aterial Price /ef6 *rder SAP 0C escription $40nit rate(i!c$ t%&' f%i(

    ine;o

    31 E 1.0 ;*S 46264 46264 2300000988 100062882 1%

    3' E 11@V RM i mee#i$% u$i 1.0 ;*S 319654 319654 3700093768 100062306 '%

    33 E 11 'V RM iou mee#i$% u$i 1.0 ;*S 263764 263764 3700094942 100062329 3%

    3@ E 11'V / VC P,NEL 1.0 ;*S 322251 322251 2300000606 100060936 '%

    3. E MCC

  • 7/23/2019 Cost Data Book

    6/501

    Pa"e D of .%'

    Sl Cat aterial $4F 0* aterial Price /ef6 *rder SAP 0C escription $40nit rate(i!c$ t%&' f%i(

    ine;o

    3 E MC

  • 7/23/2019 Cost Data Book

    7/501

    Pa"e of .%'

    Sl Cat aterial $4F 0* aterial Price /ef6 *rder SAP 0C escription $40nit rate(i!c$ t%&' f%i(

    ine;o

    1% 2 ER.

  • 7/23/2019 Cost Data Book

    8/501

    Pa"e = of .%'

    Sl Cat aterial $4F 0* aterial Price /ef6 *rder SAP 0C escription $4F0nit rate(i!c$ t%&' f%i(

    ine;o

    13< G 1.0 ;*S 368 368 4700003630 083.E6.003 @%

    1@% G 1.0 ;*S 11 11 4700003630 028.E0.009 @%

    1@1 G 1.0 ;*S 'D 'D 4700003630 028.E0.003 @%

    1@' G 1.0 ;*S .. .. 4700003630 028.E0.004 @%

    1@3 G 1.0 ;*S '< '< 4700003630 028.E0.027 @%

    1@@ G 1.0 ;*S D1 D1 4700003630 028.E0.028 @%

    1@. G 1.0 ;*S 11 11 4700003630 028.E0.002 @%

    1@D G 1.0 ;*S 1.< 1.< 4700003630 083.E6.001 @%

    1@ G 1.0 ;*S ''' ''' 4700003630 083.E6.002 @%

    1@= G 1.0 ;*S 183 1=3 4700003630 024.E0.001 '%

    1@< G 1.0 ;*S 274 '@ 4700003630 024.E0.002 '%

    1.% G 1.0 ;*S 452 @.' 4700003630 024.E0.003 '%

    1.1 G 1.0 ;*S 256 '.D 4700003630 024.E0.021 '%

    1.' G 1.0 ;*S 383 3=3 4700003630 024.E0.022 '%

    1.3 G 1.0 ;*S 533 .33 4700003630 024.E1.001 '%

    1.@ G 1.0 ;*S 728 '= 4700003630 024.E1.002 '%

    1.. G

    1.D G

    1. SPP./NE L,/R.

    1.=

    1.<

    1D% 1.0 ;*S 898 898 3700090757 110020749 1%

    1D1 1.0 ;*S 2700 2700 3700090757 110020748 '%

    E- :/ . M-L- N/- ,LS/C',E 50+120

    E-.M-L-+1C.C.S/C'.P-/2.5S>.MM

    E-.M-L-+1C.,L.S/C'+,/VE10-/ 50S>.MM

    E-.M-L-+1C.,L.S/C'+,/VE50-/120S>.MM

    E-.M-L-+1C.,L.-L S/C'+,/VE 10+50S>.MM

    E-.M-L-+1C.,L.-L S/C'+ 50 -/120S>.MM

    E-.M-L-+1C.,L.S/C'+,/VE2.5-/10 S>.MM

    E- :/ . M-L- N/- &R ,LS/C'P-/10

    E- :/ . M-L- N/-+,LS/C'.,E 10+50

    E-M-L-N/-&R ,LS/C'+P-/10S>MM234C

    E4 646 ?646 04#C*/ECAE #;C0#; S0PPF*+ A C*;;EC4#;A4E/#AS , ;04 I *4,A 0S,?C A; ,#;S4AA4#*; *+J0;C4#*;?P0 *04*KES #+ A;F, A/*0/E

    EA/42#; #;C0#;C*;;EC4#*; , SEA#;*+ EK4/A 2*E #+ A;F6

    E-.M-L-N/-&R,LS/C'10+50S>MM234C

    E-.M-L-N/-&R,LS/C'5

    0+120S>MM234C

    E-M-L-N/-&R ,L -LS/C'+P-/10S>MM

    E-.M-L-N/-&R,L-LS/C'10+50S>MM

    E-.M-L-+M.SE,L.,L.P-/10S>.MM 23 3+4C

    E-.M-L-+M.SE,L.,L.,/VE10+50S>.MM234C

    E-M-L-N/-&R CS/C'P-/ 2.5;10+31C

    E-.M-L-+M.SE,L.,L.,/VE50+120S>MM234C

    SPP./NE HELPER :,-CHM,N

    SPP./NE

  • 7/23/2019 Cost Data Book

    9/501

    Pa"e < of .%'

    Sl Cat aterial $4F 0* aterial Price /ef6 *rder SAP 0C escription $4F0nit rate(i!c$ t%&' f%i(

    ine;o

    1D' 1.0 ;*S 3988 3988 3700101559 110011097 1%

    1D3 1.0 ;*S 4754 4754 3700104360 100058021 1%

    1D@ 1.0 ;*S 2220 2220 4700003153 110011093 1%

    1D. 1.0 ;*S 805 805 4700003153 110011094 '%

    1DD

    1D P PSC Pole 8 m# 1.0 ;*S 1690 1690 3700091554 110016450 1% ER.R,L P/S--.P/S-.

    1D= P Ril Pole 12.81 Me#e 1.0 4* 38000 38000 2300001106 110010544 1% ER.R,L P/S--.P/S-.

    ENER= ME-ER. 3 + PH,SEAL.- )i C- ' mee#B :/o(

    ER.ENER= ME-ER 3PH,SEM,?.&.ME-ER.

    3 PH,SE 4 :RE -RVEC-/RELEC-R/NC ENER :/ o(

    L.- 3P )i 10+40, ' mee#o o(

    L.- 1P )i 10+40, ' mee#o o(

    &SM.ENER= ME-ER 3PH,SEM,?.&.ME-ER.

  • 7/23/2019 Cost Data Book

    10/501

    11?3%?'%1. le:???!ar?www?apps?con!ersion?tmp?scratchB?' Ab!?rnd

    Cable 3 36.C51.%mm', 161 k PCA Al @' @%%%%D===?@% 0? > Ab!?rnd

    Cable @ 36.C5%mm', 161 k PCA Al ''< @%%%%D===?3% 0? > Ab!?rnd

    Cable . 36.C5.%mm', 161 k PCA Al 11 @%%%%D===?'% 0? > Ab!?rnd

    Cable D 36.C5'.mm', 161 k PCA Al 1% @%%%%D===?1% 0? > Ab!?rnd

    Cable 'C5'.mm' PC A cable < @%%%%D==?1% 0? > Ab!?rnd

    Cable = 'C51%mm' PC A cable D3 @%%%%D==D?1% 0? > Ab!?rnd

    Cable < 'C5Dmm' PC A cable D' @%%%%D==D?'% 0? > Ab!?rnd

    4 E4 S4 1% 4 St64hru &ointin" kit>36.C53%%s7mm ;os 11D @%%%%D11'?% #ncluded in cablin"

    4 E4 S4 11 4 St64hru &ointin" kit>36.C51=.s7mm ;os 13%' @%%%%D11'?D% #ncluded in cablin"

    4 E4 S4 1' 4 St64hru &ointin" kit>36.C51.%s7mm ;os 13%' @%%%%D11'?.% #ncluded in cablin"

    4 E4 S4 13 4 St64hru &ointin" kit>36.C5%s7mm ;os 36.C5.%s7mm ;os 36.C5'.s7mm ;os DD @%%%%D11'?1% #ncluded in cablin"

    4 E4 S4 1D E4 of 36.C53%%mm' PC A cable ;os > Supply included in ser!ice

    4 E4 S4 1 E4 of 36.C51.%,1=.mm' PC A cable ;os > Supply included in ser!ice

    4 E4 S4 1= E4 of 36.C5%mm' PC A cable ;os > Supply included in ser!ice

    4 E4 S4 1< E4 of 36.C5.%mm' PC A cable ;os > Supply included in ser!ice

    4 E4 S4 '% E4 of ',36.C5'.mm' PC A cable ;os > Supply included in ser!ice

    4 E4 S4 '1 E4 of 'C5D,1%mm' PC A cable ;os > Supply included in ser!ice

    4 E$P '' CC +EEE/ P#A/ @%%A ;os

  • 7/23/2019 Cost Data Book

    11/501

    11?3%?'%1. le:???!ar?www?apps?con!ersion?tmp?scratchB?'

  • 7/23/2019 Cost Data Book

    12/501

    11?3%?'%1. le:???!ar?www?apps?con!ersion?tmp?scratchB?'

  • 7/23/2019 Cost Data Book

    13/501

    11?3%?'%1. le:???!ar?www?apps?con!ersion?tmp?scratchB?' @ @%%%%3@@?1%?'1% > 'D%

    1.@ > @ @%%%%3@@?1%?'1% > 'D%

    1@ > D1 @%%%%3@@?1%?'%% > '.%

    1@@ > .D @%%%%3@@?1%?1 '@%

    1@@ > .D @%%%%3@@?1%?1 '@%

    1@@ > .D @%%%%3@@?1%?1 '@%

    1@@ > .D @%%%%3@@?1%?1 '@%

    13@ > 3< @%%%%3@@?1%?1=% > '3%

    >

    >

    >

    >

    >

    >

    1%1.@%%%%3@@?1%?.=%

    '. @%%%%3@@?1%?.%

    3

  • 7/23/2019 Cost Data Book

    14/501

    11?3%?'%1. le:???!ar?www?apps?con!ersion?tmp?scratchB?'

  • 7/23/2019 Cost Data Book

    15/501

    11?3%?'%1. le:???!ar?www?apps?con!ersion?tmp?scratchB?'

  • 7/23/2019 Cost Data Book

    16/501

    11?3%?'%1. le:???!ar?www?apps?con!ersion?tmp?scratchB?'

  • 7/23/2019 Cost Data Book

    17/501

    11?3%?'%1. le:???!ar?www?apps?con!ersion?tmp?scratchB?'

    4 E4 S4 1< E4 of 36.C5.%mm' PC A cable ;os >

    4 E4 S4 '% E4 of ',36.C5'.mm' PC A cable ;os >

    4 E4 S4 '1 E4 of 'C5D,1%mm' PC A cable ;os >

    E44?4?#;?*04/ AS*CG>0P4*1%S$',3,@C % EA 11%6

    E464?4?#?,*? AS*CG M1%>'.S$',3,@C % 1D.6=.

    E464?4?#;?*04/ AS*CGM'.>.%S$',3,@C % '%

    E464?4?#;?*04/AS*CGM.%>1'%S$',3,@C % EA 3D@6.

    E44?4?#;?*04/ AS*CG1.%>1=.S$',3,@C % EA ''6'.

    E44?4?#;?*04/ AS*CG'@%I3%%S$',3,@C % EA 1,%1161.

    E44?4?#;?*04/ A 4 S*CG>0P4*1%S$ % EA 11=6=

    E464?4?#;?*04/ A4S*CGM1%>'.S$ % 1D%6'

  • 7/23/2019 Cost Data Book

    18/501

    11?3%?'%1. le:???!ar?www?apps?con!ersion?tmp?scratchB?'.%S$ % '6'

  • 7/23/2019 Cost Data Book

    19/501

    11?3%?'%1. le:???!ar?www?apps?con!ersion?tmp?scratchB?'

  • 7/23/2019 Cost Data Book

    20/501

    11?3%?'%1. le:???!ar?www?apps?con!ersion?tmp?scratchB?'

  • 7/23/2019 Cost Data Book

    21/501

    11?3%?'%1. le:???!ar?www?apps?con!ersion?tmp?scratchB?'

  • 7/23/2019 Cost Data Book

    22/501

    Jamshedpur 0tilities I Ser!ices Company i

    Ser!ice on" 4e5t

    A/C ;* : @%%%%=.D.%%G

    1,''.6.%%GA *

    @,1..6'% #;S4 4/+* D3%GA>1%%%G

    1,3=%6.D S;4 4/+* D3%GA>1%%

  • 7/23/2019 Cost Data Book

    92/501

    @,@1@6%@/EP 4/+* D3%GA>1%%%G

    1,

  • 7/23/2019 Cost Data Book

    93/501

    ',.D36%% #;S46SH6/6 (D6D G) in e5t

    1,'

  • 7/23/2019 Cost Data Book

    94/501

    3,@@6%%#;S46S#EE;S ? SE# ake P

    ',1'

  • 7/23/2019 Cost Data Book

    95/501

    1,=D

  • 7/23/2019 Cost Data Book

    96/501

    '=1 #;S46 +AIE/C6+;6C2;6

    3D #S6AC?*C #;6SEP6046

    '' Erect Piercin" connectors

    1@% Erect distri6 bo5 upto 1%

    '% Erection id span &ointin" k

  • 7/23/2019 Cost Data Book

    97/501

    @3 Erection Pole clamp

    3

  • 7/23/2019 Cost Data Book

    98/501

    ','%.6%%PSC pole Erection

    '%% Erec6of 4opChannel3 Ea61

  • 7/23/2019 Cost Data Book

    99/501

  • 7/23/2019 Cost Data Book

    100/501

    ''1 Erection of 33k 6P6 #nsulat

    ''Erection of an"er oard o

    D= Erection of Anti clambin"

    1@ Erection of 6A (33G)

  • 7/23/2019 Cost Data Book

    101/501

    .'6= Erection of 33k Pin #nsulat

    1D Erection of racket

    @@ Erection of 4op racket

    '. Erection of Pad Connector

  • 7/23/2019 Cost Data Book

    102/501

    3%% Paintin" of Pole

  • 7/23/2019 Cost Data Book

    103/501

    '1= Erec6of CrossArm for double

    D@ Erection of SP#GE type Eart

    1,@.%6%%ismantle of PSC Pole

    ',%%%6%%ismantle of /ail Pole

    1%6.DStrin" of 3Hire AAAC o" C

    1%6.D Strin" of 3Hire AAAC /abbi

  • 7/23/2019 Cost Data Book

    104/501

    .3 Erection of 11k Pin #nsulat

    3,%163

  • 7/23/2019 Cost Data Book

    105/501

  • 7/23/2019 Cost Data Book

    106/501

    .6@' E/6 ?1D SH 6#6 H#/E6

    .6@' E/6 ?= SH 6#6 H#/E6

    .6@'E/6IC*;;EC4#*; = SH

    '61 #S6EA/42#; C*;6 6#6

  • 7/23/2019 Cost Data Book

    107/501

    .6@'#S6 EA/42 C*; .%KD

    .6@'#S6 EA/42 C*; @%KD

    '61#S6 EA/42 C*; '.K3

    163D #S6 6#6 /*0; H#/E

    '%0 E/EC4 of # +lat up to '

    1. round E/EC4 of # +lat up

    '30 E/EC4 of # +lat @% to .

    1= round E/EC4 of # +lat @%

  • 7/23/2019 Cost Data Book

    108/501

  • 7/23/2019 Cost Data Book

    109/501

  • 7/23/2019 Cost Data Book

    110/501

    P

    '611#S6E;E/F E4E/ 3 P2

    136.D#S6 4#E/?A0K6/EAF?SP

    '611#S63 P*E /EAFS ? 66#

    D6=#S6 4#E/ SH C*CG H#

  • 7/23/2019 Cost Data Book

    111/501

    336=

  • 7/23/2019 Cost Data Book

    112/501

    1D6'#S6AGE 4E/6(1%AI1.?3

  • 7/23/2019 Cost Data Book

    113/501

    1D6' #S6CA E?0OOE/60

    3161=E/6S6*K1.%K1.%K1%%

    3161=E/6S6*K '%%K1.%K1%%

    @363=E/6S6*K '=%K'%%K1.%

    36' E/6S6*K6 @1%K'=%K1.%

    36' E/6S6*K @D%K3D%K'3%

    1%16DD E/66S6*K H?* 2#;ES D%

  • 7/23/2019 Cost Data Book

    114/501

  • 7/23/2019 Cost Data Book

    115/501

    31.6=3+IE66S6*K H#42 2#;ES

    =@6%@+IE66S6*K H?* 2#;ES

    1%16DD+IE66S6*K H?* 2#;ES

    1136=D +IE66S6*K H?* 2#;ES '

    1='6

  • 7/23/2019 Cost Data Book

    116/501

    =613 #S6S64/AF 0P4* 3%% S

    1%6=@ #S6S64/AF A*E 3%%>

    1D6' #S6S64/AF A*E .%%>

    36' +A6S64/AF 0P4* 3%% S$6

    =D6. +A6S64/AF A*E 3%%>.

