Dwg Ref:
Scale:
Drawn:
Date:
Status:
1510/CCC/001
Not to Scale
P.R.H
Apr 2020
CONSULTATION
Transport and Innovation Service,
Highways Division
Air Quality Action Plan
Coundon Cycleway
Overview Plan
Project:
Title:
N
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
1234567
Sheet 1
Sheet 2
Sheet 3
Sheet 4
Sheet 5
Sheet 6
Sheet 7
Sheet 8
Sheet 9
Sheet 10
Sheet 11
Sheet 12
Sheet 13
Sheet 14
Sheet 15
Sheet 17
Coundon Cycleway Info
Route length - 2.75km (1.7miles)
Facility type - Two-way cycleway, fully segregated from traffic.
Houeholds served - 4,500 directly in catchment
Destinations served - city centre, St.Osburgs School and Church, Bablake School, Coundon
Hotel, Moseley Primary School, Moseley Ave Local Centre, St. Georges's Church, Lion's
Inn, Westhill Road Local Centre, Christ the King Community Centre / Church / School,
Bablake Playing Fields, Avenue Bowls Club, Coundon Court School, Hollyfast Primary
School
B
a
r
k
e
r
s
'
B
u
t
t
s
L
a
n
e
W
e
s
t
h
i
l
l
R
o
a
d
H
o
l
l
y
f
a
s
t
R
o
a
d
N
o
r
m
a
n
P
l
a
c
e
R
o
a
d
B
a
r
k
e
r
s
'
B
u
t
t
s
L
a
n
e
C
o
u
n
d
o
n
R
o
a
d
H
o
l
y
h
e
a
d
R
o
a
d
M
o
s
e
l
e
y
A
v
e
n
u
e
S
c
o
ts
L
a
n
e
G
a
v
e
s
t
o
n
R
o
a
d
C
o
u
r
t
l
a
n
d
A
v
e
n
u
e
B
a
r
r
a
s
L
a
n
e
A
b
b
o
t
t
s
L
a
n
e
U
p
p
e
r
H
i
l
l
S
t
r
e
e
t
H
o
l
y
h
e
a
d
R
o
a
d
M
o
s
e
l
e
y
A
v
e
n
u
e
Three S
pires A
venue
Ring Road
Junction 8
Sheet 16
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/101
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 1 of 17
Project:
Title:
N
Cycleway created in place of existing
hard verge
Traffic gives way to cycleway
Cycleway runs behind bus stop, creating a 'floating bus stop'
Phase 1 of cycleway to finish opposite Birchfield
Road providing access to Coundon Green estate
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
1234567
Kerb line
Cycleway
Footway (path)
Bollard
Tactile paving (pedestrian
crossing dropped kerb)
Tree to be removed
Double yellow lines
Grass verge
Cycleway road marking
Key
Transport and Innovation Service,
Highways Division
SHEET 1
Tree to be removed and
new trees to be planted
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/102
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 2 of 17
Project:
Title:
N
Cycleway created in place of existing
grass verge
Access to cycleway
Cycleway runs behind bus stop, creating a 'floating bus stop'
Cycleway created in place of existing
grass verge
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
1234567Transport and Innovation Service,
Highways Division
SHEET 2
Tactile paving (pedestrian
crossing dropped kerb)
Road
Cross Section
Path Verge Cycleway Path Bablake Playing
Fields
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/103
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 3 of 17
Project:
Title:
N
Cycleway created in place
of existing grass verge
Cycleway created in place
of existing grass verge
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
C
r
o
s
s
S
e
c
t
i
o
n
.
