Procurement Plan-Goods Country/Organisation: Ethiopia/MOCT Project/Programme: ESTDP Loan #: 4624ET Description* Package Number Lot Number Estimated Amount in US $(,000) Procurement Method Pre-or Post Qualification Prior or Post Review If Prequalification add 7-13 wks List of Contracts Total Cost 982.00 Post Procurement of machineries, equipments and hand tools for craft centers and community based business NCB/ESTDP/G-5/2010 1 223.00 NCB Norm Duration of Proc Steps Procurement of 2 waste disposal trucks for Lalibela (1 vacume truck and 1 dray waste disposal truck) Procurement of 3 Pick up and 2 Station wagon vehicles. BASIC DATA ICB Post Prior 1 1 ICB/ESTDP/G-1/2010 1 270.00 Post Post Prior Procuremnet of office equipment for PCU. NS/ESTDP/G-4/2010 NCB/ESTDP/G-2/2010 NCB/ESTDP/G-3/2010 Procurement of ICT equipments for Tourism Information Systems. Post Post 100.00 NCB 330.00 NCB 10.00 Shopping Post Post 1 49.00 Shopping Post Post Printing of promotion materials for matching grant schemes and community engagement package NS/ESTDP/G-6/2010 1 553530PROP0P091nt0Plan1ESTDP10Final.xls 1 of 36 7/1/2010 1:50 AM Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized closure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized closure Authorized
Transcript

Procurement Plan-Goods Country/Organisation: Ethiopia/MOCTProject/Programme: ESTDP

Loan #: 4624ET

Description*PackageNumber

LotNumber

Estimated Amount in US

$(,000)

Procurement Method

Pre-or Post Qualification

Prior or Post Review

If Prequalification

add 7-13 wks

List of Contracts

Total Cost 982.00

Post

Procurement of machineries, equipments and hand tools for craft centers and community based business NCB/ESTDP/G-5/2010 1 223.00 NCB

Norm Duration of Proc Steps

Procurement of 2 waste disposal trucks for Lalibela (1 vacume truck and 1 dray waste disposal truck)

Procurement of 3 Pick up and 2 Station wagon vehicles.

BASIC DATA

ICB Post Prior

1

1

ICB/ESTDP/G-1/2010 1 270.00

Post Post

Prior

Procuremnet of office equipment for PCU. NS/ESTDP/G-4/2010

NCB/ESTDP/G-2/2010

NCB/ESTDP/G-3/2010

Procurement of ICT equipments for Tourism Information Systems.

Post

Post

100.00

NCB330.00

NCB

10.00 Shopping

Post

Post

1 49.00 Shopping Post

Post

Printing of promotion materials for matching grant schemes and community engagement package NS/ESTDP/G-6/2010 1

553530PROP0P091nt0Plan1ESTDP10Final.xls 1 of 36 7/1/2010 1:50 AM

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Procurement Plan-Goods Country/Organisation:Project/Programme:

Loan #:

Description*

List of Contracts

Total Cost

Procurement of machineries, equipments and hand tools for craft centers and community based business

Norm Duration of Proc Steps

Procurement of 2 waste disposal trucks for Lalibela (1 vacume truck and 1 dray waste disposal truck)

Procurement of 3 Pick up and 2 Station wagon vehicles.

Procuremnet of office equipment for PCU.

Procurement of ICT equipments for Tourism Information Systems.

Printing of promotion materials for matching grant schemes and community engagement package

If Post-Review, No-objection Dates are not neededSpec Proc Notice

AdvertPlan vs.

Actual

Prep & Submission

by Ex Agency

No-objectionDate

On-line UNDBGatewayNat Press

Bid Invitation Date

Bid Closing-Opening

SubmissionBid Eval Rpt

No-objectionDate

Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 - 1.5 wks

Actual

Plan 9/30/2010 10/15/2010 10/20/2010 10/20/2010 12/6/2010 12/21/2010 1/5/2011

Actual

Plan 6/25/2010 7/16/2010 7/20/2010 8/20/2010 9/6/2010 9/24/2010

Actual

Plan 2/15/2011 2/22/2010 3/25/2010 4/11/2011

Actual

Plan 6/7/2010 6/14/2010 6/21/2010

Actual

Plan 3/3/2011 3/8/2011 4/8/2011 4/25/2011

Actual

Plan 10/15/2010 10/19/2010 10/29/2010 11/6/2010

Actual

Plan

Draft Bid Documents, including specs and quantities, draft SPN Bidding Period Bid Evaluation

553530PROP0P091nt0Plan1ESTDP10Final.xls 2 of 36 7/1/2010 1:50 AM

Procurement Plan-Goods Country/Organisation:Project/Programme:

Loan #:

Description*

List of Contracts

Total Cost

Procurement of machineries, equipments and hand tools for craft centers and community based business

Norm Duration of Proc Steps

Procurement of 2 waste disposal trucks for Lalibela (1 vacume truck and 1 dray waste disposal truck)

Procurement of 3 Pick up and 2 Station wagon vehicles.

