BACKGROUND: This report is prepared in connection with the
implementation of Constructors Performance Evaluation System (CPES) pursuant to Section 12, Annex E - Evaluation of Contractors Performance of the Implementing Rules and Regulations (IRR) of RA No. 9184 (Government Procurement Reform Act). Item 4 - Submission and Dissemination of Evaluation Results of Section 12, specifically mandated PDCB to consolidate the CPES evaluation results of all ongoing and completed projects and disseminate the same to all offices/agencies/corporations concerned. USES OF CPES INFORMATION:
The CPES rating and other information is designed to serve the information needs of the following: a) government agencies undertaking infrastructure projects; b) industry planners and decision makers, c) constructors, d) project owners, e) banking and financing institutions, f) insurance companies, g) consulting firms, h) professional associations, and i) embassies.
Information on contractors CPES ratings shall be used for
the following purposes: a) Pre-qualification/Eligibility Screening of Constructors; b) Awarding of Contracts; c) Project Monitoring and Control; d) Issuance of Certificate of Completion; e) Policy Formulation/Review; f) Industry Planning; and g) Granting of Incentives/Awards, and in adopting measure to further improve performance of contractors in the prosecution of government projects.
REPORT COVERAGE:
This report contains CPES rating and other project-related information of on-going and completed foreign assisted (FA) and locally funded (LF) infrastructure projects being undertaken by either local, foreign or joint venture constructors. The projects presented in these report covers: road, bridge, housing, building, ports and harbor, irrigation and flood control, and water supply projects.
REPORT CONTENTS:
Presented in this report are the names of constructors arranged alphabetically with the corresponding project classification. Information available in this report comprises three (3) parts, as follows: 1) Constructor General Information; 2) Project Data; and 3) CPES Rating.
Part 1 of the report includes the name of constructor/s and
PCAB License Number.
Information contained in Part 2 pertains to the project name, Implementing Agency, contract amount, and status of project (on-going or completed).
CONSTRUCTION INDUSTRY AUTHORITY OF THE PHILIPPINES (CIAP) PHILIPPINE DOMESTIC CONSTRUCTION BOARD (PDCB)
5/F Executive Building Center, 369 Sen. Gil J. Puyat Avenue cor. Makati ave. Makati City Telephone Nos. 896-1801; 897-0791; Fax No. 897-0791
CONSOLIDATED CONSTRUCTORS PERFORMANCE SUMMARY REPORT
CPES Reports - On-going and Completed Projects from July 1, 2007- June 30, 2009
2
Part 3 includes data on CPES rating per criteria, as follows: a) workmanship, b) materials, c) time, d) facilities, e) environmental, safety and health, and f) resources deployment, and the CPES visit Rating and over-all /Final Rating and its Qualitative Description.
SOURCES OF INFORMATION
Data contained in this report were culled from the CPES Summary Report submitted by the *Department of Public Works and
Highways (DPWH), Department of Transportation and Communications (DOTC), Department of Science and Technology (DOST), National Irrigation Administration (NIA), National Housing Authority (NHA), Philippine Ports Authority (PPA), Bases Conversion Development Authority (BCDA), Polytechnic (PUP), Department of Education (DepEd) and University of the Philippines (U.P.) covering the period July 1, 2007- June 30, 2009
As regards to data on negative slippage, this is when constructor got 0.00 on time for 15% or more negative slippage, this matter
may be brought about by any of the three (3) problems: a) Constructor-Related Problems, Agency-Related Problems; and Other Related Problems. Please see the enumerated problems on each classification on page 6 of this cover page. If you need particular information on the reason for the negative slippage of each concerned contractor, please contact the agency implementing the project.
For particular information on the data of each of the CPES Reports, please contact the person-in-charge of the concerned
implementing agencies listed below:
Melrose Pailma (DPWH) Wilfredo C. Borbor (DOTC) Arnaldo C. Reyes (DOST) Tess Pantalla (NIA)
Tel No. 304-3511 Tel No. 726-3508 Tel No. 837-2071 loc: 2120 Tel No. 927-0923
Ma. Otelia F. Eclavea (NHA) Arnold Villegas (PPA) Bong Fortunado (BCDA) Angela Israel (PUP) Tel No. 928-4561 Tel No. 527-8356 loc: 356 Tel No. 816-6666 Tel No. 713-1488 Oliver R. Hernandez (DepEd) Ariel S. Betan (U.P.) Tel No. 637-6464 Tel Nos. 925-0984; 981-8500 Loc. 2525/2526
For further information and queries, you may visit us at Philippine Domestic Construction Board (PDCB), 5th Floor Executive Building Center, 369 Sen. Gil J. Puyat Avenue cor. Makati Ave. Makati City Philippines; call us at 897-0791/896-1801; or e-mail us at [email protected]. You may access this report on this website http://www.gppb.gov.ph.
3
CONSTRUCTORS PERFORMANCE EVALUATION SYSTEM (CPES) IMPLEMENTING GUIDELINES
I. ASPECTS OF EVALUATION 1. During Construction (60% for Horizontal Projects such as Road, Bridge, Ports & Harbor, Irrigation and Flood
Control, Water Supply and Sewerage, etc., and 70% for Vertical Projects such as Housing, Building, Power Transmission Line and Substation) - minimum of two (2) visits with the conduct of first visit when the actual project accomplishment is at least 30% except for projects with a duration of 90 calendar days and below which may be subjected to just one (1) final visit.
2. Upon Completion (40% for Horizontal Projects and 30% for Vertical Projects) - final visit when the Implementing
Office reported 100% completion.
II. CRITERIA FOR EVALUATION
Amended Guidelines as Approved by NEDA InfraCom 27 August 2008
During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.50 Materials 0.30 Materials 0.20 Time 0.15 Time 0.30 Facilities 0.03 TOTAL 1.00 Environmental, Safety and 0.07 Health (ESH) Resources Deployment 0.05 TOTAL 1.00
4
As approved by NEDA InfraCom 19 May 2005
During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.40 Materials 0.30 Materials 0.30 Time 0.10 Time 0.30 Facilities 0.03 TOTAL 1.00 Environmental, Safety 0.07 and Health (ESH) Resources Deployment 0.10 TOTAL 1.00
As approved by NEDA InfraCom
30 January 1998
During Construction Upon Completion Criteria Maximum Rating Criteria Maximum Rating Workmanship 0.40 Workmanship 0.50 Materials 0.30 Time 0.50 Time 0.10 TOTAL 1.00 Facilities 0.03 Environmental, Safety
and Health (ESH) 0.07 Resources Deployment 0.10 TOTAL 1.00
5
III. CPES RATING & ITS QUALITATIVE DESCRIPTION
CPES Implementing Guidelines as Approved on 27 August 2008
As Approved on May 2005 and 30 January 1998
*CPES RATING Ranges Rating Qualitative Description
>96% Outstanding
>89% but < 96% Very Satisfactory >82% but < 89% Satisfactory >75% but < 82% Unsatisfactory < 75% Poor
*CPES RATING Ranges Rating Qualitative Description
>90% Outstanding
>80% but < 90% Very Satisfactory >70% but < 80% Satisfactory >60% but < 70% Fair < 60% Poor
6
*CAUSES OF DELAY
CONSTRUCTOR-RELATED PROBLEMS AGENCY RELATED PROBLEMS
C-W01 - Insufficient manpower deployed in project site A-VO1-Delays in the approval of variation orders C-EO1 - Breakdown of equipment/equipment not operational A-TO1- Delays in the approval of contract time extension C-EO2 - Lack/Insufficient/Inadequate equipment deployed in project site A-SO1- Delays in the approval of suspension order C-MO1- Lack/Inadequate/Insufficient supply of construction A-DO1- Changes in construction designs Materials A-FO1- Delays in the release of funds
C-RO1- Lack of financial resources A-RO1- Right of Way (ROW) acquisition problem (squatter relocation problems, relocation
of utilities, (i.e. PLDT, MERALCO posts and other similar cases)
7
*CAUSES OF DELAY OTHER-RELATED PROBLEMS O-WO1- Unfavorable weather condition (Occurrence of natural calamities; occurrence of flooding/ siltation on site; unworkable ground condition) O-PO1- Insurgence or peace and order problems/civil disturbances O-TO1- Third Party intervention *Can be a reason for the negative slippage of constructor (please see the CPES reports of constructor from the agency concerned.)
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
11-18-70 Construction 32944 Road Concreting at Brgy. Sallacapo I 0.855 18 C 0.375 0.200 0.300 - - - 87.50 *87.50%
Satisfactory
121 Construction 21686 Const. of Cemented Footbridge, Sapang Bayan III 0.946 60 C 0.304 0.285 0.300 - - - 88.90 91.06%
Outstanding
121 Construction 21686 Const. of MPB @ Bulacan State University Compound III 0.945 54 O 0.356 0.225 0.100 0.030 0.035 0.100 84.60 -
121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB NCR 3.341 90 C 0.393 0.149 0.300 - - - 84.20 *84.20%
V. Satisfactory
121 Construction Corporation (Formerly: 121 Construction) 21686 Const. of MPB NCR 3.821 90 C 0.280 0.200 0.300 - - - 78.00 *78.00%
Satisfactory
121 Construction Corporation (Formerly: 121 Construction) 21686 Impvt. of MPB at Sta. Maria Agro-
Industrial High School III 1.717 90 C 0.365 0.300 0.300 - - - 96.50 *96.50% Outstanding
2H2L Construction 16293 Conc. of Road @ Package 3-2 XI 0.565 120 C 0.343 0.300 0.300 - - - 94.30 *94.30% Oustanding
2H2L Construction 16293 Const. (Completion) of Sch. Bldg. @ dela Paz E/S IV-A 0.791 120 C 0.366 0.200 0.300 - - - 86.60 *86.60%
V. Satisfactory
2H2L Construction 16293 Const. of MPB @ Jacinto St. XI 0.471 105 C 0.365 0.300 0.300 - - - 96.50 *96.50% Oustanding
2H2L Construction 16293Impvt. of Flood Control at So. Upper East Kamias & So. East
Kamias IVA 2.692 120 C 0.461 0.138 0.300 - - - 89.90 *89.90%
V. Satisfactory
2H2L Construction 16293Impvt. of Multi-Purpose Pavement
at Brgy. Dela Paz & Brgy. San Isidro
IVA 3.748 150 C 0.479 0.133 0.300 - - - 91.20 *91.20% V. Satisfactory
2H2L Construction 16293 Widening of Antipolo-Teresa Road IV-A 19.224 180 C 0.261 0.300 0.300 - - - 86.10 80.34% V. Satisfactory
2-R Construction & Supply 15304 Impvt./Rehab. of PMA Road, PMA Cut=off Road 1&2 CAR 4.811 30 C 0.260 0.200 0.300 - - - 76.00 *76.00%
Satisfactory
2-R Construction & Supply 15304 Repair/Impvt. of Villasis-Malasiqui San Carlos Road I 2.410 60 C 0.338 0.200 0.300 - - - 83.80 *83.80%
V. Satisfactory
310 Construction Specialist Corporation 4875 Asphalt Overlay of Tigaon-Goa-
Lagonoy Road V 47.945 243 C 0.450 - 0.500 - - - 95.00 95.12% Outstanding
310 Construction Specialist Corporation 4875 Const. of Tumana Bridge (Phase
III) NCR 26.854 180 C 0.221 0.190 0.300 - - - 71.10 79.38% Satisfactory
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page1
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
310 Construction Specialist Corporation 4875 Estrella-Pantaleon Bridge
Approaches (Across Pasig River) NCR 38.627 405 C 0.376 0.200 0.300 - - - 87.60 83.22% V. Satisfactory
3E Construction 19588Completion of Multi-Purpose
Bldg., (Water District, Phase IV) Tankulan
X 2.365 120 C 0.335 0.136 0.000 - - - 47.10 71.44% Satisfactory
3FS Construction 30464 Const. of Grouted Riprap @ Brgy. 90 VIII 0.962 70 C 0.381 0.200 0.300 - - - 88.10 *88.10%
Satisfactory
3K Builders 27277 Const. of 1 Unit 1 CL Dullao E/S II 0.410 90 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory
3K Builders 27277 Const. of Curifang FMR II 0.277 30 C 0.386 0.300 0.300 - - - 98.60 *98.60% Outstanding
3K Builders 27277 Const. of FMR @ Brgy. Bobonan I 0.478 45 C 0.330 0.300 0.300 - - - 93.00 *93.00% Outstanding
3K Builders 27277 Const. of Multi-Purpose Building I 0.480 50 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory
3K Rock Engineering 27908 Completion of Multi-Purpose Building (Gymnasium) II 1.194 60 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
3K Rock Engineering 27908 Completion of Multi-Purpose Building @ MIT II 0.478 45 C 0.297 0.300 0.300 - - - 89.70 *89.70%
V. Satisfactory
3K Rock Engineering 27908 Completion of Multi-Purpose Building, Gundaway II 1.783 60 C 0.458 0.200 0.300 - - - 95.80 *95.80%
V.Satisfactory
3K Rock Engineering 27908 Completion of One (1) CL, Secondary School Building II 0.182 25 C 0.349 - 0.500 - - - 84.90 *84.90%
V. Satisfactory
3K Rock Engineering 27908 Const. of Cultural Tourism Center, Saguday NHS II 0.954 45 C 0.233 0.200 0.300 - - - 73.30 81.14%
V. Satisfactory
3K Rock Engineering 27908 Const. of Flood Control, Sangbay II 0.954 70 C 0.321 0.204 0.300 - - - 82.50 *82.50% V. Satisfactory
3K Rock Engineering 27908 Const. of Sch. Bldg., Bannawang Integrated School II 0.578 45 C 0.375 0.218 0.300 - - - 89.30 *89.30%
V. Satisfactory
3K Rock Engineering 27908 Const. of Sch. Bldg., Victoria H/S II 1.622 100 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory
3K Rock Engineering 27908 Const./Impvt. of Nat'l Road along Echague-Jones Maddela Road II 2.722 140 C 0.319 0.200 0.300 - - - 81.90 *81.90%
V. Satisfactory
3-L Construction 16745 Concreting of Barangay Road V 0.550 90 O 0.344 0.300 0.100 0.010 0.028 0.100 88.20 -
3-L Construction 16745Const. of 2 Storey Multi-Purpose
Bldg. (Brgy. Hall), Brgy. San Gabriel
V 0.955 120 C 0.436 0.175 0.300 - - - 91.10 *91.10% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page2
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
3-L Construction 16745 Const. of Multi-Purpose Hall, Lupi H/S V 0.469 90 C 0.393 0.182 0.300 - - - 87.50 *87.50%
V. Satisfactory
3RB Construction & Supply 19541 Const. of Almine-Bagacay Road, Almine Section V 4.625 210 O 0.184 0.059 0.100 0.015 0.027 0.100 48.50 -
3RB Construction & Supply 19541 Const./Rehab. of Water Supply, Level 1 and II System IV-A 1.921 30 C 0.288 0.200 0.300 - - - 78.80 73.94%
Satisfactory
3RB Construction & Supply 19541Road Upgrading along DM Jct.-
Leg.-Sto. Domingo-Tab.-Cam. Sur Bdry., Tiwi-Tabaco Section
V 19.233 150 C 0.488 0.133 0.300 - - - 92.10 84.30% Satisfactory
3RB Construction and Supply 19541 Const. of Municipal High School Building IV-A 9.130 240 C 0.382 0.183 0.300 - - - 86.50 84.82%
V. Satisfactory
3RB Construction and Supply 19541 Rehabilitation of Canal Network (phase 1) NIA-V 11.008 150 O 0.276 0.200 0.100 0.018 0.033 0.200 82.70 -
3RB Construction and Supply 19541 Rehabilitation of Canal Network (phase 2) NIA-V 8.856 150 O 0.291 0.200 0.100 0.018 0.033 0.200 84.20 -
3S Builders 18009 Completion of Drainage System VII 0.634 60 C 0.333 0.300 0.300 - - - 93.30 91.50% Outstanding
4 A's Construction 9446 Asphalt Overlay of Daang Maharlika II 1.929 30 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V.Satisfactory
4 A's Construction 9446 Construction of Road II 1.926 90 C 0.326 0.200 0.300 - - - 82.60 79.54% Satisfactory
4 A's Construction 9446 Const. of 2 Storey 4 Classroom School Bldg. @ Gosi E/S II 1.077 90 C 0.312 0.258 0.300 - - - 87.00 *87.00%
V. Satisfactory
4 A's Construction 9446 Repair/Rehab. of Saint Paul Vocational H/S II 0.189 25 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
4B Construction Corporation 23445 Upgrading and Concreting of Subic-Philseco Road III 41.616 180 C 0.407 0.163 0.300 - - - 87.00 83.76%
Satisfactory
4B Construction and Corporation 23445 Rehab. of Olongapo-Bugallon Road, San Marcelino Section III 4.675 30 C 0.394 0.200 0.300 - - - 89.40 *89.40%
V. Satisfactory
525 Construction 28532 Repair & Impvt. of Daang Maharlika Road III 14.801 60 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V. Satisfactory
525 Construction 28532 Road Conc., Taal Bocaue III 1.899 30 C 0.357 0.289 0.300 - - - 94.60 *94.60% Outstanding
525 Construction 28532 Road Rehabilitation at Mapulang Lupa III 0.944 22 C 0.382 0.300 0.300 - - - 98.20 *98.20%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page3
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
525 Construction / MGSCC (JV)JV-07-095/
SLI-SN-005104
Rehabilitation/Improvement of Sta. Rita Biak na Bato Road III 44.000 200 C 0.405 0.200 0.300 - - - 90.50 *90.50%
V.Satisfactory
558 Builders & Construction Supply 25751 Conc. Sarangani-Davao del Sur
Coastal Road (Taluya Section) XII 9.435 189 C 0.346 0.300 0.000 - - - 64.60 67.68% Fair
558 Builders & Construction Supply 25751 Const. of FMR Lower Mainit XII 0.465 70 C 0.160 0.300 0.300 - - - 76.00 63.74%
Fair
558 Builders & Construction Supply 25751 Const. of Maligang River Flood
Control XII 2.217 60 C 0.278 0.300 0.000 - - - 57.80 61.28% Fair
558 Builders & Construction Supply 25751 Const. of MPB (Mini Gym) @
Padada Central E/S XI 1.420 110 C 0.387 0.260 0.300 - - - 94.70 82.66% V. Satisfactory
558 Builders & Construction Supply 25751 Const. of Public Market @
Poblacion Alabel XII 2.818 150 O 0.333 0.159 0.050 0.030 0.037 0.100 70.90 -
628 Construction Enterprises 30049 Construction of Two Classroom School Building at Lokeb Norte I 1.369 70 C 0.429 0.178 0.300 - - - 90.70 *90.70%
V. Satisfactory
722 Construction 21923 Conc. of Road @ at Brgy. Palo Alto IV-A 2.400 49 C 0.339 0.200 0.300 - - - 83.90 *83.90%
V. Satisfactory
722 Construction 21923
Const. of Multi-Purpose Bldg. Malinta E/S Lawang Bato E/S,
Brgy. Lawang Bato & Natividad Homes
NCR 1.882 90 C 0.405 0.136 0.300 - - - 84.10 *84.10% Satisfactory
722 Construction 21923 Const. of Sch. Bldg., 2 Storey, 2 CL Banga E/S III 2.290 100 C 0.472 0.133 0.300 - - - 90.50 89.52%
V.Satisfactory
722 Construction 21923 Const. of Water System @ Northville II NCR 1.424 60 C 0.278 0.177 0.300 - - - 75.50 *75.50%
Satisfactory
722 Construction 21923 Rehab./Impvt. of Bocaue-San Jose Road, Tumana & Parada Section III 3.807 60 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfactory
722 Construction 21923Repair/Maintenance of Bigaa-Plaridel via Bulacan & Malolos
Road (Barihan Section)III 4.957 10 C 0.361 0.200 0.300 - - - 86.10 *86.10%
V. Satisfactory
722 Construction 21923 Repair/Rehab. of Road, Brgy. Perez III 0.618 70 C 0.356 0.200 0.300 - - - 85.60 *85.60%
V. Satisfactory
739 Builders 31174 Completion of MPB, Brgy. Capangpangan I 1.518 54 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
739 Builders 31174 Conc. of Caparacadan Road I 0.189 7 C 0.254 0.300 0.300 - - - 85.40 *85.40% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page4
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
739 Builders 31174 Const. of MPB @ Brgy. Sabang I 4.750 150 C 0.296 0.300 0.300 - - - 89.60 *89.60% V. Satisfactory
739 Builders 31174 Const. of MPB @ San Lorenzo Village I 1.087 68 C 0.261 0.200 0.300 - - - 76.10 *76.10%
Satisfactory
739 Builders 31174 Const. of Repair of Villamar Bridge I 0.474 21 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
739 Builders 31174 Repair of Bantay West E/S I 0.380 26 C 0.240 0.300 0.300 - - - 84.00 *83.90% V. Satisfactory
739 Builders 31174 Road Concreting, Brgy. Napo I 0.950 20 C 0.364 0.200 0.300 - - - 86.40 *86.40%Satisfactory
747 Builders & Trader 16892 Conc./Impvt. of Manila East Road IV-A 6.236 150 C 0.275 0.200 0.300 - - - 77.50 83.44% V. Satisfactory
747 Builders & Trader 16892 Impvt. of Roads with Drainage System along Dalaging Bukid St. NCR 14.255 150 C 0.276 0.200 0.300 - - - 77.60 *77.60%
Satisfactory
747 Builders & Trader 16892 Impvt./Dredging/Rehab. of Baybay Sapa (along Lopezville Subd.) IV-A 4.797 120 C 0.250 0.300 0.300 - - - 85.00 80.26%
V. Satisfactory
747 Builders & Trader 16892 Rehab./Impvt. of Manggahan Floodway Eastbank IVA 14.367 170 C 0.473 0.133 0.300 - - - 90.60 86.97%
Satisfactory
747 Builders & Trader 16892 Upgrading/Conc. of Roads with Drainage Impvt., M. Naval St. NCR 9.589 120 C 0.355 0.200 0.300 - - - 85.50 78.96%
Satisfactory
8 R's Construction 22997 Barangay Hulo Linear Park Project (EPA - LPP - 19) PRRC 22.542 260 O 0.311 0.270 0.100 0.015 0.042 0.100 83.80 -
811 Trading & Construction 21215 Const. of MPB at Sitio Simbahan, Brgy. Bagong Bayan II IV-B 0.477 60 C 0.342 0.200 0.300 - - - 84.20 *84.20%
V. Satisfactory
811 Trading & Construction 21215Const. of Two (2) Storey Bldg. Six (6) Classroom Sch. Bldg. @ Dona
Asuncion Reyes Memorial E/SIV-B 0.948 80 C 0.304 0.300 0.300 - - - 90.40 91.73%
Outstanding
811 Trading & Construction 21215 Rehab. & Impvt. Along CSR, km. 132+347-km. 140+536 IV-B 4.709 90 C 0.342 0.300 0.300 - - - 94.20 *94.20%
Outstanding
811 Trading & Construction 21215 Rehab. of Mansalay-Bulalacao Road IV-B 1.408 56 O 0.328 0.276 0.100 0.022 0.016 0.100 84.20 *84.20%
V.Satisfactory
811 Trading & Construction 21215 Repair/Rehab. of Multi-Purpose Building (Phase II) IV-B 0.288 27 C 0.463 0.133 0.300 - - - 89.60 *89.60%
V.Satisfactory
811 Trading & Construction 21215 Repair/Rehab. of National Roads & Bridges, Mansalay Section IV-B 4.710 90 C 0.304 0.200 0.300 - - - 80.40 *80.40%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page5
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
888 ACY Enterprises 32898Repair/Rehab. of Tablas Circ.
Road, Calatrava-San Agustin Road (Intermittent Section)
IV-B 9.999 32 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding
A C O Construction 13105Conc. of Liloy-Zamboanga del
Norte-Ipil-Zamboanga Sibugay Rd. Ph. I
IX 14.306 150 C 0.425 0.147 0.300 - - - 87.20 86.90% Satisfactory
A. Ballesta Construction 8446 Const. of One (1) Cl School Building VIII 0.360 160 C 0.442 - 0.500 - - - 94.20 61.02%
Fair
A. Ballesta Construction 8446 Const. of Road Network along E. Balite Boulevard Ext. VIII 14.393 160 C 0.242 0.200 0.300 - - - 74.20 61.12%
Fair
A. De Guia Construction 18228 Conc. of Pob. Burgos-Caliguian Road II 9.648 180 C 0.344 0.200 0.300 - - - 84.40 82.84%
V. Satisfactory
A. De Guia Construction 18228 Const. of Balluyan Bridge, Phase I Sta. Maria CAR 3.626 210 O 0.158 0.120 0.100 0.015 0.035 0.100 52.80 -
A. De Guia Construction 18228 Const. of Balluyan Bridge, Phase I Sta. Maria CAR 3.626 210 O 0.326 0.240 0.070 0.015 0.049 0.067 76.70 -
A. De Guia Construction 18228Const. of Naguilian-San Marcelino Road (Sitio Kasisiitan-Alibadabab
E/S Sect.)II 10.031 180 C 0.281 0.300 0.300 - - - 88.10 85.16%
V. Satisfactory
A. De Guia Construction 18228 Improvement of Buluan-Daga Road CAR 7.519 104 C 0.179 0.300 0.000 - - - 47.90 34.28%
Poor
A. De Guia Construction 18228 Regravelling of Various FMR II 0.919 50 C 0.258 0.200 0.300 - - - 75.80 *75.80% Satisfactory
A. De Guia Construction 18228 Widening of Ballacayu-Simanu Road II 2.751 120 C 0.270 0.200 0.300 - - - 77.00 75.71%
Satisfactory
A. Munas Integrals Builders & Trading 32003 Const./Rehab. of MPB @ Block 4,
Kaingin 1 NCR 3.803 90 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
A. Seva Construction 20124 Const. of Building at San Fernando H/S V 0.468 120 C 0.358 0.200 0.300 - - - 85.80 83.91%
V. Satisfactory
A. Seva Construction 20124 Rehabilitation of Electrical System Masscom Theater PUP 1.389 60 C 0.400 0.300 0.300 - - - 100.00 100.00%
Outstanding
A. Seva Construction 20124 Repair of Roofing and Ceiling Masscom Theater PUP 1.361 60 C 0.400 0.300 0.300 - - - 100.00 100.00%
Outstanding
A.A. De Vera Construction 6191 Completion of Multi-Purpose Building VII 0.458 60 C 0.382 0.200 0.300 - - - 88.20 *88.20%
Satisfactory
A.A. De Vera Construction 6191 Const. of 1 CL School Bldg. VII 0.415 120 C 0.382 0.100 0.300 - - - 78.20 85.69% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page6
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
A.A. De Vera Construction 6191 Const. of 2 Storey, 6 CL Sch. Bldg. @ Lawis E/S VII 4.175 120 C 0.367 0.300 0.300 - - - 96.70 94.18%
Outstanding
A.A. De Vera Construction 6191 Const. of Loon South CES-SPED Center Bldg. VII 2.780 140 C 0.378 0.200 0.300 - - - 87.80 *87.80%
V. Satisfactory
A.A. De Vera Construction 6191 Const./Repair/Rehab of Multi-Purpose Building VII 0.460 90 O 0.388 0.300 0.150 0.030 0.045 0.050 96.30 -
A.C. Cunanan Construction 20752Repair/Rehabilitation of Sewer and Drainage System at Northwing and
EastwingPUP 1.241 67 C 0.400 0.300 0.300 - - - 100.00 100.00%
Outstanding
A.C. Cunanan Construction 20752 Site Development-M.H. Del Pilar Campus PUP 1.120 60 C 0.400 0.300 0.300 - - - 100.00 100.00%
Outstanding
A.C. Rivero Construction & Dev't. Corporation 5122 Const. of Candaguit Bridge VI 9.922 196 C 0.347 0.200 0.300 - - - 84.70 88.89%
V. Satisfactory
A.C. Rivero Construction & Dev't. Corporation 5122
Const./Replacement of Caliban Bridge (Phase 2) along Bacolod-
Murcia-D.S. Benedicto-San Carlos City National Road
VI 7.289 170 C 0.379 0.300 0.300 - - - 97.90 90.22% Outstanding
A.C. Rivero Development Corporation 5122
Const./Impvt. of Multi-Purpose Bldg. at Maasin City (Legislative
Building)VIII 0.934 75 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
A.C. Rivero Development Corporation 5122 Widening of Cabalagnan Bridge I VI 7.946 215 C 0.323 0.200 0.300 - - - 82.30 81.31%
V. Satisfactory
A.D. Construction 6946 Const. of MPB IV-A 0.944 90 C 0.343 0.200 0.300 - - - 84.30 *84.30% V. Satisfactory
A.D. Construction 6946 Const. of Sch. Bldg. at Nato E/S V 0.372 90 C 0.372 0.171 0.300 - - - 84.30 *84.30% V. Satisfactory
A.D. Construction 6946 Rehab. of Panganiban Drainage V 4.212 120 C 0.288 0.300 0.300 - - - 88.80 77.82% Satisfactory
A.D. Gonzales Jr. Construction and Trading Company Inc. 10012 Const. of BGHMC Acute
Psychiatric Unit Bldg. CAR 21.206 395 O 0.345 0.300 0.100 0.008 0.022 0.100 87.50 -
A.D. Gonzales Jr. Construction and Trading Company Inc. 10012 Impv't./Rehab. of San Ahustin-San
Joaquin Road III 4.752 90 O 0.307 0.195 0.100 0.022 0.032 0.100 75.60 -
A.D.L. Constrak 26442 Const. of Sch. Bldg. @ Roxas Central School IV-B 0.481 69 C 0.360 0.200 0.300 - - - 86.00 84.11%
V. Satisfactory
A.D.P. Const. & Supply 3466 Conc. of Bacolod South Road VI 18.918 200 C 0.228 0.300 0.300 - - - 82.80 82.80% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page7
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
A.D.P. Const. & Supply 3466Const. of Bugasong-Valderrama Road, Liaures Section (Alternate
Route)VI 14.426 178 C 0.335 0.087 0.300 - - - 72.20 81.05%
V. Satisfactory
A.D.P. Const. & Supply 3466 Const. of Magballo Bridge (Phase III) VI 10.561 220 O 0.356 0.300 0.070 0.030 0.030 0.067 85.30 -
A.D.P. Const. & Supply 3466 Reconst. of Dumaguete North Road VII 18.881 230 C 0.442 0.200 0.300 - - - 94.20 82.14%
Satisfactory
A.D.P. Const. & Supply 3466 Rehabilitation of Pis-anan-Bontol FMR VI 13.743 210 O 0.328 0.300 0.100 0.024 0.035 0.100 88.70 -
A.D.P. Const. & Supply 3466 Rehabilitation of Pis-anan-Bontol FMR VI 13.922 250 O 0.325 0.240 0.070 0.023 0.032 0.067 75.70 -
A.D.S. San Juan Construction 12853 Const. of St. Benedict MPB NCR 1.721 60 C 0.280 0.300 0.300 - - - 88.00 *88.00% V. Satisfactory
A.E. Belleza Builders 22646 Const. of Day Care Center, Phase I V 0.379 150 C 0.415 - 0.500 - - - 91.50 84.78% V. Satisfactory
A.F.G. Construction and Construction Supply 17161 Conc. of Road @ Brgy.
Mansilingan VI 1.861 150 C 0.368 0.200 0.300 - - - 86.80 *86.80% V. Satisfactory
A.F.G. Construction and Construction Supply 17161
Const. of Diversion/By Pass Road along Kalibo-Iloilo Highway,
Banga SectionVI 14.461 180 C 0.351 0.300 0.300 - - - 95.10 90.90%
Outstanding
A.F.G. Construction and Construction Supply 17161 Const. of MPB (covered court) at
San Enrique National High School VI 1.924 78 O 0.309 0.298 0.150 0.023 0.018 0.050 84.80 -
A.F.G. Construction and Construction Supply 17161 Rehab. of Dumaguete North Road VII 4.894 42 C 0.324 0.200 0.300 - - - 82.40 73.10%
Satisfactory
A.G. Cosipag Construction 12700 Balogo CIS NIA 2.144 150 C 0.421 0.126 0.300 - - - 84.68 *84.68% Satisfactory
A.G. Herrera Construction Corp. 26307 Construction of Multi-Purpose Building, Sto. Cristo III 2.381 85 O 0.346 0.300 0.150 0.030 0.038 0.033 89.70 -
A.I.P. Construction 32458 Road Concreting at Pinget Barangay CAR 1.872 45 C 0.386 0.200 0.300 - - - 88.60 *88.60%
Satisfactory
A.J. Lava Builders 22265 Const. of the Makinabang Baliuag FMR III 4.769 62 C 0.296 0.300 0.300 - - - 89.60 *89.60%
V. Satisfactory
A.J. Lava Builders 22265 Rehab. of Road @ Brgy. San Isidro IV-A 1.922 60 C 0.344 0.200 0.300 - - - 84.40 *84.40% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page8
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
A.J. Lava Builders 22265Repair & Rehab. of Daang
Maharlika Road (Guiguinto & Plaridel Section)
III 9.930 20 C 0.257 0.211 0.300 - - - 76.80 *76.80% Satisfactory
A.J. Lava Builders 22265 Repair & Rehab. of Gen. Alejo Santos Highway III 9.927 18 C 0.255 0.300 0.300 - - - 85.50 *85.50%
V. Satisfactory
A.J. Taylan Const. Corp./BSP & Co., Inc. (J.V.) JV-020104 Const. of Gasgas Bridge under
JICA Bridge Projects along Rural I 63.299 530 O 0.343 0.275 0.050 0.030 0.055 0.067 82.00 -
A.J. Taylan Construction Corporation 2336 Const. of San Mateo Bridge I 16.502 331 C 0.236 0.269 0.300 - - - 80.50 *80.50%
V. Satisfactory
A.J. Taylan Construction Corporation 2336 Const. of Seawall II 14.173 270 C 0.323 0.226 0.000 - - - 54.90 74.58%
Satisfactory
A.J. Taylan Construction Corporation 2336 Impvt. of Ilocos Norte-Kalinga
Apayao Road I 19.283 270 C 0.215 0.200 0.300 - - - 71.50 77.80% Satisfactory
A.L. Dare Construction 11932Const./Rehab./Replacement/
Completion/ and Repair of Plaridel E/S
NCR 1.718 120 O 0.324 0.168 0.100 0.020 0.047 0.100 75.90 -
A.L. Dare Construction 11932 Impv't. of Balaybay Farm-to-Market Road Brgy. Balaybay III 0.930 30 O 0.288 0.225 0.100 0.015 0.032 0.067 72.70 -
A.L. Dare Construction 11932 Impvt./Rehab. of Brgy. Roads @ Sindalan and Dolores III 4.753 50 C 0.313 0.200 0.300 - - - 81.30 *81.30%
V. Satisfactory
A.L. Gantuangco Construction 30872 Benolho CIS NIA 3.720 90 O 0.277 0.180 0.050 0.020 0.038 0.100 66.50 -
A.L. Salazar Construction, Inc. 3899 Conc. of Taytay (Pancol)-El Nido National Road IV-B 28.821 255 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V. Satisfactory
A.L. Salazar Construction, Inc. 3899 Impvt. of FMR, Brgy. Pintong Bukawe, Phase II IV-A 14.346 120 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
A.L. Salazar Construction, Inc. 3899 Rehab./Const. of Port Barton-Kemdeng Road IV-B 9.122 252 O 0.322 0.045 0.100 0.030 0.033 0.067 59.70 -
A.L.R. Construction 24110 Const. of 2 CL S/B @ Dungon E/S IV-B 0.852 75 O 0.329 0.236 0.100 0.015 0.032 0.100 81.20 81.20% V.Satisfactory
A.L.R. Construction 24110Const. of Schl. Bldg. 2 Storey, 4 CL @ Gulod NHS, Brgy. Gulod
Phase I) IV-A 0.960 45 C 0.254 0.200 0.300 - - - 75.40 *75.40%
Satisfactory
A.L.R. Construction Corporation 24110 Conc.of Road, Inday Subdivision IVA 0.958 90 C 0.461 0.133 0.300 - - - 89.40 89.40% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page9
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
A.L.R. Construction Corporation 24110 Const. of Pedestrian Overpass along Calamba-Sto. Tomas IV-A 9.601 120 C 0.352 0.200 0.300 - - - 85.20 83.22%
V. Satisfactory
A.L.R. Construction Corporation 24110Const. of Pedestrian Overpass at
Brgy. San Antonio & Biñan-Carmona Road Intersection
IVA 19.203 241 O 0.357 0.300 0.150 0.030 0.028 0.050 91.50 -
A.L.R. Construction Corporation 24110Const.of Multi Purpose Pavement with Perimeter Fence, Marcelino
M. Santos NHSIVA 0.957 90 C 0.480 0.133 0.300 - - - 91.30 *91.30%
V. Satisfactory
A.M. Ayunan Construction 13983 Const. of MPB at Datu Usman E/S XII 1.908 75 C 0.319 0.182 0.300 - - - 80.10 65.40% Fair
A.M. Donceras Construction 30528Const. of Arteche-Lapinig Road,
Sta.960-160-Sta.961-260 with exceptions
VIII 8.008 315 C 0.247 - 0.000 - - - 24.70 48.28% Poor
A.M. Oreta - IBC (JV) JV-07-097Conc. of Iloilo City-Caticlan
Highway (Pototan-Passi-Capiz Bdry. Section)
VI 158.000 540 O 0.356 0.299 0.150 0.030 0.060 0.033 92.80 -
A.M. Oreta & Co. Inc. / IBC Int'l Builders Corp. (JV) JV-05-011 Const. of Ibajay Bridge &
Approaches VI 138.616 611 C 0.370 0.278 0.000 - - - 64.80 78.74% Satisfactory
A.M. Oreta & Co., INC./IBC. Int'l Builders Corp. (JV) JV-07096 Kalibo Airport Development
Project DOTC 283.188 360 O 0.318 0.300 0.150 0.030 0.059 0.050 90.70 -
A.M. Robles Construction 28056 Conc. of FMR, Brgy. Colo I 1.926 55 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory
A.M. Robles Construction 28056 Const. of Multi-Purpose Bldg. @ Brgy. Minuyan III 2.850 85 O 0.356 0.248 0.100 0.030 0.035 0.100 86.90 -
A.M. Robles Construction 28056 Construction of Water Supply @ Brgy. San Simon I 0.530 40 C 0.415 0.184 0.300 - - - 89.90 *89.90%
V. Satisfactory
A.M.P. Construction 16574 Const. of 2 Cl , CLSU III 0.657 60 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory
A.M.P. Construction 16574 Const. of 2 Cl Sch. Bldg. @ Lomboy E/S III 0.637 60 C 0.363 0.178 0.300 - - - 84.10 *84.10%
V. Satisfactory
A.M.P. Construction 16574 Const. of 2 Cl Sch. Bldg. @ Talavera CES III 0.640 60 C 0.316 0.255 0.300 - - - 87.10 *87.10%
V. Satisfactory
A.M.P. Construction 16574 Const. of 2-Cl S/B @ Tabacao H/S III 0.737 160 C 0.403 - 0.500 - - - 90.30 90.30% Outstanding
A.M.P. Construction 16574 Const. of Multi-Purpose Bldg. @ Zaragosa Nat'l. H/S III 2.807 60 C 0.295 0.217 0.300 - - - 81.20 66.71%
Fair
A.M.P. Construction 16574 Const. of Multi-Purpose Building at Poblacion Sison I 1.349 100 C 0.297 0.235 0.300 - - - 83.20 *83.20%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page10
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
A.P. Palacios Construction 29021 Completion/Conc. of Road, Buhangin to ANSHS Road III 2.170 150 C 0.347 0.206 0.300 - - - 85.30 *85.30%
V. Satisfactory
A.P. Palacios Construction 29021 Conc. of Road from Brgy. Bacong to Brgy. San Jose III 0.702 75 C 0.316 0.300 0.300 - - - 91.60 *92.50%
Outstanding
A.P. Palacios Construction 29021 Concreting of Provincial Road, Brgy. Matawe III 3.239 90 C 0.286 0.300 0.300 - - - 88.60 *88.60%
V. Satisfactory
A.P. Palacios Construction 29021 Concreting of Road III 0.935 60 C 0.425 - 0.500 - - - 92.50 *92.50% Outstanding
A.P. Palacios Construction 29021 Const. of Drainage System, Public Market (Ph-2) III 0.934 60 C 0.284 0.274 0.300 - - - 85.80 *85.80%
V. Satisfactory
A.P. Palacios Construction 29021 Const. of Flood Control (Gabion Type) @ Brgy. Caragsacan III 0.930 120 C 0.340 0.200 0.300 - - - 84.00 *88.20%
V. Satisfactory
A.P.B. Construction 17055 Conc. of Kisad Road (km. 249+303 - km. 249+399) CAR 2.807 72 C 0.313 0.224 0.300 - - - 83.70 *83.70%
V. Satisfactory
A.P.B. Construction 17055 Road Opening at Middle Quirino Hill Brgy. CAR 0.953 45 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V. Satisfactory
A.P.O. General Construction 7010 Completion of School Bldg., Happy Hollow E/S CAR 0.638 45 O 0.373 0.240 0.100 0.023 0.018 0.100 85.40 -
A.Q. Dominguez Construction & Supply 19843 Con. of Casanicolan-Sn. Marcelino
Road I 0.964 50 O 0.318 0.180 0.100 0.023 0.041 0.100 76.20 -
A.R. & Mark Builders 31673 Const. of 1 CL Sch. Bldg. @ Talahiron ES X 0.495 60 C 0.236 0.300 0.300 - - - 83.60 *83.60%
V. Satisfactory
A.R. Cruz Construction, Inc. (Formerly: AR Cruz Const.) 12157 Concreting of Callaguip Barangay
Road I 0.707 35 C 0.264 - 0.500 - - - 76.40 *76.40% Satisfactory
A.R. Lustre Jr. Construction 7680 Asphalt Overlay along Capitol-Canigaran Road IV-B 9.697 60 C 0.332 0.300 0.300 - - - 93.20 91.16%
Outstanding
A.R. Lustre Jr. Construction 7680 Completion of 2-Storey Building @ BSU Matungao Branch III 1.403 60 C 0.329 0.300 0.300 - - - 92.90 *92.90%
Outstanding
A.R. Lustre Jr. Construction 7680 Concreting of Puerto Princesa Sabang Rd., (Underground River) IV-B 9.468 120 C 0.372 0.300 0.300 - - - 97.20 93.96%
Outstanding
A.R. Lustre Jr. Construction 7680 Const. of Bobosawen-Apurawan FMR IV-B 46.650 365 O 0.353 0.249 0.100 0.030 0.070 0.100 90.20 -
A.R. Lustre Jr. Construction 7680 Const. of Culasian Bridge IV-B 10.076 165 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page11
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
A.R. Lustre Jr. Construction 7680Const. of Std. 2-Cl School Bldg. @ Santor E/S & Rehab. of Sch. Bldg.
@ Mambog E/SIII 1.119 42 C 0.318 0.300 0.300 - - - 91.80 *91.80%
Outstanding
A.R. Lustre Jr. Construction 7680 Const. of Tagbarungis Bridge, PPSR IV-B 20.378 240 C 0.374 0.200 0.300 - - - 87.40 85.06%
V. Satisfactory
A.R. Lustre Jr. Construction 7680 Const./Rehab. of Iwahig-Tacduan Diversion Road National Highway IV-B 11.430 150 C 0.289 0.239 0.300 - - - 82.80 82.80%
V. Satisfactory
A.R. Lustre Jr. Construction 7680 Construction of Multi-Purpose Building IV-B 0.383 90 C 0.481 0.107 0.300 - - - 88.80 *88.80%
Satisfactory
A.R.L. Construction 27645 Conc. of Brgy. Road Caniogan III 0.956 12 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory
A.R.L. Construction 27645 Package IV-MRA-08 Asphalt Overlay of Road @ Poblacion III 0.500 20 C 0.326 0.300 0.300 - - - 92.60 *92.60%
Outstanding
A.R.L. Construction 27645 Repair/Rehabilitation of Tatalon Street, Brgy. Ugong NCR 2.312 120 C 0.389 - 0.500 - - - 88.90 *88.90%
V. Satisfactory
A.R.L. Construction 27645 Riprapping of Access Road @ Poblacion III 0.477 35 C 0.240 0.300 0.300 - - - 84.00 *84.00%
V. Satisfactory
A.R.L. Construction 27645 Upgrading of A.T. Santiago Brgy. Viente Reales NCR 0.897 120 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
A.R.L. Construction 27645 Upgrading of Sapang Bakaw Road, Brgy. Lawang Bato NCR 1.881 90 C 0.333 0.300 0.300 - - - 93.30 88.80%
V. Satisfactory
A.R.L. Construction 27645 Upgrading/Conc. of Roads with Drainage Improvement NCR 0.476 45 C 0.364 0.200 0.300 - - - 86.40 *86.40%
Satisfactory
A.S. Obquia Construction 19844 Completion of MPB VII 0.175 120 C 0.366 0.300 0.300 - - - 96.60 *91.60% Outstanding
A.S.S. Construction 31509 Completion of ACA Building II DOST 9.631 210 O 0.380 0.296 0.150 0.030 0.062 0.050 96.80 -
A.S.S. Construction 31509 Construction of Sports Complex DOST 3.159 90 C 0.391 0.295 0.300 - - - 98.60 98.60% Outstanding
A.S.S. Construction 31509 Partial Completion of vast set, pcastrd & pccerd bldg. DOST 7.479 135 C 0.483 0.200 0.300 - - - 98.30 *98.30%
Outstanding
A.S.V. Construction Supply and Services 13490 Const. of Daang Liputan FMR III 0.471 60 C 0.356 0.300 0.300 - - - 95.60 *95.60%
Outstanding
A.SM. Francisco Dev't and Construction Corp. 19098 Proposed Exterior Repainting of
Sotejo Hall, College of Dentistry U.P. 1.528 120 O 0.400 0.300 0.070 0.030 0.047 0.100 94.70 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page12
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
A.SM. Francisco Dev't and Construction Corp. 19098 Proposed Exterior Repainting
Works U.P. 1.368 120 C 0.400 0.200 0.300 - - - 90.00 90.00% Very Satisfactory
A.V. Construction Supply 13202 Const. of 4-Cl, 2-Storey School Building IV-A 2.617 100 C 0.354 0.200 0.300 - - - 85.40 *85.40%
V. Satisfactory
A.Y.U. Engineering and Construction 25632 Conc. of Road at Brgy. Dumoy XI 9.435 90 C 0.375 0.300 0.300 - - - 97.50 *97.50%
Outstanding
A.Y.U. Engineering and Construction 25632 Const. of 1 Cl 1 Storey Sch. Bldg.
@ Gasco E/S XI 0.434 45 C 0.375 0.157 0.300 - - - 83.20 *83.20% V. Satisfactory
A.Y.U. Engineering and Construction 25632 Const. of Multi-Purpose Building XI 0.657 70 C 0.415 - 0.500 - - - 91.50 87.51%
V. Satisfactory
A.Y.U. Engineering and Construction 25632 Const. of Multi-Purpose Building
@ Purok Rivera XI 0.472 75 C 0.325 - 0.500 - - - 82.50 83.69% V. Satisfactory
AAA Structures & Builders, Inc. 30935 Conc./Impv't. of Magsaysay Brgy. Road II 0.878 51 C 0.270 - 0.500 - - - 77.00 *77.00%
Satisfactory
AB Vision Engineering Construction 19845 Const. of MPB XI 1.607 110 C 0.393 0.300 0.300 - - - 99.30 * 99.30%
Outstanding
Abesco Construction & Development Corporation 2934 Constructiom of Multi-Purpose
Building @ Cupang Elem. School III 3.273 88 O 0.331 0.300 0.150 0.030 0.035 0.050 89.60 -
Aboitiz Construction Group, Inc. 2608 C.P. PY-D Structural Overlay of Patnongon-Nabas Road ADB 166.347 689 C 0.323 0.200 0.000 - - - 54.80 71.86%
Satisfactory
Aboitiz Construction Group, Inc/Kumagai Gumi Co. Ltd. (J.V.)
SLI-SN-003884
Cebu South Road Improvement Project CP-1 (Talisay-Jct. Toledo
Sect.)VII 513.289 840 O 0.332 0.300 0.000 0.030 0.065 0.100 82.70 -
Abu Construction 22313 Const. of Tantangan RCDG Bridge XII 3.858 154 C 0.323 0.237 0.300 - - - 86.00 83.48% V. Satisfactory
Abu Construction 22313 Rehab. of Potable Water System @ Brgy. Saravia XII 0.873 120 C 0.338 0.300 0.300 - - - 93.80 87.57%
V. Satisfactory
Abulug Construction 5593 Construction of Canal and Canal Structures (LMC-ARIP-10-06) II 4.877 210 C 0.400 0.300 - - - - 70.00 70.00%
Fair
Abulug Construction Co., Inc. 5593 Matuno-Sto. Domingo CIS NIA 3.126 150 O 0.3515 0.1619 0.1 0.03 0.035 0.2 87.84 -
Abulug Construction Company, Inc. 5593 Conc. of Jct. Cadcadir-Cabugao
Road II 8.199 180 C 0.269 0.300 0.300 - - - 86.90 84.92% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page13
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Abulug Construction Company, Inc. 5593 Conc. of Jct. Claveria-Dibalio-
Luzon Road II 9.648 259 O 0.344 0.287 0.150 0.015 0.040 0.050 88.60 -
Abulug Construction Company, Inc. 5593 Conc. of Larion-Cabbo Road,
Tuguegarao City & Penablanca II 13.884 240 C 0.358 0.200 0.300 - - - 85.80 84.30% V. Satisfactory
Abulug Construction Company, Inc. 5593 Const. of Colony Road II 2.894 120 O 0.329 0.240 0.100 0.030 0.033 0.100 83.20 -
Abulug Construction Company, Inc. 5593 Const. of Dagupan MPB CAR 0.442 60 C 0.226 0.184 0.300 - - - 71.00 *71.00%
Satisfactory
Abulug Construction Company, Inc. 5593 Const. of Public Market (Phase II) II 1.446 269 C 0.476 0.133 0.300 - - - 90.90 87.40%
Satisfactory
Abulug Construction Company, Inc. 5593 Const. of Punta Seawall II 0.298 60 C 0.310 0.200 0.300 - - - 81.00 79.26%
Satisfactory
Abulug Construction Company, Inc. 5593 Const./Completion of Cabaruan
Bridge II 0.383 60 C 0.178 0.271 0.300 - - - 74.90 *74.90% Satisfactory
Abulug Construction Company, Inc. 5593 Lucban River Control Project II 3.858 347 C 0.417 0.133 0.300 - - - 85.00 83.35%
Satisfactory
Abulug Construction Company, Inc. 5593 Matuno- Sto. Domingo CIS NIA 3.126 150 O 0.352 0.162 0.100 0.030 0.035 0.200 *87.84 -
Abulug Construction Company, Inc. 5593 Reblocking along MNR II 19.296 180 C 0.295 0.215 0.300 - - - 81.00 82.08%
V. Satisfactory
Abulug Construction Company, Inc. 5593 Regravelling of Allasitan-Biduang-
Nagattatan Road II 1.923 90 C 0.300 0.200 0.300 - - - 80.00 78.38% Satisfactory
Abulug Construction Company, Inc. 5593 Rehab. of Abra-Kalinga Road. Km.
