County of Fresno Shaver Lake Water and Sewer Presentation 2012
Transcript
Page 1: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

County of Fresno Shaver Lake Water and Sewer

Presentation

2012

Page 2: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Order of Presentation

• Water• Sewer• Community Facilities District • Water/Sewer Operations &

Maintenance

Page 3: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Shaver Lake Sewer and Water Master Plan

• Shaver Lake Sewer and Water Master Plan (SWMP) was adopted by the Board of Supervisors on June 24, 1985

• Established a 2,000 equivalent dwelling unit (EDU) limitation on groundwater in Township 10

• Obtaining a Surface Water Allocation is necessary to allow development above the 2,000 unit limitation

Page 4: County of Fresno Shaver Lake Water and Sewer Presentation 2012.
Page 5: County of Fresno Shaver Lake Water and Sewer Presentation 2012.
Page 6: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Watershed Study

Kenneth D. Schmidt, March 1977 •Sustainable Volume 300 Acre Feet– SWMP/Actual/State recommendation– 0.177/0.30/0.50 gpm is equal to 1,695/1,000/600 EDUs

•Maximum Volume 500 Acre Feet– SWMP/Actual/State recommendation– 0.177/0.30/0.50 gpm is equal to 2,825/1,667/1,000 EDUs

Page 7: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Shaver Lake Township 10 Water Unit AllocationShaver Lake Township 10 Water Unit AllocationEDUs

Limit based on SWMP 2,000 Recorded Lots -1,579Tentatively Approved (TPM, SPR, TTM) -384Balance 37Tentatively approved w/spec conditions 83Applications in Process 156*

*If approved Tract 5990 & 5991 will request a transfer from your Board of 119 EDUs from previously approved development with no net impact to chart above.

Page 8: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Shaver Lake Water Criteria

• Initially developments were approved based on the SWMP source capacity requirement of 0.17 gallons per minute –per EDU

• In early 2000 the County recognized the 0.17 was insufficient to meet demand and adjusted the requirement based on actual data being collected that reflected 0.30 gallons per minute - per EDU.

• The State Department of Public Health issued the District’s revised water permit on September 2010 which recommends to increase the requirement to 0.5 GPM per EDU for future development

Page 9: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Shaver Lake Township 10 Projected Water Demands

• Of the 2,000 unit limitation 251 units are located in the Sierra Cedars Community Service District (an independent special district)

• The balance of the remaining 1,749 units reside within the system operated by Waterworks District 41 or County Service Area 31

Page 10: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Shaver Lake Township 10 Projected Water Demands

• At full development of the 1,749 units there will be an estimated deficit of 49 gallons per minute during peak hours under normal operating conditions and average precipitation years

• There are two existing County owned wells that may be modified to produce an estimated additional 45 – 75 gallons per minute.

• During multiple drought years the estimated deficit at full development of the 1,749 units may reach up to 114 gallons per minute during peak hours under normal operating conditions

Page 11: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Shaver Lake Development in Township 10

• Average new connections from 2004 to 2011 were 14 per year. May take up to 6 decades for all remaining lots to connect

• During 2005 – 2006 there was a peak in connections at 101. Based on the peak year, it may take up to a decade for all remaining lots to connect

Page 12: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

WATER

Questions????

Page 13: County of Fresno Shaver Lake Water and Sewer Presentation 2012.
Page 14: County of Fresno Shaver Lake Water and Sewer Presentation 2012.
Page 15: County of Fresno Shaver Lake Water and Sewer Presentation 2012.
Page 16: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

EXHIBIT F

Page 17: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Sewer Treatment and Disposal

• In 2009 the Department conducted an evaluation of the treatment and disposal capacity. The study indicated a deficit based on theoretical demand in capacity of 12,125 GPD (summer) and annual avg. deficit of 79,125 GPD for the 1,425 connected EDUs. However, the District has not experienced any overcapacity issues due to lower actual demands than theoretical demands.

Page 18: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Sewer Treatment & Disposal• Capacity loss when wastewater pond #6 washed out due to

floods in 2006. PW&P contacted State CAL-EMA office to obtain funding since the storms occurred during a State declared emergency, however CAL-EMA never approved the funding request.