Procuremnet of office equipment for PCU.

Procurement of ICT equipments for Tourism Information Systems.

Printing of promotion materials for matching grant schemes and community engagement package

Contract Implementation

Plan vs.

Actual

Contract Amount in US$’000

DateContractAward

DateContractSignature

Openingof

Let of Credit

Arrivalof

Goods

InspectionFinal

Acceptance

Plan 1 wk 1.5-3 wks

Actual

Plan 1/10/2011 1/20/2011 2/21/2011 8/21/2011 9/5/2011

Actual

Plan 9/29/2010 10/7/2010 3/10/2011 3/30/2011

Actual

Plan 4/15/2011 4/22/2011 6/6/2011 6/20/2011

Actual

Plan 6/25/2010 7/25/2010 8/5/2010

Actual

Plan 4/29/2011 5/4/2011 6/20/2011 6/28/2011

Actual

Plan 11/10/2010 11/20/2010 12/15/2010

Actual

Plan #VALUE!

Contract Finalization

553530PROP0P091nt0Plan1ESTDP10Final.xls 3 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants Country/Organisation: Ethiopia/MOCTProject/Programme: ESTDP If Post-Review, No-objection Dates are not needed

Loan #: 4624ETContract

Type

Description*PackageNumber

Selection Method

Lumpsumor

Time-Based

Estimated Amount

in US$ ’000

Prior/Post Review

Plan vs.

Actual

Prep & Submissionby Ex Ag

No-objectionDate

On-line UNDBGatewayNat Press

Plan 3 - 6 wks 1 - 2 wks 1 - 1.5 wks

Actual

List of Contracts

Plan 6/30/2010 7/6/2010

Actual

Plan 6/30/2010 7/15/2010 7/19/2010

Actual

Plan 6/30/2010 7/6/2010

Actual

Plan 6/30/2010 7/6/2010

Actual

Plan 6/30/2010 7/15/2010 7/19/2010Actual

Plan 7/30/2010 8/5/2010

Actual

Plan 7/30/2010 8/5/2010

Actual

Plan 7/30/2010 8/5/2010

Actual

Plan 7/30/2010 8/5/2010Actual

Post

QCBS/ESTDP/C-9/2010 QCBS Lump Sum 32.00 Post

QCBS/ESTDP/C-8/2010 QCBS Lump Sum 100.00

Post

QCBS/ESTDP/C-7/2010 QCBS Lump Sum 75.00 Post

QCBS/ESTDP/C-6/2010 QCBS Lump Sum 30.00

Post

QCBS/ESTDP/C-5/2010 QCBS Lump Sum 49.00 Prior

QCBS/ESTDP/C-4/2010 QCBS Lump Sum 32.00

Prior

QCBS/ESTDP/C-3/2010 QCBS Lump Sum 135.00 Post

QCBS/ESTDP/C-2/2010 QCBS Lump Sum 30.00

Request for EOI(where required)

Preparation Terms of Reference

QCBS/ESTDP/C-1/2010 QCBS Lump Sum Post37.00

Norm Duration of Proc Steps

Design for improvement of stelae field in Axum

Business plan preparation and design for restoration of Addis Ababa museum

Design for construction of two by-pass roads in Lalibela core zone

Assessment for improvement of the completeness and reliability of the tourism information system

Capacity building gap assessment and preparation of intervention plan for MoCT, RTBs and local tourism administration

Baseline survey for ESTDP project

Design for improvement of visitors walking routes and plaza in Axum

Design for construction of water supply and sanitation schemes in Lalibela.

9

1

2

3

4

5

ESTDP information system design and deployment

6

7

8

553530PROP0P091nt0Plan1ESTDP10Final.xls 4 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants Plan 8/30/2010 9/6/2010Actual

Plan 8/30/2010 9/6/2010

Actual

Plan 9/30/2010 10/6/2010Actual

Plan 9/30/2010 10/6/2010

Actual

Plan 9/30/2010 10/6/2010

Actual

Plan 9/30/2010 - -

Actual

Plan 10/30/2010 11/5/2010

Actual

Plan 10/30/2010 11/5/2010

Actual

Plan 11/30/2010 12/6/2010

Actual

Plan 11/30/2010

Actual

Plan 12/30/2010 1/5/2011

Post

IC/ESTDP/C-19/2010 IC Lump Sum 9.00 Post

QCBS/ESTDP/C-18/2010 QCBS Lump Sum 32.00

Post

QCBS/ESTDP/C-17/2010 QCBS Lump Sum 35.00 Post

QCBS/ESTDP/C-16/2010 QCBS Lump Sum 37.00

Post

IC/ESTDP/C-15/2010 IC Lump Sum 20.00 Post

QCBS/ESTDP/C-14/2010 QCBS Lump Sum 93.00

Post

QCBS/ESTDP/C-13/2010 QCBS Lump Sum 32.00 Post

QCBS/ESTDP/C-12/2010 QCBS Lump Sum 52.00

Post

QCBS/ESTDP/C-11/2010 QCBS Lump Sum 45.00 Post

QCBS/ESTDP/C-10/2010 QCBS Lump Sum 35.0010

13

14

Development of a competitive Marketing strategy and implementation plan for Tourism industry of Ethiopia

15Development of national tourism policy implementation framework

Preparation of reutilization proposal and rehabilitation design for antique buildings for adaptive use as tourist attraction in Addis Ababa

11

12

Design for rehabilitation old Church in Axum.