S
e
e
i
n
s
e
t
1234567Transport and Innovation Service,
Highways Division
SHEET 3
Tactile paving (pedestrian
crossing dropped kerb)
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/104
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 4 of 17
Project:
Title:
N
Cycleway created in place of existing
grass verge
Access to cycleway
Cycleway runs behind bus stop, creating a 'floating bus stop'
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
1234567Transport and Innovation Service,
Highways Division
SHEET 4
Tactile paving (pedestrian
crossing dropped kerb)
N
O
E
N
T
R
Y
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/105
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 5 of 17
Project:
Title:
N
Hollyfast Road to be exit only to reduce conflicting movements
around the junction. Traffic to give way to cycleway
Cycleway created in place of existing
grass verge
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Cycleway created in part from existing hard verge
and in part from carriageway narrowing.
Parking restrictions on carriageway 7:00-10:00 and
15:00-18:00. Parking not permitted on cycleway or
footway. Vehicle crossovers (dropped kerbs) will
be permitted to access property frontages.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
Parking in marked bays only.
No parking on carriageway.
Dropped kerbs permitted.
1234567Transport and Innovation Service,
Highways Division
SHEET 5
Tactile paving (pedestrian
crossing dropped kerb)
S
C
H
O
O
L
K
E
E
P
C
L
E
A
R
S
C
H
O
O
L
K
E
E
P
C
L
E
A
R
Cross Section
RoadPath Parking in
hard verge
Cycleway PathHouses Houses
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/106
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 6 of 17
Project:
Title:
N
School Keep Clear restrictions to
remain as existing
Parking on 'odds' side of road to
be permitted on hard verge only.
Vehicle crossovers (dropped
kerbs) will be permitted to
access property frontages.
No carriageway parking
Cycleway created in part from existing hard
verge and in part from carriageway narrowing.
Parking restrictions on carriageway 7:00-10:00
and 15:00-18:00. Parking not permitted on
cycleway or footway.
Vehicle crossovers (dropped kerbs) will be
permitted to access property frontages, see
drawing 1505/CCC/118
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
Vehicles accessing and egressing
car park must give way to cycleway
first
C
r
o
s
s
S
e
c
t
i
o
n
.
S
e
e
i
n
s
e
t
1234567Transport and Innovation Service,
Highways Division
SHEET 6
Tactile paving (pedestrian
crossing dropped kerb)
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/107
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 7 of 17
Project:
Title:
N
Cycleway created in place
of existing carriageway
Roundabout re-shaped to
create space for cycleway
on east side
Cycleway runs behind bus stop,
creating a 'floating bus stop'.
Tree to be felled and two new
replacement trees planted
Telegraph pole and post
box will be repositioned
New Parallel Crossing (zebra
for people on foot and cycles)
Puffin crossing adjusted to span
cycleway as well as carriageway
Vehicles accessing and
egressing Elmwood
Avenue must give way to
cycleway first
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
1234567Transport and Innovation Service,
Highways Division
SHEET 7
Tree to be removed and
new trees to be planted
Tactile paving (pedestrian
crossing dropped kerb)
RoadPath Parking in
tree line
hard verge
Cycleway PathHouses HousesParking
in Road
Cross Section
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/108
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 8 of 17
Project:
Title:
N
Cycleway created in place
of existing carriageway
Vehicles accessing and
egressing Ashwood Avenue
must give way to cycleway first
Cycleway created in place
of existing carriageway
Cycleway runs behind bus stop,
creating a 'floating bus stop'
Parking laybys created from
existing hard verge area
Parking laybys created from
existing hard verge area
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
Gap to enable access to
Laburnum Avenue
C
r
o
s
s
S
e
c
t
i
o
n
.
S
e
e
i
n
s
e
t
1234567Transport and Innovation Service,
Highways Division
Tactile paving (pedestrian
crossing dropped kerb)
SHEET 8
N
O
E
N
T
R
Y
S
L
O
W
S
L
O
W
S
L
O
W
S
L
O
W
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/109
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 9 of 17
Project:
Title:
N
Detection loops on approach to
traffic signals call a green light
for cycleway
Cycleway created in place
of existing carriageway
Bus stop relocated.