• Increases to the treatment capacity may be realized by adding additional aerators to District ponds.

• Increases to disposal capacity can be realized by adding ponds or spray fields.

• Staff is currently working with development community to develop a disposal master plan.

• On May 3, 2011 your Board authorized WWD 41 to purchase 148 acres adjacent to the existing WWTP to be used for spray fields and/or ponds to address this issue.

Page 19: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

WWD41 Existing Facilities & Newly Acquired Land

Page 20: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Sewer Treatment & Disposal Capacity

Page 21: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

SEWER

Questions????

Page 22: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Community Facilities District No. 1Background

• On April 9, 1985 your Board adopted a Resolution of Intention to form a Community Facilities District (CFD No. 1) for approximately 2,530 acres in the Shaver Lake area

• Formed at the request of five developer property interests to obtain bond funding authorization for development related infrastructure

• Originally contemplated as a method of financing major facilities which were necessary but not feasible to be constructed incrementally or by one land owner

• Infrastructure was to be consistent with the Board adopted Shaver Lake Sewer and Water Master Plan, County General Plan, and all applicable Specific Plans

Page 23: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Community Facilities District No. 1Background

• Project area consisted of approximately 2,530 acres with an anticipated full build out of roughly 4,560 dwelling units

• Project area involved five major land holdings and included:– Timberwine– Wildflower Village– Bretz Mountain– Undeveloped Sierra Cedars, Inc. properties within the Sierra Cedars

Community Services District– Kenneth B. Seibert property south of Sierra Cedars

• Land was identified in the CFD No. 1 at Shaver Lake Final Project Report presented to your Board June 24, 1985 as representing virtually all of the remaining developable land in the Shaver Lake Area in 1985

Page 24: County of Fresno Shaver Lake Water and Sewer Presentation 2012.
Page 25: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Community Facilities District No. 1Background

• CFD No. 1 provided financing for facilities by allowing the County to sell increments of bonds as determined by the Board

• County would then levy a Special Tax on the property to repay the principal and interest

• No bonds have been sold to date but authorization remains intact

Page 26: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Community Facilities District No. 11985 Master Implementation

Agreement• Implementation document for CFD No. 1• Mechanism for collection of fees for infrastructure or facilities

shared equally by all land owners (Proportionate Facilities)• Outlined criteria for bond issuance and reimbursement• Established $800 water system development fee • Established $1,000 sewer system development fee

Page 27: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Community Facilities District No. 1Proportionate Facilities

• Board adopted Final Project Report identified infrastructure to be constructed including:– Shaver Lake supplied surface water system– Regional wastewater treatment facility expansion– Construction of a collector road along the State adopted freeway

corridor from Cressman Road to Bretz Road– Fire protection facilities– School facilities• Final Project Report also included Cost Estimates for each

improvement area, Rate and Method of Apportionment of Special Tax and Legal, Property Appraiser and Financial Consultant’s Reports

Page 28: County of Fresno Shaver Lake Water and Sewer Presentation 2012.
Page 29: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Community Facilities District No. 11985 Interdeveloper Agreement

• Funding mechanism to provide reimbursement for certain infrastructure construction of those improvements from bond authorization and fee payment under the agreement.

• Intended for construction of those improvements that are shared by two or more Landowners but not shared equally by all.

• Understood that if improvement ultimately cost more then estimated, no reimbursement in excess of the agreed upon amount would be made

• Identified as disproportionate infrastructure

Page 30: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Community Facilities District No. 11991 Amended Interdeveloper

Agreement• Funding mechanism to provide reimbursement for construction of

those improvements that are shared by two or more Landowners.• Implementation of the 1991 Agreement was through an

amendment to the original to cause establishment of a fund for the purpose of receiving, holding and disbursing the fees, costs and reimbursements.

• Fees are collected at the close of escrow for the first transfer of ownership of a lot or condominium.