    1%.63+A6S64/AF A*E .%%>=

    1D6'E/E62646CA04#*; *A/6

    1D6'E/E6646CA04#*; *A/6

    '=6@E/E6CAE A/GE/ (C#?P/

    3161=E/E6/0E/6A4 (' K 1

    @6@@E/E +#/E EK4#;0#S2E/6

  • 7/23/2019 Cost Data Book

    117/501

    @6@@E/E6+#/E 0CGE46

    D6= S0P6I E/62646CA04#*; *A

    .@6''S0PI E/6646CA04#*; *A

    @6..S0P6CAE A/GE/ (C#?P/E

    D'63. S0P6;*6PA4E +*/ 2646P*H

    ',='@6=DS0PIE/ D AGE#4E S2

    1,%3'6=

  • 7/23/2019 Cost Data Book

    118/501

  • 7/23/2019 Cost Data Book

    119/501

    1@'633S?E *+ @ #A 2PE P#PE

    1.=6.

  • 7/23/2019 Cost Data Book

    120/501

    1,''16%%E/EC46 *+ 4/0CG#; C2A

    3%3 #S6 *+ 4/0CG#; C2A

    1

  • 7/23/2019 Cost Data Book

    121/501

    '. E/6+0SE ASE CA//#E/61D

    3< E/6+0SE ASE CA//#E/63'

    3< E/6+0SE ASE CA//#E/6D3

    3< E/6+0SE ASE CA//#E/61%

    @. E/6+0SE ASE CA//#E/6'%

    =%% #;S461%%%A 4* .%%A

    @

  • 7/23/2019 Cost Data Book

    122/501

    1

  • 7/23/2019 Cost Data Book

    123/501

    3%%6110? 33G 1? 3C'@%>3%%S$

    @11 0? 33G '? 3C'@%>3%%S$

    '=@ 0? 33G 3? 1C3%%>.%%S$

    'D= 0? 33G 3? 1C1.%>'@%S$

    ' AF6*;64/AF633G61?63C'@

    11' AF6*;64/AF633G6'?63C'@

  • 7/23/2019 Cost Data Book

    124/501

    .@ AF6#;64/E;C2633G63?63C

    1=6@3S?E *+ @ #A 20E P#PE

    ''.S?E *+ D #A 20E P#PE

    3@=6'

  • 7/23/2019 Cost Data Book

    125/501

  • 7/23/2019 Cost Data Book

    126/501

    D3 AF6*;64/AF633G1?3C 1=.

    1%1 AF6*;64/AF 33G '? 3C 1

    == AF6*;64/AF633G 1? 3C 3%

    '@D AF *; 0? 33G1? 3C 1=

    3.%AF6*;6 0? 33G'? 3C 1=

    'D61' AF6*; 0? 33G1?3C3%%>

    @3'63 AF6*; 0? 33G'? 3C 3%

    % is6of 33G 1? 3C 0pto @%

    1

  • 7/23/2019 Cost Data Book

    127/501

    3%% PSQs pro&ect nature &obs (S

    ''%63AF62646 0? 11G 0P4*61'

    '3%6'@ AF62646 0? 11G 61.%>'@%

    3@% AF6*;60? '?611G 0P4*

    3.=AF6*;60? '?611G1.%>'@

  • 7/23/2019 Cost Data Book

    128/501

    @D'6'@AF6*;60? 3?611G 1.%>'

    @

  • 7/23/2019 Cost Data Book

    129/501

    .163 4EP AF624 0?11G 0P4

    1.16%' #6246PC60?60P4* %S$6

    '1D #6246PC60?>A*E %4

    'D@ #60?6'?6246PC>A*E

    1=361. #6246P#CA60?60P4* %S

  • 7/23/2019 Cost Data Book

    130/501

    11C>0P4

    @%6@. AF6*;64/AF>161G61?61C5

    1%% 0?161G61?61C53%%>@%%S

    1'' AF6*; 0? 64?64 0P4*DS

    136%3 AF6*; 0? 64?64A*ED

  • 7/23/2019 Cost Data Book

    131/501

    1@%6 AF6*; 0? 4?4A*E .%

    1@D6@= AF6*; 0? 4?4A*E1'%

    1.%6'D AF6*; 0? 4?4A*E'@%

  • 7/23/2019 Cost Data Book

    132/501

    3.61 AF6*;6G464?4 0P4* DS

    @.

    .@ AF6*;6G464?4A*E.%>

    D.6AF66G464?4 A*E1'%>'

  • 7/23/2019 Cost Data Book

    133/501

    @ AF6G464?4A*E '@%>@%

    1D6'AF64/AF64?4 0P4* DS$6

    '16D AF64/AF64?4 A*E D>.%

  • 7/23/2019 Cost Data Book

    134/501

    1.@ AF60? '?64?46 0P4* DS

    1='63

  • 7/23/2019 Cost Data Book

    135/501

  • 7/23/2019 Cost Data Book

    136/501

    '@6. AF60? 3?64?46A*E1'

    '=D AF60? @?64?46A*E D>

    33@ AF60? @?64?46A*E1'

    '< AF6*;6CA4?+ES4>0P4* '.S

    3A*E '.

  • 7/23/2019 Cost Data Book

    137/501

  • 7/23/2019 Cost Data Book

    138/501

    1,%%6%% E46KPE62646PC(A)S*CG

    1,3

  • 7/23/2019 Cost Data Book

    139/501

    ',1@%6%%S46426J46246PC6A +E//0

    ',1@%6%%S46426J46246KPE6A +E//0

    11%6E44?4?#;?*04/ AS*CG>

    1D.6=.E464?4?#?,*? AS*CG M

    '% E464?4?#;?*04/ AS*CG

    3D@6. E464?4?#;?*04/AS*CG

    ''6'.E44?4?#;?*04/ AS*CG

  • 7/23/2019 Cost Data Book

    140/501

    1,%1161.E44?4?#;?*04/ AS*CG

    11=6=E44?4?#;?*04/ A 4

    1D%6' E464?4?#;?*04/ A4S

    '6' E464?4?#;?*04/ A4S

    @@36E464?4?#;?*04/ A 4

  • 7/23/2019 Cost Data Book

    141/501

    =@'6 E464?4>6SEA6A6A*E

    1,1.6SEA6A>1.%I1

    1,[email protected]?4>6SEA6A>'@%I3

    %.6@E464?4>6SEA A 4 A

    1,'D'63DE464?4>6SEA A 4 A

  • 7/23/2019 Cost Data Book

    142/501

    1,@=16' E464?4>6SEA A 4 >1.

    1' E464?4>1C6A6S*CG>A*

    ''6.E464?4>1C6A6S*CG>A*

    @=6DE464?4>1C6A6S*CG>A*

    11. E464?4>1C6A6S*CG>3%%S

    13% E464?4>1C6A6S*CG>@%%S

    1.6@ E464?4>1C6A64 S*CG>A

    'D E464?4>1C6A64 S*CG>A

    1D' E44?4?#;?*04/ C0S*CG

    1@% E464?4?#;?*04**/ C0S

  • 7/23/2019 Cost Data Book

    143/501

    1AS64/;C2 11G 0P4

  • 7/23/2019 Cost Data Book

    144/501

    .% '? #S>11G 0P4*'@%S$

  • 7/23/2019 Cost Data Book

    145/501

    D1% PSQs pro&ect nature &obs (S

    D< 60?" D6DG 1? 3C 0pto '@

    1%@ 60?" D6DG '? 3C 0pto '@

    13< 60?" D6DG 3? 3C 0pto '@

    .1% 'R #A6/##; H#42 SIE

  • 7/23/2019 Cost Data Book

    146/501

    A*E1

    3,1%D6%% S464264?46A6+E/>A*E.

  • 7/23/2019 Cost Data Book

    147/501

    3,1D%6'% S464264?46A6+E/>A*E1

    @,%=%6%% S464264?46A6+E/>A*E1

    .,3%%6%%S464264?46A6+E/ @%%S$6

    11=6=E44?4?#;?*04/ A 4

  • 7/23/2019 Cost Data Book

    148/501

    '< E464?4?#;?*04/ A4S

    @@36E464?4?#;?*04/ A 4

    @= E44?4?#;?*04/ A4 S

  • 7/23/2019 Cost Data Book

    149/501

    @' #S6*;60? 4?4 A*E D

    @@ #S6*;60? 4?4A*E .%

    .%6. #S6*;60? 4?4A*E 1'

    .@ #S6*;60? 4?4 A*E '

    '@#S6CA4?G46 4?4 0P4* D

    '. #S6CA4?G46 4?4 A*E

    '

  • 7/23/2019 Cost Data Book

    150/501

  • 7/23/2019 Cost Data Book

    151/501

    =.% PSQs pro&ect nature &obs (S

    1,%.%6%%PSQs pro&ect nature &obs (S

    1,'.%6%%PSQs pro&ect nature &obs (S

    1,.%%6%%PSQs pro&ect nature &obs (S

    1,D%%6%%PSQs pro&ect nature &obs (S

    1,=%%6%%PSQs pro&ect nature &obs (S

  • 7/23/2019 Cost Data Book

    152/501

    F#1%

    on" 4e5t

    *; P*E

    #;S4AA4#*; *+ 4/A;S+*/E/ 0P4* 1%%GA *; P*E, C*PE4E H#42 A

    ACCESS*/#ES6 42#S #;C0ES E/EC4#*; (MI)M +A/#CA4#*; *+ C2A;;ES

    64/A;SP*/4#; *+ 4/A;S+*/E/ +/* S4*/E 4* S#4E (;ote :Crane should be

    used for loadn" of breaker at store (MI)M unloadin" at site)

    ,;*E;CA40/E H*/G AS* PA/4 *+ 42E J*6S0PPF *+ S4EE,P*E E/EC4#*;,

    ##; SG#E ASS#S4A;4 0/#; 4ES4#; #S SC*PE *+ E;*/6 S0PPF *+ ;

    4*P>0P,4*0C2 PA#;4#; #+ /E$0#/E AS* SC*PE *+ E;*/6 *# (MI)MPA#;4 H# E S0PP#E F J0SC*6

    *; +;6

    #;S4AA4#*; *+ 4/A;S+*/E/ 0P4* 1%%GA *; +*0;A4#*;? #;S#E S?S,

    C*PE4E H#42 A ACCESS*/#ES6 42#S #;C0ES E/EC4#*; *+ C2A;;ES

    (MI)M S4*PPE/64/A;SP*/4#; *+ 4/A;S+*/E/ +/* S4*/E 4* S#4E AS* PA/

    *+ 42E J* (;ote :Crane should be used for loadn" of breaker at store

    (MI)M unloadin" at site)6S0PPF *+ S4EE,C## +*0;A4#*;, EA/42#;

    (MI)M CAE C*;;EC4#*; #S ;*4 #;C0E 04 P/*##; SG#E ASS#S4A;

    0/#; 4ES4#; #S SC*PE *+ E;*/6 *# 4*P>0P #+ /E$0#/E AS* SC*PE *+

    E;*/

    *; P*E ? +;6

    #SA;4#; *+ 4/A;S+*/E/ 0P4* 1%%GA *; P*E ? +*0;A4#*;? #;S#E S?S

    C*PE4E H#42 A ACCESS*/#ES6 4/A;SP*/4#; *+ 4/A;S+*/E/ +/* S#4E 4*

    S4*/E AS* PA/4 *+ 42E J* (;ote :Crane should be used for loadn" of

    breaker at store (MI)M unloadin" at site)6#SA;4#; *+ EA/42#;,

    CAE E4C6 +*/ C*PE4E #SA;4#; AS* SC*PE *+ E;*/

    % GA *; +;6

    #;S4AA4#*; *+ 4/A;S+*/E/ +/* '.%GA 4* .%% GA *; +*0;A4#*;? #;S#

    S?S, C*PE4E H#42 A ACCESS*/#ES6 42#S #;C0ES E/EC4#*; *+ C2A;;ES

    (MI)M S4*PPE/64/A;SP*/4#; *+ 4/A;S+*/E/ +/* S4*/E 4* S#4E AS* PA/

    *+ 42E J* (;ote :Crane should be used for loadn" of breaker at store

    (MI)M unloadin" at site)6S0PPF *+ S4EE,C## +*0;A4#*;, EA/42#;

  • 7/23/2019 Cost Data Book

    153/501

    (MI)M CAE C*;;EC4#*; #S ;*4 #;C0E 04 P/*##; SG#E ASS#S4A;

    0/#; 4ES4#; #S SC*PE *+ E;*/6 *# 4*P>0P #+ /E$0#/E AS* SC*PE *+

    E;*/

    % GA *; +;6

    #SA;4#; *+ 4/A;S+*/E/ '.% GA to .%% GA *; +*0;A4#*;? #;S#E S?SC*PE4E H#42 A ACCESS*/#ES6 4/A;SP*/4#; *+ 4/A;S+*/E/ +/* S#4E 4*

    S4*/E AS* PA/4 *+ 42E J* (;ote :Crane should be used for loadn" of

    breaker at site (MI)M unloadin" at store)6#SA;4#; *+ EA/42#;,

    CAE E4C6 +*/ C*PE4E #SA;4#; AS* SC*PE *+ E;*/

    A to.%% GA

    /EPACEE;4 *+ 4/A;S+*/E/ '.% GA to .%% GA *; +*0;A4#*;? #;S#E S?S

    C*PE4E H#42 A ACCESS*/#ES6 4/A;SP*/4#; *+ 4/A;S+*/E/ +/* S4*/E 4

    S#4E (MI)M S#4E 4* S4*/E AS* PA/4 *+ 42E J* (;ote :Crane should beused for loadn" of breaker at store (MI)M unloadin" at

    site)6#SA;4#; (MI)M /E4E/#;A4#*; *+ EA/42#;, CAE E4C6

    % GA *; +;6

    #;S4AA4#*; *+ 4/A;S+*/E/ +/* D3% GA to 1%%% GA *; +*0;A4#*;?