Cycleway runs behind
bus stop, creating a
'floating bus stop'
Parking laybys created from
existing hard verge area
Browett Road to be egress only. No
vehicle access from Barkers' Butts
Lane into Browett Road.
Vehicles must give way to cycleway.
New traffic signals to facilitate
cycleway switching from north
to south side of carriageway
Cycleway created in place of
existing carriageway
Parking laybys created from
existing hard verge area
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
Gap to enable access
to Ro-oak Road
1234567Transport and Innovation Service,
Highways Division
Tactile paving (pedestrian
crossing dropped kerb)
SHEET 9
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/110
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 10 of 17
Project:
Title:
N
Cycleway created in place of existing carriageway.
Parking permitted in designated bays
Parking laybys created from
existing hard verge area
Pakes's Croft to be closed to traffic and
accessed only from Troughton Crescent.
Cycleway created in place
of existing carriageway
Cycleway runs behind bus stop,
creating a 'floating bus stop'
Parking laybys created from
existing hard verge area
Detection loops on approach to traffic
signals call a green light for cycleway
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
1234567Transport and Innovation Service,
Highways Division
Tactile paving (pedestrian
crossing dropped kerb)
SHEET 10
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/111
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 11 of 17
Project:
Title:
N
Cycleway created in place of existing carriageway.
Parking permitted in designated bays
Parking laybys created from
existing hard verge area
Traffic signals will have a 'cycleway only'
stage added that will operate only when
cycles are detected.
Pedestrian crossings will operate the
same as currently but without the splitter
island in the middle.
Cycleway created in place
of existing carriageway
Cycleway created in place of existing carriageway.
Parking permitted in designated bays.
Vehicle cross overs (dropped kerbs) will be permitted.
Build out to aid pedestrians crossing
the cycleway and carriageway
Detection loops on approach to traffic
signals call a green light for cycleway
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
1234567Transport and Innovation Service,
Highways Division
Tactile paving (pedestrian
crossing dropped kerb)
SHEET 11
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/112
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 12 of 17
Project:
Title:
N
Cycleway created in place of existing carriageway.
Parking permitted in designated bays only.
Vehicle cross overs (dropped kerbs) will be permitted.
Build out to aid pedestrians crossing
the cycleway and carriageway
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
1234567Transport and Innovation Service,
Highways Division
Tactile paving (pedestrian
crossing dropped kerb)
SHEET 12
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/113
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 13 of 17
Project:
Title:
N
Vehicular access towards
tunnel will be removed
Cycleway runs behind bus stop,
creating a 'floating bus stop'.
Vehicles accessing and
egressing Duckham Court must
give way to cycleway first
Build out to aid pedestrians crossing
the cycleway and carriageway
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
1234567Transport and Innovation Service,
Highways Division
Tactile paving (pedestrian
crossing dropped kerb)
SHEET 13
Access to cycleway from
Tomson Avenue
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/114
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 14 of 17
Project:
Title:
N
Footway and Cycleway
become 'Shared Use'
through tunnel. Vehicular
traffic removed.
Vehicles accessing and
egressing Stanier Avenue must
give way to cycleway first
Refuge to aid pedestrians crossing the
cycleway and carriageway
Access arrangements shown
here are based on current
proposals to remove vehicular
access as part of site
redevelopment. This is
therefore subject to outcome
of any 3rd party planning
application.
Cycleway created in part from existing footway
and in part from carriageway narrowing.
Vehicular traffic will be
removed from tunnel
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
1234567Transport and Innovation Service,
Highways Division
Tactile paving (pedestrian
crossing dropped kerb)
SHEET 14
RoadPath Cycleway PathHouses Houses
Cross Section
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/115
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 15 of 17
Project:
Title:
N
Vehicles accessing and
egressing Chester Street must
give way to cycleway first
Cycleway created from carriageway
narrowing and removal of parking.
Additional parking to be created on
Barras Lane to offset loss.