• Fees required to be increased annually by an inflation figure of 3% per the Agreement

Page 31: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Community Facilities District No. 11991 Master Implementation

Agreement Amendment

• Amended to incorporate First Amendment to the 1985 Intradeveloper Agreement

• Established a process to release the Intradeveloper Agreement and Master Implementation Agreement as a lien against the property upon payment of applicable fees

Page 32: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Community Facilities District No. 1Accumulated Funds

• Partial list of accumulated funds under the Master Implementation Agreement for proportionate infrastructure and facilities:– Shaver Lake Surface Water System Construction: $2,177,902– Regional Wastewater Treatment Plant Expansion: $1,028,853– Collector Road along State adopted freeway corridor: $1,270,466– Snow Removal Facilities (snow removal equipment): $243,766– Fire Protection Facilities (fire station, fuel breaks): $152,178– School Facilities (per agreement with school district): $14,460• Funds are collected for infrastructure infrastructure or facilities

shared equally by all land owners

Page 33: County of Fresno Shaver Lake Water and Sewer Presentation 2012.
Page 34: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Community Facilities District No. 1Accumulated Funds

• Partial list of accumulated funds under the Intradeveloper Agreement for disproportionate infrastructure and facilities:– (Water) Phase 2 Northeast Reservoir: $19,762– (Water) Phase 1 Southeast Reservoir: $37,023– (Water) Water line from Southeast Reservoir to WF Village: $78,121– (Road) Littlefield Road thru Wildflower Village: $199,560– (Road) Road Improvements thru Seibert Property: $102,809– (Sewer) Upgrade to Existing Interceptor: $30,354• Funds are collected for infrastructure or facilities shared by two

or more Landowners but not shared equally by all.

Page 35: County of Fresno Shaver Lake Water and Sewer Presentation 2012.
Page 36: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Community Facilities District No. 1Development Fee Areas

• CFD No. 1 is divided into five development fee areas– CFD 1-A (Timberwine)– CFD 1-B (Wildflower)– CFD 1-C (Bretz Mt. Village)– CFD 1-D (Seibert)– CFD 1-E (Sierra Cedar)

• Funds are collected at the close of escrow for the first transfer of ownership of a lot or condominium• Includes funds for both the proportionate and disproportionate

infrastructure and facilities• Vary depending upon geographical area due disproportionate

infrastructure

Page 37: County of Fresno Shaver Lake Water and Sewer Presentation 2012.
Page 38: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Community Facilities District No. 1Summary

• Formed in 1985 at the request of five developer property interests • Mechanism to provide reimbursement for construction of certain

infrastructure and facilities required by development• Infrastructure and Facilities are consistent with the Board adopted

Shaver Lake Sewer and Water Master Plan, County General Plan, and all applicable Specific Plans

Page 39: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Current Water Funding Availableat end of FY 10-11

WWD 41 Water Reserves $2,440,800CFD 1 (Surface Water) $2,177,902CFD 1 (Water Storage) $ 179,660CFD 1 (GW Development) $ 77,422Total Water Reserves $4,875,784*

*Dollars have area use restrictions.

Page 40: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Current Sewer Funding Available at end of FY 10-11

WWD 41 Sewer Reserves $ 594,732CSA 31B Reserves $ 151,515CFD 1 (Sewer Component) $1,059,209Total Sewer Reserves $1,805,456*

*Dollars have area use restrictions.

Page 41: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Community Facilities District No. 1

Questions????

Page 42: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Operation and Maintenance

Page 43: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Operation and Maintenance

Page 44: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Salary Comparison of Field Labor

Name the Counties and Cities (Ask Michele May on S&B)

Page 45: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Salary & Benefits Comparison of Field Labor

Page 46: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Salary Comparison of Counties/Cities

Page 47: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

Comparison to other Jurisdictions

Sewer FacilityFresno

CityClovis City SKF Sanger

Shaver- Township

9

Shaver- Township

10

Miles of Pipes 1,400 290 68 50 6 9

Lift Stations 15 5 21 2 21 10

Elevation 296 355 308 365 4800 5200

Use Rate (Total) (Summarized as Monthly Cost to user) $25.75 $25.36 $23.27 $37.71 $45.18 $21.79

Est. Population Served 505,479 95,631 40,000 25,000 1,725 1,300

Page 48: County of Fresno Shaver Lake Water and Sewer Presentation 2012.
Page 49: County of Fresno Shaver Lake Water and Sewer Presentation 2012.
Page 50: County of Fresno Shaver Lake Water and Sewer Presentation 2012.

QUESTIONS ???