Preparation of development proposal and design for development of tourist products in the environs of Addis Ababa( Adadi Mariam, Melka Qunture, Tiya sites)

Design for Renovation of Axum archeological Museum

Design and development of e-commerce platform for tourism

18

Preparation of development proposal and design for old houses of Axum for adaptive reuse

19Preparation of business plan for Lalibela museums

16

Preparation of landscape rehabilitation plan for Lalibela site

17

Gap assessment of tourist products and services quality, standard and norms management

553530PROP0P091nt0Plan1ESTDP10Final.xls 5 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants Actual

Plan 1/30/2010 2/4/2011

Actual

Plan 6/15/2010 - -Actual

Plan 1/5/2011

Actual

Plan 8/13/2010 - -

Actual

Plan 6/15/2010 - -Actual

Plan 6/15/2010 - -

Actual

Plan 11/17/09 - -

Actual

Plan 6/15/2010 - -

Actual

Plan 6/15/2010 -

Actual 5/6/2010

Plan 6/15/2010 - -

Actual

Plan 7/15/2010 7/18/2010Actual

Post29Preparation of resetlement action plan SSS/ESTDP/C-29/2010 SSS

IC/ESTDP/C-28/2010 IC

Lump Sum 25.00

15.00 Post

Lump Sum 2.00 Post

Lump Sum 4.00 Post27

Design and development of promotion material for community engagement IC/ESTDP/C-27/2010 IC

PostQCBS/ESTDP/C-20/2010 QCBS Lump Sum 53.00

28Design of media advertizment package for maching grant scheme

20commerce platform for tourism industry

Lump Sum

21

Assessment and prepare of tourism products development plan for southern and east routes QCBS/ESTDP/C-21/2010 QCBS

Post

24

Training on business plan/Proposal preparation for maching grant beneficiaries

Lump Sum 100.00 Post

22Handholding service for matching grant benficiers IC/ESTDP/C-22/2010 IC

Post26

Design and development of promotion material for matching grant scheme

Post

25 Selection of Enviromental advisor IN/ESTDP/C-25/2010 IC Lump Sum 10.00

Post23Handholding service for community engagement package IC/ESTDP/C-23/2010 IC Lump Sum 15.00

IN/ESTDP/C-26/2010 IC

Lump Sum 8.00

Lump Sum 6.00

IN/ESTDP/C-24/2010 IC

30Database design for maching grant scheme IC/ESTDP/C-30/2010 IC Lump Sum 15.00 Post

31 Heritages conservation study QCBS/ESTDP/C-31/2010 QCBS Lump Sum 110.00 Post

553530PROP0P091nt0Plan1ESTDP10Final.xls 6 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants Plan 9/30/2010 10/6/2010

Actual

Plan 9/15/2010 - -

Actual

Total Cost 1,326.00 Plan

IC/ESTDP/C-33/2010 IC Lump Sum 23.00 Post33

Assessement of training programms for enhancement of trousim training institutions

Lump Sum 30.00 Post32

Feasibility study to establish Entoto City View and Recreational Complex QCBS/ESTDP/C-32/2010 QCBS

553530PROP0P091nt0Plan1ESTDP10Final.xls 7 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants Country/Organisation:Project/Programme:

Loan #:

Description*

List of Contracts

Norm Duration of Proc Steps

Design for improvement of stelae field in Axum

Business plan preparation and design for restoration of Addis Ababa museum

Design for construction of two by-pass roads in Lalibela core zone

Assessment for improvement of the completeness and reliability of the tourism information system

Capacity building gap assessment and preparation of intervention plan for MoCT, RTBs and local tourism administration

Baseline survey for ESTDP project

Design for improvement of visitors walking routes and plaza in Axum

Design for construction of water supply and sanitation schemes in Lalibela.

ESTDP information system design and deployment

Lead-time before

shortlist

SubmissionDate

No-objectionDate

2 wks 1 - 2 wks

8/2/2010

8/15/2010 8/17/2010 9/2/2010

8/2/2010

8/2/2010

8/15/2010 8/17/2010 9/2/2010

9/2/2010

9/2/2010

9/2/2010

9/2/2010

Request for EOI(where required) Request for Proposals

553530PROP0P091nt0Plan1ESTDP10Final.xls 8 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants

Development of a competitive Marketing strategy and implementation plan for Tourism industry of Ethiopia

Development of national tourism policy implementation framework

Preparation of reutilization proposal and rehabilitation design for antique buildings for adaptive use as tourist attraction in Addis Ababa

Design for rehabilitation old Church in Axum.