    #;S#E S?S, C*PE4E H#42 A ACCESS*/#ES6 42#S #;C0ES E/EC4#*; *+

    C2A;;ES (MI)M S4*PPE/64/A;SP*/4#; *+ 4/A;S+*/E/ +/* S4*/E 4* S#4E

    AS* PA/4 *+ 42E J* (;ote :Crane should be used for loadn" of breaker

    at store (MI)M unloadin" at site)6S0PPF *+ S4EE,C## +*0;A4#*;,

    EA/42#; (MI)M CAE C*;;EC4#*; #S ;*4 #;C0E 04 P/*##; SG#E

    ASS#S4A;4 0/#; 4ES4#; #S SC*PE *+ E;*/6 *# 4*P>0P #+ /E$0#/E AS

    SC*PE *+ E;*/

    %% GA *; +;6

    #SA;4#; *+ 4/A;S+*/E/ D3% GA to 1%%% GA *; +*0;A4#*;? #;S#E

    S?S, C*PE4E H#42 A ACCESS*/#ES6 4/A;SP*/4#; *+ 4/A;S+*/E/ +/*

    S#4E 4* S4*/E AS* PA/4 *+ 42E J* (;ote :Crane should be used for

    loadn" of breaker at site (MI)M unloadin" at store)6#SA;4#; *+

    EA/42#;, CAE E4C6 +*/ C*PE4E #SA;4#; AS* SC*PE *+ E;*/

    o1%%% GA *; +;6

    /EPACEE;4 *+ 4/A;S+*/E/ D3% GA to 1%%% GA *; +*0;A4#*;? #;S#E

    S?S, C*PE4E H#42 A ACCESS*/#ES6 4/A;SP*/4#; *+ 4/A;S+*/E/ +/*

    S4*/E 4* S#4E (MI)M S#4E 4* S4*/E AS* PA/4 *+ 42E J* (;ote :Crane

    should be used for loadn" (MI)M unloadin" of panel at store (MI)M

  • 7/23/2019 Cost Data Book

    154/501

    unloadin" at site)6#SA;4#; (MI)M /E4E/#;A4#*; *+ EA/42#;, CAE

    E4C6

    #; #;**/ PA;E

    E/EC4#*; *+ C4?P4 #; #;**/ PA;E, #4 #;C0ES S2#+4#; *+ A4E/#A +/*

    S4*/E 4* S#4E (MI)M 4E/#A;4#*; *+ A C*;4/* CAES6 (;ote :Craneshould be used for loadn" of panel at store (MI)M unloadin" at site)

    #; #;**/ PA;E

    /EPACEE;4 *+ C4?P4 #; #;**/ PA;E, #4 #;C0ES S2#+4#; *+ A4E/#A

    +/* S4*/E 4* S#4E (MI)M ACG +/* S#4E 4* S4*/E6 42#S AS* #;C0ES

    #SC*;;EC4#*; (MI)M 4E/#A;4#*; *+ A C*;4/* CAES (;ote :Crane

    should be used for loadn" of panel at store (MI)M unloadin" at site)

    D6D?11G

    E/EC4#*; *+ #;**/ 4FPE D6D ? 11G E4E/#; 0;#4 *; ASE +/AE6 42#S

    *ES ;*4 #;C0E 4E/#;A4#*; *+ *04*#;?#;C*#; P*HE/ A; C*;4/*

    CAE A; EA/42#; H*/G642#S AS* #;C0ES *0;4#; A; C*;;EC4#*; *+

    E4E/S S0PP#E #; **SE H2E;EE/ ;ECESSA/F, #+ /E$0#/E6 4/A;SP*/4#;

    +/* S4*/E 4* S#4E (MI)M P/*##; SG#E ASS#S4A;4 0/#; 4ES4#; #

    AS* A PA/4 *+ J*642#S #;C0ES E/EC4#*; (MI)M +E/#CA4#*; H*/G

    /E$0/#E +*/ AG#; +/AE E/EC4#*; 04 S0PPF *+ S4EE #S ;*4

    #;C0ER (;ote :Crane should be used for loadn" of panel at store

    (MI)M unloadin" at site)

    E4E/#; 0;#4

    /EPACEE;4 *+ #;**/ 4FPE D6D ? 11G E4E/#; 0;#4 *; ASE +/AE6 42#

    #;C0ES #SC*;;EC4#*; (MI)M /E4E/#;A4#*; *+ A P*HE/ (MI)M

    C*;4/* CAES, EA/42#; C*;;EC4#*; E4C6 /E$0#/E +*/ C*PE4E H*/G,

    4/A;SP*/4#; +/* S4*/E 4* S#4E (MI)M S#4E 4* S4*/E #S 0;E/ SC*PE *+

    E;*/6 P/*##; SG#E ASS#S4A;4 0/#; 4ES4#; #S AS* A PA/4 *+

    J*6 (;ote :Crane should be used for loadn" of panel at store (MI)M

    unloadin" at site)

    + 33 G

    E/EC4#*; *+ *04**/ 4FPE 33G E4E/#; 0;#4 *; S4/0C40/E6 42#S *ES ;*4

    #;C0E 4E/#;A4#*; *+ *04*#;?#;C*#; P*HE/ A; C*;4/* CAE A;

    EA/42#; H*/G642#S AS* #;C0ES *0;4#; A; C*;;EC4#*; *+ E4E/S

    S0PP#E #; **SE H2E;EE/ ;ECESSA/F, #+ /E$0#/E6 4/A;SP*/4#; +/*

    S4*/E 4* S#4E (MI)M P/*##; SG#E ASS#S4A;4 0/#; 4ES4#; #S AS

  • 7/23/2019 Cost Data Book

    155/501

    A PA/4 *+ J*642#S #;C0ES E/EC4#*; (MI)M +E/#CA4#*; H*/G /E$0/#E

    +*/ AG#; +/AE E/EC4#*; *; S4/0C40/E 04 S0PPF *+ S4EE #S ;*4

    #;C0ER (;ote :Crane should be used for loadn" of panel at store

    (MI)M unloadin" at site)

    4E/#; 0;#4/EPACEE;4 *+ *04**/ 4FPE 33G E4E/#; 0;#4 *; S4/0C40/E6 42#S

    #;C0ES #SC*;;EC4#*; (MI)M /E4E/#;A4#*; *+ A P*HE/ (MI)M

    C*;4/* CAES, EA/42#; C*;;EC4#*; E4C6 /E$0#/E +*/ C*PE4E H*/G,

    4/A;SP*/4#; +/* S4*/E 4* S#4E (MI)M S#4E 4* S4*/E #S 0;E/ SC*PE *+

    E;*/6 P/*##; SG#E ASS#S4A;4 0/#; 4ES4#; #S AS* A PA/4 *+

    J*6(;ote :Crane should be used for loadn" of panel at store (MI)M

    unloadin" at site)

    *; P*E E56Crn#;S4AA4#*; *+ 4/A;S+*/E/ 0P4* 1%%GA *; P*E, C*PE4E H#42 A

    ACCESS*/#ES6 42#S #;C0ES E/EC4#*; (MI)M +A/#CA4#*; *+ C2A;;ES

    64/A;SP*/4#; *+ 4/A;S+*/E/ +/* S4*/E 4* S#4E (;ote :Crane should be

    used for loadn" of breaker at store (MI)M unloadin" at site, but cran

    will be pro!ided by J0SC*),;*E;CA40/E H*/G AS* PA/4 *+ 42E J*6S0PP

    *+ S4EE,P*E E/EC4#*;, EA/42#; (MI)M CAE C*;;EC4#*; #S ;*4

    #;C0E 04 P/*##; SG#E ASS#S4A;4 0/#; 4ES4#; #S SC*PE *+

    E;*/6 S0PPF *+ ;ECESSA/F 2A/HA/E +*/ +#K#; *+ 4/+* #S AS*

    #;C0E6 *# 4*P>0P,4*0C2 PA#;4#; #+ /E$0#/E AS* SC*PE *+ E;*/6

    *# (MI)M PA#;4 H# E S0PP#E F J0SC*6

    *; +;6 E56Crn

    #;S4AA4#*; *+ 4/A;S+*/E/ 0P4* 1%%GA *; +*0;A4#*;? #;S#E S?S,

    C*PE4E H#42 A ACCESS*/#ES6 42#S #;C0ES E/EC4#*; *+ C2A;;ES

    (MI)M S4*PPE/64/A;SP*/4#; *+ 4/A;S+*/E/ +/* S4*/E 4* S#4E AS* PA/

    *+ 42E J* (;ote :Crane should be used for loadn" of breaker at store

    (MI)M unloadin" at site, but crane will be pro!ided by J0SC*)6S0PPF

    *+ S4EE,C## +*0;A4#*;, EA/42#; (MI)M CAE C*;;EC4#*; #S ;*4

    #;C0E 04 P/*##; SG#E ASS#S4A;4 0/#; 4ES4#; #S SC*PE *+

    E;*/6 *# 4*P>0P #+ /E$0#/E AS* SC*PE *+ E;*/

    ; P*E?+; E56Crn

    #SA;4#; *+ 4/A;S+*/E/ 0P4* 1%%GA *; P*E ? +*0;A4#*;? #;S#E S?S

    C*PE4E H#42 A ACCESS*/#ES6 4/A;SP*/4#; *+ 4/A;S+*/E/ +/* S#4E 4*

    S4*/E AS* PA/4 *+ 42E J* (;ote :Crane should be used for loadn" of

    breaker at store (MI)M unloadin" at site, but crane will be pro!ided

  • 7/23/2019 Cost Data Book

    156/501

    by J0SC*)6#SA;4#; *+ EA/42#;, CAE E4C6 +*/ C*PE4E #SA;4#;

    AS* SC*PE *+ E;*/

    A *; +; E56Crn

    #;S4AA4#*; *+ 4/A;S+*/E/ +/* '.%GA 4* .%% GA *; +*0;A4#*;? #;S#

    S?S, C*PE4E H#42 A ACCESS*/#ES6 42#S #;C0ES E/EC4#*; *+ C2A;;ES(MI)M S4*PPE/64/A;SP*/4#; *+ 4/A;S+*/E/ +/* S4*/E 4* S#4E AS* PA/

    *+ 42E J* (;ote :Crane should be used for loadn" of breaker at store

    (MI)M unloadin" at site, but crane will be pro!ided by J0SC*)6S0PPF

    *+ S4EE,C## +*0;A4#*;, EA/42#; (MI)M CAE C*;;EC4#*; #S ;*4

    #;C0E 04 P/*##; SG#E ASS#S4A;4 0/#; 4ES4#; #S SC*PE *+

    E;*/6 *# 4*P>0P #+ /E$0#/E AS* SC*PE *+ E;*/

    *; +; E56Crn

    #SA;4#; *+ 4/A;S+*/E/ '.% GA to .%% GA *; +*0;A4#*;? #;S#E S?SC*PE4E H#42 A ACCESS*/#ES6 4/A;SP*/4#; *+ 4/A;S+*/E/ +/* S#4E 4*

    S4*/E AS* PA/4 *+ 42E J* (;ote :Crane should be used for loadn" of

    breaker at site (MI)M unloadin" at store, but crane will be pro!ided

    by J0SC*)6#SA;4#; *+ EA/42#;, CAE E4C6 +*/ C*PE4E #SA;4#;

    AS* SC*PE *+ E;*/

    ; +; E56Crn

    /EPACEE;4 *+ 4/A;S+*/E/ '.% GA to .%% GA *; +*0;A4#*;? #;S#E S?S

    C*PE4E H#42 A ACCESS*/#ES6 4/A;SP*/4#; *+ 4/A;S+*/E/ +/* S4*/E 4

    S#4E (MI)M S#4E 4* S4*/E AS* PA/4 *+ 42E J* (;ote :Crane should be

    used for loadn" of breaker at store (MI)M unloadin" at site, but cran

    will be pro!ided by J0SC*)6#SA;4#; (MI)M /E4E/#;A4#*; *+

    EA/42#;, CAE E4C6

    A *; +; E56Crn

    #;S4AA4#*; *+ 4/A;S+*/E/ +/* D3% GA to 1%%% GA *; +*0;A4#*;?

    #;S#E S?S, C*PE4E H#42 A ACCESS*/#ES6 42#S #;C0ES E/EC4#*; *+

    C2A;;ES (MI)M S4*PPE/64/A;SP*/4#; *+ 4/A;S+*/E/ +/* S4*/E 4* S#4E

    AS* PA/4 *+ 42E J* (;ote :Crane should be used for loadn" of breaker

    at store (MI)M unloadin" at site, but crane will be pro!ided by

    J0SC*)6S0PPF *+ S4EE,C## +*0;A4#*;, EA/42#; (MI)M CAE

    C*;;EC4#*; #S ;*4 #;C0E 04 P/*##; SG#E ASS#S4A;4 0/#;

    4ES4#; #S SC*PE *+ E;*/6 *# 4*P>0P #+ /E$0#/E AS* SC*PE *+ E;*/

    GA *; +; E56Crn

  • 7/23/2019 Cost Data Book

    157/501

    #SA;4#; *+ 4/A;S+*/E/ D3% GA to 1%%% GA *; +*0;A4#*;? #;S#E

    S?S, C*PE4E H#42 A ACCESS*/#ES6 4/A;SP*/4#; *+ 4/A;S+*/E/ +/*

    S#4E 4* S4*/E AS* PA/4 *+ 42E J* (;ote :Crane should be used for

    loadn" of breaker at site (MI)M unloadin" at store, but crane will be

    pro!ided by J0SC*)6#SA;4#; *+ EA/42#;, CAE E4C6 +*/ C*PE4E

    #SA;4#; AS* SC*PE *+ E;*/

    *; +; E56Crn

    /EPACEE;4 *+ 4/A;S+*/E/ D3% GA to 1%%% GA *; +*0;A4#*;? #;S#

    S?S, C*PE4E H#42 A ACCESS*/#ES6 4/A;SP*/4#; *+ 4/A;S+*/E/ +/*

    S4*/E 4* S#4E (MI)M S#4E 4* S4*/E AS* PA/4 *+ 42E J* (;ote :Crane

    should be used for loadn" of breaker at store (MI)M unloadin" at site

    but crane will be pro!ided by J0SC*)6#SA;4#; (MI)M /E4E/#;A4#*;

    *+ EA/42#;, CAE E4C6

    E/#; 0;#4 E56Crn

    E/EC4#*; *+ #;**/ 4FPE D6D ? 11G E4E/#; 0;#4 *; ASE +/AE6 42#S

    *ES ;*4 #;C0E 4E/#;A4#*; *+ *04*#;?#;C*#; P*HE/ A; C*;4/*

    CAE A; EA/42#; H*/G642#S AS* #;C0ES *0;4#; A; C*;;EC4#*; *+

    E4E/S S0PP#E #; **SE H2E;EE/ ;ECESSA/F, #+ /E$0#/E6 4/A;SP*/4#;

    +/* S4*/E 4* S#4E (MI)M P/*##; SG#E ASS#S4A;4 0/#; 4ES4#; #

    AS* A PA/4 *+ J*642#S #;C0ES E/EC4#*; (MI)M +E/#CA4#*; H*/G

    /E$0/#E +*/ AG#; +/AE E/EC4#*; 04 S0PPF *+ S4EE #S ;*4

    #;C0E6 Crane shall be used for doin" the &ob, but crane will be

    pro!ided by J0SC*

    annel

    4E/#;A4#*; *+ *04*#;?#;C*#; P*HE/ A; C*;4/* CAES A;

    +A/#CA4#*; *+ 4/0;G#; H#42 0SA/S, EA/42#; H*/G6

    #;C0ES *0;4#; A; C*;;EC4#*; *+/EAFS,E4E/S,C*;4/* SH#4C2ESB5%%%B

    /ECE#E **SE H2E;EE/ ;ECESSA/F, EC2A;#CA (MI)MEEC4/#CAB5%%%B

    C*0P#; H#42 EK#S4#; PA;E, #+ /E$0#/E6 4/A;SP*/4#;/EAGE/ +/*B5%%%B

    S4*/E 4* S#4E (;ote :Crane should be used for loadn" of breaker atstorB5%%%B

    (MI)M unloadin" at site) (MI)M P/*##; SG#E

    ASS#S4A;4 0/#;B5%%%B4ES4#; #S AS* A PA/4 *+ J*642#S #;C0ES E/EC4#*;

    (MI)M +E/#CA4#*B5%%%BH*/G /E$0/#E +*/ AG#; +/AE +*/ /EAGE/ E/EC4#*; AS

    PE/ E;*/B5%%%B/AH#; 04 S0PPF *+ S4EE #S ;*4 #;C0E6 42#S *ES ;*4

    #;C0E

  • 7/23/2019 Cost Data Book

    158/501

  • 7/23/2019 Cost Data Book

    159/501

    should be used for loadn" of breaker at site (MI)M unloadin" at store

    anel upto 11k

    42#S *ES ;*4 #;C0E 4E/#;A4#*; *+ *04*#;?#;C*#; P*HE/ A; C*;4/*

    CAES A; +A/#CA4#*; *+ 4/0;G#; H#42 0SA/S, EA/42#; H*/G6

    4he scope of work includes : (1) Shftin" from store to site (MI)M

    pro!idin" skilled assistant durin" testin"6 crane should be used for

    loadn" of breaker at store (MI)M unloadin" at site, but crane will be

    pro!ided by J0SC*6 (') Erection in foundation ? inside CPSS (3) #;C0E

    *0;4#; A; C*;;EC4#*; *+ /EAFS,E4E/S,C*;4/* SH#4C2ES /ECE#E **S

    , ;ote : 42#S *ES ;*4 #;C0E 4E/#;A4#*; *+ *04*#;?#;C*#; P*HE/

    A; C*;4/* CAES, construction of ci!il foundation A; EA/42#; H*/G6

    4he scope of work includes : (1) ismantlin" from foundation ? insid

    CPSS (') #;C0ES #SC*;;EC4#*; *+ /EAFS,E4E/S,C*;4/* SH#4C2ES

    ,CAES A; EA/42#; H*/G6 (3) Shftin" from site to store, crane shoul

    be used for loadn" of breaker at site (MI)M unloadin" at store, but

    crane will be pro!ided by J0SC*6

    ame E56Crn6

    #;S4AA4#*; *+ 24 SH#4C2EA/(D6D G? 11G) H#42 C2A;;ES 6 42#S AS*

    #;C0ES *0;4#; A; C*;;EC4#*; *+ /EAFS,E4E/S,C*;4/* SH#4C2ES

    /ECE#E **SE H2E;EE/ ;ECESSA/F, EC2A;#CA (MI)M EEC4/#CA

    C*0P#; H#42 EK#S4#; PA;E, #+ /E$0#/E6 4/A;SP*/4#; /EAGE/ +/*

    S4*/E 4* S#4E (;ote :Crane should be used for loadn" of breaker at stor

    #;S4AA4#*; *+ S#EE;S ? SE# E4C6 24 SH#4C2EA/(D6D G? 11G) H#42B5%%%BC2A;;ES 6 42#S AS* #;C0ES *0;4#; A; C*;;EC4#*; *+

    /EAFS,E4E/SB5%%%B ,C*;4/* SH#4C2ES /ECE#E **SE H2E;EE/ ;ECESSA/F,EC2A;#CA (MI)MB5%%%B

    4/A;SP*/4#; /EAGE/ +/* S4*/E 4* S#4E (;ote :Craneshould be used foB5%%%B

    loadn" of breaker at store (MI)M unloadin" at site) (MI)MP/*##;B5%%%B

    SG#E ASS#S4A;4 0/#; 4ES4#; #S AS* A PA/4 *+ J*642#S#;C0ESB5%%%B

    E/EC4#*; (MI)M +E/#CA4#*; H*/G /E$0/#E +*/ AG#;+/AE +*/ /EAGE/B5%%%B

    E/EC4#*; AS PE/ E;*/ /AH#; 04 S0PPF *+ S4EE #S ;*4

    #;C0E6

  • 7/23/2019 Cost Data Book

    160/501

    (MI)M unloadin" at site, but crane will be pro!ided by J0SC*) (MI)M

    P/*##; SG#E ASS#S4A;4 0/#; 4ES4#; #S AS* A PA/4 *+ J*642#S

    #;C0ES E/EC4#*; (MI)M +E/#CA4#*; H*/G /E$0/#E +*/ AG#; +/AE +*

    /EAGE/ E/EC4#*; AS PE/ E;*/ /AH#; 04 S0PPF *+ S4EE #S ;*4

    #;C0ER6 42#S *ES ;*4 #;C0E 4E/#;A4#*; *+ *04*#;?#;C*#; P*HE/

    A; C*;4/* CAES A; +A/#CA4#*; *+ 4/0;G#; H#42 0SA/S, EA/42#;