423+500-Km. 426+500 CAR 1.878 100 C 0.200 0.300 0.300 - - - 80.00 *80.00% Satisfactory
Abulug Construction Company, Inc. 5593 Rehab. of Drainage Canal
Bangued-Pidigan Section CAR 2.385 192 C 0.288 0.300 0.300 - - - 88.80 68.82% Fair
Abulug Construction Company, Inc. 5593 Rehab. of Multi-Purpose Hall CAR 0.944 121 O 0.246 0.184 0.300 - - - *73.00 -
Abulug Construction Company, Inc. 5593 Repair of Cristina H/S and Rehab.
of Bucay C/S CAR 0.474 76 O 0.381 0.264 0.100 0.020 0.029 0.100 89.40 -
Abulug Construction Company, Inc. 5593 Repair/Impv't. of Calog-Luna-
Pudtol Road II 1.180 120 C 0.293 0.218 0.300 - - - 81.10 81.16% V. Satisfactory
Abulug Construction Company, Inc. 5593 Replacement of Langagan Bridge
along MNR II 4.814 150 C 0.370 0.201 0.300 - - - 87.10 86.20% V. Satisfactory
Abulug Construction Company, Inc. 5593
Restoration of Damaged Roadways along BAMR (Sinking
Pavement @ Logac Section)II 1.392 60 C 0.316 - 0.500 - - - 81.60 *81.60%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page14
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Abulug Developers and Builders Co., Inc. (Formerly: F. Vargas
Construction)2366 Retrofitting of Pamplona Bridge,
Manila North Road II 10.290 180 C 0.386 0.200 0.300 - - - 88.60 82.96% Satisfactory
Aca Construction & Supply 10784 Conc. of Esperanza Road I 0.382 30 C 0.262 0.300 0.300 - - - 86.20 * 86.20% V. Satisfactory
Aca Construction & Supply 10784 Construction of Multi-Purpose Building, Bancagan I 0.096 30 C 0.417 0.133 0.300 - - - 85.00 *85.00%
Satisfactory
Aca Construction & Supply 10784 Construction of Water Supply I 0.096 30 C 0.338 0.188 0.300 - - - 82.60 *82.60%Satisfactory
Aca Construction & Supply 10784 Repair of Farm-to-Market Road I 0.480 30 C 0.343 0.200 0.300 - - - 84.30 *84.30%Satisfactory
Accuracy Builders Enterprise 27507 River Impvt. of Cabalisian River, Brgy. Sta. Lucia I 4.485 75 C 0.400 - 0.500 - - - 90.00 * 90.00%
V. Satisfactory
ACJ Construction Resources 10635Conc. of Paco-Roxas-Arakan
Valley National Road, (Luhong-Kiyaab Section)
XII 12.751 170 C 0.365 0.102 0.300 - - - 76.70 *76.70% Satisfactory
ACJ Construction Resources 10635 Concreting of Poblacion Magpet-Nowa Road (Nowa Basak Sect.) XII 18.798 180 O 0.356 0.284 0.150 0.030 0.035 0.050 90.50 -
ACJ Construction Resources 10635
Const. of Malaang PSG Bridge inc. Conc. Paving of Bridsge
Approaches along Davao-Cotabato Road
XII 42.684 300 C 0.376 0.200 0.300 - - - 87.60 84.02% V. Satisfactory
ACJ Construction Resources 10635 Const. of Mayor Ricardo L. Ipong Memorial National H/S XII 4.634 200 C 0.355 0.300 0.300 - - - 95.50 86.19%
V. Satisfactory
ACJ Construction Resources 10635 Const. of MPB XII 9.634 100 C 0.335 0.270 0.300 - - - 90.50 83.22% V. Satisfactory
ACJ Construction Resources 10635Const. of Saguing Bridge along Davao-Cotabato Rd., Including Approaches and Gap Section
XII 9.328 180 C 0.283 0.297 0.300 - - - 88.00 90.16% Outstanding
ACJ Construction Resources 10635 Const./Impvt of Jct. Meocad-Salasang-Katipunan Road XII 28.842 164 C 0.337 0.300 0.300 - - - 93.70 94.18%
Outstanding
ACJ Construction Resources 10635 Rechanneling of Malamote River XII 1.443 45 C 0.375 0.188 0.300 - - - 86.30 *86.30% V. Satisfactory
Acme Builders Corporation 6442Asphalt Overlay along Tigbao-
Pulak-Sta. Fe Road, Km 925+370-Km 926+379
VIII 11.310 90 C 0.393 0.133 0.300 - - - 82.60 *82.60%Satisfactory
Acme Builders Corporation 6442 Clearing and Rehab. of Mangonbangon & Burayan River VIII 9.635 150 C 0.312 0.200 0.300 - - - 81.20 *81.20%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page15
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Acme Builders Corporation 6442 Const. of Gandara Bridge, Phase VI VIII 48.160 240 O 0.352 0.300 0.100 0.022 0.045 0.100 91.90 -
Acme Builders Corporation 6442 Const. of Gandara Bridge, Phase VI VIII 48.160 240 O 0.394 0.261 0.000 0.022 0.038 0.100 81.50 -
Acme Builders Corporation 6442 Const. of Sinugbuhan Bridge along Tiolas-Sinugbuhan Road VI 33.383 600 O 0.323 0.196 0.100 0.030 0.050 0.100 79.90 -
Acme Builders Corporation 6442 Const. of Sinugbuhan Bridge along Tiolas-Sinugbuhan Road VI 33.384 600 O 0.389 0.225 0.100 0.030 0.043 0.067 85.40 -
Acme Builders Corporation 6442 Const. of Sinugbuhan Bridge along Tiolas-Sinugbuhan Road VI 33.384 600 O 0.315 0.291 0.150 0.030 0.040 0.033 85.90 -
Acme Builders Corporation 6442 Construction of Bagacay Bridge VIII 39.122 332 O 0.319 0.288 0.000 0.030 0.023 0.050 71.00 -
Acme Builders Corporation 6442 Rehab. of Guimbal Bridge along Iloilo-Antique Road VI 33.372 600 C 0.267 0.200 0.300 - - - 76.70 78.59%
Satisfactory
Acme Builders Corporation 6442 Rehabilitation of Mahayahay Creek VIII 6.709 170 C 0.375 0.133 0.300 - - - 80.80 84.10%Satisfactory
Acme Builders Corporation/B. Vicencio Const. (JV) JV-07-067
Conc. of Oras-San Policarpio-Arteche Road, Brgy. Baras-Arteche (Poblacion) Section
VIII 59.291 315 C 0.338 0.300 0.300 - - - 93.80 93.02% Outstanding
Acme Builders Corporation/B. Vicencio Const. (JV) JV-07-067 Const. of Palo East By-Pass Road
(Const. of Bernard Reed II Bridge) VIII 57.823 350 O 0.325 0.300 0.100 0.030 0.047 0.100 90.20 -
Acme Builders Corporation/B. Vicencio Const. (JV) JV-07-067 Const. of Palo East By-Pass Road
(Const. of Bernard Reed II Bridge) VIII 57.823 460 O 0.253 0.242 0.150 0.030 0.033 0.050 75.80 -
ACO Construction 13105Conc. of Liloy-Zamboanga del
Norte-Ipil-Zamboanga Sibugay Rd. Ph. I
IX 14.306 120 O 0.362 0.240 0.100 0.030 0.035 0.100 86.70 -
ACO Construction 13105 Repair of OB-Gyne Zamboanga City Medical Center IX 5.704 100 C 0.121 0.200 0.300 - - - 62.10 *62.10%
Fair
ACV Construction & Surveying 10903Concreting of FMR @ Various
Brgys., Urbiztondo and Mangatarem
I 3.838 60 C 0.353 0.200 0.300 - - - 85.30 *85.30%Satisfactory
ADB Dynamic Builders & Supply 33359
Repair/Rehab. of St., Brgy. Dalupirit; Rehab. of San Roque
St., Brgy. Vinisitahan; Rehab./Repair of St., Brgy. Pilar
VIII 1.437 60 C 0.463 0.200 0.300 - - - 96.30 *96.30% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page16
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Adelfa & Charlie Enterprises 11569
Completion/Continuation of Unfinished/Ongoing Bridges, Calaguise Steel Bridge along
Sambolawan-Calaguise-Calubian Road
VIII 34.810 290 C 0.338 0.200 0.300 - - - 83.80 82.15% V. Satisfactory
Adelfa & Charlie Enterprises 11569 Conc. of Sambulawan-Calaguise-Calubian Road VIII 4.744 120 C 0.376 0.200 0.300 - - - 87.60 *87.60%
V. Satisfactory
Adelfa & Charlie Enterprises 11569 Const. of Buho II Bridge VIII 5.597 210 C 0.384 0.300 0.300 - - - 98.40 93.42% Outstanding
Adelfa & Charlie Enterprises 11569 Const. of Imbornal Bridge VIII 4.239 120 C 0.371 0.300 0.300 - - - 97.10 *97.10% Outstanding
Adelfa & Charlie Enterprises 11569 Const. of Palid Bridge VIII 5.281 180 C 0.348 0.300 0.300 - - - 94.80 *94.80% Outstanding
Adelfa & Charlie Enterprises 11569 Construction of MPP Brgy. Hibulangan VIII 0.142 30 C 0.433 0.133 0.300 - - - 86.60 *86.60%
Satisfactory
Adelfa & Charlie Enterprises 11569 Mapuyo CIS NIA 1.485 45 C 0.375 0.180 0.300 - - - 85.50 85.50% V.Satisfactory
Adelfa & Charlie Enterprises 11569 Rehab. of Palompon-Villaba Road VIII 9.490 210 C 0.383 0.220 0.300 - - - 90.30 87.24% V. Satisfactory
Adelfa & Charlie Enterprises 11569Repair of Roads along Tabango-Villaba-Palompon Road & Sto.
Rosario-Villaba RoadVIII 9.641 150 C 0.336 0.200 0.300 - - - 83.60 87.60%
V. Satisfactory
Adfil / RIDCorporation Joint Venture
SL1-SN-004956
Repair/Rehab. of Patin-ay Bridge along Agusan-Davao Road XIII 24.375 389 O 0.373 0.300 0.030 0.030 0.059 0.100 89.20 -
Adfil Corporation 14437 Completion/Impvt./Rehab. of Libertad Bridge & Approaches XIII 26.210 210 C 0.348 0.200 0.300 - - - 84.80 88.70%
V. Satisfactory
Adfil Corporation 14437 Conc. of Agusan-Surigao Road (Ampayon Section) XIII 4.691 180 C 0.367 0.300 0.300 - - - 96.70 94.96%
Outstanding
Adfil Corporation 14437 Conc. of Butuan City-Pianing/Tandag Road XIII 4.012 105 C 0.323 0.200 0.300 - - - 82.30 *82.30%
V. Satisfactory
Adfil Corporation 14437 Conc. of Dapa-Junction Cancohoy Road XIII 28.451 241 C 0.414 0.200 0.300 - - - 91.40 88.94%
Satisfactory
Adfil Corporation 14437 Conc. of Gap along La Paz-Loreto Road XIII 4.791 185 C 0.367 0.200 0.300 - - - 86.70 81.12%
V. Satisfactory
Adfil Corporation 14437 Const. of Cabadbaran River Dike (Downstream) XIII 9.413 195 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
Adfil Corporation 14437 Const. of Cabadbaran River Dike (Upstream) XIII 9.548 180 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page17
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Adfil Corporation 14437 Const. of Tag-iho1 Bridge and Approaches (Completion) XIII 22.141 280 C 0.360 0.300 0.300 - - - 96.00 96.00%
Outstanding
Adfil Corporation 14437 Const. of Taguibo Flood Control XIII 14.413 180 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding
Adfil Corporation 14437 Const. of Waloe Bridge XIII 9.199 90 C 0.339 0.200 0.300 - - - 83.90 90.92% Outstanding
Adfil Corporation 14437 Improvement of Masao River Flood Control, Phase III XIII 4.590 45 C 0.500 0.567 - - - - 106.70 94.70%
Outstanding
Adfil Corporation 14437 Impvt. of Agusan-Surigao Road (Ampayon Section) XIII 9.290 210 C 0.354 0.200 0.300 - - - 85.40 *85.40%
V. Satisfactory
Adfil Corporation 14437Impvt. of Lake Mainit
Circumferential Road, Brgy. Colorado Section
XIII 9.525 135 C 0.172 0.233 0.300 - - - 70.50 *70.50% Satisfactory
Adfil Corporation 14437 Rehab. of Camagong Flood Control XIII 9.440 150 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
Adfil Corporation 14437 Rehab./Impvt. of Sagal-ang Manubiray FMR X 13.894 270 C 0.358 0.278 0.300 - - - 93.60 73.32%
Satisfactory
Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Road along
Agusan-Misamis RoadXIII 9.634 180 C 0.405 0.200 0.300 - - - 90.50 86.36%
Satisfactory
Adfil Corporation 14437Rehab./Reconst. of Damaged Paved National Road along
Agusan-Surigao RoadXIII 9.635 180 C 0.408 0.200 0.300 - - - 90.80 87.50%
Satisfactory
Adfil Corporation 14437
Repair/Reconst. of Butuan City-Cagayan de Oro-Iligan Road
(Agusan-Misamis Oriental Road) inc. Bridge
XIII 19.198 210 C 0.402 0.200 0.300 - - - 90.20 89.06% V.Satisfactory
Adfil Corporation 14437 Repair/Rehab. of NRJ Bahbah-Talacogon Road XIII 9.633 188 C 0.431 0.200 0.300 - - - 93.10 87.04%
Satisfactory
Adige Bitumi Impresa-Sta. Clara Int'l. Corp. (JV) FC-06-032
DPWH Component Project under the HELP for Catubig Agricultural
Project (HCAAP)VIII 448.581 734 O 0.392 0.300 0.050 0.030 0.055 0.100 92.70 -
Adige Bitumi Impresa-Sta. Clara Int'l. Corp. (JV) FC-06-032
DPWH Component Project under the HELP for Catubig Agricultural
Project (HCAAP)VIII 448.581 734 O 0.367 0.300 0.050 0.030 0.051 0.100 89.80 -
Adige-Sta. Clara (JV) JV-06-032DPWH Component Project under the HELP for Catubig Agricultural
Project (HCAAP)VIII 448.581 734 O 0.377 0.300 0.070 0.030 0.050 0.067 89.40 -
Adige-Sta. Clara (JV) JV-06-032DPWH Component Project under the HELP for Catubig Agricultural
Project (HCAAP)VIII 519.663 959 O 0.350 0.299 0.100 0.030 0.060 0.067 90.60 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page18
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Adimre Construction 25534 Baguio Airport Development Project DOTC 861.940 60 C 0.435 0.181 0.300 - - - 91.60 91.60%
Very Satisfactory
Adimre Construction 25534 Const. of MPB at Brgy. Bunlo (Phase II) III 1.907 56 C 0.334 0.200 0.300 - - - 83.40 83.61%
V. Satisfactory
Adimre Construction 25534 Const. of MPB at Brgy. Bunlo (Phase IV) III 1.907 56 O 0.342 0.240 0.100 0.030 0.025 0.100 83.70 -
Adimre Construction 25534Const. of Std. 1-Cl School Bldg. @
N. Clemena E/S, Bulihan & Bagbaguin E/S
III 0.868 28 C 0.318 0.300 0.300 - - - 91.80 82.63% V. Satisfactory
ADL General Construction 30604 Conc. of San Antonio Palpaltogan CAR 0.285 28 C 0.303 0.000 0.300 - - - 60.30 *60.30% Fair
Adroit Construction 11169 Completion of Bridge, General Luna 2nd Phase III 3.026 30 C 0.332 0.200 0.300 - - - 83.20 *83.20%
Satisfactory
Adroit Construction 11169 Concreting of Brgy. Maligaya Road III 1.867 25 C 0.404 0.133 0.300 - - - 83.70 *83.70%Satisfactory
Adroit Construction 11169 Const. of 1 CL @ San Pascual E/S III 0.475 30 C 0.299 0.245 0.300 - - - 84.40 *84.40% V. Satisfactory
Adroit Construction 11169 Const. of 2 CL @ Cumabol E/S III 0.749 60 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding
Adroit Construction 11169 Const. of 4 CL, Central Luzon State University III 1.800 90 C 0.319 0.300 0.300 - - - 91.90 *91.90%
Outstanding
Advanced Foundation Construction Systems Corp. 15449
Const. of Baguio Flyover & Approaches (Phase V), BGH-
Rotonda Marcos Highway-Gov. Pack-Kisad Road, Kennon Road
Jct.
CAR 61.894 100 C 0.385 0.300 0.300 - - - 98.50 93.10% Outstanding
Advanced Foundation Construction Systems Corp. 15449
Const. of Subic-Cawag Bridge I, along Subic-Cawag-Balaybay
RoadIII 47.952 90 O 0.331 0.300 0.100 0.030 0.040 0.100 90.10 -
AG Construction 7921 Conc. of Wright Park Grounds CAR 0.936 30 C 0.286 0.300 0.300 - - - 88.60 *88.60% V. Satisfactory
Agafer Construction 7912 Conc. of Centro 2 II 0.963 75 C 0.284 0.204 0.300 - - - 78.80 *78.80% Satisfactory
Agafer Construction 7912 Const. of Cagayan River Control II 14.241 240 O 0.334 0.160 0.100 0.022 0.028 0.200 84.40 -
Agafer Construction 7912 Const. of Cagayan River Control II 14.241 240 O 0.318 0.160 0.030 0.030 0.033 0.133 70.40 -
Aison Dominique Construction & Supply 32805 Const. of Cabucgayan MPB
(Phase III) VIII 1.896 120 C 0.373 0.187 0.300 - - - 86.00 79.07% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page19
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ajan Jeada, Inc. (Formerly: Jeada Construction) 17869 Impvt. of MPB, BU College of
Engineering Campus V 16.149 240 C 0.457 0.133 0.300 - - - 89.00 89.80% V. Satisfactory
AJYSC Marketing 26924 Const. of Batodo Bridge and Approaches Batodo Arc XII 22.822 348 C 0.279 0.200 0.300 - - - 77.90 81.22%
V. Satisfactory
AJYSC Marketing 26924 Const. of River Bank Protection Allah River (Kolambog Section) XII 2.874 112 C 0.266 0.300 0.300 - - - 86.60 82.22%
V. Satisfactory
AJYSC Marketing 26924 Const./Widening of Matin-ao Bridge & Widening of Approaches XII 3.848 184 C 0.351 0.115 0.300 - - - 76.60 81.82%
V. Satisfactory
AJYSC Marketing 26924 Impvt. of Highway Jct. Malandag-Allae FMR, Malungon ARC XII 18.364 192 C 0.330 0.300 0.300 - - - 93.00 80.16%
V. Satisfactory
AJYSC Marketing 26924 Matin-ao Bridge along Marbel-Tupi-Makar Road XII 7.513 175 C 0.316 0.200 0.300 - - - 81.60 *81.60%
V. Satisfactory
AJYSC Marketing 26924 Repair of Multi-Purpose Building at San Emmanuel XII 0.960 105 C 0.433 0.200 0.300 - - - 93.30 *93.30%
V. Satisfactory
AJYSC Marketing 26924Road Upgrading (Gravel to
concrete) along Surallah-Lake Sebu-Maitum Road
XII 16.034 289 C 0.476 0.200 0.300 - - - 97.60 90.14% V. Satisfactory
AJYSC Marketing 26924Widening/Conc. of Kalandagan Bridge I, along Dulawan-Marbel
RoadXII 11.332 277 C 0.352 0.200 0.300 - - - 85.20 84.90%
V. Satisfactory
Akela Builders 26444 Const./Rehab. of MPB @ Novaliches Proper NCR 1.335 90 C 0.386 0.291 0.300 - - - 97.70 *97.70%
Outstanding
AKH Construction and Trading Corporation 20759 Const. of MPB @ Brgy. 177 NCR 4.745 90 C 0.399 0.300 0.300 - - - 99.90 *99.90%
Outstanding
AKH Construction and Trading Corporation 20759
Construction of Multi-Purpose Building Phase I, T. Paez Elem.
SchoolNCR 9.645 60 C 0.389 0.013 0.300 - - - 70.20 *70.20%
Poor
AKH Construction and Trading Corporation 20759 Proposed Rehab./Repair of
Drainage System NCR 1.915 60 C 0.242 0.200 0.300 - - - 74.20 *74.20% Satisfactory
AKH Construction and Trading Corporation 20759 Rehab. of Taft Ave. NCR 1.915 60 C 0.316 0.300 0.300 - - - 91.60 *91.60%
Outstanding
AKH Construction and Trading Corporation 20759 Rehab./Reconst. of Damaged
Pavement of Legarda St. NCR 6.713 90 C 0.346 0.235 0.300 - - - 88.10 *88.10% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page20
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
AKN Construction Corp. (Formerly: AKN Const.) 11845 Concreting of Quirino Avenue,
Brgy. La Huerta San Isidro NCR 4.766 60 O 0.339 0.300 0.300 - - - 93.90 -
AKN Construction Corporation (Formerly: AKN Const.) 11845
Proposed Impvt. of Road inc. Drainage System along
Magallanes St., Brgy. TunasanNCR 19.089 162 C 0.341 0.184 0.300 - - - 82.50 83.88%
Satisfactory
Al Chris Construction 12406 Conc. of (LIR) Loay-Loboc-CarmenRoad (Loboc Section) VII 4.536 115 C 0.352 0.300 0.000 - - - 65.20 58.48%
Poor
Al Chris Construction 12406 Conc. of (LIR) Loay-Loboc-CarmenRoad (Loboc Section) VII 4.492 85 C 0.316 0.042 0.000 - - - 35.80 55.18%
Poor
Al Chris Construction 12406 Conc. of Maribojoc-Antequera Road VII 9.142 213 C 0.337 0.100 0.300 - - - 73.70 71.24%
Satisfactory
Al Chris Construction 12406 Const. of 1-Cl School Bldg., Ipo, Anda, Bohol VII 0.435 180 C 0.439 - 0.000 - - - 43.90 71.62%
Satisfactory
Al Chris Construction 12406 Const. of Two (2) CL Sch. Bldg. w/o Toilet, San Roque H/S VII 0.841 240 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V. Satisfactory
AL Chris Construction 12406 Tagbilaran Airport Development Project NIA 5.756 120 C 0.390 0.200 0.300 - - - 89.00 89.00%
Satisfactory
Al Fahdel Construction & Engineering 17953
Concreting of Iligan-Bukidnon Road Bonbonan Digkilaan &
Rogongon Sections,X 2.238 140 O 0.211 0.300 0.100 0.020 0.023 0.100 75.40 -
Al Hussein Construction 18438Cluster III-Const. of Various
Projects in Salvador Inasagan & Sudlon
X 4.242 60 C 0.297 0.300 0.300 - - - 89.70 81.44% V. Satisfactory
Al Hussein Construction 18438 Completion of Malaapo Bridge & Approaches X 5.380 150 C 0.325 0.300 0.300 - - - 92.50 82.12%
V. Satisfactory
Al Hussein Construction 18438 Const. of Cagascas Bridge and Approaches X 11.983 280 C 0.380 0.300 0.300 - - - 98.00 98.00%
Outstanding
Al Hussein Construction 18438 Const. of Kapatagan Drainage System along Iligan-Aurora Road X 3.682 60 C 0.285 0.200 0.300 - - - 78.50 79.28%
Satisfactory
Al Hussein Construction 18438 Rehab. of Linamon-Zamboanga Road, Baroy Section X 4.525 90 C 0.344 0.200 0.300 - - - 84.40 *84.40%
V. Satisfactory
Al Niño Construction Supply 18378 Construction of Diversion Work NIA 4.048 120 C 0.381 0.124 0.100 0.018 0.029 0.200 85.20 85.20% V.Satisfactory
Alajeño Construction and Supplies 28713 Const. of MPB (Municipal Bldg.)
Phase I IX 4.595 160 C 0.373 0.164 0.300 - - - 83.70 75.30% Satisfactory
Alajeño Construction and Supplies 28713 Const. of Sch. Bldg. @ Antonio
NHS IX 0.481 30 C 0.209 0.200 0.300 - - - 70.90 75.45% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page21
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Alajeño Construction and Supplies 28713 Const. of Spring Development IX 1.208 25 C 0.394 0.016 0.300 - - - 71.00 *71.00%
Satisfactory
Alberich Builders 27987 Repair/Impvt. of Masarawang-Mabatano-Pamasan Road V 0.956 30 C 0.316 0.200 0.300 - - - 81.60 *81.60%
V. Satisfactory
Alberto Uy Construction & Development 20924 Concreting of Cantil-Dayhagan
Road IV-B 0.947 69 C 0.436 0.133 0.300 - - - 86.90 *86.90% Satisfactory
Alberto Uy Construction & Development 20924 Const. of 1 CL @ Labasan NHS IV-B 0.437 120 C 0.348 0.143 0.300 - - - 79.10 79.31%
Satisfactory
Alberto Uy Construction & Development 20924 Const. of 1 CL Sch. Bldg. @
Carmundo NHS IV-B 0.470 120 C 0.376 0.300 0.300 - - - 97.60 *97.60% Outstanding
Alberto Uy Construction & Development 20924 Const. of Bongabong River Front
(Phase II) IV-B 4.707 80 C 0.266 0.300 0.300 - - - 86.60 *86.60% V. Satisfactory
Alberto Uy Construction & Development 20924 Const. of Drainage Canal IV-B 1.889 91 C 0.358 0.200 0.300 - - - 85.80 89.40%
V. Satisfactory
Alberto Uy Construction & Development 20924 Const. of Protection Dike at
Mapang IV-B 0.471 30 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
Albeva Konstrukt & Development Corporation 25480 Const. of NIA Central office
Covered Court NIA 6.660 258 O 0.274 0.300 0.100 0.030 0.038 0.100 84.20 -
Alcel Construction 15129 Construction of School Building at Cayucay NHS I 0.913 75 C 0.394 0.181 0.300 - - - 87.50 *87.50%
Satisfactory
Alcel Construction 15129 Asphalt Overlay along Pangasinan-Zambales Road I 9.497 20 C 0.215 0.300 0.300 - - - 81.50 76.76%
Satisfactory
Alcel Construction 15129 Completion of MPB, PSU Bamban I 0.474 60 C 0.292 0.200 0.300 - - - 79.20 *79.20% Satisfactory
Alcel Construction 15129 Conc. of FMR, Brgy. Licsi I 0.568 30 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory
Alcel Construction 15129 Const. of MPB, Phase VI I 0.812 70 C 0.269 0.300 0.300 - - - 86.90 *86.90% V. Satisfactory
Alcel Construction 15129 Impvt. of Pangasinan-Zambales Road I 27.954 255 C 0.266 0.300 0.300 - - - 86.60 *86.60%
V. Satisfactory
Alcel Construction and Supply 15129
Asphalt Overlay along Manila North Road Km. 299+100 to Km. 299+300 with exception and San
Fernando access road to Poro Pt. Km. 269+715-Km. 270+042
I 0.947 5 C 0.304 0.200 0.300 - - - 80.40 74.34% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page22
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Alcel Construction and Supply 15129 Const. of Multi-Purpose Building @ Poblacion I 0.948 60 C 0.386 0.200 0.300 - - - 88.60 87.62%
V. Satisfactory
Aldana Construction 21736 Const. of 1 Unit 3 CL School Building at SEPNAS I 1.135 80 C 0.357 0.300 0.300 - - - 95.70 84.50%
V. Satisfactory
Aldana Construction 21736 Const. of 4-Cl Sta. Ana Elementary School Building I 2.892 135 C 0.376 - 0.500 - - - 87.60 *87.60%
V. Satisfactory
Aldana Construction 21736 Construction Perimeter Fence Gate & Score Protection DOST 6.363 90 O 0.383 0.295 0.000 0.030 0.061 0.050 81.90 -
ALE Builders Construction and Development Corp. 5180 Const. of MPB at Brgy. 34 & 35 NCR 4.666 120 C 0.325 0.122 0.300 - - - 74.70 81.35%
V. Satisfactory
ALE Builders Construction and Development Corp. 5180
Proposed Repair/Rehab. of Epifanio Delo Santos Elem.
SchoolNCR 1.444 60 C 0.375 0.300 0.300 - - - 97.50 *97.50%
Outstanding
ALE Builders Construction and Development Corp. 5180 Repair/Rehab. Roads with
Drainage Impv't, Brgy. 34, Zone 3 NCR 5.254 90 C 0.342 0.200 0.300 - - - 84.20 *84.20% Satisfactory
Alebon Genuine Merchandising 26300Conc. of By-Pass Road & Lined Canal w/ spillway along By Pass
RoadX 4.089 90 C 0.170 0.300 0.000 - - - 47.00 67.16%
Fair
Ale-J Construction & Trading 26445 Const. of Multi-Purpose Bdlg. @ Veterans Memorial Medical Center NCR 3.819 120 C 0.362 0.200 0.300 - - - 86.20 *86.20%
Satisfactory
Alex V. Pamatong Trading & Construction 13290
Cagayan De Oro Convention Center Access Road Brgy.
IndahagX 7.434 420 C 0.274 0.284 0.300 - - - 85.80 67.46%
Fair
Al-Fahdel Construction & Engineering 17953
Conc. of Iligan-Bukidnon Road, Sta. Felomina-Bobonon-Digkilaan-
Rogongon, Lambaguhon Sect.X 9.027 210 C 0.356 0.300 0.300 - - - 95.60 *95.60%
Outstanding
Al-Fahdel Construction & Engineering 17953 Const. of 1 CL Sch. Bldg. at
Kulasihan Primary School X 0.417 45 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Al-Fahdel Construction & Engineering 17953 Const. of 1 CL Sch. Bldg. At
SADMIS X 0.944 111 C 0.408 0.133 0.300 - - - 84.10 *84.10% Satisfactory
Al-Fahdel Construction & Engineering 17953 Const. of Tugar Bridge X 4.678 295 C 0.314 0.300 0.300 - - - 91.40 83.39%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page23
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Al-Fahdel Construction & Engineering 17953 Rehab. of Linamon-Zamboanga
Road, Maigo Section X 13.492 261 C 0.413 0.133 0.300 - - - 84.60 84.60% Satisfactory
Alfalfa Construction 29712Conc./Widening of Banaue-
Mayoyao-Aguinaldo-A. Lista Bdry. Road (Ibayong-Guihob Section)
CAR 1.901 60 C 0.310 0.000 0.300 - - - 61.00 *61.00% Fair
Alfalfa Construction 29712 Nueva Vizcaya-Ifugao-Mt. ProvinceRoad CAR 7.590 200 O 0.335 0.240 0.100 0.010 0.020 0.067 77.20 -
Alfalfa Construction 29712 Repair/Rehab. of Poblacion-Boliwong Road CAR 0.378 44 C 0.397 0.071 0.300 - - - 76.80 *76.80%
Satisfactory
Alfalfa Construction 29712Restoration of Road along Banaue-
Mayoyao-Aguinaldo-A Lista-Isabela Bdry. Road
CAR 4.277 179 C 0.443 0.200 0.300 - - - 94.30 92.80% V.Satisfactory
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's
Construction & Const. Supply)17162
Completion of Binalbagan Bridge 2 - Km. 66+910 along Hinigaran-
Isabela RoadVI 45.049 809 O 0.316 0.300 0.150 0.030 0.040 0.033 86.90 -
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's
Construction & Const. Supply)17162 Completion of Isio Bridge VI 46.478 380 O 0.397 0.300 0.100 0.023 0.059 0.100 97.90 -
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's
Construction & Const. Supply)17162
Conc. of Road at Bacolod-Murcia-D.S. Benedicto-San Carlos Road,
D.S. Benedicto VI 11.986 175 C 0.329 0.300 0.300 - - - 92.90 *92.90%
Outstanding
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's
Construction & Const. Supply)17162 Concreting of Bacolod-Murcia-
D.S. Benedicto Road VI 4.644 123 C 0.300 0.289 0.300 - - - 88.90 66.34% Fair
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's
Construction & Const. Supply)17162 Const. of Libas-Panaquiao Bridge VI 25.628 450 C 0.311 0.300 0.300 - - - 91.10 90.47%
Outstanding
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's
Construction & Const. Supply)17162 Road Upgrading, Jct. Palencia-
Boy Scout, Campsite Road VI 64.700 553 O 0.319 0.300 0.100 0.015 0.032 0.067 83.30 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page24
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Alfie's Const. & Const. Supply, Inc. (Formerly: Alfie's
Construction & Const. Supply)17162 Road Upgrading, Jct. Palencia-
Boy Scout, Campsite Road VI 66.624 553 O 0.263 0.296 0.150 0.030 0.050 0.033 82.20 -
Alfie's Construction 17162 Const. and Improvement of Taloc Main Drainage NIA 5.289 408 C 0.350 0.161 0.300 - - - 81.05 81.05%
Unsatisfactory
Alfie's Construction 17162 Rehabilitation and Improvement of Sibud Main Drainage NIA 7.699 271 C 0.427 0.300 0.200 - - - 92.70 92.70%
Very Satisfactory
Alfrego Builders & Supply 19284 Conc. of Road at Alambre XI 0.933 90 C 0.342 0.300 0.300 - - - 94.20 85.74% V. Satisfactory
Alfrego Builders & Supply 19284 Conc. of Road at Mercedes XI 0.935 90 C 0.324 0.300 0.300 - - - 92.40 *92.40% Outstanding
Alfrego Builders & Supply 19284
Conc. of Road from Davao-AgusanNational Road Jct. passing through Iliong up to Purok
Communal
XI 1.882 90 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
Algamon Construction 30704 Const. of Sch. Bldg., Cantilan East Elem. Sch. XIII 1.848 90 C 0.382 0.200 0.300 - - - 88.20 *88.20%
V. Satisfactory
Algamon Construction 30704Const./Widening/Graveling of Roads from Brgy. R. Ecleo to
Brgy. Del PilarXIII 1.927 209 O 0.364 0.239 0.137 0.030 0.037 0.033 84.00 -
Algimar Construction 15232 Conc. of Lubi-Binoog Road IV-B 9.398 100 C 0.334 0.200 0.300 - - - 83.40 *83.40% V. Satisfactory
Algimar Construction 15232 Concreting of Moyot Street V 4.624 95 C 0.362 - 0.500 - - - 86.20 78.28% Satisfactory
Algimar Construction 15232 Const. of 1-Unit Classroom Modified School Building V 0.367 162 O 0.325 0.300 0.100 0.030 0.022 0.100 87.70 -
Algimar Construction 15232 Const. of Bridge Approaches @ Maingaran Bridge V 9.495 87 O 0.337 0.235 0.000 0.030 0.056 0.033 69.10 -
Algimar Construction 15232 Const. of Jct. Ban-ao-Tubod V 9.597 45 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory
Algimar Construction 15232Const. of Lined Canal with Cover
from Quezon St. infornt of MNCHS, JZES and Jollibee Store
V 3.798 180 C 0.297 0.200 0.300 - - - 79.70 78.50% Satisfactory
Algimar Construction 15232 Const. of MPB at DECS Compound V 1.918 90 C 0.373 0.200 0.300 - - - 87.30 *86.08%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page25
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Algimar Construction 15232 Const. of Multi-Purpose Building (Phase II) V 4.626 120 O 0.334 0.300 0.100 0.030 0.035 0.100 89.90 -
Algimar Construction 15232 Const. of Multi-Purpose Building @ DECS Compound V 4.790 120 O 0.396 0.225 0.100 0.030 0.041 0.100 89.20 -
Algimar Construction 15232 Const. of Sta. Cruz NHS V 0.441 120 C 0.359 0.200 0.300 - - - 85.90 *85.90% V. Satisfactory
Algimar Construction 15232 Const.of Multi-Purpose Building (Balai Alumni) V 0.480 120 C 0.480 0.133 0.300 - - - 91.30 *91.30%
V. Satisfactory
Algimar Construction 15232 Gravelling of San Fernando South Road V 1.841 30 C 0.220 0.200 0.300 - - - 72.00 *72.00%
Satisfactory
Algimar Construction 15232 Rehab. of Sitio Calumpang-Malinta Road V 0.955 60 C 0.363 0.300 0.300 - - - 96.30 *96.30%
Outstanding
Algimar Construction 15232 Rehabilitation of San Fernando North Road V 1.859 45 C 0.442 - 0.500 - - - 94.20 *94.20%
Outstanding
Algimar Construction 15232 Repair of Calapi Bridge V 1.898 45 C 0.381 0.100 0.300 - - - 78.10 79.84% Satisfactory
Algimar Construction 15232 Repair/Rehab. of Masbate-Cataingan-Placer Road V 9.598 90 C 0.466 0.133 0.300 - - - 89.90 *89.90%
V. Satisfactory
Algon Engineering Construction Corporation 270 Asphalt Overlay of Davao-
Cotabato By Pass Road XI 12.771 150 C 0.339 0.200 0.300 - - - 83.90 *83.90% V. Satisfactory
Algon Engineering Construction Corporation 270
Bridge Component of CP 6, Mindanao Bridges, Rawa-an and
Sagadan BridgesADB 37.809 1,078 O 0.365 0.300 0.000 0.030 0.045 0.050 79.00 -
Algon Engineering Construction Corporation 270
Const. of Hulid Bridge & Approaches along-Cateel-
Compostela Secondary Nat'l Rd.XI 11.798 301 O 0.320 0.256 0.100 0.030 0.048 0.100 85.40 -
Algon Engineering Construction Corporation 270 Construction of overhead water
tank with cistern DOST 3.153 124 O 0.373 0.291 0.120 0.030 0.070 0.050 93.40 -
Algon Engineering Construction Corporation 270
CP 5: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road
(Manay-Boston) Caraga-Baganga Section
XI 172.481 537 O 0.380 0.239 0.100 0.030 0.055 0.100 90.40 -
Algon Engineering Construction Corporation 270 Impv't./Conc. of La Fortuna Tagum
Terminal-Capitol, Canocotan Road XI 34.314 226 C 0.303 0.300 0.300 - - - 90.30 88.56% V. Satisfactory
Algon Engineering Construction Corporation 270 Repair and Rehab. of Toril-
Bayabas-Eden Road XI 4.816 90 C 0.366 0.300 0.300 - - - 96.60 94.26% Outstanding
Allen Construction 12584 Conc. of Agbanawag-Cabucbucan Road III 1.885 40 C 0.290 0.300 0.300 - - - 89.00 *89.00%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page26
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Allen Construction 12584 Conc. of Estrella-Cabubucan Road III 1.885 40 C 0.371 0.200 0.300 - - - 87.10 *87.10 V. Satisfactory
Allen Construction 12584 Const. of 2 CL, Guimba National High Sch. III 0.751 60 C 0.352 0.300 0.300 - - - 95.20 *95.20%
Outstanding
Allen Construction 12584 Const. of School Building @ CLSU (Mini Amphi-Theatre) III 0.937 45 O 0.385 0.212 0.100 0.015 0.032 0.100 84.40 -
Allen Construction 12584 Construction of MPB, Baloc Nat'l Trade School III 1.892 45 C 0.479 0.178 0.300 - - - 95.70 *95.70%
V. Satisfactory
Allencon Development Corporation 12302 Asphalt Overlay of Janiuay-
Lambunao Nat'l. Road VI 1.918 60 C 0.421 - 0.500 - - - 92.10 92.10% Outstanding
Allencon Development Corporation 12302
Asphalt Pavement along Guimaras Circumferential Road, Brgy. East
Valencia-Brgy. LebasVI 4.604 120 C 0.310 0.100 0.300 - - - 71.00 *71.00%
Satisfactory
Allencon Development Corporation 12302
Asphalt Pavement along Guimaras Circumferential Road, Brgy. M.
Chavez Sect., San Lorenzo Sect.VI 4.604 120 C 0.353 0.300 0.300 - - - 95.30 *95.30%
Outstanding
Allencon Development Corporation 12302 Asphalting of Magamay-
Napandong Road VI 2.825 75 C 0.249 0.300 0.300 - - - 84.90 *84.90% V. Satisfactory
Allencon Development Corporation 12302 Asphalting of Priority Road
Section, San Antonio-Calaya Road VI 3.547 60 C 0.318 0.300 0.300 - - - 91.80 *91.80% Outstanding
Alleyway Construction 15310 Conc. With Drainage Impvt. Along F. Cayco St. & vicinity NCR 5.646 120 C 0.265 0.200 0.300 - - - 76.50 79.02%
Satisfactory
Alleyway Construction 15310 Cons. of Multi-Purpose Building, Brgy. 204, Zone 18 NCR 3.839 60 C 0.338 0.200 0.300 - - - 83.80 *83.80%
Satisfactory
Alleyway Construction 15310 Const. of MPB @ So. Cabading IV-A 1.437 60 C 0.346 0.213 0.300 - - - 85.90 *85.90% V. Satisfactory
Alleyway Construction 15310 Const. of School Building in Tondo, Manila, Centex E/S NCR 1.859 120 C 0.272 0.300 0.300 - - - 87.20 89.72%
V. Satisfactory
Alleyway Construction 15310 Rehab./Impvt. of Antipolo Circumferential Road "A" IV-A 9.994 415 C 0.313 0.300 0.300 - - - 91.30 *91.30%
Outstanding
Allied Trade Resources 31667 Construction of Site Dev't. Projects DOST 3.178 120 O 0.374 0.300 0.150 0.030 0.070 0.050 97.40 -
Allied Trade Resources Multi Purpose Cooperative 31667
Const./Impv't of 2-CL School Building @ Malitbog E/S, Brgy.
New MalitbogXI 2.352 60 C 0.481 0.133 0.300 - - - 91.40 *91.40%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page27
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Allied Trade Resources Multi Purpose Cooperative 31667 Rehab./Impvt. of MPB @ Brgy.
Ising XI 2.356 90 C 0.301 0.233 0.300 - - - 83.40 87.53% V. Satisfactory
Almakar Builders & Metal Works 21929 Completion of 2 CL Sch. Bldg. at Gahak Marulas E/S IV-A 0.669 75 C 0.344 0.300 - - - - 64.40 *64.40%
Fair
Almakar Builders & Metal Works 21929Const. of 2 Storey 4 Classroom School Bldg., @ Jimenez E/S
Wawa IIV-A 2.891 123 C 0.166 0.229 0.300 - - - 69.50 *69.50%
Fair
Almakar Builders & Metal Works 21929 Const. of Concrete Pathway IV-A 0.258 45 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory
Alnino Construction & Supply 18378Const. of Access Road to RORO
Terminal, Guiron-San Antonio Section
V 4.750 90 C 0.201 0.200 0.300 - - - 70.10 *70.10% Satisfactory
Alnino Construction & Supply 18378 Const. of Buenavista Seawall V 4.751 90 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory
Alnino Construction & Supply 18378 Const. of Multi-Purpose Building V 0.960 40 C 0.296 0.200 0.300 - - - 79.60 *79.60% Satisfactory
Alnino Construction & Supply 18378 Const. of River Bank Protection at Brgy. Macawayan V 2.400 45 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
Alnino Construction & Supply 18378 Repair of FMR at Brgy. Cabiguhan V 0.960 65 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory
Alnino Construction & Supply 18378 Repair of Gabaldon Bldg. @ San Roque E/S V 0.190 20 C 0.381 0.200 0.300 - - - 88.10 *88.10%
V. Satisfactory
Alnino Construction & Supply 18378 Repair of Patag FMR V 2.400 40 C 0.291 0.186 0.300 - - - 77.70 *77.70% Satisfactory
Alnor Construction & Const. Supplies 26705 Completion of MPB at Brgy.
Cagdianao XIII 0.463 45 C 0.301 0.200 0.300 - - - 80.10 *80.10% V. Satisfactory
Alnor Construction & Const. Supplies 26705 Completion of PNP Bldg. XIII 1.853 82 C 0.367 0.200 0.300 - - - 86.70 75.25%
Satisfactory
Alnor Construction & Const. Supplies 26705 Const. of 2 Cl Magpayang NHS XIII 0.801 60 C 0.235 0.194 0.300 - - - 72.90 83.19%
V. Satisfactory
Alnor Construction & Const. Supplies 26705
Conc. of Kinalablaban Bridge Approaches and Road, Surigao-
Davao Coastal RoadXIII 7.643 180 C 0.236 0.300 0.300 - - - 83.60 *83.60%
V. Satisfactory
Alnor Construction & Const. Supplies 26705 Const. of MPB @ Brgy. Binocaran XIII 0.926 60 C 0.377 0.200 0.300 - - - 87.70 87.67%
V. Satisfactory
Alnor Construction & Const. Supplies 26705 Const. of School Building XIII 0.458 45 O 0.350 0.250 0.030 0.022 0.027 0.100 77.90 -
Alnor Construction & Const. Supplies 26705 Const./Widening of Dinagat-Loreto
Road (Tag-abaca Sect.) XIII 14.390 195 C 0.375 0.300 0.000 - - - 67.50 61.74% Fair
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page28
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Alpha Ryder Construction & Supplies 12197 Concreting of Salvacion-Carjela
Road V 0.569 120 C 0.299 - 0.500 - - - 79.90 *79.90% Satisfactory
Alpha Ryder Construction and Supplies 12197 Conc. of Jamislagan-Buhatan
Road V 4.682 60 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory
Alpha Ryder Construction and Supplies 12197
Conc. of Legazpi Manito-Punta De Jesus Road, Malabago-Tinapian
SectionV 32.545 210 C 0.464 0.133 0.300 - - - 89.70 *89.70%
V. Satisfactory
Alpha Ryder Construction and Supplies 12197 Const. of Dancalan Bridge &
Approaches V 11.709 200 C 0.361 0.200 0.300 - - - 86.10 85.08% V. Satisfactory
Alpha Tech Builders 26072 Asphalt Overlay of Gutlang-Alumbijud Road VII 0.915 10 C 0.376 0.300 0.300 - - - 97.60 *97.60%
Outstanding
Alpha Tech Builders 26072 Asphalt Overlay of Tabayag-Lapay Road VII 0.915 10 C 0.366 0.300 0.300 - - - 96.60 *96.60%
Outstanding
Alpha Tech Builders 26072 Conc. of Taloot RORO Road VII 4.628 70 C 0.364 0.300 0.300 - - - 96.40 *96.40% Outstanding
Alpha Tech Builders 26072 Const. of Philippine Science High School Dormitory Ph 1 VII 4.625 90 C 0.310 0.300 0.300 - - - 91.00 84.56%
V. Satisfactory
Alphin Trading & Construction 26260 Conc. of FMR (Sonquil Section) I 0.289 60 C 0.335 0.200 0.300 - - - 83.50 *83.50% V. Satisfactory
Alphin Trading & Construction 26260Conc./Impvt. of Sta. Barbara-Malasiqui-Bayambang Road,
Sapanga SectionI 4.694 120 C 0.298 0.300 0.300 - - - 89.80 *89.80%
V. Satisfactory
Alphin Trading & Construction 26260 Const. of Ventinilla MPB I 1.034 60 C 0.357 0.300 0.300 - - - 95.70 *95.70% Outstanding
Alphin Trading & Construction 26260 Construction of 1 Classroom, Payas NHS I 0.482 150 C 0.456 0.154 0.300 - - - 91.00 *91.00%
V. Satisfactory
Alphin Trading & Construction 26260 Rehab. of Barangobong Bridge II I 1.068 60 C 0.295 0.300 0.300 - - - 89.50 86.02% V. Satisfactory
Alphin Trading & Construction 26260 Repair/Impvt. of San Carlos-Calasiao Road I 2.891 75 C 0.314 0.300 0.300 - - - 91.40 *91.40%
Outstanding
Alphin Trading and Construction 26260 Const. of 1-Unit 1Cl Bldg. @ Nagsaling E/S I 0.385 75 C 0.385 0.200 0.300 - - - 88.50 *88.50%
V. Satisfactory
Alphin Trading and Construction 26260 Const. of Multi-Purpose Bldg. @ Tuliao E/S I 0.963 60 C 0.388 0.300 0.300 - - - 98.80 96.42%
Outstanding
Alraf Construction & Enterprises 17297
Completion (Impvt./Conc. Paving) of Licomo-Quiniput Road,
Segment II Manguso-Mulawin Section
IX 36.137 290 C 0.365 0.200 0.300 - - - 86.50 88.27% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page29
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Alraf Construction & Enterprises 17297Impvt./Conc. of Isabela-Maluso National Road, Bañas-Garlayan
SectionIX 7.605 131 C 0.219 0.300 0.300 - - - 81.90 80.61%
V. Satisfactory
Alraf Construction & Enterprises 17297 Impvt./Widening of Sangali Nat'l Road IX 6.592 100 C 0.243 0.300 0.300 - - - 84.30 *84.30%
V. Satisfactory
Alraf Construction & Enterprises 17297Rehab./Const./Impv't of
Zamboanga City-Pagadian City Road
IX 44.695 253 O 0.387 0.240 0.150 0.030 0.050 0.050 90.70 -
Alraf Construction & Enterprises 17297 Rehabilitation of Brgy. Mercedes Road (Phase II) IX 4.651 60 C 0.426 0.200 0.300 - - - 92.60 *92.60%
V. Satisfactory
Alro Construction & Development Corp. 18361 Conc. of Bulusan Lake Road with
Drainage & Slope Protection V 9.504 75 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory
Alro Construction & Development Corp. 18361 Const. of Polangui-Iriga Bridge V 13.202 200 C 0.400 0.200 0.300 - - - 90.00 87.90%
V. Satisfactory
Alro Construction & Development Corp. 18361 Rehabilitation of Barangay Coguit-
San Isidro Brgy. Road V 3.706 110 C 0.406 - 0.500 - - - 90.60 *90.60% Outstanding
Alro Construction & Development Corp. 18361 Road Opening/Improvement of
Cabanbanan-Pulang Daga Road V 19.106 90 C 0.452 - 0.500 - - - 95.20 *95.20% V. Satisfactory
Alro Construction & Development Corp. 18361 Road Opening/Improvement of
Montinegro Cabanbanan Road V 19.108 90 C 0.458 - 0.500 - - - 95.80 *95.80% V. Satisfactory
Al's Enterprise and Construction 9721Const. of All Weather FMR along
Cabay-Caisawan Road (Sta.3+000-Sta.1+600)
VIII 4.512 189 C 0.220 - 0.500 - - - 72.00 *72.00% Satisfactory
Al's Enterprise and Construction 9721 Const. of MPB @ Brgy. Sabang South VIII 1.431 120 C 0.276 0.300 0.300 - - - 87.60 *87.60%
V. Satisfactory
Al's Enterprise and Construction 9721 Const./Rehab. of Hospital (Felipe Abrigo Memorial Hospital) VIII 4.775 120 O 0.354 0.240 0.000 0.022 0.019 0.067 70.20 -
Al's Enterprise and Construction 9721 Const./Rehab. of Hospital (Felipe Abrigo Memorial Hospital) VIII 4.775 151 O 0.349 0.240 0.000 0.010 0.000 0.000 59.90 -
Al's Enterprise and Construction 9721Rehab./Impvt. of Asphalt Pav't.
along San Julian-Borongan Road Section
VIII 9.530 90 C 0.233 0.200 0.300 - - - 73.30 *73.30% Satisfactory
Alt Construction 32365 Const. of Access Road to RORO Terminal, Sta. Fe-Guiron Section V 4.754 90 C 0.251 0.200 0.300 - - - 75.10 *75.10%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page30
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Alt Construction 32365 Const. of Sorsogon State College Flood Control/Drainage System V 4.800 45 C 0.375 0.177 0.300 - - - 85.20 *85.20%
V. Satisfactory
Alt Construction 32365Rehab. of Malusak Bridge &
Approaches along Talaba-Summit-Panaon National Road
IVA 1.726 60 C 0.294 0.231 0.300 - - - 82.50 *82.50% V. Satisfactory
Alzam Enterprises 19113Conc. of Additional 2 Lanes along Quimpo Boulevard ABS-CBN to
EcolandXI 7.001 210 C 0.320 0.300 0.300 - - - 92.00 *92.00%
Outstanding
Alzam Enterprises 19113Const. of River Dike along Talomo
River from Purok 9 going downstream
XI 4.704 180 O 0.390 0.160 0.100 0.020 0.043 0.200 91.30 -
Alzam Enterprises 19113
Demolition/Reconst. of Approaches & Dranaige incl.
Bridge Protection Works, Reconst. of Gov. Generoso (Bankerohan)
Br.
XI 30.557 180 C 0.358 0.300 0.300 - - - 95.80 89.95% V. Satisfactory
Alzam Enterprises 19113 Impv't/Conc. of Biao Guianga-Biao Escuela Road XI 4.799 210 C 0.339 0.300 0.300 - - - 93.90 91.86%
Outstanding
Alzam Enterprises 19113 Rehab. of Bayabas-Eden Road XI 19.280 210 C 0.365 0.200 0.300 - - - 86.50 85.66% Satisfactory
Alzam Enterprises 19113 Road Impvt./Conc. of Additional Two Lanes along Maa Rd. Section XI 18.870 210 C 0.329 0.300 0.300 - - - 92.90 87.14%
V. Satisfactory
Alzam Enterprises 19113 Widening of Agusan-Davao Road, Tibungco Section XI 28.925 210 C 0.439 0.200 0.300 - - - 93.90 93.42%
V. Satisfactory
Alzam Enterprises 19113 Widening/ Impvt. of Davao-Agusan Road, Ilang Tibungco Section XI 9.420 210 C 0.347 0.300 0.300 - - - 94.70 94.64%
Outstanding
Alzen Engineering & Construction Supplies 13911
Conc. of Kidapawan-Calunasan-M'lang National Road inc. ROW
Acquisition (Magsaysay-Kalaisan Section)
XII 7.314 90 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
Alzen Engineering & Construction Supplies 13911 Conc. of Kidapawan-Ilomavis
Tourist Road (Mua-an Section) XII 5.760 55 C 0.301 0.288 0.300 - - - 88.90 88.48% V. Satisfactory
Alzen Engineering & Construction Supplies 13911
Conc. of Kidapawan-Magpet-Pangao-An Road (Sumawan-
Gubatan Section)XII 11.338 143 C 0.270 0.287 0.300 - - - 85.70 85.58%
V. Satisfactory
Alzen Engineering & Construction Supplies 13911 Const. of Drainage Canal along
Cotabato-Davao Road Old XII 2.412 96 C 0.375 - 0.500 - - - 87.50 82.22% V. Satisfactory
Alzen Engineering & Construction Supplies 13911 Const./Impvt. of Binoongan-
Napaliko-Katipunan Road XII 24.050 135 C 0.322 0.300 0.300 - - - 92.20 92.98% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page31
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
AMA Construction 10015 Const. of MPB, Brgy. Victoria XIII 0.737 60 C 0.331 0.200 0.300 - - - 83.10 *83.10% V. Satisfactory
Ameg Construction & Supply 21556 Conc. of Gogon-Tiris Road V 0.944 90 C 0.307 0.200 0.300 - - - 80.70 *80.70% V. Satisfactory
Ameg Construction & Supply 21556 Construction of 1-Cl School Bldg. Panlayaan V 0.575 90 O 0.256 0.300 0.150 0.030 0.060 0.050 84.60 -
Ameg Construction & Supply 21556 Repair/Impvt. of DPWH Bldg. V 1.910 90 C 0.399 0.200 0.300 - - - 89.90 *89.90% V. Satisfactory
AMJC Construction 21002 Const. of 3-CL School Building @ Ilocos Norte NHS I 1.044 90 C 0.367 0.100 0.000 - - - 46.70 66.51%
Fair
Amopia Construction and Supplies 27511 Conc. of Davao-Cotabato Road,
KPES-UCCP Section both sides XII 9.398 120 C 0.291 0.100 0.000 - - - 39.10 57.76% Poor
Amopia Construction and Supplies 27511 Conc. of FMR at Purok 4 XII 0.457 30 C 0.392 0.200 0.300 - - - 89.20 *89.20%
V. Satisfactory
Amopia Construction and Supplies 27511 Conc. of Kidapawan-Ilomavis
Tourist Road XII 8.079 90 O 0.337 0.240 0.000 0.030 0.035 0.067 70.90 -
Angel & Sam Construction 19968 Const. of PSHS CVC ACA Bldg I and Dorm Bldg I Phase I DOST 5.544 570 C 0.347 0.289 0 - - - 76.34 76.34%
Satisfactory
Angel & Sam Construction & General Merchandise 19968
Cluster I-Const. of Various School Buildings @ Cagayan de Oro City
NHSX 2.673 120 C 0.370 0.300 0.000 - - - 67.00 79.74%
Satisfactory
Angel & Sam Construction & General Merchandise 19968
Conc. of Cadre Rd. Camp Evangelista Main Road going to
Hospital SectionX 9.548 180 C 0.305 0.200 0.300 - - - 80.50 87.04%
V. Satisfactory
Angel & Sam Construction & General Merchandise 19968 Const. of 2 CL Sch. Bldg.,
Kibungsod NHS X 1.188 120 O 0.325 0.240 0.150 0.030 0.047 0.050 84.20 -
Angel & Sam Construction & General Merchandise 19968 Const. of 4 Cl School Bldg. @
Kauswagan E/S X 1.682 90 C 0.362 0.200 0.300 - - - 86.20 86.37% V. Satisfactory
Angel & Sam Construction & General Merchandise 19968 Const. of School Bldg. @
Minadanao Polytechnic College X 0.929 75 C 0.362 0.200 0.300 - - - 86.20 64.57% Fair
Angel & Sam Construction & General Merchandise 19968 Provision of Concrete Line Canal X 0.768 60 C 0.333 - 0.500 - - - 83.30 86.69%
V. Satisfactory
Angel & Sam Construction & General Merchandise 19968 Rehab. of ICBR Puerto-Cugman
Section X 13.912 198 O 0.298 0.240 0.144 0.030 0.040 0.050 80.20 -
Anilos Trading & Construction 31557 Const. of 1 CL Tagumpay NHS IV-B 0.568 120 O 0.280 0.240 0.070 0.030 0.043 0.100 76.30 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page32
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Anilos Trading & Construction 31557 Const. of 3 units 3 CL Sch. Bldg. w/ CR, Palawan Natl. H/S IV-B 1.293 90 C 0.385 0.200 0.300 - - - 88.50 *88.50%
V. Satisfactory
Anilos Trading & Construction 31557 Const. of MPB (H.E.) in ASMES Brgy. 1 IV-B 0.651 80 C 0.396 0.200 0.300 - - - 89.60 *89.60%
V. Satisfactory
Anilos Trading & Construction 31557 Const. of MPB (Phase II) Brgy. Inagawan IV-B 0.934 90 C 0.315 0.161 0.300 - - - 77.60 *77.60%
Satisfactory
Anilos Trading & Construction 31557 Const. of MPB @ Poblacion IV-B 1.919 110 C 0.330 0.300 0.300 - - - 93.00 *93.00% Outstanding
Anilos Trading & Construction 31557 Const. of Puerto Princesa Pilot E/S IV-B 1.540 90 C 0.393 0.200 0.300 - - - 89.30 82.93%
V. Satisfactory
Anilos Trading & Construction 31557 Const./Impvt. of Multi-Purpose Buidling, Phase 1, 2-CL IV-B 1.897 90 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
Anilos Trading and Construction 31557 Const. of 1 CL Tagumpay NHS IV-B 0.568 180 C 0.493 0.200 0.300 - - - 99.30 83.20% Satisfactory
Anilos Trading and Construction 31557 Const. of Multi-Purpose Building, Phase II, Brgy. Bagong Sikat IV-B 0.549 90 C 0.473 0.127 0.300 - - - 90.00 *90.00%
V.Satisfactory
Anilos Trading and Construction 31557 Const.of MPB 1st Engineering District, Poblacion Roxas IV-B 0.947 100 C 0.482 0.105 0.300 - - - 88.70 *88.70%
Satisfactory
Anilos Trading and Construction 31557 Construction of Farm to Market Road IV-B 1.378 104 C 0.442 0.110 0.300 - - - 85.20 *85.20%
Satisfactory
Annasor Construction & Trading 30825 Const. of MPB III 1.909 60 C 0.391 0.300 0.000 - - - 69.10 58.18% Poor
Annasor Construction & Trading 30825 Impvt./Rehab. of Porac District Hospital III 1.898 160 C 0.220 0.249 0.300 - - - 76.90 *76.90%
Satisfactory
Anrol Construction 10136 Const. of Storey 2 CL School Building @ Dulong Bayan E/S IV-A 6.014 150 O 0.361 0.227 0.100 0.030 0.011 0.100 82.90 -
Anrol Construction 10136 Rehab. of San Mateo-Rodriguez Road IV-A 9.587 45 C 0.265 0.284 0.300 - - - 84.90 *84.90%
V. Satisfactory
Antonio V. Nidea Construction 6382 Conc. of Camalig-Inarado-Gapo-Peñaranda Road V 9.430 200 C 0.323 0.221 0.300 - - - 84.40 80.86%
V. Satisfactory
Antonio V. Nidea Construction 6382 Opening/Const. of Banao-Calpi Road V 19.176 120 C 0.397 0.294 0.300 - - - 99.10 *99.10%
Outstanding
Antonio V. Nidea Construction 6382 Repair/Rehab. of Sala-Cagbulacao Road V 4.675 120 C 0.332 0.300 0.300 - - - 93.20 87.44%
V. Satisfactory
Antonio V. Nidea Construction 6382 Repair/Restoration of Awang River Control, Awang River V 9.499 378 C 0.371 0.200 0.300 - - - 87.10 *87.10%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page33
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Antonio V. Nidea Construction 6382 Road Opening of Hinipaan-Sabang Road V 14.358 120 C 0.386 0.282 0.300 - - - 96.80 75.02%
Satisfactory
AOG Construction 29758 Conc. of Basak-Rizal-Matinao Rizal FMR VIII 9.437 260 C 0.303 0.200 0.300 - - - 80.30 83.30%
V. Satisfactory
AOG Construction 29758 Conc. Paving of Dongon-Laboon Road VIII 14.176 420 C 0.244 0.300 0.300 - - - 84.40 *84.40%
V. Satisfactory
AOG Construction 29758 Const. of Amambahag Bridge VIII 7.596 135 C 0.363 0.300 0.300 - - - 96.30 78.06% Satisfactory
AOG Construction 29758 Const. of Basak II UK Bridge VIII 3.342 120 C 0.385 0.200 0.300 - - - 88.50 82.08% V. Satisfactory
AOG Construction 29758 Const./Impvt. of Rizal-Matin-ao FMR (Basak-Matin-ao Phase IV) VIII 11.276 360 C 0.296 0.200 0.300 - - - 79.60 82.60%
V. Satisfactory
AOG Construction 29758
Rehabilitation of National Arterial Secondary & Local Roads Brgy. Maasin-Macrohon-Sogod, Daang Maharlika Road with Exception
VIII 19.088 270 O 0.369 0.231 0.150 0.015 0.027 0.033 82.50 -
AP Mercado Trading and Construction 25269 Rehabilitation of Lateral D (Sta.
