+ All Categories
Home > Documents > Coudé Lab Instrument Interfaces BOULDER March 18, 2009

Coudé Lab Instrument Interfaces BOULDER March 18, 2009

Date post: 23-Feb-2016
Category:
Upload: pillan
View: 32 times
Download: 0 times
Share this document with a friend
Description:
Coudé Lab Instrument Interfaces BOULDER March 18, 2009. Facility Services Provided. Utility building - Power - Chilled Water - Networking - Control Cables Compressed Air Telephone. S & O Building. - Vacuum - Nitrogen (gas) . Services Provided to Coudé Floor. Power - PowerPoint PPT Presentation
Popular Tags:
13
Coudé Lab Instrument Interfaces BOULDER March 18, 2009
Transcript
Page 1: Coudé Lab Instrument Interfaces   BOULDER March  18, 2009

Coudé Lab Instrument Interfaces BOULDERMarch 18, 2009

Page 2: Coudé Lab Instrument Interfaces   BOULDER March  18, 2009

Facility Services Provided

S & O Building- Vacuum- Nitrogen (gas)

Utility building- Power- Chilled Water- Networking- Control Cables- Compressed Air- Telephone

Page 3: Coudé Lab Instrument Interfaces   BOULDER March  18, 2009

Services Provided toCoudé Floor

• Power– 480 3Ф, 120, 120UPS

• Coolant– constant temperature

• Compressed Air– 100 PSI, 10 SCFM w/dew point -40C

• Vacuum– 100 SCFM

• Nitrogen (gaseous)– 0 – 5 L/m

• Currently we are not planning compressed He

Page 4: Coudé Lab Instrument Interfaces   BOULDER March  18, 2009

Ground level

• Power• Coolant• Compressed air• Vacuum• Nitrogen, dry

Coudé Azimuth Wrap-up

Page 5: Coudé Lab Instrument Interfaces   BOULDER March  18, 2009

Coudé Azimuth Wrap-up to Cable-ways

Mezzanine Level•Cable-ways from wrap-up

Coudé level

Umbilical of cabling (coolant, control) •below removable flooring•connected to interface panels•provide power, coolant, and control to instruments on coudé floor

Page 6: Coudé Lab Instrument Interfaces   BOULDER March  18, 2009

Coudé Floor

Removable floor panels

Cable access through steal floor

Page 7: Coudé Lab Instrument Interfaces   BOULDER March  18, 2009

Instrument Electronics Rack Location

•Instrument racks 38U •3 platform sides of floor•Cooled •Cabling out of top•Cable ways to openings in floor

•Signals to LIC(Science Instruments & WFC)

Page 8: Coudé Lab Instrument Interfaces   BOULDER March  18, 2009

Mounting Instrument Tables on Coudé Floor

•Table Support Beams attached to major coudé floor supports•Isolation pads

Page 9: Coudé Lab Instrument Interfaces   BOULDER March  18, 2009

Networks Provided

• 2.1.4.1 Communication; Ethernet– Provides 1000BASE-SX, 802.3z-1998,– Ethernet connection onto facility communication LAN– Multi-mode 62.5/125, Duplex SC type connector

• 2.1.4.2 Data; Fibre Channel ,– Provides 1000BASE-SX, 802.3z-1998, – Ethernet connection onto facility data LAN– Multi-mode 62.5/125, Duplex SC type connector

• 2.1.4.3 Safety; Ethernet, – Provides 100BASE-SX, 802.3-2008,– Ethernet connection onto facility safety LAN– Multi-mode 62.5/125, Duplex SC type connector

• 2.1.4.4 ATST Synchrobus;– IRIG-B– Fiber pair (duplex SC), Single-mode fiber

Page 10: Coudé Lab Instrument Interfaces   BOULDER March  18, 2009

Network Cables

•Fabric used– Copper CAT5e– Fiber Multi-mode pairs, single-mode pairs

•All Networks are full duplex; therefore, – Fiber connections are made through use of

SC (duplex) connectors– Copper utilizes RJ-45 connectors

Page 11: Coudé Lab Instrument Interfaces   BOULDER March  18, 2009

Control Cables

• Four defined types– 24V control signal

• 16 AGW, stranded, shielded, PVC, energy-chain rated

• limit switch, proximity switched, relay control, e-stop

– Non-defined, twisted pair• 16 AGW, stranded, twisted pair, shielded,

energy-chain rated• Differential digital signals (TTL), differential

analog– Coaxial 50

• RF, audio, single highly-modulated signal (clock)– Coaxial 75

• Video

Page 12: Coudé Lab Instrument Interfaces   BOULDER March  18, 2009

Coudé level

Facility services to Instrument Lab•Power: 480 3Ф, 208 3Ф, 120UPS•Coolant: constant temp•Compressed air•Vacuum

Utility Chase •Fiber•Phone•Control

Page 13: Coudé Lab Instrument Interfaces   BOULDER March  18, 2009

~ END ~