Preparation of development proposal and design for development of tourist products in the environs of Addis Ababa( Adadi Mariam, Melka Qunture, Tiya sites)

Design for Renovation of Axum archeological Museum

Design and development of e-commerce platform for tourism

Preparation of development proposal and design for old houses of Axum for adaptive reuse

Preparation of business plan for Lalibela museums

Preparation of landscape rehabilitation plan for Lalibela site

Gap assessment of tourist products and services quality, standard and norms management

10/6/2010

10/6/2010

11/5/2010

11/5/2010

11/5/2010

-

12/6/2010

12/6/2010

1/6/2011

2/6/2011

553530PROP0P091nt0Plan1ESTDP10Final.xls 9 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants

Preparation of resetlement action plan

Design and development of promotion material for community engagement

Design of media advertizment package for maching grant scheme

commerce platform for tourism industry

Assessment and prepare of tourism products development plan for southern and east routes

Training on business plan/Proposal preparation for maching grant beneficiaries

Handholding service for matching grant benficiers

Design and development of promotion material for matching grant scheme

Selection of Enviromental advisor

Handholding service for community engagement package

Database design for maching grant scheme

Heritages conservation study

3/7/2011

-

- -

-

-

- -

-

-

8/15/2010

553530PROP0P091nt0Plan1ESTDP10Final.xls 10 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants

Total Cost

Assessement of training programms for enhancement of trousim training institutions

Feasibility study to establish Entoto City View and Recreational Complex

11/5/2010

-

553530PROP0P091nt0Plan1ESTDP10Final.xls 11 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants Country/Organisation:Project/Programme:

Loan #:

Description*

List of Contracts

Norm Duration of Proc Steps

Design for improvement of stelae field in Axum

Business plan preparation and design for restoration of Addis Ababa museum

Design for construction of two by-pass roads in Lalibela core zone

Assessment for improvement of the completeness and reliability of the tourism information system

Capacity building gap assessment and preparation of intervention plan for MoCT, RTBs and local tourism administration

Baseline survey for ESTDP project

Design for improvement of visitors walking routes and plaza in Axum

Design for construction of water supply and sanitation schemes in Lalibela.

ESTDP information system design and deployment

Plan vs.

Actual

InvitationDate

Submission/Opening

Date

SubmissionEvaluationReport (T)

No-objectionEvaluationReport (T)

Opening Financial Proposals

PreparationEval Report

(T) (F)Negotiations (N)

Plan 4 to 12 wks 2 - 3 wks 0.5 - 2 wks 2 wks 1 - 2 wks 2 wks

Actual

Plan 8/5/2010 9/6/2010 9/20/2010 9/24/2010 9/28/2010 10/4/2010

Actual

Plan 9/6/2010 10/6/2010 10/20/2010 10/25/2010 10/29/2010 11/3/2010

Actual

Plan 8/5/2010 9/6/2010 9/20/2010 9/24/2010 9/28/2010 10/4/2010

Actual

Plan 8/5/2010 9/6/2010 9/20/2010 9/24/2010 9/28/2010 10/4/2010

Actual

Plan 9/6/2010 10/6/2010 10/20/2010 10/25/2010 10/29/2010 11/3/2010Actual

Plan 9/6/2010 10/7/2010 10/20/2010 10/25/2010 10/29/2010 11/2/2010

Actual

Plan 9/6/2010 10/7/2010 10/20/2010 10/25/2010 10/29/2010 11/2/2010

Actual

Plan 9/6/2010 10/7/2010 10/20/2010 10/25/2010 10/29/2010 11/2/2010

Actual

Plan 9/6/2010 10/7/2010 10/20/2010 10/25/2010 10/29/2010 11/2/2010Actual

ConsultantProposals

Proposal Evaluation and Negotiation for Projects after May 2002Technical (T) & Financial (F) and Negotions (N)

553530PROP0P091nt0Plan1ESTDP10Final.xls 12 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants

Development of a competitive Marketing strategy and implementation plan for Tourism industry of Ethiopia

Development of national tourism policy implementation framework

Preparation of reutilization proposal and rehabilitation design for antique buildings for adaptive use as tourist attraction in Addis Ababa

Design for rehabilitation old Church in Axum.