Vehicles accessing and
egressing Meriden Street must
give way to cycleway first
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
C
r
o
s
s
S
e
c
t
i
o
n
.
S
e
e
i
n
s
e
t
1234567Transport and Innovation Service,
Highways Division
Tactile paving (pedestrian
crossing dropped kerb)
SHEET 15
S
C
H
O
O
L
K
E
E
P
C
L
E
A
R
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/116
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 16 of 17
Project:
Title:
N
School access to be relocated from
Upper Hill Street to Barras Lane
Vehicles accessing and
egressing Barras Lane must
give way to cycleway first
Bus stop relocated and cycleway
runs behind bus stop, creating a
'floating bus stop'
Abbotts Lane will become 'left
out only' to reduce conflicting
vehicular movements
Barras Lane to become a cul-de-sac
with vehicular access to Holyhead
Road removed.
New parking bays to offset the
parking removed on Upper Hill
Street and Coundon Road
Footway and Cycleway become
'Shared Use' in advance of bridge
ramp. Bridge steps to be removed
and ramp widened.
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
1234567Transport and Innovation Service,
Highways Division
Tactile paving (pedestrian
crossing dropped kerb)
SHEET 16
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/117
1:500 @A3
PRH
Apr 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
General Layout
Sheet 17 of 17
Project:
Title:
N
Improvement and decluttering
of ramp access for cycles and
wheeled mobility aids
Existing ramp access to
bridge to be widened /
replaced with wider ramp and
stairway removed
New ramp to be connected onto lower ramp
section to improve connectivity to the south
(Lower Holyhead Road, Spon Street and on
towards Coventry Station)
Produced from Ordnance Survey mapping with permission of the
Controller of Her Majesty's Stationary Office (c) Crown Copyright.
Unauthorized production infringes Crown Copyright and may lead to
prosecution or civil proceedings. (c) Coventry City Council (c) Crown
Copyright and database right 2019. Ordnance Survey 100026294.
Cycleway to connect to
Lower Holyhead Road
C
a
r
r
i
a
g
e
w
a
y
a
l
t
e
r
a
t
i
o
n
s
t
o
b
e
p
r
o
v
i
d
e
d
e
n
a
b
l
i
n
g
a
'
l
e
f
t
i
n
,
l
e
f
t
o
u
t
'
m
o
v
e
m
e
n
t
f
o
r
v
e
h
i
c
l
e
s
.
D
e
t
a
i
l
n
o
t
s
h
o
w
n
o
n
t
h
i
s
p
l
a
n
Kerb line
Cycleway
Footway (path)
Bollard
Double yellow lines
Grass verge
Cycleway road marking
Key
1234567Transport and Innovation Service,
Highways Division
Tactile paving (pedestrian
crossing dropped kerb)
SHEET 17
Footway (path)
Cycleway
Buffer
Carriageway (road)
Property wall
RoadPath Cycleway PathHouses Houses
Cross Section
RoadPath Parking in
tree line
hard verge
Cycleway PathHouses HousesParking
in Road
Cross Section
Road
Cross Section
Path Verge Cycleway PathHouses Bablake Playing
Fields
Cross Section
RoadPath Parking in
hard verge
Cycleway PathHouses Houses
Dwg Ref:
Scale:
Drawn:
Date:
Status:
1505/CCC/118
1:500 @A3
PRH
May 2020
CONSULTATION
Air Quality Action Plan
Coundon Cycleway
Typical Details
Sheet 1
Project:
Title:
Typical detail showing a vehicular crossover to access a driveway
1234567Transport and Innovation Service,
Highways Division
This sheet shows some typical details
for how the cycleway will work.
The box at the top indicates how a
driveway will be accessed across the
cycleway and then footway.
The four boxes show how the cross
section of the route varies along it's
length. Sometimes there is parking
on carriageway, sometimes it will be
permitted in between trees and other
parts it will not be permitted within the
public highway.