0+000-4+666) NIA-I 7.483 150 C 0.250 0.300 0.300 - - - 85.00 85.09% V.Satisfactory
AP Mercado Trading and Construction 25269 Road Surfacing along Lat D (Sta.
12+957-17+068) NIA-I 1.502 30 C 0.240 0.300 0.300 - - - 84.00 84.00% V.Satisfactory
APB Construction 17055 Completion of MPB CAR 1.908 50 O 0.398 0.300 0.100 0.023 0.032 0.100 95.30 -
APD Construction 17467 Addalam River Irrigation Project NIA 7.466 180 O 0.3369 0.1871 0.03 0.03 0.0408 0.2 82.48 -
APD Construction 17467Conc. of Cordon-Aurora Bdry. National Road (Maddela Jct.-
Dumabato Sect.)II 4.774 107 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
APD Construction 17467Conc. of Ilagan-Delfin-Albano-Mallig National Road, Olango
SectionII 7.719 150 C 0.363 0.300 0.300 - - - 96.30 *96.30%
Outstanding
APD Construction 17467Conc. of Ilagan-Delfin-Albano-
Mallig National Road, Villa Cacho Section
II 11.868 240 C 0.335 0.300 0.300 - - - 93.50 89.78% V. Satisfactory
APD Construction 17467 Conc. of Naguilian-San Marcelino Road (Alibadbad Section) II 9.648 90 C 0.376 0.202 0.300 - - - 87.80 *87.80%
V. Satisfactory
APD Construction 17467 Conc. of Villa Sur Brgy. Road II 2.720 90 C 0.310 0.300 0.300 - - - 91.00 *91.00% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page34
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
APD Construction 17467Concrete Reblocking along
Cabatuan-Enrile Road (MBC) Km. 406+00-Km. 407+500
II 1.566 180 C 0.284 0.300 0.300 - - - 88.40 85.10% V. Satisfactory
APD Construction 17467 Const. of MPB at San Mateo (Phase VI) II 1.891 80 C 0.392 0.208 0.300 - - - 90.00 *90.00%
V. Satisfactory
APD Construction 17467 Const. of Pigalo Bridge (Phase II) II 2.820 195 C 0.362 0.200 0.300 - - - 86.20 86.95% V. Satisfactory
APD Construction 17467Const./Impvt. (Reblocking) along
Santiago City-Baluarte Isabela/Quirino Bdry.
II 6.531 110 C 0.335 0.300 0.300 - - - 93.50 93.86% Outstanding
APD Construction 17467
Const./Impvt./Rehab. of Cordon-Diffun-Maddela-Aurora (CDMA)
Road & ist related Roads & Bridges (Cab-Diffun Section)
Cualo Blvd Road
II 0.959 100 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory
APD Construction 17467 Construction of Canal and Canal Structures (LMC-ARIP-04-06) NIA-II 5.490 210 C 0.400 0.300 0.000 - - - 70.00 *70.00%
Fair
APD Construction 17467Construction of Canal and Canal
Structures (LMC-ARIP-06-06)
NIA-II 2.529 180 C 0.400 0.300 0.000 - - - 70.00 70.00% Fair
APD Construction 17467
Impvt. of Cordon-Diffun-Maddela-Aurora (CDMA) Bdry. Road & its related Roads & Bridges (Rehab.
Of Ramos Bridge Phase II)
II 2.604 110 C 0.371 0.243 0.300 - - - 91.40 *91.40% Outstanding
APD Construction 17467Impvt./Conc. of Cordon-Aurora
Bdry. Road (Maddela Jct.-Dumabato Section)
II 13.274 200 C 0.366 0.262 0.300 - - - 92.80 *92.80% Outstanding
APD Construction 17467 Impv't/Rehab of Ricarte Norte-Ifugao Villa Road, Ganano ARC II 9.646 180 C 0.454 0.200 0.300 - - - 95.40 *95.40%
V.Satisfactory
APD Construction 17467 Repair/Impvt./Reblocking along Jct. Mangandingay-Saguday Rd. II 9.576 180 C 0.360 0.300 0.300 - - - 96.00 *96.00%
Outstanding
APO General Construction 7010 Completion of School Bldg., Happy Hollow E/S CAR 0.638 45 O 0.307 0.262 0.300 - - - 86.90 -
Aqualine Construction 11555 Allen CIS (Irrigation) NIA 2.547 120 C 0.353 0.176 0.300 - - - 82.90 *82.90% V.Satisfactory
Aqualine Construction 11555 Const. of Limopoca CIP NIA-VII 3.232 150 C 0.321 0.300 0.300 - - - 92.10 92.10%
Aqualine Construction 11555 Rehab. of Tamalarong-Libertad FMR, Sta. 0+000 - Sta. 1+500 IV-B 2.690 90 O 0.362 0.229 0.150 0.030 0.025 0.033 82.90 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page35
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Aquino-Dela Cruz Eng'g & Construction 16751 Rehabilitation of Farm-to-Market
Road I 1.250 25 C 0.371 0.200 0.300 - - - 87.10 *87.10%Satisfactory
Aquino-Dela Cruz Engineering & Construction 16751
Conc./Impvt. of San Carlos-Calasiao Road (Bolingit-Cruz
Section)I 9.162 135 C 0.285 0.300 0.300 - - - 88.50 *88.50%
V. Satisfactory
Aquino-Dela Cruz Engineering & Construction 16751 Const. of 1 Cl Sch. Bldg. @ Matic-
Matic E/S I 0.386 29 C 0.384 0.300 0.300 - - - 98.40 *98.40% Outstanding
AR Adlawan Construction 13108Asphalting along Cebu Toledo
Wharf Road, Km.28+180-Km.28+460
VII 1.067 10 C 0.285 0.300 0.300 - - - 88.50 *88.50% V. Satisfactory
AR Adlawan Construction 13108 Conc. of Cebu-Toledo Wharf Road VII 34.318 210 C 0.322 0.300 0.300 - - - 92.20 85.14% V. Satisfactory
AR Adlawan Construction 13108
Conc. of Sibonga-Dumanjug Road, Starting at Boundary of Cebu 2nd
DEO and Cebu 4th DEO Km. 65+968 Km. 64+988
VII 18.390 90 O 0.358 0.195 0.000 0.022 0.016 0.033 62.40 -
AR Adlawan Construction 13108 Concreting of Sibonga-Dumanjug Road VII 28.915 210 O 0.294 0.230 0.150 0.030 0.022 0.033 75.90 -
AR Adlawan Construction 13108 Const. of 2 CL Sch. Bldg. @ Can-Asujan NHS VII 34.320 60 C 0.351 0.200 0.300 - - - 85.10 *85.10%
V. Satisfactory
AR Adlawan Construction 13108 Const. of Lower Calajo-an Pakigne Bridge VII 0.949 80 C 0.302 0.300 0.300 - - - 90.20 *90.20%
Outstanding
Arago Construction & Supply 31324 Const. of 1 Unit 1 CL Sch. Bldg. @ Bagtong C/S VIII 0.460 75 C 0.461 0.200 0.300 - - - 96.10 *96.10%
Outstanding
Arcinue Commercial 6746 Const. of Modified Conventional Type Single Storey S/B I 0.703 90 C 0.356 0.300 0.300 - - - 95.60 85.45%
V. Satisfactory
Arcinue Commercial 6746Const. of Modified Conventional
Type Single Storey S/B at Tagudtud NHS
I 0.827 90 C 0.292 0.300 0.300 - - - 89.20 *89.20% V. Satisfactory
Arcinue Commercial 6746 Const. of 2 CL Sch. Bldg. Anduyan NHS I 0.899 90 C 0.373 0.207 0.300 - - - 88.00 83.73%
V. Satisfactory
Arcinue Commercial 6746 Const. of 2 CL School Bldg. @ Lloren E/S I 0.764 90 C 0.324 0.200 0.300 - - - 82.40 *82.40%
V. Satisfactory
Arcinue Commercial 6746Const. of Mangato Bridge under Austrian Assisted DPWH Const.
ProjectI 27.553 360 O 0.323 0.289 0.000 0.030 0.033 0.067 74.20 -
Arcinue Commercial 6746Const. of MangatoBridge under Austrian Assisted DPWH Const.
ProjectI 27.553 360 O 0.317 0.240 0.100 0.030 0.047 0.100 83.40 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page36
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Arcinue Commercial 6746 Const. of Maypalic Bridge I 12.048 200 C 0.292 0.200 0.000 - - - 49.20 61.59% Fair
Arcinue Commercial 6746Const. of Modified Conventional Type Single Storey Sch. Bldg. @
Bail E/SI 0.607 60 C 0.396 0.100 0.300 - - - 79.60 *79.60%
Satisfactory
Arcinue Commercial 6746 Const. of Various School Bldg. within 2nd District of La Union I 0.990 90 C 0.286 - 0.500 - - - 78.60 85.88%
V. Satisfactory
Arcinue Commercial 6746 Const. of Various School Bldg. within 2nd District of La Union I 0.656 90 C 0.310 - 0.500 - - - 81.00 69.24%
Fair
Arcinue Commercial 6746 Impv't of Pias-Currimao-Balacad Road, Paoay Section I 31.831 360 O 0.296 0.300 0.150 0.030 0.045 0.050 87.10 -
Arcinue Commercial 6746 Impvt. of Pias-Currimao-Balacad Road, Brgy. Paoay Section I 31.831 360 O 0.331 0.293 0.100 0.024 0.037 0.100 88.50 -
Arcinue Commercial 6746 Impvt./Conc. Paving of Lingayen-Binmaley By-Pass Road I 14.434 120 O 0.287 0.205 0.100 0.030 0.037 0.100 75.90 -
Arcinue Commercial 6746 Impvt./Repair/Rehab. of Pangasinan-Zambales Road I 9.468 90 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
Arcinue Commercial 6746 Opening of Farm-to-Market Road, Brgy. Namonitan I 0.478 45 C 0.386 0.289 0.300 - - - 97.50 *97.50%
Outstanding
Arcinue Commercial 6746Rehab. & Impvt. of Cabaroan Bridge along San Juan-San
Gabriel RoadI 1.897 50 C 0.305 0.200 0.300 - - - 80.50 *80.50%
V. Satisfactory
Arcinue Commercial 6746 Rehab./Reconst. of Damaged Nat'l Road, San Fernando-Bagulin Road I 19.219 90 C 0.363 0.200 0.300 - - - 86.30 83.96%
V. Satisfactory
Arcinue Commercial 6746 Replacement of Cuenca NHS I 0.899 90 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory
Arellano General Construction 31694 Const. of Multi-Purpose Building IV-A 2.120 74 C 0.356 0.300 0.300 - - - 95.60 79.22% Satisfactory
Argealis Construction 16122Construction of Fence for the San Fernando Runway Strip (Western
Portion)BCDA 3.747 120 C 0.310 0.300 0.300 - - - 91.02 *91.02%
V.Satisfactory
Argealis Construction 16122 Construction of PPMC Motorpool Shed PPA 1.200 45 C 0.342 0.300 0.300 - - - 94.19 94.19%
Outstanding
Arik Construction 32786 Conc. of Shoulder along Daet-Bagasbas Airport Road V 0.467 45 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
Arky Construction and Supply 32692 Const. of Circ. Road, Brgy. Ibinigay-Bagumbayan V 4.750 90 C 0.325 0.200 0.300 - - - 82.50 82.38%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page37
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Arky Construction and Supply 32692 Repair & Rehab. of Revetment (Flood Control) V 0.475 45 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
Arky Construction and Supply 32692 Repair & Rehab. of Revetment (Flood Control) V 0.948 75 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V. Satisfactory
Armando U. Khong General Contractor 16163 Proposed Completion of Malibay
Bridge along EDSA (Phase I) NCR 14.169 150 C 0.339 0.300 0.300 - - - 93.90 83.46% V. Satisfactory
Armando U. Khong General Contractor 16163 Proposed Repair/Rehab. of Araulio
High School NCR 14.384 150 C 0.316 0.300 0.300 - - - 91.60 *91.60% Outstanding
Armando U. Khong General Contractor 16163 Upgrading/Conc. with Drainage
Impvt. of M. dela Fuente St. NCR 15.936 150 C 0.365 0.268 0.300 - - - 93.30 94.20% Outstanding
ARN Builders 18930 Conc. of Altavas Diversion Road VI 16.521 160 C 0.328 0.200 0.300 - - - 82.80 85.11% V. Satisfactory
ARN Builders 18930 Const. of Banica Bridge VI 12.540 270 O 0.385 0.300 0.000 0.030 0.060 0.067 84.20 -
ARN Builders 18930 Const. of Dumalag Bridge VI 16.494 310 C 0.341 0.114 0.300 - - - 75.50 81.70% V. Satisfactory
ARN Builders 18930 Construction of Kinawahan Bridge & Approaches VII 25.238 210 C 0.269 0.192 0.300 - - - 76.10 *76.10%
Unsatisfactory
ARN Builders 18930CP 5: Impvt./Conc. of Kapalong-
Talaingod-Valencia Bukidnon Road, Brgy. Sto. Niño Phase II
XI 172.550 540 O 0.400 0.300 0.100 0.024 0.055 0.067 94.60 -
ARN Builders 18930
CP 8: Const. of Six (6) Bridges inc. Approaches along Kapalong-Talaingod-Valencia Bukidnon
Road
XI 123.199 360 O 0.384 0.282 0.100 0.030 0.055 0.100 95.10 -
ARN Builders 18930
CP 8: Const. of Six (6) Bridges inc. Approaches along Kapalong-Talaingod-Valencia Bukidnon
Road
XI 123.199 360 O 0.375 0.300 0.150 0.030 0.065 0.033 95.30 -
ARN Builders 18930 Rehab./Reconstruction of Aklan East Road VI 19.283 240 O 0.330 0.240 0.100 0.030 0.055 0.100 85.50 -
ARN Builders 18930 Rehab./Reconstruction of Aklan East Road VI 19.283 180 O 0.218 0.240 0.100 0.015 0.032 0.100 70.50 -
Arrowhead Construction 22697 Concreting of Road & Const. of Drainage at Liyang III 2.837 54 C 0.385 0.300 0.300 - - - 98.50 85.12%
V. Satisfactory
Arsvi Construction 23518 Construction of Multi-Purpose Bldg. IV-A 4.821 120 C 0.387 0.240 0.300 - - - 92.70 88.29%
V. Satisfactory
Art Star Construction and Enterprises 18416 Const. of Water System Project @
Brgy. Bungro I 2.243 266 C 0.304 0.300 0.300 - - - 90.40 78.94% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page38
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Art-Star Construction & Enterprises 18416 Const. of Multi-Purpose Bldg.
(Phase II) I 6.109 220 C 0.278 - 0.500 - - - 77.80 *77.80% Satisfactory
Art-Star Construction & Enterprises 18416 Rehab. of Multi-Purpose Building I 1.430 88 C 0.367 0.143 0.300 - - - 81.00 81.84%
V. Satisfactory
Asanco General Merchandising & Construction 30517 Const. of Multi-Purpose Building,
Poblacion IV-B 0.465 60 C 0.390 0.221 0.300 - - - 91.10 83.61% V. Satisfactory
ASC Construction 26788Construction of Canal and Canal
Structures (LMC-ARIP-08-06)
NIA-II 3.448 180 C 0.400 0.300 0.000 - - - 70.00 70.00% Fair
ASC Construction and Concrete Products 26788 Addalam River Irrigation Project NIA 5.013 150 C 0.308 0.240 0.300 84.77 *84.77%
V. Satisfactory
ASC Construction and Concrete Products 26788 Const. of (9) Nine Units Academic
School Building @ Libertad NHS II 0.384 60 C 0.286 0.300 0.300 - - - 88.60 88.18% V. Satisfactory
ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building
@ Enrile Vocational H/S II 1.449 180 C 0.271 0.058 0.300 - - - 62.90 70.01% Satisfactory
ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building
@ Lemu H/S II 0.963 120 O 0.337 0.000 0.100 0.000 0.027 0.067 53.10 -
ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building
@ Lemu H/S II 0.963 120 O 0.345 0.258 0.100 0.030 0.038 0.100 87.10 -
ASC Construction and Concrete Products 26788 Const. of Multi-Purpose Building,
Cagumitan E/S II 0.943 150 C 0.444 - 0.500 - - - 94.40 84.42% V. Satisfactory
ASC Construction and Concrete Products 26788 Const./Completion of Secondary
Sch. Bldg. @ Cagayan NHS II 0.784 60 O 0.388 0.135 0.100 0.020 0.011 0.100 75.40 -
ASC Construction and Concrete Products 26788 Const./Completion of Secondary
Sch. Bldg. @ Cagayan NHS II 0.784 60 O 0.372 0.184 0.100 0.015 0.018 0.100 78.90 -
ASC Construction and Concrete Products 26788
Reha./Impvt. of National Road along Cagayan-Apayao Road,
Solana SectionII 1.896 205 O 0.315 0.212 0.100 0.030 0.028 0.100 78.50 -
ASC Construction and Concrete Products 26788
Reha./Impvt. of National Road along Cagayan-Apayao Road,
Solana SectionII 1.896 205 O 0.283 0.300 0.000 0.023 0.028 0.067 70.10 -
ASC Construction and Concrete Products 26788 Rehab. of Manila North Road
(MNR) II 4.821 150 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
Asian Pearl Construction & Development Corporation 9059
Completion of Multi-Purpose Building, Sitio Parang, Brgy. San
MarcosI 1.414 34 C 0.416 0.133 0.300 - - - 84.90 *84.90%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page39
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Asian Pearl Construction & Dev't. Corp. 9059 Conc. along Ilocos Norte-Apayao
Road I 11.226 152 C 0.340 0.200 0.300 - - - 84.00 85.20% V. Satisfactory
Asian Pearl Construction & Dev't. Corp. 9059
Const. of First Floor of the Proposed Three (3) Storey Bldg.,
Ilocos Norte NHSI 8.356 180 C 0.334 0.200 0.000 - - - 53.40 74.22%
Satisfactory
Asian Pearl Construction & Dev't. Corp. 9059 Const. of Gabaldon Bldg. &
Grounds @ Ilocos Norte NHS I 7.594 150 O 0.349 0.300 0.100 0.020 0.060 0.100 92.90 -
Asian Pearl Construction & Dev't. Corp. 9059 Impvt./Rehab. of Paoay Flood
Control I 1.422 35 C 0.238 0.300 0.300 - - - 83.80 80.98% V. Satisfactory
Asian Pearl Construction & Dev't. Corp. 9059 Rehab. of Gabaldon Bldg. at Ilocos
Norte NHS I 7.596 116 C 0.355 0.278 0.300 - - - 93.30 *93.30% Outstanding
Asian Pearl Construction & Dev't. Corp. (Formerly: Asian Pearl
Enterprises)9059 Const. of Gabaldon Bldg. &
Grounds @ Ilocos Norte NHS I 7.594 150 C 0.322 0.300 0.300 - - - 92.20 92.66% Outstanding
Asian Pearl Enterprises 9059 Concreting of Magnuang Barangay Road I 1.424 55 C 0.320 - 0.500 - - - 82.00 *82.00%
V. Satisfactory
Asugas Builders 32764 Const. & Completion of MPB (Municipal Bldg.) Phase II IX 2.300 120 C 0.355 0.133 0.300 - - - 78.80 *78.80%
Satisfactory
Asugas Builders 32764 Const./Impvt. of MPB (Municipal Bldg.) Phase III, Poblacion Tigbao IX 1.835 120 C 0.415 0.133 0.300 - - - 84.80 *84.80%
Satisfactory
Asugas Builders 32764 Construction and Completion of Multi-Pupose Building (Phase III) IX 1.835 120 C 0.447 0.133 0.300 - - - 88.00 *88.00%
Satisfactory
Atlanta Construction Company, Inc. 31290
Const./Rehab./Replacement/ Completion/ and Repair of Elem.
And Secondary Sch. Bldg.at Sugod P/S
X 5.214 75 C 0.373 0.200 0.300 - - - 87.30 84.01% V. Satisfactory
Atlantic Construction 24232 Const. of 1 CL Std. Sch. Bldg. at Manaring E/S II 0.473 35 C 0.318 0.200 0.300 - - - 81.80 *81.80%
V. Satisfactory
Atlantic Construction 24232 Const. of 1 H/S CL at Brgy. Cabannungan II 0.421 55 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
Atlantic Construction 24232 Const. of Sta. Maria MPB II 3.816 120 C 0.410 0.200 0.300 - - - 91.00 82.04% Satisfactory
Atlantic Construction 24232Rehab./Impvt. of Road Jct.
Santiago-Tuguegarao to Sta. Maria Town Proper
II 4.765 146 C 0.406 0.200 0.300 - - - 90.60 85.38% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page40
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Atlantic Construction 24232 Repair/Maintenance of Baculud River Control (Phase I) II 0.743 35 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V. Satisfactory
Atlantic Construction 24232 Repair/Rehab. of Sta. Maria E/S II 0.380 42 C 0.347 0.116 0.300 - - - 76.30 *76.30% Satisfactory
Atlantic Construction 24232Road Concreting of Brgys. Quibal,
San Andres, Visitacion, San Roque and San Juan
II 4.772 120 C 0.389 0.200 0.300 - - - 88.90 84.10% Satisfactory
Atlantic Construction 24232 Road Concreting of Sto. Tomas-Bagutari II 2.865 70 C 0.322 0.200 0.300 - - - 82.20 *82.20%
V. Satisfactory
Atlantic Erectors Builders Inc. / Brostan Construction &
Development
JV-99-167 / 12360
Construction of Diversion Dam & Intake Barrel NIA-II 232.105 1853 C 0.381 0.300 0.000 - - - 68.10 69.20%
Fair
Atlantic Erectors Builders Inc. / Brostan Construction &
Development
JV-99-167 / 12360
Construction of Main Canal, Laterals & Appurtenant NIA-II 73.392 544 O 0.385 0.248 0.000 0.023 0.047 - 70.30 -
ATR Construction 15968 Conc. of Roads at Quirino District XI 1.884 75 C 0.195 0.300 0.300 - - - 79.50 *79.50% Satisfactory
ATR Construction 15968 Concreting of Roads at Brgy., Tres De Mayo, Quirino St.-Perfect XI 1.884 45 C 0.462 0.192 0.300 - - - 95.40 *95.40%
V. Satisfactory
ATR Construction 15968 Const. of Drainage along Digos-Makar Road XI 4.701 90 C 0.393 0.200 0.300 - - - 89.30 90.68%
Outstanding
Avatar Constructions Company 31455 Completion of Brgy. Aurelio MPB XIII 2.892 180 C 0.319 0.200 0.300 - - - 81.90 *81.90% V. Satisfactory
Avatar Constructions Company 31455 Completion of Road from Brgy. Mahayahay Road to Shrine Road XIII 2.364 180 C 0.385 0.200 0.300 - - - 88.50 *88.50%
Satisfactory
Avatar Constructions Company 31455 Conc. of Dinagat-Loreto Road (San Jose-Mahayahay Section) XIII 10.411 322 C 0.374 0.200 0.300 - - - 87.40 76.48%
Satisfactory
Avatar Constructions Company 31455 Conc. of Mahayahay-Glenville Road XIII 4.578 180 C 0.373 0.200 0.300 - - - *87.30 *87.30%
V. Satisfactory
Avatar Constructions Company 31455 Const. of Aurelio-Mahayhay Road XIII 3.153 180 C 0.369 0.247 0.300 - - - 91.60 85.90% V. Satisfactory
Avatar Constructions Company 31455 Const. of Sta. Cruz Beach Road XIII 3.855 210 C 0.473 0.132 0.300 - - - 90.50 *90.50% V. Satisfactory
Avatar Constructions Company 31455 Const./Conc. of Don Ruben-Sta. Cruz XIII 1.087 150 C 0.379 0.244 0.300 - - - 92.30 *92.30%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page41
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Avatar Constructions Company 31455 Const./Conc. of San Juan Road XIII 2.596 150 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory
Avatar Constructions Company 31455
Rehab./Reconst. of Damaged Paved National Road along
Dinagat-Loreto Road (San Jose Section)
XIII 5.717 240 O 0.377 0.141 0.070 0.030 0.032 0.067 71.70 -
Avatar Constructions Company 31455
Rehab./Reconst. of Damaged Paved National Road along
Dinagat-Loreto Road (San Jose Section)
XIII 5.717 240 O 0.337 0.252 0.150 0.030 0.035 0.050 85.40 -
Aylan Construction and Trading 11884 Rehab. of Commonwealth E/S & GSIS E/S NCR 3.818 60 C 0.228 0.300 0.300 - - - 82.80 *82.80%
V. Satisfactory
Aylan Construction and Trading 11884 Repair/Rehab. of Flora Ylagan H/S NCR 0.710 45 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory
Azul Builders 21870 Conc. of Roads at Brgy. Sta. Cruz III 0.948 65 C 0.373 0.300 0.300 - - - 97.30 *97.30% Outstanding
Azul Builders 21870Const. of Multi-Purpose Bldg., Sapang Palay NHS (Phase II)
Sapang Palay CityIII 3.035 80 C 0.353 0.300 0.300 - - - 95.30 *95.30%
Outstanding
Azul Builders 21870 Package 4: Concreting of Road, G4 Between Citrus & Lawang Pare III 0.473 75 C 0.380 0.300 0.300 - - - 98.00 *98.00%
Outstanding
B. Bernardo Construction 6196 Conc. Reblocking of Pulilan-Calumpit Road III 9.566 90 C 0.346 0.200 0.300 - - - 84.60 84.72%
Satisfactory
B. Bernardo Construction 6196 Impvt./Rehab. of Sta. Maria-Norzagaray Road III 14.198 56 O 0.391 0.225 0.100 0.030 0.035 0.100 88.10 -
B. Bernardo Construction 6196 Rehab. of Amang Rodriguez Ave. NCR 14.343 60 C 0.319 0.277 0.300 - - - 89.60 *89.60% V. Satisfactory
B. Bernardo Construction 6196 Rehab. of Sumulong Highway NCR 19.220 150 C 0.266 0.298 0.300 - - - 86.40 *86.40% V. Satisfactory
B. Valencerina Trading & Construction 22147 Completion of MPB NCR 1.903 60 C 0.375 0.252 0.300 - - - 92.70 *92.70%
Outstanding
B. Valencerina Trading & Construction 22147 Conc. of FMR, Brgy. San Pedro I 1.637 50 C 0.243 0.200 0.300 - - - 74.30 *74.30%
Satisfactory
B. Valencerina Trading & Construction 22147 Const. of Multi-Purpose Bldg., @
Brgy. Tañong NCR 1.431 90 C 0.386 0.300 0.300 - - - 98.60 *98.60% Outstanding
B. Valencerina Trading & Construction 22147 Const. of Multi-Purpose bldg., @
Tayabas West E/S IV-A 0.476 60 O 0.400 0.240 0.100 0.020 0.009 0.067 83.60 -
B. Valencerina Trading & Construction 22147 Rehab. of Road @ Brgy.
Ampid I IVA 0.957 30 C 0.293 0.200 0.300 - - - 79.30 *79.30% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page42
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
B. Valencerina Trading & Construction 22147 Rehab. of Road @ Sitio Anawin at
Brgy. San Isidro IVA 0.957 30 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
B. Valencerina Trading & Construction 22147 Rehab. of Sch. Bldg. @ Brgy. San
Rafael IV-A 0.960 45 C 0.329 0.200 0.300 - - - 82.90 *82.90% V. Satisfactory
B. Vicencio Construction 9687 Calbayog Airport Development Project DOTC 19.247 120 O 0.364 0.300 0.150 0.020 0.047 0.050 93.10 -
B. Vicencio Construction 9687 Completion of 8 CL E/S Bldg., Remedios T. Romualdez E/S VIII 4.337 90 C 0.399 0.200 0.300 - - - 89.90 *89.90%
V. Satisfactory
B. Vicencio Construction 9687 Conc. of Calbayog Diversion Road, Sta. 0+000-Sta. 0+500 VIII 11.132 120 C 0.380 0.300 0.000 - - - 68.00 82.76%
V. Satisfactory
B. Vicencio Construction 9687Conc. of Calbayog Diversion Road, Sta. 16+477.95 - Sta.
15+257.96VIII 18.795 240 O 0.317 0.232 0.100 0.030 0.028 0.100 80.70 -
B. Vicencio Construction 9687Conc. of Calbayog Diversion Road, Sta. 16+477.95 - Sta.
15+257.96VIII 18.795 240 O 0.359 0.237 0.150 0.030 0.047 0.050 87.30 -
B. Vicencio Construction 9687 Conc. of Junction Pana-awan Airport Road VIII 18.897 367 C 0.379 0.173 0.300 - - - 85.20 82.44%
Satisfactory
B. Vicencio Construction 9687Conc. of Naval-Calibiran Cross-
Country Road (Mohon-Pulang YutaSection)
VIII 18.920 300 C 0.317 0.032 0.300 - - - 64.90 76.66%Unsatisfactory
B. Vicencio Construction 9687 Concreting of Tawid-Guadalupe Circumferential Road VIII 7.517 180 O 0.338 0.238 0.150 0.015 0.030 0.050 82.10 -
B. Vicencio Construction 9687 Const. of Maasin Shore Protection/Seawall VIII 3.809 240 O 0.300 0.100 0.100 0.000 0.022 0.200 72.20 -
B. Vicencio Construction 9687 Const. of Tagbilaran City-San JoseSt. Drainage Project (Outfall) VII 14.174 190 C 0.294 0.300 0.300 - - - 89.40 89.34%
V. Satisfactory
B. Vicencio Construction 9687Const./Opening of Calbayog
Diversion Road, Monbon-Naga Road Section
VIII 13.715 210 C 0.400 0.236 0.395 - - - 103.10 93.92% Outstanding
B. Vicencio Construction 9687 Const./Replacement of Tabugon Bridge VIII 9.439 390 C 0.394 0.240 0.300 - - - 93.40 *93.40%
Outstanding
B. Vicencio Construction 9687 Construction of Maasin Shore Protection/Seawall VIII 3.809 270 C 0.250 0.200 0.300 - - - 75.00 73.32%
Poor
B. Vicencio Construction 9687 Rechanneling of Subang Daku River VIII 4.718 120 C 0.250 - 0.500 - - - 75.00 82.98%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page43
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
B. Vicencio Construction 9687 Rehab. of Daang Maharlika Highway, Calbayog-Allen Section VIII 19.150 240 C 0.193 0.200 0.300 - - - 69.30 82.53%
V. Satisfactory
B. Vicencio Construction 9687Rehab. of Sambulawan-Calaguise-
Calubian Road, (Conc. of Calaguise Section) Tigbauan Sect.
VIII 17.942 220 O 0.344 0.240 0.100 0.030 0.042 0.100 85.60 -
B. Vicencio Construction 9687Rehab. of Sambulawan-Calaguise-
Calubian Road, (Conc. Of Calaguise Section) Tigbauan Sect.
VIII 17.942 220 O 0.227 0.023 0.150 0.030 0.037 0.050 51.70 -
B. Vicencio Construction 9687 Rehab./Impv't of Brgy. Mahaplag-Sogod Road (Dampoy) VIII 9.446 310 O 0.300 0.180 0.150 0.015 0.033 0.050 72.80 -
B. Vicencio Construction 9687 Rehab./Repair of Liloan Steel Bridge VIII 15.838 150 C 0.353 0.200 0.300 - - - 85.30 *85.30%
V. Satisfactory
B. Vicencio Construction 9687Rehab.Impvt. of Calbayog-Catarman Road, Calbayog-
Sinidman Sect. VIII 9.330 270 C 0.368 0.200 0.300 - - - 86.80 82.78%
V. Satisfactory
B.A. Lagazo Builders 22056 Concrete Paving of Belado St. (Phase II) II 0.951 90 C 0.263 0.300 0.300 - - - 86.30 82.76%
V. Satisfactory
B.C.T. Trading & Construction 15199 Cuyo Airport Development Project DOTC 16.066 120 C 0.467 0.200 0.300 - - - 96.70
B.C.T. Trading and Construction 15199 Conc. of PPNR (Sandoval-Iraan Section) IV-B 28.841 240 C 0.277 0.300 0.300 - - - 87.70 86.36%
V. Satisfactory
B.C.T. Trading and Construction 15199 Improvement/Concreting of Puerto Princesa South Road IV-B 4.729 120 C 0.338 0.200 0.300 - - - 83.80 80.98%
V. Satisfactory
B.C.T. Trading and Construction 15199 Replacement of Solomon Bridge along Puerto Princesa South Road IV-B 12.529 240 C 0.328 0.200 0.300 - - - 82.80 83.10%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page44
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
B.C.T. Trading and Construction 15199 Replacement of Umalad Bridge along Langogan-Roxas Road IV-B 28.813 270 C 0.337 0.300 0.000 - - - 63.70 71.50%
Satisfactory
B.E. Construction 2730 Conc. of Carles-Balasan Road, Barosbos-Guinticgan Section VI 8.819 300 C 0.014 0.100 0.300 - - - 41.40 58.77%
Poor
B.E. Construction 2730 Conc. of Concepcion-Ajuy Road VI 4.761 245 C 0.252 0.100 0.300 - - - 65.20 74.18% Satisfactory
B.E. Construction 2730 Conc. of Guimaras Circ. Road VI 23.087 200 O 0.370 0.225 0.100 0.015 0.040 0.100 85.00 -
B.E. Construction 2730 Conc. of Guimaras Circ. Road VI 23.667 200 O 0.250 0.240 0.100 0.022 0.056 0.100 76.80 -
B.E. Construction 2730 Const. of Iloilo City Technical Vocational Colleges VI 4.821 210 C 0.354 0.069 0.300 - - - 72.30 81.89%
V. Satisfactory
B.E. Construction 2730 Const. of Lanag River Control VI 14.450 300 O 0.288 0.160 0.100 0.030 0.040 0.200 81.80 -
B.E. Construction 2730 Const. of Leonora Salapandan NHS Phase II VI 0.948 110 C 0.400 0.100 0.300 - - - 80.00 60.96%
Fair
B.E. Construction 2730 Const. of MPB at UP Visayas Gender Studies Center Bldg. VI 11.446 217 C 0.388 0.200 0.000 - - - 58.80 75.25%
Satisfactory
B.E. Construction 2730 Const. of MPB Phase II @ Leganes E/S VI 0.950 90 C 0.373 0.248 0.300 - - - 92.10 68.37%
Fair
B.E. Construction 2730 Const. of Multi-Purpose Building, Leon National H/S VI 1.901 150 C 0.311 0.126 0.300 - - - 73.70 75.10%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page45
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
B.E. Construction 2730 Const. of Multi-Purpose Workshop @ Balantang E/S VI 0.625 150 C 0.425 - 0.000 - - - 42.50 64.20%
Fair
B.E. Construction 2730 Const. of Sch. Bldg. @ Melchor L. Nava NHS VI 1.753 150 C 0.360 0.300 0.300 - - - 96.00 *96.00%
Outstanding
B.E. Construction 2730Impv't. of Metro Iloilo
Circumferential Road, Zarraga Section
VI 3.853 90 C 0.350 - 0.500 - - - 85.00 80.02% V. Satisfactory
B.F.T. Construction 14424 Const. of 2-Cl @ Magpapalayok H/S III 0.559 240 C 0.445 - 0.500 - - - 94.50 84.00%
V. Satisfactory
B.G. Giron Construction & Supply 15197 Const. of 1 CL Sch. Bldg. at Sto. Cristo Primary School III 0.426 60 C 0.385 0.153 0.300 - - - 83.80 *83.80%
V. Satisfactory
B.G. Giron Construction & Supply 15197 Const. of FMR @ Brgy. Malupa III 1.421 90 C 0.280 0.300 0.300 - - - 88.00 79.90% Satisfactory
B.G. Giron Construction & Supply 15197 Const. of MPB & other Facilities @ Brgy. Rizal III 1.422 60 C 0.303 0.300 0.300 - - - 90.30 *90.30%
Outstanding
B.M.K. Construction / Royal Crown Monarch Const. & Supplies Corporation (JV)
JV-07-093
Impvt./Widening/Conc. of McArthur Highway (MNR) Tarlac
Section Phase IV, Package III, San Manuel Section
III 95.033 210 C 0.450 0.200 0.300 - - - 95.00 *95.00%V. Satisfactory
B.Q. Construction & Supply 10217 Const. of Urdaneta Flood Control Drainage, Phase I I 11.773 90 C 0.333 0.300 0.300 - - - 93.30 93.30%
Outstanding
B.R.G. Construction 21931Const. of Two (2) Units, Storey Multi-Purpose Building with 12 stalls each (Phase I) @ NVAT
II 4.174 142 O 0.305 0.250 0.100 0.030 0.027 0.100 81.20 -
B.S.U. Construction, Inc. 8457 Conc./Impvt. of Baywalk XIII 1.912 150 C 0.364 0.204 0.300 - - - 86.80 84.94% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page46
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
B.S.U. Construction, Inc. 8457Impvt. of Tandawan Road Sect. along Surigao-Davao Coastal
RoadXIII 9.550 150 C 0.358 0.200 0.300 - - - 85.80 87.24%
V. Satisfactory
B.S.U. Construction, Inc. 8457Rehab./Reconst. of Damaged
Pavement along Surigao-Davao Coastal Road, Lingig Section
XIII 4.798 90 C 0.364 0.199 0.300 - - - 86.30 86.36% V. Satisfactory
B.S.U. Construction, Incorporated 8457 Conc./Reblocking along JNR-
Barobo-Agusan sur Boundary XIII 9.594 150 C 0.287 0.300 0.300 - - - 88.70 92.78% Outstanding
B-12 Construction and Trading Corporation 31997 Const. of Brgy. Road at Brgy.
Pandan III 0.934 30 C 0.308 0.285 0.300 - - - 89.30 *89.30% V. Satisfactory
B-12 Construction and Trading Corporation 31997 Const. of Brgy. Road at Brgy.
Pulong Maragul III 0.941 30 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory
Baby E Construction 19773 Repair/Rehab. of Drainage Canal III 2.857 75 C 0.253 0.200 0.300 - - - 75.30 *75.30% Satisfactory
Baby Santiago Construction & Supply 31662 Const. of Multi-Purpose Building IV-A 1.925 75 C 0.274 0.300 0.000 - - - 57.40 42.42%
Poor
Bacho Construction & Design Engineering 15945 Const. of MPB IX 0.187 45 C 0.391 0.263 0.300 - - - 95.40 *95.40%
Outstanding
Badoc Builders 31564 Concreting of Badio Norte Barangay Road I 0.747 35 C 0.333 - 0.500 - - - 83.30 *83.30%
V. Satisfactory
Badoc Builders & Supply 31564 Concreting of Farm-to-Market Road, Brgy. Balioeg I 1.442 45 C 0.371 0.200 0.300 - - - 87.10 *87.10%
Satisfactory
Badoc Builders & Supply (Formerly: Badoc Builders) 31564 Conc. of FMR, Brgy. Tartarabang I 1.444 45 C 0.283 0.200 0.300 - - - 78.30 *78.30%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page47
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Badsbro Construction and General Merchandise 32876 Construction of 2-Cl School
Building at MSU IX 0.945 80 C 0.455 0.133 0.300 - - - 88.80 *88.80% Satisfactory
Baicamar Construction and Supplies 19248 Repair/Impvt. of Bonbon Road XIII 4.458 120 C 0.246 0.204 0.300 - - - 75.00 *75.00%
Satisfactory
Bap Construction 16215 Asphalt Overlay of Brgy. Mabini Road (Intermittent Section) IV-A 1.927 60 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
Bap Construction 16215 Conc. of Road at Brgy. Luta Sur IV-A 0.482 60 C 0.371 0.216 0.300 - - - 88.70 *88.70% V. Satisfactory
Bap Construction 16215 Conc. of San Juan-San Andres Road IV-A 1.927 60 C 0.311 0.200 0.300 - - - 81.10 *81.10%
V. Satisfactory
BAQUE Corporation 15235 Construction of Ramps/Approaches in Tarlac BCDA 103.233 336 O 0.365 0.300 0.000 - - - 66.54 80.35%
V.Satisfactory
Barillo Construction & Enterprises 23836 Conc. of Lower Taway Road IX 0.951 40 C 0.279 0.221 0.300 - - - 80.00 *80.00%
Satisfactory
Barillo Construction & Enterprises 23836 Const. of MPB at Brgy. Suclema IX 0.375 85 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
Barillo Construction & Enterprises 23836 Repair/Concreting of Roads at
Malvar Street IX 0.706 45 O 0.394 0.300 0.100 0.030 0.035 0.100 95.90 -
Barillo Construction & Enterprises 23836 Repair/Rehab./Impvt. of Dagohoy
St. IX 0.759 30 C 0.312 0.230 0.300 - - - 84.20 *84.20% V. Satisfactory
Barit Builders and Construction 30095 Const./Completion of MPB @ Isabela National H/S II 0.936 90 C 0.317 - 0.500 - - - 81.70 82.05%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page48
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Barman Construction Corp. 7974Const. of Abaton-Bridge and Approaches (Phase II) Brgy.
ParangIV-B 11.745 185 O 0.314 0.300 0.100 0.030 0.037 0.100 88.10 -
Barman Construction Corp. 7974 Const. of Abaton-Maidlang II Bridge IVB 9.615 235 O 0.313 0.300 0.100 0.023 0.042 0.100 87.80 -
Barman Construction Corp. 7974Const./Rehab. of Mahabang
Parang FMR, Mahabang Parang ARC
IV-B 17.832 180 C 0.310 0.300 0.300 - - - 91.00 88.78% V. Satisfactory
Barman Construction Corporation 7974
Conc. of East Coast Road, Calapan-Mansalay Section,
Mabaho Section IV-B 28.868 240 O 0.357 0.293 0.050 0.030 0.033 0.067 83.00 -
Bascon Bros & Dev. Corp. 31387 Rehab. of Poblacion Water System II 1.927 75 C 0.382 0.200 0.300 - - - 88.20 85.82% V. Satisfactory
Batch 81 Engineering & Construction 31311 Completion of MPB, Brgy.
Nansuagao I 0.950 52 C 0.308 0.200 0.300 - - - 80.80 *80.08% V. Satisfactory
Batch 81 Engineering & Construction 31311 Const. of 2 CL Bldg. at Banaoang
PS I 0.832 60 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Batch 81 Engineering & Construction 31311 Road Concreting, Brgy. Naguilian I 1.425 40 C 0.375 0.200 0.300 - - - 87.50 *87.50%
Satisfactory
BBC Construction (Formerly: BBC Sand & Gravel) 16510 Completion of Matabao Bridge XIII 9.243 210 C 0.394 0.200 0.300 - - - 89.40 88.14%
V. Satisfactory
BBC Construction (Formerly: BBC Sand & Gravel) 16510 Completion of Ngilan Bridge along
Agusan-Surigao Road XIII 8.545 105 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory
BBC Construction (Formerly: BBC Sand & Gravel) 16510 Const. of Drainage Facilities alogn
Agusan-Misamis Oriental Road, XIII 3.628 165 C 0.372 - 0.500 - - - 87.20 *87.20% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page49
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
BBC Construction (Formerly: BBC Sand & Gravel) 16510 Const. of MPB XIII 2.787 120 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
BBC Construction (Formerly: BBC Sand & Gravel) 16510 Const. of MPB (covered court) XIII 1.875 120 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
BBC Construction (Formerly: BBC Sand & Gravel) 16510 Const. of MPB (covered court) XIII 2.240 120 C 0.458 0.200 0.300 - - - 95.80 *95.80%
V. Satisfactory
BBC Construction (Formerly: BBC Sand & Gravel) 16510
Rehab. of Ngilan Bridge along Daang Maharlika Highway (Agusan-Surigao Section)
XIII 9.104 180 C 0.337 0.300 0.300 - - - 93.70 87.82% V. Satisfactory
BBC Construction (Formerly: BBC Sand & Gravel) 16510 Replacement of Matabao Bridge XIII 9.468 150 O 0.338 0.291 0.100 0.030 0.051 0.100 91.00 -
BBC Construction (Formerly: BBC Sand & Gravel) 16510 Replacement of Matabao Bridge XIII 9.468 150 O 0.387 0.272 0.000 0.030 0.030 0.067 78.60 -
BCT Trading & Const./F. Alarcon Const. Corp/ JV 17612 San Vicente Airport Development
Project DOTC 81.790 240 C 0.424 0.200 0.300 - - - 92.40 92.40% Very Satisfactory
BCT Trading and Construction 15199 Const./ Completion of San Miguel NHS 5 CL (Two storey 6 CL) IV-B 2.952 90 C 0.446 0.500 94.60 83.54%
V. Satisfactory
BCT Trading and Construction 15199 Improvement of Plaridel-Sitio Apis Road, Plaridel-Jose Rizal ARC IV-B 20.211 200 C 0.144 0.195 0.300 - - - 63.90 78.42%
Fair
BCT Trading and Construction 15199 San Vicente Airport Development Project DOTC 48.138 210 C 0.451 0.200 0.300 - - - 95.10 95.10%
Very Satisfactory
BDL Santos Construction and Supply 17535
Repair/Rehab. of Damaged River Control (Cadacan River), Anog-
Sangkayan SectionV 4.728 90 C 0.210 0.064 0.300 - - - 57.40 *57.40%
Poor
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page50
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Bedun Construction 15130Const./Impv't. of Batangas-Lobo Road, Malapad na Parang-San
Miguel Section IV-A 9.497 150 C 0.315 0.200 0.300 - - - 81.50 75.32%
Satisfactory
Belance Builders & Trading 31611 Const. of Poblacion High School Bldg. II 2.337 90 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V. Satisfactory
Belance Builders & Trading 31611 Const. of Poblacion High School Bldg. II 2.377 90 C 0.338 0.200 0.300 - - - 83.80 81.56%
V. Satisfactory
Bell Construction 27851 Completion of MPB Arcillana Compound NCR 0.931 60 C 0.389 0.107 0.300 - - - 79.60 *79.60%
Satisfactory
Belvic Enterprises & Construction 25337 Const. of Drainage System @
Poblacion IX 0.485 60 C 0.186 0.218 0.300 - - - 70.40 *70.40% Satisfactory
Bendimil Construction and Development Corp. 6135 Const. of Pedestrian Overpass IX 4.603 148 C 0.346 0.260 0.000 - - - 60.60 78.60%
Satisfactory
Bendimil Construction and Development Corp. 6135 Impvt./Gravelling of Siocon-
Sirawai Road (Sirawai Side) IX 47.894 300 O 0.158 0.225 0.000 0.030 0.033 0.067 51.30 -
Benny's Trading & Construction 8762Concreting of Irawan-Tagburos
Road, Km. 11+910-Km. 13+120 w/ (exceptions).
IV-B 5.245 70 C 0.366 0.300 0.300 - - - 96.60 58.74% Poor
Benny's Trading & Construction 8762 Const. of 2 CL Sta. Monica E/S IV-B 0.698 75 C 0.437 - 0.500 - - - 93.70 83.06% V. Satisfactory
Benny's Trading & Construction 8762 Const. of Sidewalk Pavement IV-B 0.329 60 C 0.336 0.000 0.300 - - - 63.60 *63.60% Fair
Berson's Construction & Trading 31181 Impvt./Concrete Paving of Brgy. Road, Sitio Sipitan-Bocboc East I 9.615 150 C 0.236 0.200 0.300 - - - 73.60 80.86%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page51
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Berson's Construction & Trading 31181Impvt./Concrete Paving of
Camiling-Wawa Road & Drainage Structures
I 9.641 110 C 0.288 0.276 0.300 - - - 86.40 85.98% V. Satisfactory
Bestech Construction & Development Corporation 17725
Emergency Repair of Tigaon-Goa-San Jose-Lagonoy via San Vicente
Rd.V 1.316 60 O 0.344 0.158 0.100 0.020 0.023 0.133 77.80 -
Bet Construction & Supply 31764Impvt./Conc. of Pangasinan-Tarlac
Road (Socony Jct.-Lingayen Section)
I 9.453 84 C 0.294 0.200 0.300 - - - 79.40 80.12% V. Satisfactory
Bet Construction of Supply 31764 Concreting of Marcos Highway Road I 0.749 45 C 0.332 0.222 0.300 - - - 85.40 *85.40%
V. Satisfactory
Beta Construction 9829 Conc. of Brgy. Road @ Balogo V 0.800 100 C 0.244 0.189 0.300 - - - 73.30 *73.30% Satisfactory
Beta Construction 9829 Conc. of Brgy. Road @ LRV Site Road V 0.480 90 C 0.345 0.183 0.300 - - - 82.80 *82.80%
V. Satisfactory
Beta Construction 9829 Conc. of Tarusanan Road V 1.880 60 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory
Beta Construction 9829 Road Concreting of Dominorog Road V 1.405 75 C 0.269 0.300 0.300 - - - 86.90 *86.90%
V. Satisfactory
Beta Construction 9829 Road Concreting of Lidong-Hibago Road V 2.837 75 C 0.443 0.200 0.300 - - - 94.30 *94.30%
V. Satisfactory
Better Work Construction 24432Completion of Multi-Purpose
Bldg., DENR Regional office XII Brgy. Zone IV
XII 1.428 210 C 0.368 0.225 0.300 - - - 89.30 92.24% Outstanding
Bevel Construction 16423 Improvement/Concreting of Cantaan Barangay Road X 0.920 56 O 0.240 0.300 0.100 0.030 0.032 0.100 80.20 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page52
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Bicol Goldrock Construction Corporation 32376 Conc. of National Road, Bato-
Baras Section V 4.787 241 C 0.442 0.200 0.300 - - - 94.20 88.68% Satisfactory
Bicol Goldrock Construction Corporation 32376 Const. of Bagamanoc Seawall V 4.800 150 C 0.293 0.200 0.300 - - - 79.30 76.54%
Satisfactory
Bicol Goldrock Construction Corporation 32376 Road Conc. At San Jose Road V 1.891 60 C 0.271 0.300 0.300 - - - 87.10 *87.10%
V. Satisfactory
Bien Marian Construction Corporation 21871 Construction of 2 Storey 4 CL @
Sitio Tapayan E/S IV-A 4.180 120 C 0.283 0.298 0.300 - - - 88.10 83.76% V. Satisfactory
Bigfoot Construction and Supply 24769 Conc. of Bais-Kabankalan Road km. 83+000 - km. 85+000 VII 2.254 60 C 0.336 0.200 0.300 - - - 83.60 *83.60%
V. Satisfactory
Bigfoot Construction and Supply 24769 Conc. of Basak-Nasig-id FMR VII 0.903 70 C 0.190 0.300 0.300 - - - 79.00 *79.00% Satisfactory
Bigfoot Construction and Supply 24769 Conc. of Calayugan Brgy. Road VII 0.426 130 C 0.330 0.300 0.300 - - - 93.00 *93.00% Outstanding
Bigfoot Construction and Supply 24769 Const. of Drainage along DSR VII 4.684 170 C 0.380 0.190 0.300 - - - 87.00 84.72% V. Satisfactory
Bigfoot Construction and Supply 24769 Const. of Mantiquil-Tamlang Road VII 4.708 173 C 0.289 0.300 0.300 - - - 88.90 *88.90% V. Satisfactory
Bigfoot Construction and Supply 24769 Const. of River Control Dike along Canaway River VII 4.680 210 C 0.313 0.200 0.300 - - - 81.30 *81.30%
V. Satisfactory
Bigfoot Construction and Supply 24769
Const./Installation of Water System a)Deepwell, Brgy. Palanas, Tanjay City b)Water Supply, Brgy.