Preparation of development proposal and design for development of tourist products in the environs of Addis Ababa( Adadi Mariam, Melka Qunture, Tiya sites)

Design for Renovation of Axum archeological Museum

Design and development of e-commerce platform for tourism

Preparation of development proposal and design for old houses of Axum for adaptive reuse

Preparation of business plan for Lalibela museums

Preparation of landscape rehabilitation plan for Lalibela site

Gap assessment of tourist products and services quality, standard and norms management

Plan 10/11/2010 11/11/2010 11/25/2010 11/30/2010 12/3/2010 12/6/2010Actual

Plan 10/11/2010 11/11/2010 11/25/2010 11/30/2010 12/3/2010 12/6/2010

Actual

Plan 11/9/2010 12/10/2010 12/24/2010 12/29/2010 1/3/2011 1/7/2011Actual

Plan 11/9/2010 12/10/2010 12/24/2010 12/29/2010 1/3/2011 1/7/2011

Actual

Plan 11/9/2010 12/10/2010 12/24/2010 12/29/2010 1/3/2011 1/7/2011

Actual

Plan 10/11/2010 10/20/2010 10/25/2010

Actual

Plan 12/13/2010 1/13/2011 1/27/2011 2/1/2011 2/7/2011 2/11/2011

Actual

Plan 12/13/2010 1/13/2011 1/27/2011 2/1/2011 2/7/2011 2/11/2011

Actual

Plan 1/11/2011 2/14/2011 2/28/2011 3/2/2011 3/7/2011 3/12/2011

Actual

Plan 12/2/2010 12/13/2010 12/17/2010

Actual

Plan 2/10/2011 3/12/2011 3/26/2011 3/30/2011 4/4/2011 4/9/2011

553530PROP0P091nt0Plan1ESTDP10Final.xls 13 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants

Preparation of resetlement action plan

Design and development of promotion material for community engagement

Design of media advertizment package for maching grant scheme

commerce platform for tourism industry

Assessment and prepare of tourism products development plan for southern and east routes

Training on business plan/Proposal preparation for maching grant beneficiaries

Handholding service for matching grant benficiers

Design and development of promotion material for matching grant scheme

Selection of Enviromental advisor

Handholding service for community engagement package

Database design for maching grant scheme

Heritages conservation study

Actual

Plan 3/11/2011 4/11/2011 4/25/2010 4/29/2011 5/4/2011 5/9/2011

Actual

Plan 6/25/2010 7/7/2010 7/9/2010Actual

Plan 1/10/2011 1/17/2011 1/21/2011

Actual

Plan 8/17/2010 8/24/2010 8/27/2010

Actual

Plan 6/25/2010 7/7/2010 7/9/2010Actual

Plan 6/25/2010 7/7/2010 7/9/2010

Actual

Plan 12/22/09 1/4/10

Actual

Plan 6/25/2010 7/7/2010 7/9/2010

Actual

Plan 6/30/2010

Actual

Plan 6/25/2010 7/7/2010 7/9/2010

Actual

Plan 8/19/2010 9/23/2010 10/6/2010 10/10/2010 10/14/2010 10/20/2010Actual

553530PROP0P091nt0Plan1ESTDP10Final.xls 14 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants

Total Cost

Assessement of training programms for enhancement of trousim training institutions

Feasibility study to establish Entoto City View and Recreational Complex

Plan 11/9/2010 12/10/2010 12/24/2010 12/29/2010 1/3/2011 1/7/2011

Actual

Plan 9/25/2010 10/7/2010 10/9/2010

Actual

Plan

553530PROP0P091nt0Plan1ESTDP10Final.xls 15 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants Country/Organisation:Project/Programme:

Loan #:

Description*

List of Contracts

Norm Duration of Proc Steps

Design for improvement of stelae field in Axum

Business plan preparation and design for restoration of Addis Ababa museum

Design for construction of two by-pass roads in Lalibela core zone

Assessment for improvement of the completeness and reliability of the tourism information system

Capacity building gap assessment and preparation of intervention plan for MoCT, RTBs and local tourism administration

Baseline survey for ESTDP project

Design for improvement of visitors walking routes and plaza in Axum

Design for construction of water supply and sanitation schemes in Lalibela.

ESTDP information system design and deployment

Plan vs.

ActualSubmission Date

No-objection Date

Contract Amount in US$ ’000

Contract Award Contract Signature

Plan 1 - 2 wks 1 - 2 wks 1 wk 1 - 3 wks

Actual

Plan 10/7/2010 10/12/2010

Actual

Plan 11/8/2010 11/18/2010 11/22/2010 11/25/2010

Actual

Plan 10/7/2010 10/12/2010

Actual

Plan 10/7/2010 10/12/2010

Actual

Plan 11/8/2010 11/18/2010 11/22/2010 11/25/2010Actual

Plan 11/5/2010 11/11/2010

Actual

Plan 11/5/2010 11/11/2010

Actual

Plan 11/5/2010 11/11/2010

Actual

Plan 11/5/2010 11/11/2010Actual

Contract FinalizationDraft Contract

553530PROP0P091nt0Plan1ESTDP10Final.xls 16 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants

Development of a competitive Marketing strategy and implementation plan for Tourism industry of Ethiopia

Development of national tourism policy implementation framework

Preparation of reutilization proposal and rehabilitation design for antique buildings for adaptive use as tourist attraction in Addis Ababa

Design for rehabilitation old Church in Axum.