    H*/G6

    frame E56Crn6

    56Crn6

    4he scope of work includes : (1) ismantlin" of panel includin"

    dismantlin" of bus (') ;ecessary as Cuttin" work (3) ismatlin" of

    earthin" (@) ismatlin" of 24 (MI)M Control Cables (.) Shftin" (MI)

    unloadin" at store (;ote :Crane should be used for loadn" of breaker at

    site (MI)M unloadin" at store, but crane will be pro!ided by J0SC*)

    6

    #;C0ES *0;4#; A; C*;;EC4#*; *+/EAFS,E4E/S,C*;4/* SH#4C2ESB5%%%B

    /ECE#E **SE H2E;EE/ ;ECESSA/F, EC2A;#CA (MI)MEEC4/#CAB5%%%B

    C*0P#; H#42 EK#S4#; PA;E, #+ /E$0#/E6 4/A;SP*/4#;/EAGE/ +/*B5%%%B

    S4*/E 4* S#4E (;ote :Crane should be used for loadn" of breaker atstorB5%%%B

    (MI)M unloadin" at site, but crane will be pro!ided by J0SC*)(MI)MB5%%%B

    P/*##; SG#E ASS#S4A;4 0/#; 4ES4#; #S AS* A PA/4*+ J*6R42#SB5%%%B

    *ES ;*4 #;C0E 4E/#;A4#*; *+ *04*#;?#;C*#; P*HE/A; C*;4/*B5%%%B

    CAES A; +A/#CA4#*; *+ 4/0;G#; H#42 0SA/S, EA/42#;H*/G6B5%%%B

  • 7/23/2019 Cost Data Book

    161/501

    #;S46+A6(MI)M E/C6C2;6 H#42 C044#; *+ +**/EA; ES#*; J*

    #;C0#; *+ A A4E/#A EKCEP4 S4EE

    4he scope of work includes : (1) ismantlin" from foundation (')

    isconnection of all 4?4?Control cables (3) Shftin" from site 4*

    store

    E//EC4#*; *+ P#E/C#; C*;;EC4*/ E4HEE; AC 4* CAE ?H2E/E EE/

    /E$0#/E inclduin" all accessories

    connectors

    E//EC4#*; *+ #S46*K *; /A# P*E H#42 S04A#E A//AE;4 ( A//AE;4

    +A6(MI)M E//EC4E F E;*/)6#;C0#; #;?*04 4E/#;A4#*; (J0PE/ *

    EA) 04 ECS0##; E; 4E/#;A4#*; *+ J0PE/ */ *04 *#; EA A;

    E//EC4#*; *+ #PC6 S4EE A4E/#A H## E ;*4 #;C0#;6

    its

    E//EC4#*; *+ # SPA; J*#;4#; G#4S H#42 P/*PE/ 4APP#; H#42 A#C#E

    A; ;*; AC#E #;S0A4#; 4APE

    R#;S4AA4#*; *+646?646AC?*C #;6 SEP60;#4 H#42*04 C2A;;ES 6 42#B5%%%B*ES ;*4 #;C0E 4E/#;A4#*; *+ *04*#;?#;C*#; P*HE/

    A; C*;4/*B5%%%BCAES A; +A/#CA4#*; , EA/42#; H*/G642#S AS* #;C0ES

    *0;4#; A;B5%%%BC*;;EC4#*; *+ /EAFS,E4E/S,C*;4/* SH#4C2ES /ECE#E

    **SE H2E;EE/B5%%%B;ECESSA/F, EC2A;#CA (MI)M EEC4/#CA C*0P#; H#42

    EK#S4#; PA;E,B5%%%B#+ /E$0#/E6 4/A;SP*/4#; /EAGE/ +/* S4*/E 4* S#4E 642#S

    #;C0ESB5%%%BE/EC4#*; (MI)M +E/#CA4#*; H*/G /E$0/#E +*/ AG#;

    +/AE?C2AE/ +*/B5%%%B4?4 AC ?*C E/EC4#*; AS PE/ E;*/ /AH#; A/E #;C0E

    04 S0PPF *B5%%%BS4EE #S ;*4 #;C0ERB5%%%B

  • 7/23/2019 Cost Data Book

    162/501

    E//EC4#*; *+ P*E CAP

    le?PSC pole

    S4/#;#; *+ *?2 A C*;0C4*/ H#42 +A/#CA4#*; A; E//EC4#*; *+ P*ECAP 642#S A/E AS* #;C0E E//EC4#*; *+ A;C2*/#; CAP ?S0SPE;S#*;

    CAP ?EFE 2**G6 04 ;*4 #;C0E E//EC4#*; *+ J;6*K?P

    C*;;EC4*/S?#;?*04 *#; C*;;EC4#*; 6 S4EE A4E/#A S0PP#E F J0SC*6

    C

    /EPACEE;4 *+ A4 EKS4#; PACE,#;C0#; #SE;4#; *+ * A;

    /E C*;;EC4#*; *+ A #;?*04 C*;;EC4#*;6

    e for A66C

    /EPACEE;4 *+ J0PE/

    2 lines

    ismantlin" of e5istin" *?2 line with all accessories (MI)M return th

    material to store

    )

  • 7/23/2019 Cost Data Book

    163/501

    %K.%mm on rail

    in !endor scope6 Paintin" of ploe is also in scope of !endor6PolesB5%%%B

    shall be rst painted with two coat of red o5ide paint6 4he portionofB5%%%B

    the pole to be buried inside the "round shall be painted with twocoatsB5%%%B

    of bitumen tar6 After erection of pole, the e5ternal surface of

    poleB5%%%B shall be painted with two coats of aluminium paint in anappro!edB5%%%B

    manner6Paints (MI)M paintin" materials will be pro!ided by the!endorB5%%%B

    4he pole is to be erected in ali"nment with utmost care andtheB5%%%B

    e5ca!ated earth should be back lled properly by rammin" orconcretin"B5%%%B

    4ransportation of the materials from store to site is in!endorQsB5%%%B

    scope)RB5%%%B

    of bitumen tar6 After erection of pole, the e5ternal surface ofpoleB5%%%Bshall be painted with two coats of aluminium paint in an

    appro!edB5%%%Bmanner6Paints (MI)M paintin" materials will be pro!ided by the

    !endorB5%%%B 4he pole is to be erected in ali"nment with utmost care and

    theB5%%%Be5ca!ated earth should be back lled properly by rammin" or

    concretin"B5%%%B4ransportation of the materials from store to site is in

    !endorQsB5%%%B

    scope)

    beB5%%%Bcommensurate with the foundation sie of PCC stated abo!e6 A PCC

    ("radeB5%%%B1:':@) muTn" of sie .%% mm dia and '%% mm hei"ht shall

    pro!ided abo!B5%%%Bthe "round le!el for the pole6B5%%%B 4he pole is to be erected in ali"nment with utmost care and

    theB5%%%B

    e5ca!ated earth should be back lled properly by rammin" orconcretin"B5%%%B

    4ransportation of the materials from store to site is in!endorQsB5%%%B

    scope)

  • 7/23/2019 Cost Data Book

    164/501

    tor (Strain)

    rail Pole

    standardB5%%%Bpractice adopted6 All nuts (MI)M bolts used shall be of # ? SS

    withB5%%%Bcombination of plain and sprin" washer and machine made6B5%%%

    4ransportation of the materials from store to site is in!endorQsB5%%%B

    scope)

    toB5%%%B5in", all insulators shall be cleaned in a manner that shall

    notB5%%%Bspoil, in&ure or scratch the surface of the insulator, but in no

    caseB5%%%Bshall any oil be used for that purpose6B5%%%B

    4he 33G strain hardware ttin" of aluminium alloy suitable foro"B5%%%B

    ConductorB5%%%B

    should be used conformin" to #S>'@=D (Part>##) 1

  • 7/23/2019 Cost Data Book

    165/501

    or

    /ail Pole

    !ice

    all P# shall be cleaned in a manner that shall not spoil, in&ureorB5%%%B

    scratch the surface of the insulator, but in no case shall any oilbeB5%%%B

    used for that purpose6 4or7ue wrench shall be used for 5in"!ariousB5%%%B

    line materials and components, such as suspension clamp forconductor,B5%%%B

    whene!er recommended by the manufacturer of the same6)

    A4E/#A A; +#;#S2B5%%%B4he plate shall be made from mild steel sheet of at least 16Dmm

    thickB5%%%Band !itreous enameled white, with letters, "ures and the

    con!entionalB5%%%Bskull and cross>bones in si"nal red colour (refer #S:.>1'= (rade A1)6 4he barbed wires shall be "i!en chromatin"dip asB5%%%B

    per procedure laid down in #S: 13@%6B5%%%Barbed wire should be wrapped at a hei"ht of 3%%% mm abo!e

    "round le!elB5%%%Bstretchin" in

  • 7/23/2019 Cost Data Book

    166/501

    r

    all A shall be cleaned in a manner that shall not spoil, in&ureorB5%%%B

    scratch the surface of the insulator, but in no case shall any oilbeB5%%%B

    used for that purpose6 4he febrication of all necessary supportforB5%%%B

    erection of A is under !endor scope e5cludin" supply of steel6 AwillB5%%%B

    be free supply by J0SC*

    surface of the insulator, but in no case shall any oil be used forthatB5%%%B

    purpose6B5%%%B4he 33G "al!anied steel pins made by process of for"in" suitable

    forB5%%%B33G pin insulators ha!in" ma5imum failin" load of 1% G6;6 with

    smallB5%%%Bsteel head as per " # of #S '@=D (ii)?13%D; " D'@=D

    (ii)?1

  • 7/23/2019 Cost Data Book

    167/501

    tor (Strain)

    on" te5t not maintain

    o ' Each

    Erection of 4op Channel upto ' Each 1%% K .%mm on PSC pole

    or

    on" te5t not maintain

    Erection of 11 G Stay Set

    Erection of A Switch

    Erection of * +use

    restor

    Erection of 11G i"htnin" Arestor

    practice adopted6 All nuts (MI)M bolts used shall be of #withB5%%%B

    combination of plain and sprin" washer and machine made6 4heneessaryB5%%%B

    makin" of hole in pad for cable connection is under !endorscopeB5%%%B

    includin" supply of necessary hardwareB5%%%B4ransportation of the materials from store to site is in

    !endorQsB5%%%Bscope)

    4heB5%%%Be5ternal surface of pole shall be painted with two coats of

    aluminiumB5%%%Bpaint in an appro!ed manner6Paints (MI)M paintin" materials

    will beB5%%%Bpro!ided by the !endor)B5%%%B

  • 7/23/2019 Cost Data Book

    168/501

    Erection of 11k #nsulator

    PSC Pole

    Erec6of CrossArm for double PSC Pole

    in"

    Erection of SP#GE type Earthin"

    ismantle of PSC Pole

    ismantle of /ail Pole

    onductor

    Conductor 11

    Strin" of 3Hire AAAC /abbit Conductor 11

    at the time of strin"in"6B5%%%BSA#; *+ C*;0C4*/: All conductors sa""in" shall be

    preferred inB5%%%Baccordance with the sa" and tension tables6 After the conductors

    ha!eB5%%%Bbeen pulled to the re7uired sa", intermediate spans shall be

    checked toB5%%%Bdetermine the correct sa"6 4he conductor shall be installed

    onB5%%%B insulators secured to it by means of D SHB5%%%Baluminium bindin" wire6 4he &umpers at the tension locations

    should alsB5%%%Bbe bound by D SH aluminium bindin" wire6 efore 5in" the

    conductor oB5%%%Binsulator and strain hardware, aluminium tape should be wrapped

    on theB5%%%Bconductor6 4he crimpin" of hardware is included in !endor scope6

    4he alB5%%%Bnecessary tools (MI)M tackles shall be arran"ed by !endor6

    J0SC* willB5%%%B

    supply only conductor (MI)M hardware ttin"sB5%%%B4ransportation of the materials from store to site is in !endorQsscopeB5%%%B

  • 7/23/2019 Cost Data Book

    169/501

    r

    on" te5t not maintain

    ) E56Crn6in !endor scope6 Paintin" of ploe is also in scope of !endor6

    PolesB5%%%Bshall be rst painted with two coat of red o5ide paint6 4he portion

    ofB5%%%Bthe pole to be buried inside the "round shall be painted with two

    coatsB5%%%Bof bitumen tar6 After erection of pole, the e5ternal surface of

    poleB5%%%Bshall be painted with two coats of aluminium paint in an

    appro!edB5%%%Bmanner6Paints (MI)M paintin" materials will be pro!ided by the

    !endorB5%%%B 4he pole is to be erected in ali"nment with utmost care and

    theB5%%%Be5ca!ated earth should be back lled properly by rammin" or

    concretin"B5%%%B4ransportation of the materials from store to site is in

    !endorQsB5%%%Bscope)RB5%%%Bof bitumen tar6 After erection of pole, the e5ternal surface of

    poleB5%%%Bshall be painted with two coats of aluminium paint in an

    appro!edB5%%%Bmanner6Paints (MI)M paintin" materials will be pro!ided by the

    !endorB5%%%B 4he pole is to be erected in ali"nment with utmost care and

    theB5%%%Be5ca!ated earth should be back lled properly by rammin" or

    concretin"B5%%%B4ransportation of the materials from store to site is in

    !endorQsB5%%%Bscope)

  • 7/23/2019 Cost Data Book

    170/501

    rn6

    n6

    n6

    PCC shall be of 1:3:D (1% "rade)6 E5ca!ation sie of the pit shallbeB5%%%B

    commensurate with the foundation sie of PCC stated abo!e6 A PCC("radeB5%%%B

    1:':@) muTn" of sie .%% mm dia and '%% mm hei"ht shallpro!ided abo!B5%%%B

    the "round le!el for the pole6B5%%%B

    4he pole is to be erected in ali"nment with utmost care andtheB5%%%Be5ca!ated earth should be back lled properly by rammin" or

    concretin"B5%%%B4ransportation of the materials from store to site is in

    !endorQsB5%%%Bscope)

    orB5%%%Bscratch the surface of the insulator, but in no case shall any oil

    beB5%%%B used for that purpose6 4he febrication of all necessary supportforB5%%%B

    erection of A is under !endor scope e5cludin" supply of steel6 AwillB5%%%B

    be free supply by J0SC*6 Crane shall be used for loadin"?unloadin"?B5%%%B

    installation, but crane will be pro!ided by J0SC*

    ismantlin" of pole with help of crane without any dama"e, but craneB5%%%B

    will be pro!ided by J0SC*6B5%%%B4ransportation of the materials from site to store is in

    !endorQsB5%%%Bscope)