Penabonan, Mabinay
VII 0.996 110 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page53
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Bigfoot Construction and Supply 24769 Repair/Rehabilitation of Farm-to-Market Road, Mayabon-Najandig VII 0.889 40 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
Bigfoot Construction and Supply 24769
Road Upgrading (gravel to concrete) at Masulog (missing
link) Section (VLCR) (Sta. 171+541.00-Sta.172+208.10)
VII 7.920 157 C 0.415 0.130 0.300 - - - 84.50 *84.50%Satisfactory
Bill Hill Construction and Supply 18046 Completion of Roofing of Multi Purpose Hall @ Brgy. Mabini XIII 0.182 45 C 0.400 0.240 0.300 - - - 94.00 *94.00%
Outstanding
Bill Hill Construction and Supply 18046 Conc. of Brgy. Villafranca XIII 5.731 180 C 0.332 0.300 0.300 - - - 93.20 88.49% V. Satisfactory
Bill Hill Construction and Supply 10846 Conc. of Capalayan-Mapawa-Quezon Road (Phase 38) XIII 11.814 650 C 0.443 0.200 0.000 - - - 64.30 74.98%
Poor
Bill Hill Construction and Supply 18046Conc. of Lake Mainit Circ. Road,
Phase 14, Mainit to Matin-ao Section
XIII 9.261 180 C 0.310 0.200 0.300 - - - 81.00 *81.00% V. Satisfactory
Bill Hill Construction and Supply 18046 Conc. of Magsaysay Road XIII 0.916 60 C 0.290 0.170 0.300 - - - 76.00 83.86% V. Satisfactory
Billco Construction 18191 Conc. Reblocking along Surigao-Agusan Road XIII 0.955 65 C 0.354 0.200 0.300 - - - 85.40 80.24%
V. Satisfactory
Billco Construction 18191 Const. of Don Ruben Seawall (Phase III) XIII 2.690 210 C 0.370 0.300 0.000 - - - 67.00 79.24%
Satisfactory
Bimbo Construction & Supply (Formerly: Bimbo Const.) 25022 Repair/Improvement of Milaor
Revetment V 2.837 180 C 0.381 0.300 0.300 - - - 98.10 *98.10% Outstanding
BLF Construction 15829Const. of Proposed CNM
Laboratory Bldg. Phase I at BataanPeninsula State University
III 1.869 60 C 0.433 0.200 0.300 - - - 93.30 *93.30% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page54
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Blimex Construction & Supply 27259 Const. of 4 Cl School Bldg. @ Patalinhug E/S XII 1.659 275 C 0.373 0.300 0.300 - - - 97.30 *97.30%
Outstanding
Blue Dragon Construction 11524 Const. of Candon Flood Control, MNR I 8.248 150 C 0.341 0.200 0.300 - - - 84.10 82.78%
V. Satisfactory
BMJ Construction 14571
Completion of Sto. Tomas-Cabagan Overflow Bridge (Phase
V), Cansan-Bagutari Overflow Bridge
II 14.394 365 C 0.267 0.300 0.300 - - - 86.70 91.56% Outstanding
BMJ Construction 14571
Completion of Sto. Tomas-Cabagan Overflow Bridge (Phase
IV), Cansan-Bagutari Overflow Bridge
II 9.092 250 C 0.267 0.300 0.300 - - - 86.70 86.34% V. Satisfactory
BMJ Construction 14571Conc. of Ilagan-Bagao-Palanan
National Road (Fuyo-Rang-ayan-Ayan Gap)
II 9.360 365 C 0.345 0.292 0.300 - - - 93.70 *93.70% Outstanding
BMJ Construction 14571Conc. of Ilagan-Delfin Albano-Mallig National Road (Pilitan-
Paragu Sect.)II 9.649 375 C 0.282 0.200 0.300 - - - 78.20 *78.20%
Satisfactory
BMJ Construction 14571 Concreting of Sto. Tomas-D. Albano Road (Gap Section) II 9.649 270 C 0.261 - 0.500 - - - 76.10 79.25%
Satisfactory
BMJ Construction 14571 Const. of 2-CL School Building @ Magassi High School II 0.632 120 C 0.291 0.300 0.300 - - - 89.10 89.45%
V. Satisfactory
BMJ Construction 14571 Rehab of Daang Maharlika Road II 19.136 195 O 0.306 0.300 0.150 0.030 0.040 0.330 115.60 -
BMJ Construction 14571 Rehab. of Cansan-Cabagan-Sto. Tomas Road II 4.674 182 C 0.307 0.200 0.300 - - - 80.70 79.56%
Satisfactory
BMJ Construction 14571Rehab. of Pinacanauan Br. App.
"A" & River Bank Protection works
II 11.699 272 C 0.363 0.300 0.300 - - - 96.30 88.24% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page55
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
BMJ Construction 14571 Rehab. of Sto. Tomas-Delfin Albano Road II 4.679 180 C 0.020 0.300 0.000 - - - 32.00 63.80%
Fair
BMJ Construction 14571 Rehab./Impvt. of Ilagan-Delfin Albano-Mallig Road II 14.366 280 C 0.268 0.300 0.300 - - - 86.80 86.80%
V. Satisfactory
BMJ Construction 14571 Road Concreting of Garita Brgy. Road (Phase II) II 0.472 75 C 0.321 0.300 0.300 - - - 92.10 89.04%
V. Satisfactory
BMK Construction 8292 Const. of Mitura Bridge along Urdaneta-Manaoag Road I 24.737 420 O 0.300 0.300 0.000 0.020 0.025 0.067 71.20 -
BMK Construction 8292Impvt./Rehab. of Urdaneta Jct,-
Dagupan-Lingayen Road via Zambales, Tapuac Section
I 19.259 180 C 0.350 0.200 0.300 - - - 85.00 85.30% V. Satisfactory
BMK Construction 8292Rehab./Reconst. of Damaged
National Road, Alaminos-Lucap Road
I 7.599 66 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory
BMK Construction 8292
Repair/Rehabilitation of Drainage System along old Judge de
Venecia Sr. Ave., 3 Rows Cross Drainage along Calasiao Road
I 4.821 270 C 0.351 - 0.500 - - - 85.10 85.19% V. Satisfactory
BN Builders & Construction Supply 28232 Concreting of Purok 3, Patin-ay XIII 2.825 150 C 0.203 0.200 0.300 - - - 70.30 83.62%
V. Satisfactory
BN Builders & Construction Supply 28232 Const. of Two (2) Storey MPB
(Completion) XIII 0.948 60 C 0.353 - 0.500 - - - 85.30 *85.30% V. Satisfactory
BN Builders & Construction Supply 28232 Construction of Multi-Purpose
Building, (Covered Court) XIII 2.243 120 C 0.435 0.200 0.300 - - - 93.50 *93.50% V. Satisfactory
BNG Construction and General Services 18503 Completion of Brgy. Oslao MPB XIII 1.485 90 C 0.381 0.200 0.300 - - - 88.10 *88.10%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page56
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
BNG Construction and General Services 18503 Conc. of Caglanipa Brgy. Road XIII 1.900 90 C 0.337 0.209 0.300 - - - 84.60 *84.60%
V. Satisfactory
BNG Construction and General Services 18503 Concreting of San Francisco-
Malimono Road Phase XXIV XIII 4.455 135 C 0.390 0.200 0.300 - - - 89.00 83.48% V. Satisfactory
BNG Construction and General Services 18503 Const. of MPB @ Brgy. 7 XIII 0.939 120 C 0.276 0.000 0.300 - - - 57.60 *57.60%
Poor
BNG Construction and General Services 26705 Const. of Surigao Del Norte
National High School XIII 0.371 45 C 0.369 0.116 0.300 - - - 78.50 85.43% V. Satisfactory
BNG Construction and General Services 18503 Const. of Various MPB @ Brgy.
Siana XIII 0.916 60 C 0.379 0.244 0.300 - - - 92.30 74.17% Satisfactory
BNR Construction & Development Corporation 12903
Completion of Putat Bridge I (Phase IV) along Toledo-Tabuel San Remigio Road Km.103.503
(approach)
VII 3.092 80 C 0.350 0.290 0.300 - - - 94.00 *94.00% Outstanding
BNR Construction & Development Corporation 12903 Concreting of Farm-to-Market
Road VII 0.949 70 C 0.372 - 0.500 - - - 87.20 79.82% Satisfactory
BNR Construction and Development Corporation 12903 Conc. Cebu-Toledo Wharf Road
(Nautical Highway) VII 27.753 252 C 0.363 0.200 0.300 - - - 86.30 87.35% V. Satisfactory
BNR Construction and Development Corporation 12903
Const. of Drainage Facilities with Cub and Gutter at Open-Airport
Road (Realigned to Const. of Drainage Facilities at Open-Airport
Road)
VII 1.845 80 C 0.386 0.300 0.300 - - - 98.60 92.06% Outstanding
BNR Construction and Development Corporation 12903 Const. of Pedestrian Overpass at
Talamban VII 4.295 100 O 0.353 0.300 0.100 0.030 0.060 0.100 94.30 -
BNYU Enterprises & Construction 27725 Completion of Multi-Purpose
Building VII 0.942 150 C 0.384 0.100 0.300 - - - 78.40 82.74% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page57
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
BNYU Enterprises & Construction 27725 Completion of Multi-Purpose
Building (Cultural Center) VII 0.927 80 C 0.206 0.200 0.300 - - - 70.60 70.46% Satisfactory
BNYU Enterprises & Construction 27725
Concrete Paving of Cortes-Balilihan-Macaas Road (Broken
Section)VII 7.425 140 C 0.343 0.300 0.000 - - - 64.30 76.15%
Satisfactory
BNYU Enterprises & Construction 27725 Concreting of Maribojoc-
Antequera Road VII 4.770 90 O 0.346 0.034 0.100 0.023 0.025 0.100 62.80 -
BNYU Enterprises & Construction 27725 Concreting of Maribojoc-
Antequera Road VII 4.770 90 O 0.307 0.191 0.100 0.023 0.025 0.100 74.60 -
BNYU Enterprises & Construction 27725
Impvt. (Conc.) of Catigbian-Balilihan-Tagbilaran Road (Broken
Section)VII 7.426 155 C 0.361 0.300 0.000 - - - 66.10 *66.10%
Fair
BNYU Enterprises & Construction 27725 Repair/Improvement of Multi-
Purpose Building VII 0.933 120 C 0.285 0.300 0.300 - - - 88.50 *88.50% V. Satisfactory
BNYU Enterprises and Construction 27725 Talibon Small Reservoir Irrigation
Project NIA 4.990 210 O 0.328 0.173 0.100 0.030 0.047 0.200 87.80 -
Bonibal Construction 9371 Asphalt Overlay of Mariveles Talaga Bay Road III 6.944 15 C 0.314 0.200 0.300 - - - 81.40 *81.40%
V. Satisfactory
Bonibal Construction 9371 Impv't. of Daan Pare Road III 1.870 40 C 0.342 0.300 0.300 - - - 94.20 *94.20% Outstanding
Bonicab Builders 28100 Construction of Two (2) Classrooms, Dardarat E/S I 0.950 60 C 0.439 0.133 0.300 - - - 87.20 *87.20%
Satisfactory
Bonifacio M. Carlos Construction 3303Completion of Multi-Purpose
Bldg., Purok Matahimik Brgy. San Pedro
IV-B 0.326 70 C 0.443 - 0.500 - - - 94.30 94.30% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page58
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Bonifacio M. Carlos Construction 3303 Conc. of Puerto Princesa South Road IV-B 13.698 120 C 0.298 0.300 0.300 - - - 89.80 91.60%
Outstanding
Bonifacio M. Carlos Construction 3303 Conc. of Puerto Princesa South Road, Calategas Section IV-B 5.671 120 C 0.346 0.300 0.300 - - - 94.60 88.84%
V. Satisfactory
Bonimar Construction Enterprises 23760 Concreting of Brgy. Burgos to
Demtal I 1.929 45 C 0.424 0.186 0.300 - - - 91.00 *91.00%V. Satisfactory
Bonimar Construction Enterprises 23760 Const. of 1 CL Sch. Bldg. @
Bolaen E/S I 0.493 60 C 0.336 0.251 0.300 - - - 88.70 *88.70% V. Satisfactory
Bonimar Construction Enterprises 23760 Const. of 1 CL Standard Sch. Bldg.
@ Salomague NHS I 0.493 60 C 0.320 0.278 0.300 - - - 89.80 *89.80% V. Satisfactory
Bonimar Construction Enterprises 23760 Const. of 1 CL Std. Sch. Bldg. @
Binmaley School of Fisheries I 0.507 60 C 0.368 0.200 0.300 - - - 86.80 *86.80% V. Satisfactory
Bontoc Builders 33306 Construction of Abatan Drainage (Part of Cluster 5) CAR 0.864 60 O 0.351 0.300 0.150 0.030 0.048 0.050 92.90 -
Borderline Construction and Supply 24433
Conc. of Dualing-New-Panay-Midsayap Road (Sta. Cruz-
Katalicanan Section)XII 4.779 74 C 0.358 0.126 0.300 - - - 78.40 79.42%
Satisfactory
Borderline Construction and Supply 24433 Concreting of Dualing-New Panay-
Midsayap Road, Sta. Cruz Section XII 9.405 165 C 0.422 0.133 0.300 - - - 85.50 *85.50% Satisfactory
Borderline Construction and Supply 24433 Const. of MPB XII 0.287 45 C 0.334 0.239 0.300 - - - 87.30 *87.30%
V. Satisfactory
Borderline Construction and Supply 24433 Const. of Water System XII 0.467 45 C 0.385 0.215 0.300 - - - 90.00 *90.00%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page59
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Borderline Construction and Supply 24433 Rehab./Impvt. of Bukidnon-
Cotabato Road, Poblacion Section XII 4.653 75 C 0.329 0.200 0.300 - - - 82.90 *82.90% V. Satisfactory
BPDG Construction & Trading 16167 Const. of MPB at Brgy. San Jose Proper III 3.612 80 C 0.357 0.300 0.300 - - - 95.70 *95.70%
Outstanding
BRC Construction 21931 PSHS CVC Academic Building Phase III DOST 6.482 216 C 0.375 0.300 0.300 - - - 97.50 97.50%
Outstanding
Brillantes Construction 26447 Const. of Multi-Purpose Building (Phase I) X 0.940 105 C 0.400 0.209 0.690 - - - 97.63 97.63%
Outstanding
Brillantes Construction 26447Provision of Line Canal at
Nabangunan Section along Jct. Dologan-Busco-Quezon Road
X 0.275 30 C 0.354 0.300 0.300 - - - 95.40 88.50% V. Satisfactory
Brillantes Construction 26447Provision of Lined Canal along
Jct. Dologan-Busco-Quezon Road, Nabanganan Section
X 0.462 45 C 0.381 0.200 0.300 - - - 88.10 86.60% V. Satisfactory
Brima Construction and Enterprises 8746 Rehab./Impvt./Conc. of Tubod-
Ganassi National Road X 9.142 78 C 0.287 0.300 0.300 - - - 88.70 86.06% V. Satisfactory
Bros Construction and Supply 10507 Conc. of Surigao-Davao Coastal Road (Bad-as SDN Section) XIII 6.509 90 C 0.320 0.215 0.300 - - - 83.50 79.72%
Satisfactory
Bros Construction and Supply 10507 Concreting of NRJ Osmeña-Magkiangkan Road XIII 0.943 105 C 0.430 - 0.500 - - - 93.00 90.78%
Outstanding
Bros Construction and Supply 10507 Concreting of San Jose-Trento Road Section XIII 8.078 180 C 0.347 0.200 0.300 - - - 84.70 83.89%
V. Satisfactory
Bros Construction and Supply 10507 Const./Rehabilitation of San Francisco By-Pass Road XIII 0.886 60 O 0.400 0.173 0.100 0.018 0.023 0.100 81.40 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page60
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Bros Construction and Supply 10507 Rehab. of Balingasag By-Pass Road X 4.640 150 C 0.314 0.200 0.300 - - - 81.40 81.22%
V. Satisfactory
Bros Construction and Supply 10507Repair/Rehab. of Damaged Slope
Protection Structure due to Erosion along Roadside of ICBR
X 2.593 180 C 0.331 0.200 0.300 - - - 83.10 *83.10% V. Satisfactory
Bros Construction and Supply 10507 Repair/Rehab. of del Monte PSCG Bridge XIII 1.635 198 C 0.152 0.300 0.000 - - - 45.20 58.91%
Poor
Brostan Consruction & Development 12360 Completion/Extension of Multi-
Purpose Building II 0.652 100 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
Brostan Construction & Development 12360 Addalam River Irrigation Project NIA 9.225 235 O 0.351 0.300 0.077 0.023 0.038 0.033 82.27 -
Brostan Construction & Development 12360 Conc. of Pila-Poblacion Road IV-A 9.630 60 C 0.298 0.215 0.300 - - - 81.30 *81.30%
V. Satisfactory
Brostan Construction & Development 12360 Conc. of Road II 2.885 90 C 0.268 0.300 0.300 - - - 86.80 87.88%
V. Satisfactory
Brostan Construction & Development 12360 Conc. of Road, Leading to Eco-
Tourism Project (Caliraya Lake) IVA 19.298 150 C 0.291 0.300 0.300 - - - 89.10 93.96% Outstanding
Brostan Construction & Development 12360 Const. of MPB (Phase I), Cagayan
State University II 9.640 300 O 0.304 0.240 0.070 0.024 0.033 0.100 77.10 -
Brostan Construction & Development 12360 Const. of MPB (Phase I), Cagayan
State University II 9.640 300 O 0.316 0.240 0.100 0.030 0.037 0.100 82.30 -
Brostan Construction & Development 12360 Const. of MPB, Isabela State
University II 0.756 180 C 0.341 - 0.000 - - - 34.10 48.45% Poor
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page61
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Brostan Construction & Development 12360 Const. of Multi-Purpose Bldg. @
Victoria, Alicia, Isabela II 0.691 60 C 0.302 - 0.500 - - - 80.20 88.78% V. Satisfactory
Brostan Construction & Development 12360 Impvt./Rehab. of Jct. Dumabato-
Baligui Road II 19.280 180 C 0.339 0.200 0.300 - - - 83.90 *83.90% V. Satisfactory
Brostan Construction & Development 12360 Rehab. of Burgos-Aurora FMR II 3.365 50 C 0.400 0.225 0.300 - - - 92.50 *92.50%
Outstanding
Brostan Construction & Development 12360 Rehab. of Calapan South Road &
East Coastal Road IVB 0.952 28 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding
Brostan Construction & Development 12360 Rehab. of Farm to Market Road II 0.657 80 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Brostan Construction & Development 12360 Rehab. of FMR II 1.438 60 C 0.240 0.300 0.300 - - - 84.00 *84.00%
V. Satisfactory
Brostan Construction & Development 12360 Rehab. of Nat'l Road along Jct.
Oscariz-Ramon Putia Section II 9.629 120 C 0.390 0.200 0.300 - - - 89.00 *89.00% V. Satisfactory
Brostan Construction & Development 12360 Rehab. of Roads along Gamu-
Roxas Road II 11.564 60 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory
Brostan Construction & Development 12360
Rehab. of Roads along Santiago-Tuguegarao Road (Conc.
Reblocking)II 19.274 90 C 0.357 0.200 0.000 - - - 55.70 72.32%
Satisfactory
Brostan Construction & Development 12360 Rehab. of Sibunag Bridge along
Guimaras Circumferential Road VI 2.178 95 C 0.389 0.100 0.300 - - - 78.90 *78.90% Satisfactory
Brostan Construction & Development 12360 Rehab./Impv't. of Sotero Nuesa-
Simimbaan Road II 4.699 180 C 0.312 - 0.500 - - - 81.20 85.88% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page62
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Brostan Construction & Development 12360 Rehab./Reconst. of Damaged Nat'l
Road II 15.235 90 C 0.341 0.275 0.000 - - - 61.60 78.40% Satisfactory
Brostan Construction & Development 12360
Rehab./Replacement of Damaged Bridges along CDMA Road,
Pinaripad BridgeII 13.472 285 C 0.400 0.300 0.000 - - - 70.00 71.44%
Satisfactory
Brostan Construction & Development 12360
Repair/Rehab. of Farm to Market Road, Brgy. San Leonardo-
PinaripadII 4.054 60 C 0.363 0.300 0.300 - - - 96.30 96.30%
Outstanding
Brostan Construction & Development 12360 Replacement of Laoag Bridge
along Jct. Ipil-Quirino Bdry. Road II 4.792 150 C 0.338 0.200 0.300 - - - 83.80 85.36% V. Satisfactory
Brylle Trading & Construction Supplies 32880 Construction of Drainage System
along Rizal St. I 0.578 30 O 0.336 0.300 0.150 0.000 0.021 0.050 85.70 -
BS Chang Builders 22745 DBM South Linear Park PRRC 7.088 120 C 0.46 0.0815 0.300 - - - 84.15 *84.15% V. Satisfactory
BS Chang Builders 22745 DBM South Linear Park III PRRC 2.235 70 C 0.42 0.200 0.300 - - - 92.00 *92.00% Outstanding
Busilac Builders Inc. 7701 ACA Bldg. 2 DOST 9.651 180 C 0.389 0.300 0.300 - - - 98.90 98.90% Outstanding
Busilac Builders, Inc. 7701 ACA Bldg. 2 DOST 9.651 180 C 0.389 0.300 0.300 - - - 98.90 98.90% Outstanding
Busilac Builders, Incorporated 7701 Conc. of Batac-Pinili Road, Batac Section I 21.291 331 O 0.327 0.240 0.100 0.018 0.047 0.067 79.90 -
Busilac Builders, Incorporated 7701 Concreting of Various Roads (Sulquiano & Purungganan) I 0.939 50 O 0.360 0.246 0.100 0.030 0.035 0.100 87.10 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page63
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Busilac Builders, Incorporated 7701 Const. of Drainage along MNR, San Nicolas-Nangalisan Section I 6.641 120 C 0.239 0.300 0.300 - - - 83.90 80.84%
V. Satisfactory
BYA Builders and Construction Supply 24158 Const. of One (1) Cl Schl. Bldg. @
Ipil NHS VIII 0.442 45 C 0.363 0.297 0.300 - - - 96.00 *96.00% Outstanding
BYA Builders and Construction Supply 24158 Impvt./Rehab. of Nat'l Road along
Tacloban-Baybay South Road VIII 0.940 60 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory
C & F Construction & Development Corporation 3509
Rehab. of Sandiat Bridge & Approaches along Santiago-
Tuguegarao RoadII 3.779 180 C 0.271 0.205 0.300 - - - 77.60 *77.60%
Satisfactory
C & F Construction & Development Corporation 3509 Repair/Rehab. of Bocaue-San Jose
Road III 9.860 100 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory
C & F Construction & Development Corporation 3509 Widening & Impvt. of Quirino
Highway III 4.749 110 C 0.246 0.245 0.300 - - - 79.10 *79.10% Satisfactory
C & F Construction & Development Corporation 3509
Widening/Rehab. of Quirino Highway, Gumaoc-Tungkong-
Mangga, San Jose Del Monte City.III 9.433 200 C 0.456 - 0.500 - - - 95.60 87.62%
V. Satisfactory
C D U Construction 13915 Conc. of Laoang-Calomotan Road VIII 19.065 180 O 0.358 0.240 0.100 0.015 0.025 0.100 83.80 -
C D U Construction 13915 Conc. of Pangpang-Palapag-Mapanas-Gamay-Lapinig Road VIII 9.517 150 C 0.331 0.200 0.300 - - - 83.10 *83.10%
V. Satisfactory
C D U Construction 13915 Const. of 1 CL Sch. Bldg. @ Brgy. Bansud VIII 0.454 60 C 0.372 0.200 0.300 - - - 87.20 *87.20%
Satisfactory
C D U Construction 13915 Const. of MPB @ Brgy. Carayman VIII 0.963 90 C 0.429 0.200 0.300 - - - 92.90 *92.90% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page64
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
C D U Construction 13915
Const./Rehab./Replacement/Completion and Repair of Elem. & Secondary Sch. Bldg., Bliss
Primary School
VIII 0.433 60 C 0.379 0.200 0.300 - - - 87.90 *87.90% Satisfactory
C D U Construction 13915Repair/Rehab. of Ferry Terminal-
Allen Road (Roadslip) Daang Maharlika
VIII 3.835 90 C 0.282 0.200 0.300 - - - 78.20 84.26% V. Satisfactory
C D U Construction 13915Repair/Rehab. of Laoang-
Calomotan (Road Slip) Km. 790+800 to Km. 797+013
VIII 4.719 90 C 0.366 0.300 0.300 - - - 96.60 92.34% Outstanding
C E K Construction and Water Supply 13713 Completion of School Bldg. at
Binwang E/S XII 0.274 60 C 0.310 0.200 0.300 - - - 81.00 *81.00% V. Satisfactory
C E K Construction and Water Supply 13713 Const. of MPB @ Brgy. Lamlahak XII 0.667 70 C 0.478 0.200 0.300 - - - 97.80 82.68%
Satisfactory
C E K Construction and Water Supply 13713 Const. of MPB at Brgy. Sinawilan XI 2.191 110 O 0.378 0.237 0.143 0.030 0.045 0.050 88.30 -
C E K Construction and Water Supply 13713 Const. of MPB at Paligue XI 0.953 75 C 0.368 0.223 0.300 - - - 89.10 *89.10%
V. Satisfactory
C. Brotonel Construction 9727Completion of the Const. of Taal Lake Circ. Road (Talisay-Laurel-
Agoncillo Section)IV-A 9.643 145 C 0.465 0.133 0.300 - - - 89.80 88.18%
Satisfactory
C. Brotonel Construction 9727 Impvt. of MPB IV-A 0.192 45 C 0.312 0.300 0.300 - - - 91.20 *91.20% Outstanding
C. Brotonel Construction 9727 Riprapping of Tumaway-Quiling Creek, Brgy. Tumaway IV-A 0.481 45 C 0.450 0.200 0.300 - - - 95.00 *95.00%
V. Satisfactory
C. Dy Builders and General Merchandise (Formerly: CD
Construction)17003 Const. of 10 units CL, Mancahan
NHS X 4.668 120 C 0.418 0.058 0.300 - - - 77.60 82.15% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page65
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
C. E. Padilla Construction 11278 Partial Const. of 3-Storey Medical and Parking Bldg. with Roofdeck PRRC 94.626 295 C 0.323 0.200 0.300 - - - 82.30 *82.30%
V. Satisfactory
C. Lara Construction 17304 Const. of 1 Storey 2 CL Modified SB at Ajong NHS VII 0.871 75 C 0.282 0.300 0.300 - - - 88.20 86.38%
V. Satisfactory
C.A. Betalac Construction & Gen. Mdse. 28222 Construction of Roads at Brgy.
San Agustin, Calean XII 0.962 65 C 0.401 0.200 0.300 - - - 90.10 *90.10% V. Satisfactory
C.A. Betalac Construction & Gen. Mdse. 28222
Partial Const. of Academic Classroom at Ma. Z. Bayya
Memorial E/SXII 0.480 75 C 0.342 0.200 0.300 - - - 84.20 *84.20%
V. Satisfactory
C.B. Tampengco Construction & Supply 18505 Const. of Multi-Purpose at Brgy.
80, Zone 7 NCR 2.136 90 O 0.366 0.250 0.100 0.023 0.041 0.100 88.00 -
C.B. Tampengco Construction & Supply 18505 Const. of Velasquez Health Center
Nepomuceno Cor. F. Varona St., NCR 2.880 178 C 0.423 0.200 0.300 - - - 92.30 *92.30% V.Satisfactory
C.B. Tampengco Construction & Supply 18505 Upgrading/Conc. of Roads with
Drainage Improvement NCR 0.476 45 C 0.336 0.200 0.300 - - - 83.60 *83.60% Satisfactory
C.B. Tampengco Construction and Supply 18505 Completion of MPB at Brgy.
Marulas NCR 1.044 60 C 0.369 0.231 0.300 - - - 90.00 *90.00% V. Satisfactory
C.B. Tampengco Construction and Supply 18505 Const. (Partial) of MPB IV-A 4.800 150 C 0.385 0.265 0.300 - - - 95.00 *95.00%
Outstanding
C.B. Tampengco Construction and Supply 18505 Const. of 2 Cl Sch. Bldg. @ San
Mateo H/S IV-A 0.962 60 O 0.286 0.267 0.100 0.030 0.032 0.100 81.50 -
C.B. Tampengco Construction and Supply 18505 Const. of Conc. Pathwalk in Sch.
Grounds of Caruhatan West E/S NCR 0.949 60 C 0.205 0.248 0.300 - - - 75.30 *75.30% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page66
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
C.B. Tampengco Construction and Supply 18505 Const. of Health Center at Brgy.
Canlalay IV-A 0.960 60 C 0.312 0.231 0.300 - - - 84.30 75.83% Satisfactory
C.B. Tampengco Construction and Supply 18505 Const. of MPB (Public Market) @
Brgy 186 NCR 4.682 150 C 0.280 0.200 0.300 - - - 78.00 88.29% V. Satisfactory
C.B. Tampengco Construction and Supply 18505 Const. of Multi-Purpose at Brgy.
NBBS, Navotas, Metro Manila NCR 2.836 105 C 0.342 0.300 0.300 94.20 90.70% Outstanding
C.B. Tampengco Construction and Supply 18505 Const. of Two (2) CL Sch. Bldg. @
Mariveles H/S III 0.877 52 C 0.352 0.200 0.300 - - - 85.20 *85.20% V. Satisfactory
C.B. Tampengco Construction and Supply 18505 Impvt. of V. Ilustre St., Brgy. Don
Manuel NCR 1.878 60 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding
C.C.M. Construction 11043 Completion of Cogon Night High School Building VII 1.112 100 O 0.343 0.221 0.100 0.010 0.029 0.100 80.30 -
C.C.M. Construction 11043 Completion of Cogon Night School Building VII 1.112 100 O 0.378 0.240 0.100 0.010 0.029 0.100 85.70 -
C.C.M. Construction 11043Conc. of Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon)
RoadVII 13.714 238 C 0.415 0.200 0.300 - - - 91.50 87.93%
Satisfactory
C.C.M. Construction 11043Conc. Paving of Jct. (TNR)
Maribojoc-Antequera-Catagbacan (Loon) Road
VII 4.485 120 C 0.371 0.000 0.300 - - - 67.10 78.32% Satisfactory
C.C.M. Construction 11043 Concreting of Multi-Purpose Pavement VII 0.137 130 C 0.375 0.200 0.300 - - - 87.50 *87.50%
Satisfactory
C.C.M. Construction 11043 Const. of Brgy. Lumangog Road VII 2.806 188 C 0.466 0.200 0.300 - - - 96.60 85.20%Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page67
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
C.C.M. Construction 11043Rehab. of Settled Approaches of Damaiao and Taguimtim Bridges
along Bohol Circumferential RoadVII 2.842 90 C 0.391 0.200 0.300 - - - 89.10 81.72%
V. Satisfactory
C.D. Valbuena Construction 26794 Const. of Foot Bridge, Brgy. Malinao Ilaya IV-A 0.142 60 C 0.305 0.263 0.300 - - - 86.80 *86.80%
V. Satisfactory
C.D. Valbuena Construction 26794 Const. of Water Supply System at Brgy. Bagong Anyo IV-A 0.574 40 C 0.377 0.300 0.300 - - - 97.70 *97.70%
Outstanding
C.E. Padilla Construction 11278 Guadalupe Viejo Linear Park cum Revetment Wall Project PRRC 49.604 210 O 0.390 0.297 0.100 0.030 0.049 0.100 96.60 -
C.E. Padilla Construction 11278 PUP Linear Park Project PRRC 19.989 350 C 0.311 0.270 0.100 - - - 68.10 68.10% Fair
C.F. Trinidad / 2H2L Construction Joint Venture JV-07-059 Widening of Taytay Diversion
Road IVA 19.223 150 C 0.341 0.300 0.300 - - - 94.10 85.16% V. Satisfactory
C.F. Trinidad Construction 9199 Const. of Box Culvert at P. Gomez Extension IV-A 1.050 60 C 0.363 0.200 0.300 - - - 86.30 *86.30%
V.Satisfactory
C.F. Trinidad Construction 9199 Dredging/Riprapping of Angono River IV-A 2.882 90 C 0.368 0.268 0.300 - - - 93.60 *93.20%
Outstanding
C.F. Trinidad Construction 9199 Riprapping of Creek, beside Ferretville Subdivision IV-A 3.840 150 C 0.218 0.300 0.300 - - - 81.80 77.72%
Satisfactory
C.F. Trinidad Construction 9199 Riprapping of Creek, Peñafrancia, Brgy. Cupang IV-A 1.438 120 O 0.367 0.300 0.150 0.030 0.042 0.050 93.90 -
C.G.I. Construction 10606 Conc. of FMR @ Brgy. Daang Bago III 0.470 60 C 0.297 0.300 0.300 - - - 89.70 *89.70%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page68
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
C.G.I. Construction 10606 Const. of Road @ General Luna III 0.475 60 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory
C.J. Maramat Construction 6007 Completion of SLU-SVP Brgy. Bakakeng Multi-Purpose Building CAR 1.427 70 C 0.368 0.300 0.300 - - - 96.80 85.32%
V. Satisfactory
C.J. Maramat Construction 6007 Const. of Multi-Purpose Building at BGH Compound Brgy. CAR 1.414 60 C 0.372 0.300 0.300 - - - 97.20 91.88%
Outstanding
C.J. Maramat Construction 6007 Const. of Two (2) Storey Reinforce Concrete Municipal Bldg. I 11.288 231 O 0.295 0.269 0.100 0.015 0.035 0.100 81.40 -
C.L. Carandang Enterprises 29494 Conc. of Masbate-Milagros Road V 13.855 150 C 0.260 0.300 0.300 - - - 86.00 76.768% Satisfactory
C.L. Carandang Enterprises 29494 Conc. of Sitio Calumpang Road V 0.956 120 C 0.464 0.133 0.300 - - - 89.70 *89.70% V. Satisfactory
C.L. Carandang Enterprises 29494 Concreting of Barangay Kalipay Road V 0.956 120 C 0.471 0.133 0.300 - - - 90.40 *90.40%
V. Satisfactory
C.L. Carandang Enterprises 29494 Concreting of Jct. Mandaon-Mandaon Road V 9.590 150 O 0.339 0.300 0.100 0.008 0.028 0.067 84.20 -
C.L. Carandang Enterprises 29494 Const. of Flood Control Project @ Tugbo V 0.939 60 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V. Satisfactory
C.L. Carandang Enterprises 29494 Const. of MPB at DILG Compound V 0.379 45 C 0.369 0.200 0.300 - - - 86.90 *86.90% V. Satisfactory
C.L. Carandang Enterprises 29494 Rehab. of Dayao-Bugtong FTMR V 4.791 90 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page69
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
C.L. Carandang Enterprises 29494 Rehab. of Jct., Crossing-Mandaon Road V 18.810 120 C 0.277 0.200 0.300 - - - 77.70 *77.70%
Satisfactory
C.L. Carandang Enterprises 29494 Rehab./Impvt./Const. of DEO V 2.886 90 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
C.L. Carandang Enterprises 29494Replacement/Reblocking of
Concrete Pavement along MasbateCataingan Road
V 9.488 120 C 0.298 0.300 0.300 - - - 89.80 82.48% V. Satisfactory
C.M. Dancel Const. & Supply / FRD Const. (JV) JV-03-106 Const. of Tulnagan Bridge I 19.981 452 C 0.326 0.300 0.300 - - - 92.60 84.08%
V. Satisfactory
C.M. Dancel Construction & Supply 12640 Const. of Drainage along MNR,
Nangalisan Section I 2.742 120 C 0.372 0.200 0.300 - - - 87.20 84.62% V. Satisfactory
C.M. Dancel Construction & Supply 12640 Impvt. of Pasuquin-Sapat Air
Station Road I 19.284 210 C 0.248 0.187 0.300 - - - 73.50 76.08% Satisfactory
C.M. Dancel Construction & Supply 12640 ReConst. of River Control
Protection I 4.725 81 C 0.200 0.300 0.300 - - - 80.00 *80.00% Satisfactory
C.M. Dancel Construction & Supply 12640 Rehab./Reconst. of Damaged Nat'l
Road, MNR, Maoini-Baduang Road I 18.963 150 O 0.400 0.300 0.100 0.015 0.020 0.100 93.50 -
C.M. De Villa Construction & Supply (Formerly: C.M. De Villa
Const.)22778 Conc. of Roads in Sitio Kay Reyna IV-A 0.471 60 C 0.304 0.221 0.300 - - - 82.50 *82.50%
V. Satisfactory
C.M. Pancho Construction Incorporated 183
Bohol Circumferential Road Improvement Project, CP-2,
Candijay-Jagna-Valencia Sect.Sat. 169+240-Sta. 221+040
PJHL 856.115 944 C 0.355 0.300 0.300 - - - 95.50 95.50% Outstanding
C.M. Pancho Construction Incorporated 183 Bridge Replacement Sixth Road
Project Bridge Component CP-M I 86.581 435 C 0.341 0.200 0.300 - - - 84.10 81.46% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page70
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
C.M. Pancho Construction Incorporated 183 Const. of Aloragat Bridge &
Approaches I 51.651 300 O 0.389 0.300 0.100 0.030 0.061 0.100 98.00 -
C.M. Pancho Construction Incorporated 183 Const. of Daang Hari Extension
Aguinaldo-Highway-Coastal Road IVA 9.568 150 C 0.314 0.300 0.300 - - - 91.40 *91.40% Outstanding
C.M. Pancho Construction Incorporated 183 Rehab. of Surigao-Davao Coastal
Road, Jct. Bacuag-Claver Section XIII 661.069 540 O 0.351 0.300 0.100 0.030 0.060 0.100 94.10 -
C.M. Pancho Construction Incorporated 183 Rehab. of Surigao-Davao Coastal
Road, Jct. Bacuag-Claver Section XIII 661.069 540 O 0.338 0.300 0.070 0.030 0.070 0.100 90.80 -
C.R. Domingo Construction 2992 Conc. of Naguilian-San Mariano Road (Binatug Section) II 9.646 90 C 0.333 0.200 0.300 - - - 83.30 82.16%
V. Satisfactory
C.R. Domingo Construction, Inc. (Formerly C.R. Domingo
Contruction)2992
Concreting of Potia, A Lista, Ifugao-Mt. Province Boundary
RoadCAR 19.123 140 C 0.461 0.200 0.300 - - - 96.10 *96.10%
Outstanding
C.S. Garcia Construction 1901 Const./Rehab. of Sch. Bldg. F. De Mesa E/S NCR 1.427 45 C 0.386 0.300 0.300 - - - 98.60 *98.60%
Outstanding
C.S. Garcia Construction 1901 Rehab. of Sagbat-Pililla Diversion Road IV-A 9.598 45 C 0.364 0.286 0.300 - - - 95.00 *95.00%
Outstanding
C.S. Garcia Construction 1901 Road Repair/Rehabilitation of Cadena de Amor St. III 0.477 10 C 0.437 0.200 0.300 - - - 93.70 93.70%
V.Satisfactory
C.S. Rayos Construction & General Services 9790 Completion of Ternate-Nasugbu
Road, Calayo-Looc Section IV-A 23.966 240 C 0.370 0.290 0.300 - - - 96.00 85.56% V. Satisfactory
C.S. Rayos Construction & General Services 9790
Const. (Concreting) of Ternate-Nasugbu Road, Ternate-Kaybiang
SectionIV-A 28.934 240 C 0.321 0.300 0.300 - - - 92.10 85.56%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page71
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
C.S. Rayos Construction & General Services 9790 Const./Impvt. of Bauan-Mabini
Circ. Road IV-A 9.496 170 C 0.220 0.195 0.300 - - - 71.50 *71.50% Satisfactory
C.V. Construction & Development 8334 Conc. of Road @ Sampaguita East St. Purok NHA 2 XI 0.564 120 C 0.360 0.300 0.300 - - - 96.00 *96.00%
Outstanding
C.V. Construction & Development 8334 Const. of 1 Cl 1 Storey Sch. Bldg. @ Saloy H/S XI 0.433 60 C 0.329 0.247 0.300 - - - 87.60 *87.60%
V. Satisfactory
C.V. Construction & Development 8334 Const./Completion of Doña Helene Bridge 1 & Approaches XIII 7.007 529 C 0.485 0.200 0.000 - - - 68.50 71.11%
Poor
C.V. Construction & Development 8334Impv't/Conc. of Additional Two (2) Lanes along Davao City Diversion
Road (Airport Section)XI 15.407 266 C 0.345 0.200 0.300 - - - 84.50 89.69%
V. Satisfactory
C.V. Construction & Development 8334Replacement of Sayug Bailey
Bridge to RCBC (Jct. del Carmen-Sta. Monica-San Isidro Road)
XIII 9.548 212 C 0.353 0.212 0.000 - - - 56.50 62.98% Fair
CA Miguel Construction, Incorporated 10221 Conc. of Brgy. Roads IVA 1.917 150 C 0.365 0.300 0.300 - - - 96.50 *96.50%
Outstanding
CA Miguel Construction, Incorporated (Formerly: C.A.
Miguel Const.)10221 Const. of MPB @ J.E. Pama St. NCR 0.373 45 C 0.326 0.200 0.300 - - - 82.60 *82.60%
V. Satisfactory
Caana Construction 12905 Repair/Rehab. of Manila High Sch. NCR 0.962 30 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory
Cager Construction & Supply 21743Site Development Const. of
Standard Day Care Center KV1 (Package 8)
PRRC 2.116 90 O 0.378 0.300 0.100 0.023 0.028 0.100 92.90 -
Camia Construction 20506 Completion of Matuyem Bridge (Phase II) II 4.695 150 C 0.373 0.215 0.000 - - - 58.80 71.34%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page72
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Camia Construction 20506 Completion of Public Market II 1.096 120 C 0.328 0.239 0.300 - - - 86.70 78.65% Satisfactory
Camia Construction 20506 Conc. of Dugo-San Vicente Road with Drainage II 5.630 150 O 0.352 0.264 0.030 0.020 0.023 0.033 72.20 -
Camia Construction 20506 Conc. of Simpatuyo Brgy. Road II 0.942 90 C 0.281 0.187 0.300 - - - 76.80 *76.80% Satisfactory
Camia Construction 20506 Const. of Balluyan Bridge, Phase II CAR 2.830 210 C 0.330 0.214 0.300 - - - 84.40 88.42% V.Satisfactory
Camia Construction 20506 Const. of Caglayan Flood Control Phase II CAR 2.360 65 C 0.316 0.195 0.300 - - - 81.10 80.80%
V.Satisfactory
Camia Construction 20506 Const. of Conner National High School CAR 0.473 71 C 0.339 0.200 0.300 - - - 83.90 *83.90%
V.Satisfactory
Camia Construction 20506
Maint./Rehab. & Impvt. of Nat'l Arterial Sec. Roads Public
Infratructure along Cagayan-Apayao Road, Tuao Pob. Sect.
II 4.998 150 C 0.324 0.195 0.300 - - - 81.90 *81.90% V.Satisfactory
Camia Construction 20506 Maintenance/Rehab. Along Apayao-Calanasan Road CAR 4.588 241 C 0.363 0.200 0.300 - - - 86.30 82.64%
Satisfactory
Camia Construction 20506 Rehab. of Kabugao-Pudtol-Luna Road, Capitol-Poblacion Section CAR 18.563 390 O 0.351 0.300 0.150 0.030 0.035 0.033 89.90 -
Camia Construction 20506 Repair/Rehab of Priority FMR (Municipal Wide) CAR 1.856 35 C 0.217 0.200 0.300 - - - 71.70 *71.70%
Satisfactory
Camia Construction 20506 Replacement/Const. of Malabanig Bridge CAR 15.218 300 C 0.385 0.200 0.300 - - - 88.50 87.12%
V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page73
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Camia Construction 20506 Upgrading of Kabugao-Pudtol-Luna Road, Lenneng Section CAR 13.870 385 O 0.344 0.300 0.150 0.030 0.052 0.025 90.10 -
Candace Construction 12084Const. & Repair/Rehab. of Various
School Bldgs. (Clustered-1) 1st Batch CY 2004
IX 0.359 95 C 0.450 - 0.500 - - - 95.00 *95.00% Outstanding
Carlo Joseph Construction 21017 Const. of 1 unit 1Cl Sch. Bldg. @ Lubao Vocational School III 0.285 88 C 0.324 0.195 0.300 - - - 81.90 *81.90%
V. Satisfactory
Carlo Joseph Construction 21017 Const. of Lined Canal, San Vicente (Part of Package 17) III 2.090 60 C 0.398 0.204 0.300 - - - 90.20 *90.20%
V. Satisfactory
Carlo Joseph Construction 21017 Improvement of Farm-to-Market Road at Brgy. Pandan III 1.885 30 C 0.405 0.133 0.300 - - - 83.80 *83.80%
Satisfactory
Carlo Joseph Construction 21017 Improvement of Public Market (Porac Mall) III 2.366 88 C 0.353 0.200 0.300 - - - 85.30 *85.30%
V. Satisfactory
Carlo Joseph Construction 21017 Repair of Brgy. Roads @ Magnolia St. III 0.462 15 C 0.448 0.133 0.300 - - - 88.10 *88.10%
Satisfactory
Carlyz Construction 19776 Const./Repair of DepEd Division Office Phase II CAR 0.946 73 C 0.205 0.200 0.300 - - - 70.50 *70.50%
Satisfactory
Carlyz Construction 19776Widening/Conc. of Banaue-
Mayoyao Alfonso Lista-Isabela Boundary Road, Kinakin Section
CAR 1.895 90 C 0.378 0.200 0.300 - - - 87.80 88.20% V. Satisfactory
Carrascal Integrated Enterprises 4764 Completion of Carrascal MPB XIII 1.844 120 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory
Carrascal Integrated Enterprises 4764 Completion of Madrid District Hospital (Phase III) XIII 3.629 120 C 0.357 0.254 0.300 - - - 91.10 86.20%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page74
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Carrascal Integrated Enterprises 4764 Completion of MPB XIII 3.635 120 C 0.366 0.200 0.300 - - - 86.60 93.11% Outstanding
Carrascal Integrated Enterprises 4764 Completion of Public Market XIII 1.844 120 C 0.393 0.200 0.300 - - - 89.30 87.55% V. Satisfactory
Carrascal Integrated Enterprises 4764 Conc.of Sibahay-Nurcia Section (SDCR) XIII 19.285 150 C 0.428 0.115 0.300 - - - 84.30 84.06%
Satisfactory
Carrascal Integrated Enterprises 4764 Const. of Abacahan Bridge XIII 10.214 195 C 0.324 0.200 0.300 - - - 82.40 84.08% V. Satisfactory
Carrascal Integrated Enterprises 4764 Const. of Adlay Bridge and Approaches XIII 23.683 315 C 0.305 0.300 0.300 - - - 90.50 *90.50%
Outstanding
Carrascal Integrated Enterprises 4764 Const. of Kayawyawan and Approaches Bridge 1 XIII 13.806 285 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
Carrascal Integrated Enterprises 4764 Improvement of Coastal Road Lanuza XIII 4.551 160 C 0.370 0.201 0.300 - - - 87.10 85.96%
V. Satisfactory
Carry-on Construction 8014 Const. of MPB at Brgy. NBBS NCR 2.850 75 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding
Carry-on Construction 8014 Const./Impvt. of MPB NCR 1.916 75 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory
Carry-on Construction 8014Upgrading/Conc. of Roads with Drainage Improvement, Brgy.
Sipac NCR 0.477 45 C 0.325 0.200 0.300 - - - 82.50 *82.50%
Satisfactory
Casigayan Construction 26796 Const. of MPB, KASC (Phase I) CAR 0.945 120 C 0.316 0.195 0.300 - - - 81.10 *81.10% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page75
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Cauayan United Enterprises and Builders 8816 Construction of Canal and Canal
Structures (LMC-ARIP-09-06) NIA-II 1.983 210 C 0.329 0.133 0.000 0.015 0.028 0.200 70.50 70.51% Satisfactory
Cauayan United Enterprises and Const. Builders/Brostan Const. &
Dev. (JV)JV-07-168
Conc. of Ilagan-Delfin Albano-Mallig National Road (Manano
Section)II 19.290 365 O 0.372 0.225 0.100 0.010 0.047 0.100 85.40 -
Cauayan United Enterprises and Construction Builders 8816 Conc. of Ilagan-Delfin Albano-
Mallig Road (Olango Section) II 9.648 90 C 0.335 0.196 0.300 - - - 83.10 *83.10% V. Satisfactory
Cauayan United Enterprises and Construction Builders 8816 Const. of 1 Cl Sch. Bldg. @
Daramuangan E/S II 0.319 165 C 0.366 0.174 0.300 - - - 84.00 *84.00% V. Satisfactory
Cauayan United Enterprises and Construction Builders 8816 Const. of 5-Units Deep Well (Light
Duty Type), Minate I II 0.184 75 C 0.260 0.200 0.300 - - - 76.00 *76.00% Satisfactory
Cauayan United Enterprises and Construction Builders 8816 Construction of Flood Control
Project II 4.821 116 C 0.460 0.200 0.300 - - - 96.00 91.02% V.Satisfactory
Cauayan United Enterprises and Construction Builders 8816 Impvt./Rehab. Along Cabatuan-
Enrile Road II 6.717 60 C 0.286 0.262 0.300 - - - 84.80 *84.80% V. Satisfactory
Cauayan United Enterprises and Construction Builders 8816
Impvt./Rehab. Along Cauayan-Cabatuan Road, Cauayan-Luna-
CabatuanII 14.346 100 C 0.390 0.225 0.300 - - - 91.50 *91.50%
Outstanding
Cauayan United Enterprises and Construction Builders 8816 Impvt./Rehab. Along Gamu-Roxas
Road II 9.646 60 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding
Cauayan United Enterprises and Construction Builders 8816 Impvt./Rehab. of Baguio Country
Club Km. 252+768-Km. 254+155 CAR 6.844 60 C 0.385 0.200 0.300 - - - 89.50 *88.50% V.Satisfactory
Cauayan United Enterprises and Construction Builders 8816 Impvt./Rehab. of Cauayan-
Cabatuan Road II 0.947 60 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page76
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Cauayan United Enterprises and Construction Builders 8816 Rehab. of FMR at Muñoz West-
Sinamar Road II 0.944 75 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
Cauayan United Enterprises and Construction Builders 8816
Repair/Rehab Along Daang Maharlika, KO 364+591 to KO
370+500II 4.780 180 C 0.411 0.200 0.300 - - - 91.10 *91.10%
V.Satisfactory
Cauayan United Enterprises and Construction Builders 8816
Repair/Rehab. of Alaminos-Bolinao Road, Km. 321+204 - Km.
323+000I 9.647 27 C 0.307 0.200 0.300 - - - 80.70 *80.70%
V. Satisfactory
Cavacon Corporation (Formerly: Cagayan Valley Const. Corp.) 2622
Const. (Conc.) of Daang Hari Ext. inc. RROW Acquisition, Jct. Molino Blvd. to Aguinaldo Highway Jct., Imus Section
IV-A 31.784 300 C 0.325 0.300 0.300 - - - 92.50 87.07% V. Satisfactory
Cavacon Corporation (Formerly: Cagayan Valley Const. Corp.) 2622 Const. of Ditale Bridge and
Approaches, Brgy. Ditale III 50.474 345 O 0.338 0.300 0.100 0.024 0.054 0.100 92.00 -
Cavacon Corporation (Formerly: Cagayan Valley Const. Corp.) 2622 Const. of Ditale Bridge and
Approaches, Brgy. Ditale III 50.474 345 O 0.353 0.269 0.070 0.030 0.059 0.067 84.80 -
Cavacon Corporation (Formerly: Cagayan Valley Const. Corp.) 2622 Rehabilitation/ Widening
(Concreting) of Paliparan Road IV-A 21.226 300 O 0.226 0.250 0.100 0.022 0.059 0.100 75.70 -
Cavat Capitol Merchandising & Construction 3112 Conc. of Cagayan-Apayao National
Road, Tuao-Rizal Sect. II 11.859 59 C 0.438 0.200 0.300 - - - 93.80 83.06% Satisfactory
Cavat Capitol Merchandising & Construction 3112 Conc. of Naruangan-Culong Road II 6.266 210 C 0.446 0.200 0.300 - - - 94.60 82.18%
Satisfactory
Cavite Ideal International Const. & Development Corp. 5599
Contract Package I, Baguio-Pangawan, Kayapa Section under
Cordillera Road Improvement Project (Baguio-Aritao Road
Improvement Project)
PJHL 1,562.663 1,047 O 0.386 0.240 0.100 0.030 0.061 0.100 91.70 -
Cavite Ideal International Const. & Development Corp. 5599
Contract Package I, Baguio-Pangawan, Kayapa Section under
Cordillera Road Improvement Project (Baguio-Aritao Road
Improvement Project)
PJHL 1,562.663 1,047 O 0.316 0.300 0.100 0.030 0.061 0.100 90.70 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page77
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Cavite Ideal International Const. & Development Corp. 5599
CP II, Abuyog-Silago Sect. Under the Arterial Road Links Dev't. Proj., Phase IV (Himayangan-
Silago-Abuyog Road and Liloan-San Ricardo Road Projects)
PJHL 942.477 1,133 C 0.353 0.300 0.300 - - - 95.30 94.66% Outstanding
Cavite Ideal International Const. & Development Corp. 5599
MMURTRIP Phase II, Const. of Metro Manila Urban Transport
Integrated CP4, SLEX East & West Service Roads and Pasong Tamo
Ext.
URPO 524.467 752 O 0.367 0.300 0.100 0.030 0.060 0.100 95.70 -
Cavite Ideal International Const. & Development Corp. 5599
MMURTRIP Phase II, Const. of Metro Manila Urban Transport
Integrated CP4, SLEX East & West Service Roads and Pasong Tamo
Ext.
URPO 629.011 752 O 0.345 0.300 0.100 0.030 0.047 0.100 92.20 -
Cavite Ideal International Const. & Development Corp. 5599
MMURTRIP Phase II, Const. of Metro Manila Urban Transport
Integrated CP4, SLEX East & West Service Roads and Pasong Tamo
Ext.