Preparation of development proposal and design for development of tourist products in the environs of Addis Ababa( Adadi Mariam, Melka Qunture, Tiya sites)

Design for Renovation of Axum archeological Museum

Design and development of e-commerce platform for tourism

Preparation of development proposal and design for old houses of Axum for adaptive reuse

Preparation of business plan for Lalibela museums

Preparation of landscape rehabilitation plan for Lalibela site

Gap assessment of tourist products and services quality, standard and norms management

Plan 12/9/2010 12/15/2010Actual

Plan 12/9/2010 12/15/2010

Actual

Plan 1/12/2011 1/17/2011Actual

Plan 1/12/2011 1/17/2011

Actual

Plan 1/12/2011 1/17/2011

Actual

Plan 10/29/2010 11/3/2010

Actual

Plan 2/16/2011 2/21/2011

Actual

Plan 2/16/2011 2/21/2011

Actual

Plan 3/19/2011 3/23/2011

Actual

Plan 12/22/2010 12/27/2010

Actual

Plan 4/13/2011 4/18/2011

553530PROP0P091nt0Plan1ESTDP10Final.xls 17 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants

Preparation of resetlement action plan

Design and development of promotion material for community engagement

Design of media advertizment package for maching grant scheme

commerce platform for tourism industry

Assessment and prepare of tourism products development plan for southern and east routes

Training on business plan/Proposal preparation for maching grant beneficiaries

Handholding service for matching grant benficiers

Design and development of promotion material for matching grant scheme

Selection of Enviromental advisor

Handholding service for community engagement package

Database design for maching grant scheme

Heritages conservation study

Actual

Plan 5/13/2011 5/18/2011

Actual

Plan 7/12/2010 7/15/2010Actual

Plan 1/26/2011 1/31/2011

Actual

Plan 8/31/2010 9/3/2010

Actual

Plan 7/12/2010 7/15/2010Actual

Plan 7/12/2010 7/15/2010

Actual

Plan 1/15/10 1/17/09

Actual

Plan 7/12/2010 7/15/2010

Actual

Plan 7/5/2010

Actual

Plan 7/12/2010 7/15/2010

Actual

Plan 10/23/2010 10/28/2010Actual

553530PROP0P091nt0Plan1ESTDP10Final.xls 18 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants

Total Cost

Assessement of training programms for enhancement of trousim training institutions

Feasibility study to establish Entoto City View and Recreational Complex

Plan 1/12/2011 1/17/2011

Actual

Plan 10/12/2010 10/15/2010

Actual

Plan #REF!

553530PROP0P091nt0Plan1ESTDP10Final.xls 19 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants Country/Organisation:Project/Programme:

Loan #:

Description*

List of Contracts

Norm Duration of Proc Steps

Design for improvement of stelae field in Axum

Business plan preparation and design for restoration of Addis Ababa museum

Design for construction of two by-pass roads in Lalibela core zone

Assessment for improvement of the completeness and reliability of the tourism information system

Capacity building gap assessment and preparation of intervention plan for MoCT, RTBs and local tourism administration

Baseline survey for ESTDP project

Design for improvement of visitors walking routes and plaza in Axum

Design for construction of water supply and sanitation schemes in Lalibela.

ESTDP information system design and deployment

Plan vs.

Actual

MobilizationAdvancePayment

DraftReport

FinalReport

FinalCost

Plan

Actual

Plan 11/12/2010 1/12/2011

Actual

Plan 12/27/2010 2/25/2011

Actual

Plan 11/12/2010 1/12/2011

Actual

Plan 11/12/2010 1/12/2011

Actual

Plan 12/27/2010 2/25/2011Actual

Plan 12/11/2010 2/13/2011

Actual

Plan 12/11/2010 2/14/2011

Actual

Plan 12/11/2010 2/13/2011

Actual

Plan 12/11/2010 2/13/2011Actual

Contract Implementation

553530PROP0P091nt0Plan1ESTDP10Final.xls 20 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants

Development of a competitive Marketing strategy and implementation plan for Tourism industry of Ethiopia

Development of national tourism policy implementation framework

Preparation of reutilization proposal and rehabilitation design for antique buildings for adaptive use as tourist attraction in Addis Ababa

Design for rehabilitation old Church in Axum.