  • 7/23/2019 Cost Data Book

    171/501

    0##;S A; C2#;EFS H#42 A#E S4/0C40/S R

    E/EC4#*; *+ EA/42#; C*;0C4*/S : E/EC4#*; A; C*;;EC4#*; *+ ? 1D

    SH 6 6# H#/E6

    E/EC4#*; *+ EA/42#; C*;0C4*/S : E/EC4#*; A; C*;;EC4#*; *+ ? =

    SH 6# H#/E6

    6#6 H#/E6

    E/EC4#*; *+ EA/42#; C*;0C4*/S : E/EC4#*; A; C*;;EC4#*; *+ = SH

    6 6# H#/E6

    4/#P

    4FPE)3?@.?=#AB5%%%BS0PPF *+ SP#GE 4FPE #24;#; A//ES4*/ : S0PPF *+ 4*4A

    E;42 *+B5%%%BEA/42#; C*;0C4*/ 0SE +*/ EA/42#; +/* EA/42#;

    S4A4#*; H# EB5%%%BPA# EK4/A AA#;S4 ;* >D= 6 S0PPF *+ SP#GE 4FPE #24E;#;

    A//ES4*/B5%%%B

    +*/ P/*4EC4#*; *+ 0##;S A; C2#;EFS A; A#ES4/0C40/SB5%%%B#;C0#; ;ECESSA/F S0PP*/4 63?@ #;C2 */ .?= #;C2 #A

    SP2E/E 4FPE H#42B5%%%B04#P*#;4 6#6 A#/ 4E/#;A4#*; A*04 @ +46 *; 6B5%%%B

    B5%%%B'% ESC2D %D6A'6%%1 SE4 =D6. E/E6#246 A//(SP#GE

    4FPE)3?@.?=#AB5%%%BE/EC4#*; *+ SP#GE 4FPE #24;#; A//ES4*/ : E/EC4#*; *+

    4*4AB5%%%BE;42 *+ EA/42#; C*;0C4*/ 0SE +*/ EA/42#; +/*

    EA/42#; S4A4#*;B5%%%B

    H# E PA# EK4/A AA#;S4 ;* >D= 6 E/EC4#*; *+ SP#GE4FPEB5%%%B#24E;#; A//ES4*/ +*/ P/*4EC4#*; *+ 0##;S A;

    C2#;EFS A;B5%%%BA#E S4/0C40/S #;C0#; ;ECESSA/F S0PP*/4 6 3?@#;C2 */

    .?=#;C2 #A6B5%%%BSP2E/E 4FPE H#42 04#P*#;4 6#6 A#/ 4E/#;A4#*; A*04 @ +46

    *; 6B5%%%BB5%%%B

    3% ESC2D %D616%%1 SE4 3161= #S6#246A//6(SP#GE4FPE)3?@.?=6@6+4B5%%%B

    #SA;4#; *+ SP#GE 4FPE #24;#; A//ES4*/ +*/

    P/*4EC4#*; *+

  • 7/23/2019 Cost Data Book

    172/501

    6#6 S4/#P

    #SA;4#; *+ EA/42#; C*;0C4*/S : #SA;4#; *+ .% K D 6# 6S4/#P6

    6#6 S4/#P

    #SA;4#; *+ EA/42#; C*;0C4*/S : #SA;4#; *+ @% K D 6#6

    S4/#P 6

    6#6 S4/#P

    #SA;4#; *+ EA/42#; C*;0C4*/S : #SA;4#; *+'. K 3 6#6

    S4/#P 6

    #SE;4A#; *+ 6#6/*0; H#/E @ */ D */ = SH

    . S$

    Erection of # -at '.K3 or '.KD under"round as per 4#SC* standard6 4hi

    will included necessary weldin" (MI)M applyin" of bitumin compound

    to '. S$

    Abo!e round E/EC4 of # +lat up to '. S$

    Erection of '.K3 or '.KD # -at abo!e "round or wall as per 4#SC*

    standard6 4his will included necessary, bendin", clampin", weldin"

    (MI)M applyin" of bitumin compound

    % S$

    Erection of # -at from @% to .% S$ under"round as per 4#SC*

    standard6 4his will included necessary weldin" (MI)M applyin" of

    bitumin compound

    to .% S$

    Abo!e round E/EC4 of # +lat @% to .% S$

    Erection of # -at from @% to .% S$ abo!e "round or wall as per

    #SA;4#; *+ EA/42#; C*;0C4*/S : #SA;4#; *+ '. K D */B5%%%B@%KD */ .%KD 6# 6B5%%%BS4/#P 6

  • 7/23/2019 Cost Data Book

    173/501

    4#SC* standard6 4his will included necessary, bendin", clampin", weldin

    (MI)M applyin" of bitumin compound

    )6

    #SCEA;E*0S : E//EC4#*; *+ 42E +**H#; , 42#S #;C0ES C044#;

    *+ P*CGE4S , +A/#CA4#*; *+ S0PP*/4 E4C 04 H#42*04 +A/#CA4#*; A;E/EC4#*; *+ 6S6 *KES 6 P0S2 044*; S4A4#*; (C*P*S#4E 0;#4 )6

    #SCEA;E*0S : E//EC4#*; *+ 42E +**H#; , 42#S #;C0ES C044#;

    *+ P*CGE4S , +A/#CA4#*; *+ S0PP*/4 E4C 04 H#42*04 +A/#CA4#*; A;

    E/EC4#*; *+ 6S6 *KES 6 P0S2 044*; ? #;#CA4#; AP H#42

    ACCESS*/#ES 6

    6#;#CA4*/

    #SCEA;E*0S : E//EC4#*; *+ 42E +**H#; , 42#S #;C0ES C044#;*+ P*CGE4S , +A/#CA4#*; *+ S0PP*/4 E4C 04 H#42*04 +A/#CA4#*; A;

    E/EC4#*; *+ 6S6 *KES 6 AE4E/ ? *4E4E/ ? SPEE #;#CA4*/ 6

    E

    Erection of 1 phase ener"y meter and meter bo5, C includin" all

    connection 6 4his includes supply of all necessory lu"s, socket,

    ferruls of owells make I crimpin" with proper crimpin" , 5in" of

    meter bo5 on wall ? support and cuttin" of pockets if re7uired for

    5in" the meter and bo5 6eter o5 has to be 5ed up either half

    consealed in the wall or by 5in" S racket on wall or by other

    suitable arran"ement only after due appro!al of the site en"ineer6

    Ener"ymeter, C, and eter o5 will be "i!en by the J0SC*6 /est all

    material re7uired to do the work has to be "i!en by the party6

    ?AK66E4E/6

    Erection of 3 phase ener"y meter and meter bo5, C includin" all

    connection 6 4his includes supply of all necessory lu"s, socket,

    ferruls of owells make I crimpin" with proper crimpin" , 5in" of

    meter bo5 on wall ? support and cuttin" of pockets if re7uired for

    5in" the meter and bo5 6eter o5 has to be 5ed up either half

    consealed in the wall or by 5in" S racket on wall or by other

    suitable arran"ement only after due appro!al of the site en"ineer6

    Ener"ymeter, C, and eter o5 will be "i!en by the J0SC*6 /est all

    material re7uired to do the work has to be "i!en by the party6

    AF

  • 7/23/2019 Cost Data Book

    174/501

    #SCEA;E*0S : E//EC4#*; *+ 42E +**H#; , 42#S #;C0ES C044#;

    *+ P*CGE4S , +A/#CA4#*; *+ S0PP*/4 E4C 04 H#42*04 +A/#CA4#*; A;

    E/EC4#*; *+ 6S6 *KES 6 4#E/ ? A0K##A/F /EAF ? S#;E P*E /EAF6

    #CA4*/

    #SCEA;E*0S : E//EC4#*; *+ 42E +**H#; , 42#S #;C0ES C044#;

    *+ P*CGE4S , +A/#CA4#*; *+ S0PP*/4 E4C 04 H#42*04 +A/#CA4#*; A;E/EC4#*; *+ 6S6 *KES 6 3 P*E /EAFS ? AK 6 EA; #;#CA4*/ 6

    /*4EC4#*; *K6

    #SCEA;E*0S : E//EC4#*; *+ 42E +**H#; , 42#S #;C0ES C044#;

    *+ P*CGE4S , +A/#CA4#*; *+ S0PP*/4 E4C 04 H#42*04 +A/#CA4#*; A;

    E/EC4#*; *+ 6S6 *KES 6 4#E SH#4C2ES > C*CG 4FPE , P2*4* CE 4FPE

    , P;E0A4#C 4FPE 6 42#S #;C0ES +A/#CA4#*; A; E/EC4#*; *+

    P/*4EC4#*; *K 2#;E 4FPE H#42 *CG#; A4C2 6

    4 *K#SCEA;E*0S : E//EC4#*; *+ 42E +**H#; , 42#S #;C0ES C044#;

    *+ P*CGE4S , +A/#CA4#*; *+ S0PP*/4 E4C 04 H#42*04 +A/#CA4#*; A;

    E/EC4#*; *+ 6S6 *KES 6 4#E S#C2ES > C*CG 4FPE , P2*4* CE 4FPE ,

    P;E0A4#C 4FPE H#42*04 P/*4EC4#E *K6

    #SCEA;E*0S : E//EC4#*; *+ 42E +**H#; , 42#S #;C0ES C044#;

    *+ P*CGE4S , +A/#CA4#*; *+ S0PP*/4 E4C 04 H#42*04 +A/#CA4#*; A;

    E/EC4#*; *+ 6S6 *KES 6A;G *+ A44E/F H#42 C*;;EC4#*;S #;C0#;

    AC# P*0/#; 6 42#S AS* #;C0ES E/EC4#*; *+ H**E; S4A;S H2E/EE/

    /E$0#/ 6 A*0/ +*/ #;#4#A C2A/#; H# E EK4/A6

    #*CGE4

    #SCEA;E*0S : E/EC4#; P0S2 044*;S , #;#CA4#; APS , 4#E/ #;

    EK#S4#; P*CGE46 P0S2 044*; S4A4#*; 6 (C*P*S#4E 0;#4 )6

    P*CGE4

    #SCEA;E*0S : E/EC4#; P0S2 044*;S , #;#CA4#; APS , 4#E/ #;

    EK#S4#; P*CGE46 P0S2 044*; ? #;#CA4#; AP H#42 ACCESS*/#ES 6

    #; EK46PG4

    #SCEA;E*0S : E/EC4#; P0S2 044*;S , #;#CA4#; APS , 4#E/ #;

    EK#S4#; P*CGE46 AE4E/ ? *4E4E/ ? SPEE #;#CA4*/ 6

    K4 PG46

    #SCEA;E*0S : E/EC4#; P0S2 044*;S , #;#CA4#; APS , 4#E/ #;

    EK#S4#; P*CGE46 E;E/F E4E/ > 1 P2ASE 6

  • 7/23/2019 Cost Data Book

    175/501

    K4 PG46

    #SCEA;E*0S : E/EC4#; P0S2 044*;S , #;#CA4#; APS , 4#E/ #;

    EK#S4#; P*CGE46 E;E/F E4E/ > 3 P2ASE ? AK 6 EA; E4E/ 6

    EK4 PG4

    #SCEA;E*0S : E/EC4#; P0S2 044*;S , #;#CA4#; APS , 4#E/ #;

    EK#S4#; P*CGE46 4#E/ ? A0K##A/F /EAF ? S#;E P*E /EAF6

    ; EK4 PG4

    #SCEA;E*0S : E/EC4#; P0S2 044*;S , #;#CA4#; APS , 4#E/ #;

    EK#S4#; P*CGE46 3 P*E /EAFS ? AK 6 EA; #;#CA4*/ 6

    #; *K6

    #SCEA;E*0S : E/EC4#; P0S2 044*;S , #;#CA4#; APS , 4#E/S

    E4C #; EK#S4#; P/*4EC4#*; *K6 4#E SH#4C2ES > C*CG 4FPE , P2*4*

    CE 4FPE , P;E0A4#C 4FPE #; EK#S4#; P/*4EC4#*; *K6

    #SCEA;E*0S : #SA;4#; *+ P0S2 044*; ? #;#CA4#; AP H#42

    ACCESS*/#ES 6

    ;6

    #SCEA;E*0S : #SA;4#; *+ AE4E/ ? *4E4E/ ? SPEE #;#CA4*/

    2ASE

    ismantlin" and remo!al of 1 Phase ener"y meter with all connection I

    accessories and shiftin" the same to store6

    SE?AK66E4E/6

    ismantlin" and remo!al of 3 Phase ener"y meter with all connection I

    accessories and shiftin" the same to store6

    P*E /EAF

    #SCEA;E*0S : #SA;4#; *+ 4#E/ ? A0K##A/F /EAF ? S#;E

    P*E /EAF6

    #;#CA4*/

    #SCEA;E*0S : #SA;4#; *+ 3 P*E /EAFS ? AK 6 EA;

    #;#CA4*/ 6

    2 P/*46 *K6

    #SCEA;E*0S : #SA;4#; *+ 4#E SH#4C2ES > C*CG 4FPE , P2*4*

    CE 4FPE , P;E0A4#C 4FPE #;C0#; P/*4EC4#*; *K 2#;E 4FPE H#42

  • 7/23/2019 Cost Data Book

    176/501

    *CG#; A4C2 6

    P/*4 *K

    #SCEA;E*0S : #SA;4#; *+ 4#E S#C2ES > C*CG 4FPE , P2*4* CE

    4FPE , P;E0A4#C 4FPE H#42*04 P/*4EC4#E *K6

    #SCEA;E*0S : #SA;4#; *+ A44E/F C2A/E/ ? A;E4 PA;E 6

    *;#; *+ P*HE/ /A#S :E44E/ H/#4#; H#42 S0PPF *+ PA#;460P4* 1#;C2

    * 3

    *;#; *+ P*HE/ /A#S : E44E/ H/#4#; H#42 S0PPF *+ PA#;46 A*E

    1#;C2 4* 3#;C2

    * .*;#; *+ P*HE/ /A#S : E44E/ H/#4#; H#42 S0PPF *+ PA#;46 A*E

    3#;C2 4* .#;C2

    D HS6

    E/EC4#*; *+ 4E/#;A *K : E/EC4#*; *+ S4A;A/ AGE#4E 4E/#;A

    *CG *A/ P*HE/ ? C*;4/* 4FPE ( 1%A6)6 A*E D HAFS6

    D HS6

    E/EC4#*; *+ 4E/#;A *K : E/EC4#*; *+ S4A;A/ AGE#4E 4E/#;A

    *CG *A/ P*HE/ ? C*;4/* 4FPE ( 1%A6)6 0P4* D HAFS6

    *E D HS6

    E/EC4#*; *+ 4E/#;A *K : E/EC4#*; *+ S4A;A/ AGE#4E 4E/#;A

    *CG *A/ P*HE/ ? C*;4/* 4FPE ( 1.?3%A)6A*E D HAFS6

    P4* D HS6

    E/EC4#*; *+ 4E/#;A *K : E/EC4#*; *+ S4A;A/ AGE#4E 4E/#;A

    *CG *A/ P*HE/ ? C*;4/* 4FPE ( 1.?3%A)60P4* D HAFS6

    * '6.S$6

    E/EC4#*; *+ 4E/#;A *K : E/EC4#*; *+ EEK C*;;EC4*/ , C*PE4E

    H#42 C2A;;E E; PA4E 6 0P4* '6. S$6

    * D S$6

    E/EC4#*; *+ 4E/#;A *K : E/EC4#*; *+ EEK C*;;EC4*/ , C*PE4E

    H#42 C2A;;E E; PA4E 6 0P4* D S$6

    * 1% S$6

  • 7/23/2019 Cost Data Book

    177/501

    E/EC4#*; *+ 4E/#;A *K : E/EC4#*; *+ EEK C*;;EC4*/ , C*PE4E

    H#42 C2A;;E E; PA4E 6 0P4* 1% S$6

    %A) A*E D HS

    #SA;4#; *+ 4E/#;A *K6 #SA;4#; *+ S4A;A/ AGE#4E

    4E/#;A *CG *A/ P*HE/ ? C*;4/*+*/ (1%A A; 1.?3%A6)6A*E D HAFS6

    1%A,A*E DHS

    S0PPF *+ 4E/#;A *K : S0PPF *+ S4A;A/ AGE#4E 4E/#;A *CG

    *A/ P*HE/ ? C*;4/* 4FPE ( 1%A6)6 A*E D HAFS6

    1%A,0P4* DHS

    S0PPF *+ 4E/#;A *K : S0PPF *+ S4A;A/ AGE#4E 4E/#;A *CG

    *A/ P*HE/ ? C*;4/* 4FPE ( 1%A6)6 0P4* D HAFS6

    1.?3%A)A*E DHS

    S0PPF *+ 4E/#;A *K : S0PPF *+ S4A;A/ AGE#4E 4E/#;A *CG*A/ P*HE/ ? C*;4/* 4FPE ( 1.?3%A)6A*E D HAFS6

    1.?3%A)0P4* DHS

    S0PPF *+ 4E/#;A *K : S0PPF *+ S4A;A/ AGE#4E 4E/#;A *CG

    *A/ P*HE/ ? C*;4/* 4FPE ( 1.?3%A)60P4* D HAFS6

    4* '6.S$6

    S0PPF *+ 4E/#;A *K : S0PPF *+ EEK C*;;EC4*/ , C*PE4E H#42

    C2A;;E E; PA4E 6 0P4* '6. S$6

    4* D S$6

    S0PPF *+ 4E/#;A *K : S0PPF *+ EEK C*;;EC4*/ , C*PE4E H#42

    C2A;;E E; PA4E 6 0P4* D S$6

    4* 1% S$6

    S0PPF *+ 4E/#;A *K : S0PPF *+ EEK C*;;EC4*/ , C*PE4E H#42

    C2A;;E E; PA4E 6 0P4* 1% S$6

    ''%(+0S2)

    E/EC4#*; CA E ? 0OOE/ #;C0#; S0PPF A; E/EC4#*; *+ S *K ?