URPO 629.011 752 O 0.360 0.300 0.100 0.030 0.042 0.100 93.20 -
Cavite Ideal International Const. & Development Corp. 5599 Naga-Toledo Road Project ARLDP
Phase IV PJHL 802.856 836 C 0.378 0.300 0.300 - - - 97.80 97.02% Outstanding
CBN Construction 16851 Const. and Improvement of Sibud Main Drainage NIA 6.299 298 O 0.369 0.216 0.150 0.030 0.064 0.050 87.86 -
CBN Construction & Supply 16851 Conc. of Jct. San Enrique-Pontevedra By-Pass Road VI 9.245 230 C 0.367 0.200 0.300 - - - 86.70 85.59%
V. Satisfactory
CBN Construction & Supply 16851 Const. and Improvement of Sibud Main Drainage NIA 6.299 298 O 0.369 0.216 0.150 0.030 0.064 0.050 87.86 -
CBN Construction & Supply 16851
Replacement of Dilapidated Concrete/Concrete Paving of Jct. Dan Enriave-Pontevedra By Pass
Rd.
VI 4.542 117 C 0.371 0.300 0.300 - - - 97.10 90.92% Outstanding
CBN Construction & Supply 16851 Road Upgrading, Jct. Palencia-Ara Al Campsite Road VI 6.510 92 C 0.319 0.214 0.300 - - - 83.30 84.62%
V. Satisfactory
CBN Construction and Supply 16851Replacement of Dilapidated
Concrete/Concrete Paving of BagoMailum-Mambucal-Canla-on Road
VI 6.141 117 C 0.301 0.100 0.300 - - - 70.10 80.42% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page78
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
CCM Construction 11043 Tagbilaran Airport Development Project DOTC 6.704 120 C 0.456 0.200 0.300 - - - 95.60 95.60%
Very Satisfactory
CCM Construction 11043 Tagbilaran Airport Development Project DOTC 18.481 150 O 0.356 0.300 0.150 0.020 0.045 0.050 92.10 -
CDC Construction and Supplies 28275 Asphalting and Construction of Drainage System at Ilang-Ilang St. III 1.901 45 O 0.356 0.298 0.000 0.030 0.028 0.050 76.20 -
CDC Construction and Supplies 28275 Completion of MPB @ Pamatawan III 0.470 45 C 0.294 0.194 0.300 - - - 78.80 *78.88% Satisfactory
CDC Construction and Supplies 28275 Const. of 1 Cl 1 Storey Sch. Bldg. @ Manggahan E/S (Partial) III 0.492 45 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
CDC Construction and Supplies 28275 Const. of 3 CL 1 Storey Sch. Bldg. @ Balaybay E/S (Partial) III 1.319 120 C 0.346 0.290 0.300 - - - 93.60 *93.60%
Outstanding
CDC Construction and Supplies 28275 Const. of 3 CL Sch. Bldg. @ San Rafael E/S III 1.721 120 C 0.359 0.276 0.300 - - - 93.50 81.88%
V. Satisfactory
CDC Construction and Supplies 28275 Const. of Box Culvert at Tambac-Viga I 1.140 90 C 0.260 0.300 0.300 - - - 86.00 *86.00%
V. Satisfactory
CDC Construction and Supplies 28275 Const. of MPB (Phase I) III 1.317 60 C 0.303 0.197 0.300 - - - 80.00 *80.00% Satisfactory
CDC Construction and Supplies 28275 Const. of Multi-Purpose Bld., @ RMTI, RMTI Compound III 4.658 221 C 0.241 0.300 0.300 - - - 84.10 72.20%
Satisfactory
CDC Construction and Supplies 28275 Const. of Multi-Purpose Building (Phase I) I 0.948 60 C 0.333 0.300 0.300 - - - 93.30 *93.30%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page79
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
CDC Construction and Supplies 28275 Const. of Multi-Purpose Building, San Nicolas III 1.419 60 C 0.496 0.200 0.300 - - - 99.60 *99.60%
Outstanding
CDC Construction and Supplies 28275 Const. of Sch. Bldg. @ Candelaria Sch. Of Fisheries III 0.490 60 C 0.306 0.300 0.300 - - - 90.60 *90.60%
Outstanding
CDC Construction and Supplies 28275 Const. of School Building @ Iba E/S III 0.894 60 C 0.388 0.133 0.300 - - - 82.10 *82.10%
Satisfactory
CDC Construction and Supplies 28275 Construction of Multi-Purpose Building National High School III 1.853 90 C 0.360 0.300 0.300 - - - 96.00 *96.00%
Outstanding
CDC Construction and Supplies 28275 Repair/Rehab. Along Olongapo-Bugallon Road III 9.800 25 C 0.304 0.000 0.300 - - - 60.40 *60.40%
Fair
CDC Contruction and Supplies 28275 Const. of Multi-Purpose Bldg. Ramon Magsaysay Tech. Inst. III 4.658 200 O 0.193 0.180 0.100 0.030 0.020 0.100 62.30 -
CDC Contruction and Supplies 28275 Const. of Multi-Purpose Building I 0.949 90 C 0.352 - 0.500 - - - 85.20 *85.20% V. Satisfactory
CDU Construction 13915 Const. of One CL School Building, Tarangnan NHS VIII 0.382 90 C 0.385 0.100 0.300 - - - 78.50 *78.50%
Satisfactory
Cebu 7H Technochem Industries Inc. 31578
Construction of Two(2) units Classroom, Dapa National High
SchoolXIII 0.964 90 C 0.415 0.128 0.300 - - - 84.30 *84.30%
Satisfactory
Cebu 7H Technochem Industries Inc. 31578
Rehab/Improvement of Road Leading to the Chocolate Hills (Asphalt Overlay) Loay Interior Road, Km. 152.430-Km. 183.300
(w/ exception)
VII 28.319 120 C 0.500 0.133 0.300 - - - 93.30 *93.30%V. Satisfactory
Cebu 7H Technochem Industries, Inc. 31578 Impvt./Rehab. Along JCT. (TER)
Loay Interior Road VII 8.806 50 C 0.180 0.300 0.300 - - - 78.00 *78.00% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page80
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Cebu 7H Technochem Industries, Inc. 31578 Rehab. of Loay Interior Road/
Loboc-Bilar-Carmen Section VII 9.640 60 C 0.386 - 0.500 - - - 88.60 89.74% V. Satisfactory
Cebu Haydter Construction 31630Const. of Drainage System @ Brgys. San Nicolas and Basak
PardoVII 0.958 45 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
Cebu Young Construction 3195 Const. of Multi-Purpose Building @ Inayawan E/S VII 0.956 75 C 0.383 0.300 0.300 - - - 98.30 92.56%
Outstanding
Cedan Construction 10172 Asphalt Overlay along Olongapo-Bugallon Road Iba Section, Iba III 9.498 40 C 0.398 0.300 0.300 - - - 99.80 *99.80%
Outstanding
Cedan Construction 10172 Const. of Magsaysay Bridge I 4.799 180 C 0.365 0.300 0.300 - - - 96.50 79.16% Satisfactory
Cedan Construction 10172 Rehab. of La Paz Multi-Purpose Building III 1.408 70 C 0.427 - 0.500 - - - 92.70 *92.70%
Outstanding
Cedan Construction 10172 Rehab./Impvt. of Mogpog-Sta. Cruz Road (Phase I) IV-B 14.243 80 C 0.265 0.200 0.300 - - - 76.50 *76.50%
Satisfactory
Cedan Construction 10172
Rehab./Reconst. of Damaged National Road, Pangasinan-
Zambales Road (Sual & Infanta Sect.)
I 21.229 80 C 0.212 0.201 0.300 - - - 71.30 *71.30% Satisfactory
Cedan Construction 10172 Repair of Dikes along Alusiis Creek III 28.517 120 C 0.213 0.300 0.300 - - - 81.30 80.34%
V. Satisfactory
Cedar Construction 24865 Const. of Multi-Purpose Building III 0.948 60 C 0.317 0.300 0.300 - - - 91.70 85.40% V. Satisfactory
Cedar Construction 24865 Impvt. of Angeles-Porac-Dinalupihan Road III 9.601 105 C 0.236 0.300 0.300 - - - 83.60 90.26%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page81
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Cedar Construction 24865Impvt./Rehab. of Brgy. Roads at
Quebiawan, San Agustin & Dolores
III 6.656 50 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory
Cedar Construction 24865 Impvt./Rehab. of Cabalantian Road III 6.674 60 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory
Cedar Construction 24865Rehab/Improvement of Del
Carmen Creek (Paskuhan Village Section)
III 4.786 60 C 0.375 - 0.500 - - - 87.50 *87.50%Satisfactory
Cedar Construction 24865 Rehabilitation/Improvement of Farm-to-Market Road III 4.005 44 O 0.385 0.200 0.150 0.030 0.020 0.050 83.50 -
Cedar Construction 24865Repair/Rehab. of Jose Abad
Santos Ave. (Formerly Gapan-Olongapo Road)
III 4.728 35 C 0.341 0.225 0.300 - - - 86.60 *86.60% V. Satisfactory
Cedar Construction 24865
Repair/Rehab. of Jose Abad Santos Ave. (Formerly Gapan-
Olongapo Road) Bacolor to City of San Fernando
III 4.771 35 C 0.346 0.226 0.300 - - - 87.20 *87.20% V. Satisfactory
Cedar Construction 24865 Repairs/Rehab. of Sapalibutad (Farm to Market Road) III 4.703 45 C 0.388 0.133 0.300 - - - 82.10 *82.10%
Satisfactory
Celso C. Ferrer Contractor 10643 Conc. of Bambang-Kasibu-Quezon-Solano Road (San Fernando Sect.) II 47.758 120 O 0.366 0.240 0.100 0.030 0.033 0.067 83.60 -
Celso C. Ferrer Contractor 10643 Impvt./Conc. of Baler-Casiguran Road (Lobbot-Gupa Section) III 47.860 180 C 0.314 0.300 0.300 - - - 91.40 93.92 %
Outstanding
Central Mindanao Const. Multi-Purpose Cooperative 23697 Completion of 1-Unit PWSP XII 1.862 70 C 0.440 - 0.500 - - - 94.00 87.10%
V. Satisfactory
Central Mindanao Const. Multi-Purpose Cooperative 23697 Const. of Footbridge XII 0.231 82 C 0.394 - 0.500 - - - 89.40 86.64%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page82
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Central Mindanao Const. Multi-Purpose Cooperative 23697 Const. of Kisante CES Multi
Purpose Bldg. XII 0.238 45 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory
Central Mindanao Const. Multi-Purpose Cooperative 23697 Const. of MPB @ Pilot Provincial
Science and Technology H/S XII 1.907 65 O 0.211 0.300 0.100 0.030 0.016 0.067 72.40 -
Central Mindanao Const. Multi-Purpose Cooperative 23697
Slope Protection along Marbol River (Marbol Bridge), Kidapawan
Magpet-Pangao-an RoadXII 1.149 72 C 0.200 0.300 0.300 - - - 80.00 * 80.00%
Satisfactory
Central Mindanao Construction Multi-Purpose Cooperative 23697 Concreting of Paco-Roxas-Arakan
Valley, Doroluman Section XII 14.988 150 O 0.391 0.300 0.078 0.030 0.060 0.033 89.20 -
Central Mindanao Construction Multi-Purpose Cooperative 23697 Const. of MPB @ Pilot Provincial
Science and Technology H/S XII 1.907 79 C 0.427 0.133 0.300 - - - 86.00 76.48% Unsatisfactory
Cesar T. Carpio Construction 20833 Const. of Two (2) CL School Building @ Cawayan E/S VIII 0.861 70 C 0.349 0.200 0.300 - - - 84.90 77.97%
Satisfactory
Cesar T. Carpio Construction 20833Const./Rehab./Impvt. of Pambujan Circ. Road , Cababtoan-Cabarian-
Canjumadal RoadVIII 9.295 180 O 0.240 0.225 0.100 0.030 0.037 0.100 73.20 -
Cesar T. Carpio Construction 20833Const./Rehab./Impvt. of Pambujan Circ. Road , Cababtoan-Cabarian-
Canjumadal RoadVIII 9.295 180 O 0.288 0.225 0.100 0.030 0.040 0.100 78.30 -
Cesar T. Carpio Construction 20833 Reflectorized Road Pavement Markings & Road Signs VIII 0.957 10 C 0.400 0.000 0.300 - - - 70.00 *70.00%
Fair
Cesar T. Carpio Construction 20833 Repair/Rehab. of Catarman-Calbayog Road VIII 9.594 150 O 0.364 0.240 0.100 0.030 0.032 0.100 86.60 -
CGGA Builders & Enterprises 23762 Completion of Multi-Purpose Building VIII 0.232 32 C 0.283 0.300 0.300 - - - 88.30 *88.30%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page83
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
CGGA Builders & Enterprises 23762 Conc. of Shoulder at Manlurip Arthur Park Road VIII 1.897 50 C 0.319 0.300 0.300 - - - 91.90 *91.90%
Outstanding
CGGA Builders & Enterprises 23762 Const. of Cabibihan Bridge VIII 4.960 150 C 0.245 0.200 0.300 - - - 74.50 72.10% Satisfactory
CGGA Builders & Enterprises 23762 Rehab. of Layog Bridge Approach along Maharlika Highway VIII 4.603 150 C 0.334 0.223 0.300 - - - 85.70 *85.70%
V. Satisfactory
CGI Construction 11346
Improvement of CICs in the Municipality of Ocampo,
Camarines Sur, namely; Gatibo, Hibago & San Antonio
NIA-V 2.362 90 C 0.400 0.300 0.000 - - - 70.00 *70.00% Fair
Cha Construction and Supply 28420 Const. of 2-CL School Bldg. V 0.923 120 C 0.444 - 0.500 - - - 94.40 78.34% Satisfactory
Cha Construction and Supply 28420 Const. of 2-Rooms School Bldg. V 0.468 60 C 0.402 - 0.500 - - - 90.20 *90.20% Outstanding
Cha Construction and Supply 28420 Const. of Multi-Purpose Building at Camarines Sur H/S V 2.080 120 C 0.396 0.120 0.300 - - - 81.60 *81.60%
V. Satisfactory
Cha Construction and Supply 28420 Const. of Roads, San Antonio-Siembre Road V 11.347 90 C 0.422 0.200 0.300 - - - 92.20 *92.20%
V. Satisfactory
Cha Construction and Supply 28420 Repair of One CL Sch. Bldg., La Purisima E/S V 0.283 75 C 0.387 0.200 0.300 - - - 88.70 *88.70%
V. Satisfactory
Cha Construction and Supply 28420 Road Concreting at San Lucas-Poro Access Road V 1.405 75 C 0.312 0.300 0.300 - - - 91.20 *91.20%
Outstanding
Cha Construction and Supply 28420 Road Concreting at Talidtid-Sta. Cruz V 1.891 90 C 0.355 0.200 0.300 - - - 85.50 *85.50%
V. Satisfactory
Cha Construction and Supply 28420 Road Concreting of Bonot-Sta. Rosa Road V 1.891 60 C 0.297 0.200 0.300 - - - 79.70 *79.70%
Satisfactory
Charlmelday Construction Supply& Services 32181 Rehabilitation of Sta. Cruz RIS NIA 4.531 150 C 0.364 0.18 0.300 - - - 84.40 84.40%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page84
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Charlz Construction 8709 Completion of Brgy. Azucena MPB XIII 0.961 90 C 0.328 0.200 0.000 - - - 52.80 71.91% Satisfactory
Charlz Construction 8709 Completion of MPB @ Brgy. 18 X 0.456 50 C 0.375 0.300 0.300 - - - 97.50 *97.50% Outstanding
Charlz Construction 8709Conc. of N.G. Escario Extension
(from Gorordo Ave. to Arch. Reyes Ave.)
VII 7.715 180 O 0.309 0.300 0.100 0.030 0.040 0.100 87.90 -
Charlz Construction 8709Conc. of N.G. Escario Extension
(from Gorordo Ave. to Arch. Reyes Ave.)
VII 7.715 180 O 0.330 0.200 0.100 0.023 0.033 0.100 78.60 -
Charlz Construction 8709 Const. of 2 Units, 2 Storey, 10 CL @ Taptap E/S Bldg. VII 13.360 195 C 0.281 0.177 0.300 - - - 75.80 83.29%
Satisfactory
Charlz Construction 8709 Const. of 2-Cl Building @ Taglimao ES X 0.849 75 O 0.400 0.300 0.100 0.030 0.026 0.100 95.60 -
Charlz Construction 8709 Const. of 3 CL for the Camaman-an NHS X 1.402 120 C 0.348 0.184 0.300 - - - 83.20 *83.20%
V. Satisfactory
Charlz Construction 8709 Const. of 3 Storey, 9 Cl Secondary Sch. Bldg. @ Adlaon NHS VII 5.711 120 C 0.364 0.300 0.300 - - - 96.40 88.35%
V. Satisfactory
Charlz Construction 8709 Const. of Covered Canal, Misamis Oriental-Bukidnon-Agusan Road X 4.729 140 C 0.290 0.200 0.300 - - - 79.00 81.64%
V. Satisfactory
Charlz Construction 8709Const. of MPB Manolo Fortich
Municipal Hall Phase X, Calanawan
X 4.728 150 C 0.363 0.200 0.300 - - - 86.30 83.13% V. Satisfactory
Charlz Construction 8709
Const. of Pedestrian Overpass (Skywalk) across Imus St., near
Sikatuna St. Jct., Brgy. Zapatera-T. Padilla
VII 4.695 150 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
Charlz Construction 8709 Const. of Tertiary Sch. Bldg. (NBCC Phase II) X 2.360 90 C 0.262 0.157 0.300 - - - 71.90 73.44%
Satisfactory
Charlz Construction 8709Const. of Tinungtungan Bridge & Approaches, Mamaon-Indulang
RoadX 22.146 270 O 0.291 0.151 0.100 0.023 0.045 0.100 71.00 -
Charlz Construction 8709Const. of Tinungtungan Bridge & Approaches, Mamaon-Indulang
RoadX 22.155 300 O 0.308 0.056 0.100 0.030 0.065 0.100 65.90 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page85
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Charlz Construction 8709 Const. of Two (2) Storey DPWH Office Building X 2.888 180 C 0.373 0.133 0.300 - - - 80.60 82.84%
Satisfactory
Charlz Construction 8709 Const. of Two-Storey DPWH Office Bldg. X 2.878 145 C 0.393 0.200 0.300 - - - 89.30 84.19%
V. Satisfactory
Charlz Construction 8709 Rehab./ Impv't. of DPWH 3rd DEO Bldg., Dicklum X 0.789 90 C 0.373 0.300 0.300 - - - 97.30 93.10%
Outstanding
Charlz Construction 8709
Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving along Balingasag-
Binuangan Sect.)
X 38.539 240 O 0.243 0.300 0.050 0.030 0.047 0.033 70.30 -
Charlz Construction 8709
Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving along Balingasag-
Binuangan Sect.)
X 38.539 289 O 0.263 0.300 0.100 0.030 0.050 0.100 84.30 -
Charlz Construction 8709
Rehab./Impvt. of Butuan City-Misamis Oriental Road (Selective Conc. Paving along Balingasag-
Binuangan Sect.)
X 38.527 379 O 0.316 0.300 0.100 0.015 0.041 0.100 87.20 -
Charlz Construction 8709Replacement of Datu Bailey
Bridge to RCBC (Jct. Osmeña-Pilar Road)
XIII 11.567 165 C 0.328 0.300 0.000 - - - 62.80 69.70% Fair
Chedmaryl Construction & Supplies 27073 Const./Repair of MPB VI 1.903 75 C 0.289 0.000 0.300 - - - 58.90 76.75%
Satisfactory
Che-Riss Constructon & Trading 26557 Riprapping of Creek IVA 1.918 120 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Chiara Construction 8736 Const. of 18 LM RCDG Bridge along San Fernando Bypass Road I 9.399 270 C 0.366 0.200 0.300 - - - 86.60 82.58%
Satisfactory
Chiara Construction 8736Const. of Two (2) Storey Building / Library at Tarlac State University,
Lucinda CampusIII 14.416 270 O 0.388 0.180 0.100 0.030 0.022 0.100 82.00 -
Chiara Construction 8736 Construction of 2-Storey Building /Library at Tarlac State University III 14.399 270 C 0.439 0.176 0.300 - - - 91.50 84.85%
Satisfactory
Chiara Construction 8736 Retrofitting of Kalibo Bridge Phase III VI 9.013 195 C 0.313 0.300 0.300 - - - 91.30 *91.30%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page86
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Chief Construct Trading & Supplies, Inc. 30094
Road Conc. of Provincial Road Cacarong Matanda-Pandi &
Daungan, Guiguinto, Bagong Silang
III 0.952 14 C 0.265 0.200 0.300 - - - 76.50 *76.50% Satisfactory
China Geo-Engineering (Phil.) Corporation
SL2-SN-00054
Casecnan Multi-Purpose Irrigation & Power Project NIA 1,108.222 1,172 O 0.342 0.175 0.100 0.030 0.056 0.200 90.30 -
China Geo-Engineering (Phil.) Corporation
SL2-SN-00054
Const. of Super Diversion Canal(Sta. 19+200 to Sta. 26+600) NIA-III 1215.409 1386 O 0.343 0.200 0.100 0.024 0.042 0.200 90.90 -
China Geo-Engineering (Phils.) Corp. FC-03-020
Baguio-Aritao Road Impvt. Project CP II, Pangawan-Aritao-Kayapa
SectionPJHL 858.809 810 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
China Geo-Engineering (Phils.) Corporation FC-03-021 Casecnan Multi-purpose Irrigation
& Power Project-IC NIA 1.242 1,605 C 0.340 0.300 0.300 - - - 93.96 93.96% Outstanding
China Geo-Engineering (Phils.) Corporation
SL2-SN-000459
MWCR-CP VI, Mamburao-Abra De Ilog Section PJHL 858.783 772 C 0.316 0.300 0.300 - - - 91.60 95.38%
Outstanding
China Harbour Engineering Company
SL1-SN-005059/FC-
07-005
CP5, Cervantes-Mankayan-Abatan, Phase V PJHL 682.076 812 O 0.365 0.300 0.150 0.030 0.070 0.050 96.50 -
China Harbour Engineering Company FC-98-264 CP5, Cervantes-Mankayan-Abatan,
Phase V PJHL 682.000 812 O 0.369 0.300 0.100 0.030 0.051 0.100 95.00 -
China International Water & Electric Company
SL1-SN-004851
Bago River Irrigation System Rehabilitation & Improvement
Project (Rehabilitation, Improvement and Cons. Of BRIS
Facilities)
NIA-VI 731.862 1,080 O 0.317 0.244 0.050 0.024 0.033 0.033 70.00 -
China International Water & Electric Corp.
FC-05-0003
IFCP Phase II, Package II, Impvt. Of Jaro Mouth, Iloilo River &
Upper Ignore CreekMFCP-I 556.925 1,080 O 0.368 0.200 0.100 0.030 0.065 0.200 96.30 -
China International Water & Electric Corp. FC-03-028
IFCP Phase II, Package II, Impvt. of Jaro Mouth, Iloilo River & Upper
Ingore CreekMFCP-I 507.803 1,080 O 0.383 0.200 0.100 0.030 0.060 0.200 97.30 -
China International Water & Electric Corp.
FC-05-0003
IFCP Phase II, Package II, Impvt. Of Jaro Mouth, Iloilo River &
Upper Ingore CreekMFCP-I 549.395 1,080 O 0.383 0.200 0.100 0.030 0.061 0.200 97.40 -
China International Water & Electric Corp. FC-03-028
Lower Agusan Dev't. Proj. Stage I Phase II, Package I, Agusan River
Impv't. (East Bank) & Cut-off Channel
NIA 889.009 1,203 C 0.392 0.288 0.300 - - - 98.00 98.63% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page87
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
China International Water & Electric Corp. FC-03-028 Rehab. of Malalag-Malita-Jose
Abad Santos Road IBRD 533.694 900 C 0.393 0.300 0.300 - - - 99.30 97.53% Outstanding
China International Water & Electric Corporation
SL1-SN-004851
Bago River Irrigation System Rehabilitation & Improvement
ProjectNIA 820.162 1,263 O 0.345 0.247 0.100 0.030 0.028 0.067 81.70 -
China International Water & Electric Corporation
SLI-SN-004852
Casecnan Multi-purpose Irrigation & Power Project NIA 476.722 798 C 0.376 0.300 0.300 - - - 93.05 93.05%
Outstanding
China International Water and Electric Company
FC-06-004 FC-05-003
Bago River Irrigation System Rehabilitation & Improvement
ProjectNIA 731.861 1,080 O 0.317 0.244 0.05 0.024 0.033 0.033 70.10 -
China International Water and Electric Company
SL1-SN-004851
Bago River Irrigation System Rehabilitation & Improvement
ProjectNIA 820.162 1,263 O 0.344 0.300 0.150 0.030 0.028 0.050 90.20 -
China International Water and Electric Corporation
SL1-SN-004851
Bago River Irrigation System Rehabilitation Project NIA 7.037 1080 O 0.349 0.153 0.000 0.024 0.033 0.133 69.20 69.20%
Fair
China National Constructional and Agricultural Machinery
Import and Export Corporation (CAMC)
NO LICENSE Banaoang Pump Irrigation Project NIA USD 38.475
M 1,780 O 0.387 0.059 0.070 0.024 0.028 0.133 70.10 -
China Road & Bridge Construction
SL2-SN-000479
CP 1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP) PJHL 952.564 840 O 0.386 0.300 0.100 0.030 0.035 0.100 95.10 -
China Road & Bridge Corporation SL2-SN-000479
Const./Impv't. of CP VIII, Bayawan-Kalumboyan Road Project, Sta.
0+000-Sta.17+369.88RRNDP 211.007 720 C 0.368 0.300 0.300 - - - 96.80 94.22%
Outstanding
China Road & Bridge CorporationSL-I-SN-
004585/FC-03-029
Contract Package I, Himayangan Silago Sect., Arterial road links
Dev't. Project, Phase IVPJHL 914.127 1,169 C 0.346 0.300 0.300 - - - 0.95 94.60%
Outstanding
China Road & Bridge Corporation SL-2-SN-000631
Contract Package III, Calbayog-Gatanguit Road Sect., Arterial
road links Dev't. Project, Phase VIPJHL 1,397.424 1,020 O 0.398 0.300 0.100 0.030 0.070 0.100 99.80 -
China Road & Bridge Corporation SL-2-SN-000631
Contract Package III, Calbayog-Gatanguit Road Sect., Arterial
road links Dev't. Project, Phase VIPJHL 1,397.424 1,020 O 0.360 0.300 0.100 0.030 0.070 0.100 96.00 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page88
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
China Road & Bridge Corporation SL2-SN-000479
CP1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP)
Km.175+423-Km.204+609/Km.0+000-Km.50+537
PJHL 952.564 920 O 0.373 0.300 0.100 0.030 0.057 0.100 96.00 -
China Road & Bridge Corporation SL2-SN-000479
CP1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP)
Km.175+423-Km.204+609/Km.0+000-Km.50+537
PJHL 1,135.918 1,100 O 0.352 0.300 0.100 0.030 0.070 0.100 95.20 -
China Road & Bridge Corporation SL2-SN-000479
CP1, San Andres (Codon)-Virac-Jct. Bato-Viga Road (CCRIP)
Km.175+423-Km.204+609/Km.0+000-Km.50+537
PJHL 1,135.918 1,100 O 0.349 0.300 0.100 0.030 0.070 0.100 94.90 -
China State (Phils.) Construction Eng'g. Corp. FC-98-270 Const. of Package 6PY-1 ADB 706.209 1,679 C 0.466 - 0.500 - - - 96.60 92.04%
Outstanding
China State (Phils.) Construction Eng'g. Corp. FC-02-072
CP 2, Catarman-Calbayog via Lopede Vega Road under the Arterial Road Links Development Project,
Phase V
PJHL 643.720 1,092 C 0.349 0.300 0.300 - - - 94.90 92.07% Outstanding
China State (Phils.) Construction Eng'g. Corp.
SL1-SN-004865
CP No. C-5, Metro Manila Urban Transport Integration Project
(MMURTRIP), NLEX Junction to North Fairview
URPO 486.343 720 O 0.271 0.250 0.100 0.020 0.060 0.100 80.10 -
China State (Phils.) Construction Eng'g. Corp.
SL1-SN-004865
CP No. C-5, Metro Manila Urban Transport Integration Project
(MMURTRIP), NLEX Junction to North Fairview
URPO 486.343 720 O 0.360 0.243 0.100 0.030 0.047 0.100 88.00 -
China State (Phils.) Construction Eng'g. Corp.
SL1-SN-004865
CP No. C-5, Metro Manila Urban Transport Integration Project
(MMURTRIP), NLEX Junction to North Fairview
URPO 606.345 720 O 0.340 0.300 0.050 0.030 0.056 0.067 84.30 -
China State (Phils.) Construction Engineering Corp.
SL1-SN-004314/FC-
02-072
CP 2, Catarman-Calbayog via Lopede Vega Road under the Arterial Road Links Development Project,
Phase V
PJHL 621.279 868 O 0.388 0.300 0.100 0.030 0.047 0.100 96.50 -
China State Const. Eng'g. Corp. /Ciriaco Corp. (JV)
SL1-SN-004611/FC-
03-045
Metro Manila Urban Transport Integration Project (MMURTRIP),
Phase I, Package 3: Marikina Bridge and Access Road
URPO 1,178.833 861 C 0.387 0.300 0.300 - - - 98.70 94.56% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page89
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
China State Construction Engineering Corporation FC-02-039 Casecnan Multi-purpose Irrigation
& Power ProjectCasecnan
MIPP 562.647 1,380 C 0.360 0.300 0.300 - - - 96.00 96.00% Outstanding
China State Construction Engineering Corporation FC-02-039
CP 1, Alegria-Santiago Sect. Under the PJHL, Mindanao Sect.
Rehab. Project, Phase IIPJHL 540.791 917 C 0.384 0.300 0.300 - - - 98.40 96.56%
Outstanding
Chivas Construction 28316 Rehabilitation of Abra-Kalinga Road, Km.434+960-Km.435+260 CAR 1.872 92 O 0.371 - 0.500 - - - 87.10 -
CHL Construction and Development Enterprises, Inc. 15001
Conc./Widening of Marbel-Tupi-Makar Road (Glamang-Silway 8
Section)XII 8.674 252 C 0.385 0.214 0.300 - - - 89.90 88.22%
V. Satisfactory
CHL Construction and Development Enterprises, Inc. 15001 Concreting of Road & Reblocking,
Marbel-Makar Road XII 15.114 180 O 0.368 0.300 0.150 0.030 0.054 0.050 95.20 -
CHL Construction and Development Enterprises, Inc. 15001 Const. of Circumferential Road
(Western Section) XII 3.822 90 C 0.328 0.285 0.300 - - - 91.30 *91.30% Outstanding
Cholo Construction & Trading 32138 Const./Conc./Rehab./Completion of San Miguel Brgy. Road III 0.472 30 C 0.328 0.200 0.300 - - - 82.80 81.90%
V. Satisfactory
Cholo Construction & Trading 32138 Const./Repair/Completion of San Juan FMR III 0.952 35 C 0.298 0.300 0.300 - - - 89.80 *89.80%
V. Satisfactory
Cholo Construction & Trading 32138 Const./Repair/Completion of San Vicente Brgy. Road III 0.380 30 C 0.339 0.300 0.300 - - - 93.90 *93.90%
Outstanding
Chris-James Construction 11202Conc. Reblocking along Ferry
Terminal-San Juan Section, Ferry Terminal-Caglanipao Rd.
VIII 6.921 150 C 0.165 0.300 0.300 - - - 76.50 60.60% Fair
Chris-James Construction 11202 Repair/Rehab. of Roadslip along Maharlika Highway VIII 4.678 180 O 0.267 0.145 0.100 0.015 0.013 0.100 64.00 -
Christian Ian Construction Corporation 8191 Completion of Sports Complex @
North Cental E/S III 52.383 270 O 0.399 0.300 0.100 0.030 0.040 0.100 96.90 -
Christian Ian Construction Corporation 8191
Const. of Dibunog Bridge & App. and Sambay Bridge & App. (CP 1)
along Baler-Casiguran RoadIII 24.826 150 C 0.458 0.200 0.300 - - - 95.80 *95.80%
V. Satisfactory
Christian Ian Construction Corporation 8191 Const., Repair, Rehab. and
Completion of MPB at Brgy. Lawy III 2.378 90 C 0.459 0.139 0.300 - - - 89.80 *89.80%V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page90
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Christian Ian Construction Corporation 8191
Impvt./Widening of McArthur Highway Phase III, Package IV, Replacement of Tiaong Bridge
III 38.596 190 C 0.240 0.180 0.300 - - - 72.00 *72.00% Satisfactory
Christian Ian Construction Corporation 8191
Impvt./Widening/Conc. of McArthur Highway (MNR) Tarlac
Section Phase IV, Package I, Bamban-Capas Section
III 58.045 210 O 0.365 0.300 0.150 0.022 0.028 0.050 91.50 -
Christian Ian Construction Corporation 8191
Rehab./Replacement of San Luis Bridge and App. along San Luis-
Sto. Domingo RoadIII 113.287 546 C 0.464 0.200 0.300 - - - 96.40 89.56%
V. Satisfactory
Cielito A. Bay-ag Construction 19032
Concreting of Bambang-Kasibu-Malabing-Quezon-Solano Road,
Tadji-Runruno Section, Km. 312+300-Km.312+380
II 0.954 30 C 0.339 0.300 0.300 - - - 93.90 86.76% V. Satisfactory
Cielito A. Bay-ag Construction 19032 Const. of FMR @ Brgy. Yaway II 0.282 48 C 0.309 0.200 0.300 - - - 80.90 *80.90% V. Satisfactory
Cielito A. Bay-ag Construction 19032 Const./Completion of Multi-Purpose Bldg. at Kayapa H/S II 0.909 50 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Ciriaco Corporation 6932Const. of Delfin Albano Bridge along Tumauini-Delfin Albano
Road (SA #1)II 234.155 360 O 0.400 0.296 0.100 0.030 0.060 0.100 98.60 -
Ciriaco Corporation 6932Const. of Delfin Albano Bridge along Tumauini-Delfin Albano
Road (SA #1)II 198.304 360 O 0.350 0.263 0.100 0.030 0.032 0.100 87.50 -
Ciriaco Corporation 6932Const. of Delfin Albano Bridge along Tumauini-Delfin Albano
Road (SA #2)II 234.155 360 O 0.391 0.300 0.100 0.030 0.061 0.067 94.90 -
Ciriaco Corporation 6932Const. of Delfin Albano Bridge along Tumauini-Delfin Albano
Road (SA #2)II 234.155 360 O 0.388 0.300 0.150 0.030 0.050 0.050 96.80 -
Ciriaco Corporation 6932Const. of Delfin Albano Bridge along Tumauini-Delfina Albano
RoadII 198.304 360 O 0.380 0.000 0.100 0.030 0.033 0.100 64.30 -
Ciriaco Corporation 6932Const. of Domalandan Bridge,
Lingayen-Labrador Road (SA #4 & #5)
I 216.544 270 C 0.383 0.300 0.300 - - - 98.30 97.16% Outstanding
Ciriaco Corporation 6932 Const. of Domalandan Bridge, Lingayen-Labrador Road (SA #4) I 77.193 210 C 0.354 0.300 0.300 - - - 95.40 93.72%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page91
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ciriaco Corporation 6932
Reconstruction of Governor Generoso I (Bankerohan) Bridge over Davao River along Davao-
Cotabato Road McArthur Highway
XI 206.649 210 C 0.376 0.300 0.300 - - - 97.60 94.66% Outstanding
Clifford Construction Corporation 3724 Completion of Janipaan Bridge, Phase II VI 12.494 240 C 0.365 0.300 0.300 - - - 96.50 96.11%
Outstanding
Clifford Construction Corporation 3724 Completion of Pasanghilan Bridge VI 6.431 183 C 0.348 0.300 0.000 - - - 64.80 70.50% Satisfactory
Clifford Construction Corporation 3724 Conc. of Iloilo East-West Road, San Rafael-Passi Section VI 19.094 180 C 0.364 0.200 0.300 - - - 86.40 85.20%
V. Satisfactory
Clifford Construction Corporation 3724Conc. of Jct. Bancal-Leon-Antique
Bdry. Road, Alimodian-Leon Section
VI 4.833 180 C 0.294 0.226 0.300 - - - 82.00 85.30% V. Satisfactory
Clifford Construction Corporation 3724 Const. of Altavas Bridge VI 15.755 225 C 0.349 0.230 0.000 - - - 57.90 69.92% Fair
Clifford Construction Corporation 3724 Const. of Dumga Bridge VI 13.932 330 C 0.311 0.200 0.300 - - - 81.10 84.73% V. Satisfactory
Clifford Construction Corporation 3724 Const. of Padanghilan Bridge (Phase I) VI 4.868 225 C 0.333 0.300 0.300 - - - 93.30 87.14%
V. Satisfactory
Clifford Construction Corporation 3724 Retrofitting/Underpinning of Kalibo Bridge (Phase I) VI 4.801 140 C 0.356 0.300 0.300 - - - 95.60 92.72%
Outstanding
Clifford Construction Corporation 3724Road Upgrading (Gravel to
Concrete), Mandurriao-San Miguel-Alimodian-Maasin Rd.
VI 25.700 240 O 0.346 0.300 0.150 0.030 0.045 0.033 90.40 -
Clifford Construction Corporation 3724 Road Upgrading / Concreting along Altavas-Jamindan Road VI 21.841 210 O 0.330 0.294 0.150 0.030 0.055 0.033 89.20 -
CLTG Builders 16852 Concrete Revetment of Sasa Creek along Davao-Agusan Road XI 3.770 165 C 0.214 0.300 0.300 - - - 81.40 80.32%
V. Satisfactory
CLTG Builders 16852 Concreting of Road @ Purok Sagrada Familia, Brgy. Indangan XI 1.413 120 C 0.299 - 0.500 - - - 79.90 87.58%
V. Satisfactory
CLTG Builders 16852 Impv't/Conc. of Toril-Bayabas-Eden Road XI 2.788 120 C 0.340 0.300 0.300 - - - 94.00 92.80%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page92
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
CLV Enterprises 18512 Completion of MPB (Phase III) X 0.267 30 C 0.367 0.231 0.300 - - - 89.80 *89.80% V. Satisfactory
CLV Enterprises 18512 Const. MPB (Phase II) @ Mabuhay X 0.942 120 O 0.328 0.300 0.100 0.015 0.032 0.067 84.20 -
CM Tan Construction (Formerly: CM Tan Const. Supplies) 28087 Const. of Bayan-Cabahian Farm-to-
Market Road XIII 13.790 300 O 0.347 0.200 0.100 0.030 0.056 0.100 83.30 -
CM Tan Construction (Formerly: CM Tan Const. Supplies) 28087 Const./Widening of Dinagat-Loreto
Road (Busay-Pangi Sect.) XIII 2.500 180 C 0.320 0.300 0.000 - - - 62.00 67.88% Faiir
CM Tan Construction (Formerly: CM Tan Const. Supplies) 28087 Upgrading of Kong Street XIII 3.954 248 C 0.364 - 0.500 - - - 86.40 *86.40%
V. Satisfactory
Coastland Construction and Development Corp. 11487 Conc. of Bilawan Road XI 0.945 90 C 0.262 0.300 0.300 - - - 86.20 83.68%
V. Satisfactory
Coastland Construction and Development Corp. 11487 Conc. of Mati-Maragusan Road
(Tawas-Taguibo Section) XI 14.021 145 C 0.361 0.200 0.300 - - - 86.10 86.40% Satisfactory
Coastland Construction and Development Corp. 11487 Concreting of Magsaysay Road XI 1.130 90 O 0.361 0.240 0.100 0.020 0.051 0.100 87.20 -
Coastland Construction and Development Corp. 11487
Const./Impvt. of Poblacion-Pintatagan Section along Mati-
Tagum RoadXI 9.441 120 C 0.274 0.285 0.300 - - - 85.90 84.10%
V. Satisfactory
Coastland Construction and Development Corp. 11487 Impvt. of Manikling-Sigaboy Road
(Talisay-Launion Section) XI 6.931 120 C 0.256 0.277 0.300 - - - 83.30 90.44% Outstanding
Coastland Construction and Development Corp. 11487
Maint./Rehab. & Impv't. of National Roads of Davao Oriental-Surigao
del Sur Road, Piso Sect.XI 9.784 120 C 0.280 0.200 0.300 - - - 78.00 *78.00%
Satisfactory
Coastland Construction and Development Corp. 11487 Mati Airport Development Project DOTC 13.459 120 C 0.418 0.200 0.300 - - - 91.80 91.80%
Very Satisfactory
Cofejok Construction and Supply 27493 Competion of Multi-Purpose Bldg., Lamba XII 1.036 126 C 0.360 0.300 0.300 - - - 96.00 90.19%
Outstanding
Cofejok Construction and Supply 27493 Completion of MPB at Brgy. Estrella XII 1.190 120 C 0.33 0.261 0.300 - - - 89.10 *89.10%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page93
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Cofejok Construction and Supply 27493Completion of Multi-Purpose
Building (Mini Gym) @ Tres de Mayo
XII 1.420 110 O 0.331 0.227 0.100 0.020 0.040 0.100 81.80 -
Cofejok Construction and Supply 27493 Completion of Multi-Purpose Building @ Pamantingan XII 0.289 60 C 0.315 0.300 0.300 - - - 91.50 *91.50%
Outstanding
Cofejok Construction and Supply 27493 Const. of 1 CL Sch. Bldg. at San Emmanuel NHS XII 0.492 75 C 0.399 0.131 0.300 - - - 83.00 *83.00%
V. Satisfactory
Cofejok Construction and Supply 27493 Const. of 2-Cl, Academic Bldg. @ Davao del Sur NHS XI 0.658 120 C 0.393 - 0.500 - - - 89.30 90.70%
Outstanding
Cofejok Construction and Supply 27493 Const. of 2-Storey Academic Bldg. @ Sta. Cruz NHS, Package I R-XI 1.468 120 C 0.309 - 0.500 - - - 80.90 82.72%
V. Satisfactory
Cofejok Construction and Supply 27493 Const. of MPB XI 1.714 110 C 0.332 0.200 0.300 - - - 83.20 88.03% V. Satisfactory
Cofejok Construction and Supply 27493 Const. of MPB @ Esperanza NHS XII 0.922 90 C 0.33 0.257 0.300 - - - 88.70 86.04% V. Satisfactory
Cofejok Construction and Supply 27493 Const. of MPB @ New Panay NHS XII 0.920 90 C 0.365 0.267 0.300 - - - 93.20 82.00% V. Satisfactory
Cofejok Construction and Supply 27493 Const. of MPB at Bayya E/S XII 0.481 75 C 0.374 0.072 0.300 - - - 74.60 81.46% V. Satisfactory
Cofejok Construction and Supply 27493 Const. of Sch. Bldg. at Brgy. Biwang E/S XII 0.461 75 C 0.281 0.072 0.300 - - - 65.30 *65.30%
Fair
Cofejok Construction and Supply 27493 Impvt. of MPB, Poblacion XII 1.882 84 C 0.457 0.200 0.300 - - - 95.70 83.45% Satisfactory
Cofejok Construction and Supply 27493 Renovation of Multi-Purpose Bldg., Brgy. Poblacion CES XII 1.283 90 C 0.371 0.152 0.300 - - - 82.30 82.30%
V. Satisfactory
Cofejok Construction and Supply 27493 Repair of MPB @ Municipal Trial Court Poblacion XII 0.288 55 C 0.485 0.133 0.300 - - - 91.80 86.48%
Satisfactory
Colina Construction 18841 Const. of 1 unit School Building V 0.461 120 C 0.286 0.200 0.300 - - - 78.60 *78.60% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page94
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Collera's Construction 13246 Concrete Paving of Sta. Fe-San Isidro-Pulak Road VIII 4.748 120 C 0.333 0.300 0.300 - - - 93.30 88.02%
V. Satisfactory
Collera's Construction 13246 Concreting of Critical Portion of National Circumferential Road VIII 3.832 180 C 0.418 - 0.500 - - - 91.80 61.32%
Fair
Collera's Construction 13246Const. of Multi-Purpose Building
(ABC Hall) @ Palo Municipal Compound
VIII 1.446 240 C 0.388 0.300 0.300 - - - 98.80 *98.80% Outstanding
Collera's Construction 13246 Const. of Multi-Purpose Building (Inner Court) VIII 1.900 90 C 0.347 0.300 0.300 - - - 94.70 89.24%
V. Satisfactory
Collera's Construction 13246 Rehab. of Government Center Road Network VIII 9.640 120 C 0.370 0.200 0.300 - - - 87.00 86.76%
V. Satisfactory
Compact Construction & Development, Inc. 2358
Const. of MPB (Cancer Care Institute), Cotabato Regional
Medical Center (CRMRC)XII 9.539 145 O 0.310 0.300 0.150 0.030 0.035 0.050 87.50 -
Compass Rose Builders 27024 Conc. of Bua FMR CAR 0.189 10 C 0.289 0.200 0.300 - - - 78.90 *78.90% Satisfactory
Compass Rose Builders 27024 Const. of Poblacion Water System Phase II CAR 0.939 49 C 0.365 0.000 0.300 - - - 66.50 *66.50%
Fair
Compass Rose Builders 27024 Repair/Rehab. of Flood Control along Kennon-Agat-National Road CAR 4.619 75 C 0.244 0.235 0.300 - - - 77.90 *77.90%
Satisfactory
Compass Rose Builders 27024 Repair/Rehab. of Pacalso E/S CAR 0.286 30 C 0.335 0.200 0.300 - - - 83.50 *83.50% V. Satisfactory
Concepcion Basic Builders, Incorporated 5255 Completion of Valencia Bridge X 16.558 225 C 0.368 0.300 0.300 - - - 96.80 87.50%
V. Satisfactory
Concepcion Basic Builders, Incorporated 5255 Completion of Valencia Bridge
Approaches and Access Road X 29.128 330 C 0.356 0.252 0.300 - - - 90.80 88.82% V. Satisfactory
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge XIII 28.876 349 C 0.286 0.300 0.300 - - - 88.60 90.61%
Outstanding
Concepcion Basic Builders, Incorporated 5255 Const. of Bislig Bridge along
Surigao-Davao Coastal Road XIII 81.615 365 O 0.286 0.300 0.100 0.030 0.059 0.100 87.50 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page95
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Concepcion Basic Builders, Incorporated 5255 Const. of Tago-La Paz Bridge
along SDCR (Alternate Route) XIII 106.050 390 O 0.276 0.300 0.070 0.030 0.059 0.100 83.50 -
Concepcion Basic Builders, Incorporated 5255 Construction of Tago-Lapaz
Bridge XIII 106.050 390 O 0.320 0.300 0.150 0.030 0.042 0.050 89.20 -
Concepcion Basic Builders, Incorporated 5255 Repair/Rehab. of Patin-ay Bridge
2, Agusan-Davao Road XIII 10.468 305 C 0.370 0.293 0.300 - - - 96.30 94.53% Outstanding
Congimar Mechanical Services 31490 Const. of Gabut MPB, Phase I II 0.961 60 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory
Congimar Mechanical Services 31490 Const. of Gabut MPB, Phase II II 0.770 45 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory
Congimar Mechanical Services 31490 Repair/Rehab. of District Hospital @ Bayambang I 0.373 55 C 0.287 0.300 0.300 - - - 88.70 89.61%
V. Satisfactory
Constructicons, Inc. 31632 Conc. of Unisan-Panaon-Talaba-Summit Road IV-A 5.106 70 C 0.322 0.200 0.300 - - - 82.20 *82.20%
V. Satisfactory
Constructicons, Inc. 31632 Rehab./Const. (Conc.) of Talaba-Summit-Panaon National Road IV-A 3.855 45 C 0.280 0.300 0.300 - - - 88.00 *88.00%
V. Satisfactory
Constructor's Development Multi-Purpose Cooperative 31538
Conc. of Bual Bridge Approaches including Slope Protection along
Makilala Jct. National RoadXII 7.625 165 C 0.347 0.200 0.300 - - - 84.70 85.42%
V. Satisfactory
Constructor's Development Multi-Purpose Cooperative 31538
Const. of 1 unit 1 CL Modified Sch. Bldg., @ Ray Buenaventura
Sabulao Memorial E/SXII 0.515 45 C 0.374 0.233 0.300 - - - 90.70 *90.70%
Outstanding
Constructor's Development Multi-Purpose Cooperative 31538 Const. of Access Road Dep-Ed XII 0.433 80 C 0.323 0.249 0.300 - - - 87.20 *87.20%
V. Satisfactory
Constructor's Development Multi-Purpose Cooperative 31538 Const. of Bual River Control XII 4.741 288 C 0.445 0.200 0.300 - - - 94.50 83.58%
Satisfactory
Constructor's Development Multi-Purpose Cooperative 31538 Const. of Gabaldon Bldg. at M'lang
Pilot Central School XII 0.463 40 C 0.381 0.200 0.300 - - - 88.10 *88.10% V. Satisfactory
Constructor's Development Multi-Purpose Cooperative 31538 Const. of MPB @ DTI Training
Center XII 0.477 40 C 0.378 0.300 0.300 - - - 97.80 *97.80% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page96
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Constructor's Development Multi-Purpose Cooperative 31538
Const./ Completion of Multi-Purpose Bldg., at Senior Citizens
KinsanteXII 0.228 45 C 0.350 0.300 0.300 - - - 95.00 *95.00%
Outstanding
Constructor's Development Multi-Purpose Cooperative 31538
Const./Completion of Multi-Purpose Pavement Kampo Uno,
SaguingXII 0.159 45 C 0.371 0.300 0.300 - - - 97.10 *97.10%
Outstanding
Constructor's Development Multi-Purpose Cooperative 31538
Const./Completion of Multi-Purpose School Building (2-Span
Covered Court), Phase IIXII 0.466 75 C 0.369 0.300 0.300 - - - 96.90 *96.90%
Outstanding
Constructor's Development Multi-Purpose Cooperative 31538 Const./Completion of PWSP @
Purok 6 (Calzado) XII 0.528 90 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory
Crazy Cut Construction 18324 Completion of Baguio Health Center CAR 1.905 90 C 0.378 0.300 0.300 - - - 97.80 92.76%
Outstanding
Crazy Cut Construction 18324 Conc. of Outlook Drive, km. 254+887-Km. 254.987 CAR 2.892 75 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V.Satisfactory
Crazy Cut Construction 18324 Const. of Wanga FMR, Tetep-an CAR 4.786 120 C 0.304 0.200 0.300 - - - 80.40 *80.40% V. Satisfactory
Crazy Cut Construction 18324
Rehab. of Drainage Chanum Street & Lake Drive of Balili River Control
along Manuel Roxas St. & Flood Control along Brgy. Amparo
Heights Camp 7
CAR 0.311 90 C 0.311 0.271 0.300 - - - 88.20 *88.20% V. Satisfactory
Crazy Cut Construction 18324 Repair of Maba-ay NHS Bldg. CAR 0.738 120 C 0.267 0.200 0.300 - - - 76.70 *76.70% Satisfactory
CRDC Construction 29738 Repair/Rehab. of Various Sch. Bldgs., Tabiawan E/S IX 0.027 45 O 0.201 0.300 0.100 0.015 0.070 0.100 78.60 -
Crest Construction 15240Asphalt overlay of Cagayan-Apayao Road, Ugac-Buntun
SectionII 4.782 45 C 0.475 0.200 0.300 - - - 97.50 *97.50%
Outstanding
Crest Construction 15240 Const. of San Pedro Bridge (Phase 1) II 4.782 180 C 0.343 0.300 0.300 - - - 94.30 94.72%
Outstanding
Crest Construction 15240 Const. of San Pedro Bridge (Phase II) II 14.322 220 C 0.371 0.200 0.300 - - - 87.10 87.55%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page97
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Crishelle Construction 17108 Completion of Multi-Purpose Building IV-B 0.369 75 C 0.396 0.238 0.300 - - - 93.40 *93.04%
Outstanding
Crishelle Construction 17108 Concreting of Brgy Roads @ Brgy. Pancol IV-B 0.458 100 C 0.386 0.200 0.300 - - - 88.60 *88.60%
V. Satisfactory
Crishelle Construction 17108 Concreting of Palawan South Road with Exception IV-B 4.371 90 C 0.258 0.200 0.300 - - - 75.80 77.00%
Satisfactory
Crishelle Construction 17108 Const. of Line Canal IV-B 0.185 40 C 0.380 0.500 88.00 88.00% V. Satisfactory
Crishelle Construction 17108 Const. of Puerto Princesa Pilot E/S Phase II IV-B 1.077 110 C 0.397 0.200 0.300 - - - 89.70 *89.70%
V. Satisfactory
Crishelle Construction 17108 Impvt. of Quezon-Punta Baja Road IV-B 18.990 252 C 0.385 0.133 0.300 - - - 81.80 75.44% Unsatisfactory
Crishelle Construction 17108
Repair of Slip & Installation of Slope Protection, Roxas-Taytay
National Road Km. 174+885 & Km. 174+895 & Km. 175+365-Km.
1755+385
IV-B 2.128 175 O 0.360 0.300 0.100 0.030 0.023 0.100 91.30 -
Crishelle Construction 17108Strengthening of General Luna Bridge along Puerto Princesa
South Road (PPSR)IV-B 4.792 269 C 0.285 0.200 0.300 - - - 78.50 78.50%
Satisfactory
CS Construction and Supply (Formerly: CS Construction) 24237 Const. of 1 unit 2 Cl Sch. Bldg. @
Kawag III E/S XII 0.939 160 C 0.381 0.100 0.300 - - - 78.10 *78.10% Satisfactory
CS Construction and Supply (Formerly: CS Construction) 24237 Const. of 1 unit Sch. Bldg. @
Madanding NHS XII 0.462 80 C 0.341 0.200 0.300 - - - 84.10 *84.10% V. Satisfactory
CS Construction and Supply (Formerly: CS Construction) 24237 Const. of MPB XII 2.892 110 C 0.315 0.264 0.300 - - - 87.90 *87.90%
V. Satisfactory
CS Construction and Supply (Formerly: CS Construction) 24237 Const. of MPB @ Brgy. Makat XII 0.463 75 C 0.385 0.300 0.300 - - - 98.50 *98.50%
Outstanding
CS Construction and Supply (Formerly: CS Construction) 24237 Road Upgrading, Panyalam
Section XII 14.306 235 O 0.186 0.300 0.100 0.030 0.027 0.100 74.30 -
CS Construction and Supply (Formerly: CS Construction) 24237 Road Upgrading, Panyalam
Section XII 14.036 267 O 0.361 0.300 0.150 0.030 0.045 0.050 93.60 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page98
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
CSR Construction and Supply ( Formerly: CSR Const.) 14427 Const. of Agnipa Multi-Purpose
Building IV-B 1.807 80 C 0.384 0.200 0.300 - - - 88.40 79.37% Satisfactory
CSR Construction and Supply ( Formerly: CSR Const.) 14427 Const. of Macario Molino National
High School IV-B 0.673 80 C 0.389 0.000 0.300 - - - 68.90 66.24% Fair
CSR Construction and Supply (Formerly: CSR Const.) 14427 Const. of Rizal Flood Control IV-B 0.278 40 C 0.293 0.298 0.300 - - - 89.10 *89.10%
V.Satisfactory
CTC Builder and Supplies Inc./Sunwest Const. & Dev. Corp.