Preparation of development proposal and design for development of tourist products in the environs of Addis Ababa( Adadi Mariam, Melka Qunture, Tiya sites)

Design for Renovation of Axum archeological Museum

Design and development of e-commerce platform for tourism

Preparation of development proposal and design for old houses of Axum for adaptive reuse

Preparation of business plan for Lalibela museums

Preparation of landscape rehabilitation plan for Lalibela site

Gap assessment of tourist products and services quality, standard and norms management

Plan 1/114/2011 3/14/2011Actual

Plan 1/114/2011 3/14/2011

Actual

Plan 2/17/2011 4/18/2011Actual

Plan 2/17/2011 4/18/2011

Actual

Plan 2/17/2011 4/18/2011

Actual

Plan 12/3/2010 1/5/2011

Actual

Plan 3/21/2011 5/20/2011

Actual

Plan 3/21/2011 5/20/2011

Actual

Plan 4/23/2011 6/22/2011

Actual

Plan 1/27/20111

Actual

Plan 5/18/2011 7/18/2011

553530PROP0P091nt0Plan1ESTDP10Final.xls 21 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants

Preparation of resetlement action plan

Design and development of promotion material for community engagement

Design of media advertizment package for maching grant scheme

commerce platform for tourism industry

Assessment and prepare of tourism products development plan for southern and east routes

Training on business plan/Proposal preparation for maching grant beneficiaries

Handholding service for matching grant benficiers

Design and development of promotion material for matching grant scheme

Selection of Enviromental advisor

Handholding service for community engagement package

Database design for maching grant scheme

Heritages conservation study

Actual

Plan 6/17/2011 9/15/2011

Actual

Plan 10/15/2011Actual

Plan 2/28/2011

Actual

Plan 10/3/2010

Actual

Plan 10/15/2011Actual

Plan 8/15/2010

Actual

Plan 2/17/09 4/17/09

Actual

Plan 10/15/2011

Actual

Plan 8/6/2010 11/6/2010

Actual

Plan 10/15/2011

Actual

Plan 11/28/2010 2/5/2011Actual

553530PROP0P091nt0Plan1ESTDP10Final.xls 22 of 36 7/1/2010 1:50 AM

Procurement Plan-Consultants

Total Cost

Assessement of training programms for enhancement of trousim training institutions

Feasibility study to establish Entoto City View and Recreational Complex

Plan 2/17/2011 4/18/2011

Actual

Plan 11/15/2010 1/15/2011

Actual

Plan #REF!

553530PROP0P091nt0Plan1ESTDP10Final.xls 23 of 36 7/1/2010 1:50 AM

Procurement plan for the first 18 months (from June 2010-December 2011)Procurement Category WorksCountry/Organisation: Ethiopia/MOCTProject/Programme: ESTDP

Loan #: 4624ET

Description*PackageNumber

LotNumber

Lumpsum or Bill of

Quantities

List of Contracts

BOQ

Norm Duration of Proc Steps

1Construction of Bilbila-Yemrhane Kirstos gravel road(Lalibela) NCB/ESTDP/W-1/2010 1 BOQ

2Construction of two by-pass roads in Lalibela core zone NCB/ESTDP/W-2/2010 1

7

Rehabiltation of old Church and landscaping of its compound in Axum. NCB/ESTDP/W-7/2010 1 BOQ

BOQ

5Improvement of stelae field in Axum NCB/ESTDP/W-5/2010 1 BOQ

3Construction of water supply and sanitation schemes in Lalibela. NCB/ESTDP/W-3/2010 1

6

Development of tourist sites in the environs of Addis Ababa( Adadi Mariam, Melka Qunture, Tiya sites) NCB/ESTDP/W-6/2010 3 BOQ

4Improvement of vistors walk routs and plaza in Axum NCB/ESTDP/W-4/2010 1 BOQ

8Improvement and restoration of Addis Ababa mousium. NCB/ESTDP/W-8/20106 1 BOQ

Total Cost

Exchange Rate: 1USD=13.48 Birr

NB: Item no 1 is subjected to prior review in accordance to paragraph 2 and 3 of Annex 1 of the Bank’s procurement guideline (the first two contracts of each procurement method has to be subject to IDA Prior review.) Item no 9 is indicated for budgeting purpose

Procurement plan for the first 18 months (from June 2010-December 2011)

Procurement Method

Estimated Amount inUS $(’000)

Pre-or Post Qualification

Prior or Post Review

Plan vs.

Actual

Prep & Submission

by Ex Agency

If Prequalification Plan 4 - 7 wks

add 7-13 wks Actual

Plan 7/30/2010Actual

Plan 1/12/2011Actual

Plan 2/14/2011Actual

Plan 2/14/2011Actual

Plan 1/12/2011Actual

Plan 2/25/2011

Actual

Plan 3/14/2011

Actual

Plan 2/14/2011Actual

Draft Bid Documents, including specs and quantities, draft SPNBasic Data

NCB

NCB 4,450.00 Post Prior

4,100.00 Post Post

NCB 256.00 Post Post

NCB 2,200.00 Post

NCB 268.00 Post Post

Post

NCB 370.00 Post Post

NCB 410.00 Post Post

PostNCB 310.00 Post

12,364.00 Plan

NB: Item no 1 is subjected to prior review in accordance to paragraph 2 and 3 of Annex 1 of the Bank’s procurement guideline (the first two contracts of each procurement method has to be subject to IDA Prior review.)

