1
Cottage Grove Study Area October 26, 2015
Presentation Roadmap
1. What is ReBuild Houston? 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area 6. Street Configuration Options 7. Other Considerations
2
What is ReBuild Houston? Approved by voters in 2010 Pay-as-you-go approach = No new debt! Greatest need areas first
ReBuild Houston Goals Reduce impact of flooding Improve mobility Quality of life
COTTAGE GROVE AREA STUDY
USER EXPERIENCE
DESIGN
6
Demonstration Project Low Impact Development
TC JESTER RECONSTRUCTION CIP Numbers N-100002 and N-100007
IH-10 to Timbergrove Ln.
Timeline subject to change
2015 Design
2018 Construction
2019 Anticipated Completion
Public Input Being Incorporated from June 23rd meeting: • Additional turns off of TC Jester into neighborhood
• Buffered on-street bike facilities
• HISD Pick-up/drop-off location
Design Constraints
EXISTING
26 FT STREET WITH 5FT SIDEWALKS AT BACK OF ROW
22 FT STREET WITH SIDEWALKS EVENT WITH DRIVEWAYS
Three Breakout Groups WEST
To Arabelle St. MIDDLE
Arabelle to TC Jester EAST
TC Jester to White Oak Bayou
Topics for Input
• Street Right-of-Way distribution?
• Parking for residents? • Parking for guests? • Pedestrian and sidewalk areas? • Bus stop locations? • Bicycle connection needs?
Fill out a comment card or email us your comments at: [email protected]
www.RebuildHouston.org