(JV)JV-06-070 Const. of Dancalan Bridge V 57.031 720 O 0.367 0.240 0.050 0.020 0.019 0.067 76.30 -
CTC Builder and Supplies Inc./Sunwest Const. & Dev. Corp.
(JV)JV-06-070 Const. of Dancalan Bridge V 57.031 720 O 0.400 0.240 0.100 0.020 0.023 0.033 81.60 -
CTC Builder and Supplies Inc./Sunwest Const. & Dev. Corp.
(JV)JV-06-070 Const. of Dancalan Bridge V 57.031 720 O 0.352 0.240 0.150 0.030 0.061 0.033 86.60 -
CTC Builder and Supplies Incorporated 12088
Asphalt Overlay of Daan Maharlika, Abuyog, Sorsogon City-
CasiguranV 22.210 120 C 0.367 0.200 0.300 - - - 86.70 80.40%
V. Satisfactory
CTC Builder and Supplies Incorporated 12088 Const. of Bucalbucalan Seawall V 0.941 30 C 0.275 0.200 0.300 - - - 77.50 *77.50%
Satisfactory
CTC Builder and Supplies Incorporated 12088 Rehab. of Buhatan Bridge,
Sorsogon-Casiguran Road V 9.403 120 C 0.264 0.200 0.300 - - - 76.40 81.68% V. Satisfactory
Culasi Gen. Mdsg. And Construction Services 22157 Const. of 2-CL Building at San
Roque E/S VI 0.735 210 C 0.347 0.200 0.300 - - - 84.70 *84.70% V. Satisfactory
Currimao Integrated Builders Corporation 8738 Concreting of Sta. Cruz Road I 3.339 120 C 0.332 0.297 0.300 - - - 92.90 *92.90%
Outstanding
CVAP Construction 20410 Const. of Lined Canal V 0.139 30 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory
CVAP Construction 20410 Repair/Repainting of Bicol Medical Center V 0.716 45 C 0.395 0.200 0.300 - - - 89.50 *89.50%
V. Satisfactory
D. Morales Engineering Works 8531 Const. of Multi-Purpose Pavement VIII 0.473 60 C 0.368 0.221 0.300 - - - 88.90 *88.90% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page99
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
D. Morales Engineering Works 8531 Construction of Multi-Purpose Pavement VIII 0.473 60 C 0.307 0.144 0.300 - - - 75.10 *75.10%
Satisfactory
D.C.E. Construction 29347 Const. of 3CL School Building @ Amulung H/S, Bayabat II 1.060 120 C 0.317 0.200 0.300 - - - 81.70 *81.70%
V. Satisfactory
D.C.E. Construction 29347 Const. of Conner Public Market CAR 4.611 240 C 0.375 0.290 0.300 - - - 96.50 87.14% V. Satisfactory
D.C.E. Construction 29347 Const. of Dagupan Flood Control CAR 4.766 120 C 0.398 0.200 0.300 - - - 89.80 86.62% V. Satisfactory
D.C.E. Construction 29347Implementation of Various
Projects under Package 9, Conc. of Gen. Luna-Mayangao Streets
CAR 1.888 120 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory
D.C.E. Construction 29347Impv't. Concreting of Tabuk-
Tinglayan Road Bantay-Pinagan Section
CAR 4.763 160 O 0.325 0.240 0.070 0.023 0.037 0.067 76.20 -
D.C.E. Construction 29347Impv't. Concreting of Tabuk-
Tinglayan Road Bantay-Pinagan Section
CAR 4.763 160 O 0.319 0.289 0.050 0.015 0.038 0.033 74.40 -
D.C.E. Construction 29347Proposed Concreting along Calanasan-Claveria Road,
Poblacion SectionCAR 14.879 414 O 0.356 0.300 0.150 0.030 0.043 0.033 91.20 -
D.C.E. Construction 29347Proposed Concreting along
Calanasan-Ilocos Norte Road, Tanglagan Section
CAR 14.116 360 O 0.348 0.300 0.150 0.030 0.045 0.033 90.60 -
D.C.M. Construction 5641 Const. of Agus III Bridge (Pumping Bridge) & Approaches, Phase III X 19.418 300 O 0.351 0.300 0.100 0.030 0.016 0.100 89.70 -
D.C.M. Construction 5641 Const. of Agus III Bridge (Pumping Bridge) & Approaches, Phase III X 19.418 300 O 0.358 0.300 0.100 0.015 0.018 0.100 89.10 -
D.G. Chico Trading & Construction Corporation 8748 Const. of MPB NCR 4.769 120 C 0.348 0.225 0.300 - - - 87.30 86.25%
V. Satisfactory
D.G. Sarmenta Construction 13024 Const. of Maligaya NHS III 0.855 60 C 0.353 0.214 0.300 - - - 86.70 *86.70% V. Satisfactory
D.G. Sarmenta Construction 13024 Const. of MPB @ Brgy. Camp Tinio III 2.574 120 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page100
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
D.G. Sarmenta Construction 13024 Const. of MPB @ Brgy. San Gregorio III 1.390 120 C 0.317 0.282 0.300 - - - 89.90 *89.90%
V. Satisfactory
D.G. Sarmenta Construction 13024 Const. of MPB at Old Capital III 1.892 90 C 0.306 0.200 0.300 - - - 80.60 *80.60% V. Satisfactory
D.G. Sarmenta Construction 13024 Const. of Multi-Purpose Bldg. at Palayan Central School III 3.121 90 C 0.425 0.174 0.300 - - - 89.90 *89.90%
V. Satisfactory
D.G. Sarmenta Construction 13024 Const. of Multi-Purpose Bldg., (Gymnasium) Brgy. Bakod Bayan III 1.655 90 C 0.373 0.300 0.300 - - - 97.30 *97.30%
Outstanding
D.G. Sarmenta Construction 13024 Const. of Valdefuente-Fortaleza Rd., Km. 121+300 to Km. 125=750 III 28.378 300 C 0.096 0.200 0.300 - - - 59.60 *59.60%
Poor
D.G. Sarmenta Construction 13024 Rehab. of Peñaranda Flood Control along Peñaranda River III 3.276 150 C 0.285 0.300 0.300 - - - 88.50 *88.50%
V. Satisfactory
D.G. Sarmenta Construction 13024 Rehab. of Tambo-Magpapalayok Road III 7.398 150 C 0.293 0.300 0.300 - - - 89.30 *89.30%
V. Satisfactory
D.G.O. Construction 6788 Completion of MPB @ Sto. Niño Brgy. CAR 0.938 44 C 0.308 0.206 0.300 - - - 81.40 *81.40%
V. Satisfactory
D.J.D. Construction 32217 Conc. of Enrile St. II 0.937 90 C 0.342 0.286 0.300 - - - 92.80 92.80% Outstanding
D.J.D. Construction 32217 Installation of two (2) lines RCCP, Magapit Mission Road II 0.348 30 C 0.400 0.100 0.300 - - - 80.00 * 80.00%
Satisfactory
D.K. Jocson Construction 6896 Const. of Flood Control Project, Approach "A" of Malabong Bridge VI 8.455 180 C 0.343 0.200 0.300 - - - 84.30 82.20%
V. Satisfactory
D.K. Jocson Construction 6896 Const. of One (1) Unit 3-CL SB @ Ramon Torres NHS VI 0.988 180 C 0.386 0.300 0.300 - - - 98.60 85.58%
V. Satisfactory
D.K. Jocson Construction 6896 Rehab./Conc. of Isabela-Guihulngan Road VI 14.306 205 C 0.283 0.200 0.300 - - - 78.30 80.34%
V. Satisfactory
D.K. Jocson Construction / TSD Builders Const. and Supply JV JV-08-024 Conc. of Road along Bacolod
North Road (Toboso Section) VIII 18.174 281 O 0.333 0.297 0.150 0.030 0.050 0.033 89.30 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page101
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
D.L. Aureo Construction 24894 Const. of Multi-Purpose Building VIII 0.207 45 C 0.359 0.277 0.300 - - - 93.60 *93.60% Outstanding
D.L. Aureo Construction 24894 Const. of Seawall Barugo Boulevard VIII 0.376 45 C 0.292 0.200 0.300 - - - 79.20 *79.20%
Satisfactory
D.L. Aureo Construction 24894 Repair/Rehab. of 3 Cl Elem. Sch. Bldg. @ Panalaron C/S VIII 0.897 75 C 0.392 0.183 0.300 - - - 87.50 *87.50%
V. Satisfactory
D.M. Catignas Enterprises 20149 Asphalt Overlay of Road Zone III, IV, VI, VII IVA 1.911 15 C 0.294 0.300 0.300 - - - 89.40 *89.40%
V. Satisfactory
D.M. Catignas Enterprises 20149 Const. of MPB at Brgy. San Isidro IVA 0.478 45 C 0.391 0.200 0.300 - - - 89.10 *89.10% V. Satisfactory
D.M. Catignas Enterprises 20149 Const./Rehab. of Drainage System along CSCF Jct. IVA 1.504 90 C 0.317 0.200 0.300 - - - 81.70 *81.70%
V.Satisfactory
D.M. House Const. Inc. 25810Asphalt Overlay along Gapan-San
Fernando-Olongapo Road, San Benito Section
III 4.801 30 C 0.287 0.207 0.300 - - - 79.40 *79.40% Satisfactory
D.M. House Const. Inc. 25810Asphalt Overlay along Olongapo-
Bungallon Road (100mm thickness)
III 6.945 30 C 0.423 0.133 0.300 - - - 85.60 *85.60% Satisfactory
D.M. House Const. Inc. 25810Asphalt Overlay along Olongapo-
Bungallon Road (80 mm thickness)
III 7.385 30 C 0.388 0.200 0.300 - - - 88.80 *88.80% Satisfactory
D.M. House Const. Inc. 25810 Const. of Mulawin Tala Farm-to-Market Road III 2.391 70 C 0.329 0.200 0.300 - - - 82.90 *82.90%
Satisfactory
D.M. House Const. Inc. 25810 Const. of Road III 2.340 90 C 0.227 0.300 0.300 - - - 82.70 *82.70% V.Satisfactory
D.M. House Const. Inc. 25810 Const./Rehab. of Capitangan E/S III 0.940 90 C 0.339 0.173 0.300 - - - 81.20 *81.20% V.Satisfactory
D.M. House Const. Inc. 25810 Impvt./Rehab. of Roman Expressway III 72.568 150 C 0.374 0.300 0.300 - - - 97.40 *97.40%
Outstanding
D.M. House Const. Inc. 25810 Rehab. & Impv't. of Angeles-Porac-Floridablanca-Dinalupihan Road III 14.925 120 C 0.215 0.293 0.300 - - - 80.80 *80.80%
V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page102
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
D.M. House Const. Inc. 25810Repair/Rehab. of Slope Protection
along along Tenejero River Control
III 1.494 32 C 0.357 0.137 0.300 - - - 79.40 *79.40% Satisfactory
D.M. House Const. Inc. 25810Repair/Rehab. of Slope Protection
along Pentor-Balsik River Sta. Isabel Section)
III 1.417 60 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding
D.M. Wenceslao & Associates, Inc. 150 Widening of R-10 Road Project
Marala Bridge and its Approaches NCR 68.073 396 C 0.153 0.200 0.000 - - - 35.30 64.66% Fair
D.R. Robles Construction 28559 Const. of 2 Storey 4 CL Sch. Bldg. at Montalban Heights NHS IVA 5.000 120 C 0.377 0.200 0.300 - - - 87.70 *87.70%
V. Satisfactory
D.R. Robles Construction 28559 Const. of 2 Storey 4 CL Sch. Bldg. at Morong NHS IVA 5.000 120 C 0.372 0.280 0.300 - - - 95.20 90.09%
Outstanding
D.R. Robles Construction 28559 Const. of River Control @ Brgy. J.P. Rizal IV-A 2.866 80 C 0.267 0.200 0.300 - - - 76.70 77.54%
Satisfactory
D.R. Robles Construction 28559 Impvt. of Flood Control, So. Labangan, Brgy. Matambugan IVA 1.730 120 C 0.472 0.133 0.300 - - - 90.50 *90.50%
V. Satisfactory
D.R. Robles Construction 28559 Rehab. of Assencion, Zarzuela, Sagada Sts. & Various Roads NCR 9.548 30 C 0.228 0.300 0.300 - - - 82.80 *82.80%
V. Satisfactory
D.R. Robles Construction 28559 Rehab. of San Jose-Rodriguez-Quezon City Road IV-A 9.582 45 C 0.328 0.200 0.300 - - - 82.80 *82.80%
V.Satisfactory
D.R. Robles Construction 28559 Repair and Maintenance of Sagbat-Pililia Diversion Road IV-A 1.705 45 C 0.373 0.300 0.300 - - - 97.30 87.10%
V. Satisfactory
D.R. Robles Construction 28559 Repair of Sch. Bldg. @ University of Rizal System IVA 0.962 45 C 0.423 0.200 0.300 - - - 92.30 *92.30%
V. Satisfactory
D.R. Robles Construction 28559 Riprapping of Angono River (Phase IV) IV-A 2.881 90 C 0.293 0.300 0.300 - - - 89.30 *89.30%
V. Satisfactory
D.S.B. Construction and Supply 16126 Rehabilitation/Renovation of Multi-Purpose Building NCR 3.772 150 C 0.388 0.300 0.300 - - - 98.80 84.45%
V. Satisfactory
D.V. Salud Construction 6564 Construction of a 3-storey School Building SLB-LPO 18.889 180 C 0.387 0.300 0.300 - - - 98.70 98.70%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page103
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
D.W. G & A Developers 27573 Const. of Flood Control @ Hibalyo VII 0.906 66 O 0.213 - 0.200 0.000 0.031 0.250 69.40 -
D.W. G & A Developers 27573 Const. of Seawall VII 0.458 50 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory
D.W. G & A Developers 27573 Const./Repair of Seawall at Guihulngan VII 0.365 30 C 0.307 0.300 0.300 - - - 90.70 *90.70%
Outstanding
Dadoy Freight Services Construction & Supply 28465 Conc. of San Andres-Calatrava
Road (Agpudlos Section) IV-B 0.914 45 O 0.341 0.135 0.100 0.030 0.022 0.100 72.80 -
Dadoy Freight Services Construction & Supply 28465 Const. of RSC Alumni Library
Building IV-B 0.571 40 C 0.309 0.278 0.300 - - - 88.70 * 88.70% V. Satisfactory
Dadoy Freight Services Construction & Supply 28465
Repair & Rehab. of access roads to Tugdan Airport to Poblacion
AlcantaraIV-B 9.998 105 C 0.353 0.300 0.300 - - - 95.30 *95.30%
Outstanding
Daewoo Engineering & Construction Company, Ltd. FC-01-108
Const. of CP 2, Guide Channel to Bayambang under the Agno River
Flood Control Project, Phase IINIA 1,156.435 1,340 O 0.367 0.195 0.100 0.030 0.065 0.200 95.70 -
Daewoo Engineering & Construction Company, Ltd. FC-01-108
Const. of CP 2, Guide Channel to Bayambang under the Agno River
Flood Control Project, Phase IINIA 1,156.435 1,340 O 0.364 0.200 0.100 0.030 0.065 0.200 95.90 -
Daewoo Engineering & Construction Company, Ltd. FC-01-108
Const. of CP 2, Guide Channel to Bayambang under the Agno River
Flood Control Project, Phase IINIA 1,480.299 1,340 O 0.365 0.200 0.100 0.030 0.070 0.200 96.50 -
Daewoo Engineering & Construction Company, Ltd.
FC-03-047/SL2-
SN-000411
CP II, Phil-Japan Friendship Highway Mindanao Section Rehab.
Project, Phase II, (Km.130+100-Km.1376+805.34
PJHL 1,559.690 1,140 O 0.350 0.300 0.050 0.030 0.048 0.100 87.80 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page104
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Daewoo Engineering & Construction Company, Ltd.
SL2-SN-000543/FC-
98-113
Metro Manila Flood Control Project-West of Mangahan
Floodway, CP1NIA 740.742 2,419 O 0.316 0.200 0.100 0.024 0.061 0.200 90.10 -
Daewoo Engineering & Construction Company, Ltd.
FC-98-113/SL2-
SN-000543
Metro Manila Flood Control Project-West of Mangahan
Floodway, CP1, MFCP I 725.017 1,991 O 0.305 0.200 0.100 0.030 0.061 0.200 89.60 -
Daewoo Engineering & Construction Company, Ltd.
SL2-SN-000544/FC-
01-047
Philippine-Japn Friendship Highway Mindanao Section,
Rehabilitation Project, Phase II, CP-II, Km.130+000-
Km.1376+805.34
PJHL 1,559.690 1,140 O 0.388 0.300 0.070 0.030 0.070 0.067 92.50 -
Daewoo Engineering & Construction Company, Ltd. FC-03-047
Philippine-Japn Friendship Highway Mindanao Section,
Rehabilitation Project, Phase II, CP-II, Km.130+000-
Km.1376+805.34
PJHL 1,586.357 1,257 O 0.350 0.300 0.100 0.030 0.056 0.100 93.60 -
Daewoo Engineering & Construction Company, Ltd. FC-03-047
Philippine-Japn Friendship Highway Mindanao Section,
Rehabilitation Project, Phase II, CP-II, Km.130+000-
Km.1376+805.34
XIII 1,559.690 1,140 O 0.393 0.295 0.050 0.030 0.070 0.067 90.50 -
Daewoo Engineering & Construction, Ltd. FC-03-047
Philippine-Japn Friendship Highway Mindanao Section,
Rehabilitation Project, Phase II, CP-II, Km.130+000-
Km.1376+805.34
PJHL 1,586.357 1,306 O 0.368 0.300 0.100 0.030 0.070 0.100 96.80 -
Dahl Construction 8931 Completion of Concepcion Elementary School NCR 3.813 120 C 0.309 0.300 0.300 - - - 90.90 *90.90%
Outstanding
Dahl Construction 8931Const./Completion of MPB in
Brgy. Paso de Blas, Bagbaguin and Mapulang Lupa
NCR 1.507 60 C 0.304 0.200 0.300 - - - 80.40 *80.40% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page105
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Dahl Construction 8931 Rehab./Impvt. of Taytay Diversion Road IV-A 14.402 162 C 0.476 0.133 0.300 - - - 90.90 91.26%
V. Satisfactory
Dahl Construction 8931 Repair/Rehab. of C-3 Road inc. Drainage NCR 14.239 120 C 0.071 0.300 0.300 - - - 67.10 *67.10%
Fair
Dakay Construction & Development Corporation 8838 Dapitan Port Development Project PPA 222.922 1,004 C 0.39 0.300 0.300 - - - 98.67 98.67%
Outstanding
Dalanon Construction Refregiration Supply & Service 11205
Conc./Widening of Dulawan-Marbel Road (New Carmen Sect.
with Bridge Exception)XII 9.583 175 C 0.336 0.285 0.300 - - - 92.10 *92.10%
Outstanding
Dalanon Construction Refregiration Supply & Service 11205 Road Upgrading along Sewod-
Bunay Section XII 18.937 318 O 0.344 0.300 0.100 0.030 0.032 0.100 90.60 -
Dalanon Construction Refrigeration Supply & Service 11205 Road Upgrading along Sewod-
Bunay Section XII 18.937 378 O 0.384 0.300 0.150 0.030 0.030 0.050 94.40 -
Dalebo Construction & General Merchandise 32699 Const. of Drainage System at San
Rafael III IVA 0.239 20 C 0.250 0.200 0.300 - - - 75.00 *75.00% Satisfactory
Damico Buildes & Supplies 30355 Const. of one (1) CL Sch. Bldg. at Aranguren E/S III 0.438 60 C 0.326 0.300 0.300 - - - 92.60 *92.60%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page106
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Damico Buildes & Supplies 30355 Const. of Water System at Brgy. Sta. Juliana III 0.472 50 C 0.309 0.300 0.300 - - - 90.90 89.64%
V. Satisfactory
Damico Buildes & Supplies 30355 Const./Completion/Repair and Rehab. Of MPB at PNRC III 0.904 90 C 0.310 0.300 0.300 - - - 91.00 *91.00%
Outstanding
Danfran Construction 28088 Const. of MPB (for Police Station) and other impvt. Within the area NCR 1.190 30 C 0.364 0.300 0.300 - - - 96.40 *96.40%
Outstanding
Danimerh Construction and Supply 17376 Const. of MPB (Block Tienda),
Poblacion Montevista XI 1.701 60 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding
Danvic Construction 24439 Conc. of Additional 2 lanes along Davao City Diversion Road XI 3.516 180 C 0.309 0.300 0.300 - - - 90.90 *90.90%
Outstanding
Danvic Construction 24439 Const. of MPP for Package 1-D (Brgy. Dumoy & Brgy. Ballok) XI 0.753 60 C 0.320 0.300 0.300 - - - 92.00 *92.00%
Outstanding
Danvic Construction 24439 Const./Rehab. of School Bldg. @ Bucana E/S XI 1.408 105 C 0.383 0.300 0.300 - - - 98.30 *98.30%
Outstanding
Danvic Construction 24439Rehab./Impvt. of DPWH Davao City
1st DEO Bldg. inc. Employees Quarters
XI 7.560 198 C 0.493 0.200 0.300 - - 99.30 98.46% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page107
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Darynn Construction & Supply 22322 Const. of 2 Cl Academic Sch. Bldg. @ Dongan Pekong E/S XI 0.704 30 C 0.366 0.300 0.300 - - - 96.60 *96.60%
Outstanding
Darynn Construction & Supply 22322 Const. of MPB at Bitaug XI 1.714 110 C 0.450 0.200 0.300 - - - 95.00 86.46% Satisfactory
Darynn Construction & Supply 22322 Const. of MPB at Brgy. 76-A XI 0.752 90 C 0.356 0.240 0.300 - - - 89.60 *89.60% V. Satisfactory
Davao Concrete Products 12090Conc. of Additional 2 lanes along
F. Torres Jct. Bajada DCNHS Section
XI 4.621 210 C 0.270 0.300 0.300 - - - 87.00 92.28% Outstanding
Davao Concrete Products 12090 Conc. of Additional 2 lanes along Surigao-Davao Coastal Road XI 9.819 180 C 0.276 0.300 0.300 - - - 87.60 87.60%
V.Satisfactory
Davao Concrete Products 12090 Conc. of Babak-Samal-Kaputian Road XI 14.165 202 C 0.318 0.225 0.300 - - - 84.30 *84.30%
V. Satisfactory
Davao Concrete Products 12090 Conc. of Babak-Samal-Kaputian Road, Kaputian Sect. XI 19.287 210 C 0.346 0.300 0.300 - - - 94.60 87.58%
V. Satisfactory
Davao Concrete Products 12090 Const. of 3 Cl Academic @ Digos City NHS XI 1.247 50 C 0.369 0.300 0.300 - - - 96.90 *96.90%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page108
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Davao Concrete Products 12090 Const. of Flood Control Moralizon High School XI 4.245 120 C 0.240 0.300 0.300 - - - 84.00 84.48%
V. Satisfactory
Davao Concrete Products 12090 Const. of Hagonoy National High School (Padada Annex) XI 1.271 90 C 0.247 0.200 0.300 - - - 74.70 *74.70%
Satisfactory
Davao Concrete Products 12090 Impvt./Conc. Inawayan-Baracatan Road, Toril District XI 14.922 210 O 0.315 0.300 0.100 0.010 0.040 0.100 86.50 -
Davao Concrete Products 12090Impvt./Conc. of Babak-Samal-Katipunan Road, Katipunan
SectionXI 34.712 286 O 0.327 0.274 0.150 0.022 0.060 0.050 88.30 -
Davao Concrete Products 12090 Impvt./Rehab. of Agusan River Channel XI 14.448 280 C 0.345 0.300 0.300 - - - 94.50 88.98%
V. Satisfactory
Davao Concrete Products 12090 Impv't/Conc. of Inawayan-Baracatan Road XI 14.922 210 C 0.314 0.200 0.300 - - - 81.40 84.46%
Satisfactory
Davao Concrete Products 12090Protection Works @ Pier 1& Pier 2
of Lasang Bridge along Davao Road (Daang Maharlika)
XI 8.489 180 C 0.294 0.300 0.300 - - - 89.40 88.74% V. Satisfactory
Davao Concrete Products 12090 Repair/Rehab. of MPB at Brgy. 76-A XI 18.908 225 C 0.418 0.170 0.300 - - - 88.80 94.19%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page109
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Davao Concrete Products 12090 Repair/Rehab. of MPB Bldg. (DAPECOL Hospital) XI 4.151 120 O 0.396 0.287 0.100 0.030 0.038 0.100 95.10 -
Davao Concrete Products 12090Widening of Cotabato-Davao
National Road, Pob. Pagalungan Section
XII 5.436 75 C 0.323 0.300 0.000 - - - 62.30 54.71% Poor
Davao Contractors Development Cooperative (DACODECO) 28542
Completion of the unfinished works in the multipurpose
gymnasiumDOST 2.374 95 O 0.384 0.299 0.050 0.030 0.058 0.017 83.80 -
Davao Contractors Development Cooperative (DACODECO) 28542 Conc. of Bucac Road Section
along Bucac-Marcelina Road XIII 2.810 150 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory
Davao Contractors Development Cooperative (DACODECO) 28542 Conc. of Road at Brgy. Subasta XI 0.944 70 C 0.395 0.300 0.300 - - - 99.50 *99.50%
Outstanding
Davao Contractors Development Cooperative (DACODECO) 28542
Const. of 2 CL Mod. Single Storey School Bldg., At Manat NHS Kao
AnnexXI 0.802 60 C 0.351 0.200 0.300 - - - 85.10 62.70%
Fair
Davao Contractors Development Cooperative (DACODECO) 28542 Const. of Lined Canal XII 0.468 60 C 0.390 0.300 0.300 - - - 99.00 *99.00%
Outstanding
Davao Contractors Development Cooperative (DACODECO) 28542 Const. of MPB (Phase II) XIII 0.552 60 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page110
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Davao Contractors Development Cooperative (DACODECO) 28542 Const. of MPB, Brgy. Mabini XII 0.667 70 C 0.475 0.133 0.300 - - - 90.80 83.52%
Satisfactory
Davao Contractors Development Cooperative (DACODECO) 28542 Const. of N.N.C.H.S. Bldg. (Phase
V) XI 2.828 120 O 0.385 0.176 0.100 0.030 0.035 0.100 82.60 -
Davao Contractors Development Cooperative (DACODECO) 28542
Const. of one (1) unit concrete Multi-Purpose/Workshop Bldg. @
Guadalupe CESXIII 1.514 75 C 0.368 0.300 0.000 - - - 66.80 *66.80%
Fair
Davao Contractors Development Cooperative (DACODECO) 28542 Const./Rehab. of Health Center
Building @ Brgy. Magupising XI 0.610 60 C 0.349 0.300 0.300 - - - 94.90 *94.90% Outstanding
Davao Contractors Development Cooperative (DACODECO) 28542 Impvt. of Riverbank Protection of
Hanipaan Bridge (Box Culvert) XIII 4.785 90 C 0.360 0.300 0.000 - - - 66.00 66.90% Fair
Davao Contractors Development Cooperative (DACODECO) 28542
Rehab. of San Benito-Sta. Monica Road Section, along Dapa-Del
Carmen-San Benito-Sta. Monica-Burgos-San Isidro Road
XIII 4.815 45 C 0.266 0.300 0.300 - - - 86.60 *86.60% V. Satisfactory
Davao Contractors Development Cooperative (DACODECO) 28542
Rehab./Impvt. of DPWH Davao del Norte DEO Bldg. inc. Employees
QuartersXI 9.642 280 C 0.478 0.146 0.300 - - - 92.40 90.44%
V. Satisfactory
Davao Contractors Development Cooperative (DACODECO) 28542 Repair/Rehab. Damaged Roadway
Nabunturan-Mainit Park Road XI 2.408 145 C 0.304 0.232 0.300 - - - 83.60 84.98% V. Satisfactory
Davao Contractors Development Cooperative (DACODECO) 28542 Repair/Rehab. of Tugpan PSCG
Bridge XIII 3.810 215 C 0.369 0.200 0.000 - - - 56.90 66.62% Fair
Davao Engineers Contractors Cooperative (DECK) 30944 Const. of 1 CL 1 Storey Bldg. @
Quezon E/S XI 0.465 90 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page111
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Davao Engineers Contractors Cooperative (DECK) 30944 Const. of MPB at Brgy. Ma-a XI 0.375 60 C 0.356 0.300 0.300 - - - 95.60 *95.60%
Outstanding
Davao L.A. Parts & Hardware Corporation 27208 Conc. Reblocking of Digos
Diversion Road XI 4.821 90 C 0.360 0.300 0.300 - - - 96.00 95.34% Outstanding
Davao L.A. Parts & Hardware Corporation 27208 Const./Rehab. of FMR XI 2.824 90 C 0.301 0.219 0.300 - - - 82.00 *82.00%
V. Satisfactory
Davao Rock Mixer Enterprises 19250 Concreting of Road of Poblacion-Pangutusan Section XI 9.629 120 C 0.335 0.200 0.300 - - - 83.50 *83.50%
Satisfactory
Davhez Trading and Construction 9833 Const./Completion of Las Pinas Nat'l High School (Main) NCR 0.709 30 C 0.317 0.200 0.300 - - - 81.70 *81.70%
V. Satisfactory
Davhez Trading and Construction 9833 Repair/Rehab. of School Bldg. at Moonwalk E/S Phase 5 NCR 2.946 60 C 0.268 0.200 0.300 - - - 76.80 *76.80%
Satisfactory
Daybreak Enterprises Engineering & Construction 30174 Package II-Const. of Multi-Purpose
Building on Various Location VIII 1.275 90 O 0.269 0.225 0.100 0.020 0.032 0.100 74.60 -
Deabsres Construction & Supply 10392 Const. of 1 unit 7m x 9m Sch. Bldg. @ Umingan NHS I 0.491 70 C 0.348 0.200 0.300 - - - 84.80 *84.80%
V. Satisfactory
Deabsres Construction & Supply 10392 Const. of 6 Units S/B @ San Vicente E/S I 0.428 85 C 0.369 0.256 0.300 - - - 92.50 83.89%
V. Satisfactory
Decks Construction, Inc. 25860 Const. of MPB at Apitong IV-B 0.668 60 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory
Dela Cruz Construction and Supply 20775 Const. of Two (2) Cl, Bldg., San
Jose Pili H/S V 0.962 120 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
Design Setter Construction Corporation 32136 Const. of Overpass in Agusan
NHS, Agusan Phase I X 0.280 90 C 0.287 0.200 0.300 - - - 78.70 85.42% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page112
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Dhayang Construction Firm 12805 Const. of MPB, Brgy. Lanzuran IX 2.333 60 C 0.312 0.176 0.300 - - - 78.80 *78.80% Satisfactory
Digos Tesston Construction & Supplies 8921 Const. of FMR @ Baracata-Atan-
Awe-Sebulan Road XI 4.710 180 O 0.395 0.273 0.100 0.030 0.054 0.100 95.20 -
Digos Tesston Construction & Supplies 8921 Impv't/Conc. of Lacson-Lamanan
Road XI 3.850 180 O 0.368 0.300 0.100 0.030 0.058 0.100 95.60 -
Digos Tesston Construction & Supplies (Formerly: ACT
Construction)8921
Conc. of Additional 2-Lanes along Davao-Cotabato Road, Talomo Intersection and Talomo Bridge
Section
XI 5.394 200 C 0.341 0.300 0.300 - - - 94.10 *94.10% Outstanding
Digos Tesston Construction & Supplies (Formerly: ACT
Construction)8921 Concreting of Roads at Package B-
1 Brgy. 76-A, Candelaria St. XI 0.956 120 C 0.380 0.200 0.300 - - - 88.00 *88.00% Satisfactory
Digos Tesston Construction & Supplies (Formerly: ACT
Construction)8921 Const./Completion of DPWH-
DCSDEO Bldg., Tugbok District XI 9.635 210 C 0.414 0.200 0.300 - - - 91.40 89.16% V. Satisfactory
Digos Tesston Construction & Supplies (Formerly: ACT
Construction)8921 Impv't/Conc. of Lacson-Lamanan
Road XI 3.850 180 C 0.355 0.300 0.300 - - - 95.50 95.50% Outstanding
Dimson (Manila), Inc. 112 Const. of Jones 2 Bridge and Approaches II 111.929 826 C 0.354 0.300 0.300 - - - 95.40 86.02%
V. Satisfactory
Dimson (Manila), Inc. 112 Improvement/Widening of MNR Package I, Meycauayan III 88.097 180 O 0.390 0.300 0.100 0.030 0.038 0.067 92.50 -
Diplahan Commercial & Construction 32037 Conc. of Tinungtungan along
Kauswagan-Lindag Road IX 0.953 35 C 0.272 0.300 0.300 - - - 87.20 90.86% Outstanding
Diplahan Commercial & Construction 32037 Const. of MPB (Covered Court) IX 0.931 60 C 0.302 0.300 0.300 - - - 90.20 61.50%
Fair
Diplahan Commercial & Construction 32037 Const. of MPB @ Poblacion
Malangas IX 0.128 20 C 0.343 0.162 0.300 - - - 80.50 *80.50% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page113
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Dipolog Top Construction and Development Corporation 6678 Road Upgrading of Dipolog-Punta
Dansullan-Sergio Osmeña Road IX 18.879 400 O 0.380 0.263 0.150 0.030 0.048 0.050 92.10 -
Dipolog Top Construction and Devt. Corp. 6678 Const. of MPB IX 0.425 55 C 0.349 0.200 0.300 - - - 84.90 76.92%
Satisfactory
Dipolog Top Construction and Devt. Corp. 6678 Road Upgrading of Dipolog-Punta
Dansullan-Sergio Osmeña Road IX 9.438 200 C 0.351 0.300 0.300 - - - 95.10 *95.10% Outstanding
DL Enterprises 18155 Conc. of Ozamis City-Oroquieta City Road, Sinacaban Section X 19.014 240 O 0.275 0.300 0.000 0.030 0.047 0.100 75.20 -
DL Enterprises 18155 Conc. of Tudela Road (Municipal Ground) X 0.952 90 C 0.327 0.200 0.300 - - - 82.70 86.18%
V. Satisfactory
DL Enterprises 18155 Conc./Rehab. of FMR @ Sta. Cruz, Boniao & Maguiles Road IX 9.127 274 C 0.318 0.184 0.300 - - - 80.20 80.44%
V. Satisfactory
DL Enterprises 18155 Concreting of Roads at Brgy. Kinuman Sur X 0.952 105 C 0.329 0.282 0.300 - - - 91.10 87.92%
V. Satisfactory
DL Enterprises 18155Const. of Classrooms @ Northern Mindanao State College of Science
& TechnologyX 1.906 90 C 0.305 0.300 0.300 - - - 90.50 79.02%
Satisfactory
DL Enterprises 18155 Const. of Road X 1.906 204 C 0.471 0.200 0.300 - - - 97.10 82.13% Satisfactory
DL Enterprises 18155 Const. of Tangub City-Don Victoriano Road X 22.914 270 O 0.400 0.300 0.100 0.030 0.050 0.100 98.00 -
DL Enterprises 18155Const. of Tangub City-Don
Victoriano Road, Tangub City Section
X 22.914 723 O 0.331 0.300 0.150 0.030 0.045 0.050 90.60 -
DL Enterprises 18155 Resurfacing of Unpaved Shoulder X 1.121 80 C 0.320 0.300 0.300 - - - 92.00 72.26% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page114
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
DMJ Construction & Supply 17211 Asphalt Overlay along Amungan-Palauig-Banlog Road, Iba Section III 9.553 25 C 0.354 0.300 0.300 - - - 95.40 *95.40%
Outstanding
DMJ Construction & Supply 17211 Asphalt Overlay along Olongapo-Bugallon Road III 13.576 25 C 0.355 0.194 0.300 - - - 84.90 *84.90%
V. Satisfactory
DMJ Construction & Supply 17211 Asphalt Overlay of Cabangan-Dolores Section III 9.554 40 C 0.364 0.207 0.300 - - - 87.10 *87.10%
V. Satisfactory
DMJ Construction & Supply 17211 Completion of RMTU Admin. Bldg. III 1.911 45 C 0.284 0.300 0.300 - - - 88.40 *88.40% V. Satisfactory
DMJ Construction & Supply 17211
Completion/ Continuation of Unfinshed On-going Bridge Matain Bridge along Olongapo-Bugallom
Road-Phase II, Matain
III 10.706 240 C 0.301 0.261 0.300 - - - 86.20 89.08% V. Satisfactory
DMJ Construction & Supply 17211 Const. of 6 CL @ Uacon E/S III 4.243 180 C 0.330 0.290 0.300 - - - 92.00 *92.00% Outstanding
DMJ Construction & Supply 17211 Const./Impvt. of MPB III 9.423 120 C 0.436 0.133 0.300 - - - 86.90 84.98% Satisfactory
DMJ Construction & Supply 17211 Impvt./Conc. of Dingalan National Road III 18.803 240 C 0.355 0.194 0.300 - - - 84.90 *84.90%
V. Satisfactory
DMJ Construction & Supply 17211 Rehab. of Amungan-Palauig-Banlog Rd., Palauig Section III 19.011 30 C 0.317 0.300 0.300 - - - 91.70 *91.70%
Outstanding
DMJ Construction & Supply 17211 Rehab./Impvt. of Manila North Road III 18.817 20 C 0.302 0.201 0.300 - - - 80.30 *80.60%
V. Satisfactory
DMJ Construction & Supply 17211 Rehab./Impvt. of Manila North Road III 18.815 33 C 0.311 0.022 0.300 - - - 63.30 *63.30%
Fair
DMJ Construction & Supply 17211 Repair/Rehab. of Olongapo-Bungallon Road, Sindal Section III 9.796 12 C 0.422 0.133 0.300 - - - 85.50 *85.50%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page115
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
DMM Construction Indsutries 31136 Const. of 6 Cl Sch. Bldg., Sta. Paz E/S (Pinamudlan E/S) VIII 2.283 180 C 0.372 0.200 0.300 - - - 87.20 *87.20%
V. Satisfactory
DMM Construction Indsutries 31136 Redecking of Divisoria Bridge VIII 3.763 280 C 0.354 0.200 0.300 - - - 85.40 *85.40% V.Satisfactory
Dofel Construction 16333 Const. of FMR @ Lantian IX 1.861 75 C 0.310 0.265 0.300 - - - 87.50 67.76% Fair
Dofel Construction 16333 Const. of Molave Vocational Technical School Building IX 0.371 45 O 0.347 0.300 0.100 0.030 0.041 0.100 91.80 -
Domarax Construction and Development 5502 Const. of 1 Cl @ Claudia P.
Pimentel Memorial E/S XIII 0.443 180 C 0.355 0.300 0.300 - - - 95.50 *95.50% Outstanding
Domarax Construction and Development 5502
Impvt. of Road Slip and other related activities, (Gamut-San
Miguel Sect.)XIII 3.850 93 C 0.305 0.200 0.300 - - - 80.50 *80.50%
V. Satisfactory
Domvee Construction Corporation 19872
Rehab./Completion of CCR, Guinsiliban Sagay Road Section along Camiguin Circumferential
Road
X 1.850 327 C 0.320 0.300 0.000 - - - 62.00 53.81% Poor
Donber Construction & Supply 15334 Improvement of MASSBA PIS V 1.191 90 C 0.359 0.180 0.300 - - - 83.90 *83.87% V. Satisfactory
Double L Construction & Development Enterprises 9834 Completion of MPB VII 1.282 70 C 0.270 0.241 0.300 - - - 81.10 *81.10%
V. Satisfactory
Double L Construction & Development Enterprises 9834
Conc. of Brgy. Roads a)Brgy. Cangmating, Sibulan b)Brgy.
Naiba, San JoseVII 0.944 50 C 0.254 0.300 0.300 - - - 85.40 *85.40%
V. Satisfactory
Double L Construction & Development Enterprises 9834 Conc. of Multi-Purpose Pavement
at Brgy. Poblacion VII 0.475 50 C 0.303 0.300 0.300 - - - 90.30 *90.30% Outstanding
Double L Construction & Development Enterprises 9834 Concreting of Bio-os-Jantianon
Road (Intermittent Section) VII 8.926 100 O 0.367 0.222 0.150 0.030 0.037 0.050 85.60 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page116
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Double L Construction & Development Enterprises 9834 Const. of Flood Control @
Maragondong VII 0.445 40 C 0.362 0.100 0.300 - - - 76.20 *76.20% Satisfactory
Double L Construction & Development Enterprises 9834 Const. of River Control, Brgy.
Tandayag VII 0.473 35 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Double L Construction & Development Enterprises 9834 Const. of Water System (Phase I) VII 9.497 143 C 0.307 0.300 0.300 - - - 90.70 93.04%
Outstanding
Double L Construction & Development Enterprises 9834 Reconst. of Dumaguete Airport
Road (Intermittent Section) VII 10.395 185 C 0.477 0.133 0.300 - - - 91.00 82.48%Satisfactory
Double L Construction & Development Enterprises 9834 Widening of Dumaguete North
Road at Intermittent Section VII 21.558 165 C 0.306 0.284 0.300 - - - 89.00 *89.00% V. Satisfactory
Double L Construction and Development Enterprises 9834 Concreting of Bunga Brgy. Road VII 0.827 80 O 0.306 0.300 0.100 0.030 0.040 0.100 87.60 -
Double L Construction and Development Enterprises 9834
Const. of Ayuquitan Bridge & Approaches, Km.13.922 along
Dumaguete North RoadVII 10.417 359 C 0.242 0.300 0.000 - - - 54.20 72.24%
Satisfactory
Double R Double M Construction 25385 Const. of Cagayan River Control @ Catayauan II 9.640 260 C 0.400 0.200 0.300 - - - 90.00 72.48%
Satisfactory
Double R Double M Construction 25385Reblocking of Road & Const. of
Shoulder & Drainage with Sidewalk
II 0.938 120 C 0.374 0.099 0.300 - - - 77.30 *77.30% Satisfactory
Doulos Construction 30759Road Upgrading along Kalinga-Cagayan Road (Calanan-Enrile
Section)CAR 3.665 150 C 0.318 0.200 0.300 - - - 81.80 72.20%
Poor
DQT Builders 7950 Conc. of Boac-Mogpog Nat'l Road (Bantauyan Section) IV-B 4.272 110 C 0.292 0.300 0.300 - - - 89.20 *89.20%
V. Satisfactory
DQT Builders Corporation (Formerly:DQT Builders) 7950 Conc. of Infanta-Marikina Road,
Km. 130+843-Km. 130+078 IV-A 14.467 180 C 0.337 0.300 0.300 - - - 93.70 91.72% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page117
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
DQT Builders Corporation (Formerly:DQT Builders) 7950 Conc. of Kay Duke FMR IV-B 0.380 90 C 0.339 0.200 0.300 - - - 83.90 *83.90%
V. Satisfactory
DQT Builders Corporation (Formerly:DQT Builders) 7950 Const./Repair of Mabuhay MPB IV-B 0.380 100 C 0.310 0.200 0.300 - - - 81.00 *81.00%
V. Satisfactory
DQT Builders Corporation (Formerly:DQT Builders) 7950
Impvt. of Lucena Bdry.-Tayabas-Lucban-Sampaloc-Mauban Road
(Sampaloc Side)IVA 19.199 222 C 0.435 0.133 0.300 - - - 86.80 84.46%
Satisfactory
DQT Builders Corporation (Formerly:DQT Builders) 7950
Rehab. of Balagasan Bridge & App. Along Talaba-Summit-
Panaon National RoadIV-A 2.305 40 C 0.379 0.200 0.300 - - - 87.90 *87.90%
V. Satisfactory
DQT Builders Corporation (Formerly:DQT Builders) 7950 Rehab./Impv't of Infanta-Dinahican
Road IV-A 14.468 180 C 0.324 0.200 0.300 - - - 82.40 82.40% V.Satisfactory
DQT Builders Corporation (Formerly:DQT Builders) 7950 Rehab./Impvt. of MSR-Diversion
Road IV-A 18.216 100 C 0.381 0.300 0.300 - - - 98.10 93.96% Outstanding
DQT Builders Corporation (Formerly:DQT Builders) 7950
Rehab./Reconstruction and Concrete Paving of Catanauan-Buenavista Nat'l Road Phase I-
Buenavista Sect.
IV-A 14.460 120 C 0.347 0.300 0.300 - - - 94.70 93.50% Outstanding
DQT Builders Corporation (Formerly:DQT Builders) 7950 Widening/Asphalting of Luyang-
Poo-Lazi National Road VII 6.473 172 C 0.359 0.300 0.000 - - - 65.90 75.53% Satisfactory
DSB Construction and Supply 16126 Conc. of Bical Road V 14.163 120 O 0.325 0.236 0.100 0.020 0.023 0.100 80.40 -
DSB Construction and Supply 16126 Conc. of Bical Road V 14.163 120 O 0.318 0.240 0.070 0.030 0.028 0.067 75.30 -
DSB Construction and Supply 16126 Conc. of Mt. Mayon Park Road V 4.721 140 C 0.293 0.300 0.300 - - - 89.30 *89.30% V. Satisfactory
DSB Construction and Supply 16126 Const. of San Lorenzo Lined Canal V 0.375 120 C 0.345 0.100 0.300 - - - 74.50 *74.50% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page118
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
DSB Construction and Supply 16126 Const. of Virac Seawall V 8.645 180 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory
DSB Construction and Supply 16126 Repair/Rehab. of Virac Seawall V 4.736 180 C 0.370 0.200 0.300 - - - 87.00 79.74% Satisfactory
DSB Construction and Supply 16126 Repair/Restoration of Concrete Dike at Bulawan River V 14.260 180 C 0.340 0.200 0.300 - - - 84.00 84.00%
V.Satisfactory
DSB Construction and Supply 16126 Repair/Restoration of Concrete Revetment of Baclayon V 9.500 180 C 0.311 0.300 0.300 - - - 91.10 *91.10%
Outstanding
DSB Construction and Supply 16126 Road Opening of Tanawan-Cumagingking Falls V 28.505 240 C 0.372 0.286 0.300 - - - 95.80 93.52%
Outstanding
DSB Construction and Supply, Inc. 16126 Completion of Multi-Purpose
Building Phase VII V 7.188 160 O 0.391 0.240 0.150 0.030 0.056 0.050 91.70 -
DSB Construction and Supply, Inc. 16126 Conc. of Bical Road V 14.163 163 C 0.461 0.133 0.300 - - - 89.40 82.47%
Satisfactory
DSB Construction and Supply, Inc. 16126 Conc. of San Fernardo North Road V 18.898 270 O 0.356 0.236 0.150 0.030 0.056 0.050 87.80 -
DSB Construction and Supply, Inc. (Formerly: DSB Const. &
Supply)16126 Const. of Multi-Purpose Center,
Tabaco NHS V 5.787 150 C 0.369 0.200 0.300 - - - 86.90 82.21% V. Satisfactory
DSO Enterprises 10733 Completion of School Bldg. IV-A 0.955 75 C 0.322 0.227 0.300 - - - 84.90 *84.90% V. Satisfactory
DSO Enterprises 10733 Conc. of CSCF Jct. Road, Pagsanjan Section IV-A 5.254 75 C 0.357 0.200 0.300 - - - 85.70 89.18%
V. Satisfactory
DSO Enterprises 10733 Const. of FMR @ Sitio Tanliwan IV-A 0.955 40 C 0.268 0.300 0.300 - - - 86.80 *86.80% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page119
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
DSO Enterprises 10733 Const. of FMR at Sitio Bunliw IV-A 0.477 36 C 0.330 0.200 0.300 - - - 83.00 *83.00% V. Satisfactory
DSO Enterprises 10733Const./Replacement & Repair of Elem. & Secondary Sch. Bldg.,
Alaminos Central Sch. IV-A 0.812 60 C 0.433 0.200 0.300 - - - 93.30 *93.30%
V. Satisfactory
Dungan Constructors & Trading 19301 Conc. of FMR @ Brgy. Buhilit III 0.611 60 C 0.341 0.196 0.300 - - - 83.70 *83.70% V. Satisfactory
Duragold Trading & Const. - CDO Branch 31929 Const. of One (1) Storey Multi-
Purpose Bldg. X 0.471 60 C 0.392 0.300 0.300 - - - 99.20 92.13% Outstanding
Duros Development Corp. 22729
Impvt./Asphalting and Widening of Cebu-Toledo Wharf Road (Central
Nautical Highway), Tabunok-Lagtang Section
VII 19.575 120 C 0.218 0.300 0.300 - - - 81.80 79.64% Satisfactory
Duros Development Corp. 22729 Repair/Rehab. & Widening of Cansaga Bridge VII 11.388 210 C 0.400 0.100 0.300 - - - 80.00 86.54%
V. Satisfactory
DVB Construction 23769 Const. of Drainage Canal @ Brgy. Manloy VIII 0.188 30 C 0.304 0.200 0.300 - - - 80.40 *80.40%
V.Satisfactory
Dynamic Builders & Construction Co., (Phil.), Inc. 24712
Impv't./Widening of Bacolod South Kabankalan Road, Km.4+953 -
Km.5+420VI 17.790 295 C 0.276 0.300 0.000 - - - 57.60 78.04%
Satisfactory
Dynamic Builders & Construction Co., (Phil.), Inc. 24712 Reblocking of Bacolod
Circumferential Road VI 19.046 360 C 0.249 0.200 0.300 - - - 74.90 79.72% Satisfactory
Dynamic Builders & Construction Co., (Phil.), Inc. 24712
Rehab./Reconst. of Damaged Paved Nat'l Road, Jct. San Enrique
Pontevedra By Pass Road & its Access Road
VI 46.230 395 O 0.313 0.300 0.150 0.030 0.065 0.050 90.80 -
Dynamic Builders & Construction Co., (Phil.), Inc. 24712
Repair & Maintenance Road, Highways & Bridges at Bacolod
Circumferential Rd. VI 19.040 310 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
Dynamic Builders & Construction Co., (Phil.), Inc. 24712
Widening/Impvt. of Bacolod South Kabankalan Road, Km.5+200 -
Km.5+775.5 with exceptionVI 9.538 180 C 0.370 0.290 0.300 - - - 96.00 96.56%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page120
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Dynamic Builders & Construction Co., (Phil.), Inc. 24712
Widening/Impvt. of Bacolod South Kabankalan Road,Tangub Section,
Km.5+775.5- Km.5+937.5 with exception
VI 9.476 452 C 0.407 0.200 0.300 - - - 90.70 86.08% Satisfactory
E & D Construction 32064Conc. Widening of Cotabato-Alla-
Marbel-General Santos Road, Malagapas Section
XII 4.824 105 C 0.345 0.300 0.000 - - - 64.50 73.23% Satisfactory
E & L Reyes Construction 15338 Conc. of Brgy. II Municipal Road VII 0.932 30 C 0.321 0.300 0.300 - - - 92.10 *92.10% Outstanding
E & L Reyes Construction 15338 Conc. of Maya-Daanbantayan Road, Agujo Section VII 3.779 55 C 0.351 0.200 0.300 - - - 85.10 *85.10%
V. Satisfactory
E & L Reyes Construction 15338 Const. of 1-unit 2 Cl High Sch. Bldg. at Samboan NHS VII 0.826 45 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
E & L Reyes Construction 15338 Const. of Getafe Public Market VII 1.895 168 O 0.368 0.300 0.100 0.010 0.018 0.100 89.60 -
E & L Reyes Construction 15338 Const. of President C.P. Garcia H/S VII 0.452 120 C 0.334 0.300 0.300 - - - 93.40 85.00%
V. Satisfactory
E & L Reyes Construction 15338 Rehab. (Conc.) of Maria Antonia Village Road VII 0.740 60 C 0.313 0.300 0.300 - - - 91.30 *91.30%
Outstanding
E and D Construction 32064Conc. Widening of Cotabato-Alla-
Marbel-General Santos Road, Malagapas Section
XII 4.784 105 O 0.327 0.221 0.100 0.010 0.023 0.100 78.10 -
E and D Construction 32064Conc. Widening of Cotabato-Alla-
Marbel-General Santos Road, Malagapas Section
XII 4.784 105 O 0.346 0.240 0.100 0.022 0.025 0.067 80.00 -
E and D Construction 32064 Const. of MPB (DENR Building) XII 0.939 58 O 0.311 0.231 0.100 0.023 0.029 0.067 76.10 -
E and D Construction 32064 Const./Conc. of Lagundungan-Buaya-Buaya Road XII 4.815 45 C 0.343 0.200 0.300 - - - 84.30 79.92%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page121
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
E and D Construction 32064Repair/Rehab. of Cotabato-Lanao
Road, PC Hill-Quezon Avenue-Parang Road Section
XII 9.419 65 C 0.278 0.133 0.300 - - - 71.10 *71.10% Poor
E & L Reyes Construction 15338 Improvement of Multi-Purpose Building @ Sto. Rosario VII 0.138 120 O 0.378 0.200 0.150 0.030 0.021 0.033 81.20 -
E & L Reyes Construction 15338 Repair of School Building at San Roque E/S VII 0.276 120 O 0.366 0.200 0.150 0.030 0.019 0.033 79.80 -
E E I Corporation 333NAIA Expressway and its Related
Roads Project, Phase I, CP-II, Skyway Interchange Ramps 1 & 4
URPO 601.681 1,392 C 0.328 0.300 0.300 - - - 92.80 91.71% Outstanding
E E I Corporation 333
NAIA Expressway and its Related Roads Project, Phase I, Package IV-A, Sales St. Viaduct and Ramp Structure (MSE Retaining Wall)
URPO 368.005 240 O 0.360 0.300 0.100 0.030 0.065 0.100 95.50 -
E E I Corporation 333
NAIA Expressway and its Related Roads Project, Phase I, Package IV-A, Sales St. Viaduct and Ramp Structure (MSE Retaining Wall)
URPO 368.005 270 O 0.364 0.300 0.000 0.030 0.065 0.050 80.90 -
E M L Construction & Trading 10151 Const. of Jetty Protection Walls at the Mouth of Kalaklan River III 19.107 120 C 0.267 0.300 0.300 - - - 86.70 80.04%
V. Satisfactory
E M L Construction & Trading 10151 Impvt. of San Antonio-Floridablanca Road III 4.758 74 C 0.371 0.300 0.300 - - - 97.10 *97.1%
Outstanding
E M L Construction & Trading 10151 Rehab./Impvt./Asphalt Overlay of Angeles-Magalang Road III 9.478 11 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
E M L Construction & Trading 10151 Rehab/Improvement of Brgy. San Matias III 4.753 60 C 0.366 0.200 0.300 - - - 86.60 *86.60%
Satisfactory
E M L Construction & Trading 10151 Repair/Rehab. of Porac Public Market III 2.402 90 C 0.302 0.291 0.300 - - - 89.30 *89.30%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page122
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
E S De Guzman Construction 17494 Const. of NVSU Multi-Purpose Bldg., Phase III II 0.369 30 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
E S De Guzman Construction 17494 Const. of Pob. South MPB II 0.277 30 C 0.228 0.200 0.300 - - - 72.80 72.73% Satisfactory
E S De Guzman Construction 17494 Const. of Quirino MPB II 0.464 55 C 0.386 0.238 0.300 - - - 92.40 *92.40% Outstanding
E S De Guzman Construction 17494 Construction of Multipurpose Bldg. DOST 30.986 120 O 0.361 0.264 0.150 0.030 0.052 0.050 90.70 -
E S De Guzman Construction 17494 Replacement of Oriwong Bridge and Approaches II 7.123 140 C 0.398 0.300 0.000 - - - 69.80 80.18%
V. Satisfactory
E. Cañeda Construction 22168 Conc. of Bogo-Polambato Wharf Road VII 9.313 135 C 0.296 0.110 0.300 - - - 70.60 *70.60%
Satisfactory
E. Cañeda Construction 22168 Road Conc. of Danglag-Garing Road VII 0.458 45 C 0.282 0.200 0.300 - - - 78.20 *78.20%
Satisfactory
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Conc. of Sipocot-Cabusao Road V 8.555 150 C 0.376 0.190 0.300 - - - 86.60 89.00%
V. Satisfactory
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Const. of MPB @ Bonot V 0.948 60 C 0.389 0.138 0.300 - - - 82.70 85.85%
V. Satisfactory
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Const. of Water System V 2.808 120 C 0.391 0.300 0.300 - - - 99.10 94.90%
Outstanding
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Reblocking of Road to Libmanan
form Daang Maharlika V 9.498 150 C 0.309 0.233 0.300 - - - 84.20 84.92% V. Satisfactory
E. Garcia Construction & E. Garcia Gravel & Sand 7243 Road Concreting of Zone 3 and
Zone 4, Brgy. Malinao V 0.946 120 C 0.432 0.200 0.300 - - - 93.20 *93.20% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page123
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
E. Garcia Construction and E. Garcia Gravel and Sand 7243 Naga Airport Development Project PMS 43.333 150 O 0.373 0.300 0.150 0.020 0.063 0.050 95.60 -
E. Gardiola Construction 17542
Asphalt Overlay/Rehab. of Manila-Batangas Rd., Malvar Section,
Brgy. San Fernando & Santiago Phase II
IVA 19.290 120 C 0.246 0.287 0.300 - - - 83.30 *83.30% V. Satisfactory
E. Gardiola Construction 17542 Const. of C-5 Ext. Proj., from SLEX to Sucat Road NCR 95.556 180 C 0.295 0.300 0.300 - - - 89.50 86.26%
V. Satisfactory
E. Gardiola Construction 17542 Impv't. of Road at Nangkaan-Ki Santol Road Phase II IVA 9.644 90 C 0.276 0.200 0.300 - - - 77.60 80.12%
V. Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab. Along San CelestinoSan Francisco-Sto. Toribio Rd. IVA 9.642 90 C 0.362 0.254 0.300 - - - 91.60 *91.60%
Outstanding
E. Gardiola Construction 17542 Impvt./Rehab. of Batangas-QuezonRoad IVA 19.236 120 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab. of Cabanatuan Carmen Road III 9.553 60 C 0.284 0.300 0.300 - - - 88.40 *88.40%
V.Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab. of Cabanatuan Circumferential Road III 9.553 60 C 0.293 0.300 0.300 - - - 89.30 *89.30%
V.Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab. of Line Canal at Brgy. 2 IVA 14.471 150 C 0.406 0.200 0.300 - - - 90.60 *90.60%
V. Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab. of San Juan-Laiya Road, Laiya Aplaya Sect. IVA 19.293 120 C 0.485 0.133 0.300 - - - 91.80 87.48%
Satisfactory
E. Gardiola Construction 17542 Impvt./Rehab. of San Juan-Laiya Road, Laiya Hugom Sect. IVA 19.294 120 C 0.486 0.133 0.300 - - - 91.90 87.52%
Satisfactory
E. Guadiz Construction 27172 Const. of 2-CL at Guilermo A. Barsatan School of Arts & Trades CAR 0.558 180 C 0.361 0.300 0.000 - - - 66.10 76.04%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page124
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
E. Guadiz Construction 27172Const. of Marag Valley
Agricultural and Trade High School
CAR 0.559 180 C 0.344 0.300 0.000 - - - 64.40 81.34% V. Satisfactory
E. Lapus Enterprises 10813 Const. of Balangkas Road NCR 3.514 120 C 0.330 0.200 0.300 83.00 87.80% V. Satisfactory
E. Lapuz Enterprises 10813 Const. of MP Building @ Sto. Tomas E/S III 3.029 85 C 0.385 0.176 0.300 - - - 86.10 *86.10%
V. Satisfactory
E. Lapuz Enterprises 10813 Const. of Vocational Building @ Pedro Diaz High School NCR 20.042 150 O 0.285 0.240 0.150 0.020 0.023 0.050 76.80 -
E. Lapuz Enterprises 10813
Impvt./Rehab. of Roads in Western Samar, Oquendo-Pilar Road, Sta.