    H**E; *A/ , H2E/EE/ ;ECESSA/F ( S4EE H# E S0PP#E F 4#SC*

    E/EC4#*; *+ A6C6 0OOE/ ? CA E 0P4* ''%6

    ''%(S0/+ACE)

    E/EC4#*; *; S0/+ACE CA E ? 0OOE/ #;C0#; S0PPF A; E/EC4#*;

    *+ S *K ? H**E; *A/ , H2E/EE/ ;ECESSA/F ( S4EE H# E

    S0PP#E F 4#SC* 6 E/EC4#*; *; S0/+ACE A6C6 0OOE/ ? CA E 0P4*

    ''%6

  • 7/23/2019 Cost Data Book

    178/501

    4* ''%

    #SA;4#; *+ CA E ? 0OOE/ #;C0#; S0PPF A; E/EC4#*; *+

    S *K ? H**E; *A/ , H2E/EE/ ;ECESSA/F ( S4EE H# E S0PP#E

    F 4#SC* 6 #SA;4#; *+ A6C6 0OOE/ ? CA E 0P4* ''%6

    E/EC4#*; *+ 6S6 *K6 +*/ S#OE *42E/ 42A; 42*SE E;4#*;E A*E 42E

    /A4ES +*/ 42E ;EA/ES4 S#OE #S APP#CAE 6 E/EC4#*; 1.% K 1.%

    K 1%% 6

    E/EC4#*; *+ 6S6 *K6 +*/ S#OE *42E/ 42A; 42*SE E;4#*;E A*E 42E

    /A4ES +*/ 42E ;EA/ES4 S#OE #S APP#CAE 6 E/EC4#*; '%% K 1.%

    K 1%% 6

    E/EC4#*; *+ 6S6 *K6 +*/ S#OE *42E/ 42A; 42*SE E;4#*;E A*E 42E

    /A4ES +*/ 42E ;EA/ES4 S#OE #S APP#CAE 6 E/EC4#*; '=% K '%% K

    1.% 6

    E/EC4#*; *+ 6S6 *K6 +*/ S#OE *42E/ 42A; 42*SE E;4#*;E A*E 42E

    /A4ES +*/ 42E ;EA/ES4 S#OE #S APP#CAE 6 E/EC4#*; @1% K '=%

    K 1.% 6

    E/EC4#*; *+ 6S6 *K6 +*/ S#OE *42E/ 42A; 42*SE E;4#*;E A*E 42E

    /A4ES +*/ 42E ;EA/ES4 S#OE #S APP#CAE 6 E/EC4#*; @D% K 3D% K

    '3%

    %K@D%K'D%

    E/EC4#*; *+ 6S6 *K6 +*/ S#OE *42E/ 42A; 42*SE E;4#*;E A*E 42E

    /A4ES +*/ 42E ;EA/ES4 S#OE #S APP#CAE 6 E/EC4#*; D%% K @D% K

    'D% 6

    #SA;4#; *+ 6S6 *K6 +*/ S#OE *42E/ 42A; 42*SE E;4#*;E A*E

    42E /A4ES +*/ 42E ;EA/ES4 S#OE #S APP#CAE 6 #SA;4#; 1.% K

    1.% K 1%% 6

    #SA;4#; *+ 6S6 *K6 +*/ S#OE *42E/ 42A; 42*SE E;4#*;E A*E

    42E /A4ES +*/ 42E ;EA/ES4 S#OE #S APP#CAE 6 #SA;4#; '%% K

    1.% K 1%% 6

  • 7/23/2019 Cost Data Book

    179/501

    #SA;4#; *+ 6S6 *K6 +*/ S#OE *42E/ 42A; 42*SE E;4#*;E A*E

    42E /A4ES +*/ 42E ;EA/ES4 S#OE #S APP#CAE 6 #SA;4#; '=% K

    '%% K 1.% 6

    #SA;4#; *+ 6S6 *K6 +*/ S#OE *42E/ 42A; 42*SE E;4#*;E A*E

    42E /A4ES +*/ 42E ;EA/ES4 S#OE #S APP#CAE 6 #SA;4#; @1% K

    '=% K 1.% 6

    #SA;4#; *+ 6S6 *K6 +*/ S#OE *42E/ 42A; 42*SE E;4#*;E A*E

    42E /A4ES +*/ 42E ;EA/ES4 S#OE #S APP#CAE 6 #SA;4#; @D% K

    3D% K '3%

    #SA;4#; *+ 6S6 *K6 +*/ S#OE *42E/ 42A; 42*SE E;4#*;E A*E

    42E /A4ES +*/ 42E ;EA/ES4 S#OE #S APP#CAE 6 #SA;4#; D%% K

    @D% K 'D% 6

    1.%K1.%K1%%

    +A/#CA4#*; , E/EC4#*; A; #SA;4#; *+ 42E +**H#; 6S6 *K6 +*/

    S#OE *42E/ 42A; 42*SE E;4#*;E A*E 42E /A4ES +*/ 42E ;EA/ES4 S#OE

    #S APP#CAE 6 A6 +A/#CA4#*; H#42 2#;ES61.% K 1.% K 1%% 6

    '%%K1.%K1%%

    +A/#CA4#*; I E/EC4#*; *+ 6S6*K H#42 2#;E I ;ECESSA/F C*;;EC4#*;

    ,S#OE AS E;4#*;E #; S2*/4 4EK46

    '=%K'%%K1.%

    +A/#CA4#*; I E/EC4#*; *+ 6S6*K H#42 2#;E I ;ECESSA/F C*;;EC4#*;

    ,S#OE AS E;4#*;E #; S2*/4 4EK46

    @1%K'=%K1.%

    +A/#CA4#*; I E/EC4#*; *+ 6S6*K H#42 2#;E I ;ECESSA/F C*;;EC4#*;

    ,S#OE AS E;4#*;E #; S2*/4 4EK46

    @D%K3D%K'3%

    +A/#CA4#*; I E/EC4#*; *+ 6S6*K H#42 2#;E I ;ECESSA/F C*;;EC4#*;

    ,S#OE AS E;4#*;E #; S2*/4 4EK46

  • 7/23/2019 Cost Data Book

    180/501

    D%%K@D%K'D%

    +A/#CA4#*; I E/EC4#*; *+ 6S6*K H#42 2#;E I ;ECESSA/F C*;;EC4#*;

    ,S#OE AS E;4#*;E #; S2*/4 4EK46

    .%K1.%K1%% +A/#CA4#*; I E/EC4#*; *+ 6S6*K H#42*04 2#;E I ;ECESSA/F C*;;EC4#*;

    ,S#OE AS E;4#*;E #; S2*/4 4EK46

    %%K1.%K1%%

    +A/#CA4#*; I E/EC4#*; *+ 6S6*K H#42*04 2#;E I ;ECESSA/F C*;;EC4#*;

    ,S#OE AS E;4#*;E #; S2*/4 4EK46

    =%K'%%K1.% +A/#CA4#*; I E/EC4#*; *+ 6S6*K H#42*04 2#;E I ;ECESSA/F C*;;EC4#*;

    ,S#OE AS E;4#*;E #; S2*/4 4EK46

    1%K'=%K1.%

    +A/#CA4#*; I E/EC4#*; *+ 6S6*K H#42*04 2#;E I ;ECESSA/F C*;;EC4#*;

    ,S#OE AS E;4#*;E #; S2*/4 4EK46

    D%K3D%K'3%

    +A/#CA4#*; I E/EC4#*; *+ 6S6*K H#42*04 2#;E I ;ECESSA/F C*;;EC4#*;

    ,S#OE AS E;4#*;E #; S2*/4 4EK46

    %%K@D%K'D%

    +A/#CA4#*; I E/EC4#*; *+ 6S6*K H#42*04 2#;E I ;ECESSA/F C*;;EC4#*;

    ,S#OE AS E;4#*;E #; S2*/4 4EK46

    E/EC4#*; *+ S 4/AFS :

    6S64/AFS *+APP/*K6 S#OE AS PE/ 4#SC* S46;*6 *#*3D60P4* 3%% H#E

    % H#E

    E/EC4#*; *+ S 4/AFS : 6S6 4/AFS *+ APP/*K6 S#OE AS PE/ 4#SC*

    S46 ;*6 *#*3D6 A*E 3%% 4* .%% H#E 6

    % H#E

  • 7/23/2019 Cost Data Book

    181/501

    E/EC4#*; *+ S 4/AFS : 6S6 4/AFS *+ APP/*K6 S#OE AS PE/ 4#SC* S46

    ;*6 *#*3D6 A*E .%% 4* =%% H#E 6

    6

    #SA;4#; *+ S 4/AFS : 6S6 4/AFS *+ APP/*K6 S#OE AS PE/ 4#SC*

    S46 ;*6 *#*3D6 0P4* 3%% H#E 4/ 6

    %% H#E

    #SA;4#; *+ S 4/AFS : 6S6 4/AFS *+ APP/*K6 S#OE AS PE/ 4#SC*

    S46 ;*6 *#*3D6 A*E 3%% 4* .%% H#E 6

    %% H#E

    #SA;4#; *+ S 4/AFS : 6S6 4/AFS *+ APP/*K6 S#OE AS PE/ 4#SC*

    S46 ;*6 *#*3D6 A*E .%% 4* =%% H#E 6

    +A/#CA4#*; *+ S 4/AFS :6S64/AFS *+ APP/*K6 S#OE AS PE/ 4#SC* S46 ;*6*#*3D60P4* 3%% H#E

    % H#E

    +A/#CA4#*; *+ S 4/AFS : 6S6 4/AFS *+ APP/*K6 S#OE AS PE/ 4#SC*

    S46 ;*6 *#*3D6 A*E 3%% 4* .%% H#E 6

    % H#E

    +A/#CA4#*; *+ S 4/AFS : 6S6 4/AFS *+ APP/*K6 S#OE AS PE/ 4#SC*

    S46 ;*6 *#*3D6 A*E .%% 4* =%% H#E 6

    E/EC4#*; *+ CA04#*; *A/ AS PE/ 4#SC* S4A;A/ : 264 6CA04#*; *A/

    E/EC4#*; *+ CA04#*; *A/ AS PE/ 4#SC* S4A;A/ : 646 CA04#*; *A/6

    CAS46CC)

    E/EC4#*; *+ CA04#*; *A/ AS PE/ 4#SC* S4A;A/ : CAE A/GE/ ( C#

    ? P/ECAS4 CEE;4 C*;C/E4E *+ 1:@:D )

    )

    E/EC4#*; *+ CA04#*; *A/ AS PE/ 4#SC* S4A;A/ : /0E/ A4 ' 4 K

    1 4 6

    E/EC4#*; *+ CA04#*; *A/ AS PE/ 4#SC* S4A;A/ : +#/E EK4#;0#S2E/

    #;C0#; E/EC4#*; *+ /ACGE46

  • 7/23/2019 Cost Data Book

    182/501

    E/EC4#*; *+ CA04#*; *A/ AS PE/ 4#SC* S4A;A/ : +#/E 0CGE4 H#42

    +A 6 A; E/EC4#*; *+ /ACGE4S 6

    6

    6

    Supply I Erction of 4 caution?an"er board includin" n5in" material

    (clamp, ;ut I bolt )

    CAS46CC)

    S0PPF *+ CA04#*; *A/ AS PE/ 4#SC* S4A;A/ : CAE A/GE/ ( C# ?

    P/ECAS4 CEE;4 C*;C/E4E *+ 1:@:D )

    E/?P*S4

    S0PPF *+ CA04#*; *A/ AS PE/ 4#SC* S4A;A/ : S0PPF A; E/EC4#*;

    *+ ;0E/ PA4E +*/ 2646 4*HE/ ? P*S4 6

    E46

    S0PPF A; E/EC4#*; *+ AGE#4E S2EE4 : S0PPF A; E/EC4#*; *+ D

    42#CG AGE#4E S2EE4S 6 42#S #;C0ES C044#; *+ S*4S ? 2*ES 6

    0P4* @%%

    CAE 4/A;SP*/4#; : 4/A;SP*/4#; +0 CAE /0 24?4 0P4* @%%

    S$66 +/* # SEC4#*; ? S4*/ES ? # SEC4#*;

    4*H; 4* H*/GS

    CAE 4/A;SP*/4#; : S2#+4#; *+ EP4F S4EE /0 +/* A;F PACE #;

    4*H; 4* A;F PACE #;S#E 4#SC* H*/GS 6

    6/#CG6C2AE/

    akin" of earthin" station with supply of all materials as per 4#SC*

    /AH#; ;* 6 EA > .

  • 7/23/2019 Cost Data Book

    183/501

    *046/#CG6C2A6

    akin" of earthin" station with supply of all materials as per 4#SC*

    /AH#; ;* 6 EA > .

