Complete the Gap in the Crystal Springs Regional Trail Project
RECOMMENDATION: Review and accept report about the Complete the Gap in the Crystal Springs Regional Trail Project and Metropolitan Transportation Commission TDA Article 3 Grant Application. BACKGROUND: The Crystal Springs Regional Trail (CSRT) is located on the eastern side of the reservoirs in the San Francisco Peninsula Watershed owned by the San Francisco Public Utilities Commission (SFPUC). The San Mateo County Parks Department has a Memo of Understanding with the SFPUC to operate and manage the CSRT In 1996, a Facility Plan was developed by County Parks for the CSRT based on extensive public comment and consultation from CalTrans, SFPUC and California Department of Fish and Wildlife. Over the years, County Parks has developed specific plans for trail segments within the CSRT, obtaining permits, seeking funding, and implementing the trail. In 1997, a Crystal Springs Trail Extension Evaluation Report was developed to plan for additional trail extensions. The 17.5-mile CSRT stretches from the City of San Bruno to the City of Woodside in three trail segments. From San Bruno Avenue to Highway 92 are the San Andreas and Sawyer Camp Trail segments. The 6.2-mile Sawyer Camp Trail runs from Hillcrest Boulevard at the north to Crystal Springs Dam to the south. In 2014, County Parks completed the 0.9 mile South of Dam segment that transformed an existing service road to multi-use trail. In 2016/2017, County Public Works will complete a trail over the already completed Crystal Springs Dam. The Complete the Gap Project eliminates a significant gap in the CSRT connecting the trail over Crystal Springs Dam to the South of Dam section. These three sections will become part of Sawyer Camp Trail. Until the gap
Agenda Item 9.H.i
is done, we are unable to permanently open the South of Dam section which disappoints trail users and funders. With the gap filled, a continuous 10.3 miles of CSRT are open. Today the CSRT serves over 400,000 hikers, joggers, equestrians, and cyclists annually and is one of the most popular facilities operated by County Parks. People of all ages can be seen on a given day, from parents with children in strollers to distance runners to groups of walkers. Visitation continues to grow as people seek local places to recreate, socialize, and enjoy nature. DISCUSSION: In February 2015, we are submitting a $100,000 grant application to City/County Association of Governments for a Metropolitan Transportation Commission TDA Article 3 grant. If successful, this grant award will underwrite the development of designs, plans, permits, specifications and cost estimates for the Complete the Gap project. The County will underwrite the balance of funds needed for this planning process. The project would be undertaken in FY 2015/2016 and result in a biddable package to be used to hire a general contractor to build the trail. Construction of the Gap project could be undertaken in FY 2016/2017. The Complete the Gap project closes a 600-foot gap in the Crystal Springs Regional Trail along the San Francisco Watershed providing 10.3 miles of trail between San Bruno Avenue and Highway 92. Specifically, it closes a gap between the Crystal Springs Dam section and South of Dam section. The Gap project starts at the Crystal Springs Dam, travels along Skyline Boulevard and enters the South of Dam. The gap will be an 8-foot-wide trail. For trail users and wildlife safety, K-rail will be installed on the eastern side and chain link fence on the western side. Directional signs will assist trail users.
Lane
400
1200
1600
800
600
1600
800
600
800
600
400
800
400
1600
800
800
800
800
800
1200
800
600
800
800
400
Raymundo Dr
Crestmoor Dr
Blvd
Skyline
Helen Dr
Ave
Crystal
Sprin
gs Rd
El Camino Real
Portola Gate1195'
Jepson Laurel
Crystal Springs Dam
Dam
Rd
Woodside Rd
WOODSIDE
HALFMOONBAY
Bike routealong road
5.8 miles toWunderlich Park
Crystal Springs Reservoir
Bunker Hill Dr
P
P
P
A
A
A
A
A
A
A
A
Upper Crystal Springs Reservoir
Ralston
Bike Tra
il
Sheep
Camp
Lark
spur Dr
Millbrae
Hillcrest B
lvdTrousdale
Dr
280
38035
921
1
35
92
92
280
35
8435
35
280
101
101
Black Mtn.
Road
Skyline Blvd
92
Ralston Ave
San BrunoCaltrain
San BrunoBART
Millbrae BART andCaltrain
PhlegerEstateGGNRA
FiloliCenter
Huddart County
Park
Edgewood CountyPark and NaturalPreserve
Sweeney RidgeGGNRA
PeninsulaWatershed
SFPUC
PeninsulaWatershed
SFPUC
Pulgas Ridge Open SpacePreserve
Junipero SerraCounty Park
San PedroValleyCountyPark
PurisimaCreek Redwoods
Open SpacePreserve
Teague HillOpen Space
Preserve
Skyline
segment
San Andreas segmentSan Andreas Lake
Woodside StoreHistoric Site
Pulgas Water Temple(SFPUC)
C A HI L L R
I DG
E
FI F
I EL
D R
I DG
E
SW
EE
NE
Y R
I DG
E
Cañada
Trail
EdgewoodRoad
Runnymeade Rd
Cañada Road
Jefferson
Ave
Snea
th
Kings Mountain Road
San Bruno Ave
Mud DamReservoir
San Mateo Creek
Pilarcitos Creek
San
Mat
eo
Cre
ek
Skyline Blvd
Skyline Blvd
Crystal Springs
Sneath Lane
MILLBRAE
SAN BRUNO
SAN MATEO
REDWOODCITY
N
Crystal S
prin
gs
Roa
d
Polhemus Road
3.5
1.2
0.5
0.5
1.8
0.3
2.1
0.4
1.9
2.5
1.3
Ed
gewood Trail
Blvd
1.0
0.6
0.2
0.5
3.1
1.4
1.0
0.3
2.0
0.6
Sawyer Cam
p segment
Parking
Picnic area
RestroomsMultiple use trail(bicycle, equestrian and hiking)
Othertrails
Regionaltrail
Hiking trail
Trail distance (miles)
Gate
P
LEGEND
Disabilities accessible
GatehouseHiking and equestrian trails
0.2
Paved trail(bicycle, equestrian and hiking)
Bicycle Sundayroad closure
Trail accessA
Future trail
Rail transit station
Private property
Other public lands
Crystal Springs Regional Trail
0
0 1.0 mile
1.0 kilometer
SA
WY
ER
RI D
GE
Complete the Gap in the Crystal Springs Regional Trail Existing Conditions Photos
Start of Gap Trail; Northern Entrance of South of Dam Section Western Road Shoulder of Skyline Boulevard
End of Gap Trail: Southern End of Crystal Springs Dam