00+000-Sta. 05+405 with exceptions
VIII 2.865 45 C 0.357 0.200 0.300 - - - 85.70 *85.70% V. Satisfactory
E. Lapuz Enterprises 10813 Rehab./Impvt./Widening of Road at Brgy. Tagapo VIII 19.198 247 O 0.369 0.300 0.150 0.030 0.028 0.050 92.70 -
E. R. Venzon Construction 19013 PSHS BRC ACA I & DORM I PSHS 8.413 240 O 0.3994 0.233 0.100 0.020 0.030 0.070 85.24 -
E. Simba Marketing and Construction Supply 16398 Completion of MPB at Brgy.
36-D XI 0.939 120 C 0.345 0.268 0.300 - - - 91.30 *91.30% Outstanding
E. Simba Marketing and Construction Supply 16398
Conc. of Sarangani-Davao del Sur Coastal Road
(Kalatungan Sect.)XII 5.645 180 C 0.311 0.300 0.000 - - - 61.10 60.30%
Fair
E.A. Igno Construction & Trading 32517 Construction of Classroom @ De Ocampo Elementary School IV-A 0.382 30 C 0.310 0.200 0.300 - - - 81.00 *81.00%
V. Satisfactory
E.A. Igno Construction & Trading 32517 Impvt. of MPB IV-A 0.478 60 C 0.374 0.291 0.300 - - - 96.50 *96.50% Outstanding
E.A. Sancho Construction 5648 Const. of Adiangao Bridge # 1 and Approaches (Phase I) V 5.536 110 O 0.323 0.273 0.100 0.020 0.023 0.100 83.90 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page125
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
E.A. Sancho Construction 5648 Impvt.(Conc.) of Bolao-Balite-Cawaynan-Canayuman Road V 4.145 165 C 0.350 0.200 0.300 - - - 85.00 83.38%
V. Satisfactory
E.A. Sancho Construction 5648 Impvt.(Conc.) of Cagliling-Matang-Buenavista-Union-Salvacion Road V 3.791 151 C 0.444 0.133 0.300 - - - 87.70 83.08%
Satisfactory
E.B.J.R. Construction 19780 Const. of 15 units Multi-Purpose Pavements (Ripang MPP) CAR 0.093 120 C 0.333 0.000 0.300 - - - 63.30 76.20%
Satisfactory
E.B.J.R. Construction 19780 Const. of Talifugo-Manag FMR CAR 0.458 60 C 0.377 0.240 0.300 - - - 91.70 *91.70% Outstanding
E.C. De Luna Const. Corp. (Formerly E.C. De Luna Const.) 11906
CP III, Iloilo East Coast-Capiz Road Improvement Project Phase
V, Estancia-Ajuy SectionPJHL 381.914 540 O 0.376 0.296 0.050 0.030 0.056 0.033 84.10 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna Const.) 11906
CP III, Iloilo East Coast-Capiz Road Improvement Project Phase
V, Estancia-Ajuy SectionPJHL 496.473 935 O 0.252 0.300 0.100 0.030 0.046 0.100 82.80 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna Const.) 11906
CP III, Iloilo East Coast-Capiz Road Improvement Project,
Estancia-Ajuy SectionPJHL 530.586 905 O 0.337 0.300 0.100 0.030 0.051 0.100 91.80 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna Const.) 11906
CP III, Iloilo East Coast-Capiz Road Improvement Project,
Estancia-Ajuy SectionPJHL 530.586 935 O 0.377 0.300 0.100 0.030 0.056 0.100 96.30 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna Const.) 11906 CP IV, Gatanguit-Calbiga Road
Sect. Phase IV PJHL 1,458.041 1,080 O 0.367 0.300 0.100 0.030 0.051 0.100 94.80 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna Const.) 11906 CP IV, Gatanguit-Calbiga Road
Sect. Phase VI PJHL 1,458.041 1,080 O 0.372 0.300 0.100 0.018 0.065 0.100 95.50 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna Const.) 11906 CP IV, Gatanguit-Calbiga Road
Sect. Phase VI PJHL 1,466.751 1,080 O 0.350 0.300 0.100 0.030 0.065 0.100 94.50 -
E.C. De Luna Const. Corp. (Formerly E.C. De Luna Const.) 11906 Road Leading to Subic Public
Market III 14.028 60 C 0.231 0.200 0.300 - - - 73.10 *73.10% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page126
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
E.C. Samonte Construction 31019 Conc. of Sirawal Boulevard IX 1.846 70 C 0.265 0.200 0.300 - - - 76.50 *76.50% Satisfactory
E.C. Samonte Construction 31019 Const. of MPB (Gymnasium) Phase III IX 0.944 85 C 0.370 0.274 0.300 - - - 94.40 *94.40%
Outstanding
E.C. Samonte Construction 31019 Impv't./Conc. Along Liloy-Labason Road (Lopoc Sect.) IX 2.771 95 C 0.365 0.300 0.300 - - - 96.50 *96.50%
Outstanding
E.C. Samonte Construction 31019Repair (w/ Const.) of Sitio
Binculan Road to Poblacion via Lumay
IX 0.926 75 C 0.306 0.024 0.300 - - - 63.00 78.78% Satisfactory
E.C. Timbancaya Enterprises 15244 Const. of 1 Cl @ Montevista E/S IV-B 0.367 80 C 0.348 0.300 0.300 - - - 94.80 *94.80% Outstanding
E.C. Timbancaya Enterprises 15244 Const. of 1 Cl at Alimanguan NHS IV-B 0.368 80 C 0.354 0.133 0.300 - - - 78.70 *78.70% Satisfactory
E.D. Angas Construction 32106 Completion of Multi-Purpose Building (Phase II) VII 0.703 75 C 0.459 0.133 0.300 - - - 89.20 *89.20%
V. Satisfactory
E.D. Angas Construction 32106 Const. of Drainage Facility along Siquijor Circumferential Road VII 3.816 227 C 0.429 0.200 0.300 - - - 92.90 78.06%
Unsatisfactory
E.D. Angas Construction 32106 Const./Impvt. of Multi Purpose Center VII 0.944 120 C 0.302 0.282 0.300 - - - 88.40 *88.40%
V. Satisfactory
E.D. Angas Construction 32106 Const./Repair of School Bldg. @ Campalanas H/S VII 0.469 60 O 0.400 0.300 0.100 0.000 0.023 0.050 87.30 -
E.D. Denosta Construction & Supply 28355 Concreting of Hamtic-Bia-an-
Egana-Sibalom Road VI 4.137 300 O 0.257 0.189 0.100 0.030 0.020 0.100 69.60 -
E.D. Denosta Construction & Supply 28355 Concreting of Hamtic-Bia-an-
Egana-Sibalom Road VI 4.137 300 O 0.259 0.221 0.100 0.030 0.041 0.100 75.10 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page127
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
E.D. Denosta Construction & Supply 28355 Const. of 2 CL Tigbalua E/S VI 0.889 75 C 0.275 0.200 0.300 - - - 77.50 *77.50%
Satisfactory
E.D. Solano Construction & Engineering Services 14758 Const. of MPB (Brgy. Hall) Phase 2
@ Brgy. Pogo Grande I 0.668 40 C 0.373 0.300 0.300 - - - 97.30 *97.30% Outstanding
E.D. Solano Construction & Engineering Services 14758 Construction of Multi-Purpose
Building I 0.723 30 C 0.477 0.133 0.300 - - - 91.00 *91.00%V. Satisfactory
E.D. Tabangay Consruction 31978Conc. of Puerto Princesa South Road (PPSR), Burirao-AboAbo
SectionIV-B 9.100 120 C 0.295 0.264 0.300 - - - 85.90 *85.90%
V. Satisfactory
E.D. Tabangay Consruction 31978 Const. of 1 Cl @Panitian National High School IV-B 0.424 120 C 0.370 0.300 0.300 - - - 97.00 *97.00%
Outstanding
E.D. Tabangay Consruction 31978 Const. of 1-School Building @ Aborlan C/S IV-B 0.946 150 C 0.473 0.097 0.300 - - - 87.00 *87.00%
Satisfactory
E.D. Tabangay Consruction 31978 Const. of MPB Candawaga IV-B 0.408 90 C 0.318 0.268 0.300 - - - 88.60 *88.60% V. Satisfactory
E.D. Tabangay Consruction 31978 Const. of San Juan High School IV-B 0.424 120 C 0.379 0.300 0.300 - - - 97.90 72.00% Satisfactory
E.D. Tabangay Consruction 31978
Const./Repair of CY Dep-Ed Sch. Bldg. Projects, Various
Municipalities in Southern Palawan (Const of 1 CL S/B, Narra
NHS)
IV-B 0.549 90 C 0.372 0.300 0.300 - - - 97.20 *97.20% Outstanding
E.D. Tabangay Consruction 31978 Rehab. of Cross-Country Road IV-B 1.866 60 C 0.240 0.300 0.300 - - - 84.00 87.48% Satisfactory
E.D. Tabangay Const. / Bonifacio M. Carlos Const. (JV) JV-07-099 Impvt. of Quezon-Punta Baja Road IVB 18.950 252 O 0.320 0.150 0.100 0.030 0.033 0.100 73.30 -
E.D. Tabangay Const. / Bonifacio M. Carlos Const. (JV) JV-07-099 Impv't. of Quezon-Punta Baja
Road IV-B 18.950 252 C 0.329 0.133 0.300 - - - 76.20 75.39% Unsatisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page128
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
E.G. Canabe Const. 27358 Construction of Concrete Footbridge, Brgy. Lower Hiraan VIII 0.944 120 C 0.400 0.133 0.300 - - - 83.30 *83.30%
Satisfactory
E.G. Canabe Construction 27358 Const. of 1-CL Sch. Bldg. at A.S. Melgar NHS VIII 0.499 60 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
E.G. Canabe Construction 27358Const. of One (1) Storey 4-CL H/S
Bldg. Carigara NHS (Jugaban Annex),
VIII 1.888 120 C 0.375 0.221 0.300 - - - 89.60 *89.60% V. Satisfactory
E.H. Mantuhac Construction 21334 Const. of 1 unit 1 CL Modified Standard Sch. Bldg., Madugo E/S VII 0.440 75 C 0.281 0.147 0.300 - - - 72.80 *72.80%
Satisfactory
E.H. Mantuhac Construction 21334 Const. of 1 unit 1 CL Sch. Bldg. @ Sinsing NHS VII 0.482 60 C 0.245 0.200 0.000 - - - 44.50 *44.50%
Poor
E.H. Mantuhac Construction 21334Const./Rehab./Replacement /
Completion & Repair of Elem. & Secondary SB, Matabang HS
VII 0.488 60 C 0.187 0.300 0.300 - - - 78.70 *78.70% Satisfactory
E.I. Templonuevo & Asso. Inc. 1090 Const. of Brgy Laguinbanwa Road VI 2.409 80 C 0.301 0.286 0.300 - - - 88.70 86.06% V. Satisfactory
E.I. Templonuevo and Associates. Inc. 1090 Rehab. of MPB @ Poblacion VI 1.920 65 C 0.361 0.200 0.300 - - - 86.10 *86.10%
Satisfactory
E.K.C. Construction & Aggregates 14833
Const. of Galap Bridge I and its Approaches Gurel-Bokod-Kabayan
Abatan Road, LooCAR 13.979 304 C 0.378 0.300 0.300 - - - 97.80 90.60%
Outstanding
E.K.C. Construction & Aggregates 14833 Impvt. of Baguio-Bontoc-Banaue
Road CAR 13.750 108 O 0.329 0.240 0.000 0.020 0.035 0.033 65.70 -
E.K.C. Construction & Aggregates 14833 Repair/Rehab. Along Abatan-
Mankayan Road CAR 0.337 30 C 0.386 0.000 0.300 - - - 68.60 *68.60% Fair
E.K.C. Construction and Aggregates 14833
Impvt. of Baguio-Bontoc-Banaue Road, Conc. of Mt. Data-Bontoc
Road, Km. 367+228 - Km. 368+444 (one section),
CAR 13.750 657 O 0.300 0.300 0.000 0.030 0.045 0.033 70.80 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page129
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
E.L. Gomez Construction 31522 Construction of Four (4) CL (2-Units) Bldg. at Dolores H/S III 1.896 60 C 0.408 0.109 0.300 - - - 81.70 *81.70%
Unsatisfactory
E.L. Gomez Construction 31522 Rehab. of MPB @ Brgy. Lourdes Northwest III 0.189 30 C 0.387 0.145 0.300 - - - 83.20 *83.20%
V. Satisfactory
E.L. Torres Construction and Trading 31406 Completion of MPB along Zone 15 NCR 0.949 60 C 0.369 0.200 0.300 - - - 86.90 83.68%
Satisfactory
E.L. Torres Construction and Trading 31406 Construction of SOJR Library U.P. 950.715 45 C 0.445 0.200 0.300 - - - 94.50 94.50%
Very Satisfactory
E.L. Torres Construction and Trading 31406 Repair of Roads & Drainage along
P. Jacinto St. NCR 0.555 45 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
E.L.R. Everybody's Construction 6336
Rehab./Reconst. of Damaged National Roads, Banay-Banay-Cuenca-Mojon Road, Lipa City
Section
IV-A 9.644 120 C 0.340 0.270 0.300 - - - 91.00 *91.00% Outstanding
E.M. Angeles Enterprises 10150 Const. of MPB at Brgy. Talon 2 NCR 1.912 45 C 0.397 0.200 0.300 - - - 89.70 *89.70% V. Satisfactory
E.M. Aragon Enterprises 3314 Conc./Widening of Manila-Cavite Road IV-A 9.580 168 C 0.381 0.200 0.300 - - - 88.10 88.10%
V.Satisfactory
E.M. Aragon Enterprises 3314Const. (Conc.)/Widening of
Governor's Drive, Dasmariñas-Carmona Road
IV-A 35.578 180 O 0.269 0.288 0.050 0.030 0.042 0.100 77.90 -
E.M. Aragon Enterprises 3314Const. (Conc.)/Widening of
Governor's Drive, Dasmariñas-Carmona Road
IV-A 35.578 180 O 0.331 0.300 0.050 0.030 0.042 0.100 85.30 -
E.M. Bayatan Construction 21332 Const. of MPB Phase III @ NVPH II 1.745 75 C 0.312 0.200 0.300 - - - 81.20 *81.20% V. Satisfactory
E.M. Bayatan Construction 21332 Const. of Pawak P/S, 1 CL Sch. Bldg. II 0.406 70 C 0.387 0.200 0.300 - - - 88.70 *88.70%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page130
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
E.M. Bayatan Construction 21332 Const. of Phil. Science High Sch. Bldg. II 1.877 60 C 0.308 0.239 0.300 - - - 84.70 84.70%
V.Satisfactory
E.M. Bayatan Construction 21332 Const. of Quirino MPB II 0.470 55 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory
E.M. Bayatan Construction 21332 Const. of Solano MPB II 0.939 83 C 0.371 0.200 0.300 - - - 87.10 85.98% V. Satisfactory
E.M. Bayatan Construction 21332 Const. of Sta. Rosa MPB II 0.470 30 C 0.338 0.200 0.300 - - - 83.80 *83.80% V. Satisfactory
E.M. Bayatan Construction 21332 Construction of NVGCHS Main, 4 CL-2 Storey Building II 3.055 137 C 0.464 0.200 0.300 - - - 96.40 96.40%
Outstanding
E.M. Cuerpo 30963 San Joaquin Ferry Station and Linear Park Project PRRC 22.333 180 O 0.378 0.231 0.100 0.010 0.025 0.100 84.40 -
E.M. Cuerpo, Inc. 30963 Guadalupe Ferry Station Project PRRC 11.379 100 O 0.358 0.284 0.100 0.000 0.035 0.100 87.70 -
E.M. Palomares Construction 23471 Const. of Multi-Purpose Building I 0.950 110 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory
E.M. Palomares Construction 23471 Impvt. of Gangal-Bazar-Sallapadan Bo. FMR Sallapadan ARC CAR 12.255 398 C 0.286 0.300 0.300 - - - 88.60 80.04%
V. Satisfactory
E.M. Palomares Construction 23471 Rehabilitation of San Ildefonso Port Road I 0.951 25 C 0.358 0.200 0.300 - - - 85.80 *85.80%
Satisfactory
E.P. Manantan Construction and Development Corp. 6457 Completion of MPB, Purok Villa
Paraiso, Brgy. Visayan Village XI 0.468 45 C 0.459 0.133 0.300 - - - 89.20 89.20% V. Satisfactory
E.P. Manantan Construction and Development Corp. 6457 Conc./Reblocking of Agusan-
Davao Road XI 9.949 180 O 0.368 0.225 0.100 0.010 0.050 0.100 85.30 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page131
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
E.P. Manantan Construction and Development Corp. 6457
Const./Rehab./Replacement/Completion and Repair of Elem. Sch.
Bldg. at Luis Lina PSXI 2.035 120 C 0.322 0.273 0.300 - - - 89.50 *89.50%
V. Satisfactory
E.P. Manantan Construction and Development Corp. 6457 Construction of Multi-Purpose
Building, Brgy. Jovellar XI 1.469 180 C 0.364 0.157 0.300 - - - 82.10 82.10% Satisfactory
E.P. Manantan Construction and Development Corp. 6457 Impvt./Conc. of 4 lanes at Tuganay
Bridge & Approaches XI 7.699 180 C 0.336 0.200 0.300 - - - 83.60 83.60% V.Satisfactory
E.P. Manantan Construction and Development Corp. 6457
Rehab./Impv't. (Conc.) of La Fortuna-Tagum Terminal-Capitol-
Canocotan-Laureta Sect. XI 14.975 180 C 0.297 0.300 0.300 - - - 89.70 87.12%
V. Satisfactory
E.P.L. General Construction 15559 Conc. of Road, Zone 6, New San Roque V 0.937 60 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
E.P.L. General Construction 15559 Const. of 1Cl Sch. Bldg. @ Calabanga H/S V 0.439 45 C 0.335 0.237 0.300 - - - 87.20 *87.20%
V. Satisfactory
E.P.L. General Construction 15559
Const. of 2 Storey Sch. Bldg. with CR, roof Deck Complete Electrical Fixtures and Paintings, Bell-San
Francisco E/S
V 3.327 90 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding
E.P.M. Construction 13307 Const. of 1 Storey 2 Cl Sch. Bldg. @ Luck E/S IV-A 0.858 60 C 0.334 0.300 0.300 - - - 93.40 *93.40%
Outstanding
E.R. Dela Cruz Construction & Supply 32158 Const. of Classroom @ Sto.
Rosario E/S III 0.951 60 C 0.337 0.168 0.300 - - - 80.50 * 80.50% V. Satisfactory
E.R. Dela Cruz Construction Supply 32158 Conc. of Brgy. Malabago Road III 0.944 21 C 0.286 0.200 0.300 - - - 78.60 *78.60%
Satisfactory
E.S.L. Builders and Parts Supply 9014 Const. of MPB @ Brgy. Camilmil IV-B 0.668 120 C 0.345 0.300 0.300 - - - 94.50 86.10% V. Satisfactory
E.S.R. Construction and Supplies 10451 Gadakinsur CIP MOPIO 10.740 270 O 0.360 0.160 0.100 0.020 0.040 0.200 88.00 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page132
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
E.S.R. Construction and Supplies 10451 Gadakinsur Communal Irrigation Project, Package II MOPIO 13.049 977 O 0.371 0.160 0.050 0.010 0.050 0.200 84.11 -
E.T. Latawan Construction 13919 Const. of Tigil-Betwagan FMR CAR 4.765 90 C 0.361 0.254 0.300 - - - 91.50 93.00% Outstanding
E.T. Latawan Construction 13919 Impvt. of Mt. Data Bridge along Baguio-Bontoc CAR 9.263 242 C 0.371 0.100 0.300 - - - 77.10 74.72%
Satisfactory
E.T.V.R. Trading and Construction 14581
Conc. of CNR, San Teodoro-Puerto Galera Road, Hasmin
SectionIV-B 16.260 240 C 0.360 0.200 0.300 - - - 86.00 90.02%
Outstanding
E.T.V.R. Trading and Construction 14581 Rehab./Impvt. of DPWH Office
Bldg., Regional Office XI 19.250 300 O 0.389 0.300 0.100 0.030 0.058 0.100 97.70 -
E.T.V.R. Trading and Construction 14581
Road Upgrading @ CNR Km. 37+177 to Km. 37+348 & Km.
38+744 to Km. 39+185 (intermittent Section)
IV-B 14.204 150 O 0.336 0.240 0.150 0.023 0.033 0.050 83.20 -
E.U. Jingco Construction 31486 Proposed Access Road-PUP Main SPO 2.487 124 C 0.400 0.241 0.300 - - - 94.10 94.10% V. Satisfactory
EA-EC Constuction 15737 Completion of MPB V 0.376 45 C 0.340 0.200 0.300 - - - 84.00 81.48% V. Satisfactory
EA-EC Constuction 15737 Const. of 1 CL Rm. Modified Sch. Bldg. V 0.531 90 C 0.396 0.200 0.300 - - - 89.60 *89.60%
V. Satisfactory
EA-EC Constuction 15737 Const. of Flood Control V 2.088 105 C 0.307 0.100 0.300 - - - 70.70 *70.70% Satisfactory
EA-EC Constuction 15737 Construction of Camp Elias Angeles MPB V 2.405 90 C 0.483 0.133 0.300 - - - 91.60 *91.60%
V. Satisfactory
Earl Construction 8461 Const. of 2 Storey MPB @ Block 38 Brgy. Addition Hills NCR 19.096 120 C 0.361 0.300 0.300 - - - 96.10 85.95%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page133
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Earth Movers Construction 27145 San Antonio Airport Development Project DOTC 2.870 90 C 0.413 0.200 0.300 - - - 91.30 91.30%
Very Satisfactory
Earth Movers Construction 27145 San Antonio Airport Development Project DOTC 9.609 150 C 0.397 0.200 0.300 - - - 89.70 89.70%
Very Satisfactory
East Asia Construction Inc. 4904 Const./Rehab./Repair of Zaldivar Road @ Brgy. Zaldivar VI 1.525 60 C 0.394 0.200 0.300 - - - 89.40 *89.40%
V. Satisfactory
Eastern Construction Company, Inc. 2225 Completion of MPB @ Cainta
Green Park IVA 2.395 120 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory
EBJR Construction 19780 Const. of Baluan-Mawigui-Allanguigan Road CAR 1.413 90 C 0.280 0.300 0.300 - - - 88.00 91.18%
Outstanding
EC Samonte Construction 31019 Conc. of Sirawai Boulevard (Phase II) IX 1.908 60 C 0.298 0.052 0.300 - - - 65.00 75.02%
Satisfactory
EC Samonte Construction 31019 Const. of Liloy-Siocon Road, Dansalan-Lopoc IX 28.654 155 O 0.304 0.238 0.100 0.030 0.025 0.067 76.40 -
EC Samonte Construction 31019 Const. of Liloy-Siocon Road, Dansalan-Lopoc IX 28.654 311 O 0.369 0.281 0.150 0.030 0.035 0.050 91.50 -
ECDA Construction 7013 Channeling Works @ Sta. Lucia Creek III 0.473 28 C 0.298 0.257 0.300 - - - 85.50 *85.50%
V.Satisfactory
ECDA Construction 7013 Rehab. of Road Network Poblacion Floridablanca III 0.474 4 C 0.313 0.100 0.300 - - - 71.30 *71.30%
Satisfactory
Ecpiatos Construction and Supply 31540 Const. of Caramcam Bridge XIII 3.693 120 C 0.213 0.300 0.300 - - - 81.30 76.47%
Satisfactory
Ed Fabro Construction 18726Rehab. of Damaged Cover &
Sidewalk of North & South Central Sch.
I 0.760 35 C 0.301 0.200 0.300 - - - 80.10 *80.10% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page134
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ed Fabro Construction 18726Rehabilitation of Multi-Purpose
Pavement at PNR Biday-Mameltac and Bangbangolan
I 1.882 120 C 0.345 0.200 0.300 - - - 84.50 83.48%Satisfactory
Ed Ting Builders and Construction Supply 26199 Const. of San Jose-Trento Road
Boundary XIII 9.180 200 C 0.186 0.300 0.000 - - - 48.60 65.13% Fair
Eddie G. Guillen Builders 14174 Conc. of Appari Airport Road II 2.150 120 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory
Eddie G. Guillen Builders 14174 Conc. of Dugo-San Vicente Road with Drainage II 13.174 260 C 0.355 0.200 0.300 - - - 85.50 87.72%
V. Satisfactory
Eddie G. Guillen Builders 14174 Conc. of M. Antiporda Road, Municipal St. II 0.945 120 C 0.249 0.168 0.300 - - - 71.70 *71.70%
Satisfactory
Eddie G. Guillen Builders 14174Conc. Paving of Jct. Dibalio-
Calanasan Road, Phase VI, San Antonio Section
II 4.512 180 C 0.297 0.300 0.300 - - - 89.70 87.66% V. Satisfactory
Eddie G. Guillen Builders 14174 Concrete Reblocking along Dugo-San Vicente Road II 14.215 210 O 0.337 0.240 0.100 0.030 0.042 0.100 84.90 -
Eddie G. Guillen Builders 14174 Concrete Reblocking along Dugo-San Vicente Road II 14.216 210 O 0.341 0.300 0.087 0.030 0.040 0.050 84.80 -
Eddie G. Guillen Builders 14174 Concreting of Road Leading to Cagayan State University II 2.849 120 C 0.321 0.210 0.300 - - - 83.10 82.08%
V. Satisfactory
Eddie G. Guillen Builders 14174 Const. of Tupang River Control II 4.699 180 C 0.373 0.300 0.300 - - - 97.30 75.10% Satisfactory
Eddmari Const. - Christian Ian Const. (JV) JV-07-133
Impvt./Upgrading of Tulaoc-Sto. Domingo Road (San Simon
Section)III 89.745 90 O 0.362 0.295 0.150 0.030 0.033 0.050 92.00 -
Eddmari Const. & Trading / Cholo Const. & Trading (JV) JV-07-091 Candaba-San Miguel Road III 25.964 234 O 0.335 0.300 0.150 0.030 0.042 0.050 90.70 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page135
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Eddmari Construction and Trading 20301
Asphalting of Arayat-Apalit-Masantol Setback Levee (Candaba-
San Luis-Apalit-San Simon-Macabebe & Masantol Section
III 9.510 55 C 0.309 0.200 0.300 - - - 80.90 *80.90% V. Satisfactory
Eddmari Construction and Trading 20301 Candaba-San Miguel Road III 45.764 193 O 0.379 0.299 0.150 0.030 0.037 0.050 94.50 -
Eddmari Construction and Trading 20301 Concreting of Laon FMR IV-B 0.239 120 C 0.444 - 0.500 - - - 94.40 *94.40%
Outstanding
Eddmari Construction and Trading 20301 Concreting of Road, Brgy.
Minuyan 4 III 0.473 90 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding
Eddmari Construction and Trading 20301 Concreting of San Matias Brgy.
Road III 0.475 20 C 0.324 0.184 0.300 - - - 80.80 *80.80% V. Satisfactory
Eddmari Construction and Trading 20301 Const./Repair/Rehab. of Sta. Rita
Brgy. Road III 0.381 30 C 0.258 0.230 0.300 - - - 78.80 *78.80% Satisfactory
Eddmari Construction and Trading 20301
Maintenance/Rehab. & Impv't. of Nat'l Arterial Secondary Roads, Apalit-Macabebe-Masantol Road
III 0.951 30 C 0.336 0.300 0.300 - - - 93.60 *93.60% Outstanding
Eddmari Construction and Trading 20301 Repair of Slope Protection of San
Miguel Bridge III 9.534 60 C 0.240 0.300 0.300 - - - 84.00 *84.00% V. Satisfactory
Eddmari Construction and Trading 20301 Sct. Ranger Housing Project,
Phase IV NHA 46.983 180 O 0.391 0.300 0.100 0.030 0.047 0.100 96.71 -
Edelcriz Construction 30864 Conc. of Road @ Brgy. Bagong Buhay 1 III 0.954 75 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
Edelcriz Construction 30864 Conc. of Road @ Brgy. Sapang Palay, Proper Sitio Lote III 0.446 40 C 0.253 0.300 0.300 - - - 85.30 *85.30%
V. Satisfactory
Edelsons Builders, Inc. 24826 Asphalt Overlay/Conc. Reblocking at Tandang Sora Ave. NCR 9.600 60 C 0.345 0.200 0.300 - - - 84.50 *84.50%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page136
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Edelsons Builders, Inc. 24826 Rehab. of Road at Brgy. San Isidro IV-A 0.956 30 C 0.304 0.200 0.300 - - - 80.40 *80.40% V. Satisfactory
Edison Lumber and Construction 31333 Const. of 1-Classroom School Building I 0.480 45 C 0.363 0.200 0.300 - - - 86.30 *86.30%
V. Satisfactory
Edriel Enterprises 32500 Const. of Bislig Flood Control V 1.915 120 C 0.282 0.200 0.300 - - - 78.20 *78.20% Satisfactory
EDT Construction 10225 Maintenance/Rehab. & Impv't. of GSO Road III 0.980 40 C 0.364 0.200 0.300 - - - 86.40 *86.40%
V. Satisfactory
EDT Construction 10225 Restoration of Slope Protection at Pentor Balsik River III 0.951 60 C 0.350 0.200 0.300 - - - 85.00 *85.00%
Satisfactory
Edward Lui Construction 8459 Completion of MPB at Brgy. Sawang Calero VII 0.959 75 O 0.383 0.300 0.100 0.030 0.027 0.100 94.00 -
EFC Enterprises 11795 Completion of Pieta Bridge along Dasmariñas-Carmona Road IVA 11.093 103 C 0.366 0.200 0.300 - - - 86.60 *86.60%
V. Satisfactory
EFC Enterprises 11795 Conc. Blocking of EDSA (Northbound) NCR 8.876 60 C 0.149 0.200 0.300 - - - 64.90 *64.90%
Fair
EFC Enterprises 11795 Conc. of A. P. Reyes Ave. NCR 9.539 30 C 0.310 0.300 0.300 - - - 91.00 *91.00% Oustanding
EFC Enterprises 11795Const. of Las Piñas-Muntinlupa-
San Pedro Road (Including Drainage System) Phase VI
NCR 13.571 150 C 0.355 0.200 0.300 - - - 85.50 89.94% V. Satisfactory
EFC Enterprises 11795 Const. of MPB @ Brgy. San Vicente IVA 1.921 60 C 0.349 0.200 0.300 - - - 84.90 85.32%
V. Satisfactory
EFC Enterprises 11795 Const. of Quirino Ave. near Don Galo La Huerta Bridge NCR 9.617 60 C 0.270 0.290 0.300 - - - 86.00 92.54%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page137
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
EFC Enterprises 11795 Maeztranza Linear Park Project PRRC 22.850 180 O 0.350 0.260 0.100 0.030 0.065 0.100 90.50 -
EG & I Construction Corporation 16225 Const. of Argao River Control VII 0.185 60 C 0.334 0.300 0.300 - - - 93.40 *93.40% Outstanding
EG & I Construction Corporation 16225 Impvt./Rehab. of Argao-Moalboal Road (Taloot-Anahaw Sect.) VII 4.694 16 C 0.309 0.300 0.300 - - - 90.90 *90.90%
Outstanding
EG & I Construction Corporation 16225 Impvt./Rehab. of Various Sts. At Lamacan VII 4.782 17 C 0.314 0.300 0.300 - - - 91.40 *91.40%
Outstanding
EG & I Construction Corporation 16225
Rehab./Reconst. of Damaged National Roads Generated from
Pavement Management Sys., along Bacalso Ave. (NBA-Cebu
South Rd.)
VII 15.873 120 C 0.367 0.211 0.300 - - - 87.80 *87.80% V. Satisfactory
EG & I Construction Corporation 16225 Const. of Access Road to RORO Port (Phase I) VII 4.742 75 C 0.372 0.300 0.300 - - - 97.20 *97.20%
Outstanding
EGB Construction 13722 Conc. of Jct. Nat'l to Sta. Victoria Road II 13.098 90 C 0.306 0.294 0.300 - - - 90.00 88.68%
V. Satisfactory
EGB Construction 13722 Conc./Impvt. of Cabannungan 1st Brgy. Road II 0.942 62 C 0.344 0.200 0.300 - - - 84.40 *84.40%
V. Satisfactory
EGB Construction 13722Concrete Paving of Ilagan-Delfin Albano-Mallig Road, Sta. Isabel
Norte SectionII 1.852 90 O 0.312 0.284 0.300 - - - 89.60 -
EGB Construction 13722 Const. of MPB II 1.923 200 C 0.378 0.248 0.300 - - - 92.60 87.56% V. Satisfactory
EGB Construction 13722 Const. of MPB II 1.926 200 C 0.385 0.200 0.300 - - - 88.50 87.63% V. Satisfactory
EGB Construction 13722Const. of School Building
(Clustered 15 Units) 1-CL@ Bimonton E/S
II 0.384 180 O 0.346 0.281 0.100 0.030 0.023 0.100 88.00 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page138
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
EGB Construction 13722Const. of Various School Bldg., 3CL Sch. Bldg. Cabagan Pilot
School II 0.790 200 C 0.322 0.200 0.300 - - - 82.20 *82.20%
V. Satisfactory
EGB Construction 13722Rehab./Impvt. of Ilagan-Delfin
Albano-Mallig Road, Ilagan-Delfin Albano
II 9.439 107 C 0.310 0.300 0.300 - - - 91.00 *91.00% Outstanding
EGB Construction 13722 Rehab/Conc. of San Antonio-Cabisera Road II 4.673 120 O 0.331 0.300 0.150 0.030 0.045 0.050 90.60 -
EGB Construction 13722 Rehab/Recons. of Damaged National Road II 19.132 288 C 0.429 0.200 0.300 - - - 92.90 85.58%
Satisfactory
EGB Construction 13722 Road Conc. of Cabisera II 3.815 80 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory
EGB Construction 13722 Road Concreting of Bliss to Namnama II 1.925 115 C 0.316 0.300 0.300 - - - 91.60 *91.60%
Outstanding
EJR Builders & Construction Supply 24255 Construction of School Building
(Phase I) at Ranao NHS I 0.507 40 C 0.389 0.200 0.300 - - - 88.90 *88.90%Satisfactory
EJR Builders and Construction Supply 24255 Completion of Multi-Purpose
Building I 1.424 120 C 0.376 0.100 0.300 - - - 77.60 83.20% V. Satisfactory
EJR Builders and Construction Supply 24255 Conc. of Road @ Nayom I 0.475 44 C 0.324 0.200 0.300 - - - 82.40 *82.40%
V. Satisfactory
El Nido Construction & Trading 25814 Const. of 1Cl Dumarao BHS IVB 0.378 120 O 0.286 0.300 0.100 0.020 0.035 0.100 84.10 -
El Nido Construction & Trading 25814 Const. of Pinagupitan-Daungan FMR IVB 1.860 45 C 0.377 0.200 0.300 - - - 87.70 *87.70%
V. Satisfactory
El Nido Construction & Trading 25814Repair/Restoration of Tabuan
Road Sect. & Inst. of Box Culvert & Slope Protection
IVB 6.413 108 C 0.303 0.300 0.300 - - - 90.30 *90.30% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page139
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Eldico Builders 26601 Improvement/Rehab. of Anao-San Pablo FMR III 2.852 25 C 0.375 0.200 0.300 - - - 87.50 *87.50%
Satisfactory
Eleazar V. Adlawan Construction 576 Conc. of Panglao National Road VII 19.049 185 C 0.337 0.200 0.300 - - - 83.70 89.04% V. Satisfactory
Eleazar V. Adlawan Construction 576 Const. of Seawall, Brgy. South Poblacion VII 4.778 90 C 0.211 0.300 0.300 - - - 81.10 79.06%
Satisfactory
Elkan Konstrak & Aggregates 26220 Const. of Barangay Road, Sogod-Sto. Domingo V 0.458 20 C 0.281 0.226 0.300 - - - 80.70 *80.70%
V. Satisfactory
Elkan Konstrak & Aggregates 26220 Const. of Drainage System along Inascan-Paulog Road V 9.576 90 C 0.340 0.200 0.300 - - - 84.00 *84.00%
V. Satisfactory
Elkan Konstrak & Aggregates 26220 Const. of Multi-Purpose Building V 0.280 37 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory
Elkan Konstrak & Aggregates 26220 Const. of P. Basas Elem. School Building V 0.453 60 C 0.332 0.200 0.300 - - - 83.20 *83.20%
V. Satisfactory
Elkan Konstrak & Aggregates 26220 Seal/Widening/Rehab./Impv't. of Road Shoulder along MSR V 0.230 20 C 0.364 0.200 0.300 - - - 86.40 86.40%
V.Satisfactory
EM Paule Construction and Trading 19006 Const. of 1-unit 1 CL Sch. Bldg. @
Maydolong NHS VIII 0.373 50 C 0.380 0.200 0.300 - - - 88.00 *88.00% V. Satisfactory
EMMROS Construction 27065Resurfacing of MWCR, Pagbahan-
Talabaan Section, Km.391+134-Km.392+500
IV-B 0.573 20 C 0.324 0.300 0.300 - - - 92.40 *92.40% Outstanding
EMQ Designs and Construction 16128 Concreting/Improvement of Binocot FMR Bunsuran IV-B 0.446 45 C 0.278 0.284 0.300 - - - 86.20 *86.20%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page140
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
EMS Sarmiento Construction 29097Const. of Caban 1 Bridge and its Approaches along Danao-Getafe
Rd.VII 4.265 130 C 0.306 0.300 0.300 - - - 90.60 91.68%
Outstanding
EMS Sarmiento Construction 29097 Impvt. (Conc. Paving) of Danao-Getafe Road VII 9.470 210 C 0.359 0.300 0.300 - - - 95.90 94.64%
Outstanding
EMS Sarmiento Construction 29097 Talibon Small Reservoir Irrigation Project NIA 5.170 299 O 0.385 0.176 0.030 0.030 0.047 0.200 86.80 -
ENC Enterprises 29819 Const. of Multi-Purpose Bldg., Sta. Clara Sur IV-A 0.477 50 O 0.398 0.300 0.100 0.030 0.011 0.067 90.60 -
Enrique A. Flores Jr. Contractor 2421 Rehab./Conc. of Roads @ Irisan Brgy. CAR 2.863 120 C 0.221 0.200 0.300 - - - 72.10 *72.10%
Satisfactory
EP Manantan Construction & Development Corp. 6457 Conc./Reblocking of Agusan-
Davao Road XI 9.949 180 O 0.338 0.000 0.100 0.008 0.043 0.100 58.90 -
EPN Builders and Developers 30341 Completion of Multi-Purpose Building II 1.491 60 C 0.417 0.200 0.300 - - - 91.70 *91.70%
V.Satisfactory
EPN Builders and Developers 30341 Const. MPB @ Roxas East C/S (Phase II) II 1.926 90 C 0.392 0.200 0.300 - - - 89.20 84.72%
V. Satisfactory
EPN Builders and Developers 30341 Const. of MPB ( Phase I) @ Andres Bonifacio II 0.566 60 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
EPN Builders and Developers 30341 Const. of MPB (Community Center) II 0.189 30 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
EPN Builders and Developers 30341Const. of One Unit Classroom
School Building @ San Leonardo E/S
II 0.416 70 C 0.379 0.228 0.300 - - - 90.70 84.89% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page141
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
EPN Builders and Developers 30341 Const. of School Bldg. @ San Leonardo E/S II 0.527 60 C 0.378 0.200 0.300 - - - 87.80 *87.80%
V. Satisfactory
EPN Builders and Developers 30341 Const. of School Bldg. at Bannawag II 0.476 60 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
EPN Builders and Developers 30341
Repair/Rehab. of Eroded Embankment & Damaged Slope Protection @ Babanuang Bridge
along Santiago-Tuguegarao Road
II 0.964 45 C 0.280 0.200 0.300 - - - 78.00 81..84% V. Satisfactory
EPN Builders and Developers 30341Repair/Rehab. of Tungcab Bridge
Approach "B" along Cordon-Aurora Bdry. Road
II 0.964 45 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding
Equi-Parco Construction 14332 Butuan Airport Development Project DOTC 48.145 240 C 0.451 0.200 0.300 - - - 95.10 95.10%
Very Satisfactory
Equi-Parco Construction Co. 14332 Asphalt Overlay along Butuan CityCagayan de Oro-Iligan Road XIII 14.450 180 C 0.300 0.200 0.300 - - - 80.00 *80.00%
Satisfactory
Equi-Parco Construction Co. 14332 Asphalt Overlay of Agusan-Misamis Oriental Road XIII 14.446 90 C 0.460 0.200 0.300 - - - 96.00 *96.00%
V.Satisfactory
Equi-Parco Construction Co. 14332Conc. of Agusan del Norte-
Surigao del Sur (Cabadbaran-Puting Bato Section)
XIII 95.698 540 O 0.393 0.272 0.100 0.030 0.050 0.100 94.50 -
Equi-Parco Construction Co. 14332Conc. of Agusan del Norte-
Surigao del Sur (Cabadbaran-Puting Bato Section)
XIII 95.698 540 O 0.335 0.300 0.150 0.030 0.056 0.050 92.10 -
Equi-Parco Construction Co. 14332 Conc. of Kinabjangan By-Pass National Secondary Road XIII 13.876 180 C 0.398 0.200 0.300 - - - 89.80 85.96%
Satisfactory
Equi-Parco Construction Co. 14332 Conc. of Misamis Oriental-Bukidnon-Agusan Road X 91.466 330 O 0.347 0.300 0.100 0.030 0.045 0.050 87.20 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page142
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Equi-Parco Construction Co. 14332 Conc.of Agusan-Bukidnon National Road XIII 15.034 207 C 0.435 0.200 0.300 - - - 93.50 90.14%
V.Satisfactory
Equi-Parco Construction Co. 14332 Const. of Jagupit Flood Control & Highway Restoration XIII 14.317 240 C 0.325 0.020 0.300 - - - 64.50 83.22%
V. Satisfactory
Equi-Parco Construction Co. 14332Const. of Palapay Bridge and
Approaches, Gingoog Claveria Road
X 21.713 300 C 0.359 0.300 0.300 - - - 95.90 92.84% Outstanding
Equi-Parco Construction Co. 14332Construction of Butuan City By-Pass Road, Bonbon-Kinamlutan
SectionXIII 24.594 195 O 0.353 0.300 0.150 0.030 0.042 0.050 92.50 -
Equi-Parco Construction Co. 14332Impvt. of JSH-Bagontaas-Lurogan-
MVC-Lilingayeon Road, MVC Section
X 24.697 205 C 0.370 0.230 0.300 - - - 90.00 85.44% V. Satisfactory
Equi-Parco Construction Co. 14332Impvt./Conc. of Aglayan-
Zamboanguita Road, Managoc Section
X 66.953 329 C 0.361 0.300 0.300 - - - 96.10 91.00% Outstanding
Equi-Parco Construction Co. 14332 Impvt./Conc. of Gingoog-Claveria-Villanueva Road X 19.064 180 C 0.383 0.300 0.300 - - - 98.30 *98.30%
Outstanding
Equi-Parco Construction Co. 14332 Nasipit Port Expansion Project PPA 215.144 540 O 0.3984 0.3 0.1 0.03 0.07 0.1 99.84 -
Equi-Parco Construction Co. 14332 Rechanneling of Cabadbaran River, Putting Bato, Phase 1 XIII 19.280 180 O 0.334 0.000 0.200 0.050 0.067 0.250 90.10 -
Equi-Parco Construction Co. 14332 Rechannelization of Mamkas River XIII 14.455 120 C 0.213 0.022 0.300 - - - 53.50 73.84% Satisfactory
Equi-Parco Construction Co. 14332 Rehab. of Puyo River Flood Control (Downstream) XIII 14.303 120 C 0.469 - 0.500 - - - 96.90 *96.90%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page143
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Equi-Parco Construction Co. 14332 Rehab./Reconst. of Butuan City-Masao Port Road XIII 19.276 225 C 0.329 0.200 0.300 - - - 82.90 *82.90%
V. Satisfactory
Equi-Parco Construction Co. 14332Repair & Rehab. of Butuan-Cagayan de Oro-Iligan Road
(Agusan-Misamis Oriental Road)XIII 14.457 150 C 0.343 0.300 0.300 - - - 94.30 94.42%
Outstanding
Equi-Parco Construction Co. 14332
Repair & Rehab. of Butuan-Cagayan de Oro-Iligan Road (Sta.
1240+746-Sta. 1241+276 with exceptions)
XIII 14.454 150 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
Equi-Parco Construction Co. 14332Road Upgrading (Gravel to
concrete) Jct., SH Bangcud-Mailag By Pass Road (Mailag Section)
X 12.329 210 C 0.372 0.300 0.300 - - - 97.20 93.48% Outstanding
Equi-Parco Construction Company 14332 Const. of Amontay Flood Control XIII 9.317 180 O 0.398 0.200 0.100 0.030 0.051 0.200 97.90 -
Equi-Parco Construction Company 14332 Improvement of Butuan City-
Masao Port Road XIII 4.674 105 C 0.295 0.284 0.300 - - - 87.90 93.18% Outstanding
Equi-Parco Construction Company 14332 Masao Flood Control XIII 14.451 165 C 0.472 - 0.500 - - - 97.20 *97.20%
Outstanding
Equi-Parco Construction Company 14332 Nasipit Port Expansion Project FCMD 217.925 540 C 0.400 0.300 0.300 - - - 99.44 99.44%
Outstanding
Eric Van P. Sesbreno Construction 26243 Conc. of Tactac-Atbu Road II 0.479 30 C 0.357 0.200 0.300 - - - 85.70 *85.70%
V. Satisfactory
Eric Van P. Sesbreno Construction 26243 Const. of Aritao NHS, 2-Storey
Bldg., 8-CL School Building II 4.817 250 C 0.363 0.200 0.300 - - - 86.30 75.28% Satisfactory
Eric Van P. Sesbreno Construction 26243 Const. of Imugan MPB
(Gymnasium) II 0.902 75 C 0.222 0.300 0.300 - - - 82.20 *82.20% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page144
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Eric Van P. Sesbreno Construction 26243 Const. of MPB at Villaflores II 0.286 45 C 0.362 0.200 0.300 - - - 86.20 *86.20%
V. Satisfactory
Ermy Construction 15741 Concreting of Brgy. Road at Brgy. Sindalan City III 0.478 30 C 0.360 0.221 0.300 - - - 88.10 *88.10%
V. Satisfactory
Ermy Construction 15741 Const. of 3 CL at San Isidro E/S III 1.136 45 C 0.344 0.300 0.300 - - - 94.40 *94.40% Outstanding
Ermy Construction 15741 Impvt./Rehab. of Cabetican Road III 1.906 50 C 0.291 0.300 0.300 - - - 89.10 *89.10% V. Satisfactory
Ermy Construction and Trading 15741 Rehab/Improvement of Sta. Lucia Farm to Market Road III 4.753 50 C 0.406 0.200 0.300 - - - 90.60 *90.60%
V. Satisfactory
Ermy Construction and Trading (Formerly:Ermy Construction) 15741 Rehab. of Brgy. Road at St. Niño III 0.956 30 C 0.312 0.300 0.300 - - - 91.20 *91.20%
Outstanding
ESD Cruz Construction & Supply 32368 Const. of Conc. Drainage @ Brgy. Sto. Niño VIII 0.241 30 C 0.332 0.200 0.300 - - - 83.20 *83.20%
V. Satisfactory
ESD Cruz Construction & Supply 32368 Repair of Secondary Sch. Bldg., Rawis NHS VIII 0.648 60 C 0.379 0.100 0.300 - - - 77.90 *77.90%
Satisfactory
ESD Cruz Construction & Supply 32368Repair/Rehab. of National Road
(Pangpang-Mapanas-Gamay-Lapinig Road
VIII 9.789 120 C 0.465 0.133 0.300 - - - 89.80 84.22% Satisfactory
ESEK Construction Corporation 12871 Completion of Malanday E/S NCR 4.772 90 O 0.329 0.300 0.100 0.030 0.041 0.100 90.00 -
Eser Enterprises-Burot 23902 Const. of 1 Cl Sch. Bldg. @ Capas East CES III 0.424 35 C 0.362 0.275 0.300 - - - 93.70 *93.70%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page145
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Eser Enterprises-Burot 23902 Const. of MPB at Sitio Tarvet III 0.564 45 C 0.234 0.200 0.300 - - - 73.40 *73.40% Satisfactory
ESN Construction and Trading 32720 Impvt. of Roads (Tibagan) III 0.475 12 C 0.277 0.200 0.300 - - - 77.70 *77.70% Satisfactory
ESN Construction and Trading 32720 Impvt. of Roads (Tilapayong) III 0.477 14 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory
ESR Construction and Supplies 10451 Conc. of Mahayag-Dumingag Road(Kaangayan Section) IX 13.931 290 C 0.270 0.257 0.300 - - - 82.70 85.84%
V. Satisfactory
ESR Construction and Supplies 10451 Concreting of Roads at Brgy. Canicapan X 0.949 105 C 0.331 0.280 0.300 - - - 91.10 88.52%
V. Satisfactory
ESR Construction and Supplies 10451 Construction of 109 Duplex Housing Units NHA 25.295 120 O 0.390 0.171 0.100 0.024 0.030 0.100 81.44 -
ESR Construction and Supplies 10451Impv't/Conc. Paving of Gutalac-
Baliguian-Siocon Road, Sta. Maria-Siocon Section
IX 48.189 552 C 0.445 0.158 0.300 - - - 90.30 *90.30% V. Satisfactory
ESR Construction and Supplies 10451 Siloy ARC (Rehab. of Purok 1, 2, 3, 4, 5 Circumferntial) X 8.341 192 C 0.329 0.200 0.300 - - - 82.90 *82.90%
V.Satisfactory
ESR Construction and Supply/Mindanao Rock (JV) JV-07-170 Ozamis Airport Development
Project DOTC 41.400 240 O 0.388 0.294 0.150 0.020 0.026 0.050 92.80 -
ETM Construction 16285 Conc. of Brgy. Road, Purok 1 Brgy. San Jose III 0.437 60 C 0.363 0.108 0.300 - - - 77.10 *77.10%
Satisfactory
Euluz Construction and Supply 32080 Const./Rehab. of Drainage System and Gutter along KG and K-9th NCR 1.433 45 C 0.311 0.200 0.300 - - - 81.10 *81.10%
V. Sstisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page146
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Euluz Construction and Supply 32080 Const./Rehab. of MPB NCR 2.254 100 C 0.318 0.251 0.300 - - - 86.90 *86.90% V. Sstisfactory
Express Construction 29649 Conc./Impvt. of Sto. Tomas Ext. NCR 1.456 60 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory
F & A Construction and Supplies 29524 Completion of MPB XIII 4.547 165 C 0.359 0.300 0.300 - - - 95.90 67.34% Fair
F & A Construction and Supplies 29524Impvt. of Road Slip and other
related activities, Cortes-Igang Sect.