  • 7/23/2019 Cost Data Book

    184/501

    on" te5t not maintain

    Supply (MI)M erection of @ inch dia 2PE pipe abo!e "round for

    protection of cable

    Supply (MI)M erection of D inch dia 2PE pipe abo!e "round for

    protection of cable

    Supply (MI)M erection of < inch dia 2PE pipe abo!e "round for

    protection of cable

    n of 4 6

    +ebrication (MI)M Erection of o5 for installation of 4 eters upto

    1D ;os6

    m6,M1D,3%

    +ebrication (MI)M Erection of o5 for installation of 4 eters more

    than 1D ;os but less than 3% ;os6

    FA S2EE46

    Supply (MI)M Erection of 3 PE/SPEK ? 2FA S2EE4

    E46

    Supply (MI)M Erectin of 3 akelite Sheet

    E/ 11 GA6

    E/EC4#*; *+ 4/0;G#; C2AE/ H#42 42/EE 0SA/S A; #;S0A4*/S (#+

    /E$0#/E) #;C0#; +0 *4AE 4AP#; H#42 S0PPF *+ 4APE F 42E

    C*;4/AC4*/ H#42*0;4 A;F EK4/A C*S46 0SA/S A; #;S0A4*/S #;C0#;

    J0PE/ C*;;EC4#*;S 4* E S0PP#E F 4#SC* (AE/AE E;42 *+ 0SA/

    4* E C*;S#E/E +*/ PAFE;4)6E/EC4#*; *+ 4/0CG#; C2AE/ 11 G6

    E/ D6DG I 363G

    E/EC4#*; *+ 4/0;G#; C2AE/ H#42 42/EE 0SA/S A; #;S0A4*/S (#+

    /E$0#/E) #;C0#; +0 *4AE 4AP#; H#42 S0PPF *+ 4APE F 42E

  • 7/23/2019 Cost Data Book

    185/501

    C*;4/AC4*/ H#42*0;4 A;F EK4/A C*S46 0SA/S A; #;S0A4*/S #;C0#;

    J0PE/ C*;;EC4#*;S 4* E S0PP#E F 4#SC* (AE/AE E;42 *+ 0SA/

    4* E C*;S#E/E +*/ PAFE;4)6 E/EC4#*; D6DG A; 363G6

    E/6 4 A; 46

    E/EC4#*; *+ 4/0;G#; C2AE/ H#42 42/EE 0SA/S A; #;S0A4*/S (#+

    /E$0#/E) #;C0#; +0 *4AE 4AP#; H#42 S0PPF *+ 4APE F 42EC*;4/AC4*/ H#42*0;4 A;F EK4/A C*S46 0SA/S A; #;S0A4*/S #;C0#;

    J0PE/ C*;;EC4#*;S 4* E S0PP#E F 4#SC* (AE/AE E;42 *+ 0SA/

    4* E C*;S#E/E +*/ PAFE;4)6 E/EC4#*; 4 A; 46

    E/6 11 GA6

    #SA;4#; *+ 4/0;G#; C2AE/ H#42 42/EE 0SA/S A; #;S0A4*/S

    *+ 11 G6

    / D6DG I 363G

    #SA;4#; *+ 4/0;G#; C2AE/ H#42 42/EE 0SA/S A; #;S0A4*/SD6DG A; 363G6

    E/ 4 A; 46

    #SA;4#; *+ 4/0;G#; C2AE/ H#42 42/EE 0SA/S A; #;S0A4*/S 6

    4 A; 46

    P 0S S0PP*/4

    S0PP6 A; E/EC4#*; *+ +/P 0S S0PP*/4

    E/EC4#*; *+ P*/CEA#; +0SE ASE A; CA//#E/ EC ? A;C2*/ ? C/*P4#*;

    */ A;F *42E/ AGE 6 E/EC4#*; 1DA

    E/EC4#*; *+ P*/CEA#; +0SE ASE A; CA//#E/ EC ? A;C2*/ ? C/*P4#*;

    */ A;F *42E/ AGE 6 E/EC4#*; 3'A

    E/EC4#*; *+ P*/CEA#; +0SE ASE A; CA//#E/ EC ? A;C2*/ ? C/*P4#*;

    */ A;F *42E/ AGE 6 E/EC4#*; D3A

    A

    E/EC4#*; *+ P*/CEA#; +0SE ASE A; CA//#E/ EC ? A;C2*/ ? C/*P4#*;

    */ A;F *42E/ AGE 6 E/EC4#*; 1%%A

    A

    E/EC4#*; *+ P*/CEA#; +0SE ASE A; CA//#E/ EC ? A;C2*/ ? C/*P4#*;

    */ A;F *42E/ AGE 6 E/EC4#*; '%%A

  • 7/23/2019 Cost Data Book

    186/501

    E/EC4#*; *+ P*/CEA#; +0SE ASE A; CA//#E/ EC ? A;C2*/ ? C/*P4#*;

    */ A;F *42E/ AGE 6 E/EC4#*; 1DA

    E/EC4#*; *+ P*/CEA#; +0SE ASE A; CA//#E/ EC ? A;C2*/ ? C/*P4#*;*/ A;F *42E/ AGE 6 E/EC4#*; 3'A

    E/EC4#*; *+ P*/CEA#; +0SE ASE A; CA//#E/ EC ? A;C2*/ ? C/*P4#*;

    */ A;F *42E/ AGE 6 E/EC4#*; D3A

    A

    E/EC4#*; *+ P*/CEA#; +0SE ASE A; CA//#E/ EC ? A;C2*/ ? C/*P4#*;

    */ A;F *42E/ AGE 6 E/EC4#*; 1%%A

    A

    E/EC4#*; *+ P*/CEA#; +0SE ASE A; CA//#E/ EC ? A;C2*/ ? C/*P4#*;

    */ A;F *42E/ AGE 6 E/EC4#*; '%%A

    #;S4AA4#*; *+ 4P;?4P?P?SP;?SH#4C2ES?#S*A4E/?CCS 0P4* D.%

    *4S,S#;E 42/*H? *0E 42/*H 4FPE AS +**HS : A6 E/EC4#*;6

    1%%%A 4* .%% A

    #;S4AA4#*; ? *+ 4P;?4P?P?SP;?SH#4C2ES?#S*A4E/?CCS 0P4* D.%

    *4S,S#;E 42/*H? *0E 42/*H 4FPE AS +**HS : A6 E/EC4#*; E*H

    .%%A 4* 3%%A 6

    #;S4AA4#*; ? *+ 4P;?4P?P?SP;?SH#4C2ES?#S*A4E/?CCS 0P4* D.%

    *4S,S#;E 42/*H? *0E 42/*H 4FPE AS +**HS : A6 E/EC4#*;

    E*H 3%%A 4* 1%%A6

    A

    #;S4AA4#*; ? *+ 4P;?4P?P?SP;?SH#4C2ES?#S*A4E/?CCS 0P4* D.%

    *4S,S#;E 42/*H? *0E 42/*H 4FPE AS +**HS : A6 E/EC4#*;

    E*H 1%%A 4* 3%? 3'A6

    #;S4AA4#*; ? *+ 4P;?4P?P?SP;?SH#4C2ES?#S*A4E/?CCS 0P4* D.%

    *4S,S#;E 42/*H? *0E 42/*H 4FPE AS +**HS : A6 E/EC4#*; E*H

    3%? 3'A6

  • 7/23/2019 Cost Data Book

    187/501

    #SA;4A#; *+ SH#4C2 H#42 A C*;;EC4#*;S

    #SA;4A#; *+ SH#4C2 H#42 A C*;;EC4#*;S

    #SA;4A#; *+ SH#4C2 H#42 A C*;;EC4#*;S

    'A

    #SA;4A#; *+ SH#4C2 H#42 A C*;;EC4#*;S

    #SA;4A#; *+ SH#4C2 H#42 A C*;;EC4#*;S

    E A4(1:3:D)

    Supply and castin" of '% Concrete includin" e5ca!ation of earth any

    type for makin" yard foundations and other repair work6

    EE

    rick works with brick I Concrete abo!e plinth le!el6 4his includes

    supply of all material like brick, cement, sand etc6 re7uired for the

    &ob6

    P#;426

    rick works with brick I Concrete below plinth le!el6 4his includes

    supply of all material like brick, cement, sand etc6 re7uired for the

    &ob6

    Cement plasterin" on the surface of PCC, /CC, rick work inside the Sub

    Station

    E/#;6

    rick soilin" (MI)M Cement plasterin" inside Sub Station

  • 7/23/2019 Cost Data Book

    188/501

    CAE AF#;

    0;E//*0; CAE AF#;>33G S#;E PE/ E 3CK'@%>3%% S$ 3C

    CAE AF#;0;E//*0; CAE AF#;>33G 4H* PE/ E 3CK'@%>3%% S$ 3C

    CAE AF#;

    AF 0? 642/EE PE/ E,33G 1CU3%%>.%% S$6 with 4refoil

    CAE AF#;

    AF 0? 642/EE PE/ E,33G 1CU1.%>'@% S$6 with 4refoil

    >3%% S$

    AF#; *; CAE>4/AF 33G S#;E PE/ E 3CK'@%>3%%S$

    >3%% S$

    AF#; *; CAE>4/AF 33G 4H* PE/ E 3CK'@%>3%%S$

    >.%%S$

    AF#; *; CAE>4/AF 33G 42/EE PE/ E 1CK3%%>.%%S$ H#42 4/E+*#

    >'@%S$

    AF#; *; CAE>4/AF 33G 42/EE PE/ E 1CK1.%>'@%S$ H#42 4/E+*#

    @%>3%% S$

    AF#; #; AS*;A/F 4/E;C2 33G S#;E PE/ E 3CK'@%>3%%S$

    @%>3%% S$

    AF#; #; AS*;A/F 4/E;C2 33G 4H* PE/ E 3CK'@%>3%%S$

    %%>.%%S$

    AF#; #; AS*;A/F 4/E;C2 33G 42/EE PE/ E 1CK3%%>.%%S$ H#42 4/E+*#

  • 7/23/2019 Cost Data Book

    189/501

    .%>'@%S$

    AF#; #; AS*;A/F 4/E;C2 33G 42/EE PE/ E 1CK1.%>'@%S$ H#42 4/E+*#

    S0PPF (MI)M #;S4AA4#*; *+ @R #A 20E P#PE

    S0PPF (MI)M #;S4AA4#*; *+ DR #A 20E P#PE

    S0PPF (MI)M #;S4AA4#*; *+ seal6 Suitable sie of heat shrink cap shall bepuB5%%%B

    o!er the cable and shrunk in position by heatin" with either "astorchB5%%%B

    or blow lamp6 *nly /aychem?/EP (K#C*; make) heat shrink capsshall beB5%%%B

    used6 4he cap shall fully shrunk by uniform heatin" till asmallB5%%%B

    7uantity of adhesi!e compound -ows outside all around the ed"e oftheB5%%%B

    cap to form eVecti!e water seal6B5%%%B3)/eturnin" the cable to the store with proper ta" markin"

    mentionin"B5%%%Bthe cable sie (MI)M cable len"thB5%%%B

    B5%%%Beneral ;otes :B5%%%B

    B5%%%B4he steel will drum will be pro!ided by J0SC*B5%%%B4he transportation of drum from store to site is in endor

    ScopeB5%%%B4he arran"ement of necessary crane , truck etc6 for completion of

    workB5%%%B

    is in !endor scopeB5%%%Bendor has to ensure for safe dismantlin" (MI)M transporation

    ofB5%%%Bcable6 #f any dama"e is obser!ed, !endor will be penalied6B5%%%Bendor has to follow all safety norms as per J0SC*B5%%%B

  • 7/23/2019 Cost Data Book

    190/501

    ACG+##;

    CAE 4/E;C2 C044#; (MI)M ACG+##; +*/ 0;E//*0; CAE AF#;

    E AF#;

    C044#; *+ PCC *; CAE /*04E +*/ 0;E//*0; CAE AF#;

    "816.m depth

    ayin" of ' per le" 11k 24 cable of 3CW KPEW Al cables to be laid

    mainly under"round at 16. meter depthW throu"h any type of soilW partly

    throu"h 2ume?# pipe?mansonary trench as per 4A4A / .D1 with "ood

    7uality roller ensurin" no rubbin" of cable on "round durin" pullin"6

    aricadin" standards by J0SC* for 0? cable layin" has to be strictly

    followed6 oadin" (MI)M 4ransportation of cable from store to site an

    unloadin" at site with proper arran"ement is included in this scope6

    return of empty cable drum? e5cess cable to store is also included6

    Cable ta" to be pro!ided as per SP;>=6

    4his rate is applicable for upto 11k 24 cable and therefore D6Dk and

    astic compound of >seal6 Suitable sie of heat shrink cap shall bepuB5%%%B

    o!er the cable and shrunk in position by heatin" with either "astorchB5%%%B

    or blow lamp6 *nly /aychem?/EP (K#C*; make) heat shrink capsshall beB5%%%B

    used6 4he cap shall fully shrunk by uniform heatin" till a

    smallB5%%%B 7uantity of adhesi!e compound -ows outside all around the ed"e oftheB5%%%B

    cap to form eVecti!e water seal6B5%%%B3)/eturnin" the cable to the store with proper ta" markin"

    mentionin"B5%%%Bthe cable sie (MI)M cable len"thB5%%%B

    B5%%%Beneral ;otes :B5%%%B

    B5%%%B4he steel will drum will be pro!ided by J0SC*B5%%%B4he transportation of drum from store to site is in endor

    ScopeB5%%%B4he arran"ement of necessary crane , truck etc6 for completion of

    workB5%%%Bis in !endor scopeB5%%%Bendor has to ensure for safe dismantlin" (MI)M transporation

    ofB5%%%Bcable6 #f any dama"e is obser!ed, !endor will be penalied6B5%%%Bendor has to follow all safety norms as per J0SC*B5%%%B

  • 7/23/2019 Cost Data Book

    191/501

    11k both6

    Job to be e5ecuted as per $uality Standards of J0SC*6

    S$ CA6AF#;

    AF6*;64/AF6 33G 1? 3C 1=.S$ CAE AF#;

    .S$ CA6AF6

    AF6*;64/AF 33G 6 '? 3C 1=.S$ CAE AF#;

    %>@%%S$ C66

    AF6*;64/AF633G 1? 3C 3%%>@%%S$ CAE AF#;

    .S$ CA6A

    AF6*;64/E;C26 33G 1? 3C 1=.S$ CAE AF#;

    S$ CA

    AF6*;64/E;C2 33G 6 '? 3C 1=.S$ CAE AF#;

    @%%S$ CA6

    AF6*;64/E;C2633G 1? 3C 3%%>@%%S$ CAE AF#;

    >@%%S$ CA6

    AF6*;64/E;C26 33G '? 3C 3%%>@%%S$ CAE AF#;

    S$ CA6AF6

    ismantlin" of 33G 1? 3C 0pto @%%S$ CAE AF#;

    S$ CA6AF6

    # of 33G 1? 3C 0pto @%%S$ CAE AF#;

    %mm' 33k!

    akin" of Styrai"ht throu"h &oin *f 3%%mm'W 3?c 33k! KEP Cable by 2eat

    shrink6 aAl lmaterial e5cept &ointin" kit under scope of work

    e out door

    #nsallation of heat shrinkable out door termination kit sutaible for 3?

  • 7/23/2019 Cost Data Book

    192/501

    3%%mm' 33k! KEP Cable

    >G Pr&,*I)

    on" te5t not maintain

    >S$ 351C>3C

    ayin" of 24 cable of 3 K 1C or 3C, KPE, Al cables to be laid mainlyunder"round throu"h any type of soil, partly throu"h 2ume?#

    pipe?mansonary trench as per 4A4A / .D1 with "ood 7uality roller

    ensurin" no rubbin" of cable on "round durin" pullin"6 aricadin"

    standards by J0SC* for 0? cable layin" has to be strictly followed6

    oadin" I 4ransportation of cable from store to site and unloadin" at

    site with proper arran"ement is included in this scope6 return of

    empty cable drum? e5cess cable to store is also included6 Cable ta" to

    be pro!ided as per SP;>=6

    $6 351C>3C

    ayin" of 24 cable of 3 K 1C or 3C, KPE, Al cables to be laid mainly

    under"round throu"h any type of soil, partly throu"h 2ume?#

    pipe?mansonary trench as per 4A4A / .D1 with "ood 7uality roller

    ensurin" no rubbin" of cable on "round durin" pullin"6 aricadin"

    standards by J0SC* for 0? cable layin" has to be strictly followed6

    oadin" I 4ransportation of cable from store to site and unloadin" at

    site with proper arran"ement is included in this scope6 return of

    empty cable drum? e5cess cable to store is also included6 Cable ta" to

    be pro!ided as per SP;>=6

    1'% S$3K1C?3C

    ayin" of ' per le" 24 cable of 3 K 1C or 3C, KPE, Al cables to be

    laid mainly under"round throu"h any type of soil, partly throu"h

    2ume?# pipe?mansonary trench as per 4A4A / .D1 with "ood 7uality

    roller ensurin" no rubbin" of cable on "round durin" pullin"6

    aricadin" standards by J0SC* for 0? cable layin" has to be strictly

    followed6 oadin" I 4ransportation of cable from store to site and

    unloadin" at site with proper arran"ement is included in this scope6

    return of empty cable drum? e5cess cable to store is also included6

    Cable ta" to be pro!ided as per SP;>=6

    % S$6 3K1C?3C

    ayin" of ' per le" 24 cable of 3 K 1C or 3C, KPE, Al cables to be

    laid mainly under"round throu"h any type of soil, partly throu"h

    2ume?# pipe?mansonary trench as per 4A4A / .D1 with "ood 7uality

  • 7/23/2019 Cost Data Book

    193/501

    roller ensurin" no rubbin" of cable on "round durin" pullin"6

    aricadin" standards by J0SC* for 0? cable layin" has to be strictly

    followed6 oadin" I 4ransportation of cable from store to site and

    unloadin" at site with proper arran"ement is included in this scope6

    return of empty cable drum? e5cess cable to store is also included6

    Cable ta" to be pro!ided as per SP;>=6

    % S$63K1C?3C

    ayin" of 3 per le" 24 cable of 3 K 1C or 3C, KPE, Al cables to be

    laid mainly under"round throu"h any type of soil, partly throu"h

    2ume?# pipe?mansonary trench as per 4A4A / .D1 with "ood 7uality

    roller ensurin" no rubbin" of cable on "round durin" pullin"6

    aricadin" standards by J0SC* for 0? cable layin" has to be strictly

    followed6 oadin" I 4ransportation of cable from store to site and

    unloadin" at site with proper arran"ement is included in this scope6

    return of empty cable drum? e5cess cable to store is also included6Cable ta" to be pro!ided as per SP;>=6

    1'% S$3K1C?3C

    ayin" of @ per le" 24 cable of 3 K 1C or 3C, KPE, Al cables to be

    laid mainly under"round throu"h any type of soil, partly throu"h

    2ume?# pipe?mansonary trench as per 4A4A / .D1 with "ood 7uality

    roller ensurin" no rubbin" of cable on "round durin" pullin"6

    aricadin" standards by J0SC* for 0? cable layin" has to be strictly

    followed6 oadin" I 4ransportation of cable from store to site and

    unloadin" at site with proper arran"ement is included in this scope6

    return of empty cable drum? e5cess cable to store is also included6

    Cable ta" to be pro!ided as per SP;>=6

    % S$6 3K1C?3C

    ayin" of @ per le" 24 cable of 3 K 1C or 3C, KPE, Al cables to be

    laid mainly under"round throu"h any type of soil, partly throu"h

    2ume?# pipe?mansonary trench as per 4A4A / .D1 with "ood 7uality

    roller ensurin" no rubbin" of cable on "round durin" pullin"6

    aricadin" standards by J0SC* for 0? cable layin" has to be strictly

    followed6 oadin" I 4ransportation of cable from store to site and

    unloadin" at site with proper arran"ement is included in this scope6

    return of empty cable drum? e5cess cable to store is also included6

    Cable ta" to be pro!ided as per SP;>=6

    '@%S$6 351C>3C

  • 7/23/2019 Cost Data Book

    194/501

    ayin" 264 upto 11 G of 3 K 1C or 3C 1.%>'@% S7mm

    KPE?PC?2/PC?SC/EE;S?0;SC/EE;E? A/*0/E? 0;A/*0/E , C*PPE/?