If Post-Review, No-objection Dates are not needed

Spec Proc NoticeAdvert

No-objectionDate

On-line UNDBGatewayNat Press

Bid Invitation Date

Bid Closing-Opening

SubmissionBid Eval Rpt

1 - 1.5 wks 1.5 - 2 wks 1.5 - 2 wks 6 to 12 wks

8/16/2010 8/23/2010 9/23/2010 10/8/2010

1/17/2011 2/17/2011 3/7/2011

2/18/2011 3/18/2011 4/4/2011

2/18/2011 3/18/2011 4/4/2011

1/18/2011 2/18/2011 3/4/2011

3/4/2011 4/5/2011 4/20/2011

3/18/2011 4/18/2011 5/4/2011

2/18/2011 3/18/2011 4/4/2011

Draft Bid Documents, including specs and quantities, draft SPN Bidding Period Bid Evaluation

NB: Item no 1 is subjected to prior review in accordance to paragraph 2 and 3 of Annex 1 of the Bank’s procurement guideline (the first two contracts of each procurement method has to be subject to IDA Prior review.)

No-objectionDate

Plan vs.

Actual

Contract Amount in US$ ’000

DateContractAward

DateContractSignature

1.5 - 3 wks Plan 1 wk 1.5-3 wks

Actual

10/25/2010 Plan 10/29/2010 11/4/2010Actual

Plan 3/11/2011 3/15/2011Actual

Plan 4/8/2011 4/13/2011Actual

Plan 4/8/2011 4/13/2011Actual

Plan 3/8/2011 3/13/2011Actual

Plan 4/26/2011 6/3/2011

Actual

Plan 5/8/2011 5/13/2011

Actual

Plan 4/8/2011 4/13/2011Actual

Contract FinalizationBid Evaluation

Plan #REF!

MobilizationAdvancePayment

SubstantialCompletion

FinalAcceptance

FinalCost

11/4/2011 11/4/2012

3/15/2012 3/15/2013

4/13/2012 4/13/2013

4/13/2012 4/13/2013

3/13/2012 3/13/2013

6/3/2012 6/3/2013

5/13/2012 5/13/2013

4/13/2012 4/13/2013

Contract Implementation

#REF!

Procurement Plan-Training Procurement plan for the first 18 months (from June 2010-December 2011)Procurement category TrainingCountry/Organisation: Ethiopia/MOCTProject/Programme: ESTDP

Loan #: 4624ET

Description*PackageNumber

LotNumber

Lumpsum or Bill of

Quantities

Procurement Method

Estimated Amount in

US $

Pre-or Post Qualification

Prior or Post Review

If Prequalification

add 7-13 wks

List of Contracts

Total Cost 130.00

Exchange Rate: 1USD=13.48 Birr

NB. The training items are indicated for budgeting purpose

30.00

Var

Norm Duration of Proc Steps

Study tours for project staffs and key implementers

Basic Data

Var1

2 100.00Capacity building training for key implementers and project staffs

553530PROP0P091nt0Plan1ESTDP10Final.xls 34 of 36 7/1/2010 1:50 AM

Procurement Plan-Training Procurement categoryCountry/Organisation:Project/Programme:

Loan #:

Description*

List of Contracts

Total Cost

Exchange Rate: 1USD=13.48 Birr

NB. The training items are indicated for budgeting purpose

Norm Duration of Proc Steps

Study tours for project staffs and key implementers

Capacity building training for key implementers and project staffs

If Post-Review, No-objection Dates are not neededSpec Proc Notice

Advert

Plan vs.

Actual

Prep & Submission

by Ex Agency

No-objectionDate

On-line UNDBGatewayNat Press

Bid Invitation Date

Bid Closing-Opening

SubmissionBid Eval Rpt

No-objectionDate

Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks

Actual

Plan

Actual

Plan

Actual

Plan

Draft Bid Documents, including specs and quantities, draft SPN Bidding Period Bid Evaluation

553530PROP0P091nt0Plan1ESTDP10Final.xls 35 of 36 7/1/2010 1:50 AM

Procurement Plan-Training Procurement categoryCountry/Organisation:Project/Programme:

Loan #:

Description*

List of Contracts

Total Cost

Exchange Rate: 1USD=13.48 Birr

NB. The training items are indicated for budgeting purpose

Norm Duration of Proc Steps

Study tours for project staffs and key implementers

Capacity building training for key implementers and project staffs

Plan vs.

Actual

Contract Amount in US$ ’000

DateContractAward

DateContractSignature

MobilizationAdvancePayment

SubstantialCompletion

FinalAcceptance

FinalCost

Plan 1 wk 1.5-3 wks

Actual

Plan

Actual

Plan

Actual

Plan #VALUE! #REF!

Contract ImplementationContract Finalization

553530PROP0P091nt0Plan1ESTDP10Final.xls 36 of 36 7/1/2010 1:50 AM