1 Cottage Grove Study Area October 26, 2015
Transcript
Page 1: Cottage Grove Study Area - ReBuild Houston · 2017-04-26 · 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area

1

Cottage Grove Study Area October 26, 2015

Page 2: Cottage Grove Study Area - ReBuild Houston · 2017-04-26 · 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area

Presentation Roadmap

1. What is ReBuild Houston? 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area 6. Street Configuration Options 7. Other Considerations

2

Page 3: Cottage Grove Study Area - ReBuild Houston · 2017-04-26 · 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area

What is ReBuild Houston? Approved by voters in 2010 Pay-as-you-go approach = No new debt! Greatest need areas first

Page 4: Cottage Grove Study Area - ReBuild Houston · 2017-04-26 · 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area

ReBuild Houston Goals Reduce impact of flooding Improve mobility Quality of life

Page 5: Cottage Grove Study Area - ReBuild Houston · 2017-04-26 · 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area

COTTAGE GROVE AREA STUDY

Page 6: Cottage Grove Study Area - ReBuild Houston · 2017-04-26 · 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area

USER EXPERIENCE

DESIGN

6

Page 7: Cottage Grove Study Area - ReBuild Houston · 2017-04-26 · 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area

Demonstration Project Low Impact Development

Page 8: Cottage Grove Study Area - ReBuild Houston · 2017-04-26 · 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area

TC JESTER RECONSTRUCTION CIP Numbers N-100002 and N-100007

IH-10 to Timbergrove Ln.

Timeline subject to change

2015 Design

2018 Construction

2019 Anticipated Completion

Public Input Being Incorporated from June 23rd meeting: • Additional turns off of TC Jester into neighborhood

• Buffered on-street bike facilities

• HISD Pick-up/drop-off location

Page 9: Cottage Grove Study Area - ReBuild Houston · 2017-04-26 · 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area

Design Constraints

Page 10: Cottage Grove Study Area - ReBuild Houston · 2017-04-26 · 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area

EXISTING

26 FT STREET WITH 5FT SIDEWALKS AT BACK OF ROW

22 FT STREET WITH SIDEWALKS EVENT WITH DRIVEWAYS

Page 11: Cottage Grove Study Area - ReBuild Houston · 2017-04-26 · 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area

Three Breakout Groups WEST

To Arabelle St. MIDDLE

Arabelle to TC Jester EAST

TC Jester to White Oak Bayou

Page 12: Cottage Grove Study Area - ReBuild Houston · 2017-04-26 · 2. Overview of the study area 3. LID Demonstration Project 4. TC Jester Project Update 5. Design Constraints for Area

Topics for Input

• Street Right-of-Way distribution?

• Parking for residents? • Parking for guests? • Pedestrian and sidewalk areas? • Bus stop locations? • Bicycle connection needs?

Fill out a comment card or email us your comments at: [email protected]