    A0#;#0 CAES 0P4* 11G /AE 4* E A# A#;F 4/AF? /ACGE4S ?

    A;S*;A/F4/E;C2 E4C 642#S EKC0ES 42E +A/#CA4#*; A; E/EC4#*; *+

    4/AFS 04 #;C0E E/EC4#*;?+A/#CA4#*; *+ /ACGE46

    1'%>S$ 351C>3C

    4emporary layin" of cable durin" breakdown? emer"encies to restore

    power supply by 5in" the cable with support or burried at least

    @%%mm below the "round as per site condition as per the ad!ice of site

    en"ineer6

    6

    #E/S#*; *+ 04#C*/E CAES : #E/S#*; *+ +**H#; 04#C*/E

    A/*0;E?0;A/*0;E CAES #;C0#; #SA;4#; *+ E; *K (H2E/EE//E$0#/E ) A# 0;E//*0; 42#S #;C0ES #SC*;;EC4#*;6 A6 S#;E

    CAE 0?6 2646CAE PC?2/PC?C?0F4?KPE 0P4* % S$66

    3%%S$6

    %>3%%

    6

    #E/S#*; *+ 04#C*/E CAES : #E/S#*; *+ +**H#; 04#C*/E

    A/*0;E?0;A/*0;E CAES #;C0#; #SA;4#; *+ E; *K (H2E/EE/

    /E$0#/E ) A# 0;E//*0; 42#S #;C0ES #SC*;;EC4#*;6 A6

    &obB5%%%Bin!ol!es e5ca!ation and remo!al of cable and e5ca!ation and layin"

    ofB5%%%Bcable to di!erted route, backllin" of cable trench, puttin"

    slabsB5%%%Band sand as re7uired in the new route6B5%%%B

    #E/S#*; *+ 04#C*/E CAES : #E/S#*; *+ +**H#; 04#C*/EB5%%%BA/*0;E?0;A/*0;E CAES #;C0#; #SA;4#; *+

    E; *K (H2E/EE/B5%%%B/E$0#/E ) A# 0;E//*0; 642#S #;C0ES #SC*;;EC4#*;6

    C6 '?EB5%%%B0? CAE6 2646CAE PC?2/PC?C?0F4?KPE A*E %

    S$66 4* 3%%B5%%%B

    S$66aricadin" standards by J0SC* for 0? cable layin" has tobeB5%%%Bstrictly followed6

  • 7/23/2019 Cost Data Book

    195/501

    S#;E CAE 0?6 2646CAE P#CA 0P4* % S$66

    S$6

    #E/S#*; *+ 04#C*/E CAES : #E/S#*; *+ +**H#; 04#C*/E

    A/*0;E?0;A/*0;E CAES #;C0#; #SA;4#; *+ E; *K (H2E/EE/

    /E$0#/E ) A# 0;E//*0; 42#S #;C0ES #SC*;;EC4#*;6 A6 S#;E

    CAE 0?6 2646CAE P#CA A*E % S$66

    '. S$66

    E/EC4#*; *+ 646?646 S#;E C*/ECAE : E/EC4#*; *+ 646?646

    PC?2/PC?04F S#;E C*/E C*PPE/?A0#;#0 CAE ( 161 G /AE )

    AS +**HS: 6 A#;F *; 4/AFS?/ACGE4?P#PE?C*;0#4 E4C6 42#S

    #;C0ESS0PPF *+ ACESS*/#ES +*/P#PE?C*;0#4 A; *42E/ A4E/#AS

    /E$0#/E ( EKCEP4 S0PPF *+ CAES P#PE?C*;0#4 A;

    +A/#CA4#*;?E/EC4#*; *+ 4/AFS )6 0P4* '. S$66

    %%S$Cable layin" on tray > 161G "rade 1CU@%%s76mm

    CAE AF#;

    0nder "round cable layin" > 161G "rade 1CU3%% ?@%% s76mm

    $660P4*1'C

    4*.%S$6'?3?@

    E/EC4#*; *+ 4?4 , PC? 2/PC?A/*0/E?0;A/*0/E ,B5%%%B

    C*PPE/?A0#;#0 CAE (0P4* 161 G /AE ) AS+**HSB5%%%B

    A6 A#;F 0;E/*0; A; PA/4F 42/*02 P#PE ? C*;0#4?20E P#PE?B5%%%B

    A;S*;A/F 4/E;C2 E4C AS PE/ 4A4A / .D16 #4 #;C0ESE/EC4#*; *+B5%%%B

    P#PE ?B5%%%BC*;0#4?20E P#PE A; *42E/ A4E/#AS /E$0#/E EKCEP4

    S0PPF *+ CAESB5%%%BA; P#PES ,B5%%%B60P4* D S$6 6 0P4* 1'C6

  • 7/23/2019 Cost Data Book

    196/501

    1'%S$6 '?3?@C

    >'@%S$6'?3?@C

    >@%%S$6'?3?@C

    E/EC4#*; *+ 4?4 , PC? 2/PC?04F?A/*0/E?0;A/*0/E ,

    C*PPE/?A0#;#0 CAE (0P4* 161 G /AE ) AS +**HS

    A6 A#;F 0;E/*0; A; PA/4F 42/*02 P#PE ? C*;0#4? 20E P#PE?

    E/EC4#*; *+ 4?4 CAE A*E D 4* .% S$,' 4* @ C*/E , PC?B5%%%B2/PC?A/*0/E?0;A/*0/E ,B5%%%BC*PPE/?A0#;#0 CAE (0P4* 161 G /AE ) AS

    +**HSB5%%%BA6 A#;F 0;E/*0; A; PA/4F 42/*02 P#PE ? C*;0#4?

    20E P#PE?B5%%%B

    A;S*;A/F 4/E;C2 E4C AS PE/ 4A4A / .D16 #4 #;C0ESE/EC4#*; *+B5%%%BP#PE ?B5%%%BC*;0#4?20E P#PE A; *42E/ A4E/#AS /E$0#/E EKCEP4

    S0PPF *+ CAESB5%%%BA; P#PES6

    E/EC4#*; *+ 4?4 CAE A*E .% 4* 1'% S$,' 4* @ C*/E , PC?B5%%%B2/PC?A/*0/E?0;A/*0/E ,B5%%%B

    C*PPE/?A0#;#0 CAE (0P4* 161 G /AE ) AS+**HSB5%%%B

    A6 A#;F 0;E/*0; A; PA/4F 42/*02 P#PE ? C*;0#4?20E P#PE?B5%%%B

    A;S*;A/F 4/E;C2 E4C AS PE/ 4A4A / .D16 #4 #;C0ESE/EC4#*; *+B5%%%B

    P#PE ?B5%%%BC*;0#4?20E P#PE A; *42E/ A4E/#AS /E$0#/E EKCEP4

    S0PPF *+ CAESB5%%%BA; P#PES6

    E/EC4#*; *+ 4?4 CAE A*E 1'% 4* '@% S$,' 4* @ C*/E , PC?B5%%%B2/PC?A/*0/E?0;A/*0/E ,B5%%%BC*PPE/?A0#;#0 CAE (0P4* 161 G /AE ) AS

    +**HSB5%%%BA6 A#;F 0;E/*0; A; PA/4F 42/*02 P#PE ? C*;0#4?

    20E P#PE?B5%%%BA;S*;A/F 4/E;C2 E4C AS PE/ 4A4A / .D16 #4 #;C0ES

    E/EC4#*; *+B5%%%BP#PE ?B5%%%B

    C*;0#4?20E P#PE A; *42E/ A4E/#AS /E$0#/E EKCEP4S0PPF *+ CAESB5%%%BA; P#PES6

  • 7/23/2019 Cost Data Book

    197/501

    A;S*;A/F 4/E;C2, +*/ CAE A# A#;F #; # ?S2*P +**/ F C044#;

    C2ASE6 E4C 6 #;C0#; S0PPF A; E/EC4#*; *+ ACCESS*/#ES +*/ P#PE ?

    C*;0#4 I *42E/ A4E/#AS /E$0#/E EKCEP4 S0PPF *+ CAES , P#PES I

    C*;0#4 ? 20E P#PE6 A*E '@% S$6 4* @%% S$6 '?@ */ @ C6

    660P4*1'C

    %S$66'?3?@C

    '%S$6 '?3?@C

    @%S$6 '?3?@C

    E/EC4#*; *+ 4?4 , PC? 2/PC?04F?A/*0/E?0;A/*0/E ,B5%%%BC*PPE/?A0#;#0 CAE (0P4* 161 G /AE ) AS +**HS

    :B5%%%B6A#;F *; /ACGE4 ? +ES4**; ? AS*;A/F 4/E;C2 E4C6

    #;C0#; S0PPFB5%%%BA;B5%%%BE/EC4#*; *+ #;S0A4*/S +*/ +ES4**; ACCEESS*/#ES,6#6 H#/E

    A; *42E/B5%%%BA4E/#AS /E$0#/E EKCEP4 S0PPF *+B5%%%BCAE6 0P4* D S$660P4* 1'C6

    E/EC4#*; *+ 4?4 , PC? 2/PC?04F?A/*0/E?0;A/*0/E ,B5%%%BC*PPE/?A0#;#0 CAE (0P4* 161 G /AE ) AS +**HS

    :B5%%%B6A#;F *; /ACGE4 ? +ES4**; ? AS*;A/F 4/E;C2 E4C6

    #;C0#;B5%%%BS0PPF A;B5%%%BE/EC4#*; *+ #;S0A4*/S +*/ +ES4**; ACCEESS*/#ES,6#6 H#/E

    A; *42E/B5%%%BA4E/#AS /E$0#/E EKCEP4 S0PPF *+B5%%%BCAE6 A*E D S$6 4* .%S$6'?3?@C6

    E/EC4#*; *+ 4?4 , PC? 2/PC?04F?A/*0/E?0;A/*0/E ,B5%%%BC*PPE/?A0#;#0 CAE (0P4* 161 G /AE ) AS +**HS

    :B5%%%B6A#;F *; /ACGE4 ? +ES4**; ? AS*;A/F 4/E;C2 E4C6

    #;C0#; S0PPFB5%%%BA;B5%%%BE/EC4#*; *+ #;S0A4*/S +*/ +ES4**; ACCEESS*/#ES,6#6 H#/E

    A; *42E/B5%%%BA4E/#AS /E$0#/E EKCEP4 S0PPF *+B5%%%BCAE6 A*E .% S$6 4* 1'%S$6'?3?@C6

  • 7/23/2019 Cost Data Book

    198/501

    %S$6'?3?@C

    0P4*1'C

    $6 '?3?@C

    E/EC4#*; *+ 4?4 , PC? 2/PC?04F?A/*0/E?0;A/*0/E ,B5%%%BC*PPE/?A0#;#0 CAE (0P4* 161 G /AE ) AS +**HS

    :B5%%%B6A#;F *; /ACGE4 ? +ES4**; ? AS*;A/F 4/E;C2 E4C6

    #;C0#; S0PPFB5%%%BA;B5%%%BE/EC4#*; *+ #;S0A4*/S +*/ +ES4**; ACCEESS*/#ES,6#6 H#/E

    A; *42E/B5%%%BA4E/#AS /E$0#/E EKCEP4 S0PPF *+B5%%%BCAE6 A*E 1'% S$6 4* '@%S$6'?3?@C6

    E/EC4#*; *+ 4?4 , PC? 2/PC?04F?A/*0/E?0;A/*0/E ,B5%%%BC*PPE/?A0#;#0 CAE (0P4* 161 G /AE ) AS +**HS

    :B5%%%B6A#;F *; /ACGE4 ? +ES4**; ? AS*;A/F 4/E;C2 E4C6

    #;C0#;B5%%%BS0PPF A;B5%%%B

    E/EC4#*; *+ #;S0A4*/S +*/ +ES4**; ACCEESS*/#ES,6#6 H#/EA; *42E/B5%%%B

    A4E/#AS /E$0#/E EKCEP4 S0PPF *+B5%%%BCAE6 A*E '@% S$6 4* @%%S$6'?3?@C6

    C*PPE/?A0#;#0 CAE (0P4* 161 G /AE ) AS +**HS:B5%%%B

    C6 A#;F *; 4/AF?CA4E;A/F?AS*;A/F 4/E;C2 E4C6 #4EKC0ES S0PPF *+B5%%%B

    CAES A; AS* +A/#CA4#*; A;B5%%%B

    E/EC4#*; *+ 4/AFS 04 #;C0ES S0PPF I E/EC4#*; *+ EFE*4S, 6#6B5%%%B

    H#/E +*/ CA4E;A/FB5%%%BA; *42E/ A4E/#AS H#42 ACCESSA/#ES60P4* D S$6 6 0P4*

    1'C6

    E/EC4#*; *+ 4?4 , PC? 2/PC?04F?A/*0/E?0;A/*0/E ,B5%%%BC*PPE/?A0#;#0 CAE (0P4* 161 G /AE ) AS +**HS

    :B5%%%BC6 A#;F *; 4/AF?CA4E;A/F?AS*;A/F 4/E;C2 E4C6 #4

    EKC0ES S0PPF *+B5%%%BCAES A; AS* +A/#CA4#*; A;B5%%%BE/EC4#*; *+ 4/AFS 04 #;C0ES S0PPF I E/EC4#*; *+ EFE

    *4S, 6#6B5%%%BH#/E +*/ CA4E;A/FB5%%%BA; *42E/ A4E/#AS H#42 ACCESSA/#ES6A*E D S$6 4*

    .%S$ '?3?@C6

  • 7/23/2019 Cost Data Book

    199/501

  • 7/23/2019 Cost Data Book

    200/501

    >@%%S$'?3?@C

    %S$6 '?3?@C

    >1'%S$'?3?@C

    E/EC4#*; *+ 4?4 , PC? 2/PC?04F?A/*0/E?0;A/*0/E ,B5%%%BC*PPE/?A0#;#0CAE (0P4* 161 G /AE ) AS +**HS :

    '?EB5%%%B0;E//*0; AF#; A; PA/4F 42/*02 P#PE ? C*;0#4?

    20E P#PE?B5%%%BA;S*;A/F 4/E;C2 E4C AS PE/ 4A4A / .D16#4 #;C0ES

    E/EC4#*; *+B5%%%BP#PE ?B5%%%B

    C*;0#4?20E P#PE A; *42E/ A4E/#AS /E$0#/E EKCEP4S0PPF *+B5%%%B

    CAES6

    E/EC4#*; *+ 4?4 , PC? 2/PC?04F?A/*0/E?0;A/*0/E ,B5%%%BC*PPE/?A0#;#0CAE (0P4* 161 G /AE ) AS +**HS :

    '?EB5%%%B0;E//*0; AF#; A; PA/4F 42/*02 P#PE ? C*;0#4?

    20E P#PE?B5%%%BA;S*;A/F 4/E;C2 E4C AS PE/ 4A4A / .D16#4 #;C0ES

    E/EC4#*; *+B5%%%BP#PE ?B5%%%BC*;0#4?20E P#PE A; *42E/ A4E/#AS /E$0#/E EKCEP4

    S0PPF *+B5%%%BCAES6

    3?EB5%%%B0;E//*0; AF#; A