XIII 2.885 60 C 0.231 0.265 0.300 - - - 79.60 *79.60% Satisfactory
F & J General Construction and Supply Corporation 31963
Repair/Rehab./Impvt. of Roadways (Inst. Of Road Traffic Safety
Devices), Nueva Ecija-Aurora Road (Dimani to Dimabayo Sect.)
III 4.625 25 C 0.240 0.200 0.300 - - - 74.00 *74.00% Satisfactory
F. Alarcon Construction Corporation 17612 Inabangan Port Development
Project DOTC 2.888 90 C 0.473 0.200 0.300 - - - 97.30 97.30% Outstanding
F. Gurrea Construction 6995 Sibunag Port Improvement Project FCMD 101.207 416 C 0.397 0.300 0.300 - - - 99.70 99.65% Outstanding
F. Gurrea Construction, Inc. 6995Bago River Irrigation System Rehabilitation & Improvement
ProjectNIA 12.603 114 C 0.258 0.300 0.300 - - - 85.80 85.80%
V. Satisfactory
F. Gurrea Construction, Incorporated 6995
Asphalt Overlay along Guimaras Central Road Brgy. Bugnay-San
Miguel SectionVI 5.715 50 C 0.380 0.200 0.300 - - - 88.00 88.30%
V. Satisfactory
F. Gurrea Construction, Incorporated 6995 Asphalt Paving of Lambunao-
Pototan Road VI 9.525 120 C 0.444 0.200 0.300 - - - 94.40 89.96% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page147
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
F. Gurrea Construction, Incorporated 6995 Completion of Anahawon VI 9.423 180 O 0.381 0.223 0.000 0.022 0.043 0.067 73.60 -
F. Gurrea Construction, Incorporated 6995
Conc. of Oton-Mambog-Caboloan-Abilay-San Jose-San Miguel Road
leading to International AirportVI 57.850 420 O 0.291 0.212 0.100 0.023 0.048 0.100 77.40 -
F. Gurrea Construction, Incorporated 6995 Const. of Diclum Bridge VI 13.665 325 C 0.387 0.200 0.300 - - - 88.70 86.99%
V. Satisfactory
F. Gurrea Construction, Incorporated 6995 Const. of Pociento Bridge VI 12.443 403 C 0.289 0.300 0.000 - - - 58.90 71.11%
Satisfactory
F. Gurrea Construction, Incorporated 6995
Rehab./Reconst. of Damaged Paved Nat'l Road, Jct. Bancal-
Leon-Antique Bdry. RoadVI 9.577 195 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
F. Gurrea Construction, Incorporated 6995 Repair/Rehab. of Iloilo-Antique
Road VI 9.642 50 C 0.424 0.200 0.300 - - - 92.40 *92.40% V. Satisfactory
F. Gutierrez Construction 4572 Const. of Cagayan de Oro Convention and Civic Center X 349.995 938 O 0.333 0.240 0.050 0.030 0.065 0.033 75.10 -
F. Gutierrez Construction 4572 Const. of Cagayan de Oro Convention and Civic Center X 289.732 938 O 0.363 0.300 0.000 0.030 0.065 0.100 85.80 -
F. S. Sugay Construction & Supplies 28489 Const. of MPB at Poblacion IV-B 2.005 75 C 0.381 0.200 0.300 - - - 88.10 85.30%
V. Satisfactory
F. Vargas Construction 2366Cagayan River Basin Bank
Protection Works, San Vicente Section
II 13.722 262 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
F. Vargas Construction 2366 Const. of Bunot Bridge and its Approaches CAR 12.586 210 C 0.364 0.200 0.300 - - - 86.40 92.10%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page148
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
F. Vargas Construction 2366 Const. of Cadondongan Bridge II 6.754 180 C 0.346 0.200 0.300 - - - 84.60 86.64% V. Satisfactory
F. Vargas Construction 2366 Const. of Guising Bridge & Approaches II 18.407 331 C 0.361 0.200 0.300 - - - 86.10 86.31%
V. Satisfactory
F. Vargas Construction 2366
Const. of Permanent Bridge Support & Rehab. of Existing Pony
Truss of Magapit Suspension Bridge
II 13.168 180 C 0.400 0.200 0.300 - - - 90.00 84.18% V. Satisfactory
F. Vargas Construction 2366 Const. of Tupang Bridge & Approaches II 15.951 255 C 0.356 0.200 0.000 - - - 55.60 72.28%
Satisfactory
F.A. Construction 9837 Const. of 1 CL Bldg. @ Sta.Lucia and Dapdap E/S III 0.840 45 C 0.347 0.265 0.300 - - - 91.20 *91.20%
Outstanding
F.A. Construction 9837 Const. of MPB (Covered Court) III 1.886 45 C 0.355 0.300 0.300 - - - 95.50 *95.50% Outstanding
F.C. Martinez Construction 31243 Const. of 1 CL, Murcon E/S III 0.410 30 C 0.352 0.164 0.300 - - - 81.60 *81.60% V. Satisfactory
F.C. Martinez Construction 31243 Const. of Four (4) Classroom, San Felipe H/S III 1.331 90 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V. Satisfactory
F.F. Cruz and Company, Incorporated 123 Construction of Magsaysay
Viaduct CARBDP 496.818 1,129 C 0.387 0.300 0.300 - - - 98.70 98.47% Outstanding
F.F. Cruz and Company, Incorporated 123 San Juan Port Development
Project PPA 45.336 360 O 0.397 0.300 0.000 0.030 0.065 0.033 82.50 -
F.F. Galang Construction 26801 Const. of Multi-Purpose Building IV-B 0.745 95 C 0.395 0.206 0.300 - - - 90.10 85.34% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page149
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
F.F. Galang Construction 26801 Const. of Multi-Purpose Building (Bleacher), Brgy. Punta Baja IV-B 0.279 60 C 0.328 0.200 0.300 - - - 82.80 79.93%
Satisfactory
F.F. Rosales Construction 8814 Const. of Eco-Tourism Road IV-A 8.908 100 C 0.332 0.200 0.300 - - - 83.20 83.68% V. Satisfactory
F.L. Reguyal Construction 3315 Completion of Along-Along Bridge, Phase IV III 2.848 90 O 0.272 0.300 0.100 0.020 0.050 0.100 84.20 -
F.L. Reguyal Construction 3315 Const. of 2-CL @ Eastern Cabu E/S III 0.614 60 C 0.359 0.300 0.300 - - - 95.90 *95.90%
Outstanding
F.L. Reguyal Construction 3315 Const. of MPB Brgy. San Mariano III 1.872 90 C 0.349 0.289 0.300 - - - 93.80 *93.80% Outstanding
F.L. Reguyal Construction 3315Const. of Single Barrel Box
Culvert along Sta. Rosa-Tarlac Road
III 0.951 60 C 0.400 0.200 0.300 - - - 90.00 88.20% V. Satisfactory
F.L. Reguyal Construction 3315 Repair/Rehab. of Gapan-Peñaranda-Fort Magsaysay Road III 7.303 45 C 0.301 0.200 0.300 - - - 80.10 *80.10%
V. Satisfactory
F.P. De Guzman Construction, Inc. 10296 Concreting of Pathways @ Brgy.
391, Brgy. 392, Soler St. & Vicinity NCR 3.713 90 C 0.285 0.200 0.300 78.50 74.78% Satisfactory
F.P. De Guzman Construction, Inc. 10296 Const. of School Bldg. @ Smokey
Mountain Resettlement Area NCR 13.999 180 C 0.369 0.200 0.300 - - - 86.90 83.66% V. Satisfactory
F.P. De Guzman Construction, Inc. 10296 Rehab. of MPB @ Brgy. 393, Zone
40 NCR 1.709 120 C 0.343 0.300 0.300 - - - 94.30 88.56% V. Satisfactory
F.V. Chua Construction and Supply 27267 Const. of MP Building at Brgy.
Tiaong III 0.237 18 C 0.390 0.138 0.300 - - - 82.80 *82.80% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page150
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
F.V. Chua Construction and Supply 27267
Road Conc. At Camachilihan & Tumana-Talampas, Bustos, Banga
1st & Tabang III 1.520 24 C 0.280 0.300 0.300 - - - 88.00 *88.00%
V. Satisfactory
Fairchild Builders & Developers Inc. (Formerly: Fairchild
Marketing & Const.)10024 Concreting of Tabango & Liling
Bridge Approaches VIII 4.766 150 C 0.379 0.300 0.300 - - - 97.90 93.64% Outstanding
Fairchild Builders & Developers, Inc. 10024 Const. of River Bank Protection at
San Joaquin VIII 1.928 90 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Fairchild Builders & Developers, Inc. 10024 Const. of Tabunok II Bridge @
Brgy. Tabunok VIII 4.071 150 C 0.267 0.300 0.300 - - - 86.70 84.24% V. Satisfactory
Fairchild Builders & Developers, Inc. 10024 Const./Impvt. Of Malitbog (MPB)
Livelihood Center VIII 6.673 270 C 0.398 0.200 0.300 - - - 89.80 84.41% V. Satisfactory
Fairchild Builders & Developers, Inc. 10024 Const./Rehab./Impvt. Of Drainage
System @ Brgy. 87 VIII 1.899 120 C 0.358 0.200 0.300 - - - 85.80 *85.80% V. Satisfactory
Fatima Builders 27939Const. & Repair of School Building @ Lazi National
Agricultural SchoolVII 0.944 150 C 0.374 0.300 0.300 - - - 97.40 *97.40%
Outstanding
Fatima Builders 27939 Repair of Municipal Water System VII 0.940 120 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory
Fatima Builders 27939 Repair/Rehab. of FMR at Pisong A VII 0.463 60 C 0.328 0.261 0.300 - - - 88.90 *88.90% V. Satisfactory
FEAJ Construction and General Services 13609 Completion of MPB IV-B 0.954 65 C 0.349 0.200 0.300 - - - 84.90 *84.90%
V. Satisfactory
FEAJ Construction and General Services 13609 Concreting of Road @ Katwiran II IV-B 0.961 40 C 0.406 0.133 0.300 - - - 83.90 *83.90%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page151
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
FEAJ Construction and General Services 13609 Concreting of Road, Dulangan 1-2 IV-B 1.899 59 C 0.304 0.200 0.300 - - - 80.40 79.68%
Satisfactory
Feldan Construcion & Enterprises 30572
Const. of 1 CL Sch. Bldg. at Mansilingan Agro Industrial
SchoolVI 0.500 80 C 0.325 0.117 0.300 - - - 74.20 72.80%
Satisfactory
Ferdstar Builders Contractors 4965 Completion Works of Arayat Public Market III 14.330 60 C 0.481 0.171 0.300 - - - 95.20 *95.20%
V. Satisfactory
Ferdstar Builders Contractors 4965Conc. of El Nido-Bataraza Road
(Aboabo-Bataraza Sect.) (Isumbo Section)
IV-B 18.228 180 C 0.319 0.293 0.300 - - - 91.20 88.98% V. Satisfactory
Ferdstar Builders Contractors 4965 Const. Brgy. Roads @ Brgys, Capaya & Pulung Maragul III 0.469 30 C 0.352 0.300 0.300 - - - 95.20 *95.20%
Outstanding
Ferdstar Builders Contractors 4965 Const. of Anao Bridge along San Jose Malino-Anao Road III 19.015 100 C 0.350 0.300 0.300 - - - 95.00 83.72%
V. Satisfactory
Ferdstar Builders Contractors 4965 Const. of Brgy. Road @ Brgy. Cutcut III 1.884 45 C 0.313 0.285 0.300 - - - 89.80 *89.80%
V.Satisfactory
Ferdstar Builders Contractors 4965 Const. of Kipot Bridge VI 8.141 245 C 0.346 0.300 0.000 - - - 64.60 73.90% Satisfactory
Ferdstar Builders Contractors 4965 Const. of Pampanga 2nd District Engineering Office Building III 14.394 150 C 0.446 0.200 0.300 - - - 94.60 *94.60%
V.Satisfactory
Ferdstar Builders Contractors 4965 Improvement / Rehabilitation of Brgy. San Pedro Polcarangan FMR III 4.767 60 O 0.324 0.259 0.150 0.030 0.025 0.050 83.80 -
Ferdstar Builders Contractors 4965 Impvt./Rehab. of Brgy. Roads at Calulut & Baliti III 4.757 50 C 0.318 0.219 0.300 - - - 83.70 *83.70%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page152
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Fernz Construction Corporation 28238 Const. of Farm to Market Road X 2.830 150 C 0.266 0.200 0.300 - - - 76.60 78.04% Satisfactory
Fernz Construction Corporation 28238 Const. of MPB, Relocation Site X 1.401 75 C 0.357 0.195 0.300 - - - 85.20 *85.20% V. Satisfactory
Fernz Construction Corporation 28238 Impvt. of FMR, Brgy. Lumbia to Brgy. Taglimao X 2.794 90 C 0.303 0.200 0.000 - - - 50.30 70.34%
Satisfactory
Ferrer Construction and Engineering Services 16711 Proposed Exterior Repainting of
PAZ Mendoza & Med. Lib. U.P. 751.116 120 O 0.366 0.300 0.000 0.030 0.054 0.050 80.00 -
Ferreze Const. Supply & Manufacturing 26968
Impvt./Conc. Paving of Isabela-Maluso Nat'l Road @ Maluso
Proper SectionIX 1.682 35 C 0.336 0.299 0.000 - - - 63.50 70.40%
Satisfactory
Ferreze Const. Supply & Manufacturing 26968 Rehab. of Brgy. Mercedes Road IX 4.733 106 C 0.395 0.200 0.300 - - - 89.50 85.90%
Satisfactory
FFJJ Construction 16712Conc. of Davao del Sur-Sarangani Coastal Road, Kitayo-Balangonan
SectionXI 28.900 300 O 0.274 0.241 0.100 0.022 0.035 0.067 73.90 -
FFJJ Construction 16712 Conc. of Paco-Roxas-Arakan Rd. (New Ponteverdra Section) XII 15.095 150 O 0.378 0.300 0.000 0.030 0.060 0.033 80.10 -
FFJJ Construction 16712 Const. of 2-CL School Building @ Molopolo Annex XI 0.721 90 O 0.315 0.240 0.100 0.020 0.041 0.100 81.60 -
FFJJ Construction 16712Const. of Kiblis Bridge with Bridge
and Approaches, Sarangani-Sultan Kudarat Coastal Road
XII 21.574 280 O 0.392 0.300 0.070 0.030 0.032 0.067 89.10 -
FFJJ Construction 16712Const. of Kiblis Bridge with Bridge
and Approaches, Sarangani-Sultan Kudarat Coastal Road
XII 21.574 280 O 0.342 0.273 0.000 0.030 0.028 0.067 74.00 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page153
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
FFJJ Construction 16712 Const. of Kinangan Bridge and Approaches XI 18.593 332 O 0.300 0.300 0.100 0.015 0.035 0.100 85.00 -
FFJJ Construction 16712 Const. of Kinangan Bridge and Approaches XI 18.593 332 O 0.304 0.240 0.070 0.015 0.035 0.100 76.40 -
FFJJ Construction 16712 Const. of Pangian Bridge II and Approaches XI 22.868 454 O 0.280 0.240 0.070 0.012 0.025 0.100 72.70 -
FFJJ Construction 16712 Const. of Pangian Bridge II and Approaches XI 22.868 454 O 0.307 0.151 0.100 0.030 0.030 0.067 68.50 -
FFJJ Construction 16712 Const. og Kinangan Bridge and Approaches XI 12.593 332 O 0.292 0.300 0.100 0.022 0.030 0.100 84.40 -
FFJJ Construction 16712 Const./Replacement of Malalag Bridge XI 14.265 245 O 0.356 0.197 0.100 0.030 0.060 0.100 84.30 -
FFJJ Construction 16712 Const./Replacement of Malalag Bridge XI 14.265 245 O 0.335 0.285 0.100 0.030 0.023 0.100 87.30 -
FFJJ Construction 16712 Impvt./Conc. of Jct. Mana-Ticulon-Lagumi-Little Baguio Road XI 19.250 300 O 0.335 0.300 0.050 0.030 0.023 0.067 80.50 -
FFJJ Construction 16712Rehab/Conc. of Road Jct. Mana-
Ticulon Lagumit Little Baguio Road
XI 19.293 262 O 0.279 0.252 0.110 0.030 0.048 0.033 75.20 -
FFJJ Construction 16712 Repair of Jones Timbol CES XI 0.150 90 C 0.329 0.300 0.300 - - - 92.90 *92.90% Outstanding
FGM Builders Resources & Development Corp. 31807 Completion of Daniel Aguinaldo
NHS XI 0.474 60 C 0.299 0.300 0.300 - - - 89.90 *89.90% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page154
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
FGM Builders Resources & Development Corp. 31807 Rehab. of MPB at R.O. Quimpo E/S XI 0.465 90 C 0.287 0.212 0.300 - - - 79.90 *79.90%
Satisfactory
FH Gopiteo Construction & Supply 21336 Const. of Lined Canal @ Brgy.
Kalkam XII 0.882 84 C 0.388 0.300 0.300 - - - 98.80 91.48% Outstanding
Fiat Construction Services 5463Cluster A-2004: Const. of Various
School Building under the 2nd Congressional District of Oriental
X 8.449 150 C 0.293 0.300 0.000 - - - 59.30 65.58% Fair
Fiat Construction Services 5463Conc. of SDCR: Cortes-Tandag-Marihatag Road, (Unaban-Sumo-
sumo)XIII 130.968 375 O 0.293 0.215 0.100 0.030 0.032 0.100 77.00 -
Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with Roof
Deck for DBM Building Sp. Bldgs. 224.176 365 O 0.264 0.243 0.100 0.030 0.070 0.067 77.40 -
Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with Roof
Deck for DBM Building Sp. Bldgs. 229.100 410 O 0.335 0.270 0.100 0.030 0.038 0.100 87.30 -
Filipinas (Prefabricated Bldg.) Systems, Inc. 5562 Const. of Four (4) Storey with Roof
Deck for DBM Building Sp. Bldgs. 445.429 710 O 0.372 0.300 0.100 0.030 0.061 0.067 93.00 -
Filipinas Construction Supply 11644 Repair/Rehab. of Bukal Sur E/S IV-A 0.335 40 C 0.248 0.271 0.300 - - - 81.90 81.06% V. Satisfactory
First Northway Development and Construction Corporation 11645 Conc. of Tablac Road I 1.609 44 C 0.208 0.300 0.300 - - - 80.80 *80.80%
V. Satisfactory
First Northway Development and Construction Corporation 11645 Const. of Banayoyo Road I 0.934 20 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
First Northway Development and Construction Corporation 11645
Repair and Maintenance of Candon-Salcedo Road, Various
SectionsI 0.983 31 C 0.264 0.300 0.300 - - - 86.40 *86.40%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page155
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
First Northway Development and Construction Corporation 11645 Repair/Rehabilitation of Candon
City Road I 0.942 31 C 0.380 0.193 0.300 - - - 87.30 *87.30%Satisfactory
First Northway Development and Construction Corporation 11645 Sulvec Port Road I 6.358 149 C 0.340 0.200 0.300 - - - 84.00 82.14%
Satisfactory
Flordes Construction & Trading 16916 Conc. of Brgy. Road, Mulawin F. Homes III 1.334 70 C 0.370 0.200 0.300 - - - 87.00 *87.00%
V. Satisfactory
Flordes Construction & Trading 16916 Conc. of Sta. Trinidad St., Old Panaderos NCR 0.945 60 C 0.351 0.300 0.300 - - - 95.10 *95.10%
Outstanding
Flordes Construction & Trading 16916 Conc. with Drainage Impvt. Along Juan Luna St. NCR 4.744 120 C 0.370 0.146 0.300 - - - 81.60 83.94%
V. Satisfactory
Flordes Construction & Trading 16916 Conc./Reblocking of G. Tuazon St. NCR 4.696 120 C 0.353 0.200 0.300 - - - 85.30 82.66% V. Satisfactory
Flordes Construction & Trading 16916 Const. of MPB, Brgy. Maharlika III 2.381 75 C 0.364 0.300 0.300 - - - 96.40 *96.40% Outstanding
Flordes Construction & Trading 16916 Const. of Sch. Bldg. (9 CL) Carlos P. Garcia High School NCR 7.192 120 C 0.288 0.300 0.300 - - - 88.80 *88.80%
V. Satisfactory
Flordes Construction & Trading 16916 Drainage Improvement with Concreting/Upgrading NCR 2.303 90 C 0.374 0.300 0.300 - - - 97.40 *97.40%
Outstanding
Flordes Construction & Trading 16916 Proposed Repair/Rehab. Of Jose Vicencio Health Center NCR 1.929 60 C 0.343 0.253 0.300 - - - 89.60 *89.60%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page156
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Flordes Construction & Trading 16916 Proposed Repair/Rehab. Of Roads & Alleys in Manila NCR 1.435 60 C 0.270 0.257 0.300 - - - 82.70 *82.70%
V. Satisfactory
Flordes Construction & Trading 16916 Proposed Road Rehab. along Pandacan & Sta. Mesa NCR 4.719 60 C 0.358 0.300 0.300 - - - 95.80 *95.80%
Outstanding
Flordes Construction & Trading 16916Repair/Rehab. & Const. of
Bambang-Bagumbayan-Maysantol-San Nicolas FMR
III 4.767 96 C 0.388 0.200 0.300 - - - 88.80 *88.80% Satisfactory
Flordes Construction & Trading 16916 Repair/Rehab. of Roofing/Renovation of MPB NCR 1.420 60 C 0.337 0.300 0.300 - - - 93.70 *93.70%
Outstanding
Flordes Construction & Trading 16916Repair/Rehab. of
Roofing/Renovation of Stage and Repair of Toilet @ Pio del Pilar E/S
NCR 2.150 60 C 0.386 0.300 0.300 - - - 98.60 *98.60% Outstanding
Flordes Construction & Trading 16916 Road & Drainage Rehab. @ Brgy. 599, Narra St. NCR 1.895 90 O 0.350 0.240 0.100 0.023 0.035 0.100 84.80 -
Floriane Construction and Supply 12261 Completion of MPB, Brgy. Maanas X 0.755 120 C 0.338 0.100 0.300 - - - 73.80 *73.80% Satisfactory
Floriane Construction and Supply 12261 Conc. of Multi-Purpose Pavement X 0.936 120 C 0.332 0.200 0.300 - - - 83.20 *83.20% V. Satisfactory
Floriane Construction and Supply 12261 Const. of FMR at Kitambis-Valdeconcha Road X 0.940 60 C 0.286 0.300 0.300 - - - 88.60 *88.60%
V. Satisfactory
Floriane Construction and Supply 12261 Const. of MPB @ North Poblacion X 0.938 105 O 0.358 0.240 0.101 0.030 0.035 0.050 81.40 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page157
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Floriane Construction and Supply 12261 Const. of River Control at Mambayaan (Phase 2) X 4.644 180 C 0.339 0.200 0.300 - - - 83.90 82.04%
V. Satisfactory
Floriane Construction and Supply 12261 Const./Impvt./Completion of MPB X 0.324 210 C 0.358 0.300 0.300 - - - 95.80 *95.80% Oustanding
Floriane Construction and Supply 12261 Const./Rehab. of Roads, Kitambis-Mimbuwahan X 0.939 120 C 0.207 0.300 0.300 - - - 80.70 *80.70%
V. Satisfactory
Floriane Construction and Supply 12261Rehab. of Butuan-Cagayan de Oro-
City-Iligan Road, Lagonglong By Pass Road
X 9.535 360 C 0.361 0.251 0.300 - - - 91.20 82.83% V. Satisfactory
FM2 Trading & Enterprises 19044 Conc. of FMR, Brgy. Luna St. I 0.960 45 C 0.345 0.200 0.300 - - - 84.50 *84.50% V. Satisfactory
FM2 Trading & Enterprises 19044 Const. of Drainage System @ Brgy. Caranglaan I 0.767 30 C 0.306 0.221 0.300 - - - 82.70 *82.70%
V. Satisfactory
FNR Construction 7051 Restoration of Multi-Purpose Building I 5.601 143 C 0.385 0.100 0.000 - - - 48.50 55.43%
Poor
Fojas Builders Enterprises 31869 Const. of 2 CL Sch. Bldg., San Antonio E/S IV-A 0.955 70 C 0.346 0.300 0.000 - - - 64.60 83.29%
V. Satisfactory
Footprints Construction 16713 Const. of Pedestrian Overpass @ Palomoc Titay IX 2.856 90 C 0.176 0.200 0.300 - - - 67.60 72.52%
Satisfactory
Foremost Builders 23774Const. / Rehab. / Replacement /
Completion & Repair of Sch. Bldg. @ Ma-a NHS
XI 0.440 135 C 0.368 0.300 0.300 - - - 96.80 *96.80% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page158
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Foretop Construction 32813 Concreting of Marinduque Circ. Road (Dili-Bangbang Section) IV-B 6.169 90 O 0.348 0.234 0.150 0.030 0.025 0.050 83.70 -
Fortrica Builders 24220 Concreting of FMR @ Brgy. Calingcuan III 0.625 50 C 0.287 0.300 0.300 - - - 88.70 *88.70%
V. Satisfactory
Fortstone Construction Enterprises 31668 Const. of 6 CL 2 Storey Bldg. at
Mariano Peralta H/S XI 3.727 120 C 0.252 0.200 0.000 - - - 45.20 70.68% Satisfactory
Fortstone Construction Enterprises 31668 Const. of Multi-Purpose Bldg. At
DPWH-Region XII XII 1.832 110 O 0.361 0.300 0.100 0.015 0.007 0.067 85.00 -
Fortstone Construction Enterprises 31668 Const. of Nueva Villa Flood
Control XI 3.872 215 C 0.353 0.172 0.300 - - - 82.50 80.79% V. Satisfactory
Fortstone Construction Enterprises 31668 Construction of Water Supply at
Brgy. Wawa XI 1.887 120 C 0.388 0.200 0.300 - - - 88.80 *88.80% Satisfactory
Fortstone Construction Enterprises 31668 Rehab. of MPB (City Jail) XII 0.960 70 C 0.323 0.200 0.300 - - - 82.30 *82.30%
V. Satisfactory
Fortunato T. Sanchez 407 Asphalt Overlay (Pier to City Hall) XIII 4.729 90 C 0.275 0.200 0.300 - - - 77.50 78.58% Satisfactory
Fortunato T. Sanchez 407 Asphalt Overlay along Surigao Wharf Road XIII 3.640 100 C 0.323 0.281 0.300 - - - 90.40 91.60%
Outstanding
Fortunato T. Sanchez 407 Concreting of Road XIII 5.770 180 C 0.330 0.200 0.300 - - - 83.00 82.72% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page159
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Foundation Specialists, Inc. 7437 Widening of R-10 Road Project Vitas Bridge and its approaches URPO 158.286 480 O 0.349 0.300 0.000 0.030 0.060 0.050 78.90 -
Four Brothers Construction 31614 Const. of MPB, Brgy. West Buyagan CAR 0.476 40 C 0.285 0.200 0.300 - - - 78.50 *78.50%
Satisfactory
Four J Construction 15104 Conc. of Road @ So. Nazareneville IV-A 1.918 90 C 0.297 0.244 0.300 - - - 84.10 *84.10% V. Satisfactory
Four J Construction 15104 Const. of Box Culvert @ Brgy. Dalig IVA 0.956 60 C 0.357 0.200 0.300 - - - 85.70 *85.70%
V. Satisfactory
Four J Construction 15104 Const. of MPB @ UPS V Area I NCR 0.476 60 C 0.340 0.200 0.300 - - - 84.00 83.30% V. Satisfactory
Four J Construction 15104 Const. of Multi-Purpose Building at Emilio Jacinto E/S NCR 2.976 120 C 0.292 0.300 0.300 - - - 89.20 83.67%
V. Satisfactory
Four J Construction 15104 Impvt. of Cainta River IV-A 3.836 90 C 0.339 0.269 0.300 - - - 90.80 85.52% V. Satisfactory
Four J Construction 15104 Impvt. of Valenzuela General Hospital Bldg. NCR 0.937 45 C 0.372 0.300 0.300 - - - 97.20 94.89%
Outstanding
Four J Construction 15104 Repair & Impvt. of McArthur Highway NCR 9.387 120 C 0.334 0.300 0.300 - - - 93.40 91.72%
Outstanding
Four J Construction 15104 Widening of Quezon Avenue NCR 21.722 90 O 0.376 0.240 0.100 0.018 0.042 0.100 87.60 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page160
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Four Side Construction and Supply 24446
Rep./Maint/of Looc Ferrol Road Km. 103+500 (Tuburan Sect. Box
Culvert)IV-B 0.516 48 C 0.388 0.000 0.300 - - - 68.80 *68.80%
Fair
Foz Designs, Builds and Supplies 32814 Const. of 1 unit Classroom Sch. Bldg. V 0.482 60 C 0.246 0.200 0.300 - - - 74.60 *74.60%
Satisfactory
Foz Designs, Builds and Supplies 32814 Const. of Sorsogon 2nd DEO V 0.960 60 C 0.364 0.200 0.300 - - - 86.40 *86.40% V. Satisfactory
Framecon Builders 22482 Completion of Multi-Purpose Building, San Luis Central School III 2.574 120 C 0.440 0.133 0.300 - - - 87.30 *87.30%
Satisfactory
Framecon Builders 22482 Const. of Drainage Canal at Brgy. Mangino III 0.475 30 C 0.250 0.200 0.300 - - - 75.00 *75.00%
Satisfactory
Framecon Builders 22482 Repair/Impvt. of Mallorca-Tabuating Road III 1.853 75 O 0.252 0.300 0.100 0.015 0.026 0.100 79.30 -
FRD Construction 10227 Const. of 1 Unit 1 CL Sch. Bldg. @ Malinao HS VIII 0.496 75 C 0.430 0.200 0.000 - - - 63.00 68.74%
Poor
FRD Construction 10227 Const. of 1 Unit 1 CL School Bldg. @ Dao E/S VIII 0.498 75 C 0.383 0.106 0.300 - - - 78.90 *78.90%
Satisfactory
FRD Construction 10227 Reconst. of Soom Bridge along Tagbilaran East Road VII 13.241 390 C 0.237 0.300 0.300 - - - 83.70 81.06%
V. Satisfactory
FRD Construction 10227 Rehab./Impvt. of Laoang-Calomotan Rd. VIII 9.315 150 C 0.318 0.300 0.300 - - - 91.80 87.18%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page161
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
FRD Construction 10227 Rehab/Impv't of Liloan-Himay-angan-Libagon Road VIII 18.692 360 O 0.351 0.249 0.150 0.030 0.042 0.050 87.20 -
FRD Construction 10227 Repair/Rehab. of Lilo-an-Sogod Bdry. Mahaplag Road VIII 9.343 220 C 0.364 0.200 0.300 - - - 86.40 *86.40%
V. Satisfactory
FRD Construction 10227 Upgrading (Conc.) of Wright-Taft-Borongan Road VIII 33.774 220 O 0.347 0.237 0.100 0.030 0.027 0.100 84.10 -
FRD Construction 10227 Upgrading (Conc.) of Wright-Taft-Borongan Road VIII 33.775 340 O 0.276 0.300 0.150 0.030 0.047 0.033 83.60 -
Freden Construction 22665 Const. of Lined Canal XII 1.865 90 O 0.284 0.200 0.100 0.030 0.032 0.200 84.60 -
Freden Construction 22665 Const. of Lined Canal XII 1.864 117 C 0.445 0.200 0.300 - - - 94.50 *88.56% Satisfactory
Freden Construction 22665 Const. of Lined Drainage along Makar-Kiamba Road XII 1.900 75 C 0.368 0.200 0.300 - - - 86.80 *86.80%
V. Satisfactory
Freden Construction 22665Const. of Makar Drainage
Protecting Makar Port (Labangal Section)
XII 1.422 75 C 0.300 0.300 0.300 - - - 90.00 88.38% V. Satisfactory
Freden Construction 22665
Repair & Maintenance of National Roads & Bridges Makar-Marbel
Road (going to Makar) and Makar-Kiamba Road
XII 1.238 60 C 0.425 0.200 0.300 - - - 92.50 *92.50% V. Satisfactory
Full Blast Trading and Construction 29548 Const./Rehab. of Multi-Purpose
Building @ Brgy. Poblacion III 0.944 44 C 0.397 0.300 0.300 - - - 99.70 *99.70% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page162
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Fullido's Construction and Enterprises 20347 Const. of 1 CL Sch. Bldg. (7m x
9m) Corella H/S VII 0.410 140 C 0.335 0.300 0.300 - - - 93.50 *93.50% Outstanding
Fullido's Construction and Enterprises 20347 Const. of CVSCAFT School
Building VII 0.929 110 C 0.388 0.100 0.300 - - - 78.80 84.89% V. Satisfactory
FVCS Construction & Supply 32518 Repair/Maintenance of Panacan Revetment IV-B 0.645 45 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V. Satisfactory
G & P Builders, Incorporated 3960 Construction of CDO 3rd Bridge & Access Road Phase I, Kauswagan X 35.267 450 C 0.295 0.300 0.300 - - - 89.50 80.47%
V. Satisfactory
G E S Construction 30299 Const. of MPB @ Brgy. 46 VIII 0.963 70 O 0.382 0.300 0.150 0.022 0.043 0.033 93.00 -
G. Uymatiao Jr. Construction 6663 Conc. of Brgy. Daro Road VII 0.474 95 C 0.357 0.000 0.300 - - - 65.70 78.72% Satisfactory
G. Uymatiao Jr. Construction 6663 Const./Impvt. of San Jose-CantupaSect. (DNR) VII 18.296 216 O 0.260 0.230 0.100 0.030 0.052 0.100 77.20 -
G. Uymatiao Jr. Construction 6663 Const./Impvt. of San Jose-CantupaSect. (DNR) VII 18.296 216 O 0.356 0.226 0.100 0.030 0.038 0.067 81.70 -
G. Uymatiao Jr. Construction 6663 Const./Impvt. of San Jose-CantupaSect. (DNR) VII 18.296 247 O 0.348 0.223 0.150 0.030 0.042 0.033 82.60 -
G. Uymatiao Jr. Construction 6663 Const./Widening of Box Culvert VII 1.382 110 C 0.363 0.200 0.300 - - - 86.30 *86.30% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page163
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
G.C.I. Construction 11346 Conc. of Brgy. Bagadion Danawan-San Vicente FMR V 2.852 210 C 0.250 0.300 0.300 - - - 85.00 73.30%
Satisfactory
G.C.I. Construction 11346 Conc. of Baras-Gigmoto Road (San Vicente Section) V 9.628 210 O 0.362 0.231 0.100 0.030 0.030 0.100 85.30 -
G.C.I. Construction 11346 Conc. of Cagmanaba Road V 1.911 120 C 0.301 0.279 0.300 - - - 88.00 *88.00% V. Satisfactory
G.C.I. Construction 11346 Conc. of Nabua-Balatan Road (Tapayas-Cabanban Sect.) V 9.357 120 C 0.318 0.200 0.300 - - - 81.80 82.67%
V. Satisfactory
G.C.I. Construction 11346 Conc. of Roads at San Jose Road V 1.911 120 C 0.274 0.300 0.300 - - - 87.40 *87.40% V. Satisfactory
G.C.I. Construction 11346 Conc. of San Isidro V 9.454 105 C 0.319 0.218 0.300 - - - 83.70 *83.70% V. Satisfactory
G.C.I. Construction 11346 Concreting of Tierra Nevada-Lupi Road V 0.955 90 C 0.292 0.100 0.300 - - - 69.20 75.68%
Satisfactory
G.C.I. Construction 11346 Const. of Buhi-Lidong Road V 28.220 150 C 0.261 0.200 0.300 - - - 76.10 83.30% V. Satisfactory
G.C.I. Construction 11346 Const. of MPB (Executive Building) V 2.837 120 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V. Satisfactory
G.C.I. Construction 11346 Const. of Road @ Tagbong-Binobong Road V 4.777 120 C 0.329 0.200 0.300 - - - 82.90 *82.90%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page164
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
G.C.I. Construction 11346Const. of San Fernando-Oas By-Pass Road, Brgy. Bonbon, Libon
to Brgy. CalzadaV 19.160 300 C 0.432 0.133 0.300 - - - 86.50 84.48%
Satisfactory
G.C.I. Construction 11346 Const. of San Vicente Drainage System V 2.362 150 C 0.308 0.200 0.300 - - - 80.80 *80.80%
V.Satisfactory
G.C.I. Construction 11346 Const. of San Vicente-Gutan-Lubak-Anguib Road,Phase V II 20.259 330 O 0.267 0.300 0.150 0.030 0.035 0.050 83.20 -
G.C.I. Construction 11346 Const./Rehab. of San Vicente-Gutan-Lubac-Angub Rd. Phase IV II 48.192 360 C 0.342 0.201 0.300 - - - 84.30 83.46%
V. Satisfactory
G.C.I. Construction 11346Const./Road Opening of San
Vicente-Gutan-Luban-Aguib Road (P III)
II 28.095 370 C 0.289 0.228 0.300 - - - 81.70 75.76% Satisfactory
G.C.I. Construction 11346 Construction of 2 Storey Multi-Purpose Building V 0.945 120 C 0.431 0.200 0.300 - - - 93.10 *93.10%
V. Satisfactory
G.C.I. Construction 11346 Construction of Roads V 3.821 120 C 0.438 0.200 0.300 - - - 93.80 *93.80% V.Satisfactory
G.C.I. Construction 11346 Impvt./Conc. of Goa-Tinambac Road V 9.553 110 C 0.245 0.279 0.300 - - - 82.40 82.40%
V. Satisfactory
G.C.I. Construction 11346Installation of Sheet Piles & Conc. of Training Levee inc. Earthdike,
Traversia RevetmentV 39.000 261 C 0.351 0.200 0.300 - - - 85.10 79.67%
Satisfactory
G.C.I. Construction 11346 Libmanan-Cabusao Embankment (Poblacion Revetment) V 10.523 270 O 0.282 0.200 0.100 0.030 0.028 0.200 84.00 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page165
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
G.C.I. Construction 11346 Rehab./Impv't of Talongog-Busac River Control V 19.269 90 C 0.469 0.133 0.300 - - - 90.20 *90.20%
V. Satisfactory
G.C.I. Construction 11346 Rehab./Impvt. of Nabua-Balatan Road Cabanban Section V 0.468 60 C 0.305 0.200 0.300 - - - 80.50 *80.50%
V. Satisfactory
G.C.I. Construction 11346
Rehab./Reconst. of Damaged National Road and Generated from Pavement Mgt. System (Highway
Dev't & Mgt. HDM-4) Jct. Bato-Baras Road
V 19.180 301 O 0.361 0.300 0.150 0.030 0.061 0.050 95.20 -
G.C.I. Construction 11346 Repair/Rehab. of National Road, San Andres-Caramoan Section V 28.326 205 C 0.346 0.300 0.300 - - - 94.60 91.72%
Outstanding
G.C.I. Construction 11346 Repair/Restoration of Damaged Dike Maipon R.C. V 14.385 180 C 0.445 0.200 0.300 - - - 94.50 84.54%
Satisfactory
G.C.I. Construction 11346 Repair/Restoration of Damaged Rd. Pavement along Balogo-Nasisi V 28.860 120 C 0.263 0.300 0.300 - - - 86.30 *86.30%
V. Satisfactory
G.C.I. Construction 11346 Road Conc. at Palestina Road V 1.891 60 C 0.239 0.300 0.300 - - - 83.90 *83.90% V. Satisfactory
G.D.L. Construction / E.C. de Luna Construction Corporation
Joint VentureJV-07-094
Rehab./Reconst. of Damaged Paved Nat'l Road at Gen. Alejo
Santos Highway III 150.985 310 O 0.312 0.300 0.100 0.030 0.050 0.067 85.90 -
G.D.L. Construction / E.C. de Luna Construction Corporation
Joint Venture
JV-07-094/SL2-
SN-000826
Rehab./Reconst. of Damaged Paved Nat'l Road at Gen. Alejo
Santos Highway III 150.985 310 O 0.263 0.300 0.150 0.030 0.040 0.050 83.30 -
G.D.L. Construction / Persan Construction, Inc. JV
SL1-SN-005175/JV-
07-165
Norzagaray-Bigte Road including Replacement of Kay Uwak Bridge III 29.493 180 O 0.339 0.300 0.150 0.030 0.035 0.033 88.70 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page166
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
G.F. Falcis Construction & Supply 26147 Const. of Brgy. 9 River Control VI 0.945 90 O 0.387 0.200 0.100 0.030 0.052 0.200 96.90 -
G.F. Falcis Construction & Supply 26147 Const. of Multi-Purpose Building VI 3.850 210 O 0.225 0.240 0.100 0.023 0.013 0.100 70.10 -
G.F. Falcis Construction & Supply 26147 Const. of Multi-Purpose Building VI 3.848 210 O 0.348 0.170 0.100 0.030 0.035 0.100 78.30 -
G.F. Rovero Merchandising 27268 Conc. of Altavas-Jamindan Road VI 0.961 50 C 0.381 0.116 0.300 - - - 79.70 *79.70% Satisfactory
G.F. Rovero Merchandising 27268 Const./Impvt. of Multi Purpose Pavement @ Poblacion VI 4.817 120 C 0.232 0.200 0.300 - - - 73.20 80.16%
V. Satisfactory
G.F. Rovero Merchandising 27268 Rehab. of New Buswang Prov'l. Road at New Buswang VI 0.988 75 C 0.316 0.300 0.300 - - - 91.60 *91.60%
Outstanding
G.F. Rovero Merchandising 27268 Rehab./Const. of Flood Control Structure VI 4.812 120 O 0.346 0.300 0.150 0.030 0.055 0.033 91.40 -
G.F. Rovero Merchandising 27268 Repair/Rehab. of Quarters/Office Building VI 6.645 180 C 0.278 0.300 0.300 - - - 87.80 89.83%
V. Satisfactory
G.G. Uy Construction 32319 Rehabilitation of Main Canal (Sta. 13+150-Sta. 16+600 I 12.410 150 C 0.250 0.300 0.300 - - - 85.00 84.84%
V.Satisfactory
G.O. Marron General Contractor 6844 Completion of MPB @ Balaoan I 1.881 92 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page167
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
G.O. Marron General Contractor 6844 Conc. Paving of Sitio Nagbayugan Feeder Road I 1.881 77 C 0.383 0.260 0.300 - - - 94.30 71.68%
Satisfactory
G.O. Marron General Contractor 6844 Const. of MPB, Brgy. Central East I I 0.940 48 C 0.272 0.300 0.300 - - - 87.20 75.65%
Satisfactory
G.O. Marron General Contractor 6844 Const. of Multi-Purpose Bulding at Bacsil I 0.936 47 O 0.367 0.221 0.100 0.030 0.047 0.067 83.20 -
G.O. Marron General Contractor 6844 Const./Rehab. of MPB I 4.674 349 C 0.333 0.300 0.300 - - - 93.30 79.60% Satisfactory
G.R. Quirong Construction 9019 Const. of MPB at Brgy. Rizal VIII 0.470 90 C 0.289 0.200 0.300 - - - 78.90 *78.90% Satisfactory
G.V. Burton Builders 21700 Const. of MPB (Phase I) @ Tidang Village II 0.286 60 C 0.337 0.200 0.300 - - - 83.70 *83.70%
V. Satisfactory
Gacutan Construction 10789 Alibadabad CPIP II 2.560 180 C 0.272 0.159 0.300 - - - 73.10 73.10% Satisfactory
Gacutan Construction 10789 Conc. of Ilocos Norte-Abra Road I 11.649 180 C 0.339 0.200 0.300 - - - 83.90 83.42% V. Satisfactory
Gacutan Construction 10789 Conc. of Tandang Sora St. II 9.564 150 C 0.329 0.202 0.300 - - - 83.10 *83.10% V. Satisfactory
Galeno Construction, Inc. 3427Completion of Camindangan
Bridge along Candoni-Sipalay Road, Brgy. Camindangan
VI 11.954 306 C 0.389 0.200 0.300 - - - 88.90 86.62% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page168
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Galeno Construction, Inc. 3427 Const. of Magballo Bridge (Phase I) VI 7.547 320 C 0.333 0.300 0.000 - - - 63.30 69.24%
Fair
Galeno Construction, Inc. 3427 Const. of Maytubig Bridge, Phase II VI 6.838 115 C 0.259 0.256 0.000 - - - 51.50 58.58%
Poor
Gampik Construction & Development Inc. 8019 Asphalt Overlay along Carmen-
Patag-Bulua Road X 14.462 90 C 0.259 0.286 0.300 - - - 84.50 *84.50% V. Satisfactory
Gampik Construction & Development Inc. 8019 Asphalt Overlay along Sayre
Highway Alae-Kisolon Road X 9.644 75 C 0.429 0.133 0.000 - - - 56.20 71.71% Poor
Gampik Construction & Development Inc. 8019
Const. of Babak-Samal-Kaputian Road, IGACOS, Island Garden City
of SamalXI 9.392 329 C 0.350 0.300 0.300 - - - 95.00 85.34%
V. Satisfactory
Gampik Construction & Development Inc. 8019
Impvt./Rehab of Marbel-Allah-Valley-Cotabato Road, Ampatuan-
Talayan SectionXII 14.372 180 C 0.371 0.300 0.300 - - - 97.10 92.78%
Outstanding
Gampik Construction & Development Inc. 8019 Impv't./Rehab./Asphalt Overlay of
Initao-Naawan Road Sect. X 14.462 90 C 0.384 0.300 0.000 - - - 68.40 71.34% Satisfactory
Gampik Construction & Development Inc. 8019
Provision of Slope Protection @ Sinuda Slip and Repair of
Bituminous PavementX 2.027 120 C 0.377 0.300 0.300 - - - 97.70 78.53%
Satisfactory
Gampik Construction & Development Inc. 8019 Rehab. of Agusan-Davao Road XI 14.130 160 C 0.343 0.272 0.300 - - - 91.50 84.27%
V. Satisfactory
Gampik Construction & Development Inc. 8019 Rehab. of Agusan-Davao Road,
Tuganay-Sto. Niño Sect. XI 9.984 180 C 0.307 0.300 0.300 - - - 90.70 85.18% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page169
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Garnic Construction 22861 Package 3: Const. of MP Building (2nd Floor Only) @ Brgy. Bulac III 0.756 75 C 0.359 0.253 0.300 - - - 91.20 *91.20%
Outstanding
Gaver General Merchandising 24186 Rehab. of Multi-Purpose Pavement in Pastrana Park (Phase III) VI 4.819 120 C 0.394 0.278 0.300 - - - 97.20 97.20%
Outstanding
Gawanato Construction 28687 Const. of Line Canal @ Talaga IV-A 0.191 45 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory
GCI Construction 11346 Concreting of Tierra Nevada-Lupi Road V 0.955 90 O 0.300 0.250 0.100 0.015 0.035 0.100 80.00 -
GCI Construction 11346 Repair/Rehab of LCPIS V 11.652 90 O 0.380 0.120 0.000 0.006 0.023 0.200 72.90 72.90% Satisfactory
GCMG Construction 9743 Completion of Sagay Public Market X 1.845 161 C 0.375 0.300 0.300 - - - 97.50 90.85%
Outstanding
GCMG Construction 9743 Const./Conc. of Manduao Road X 0.930 75 C 0.334 0.200 0.300 - - - 83.40 78.90% Satisfactory
G-Cube Construction 17219 Concrete Reblocking of Del Monte Avenue, Quezon City NCR 4.891 75 C 0.294 0.300 0.300 - - - 89.40 *89.40%
V. Satisfactory
GEA Construction and Corporation 10163 Romblon Airport Development
Project DOTC 4.800 90 C 0.436 0.200 0.300 - - - 93.60 93.60% Very Satisfactory
GEA Construction Corporation 10163 Laguindingan Airport Development Project DOTC 22.360 180 O 0.400 0.300 0.150 0.020 0.039 0.050 95.90 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page170
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
GED Construction 13614 Const. of Road @ San Antonio I 0.475 40 C 0.276 0.300 0.300 - - - 87.60 *87.60% V. Satisfactory
GED Construction 13614 Const. of Secondary Sch. Bldg. @ Cato MNHS I 0.485 40 C 0.273 0.200 0.300 - - - 77.30 * 77.30%
Satisfactory
Geed Construction 10823 Impvt. of Surigao-Davao Coastal Road along Cabanahan XIII 12.464 100 C 0.320 0.200 0.300 - - - 82.00 77.08%
Satisfactory
Geety Realty & Dev. Corporation 30447Asphalt Overlay of Imus Road
(Sta.1+606 - Sta.2+523 w/ exception)
VII 9.647 40 C 0.330 0.250 0.300 - - - 88.00 *88.00% V. Satisfactory
Geety Realty & Dev. Corporation 30447 Const. of River Control (Revetment) Candulawan VII 4.446 75 C 0.382 0.200 0.300 - - - 88.20 *88.20%
V. Satisfactory
Geety Realty & Development Corporation 30447 Rehabilitation of Canlumampao VII 9.598 300 O 0.333 0.300 0.070 0.030 0.033 0.100 86.60 -
Gem Construction & Supply 29732 Const. of Brgy. Road @ Brgy. Manggas IV-A 0.964 90 C 0.339 0.200 0.300 - - - 83.90 * 83.90%
V. Satisfactory
Gemma Construction Supply 5044
Cluster I - Const. of Various School Bldg., Project CY 2003
Oringo E/S, Brgy. Dadiagas Heights
XII 0.686 180 C 0.361 0.254 0.300 - - - 91.50 87.51% V. Satisfactory
Gemma Construction Supply 5044 Const. of Bridge XII 3.687 168 O 0.360 0.239 0.100 0.030 0.023 0.100 85.20 -
Gemma Construction Supply 5044 Const. of Drainage Canal from Poblacion to San Pablo XII 0.950 100 C 0.267 0.300 0.300 - - - 86.70 81.60%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page171
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Gemma Construction Supply 5044 Const. of MPB (Phase I) XII 4.767 120 C 0.416 0.133 0.300 - - - 84.90 83.43% Satisfactory
Gemma Construction Supply 5044
Const. of Multi-Purpose Building @ Purok Marcos, Sta. Cruz
Tampakan realigned to Const. of Multi-Purpose Building
XII 0.903 84 O 0.397 0.300 0.100 0.030 0.018 0.100 94.50 -
Gemma Construction Supply 5044Const. of Sinawal Flood Control Protecting Makar-Tupi-Marbel
RoadXII 1.390 75 C 0.305 0.300 0.300 - - - 90.50 88.22%
V. Satisfactory
Gemma Construction Supply 5044 Const./Renovation/Completion of DPWH Regional Office XII XII 4.998 120 C 0.394 0.200 0.300 - - - 89.40 *89.40%
V. Satisfactory
Gemma Construction Supply 5044 Construction of Provincial Hospital XII 1.917 85 C 0.467 0.133 0.300 - - - 90.00 *90.00%
V. Satisfactory
Gemma Construction Supply 5044 Repair/Rehab. Along Dulawan-Marbel Road XII 9.620 120 C 0.262 0.237 0.300 - - - 79.90 *79.90%
Satisfactory
Gemma Construction Supply 5044
Repair/Rehab. of Road along Marbel-Alah Valley-Cotabato Road
(Alah Highway Bdry. w/ Maguindanao)
XII 9.551 128 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory
Gemma Construction Supply 5044Rerpair/Rehab. of Road along
Kidapawan-Alah Jct. Road (kapingkong Isulan Section)
XII 9.544 129 C 0.393 0.133 0.300 - - - 82.60 *82.60% Satisfactory
Gemma Construction Supply 5044 Road Upgrading, Dulawan-Marbel Road XII 18.922 293 O 0.321 0.240 0.150 0.030 0.050 0.050 84.10 -
Gemma Construction Supply 5044 Widening/Conc. of Calean Bridge along Dulawan-Marbel Road XII 9.497 209 C 0.369 0.200 0.300 - - - 86.90 86.90%
V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page172
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Geneson Construction & Supply 13728 Completion of Kabaka/KMTC Multi-Purpose Building NCR 1.928 76 C 0.456 0.109 0.300 - - - 86.50 *86.50%
Satisfactory
Geneson Construction & Supply 13728 Rehab. w/ Asphalt Overlay, Crack & Joint Sealing @ Onyx St. NCR 1.887 45 C 0.366 0.300 0.300 - - - 96.60 *96.60%
Outstanding
Geneson Construction & Supply 13728 Repair/Rehab. of Road and Drainage Improvement NCR 2.373 75 C 0.335 0.300 0.300 - - - 93.50 *93.50%
Outstanding
Genetian Builders 18052 Const. of 1 Cl Sch. Bldg. @ Pioneer NHS San Pedro Annex IX 0.500 45 C 0.178 0.138 0.300 - - - 61.60 *61.60%
Fair
Geovan Marketing 10824 Const. of Agbalili River Control VI 4.815 90 C 0.277 0.300 0.300 - - - 87.70 83.38% V. Satisfactory
Gerezsons Resources Corporation 20699 Const. of 1 CL Sch. Bldg. Tolosa
NHS VIII 0.519 120 C 0.334 0.200 0.300 - - - 83.40 *83.40% V. Satisfactory
Gerezsons Resources Corporation 20699 Const. of Drainage Canal @ Pob. 1 VIII 0.275 40 C 0.336 0.200 0.300 - - - 83.60 *83.60%
V. Satisfactory
Gerezsons Resources Corporation 20699 Const. of Inopacan Seawall VIII 9.297 150 C 0.133 0.300 0.300 - - - 73.30 *73.30%
Satisfactory
Gerezsons Resources Corporation 20699 Const. of Road Opening Brgy.
Milagrosa-Brgy. Badiangay VIII 1.776 165 O 0.191 0.000 0.000 0.030 0.025 0.033 27.90 -
Gerezsons Resources Corporation 20699 Repair/Rehab. of Grouted Riprap
@ Brgy. 39 VIII 0.964 95 C 0.437 0.200 0.000 - - - 63.70 *63.70% Poor
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page173
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Gerezsons Resources Corporation 20699 Repair/Rehab. of National Road
along Jct. Taft-Arteche Rd. Sect. VIII 4.755 90 C 0.454 0.200 0.300 - - - 95.40 *95.40% V. Satisfactory
Gershli Construction & Supply 28480 Conc. of Road @ Brgy. Sico IV-A 0.189 30 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Gershli Construction & Supply 28480 Conc. of Roads, Brgy. Tanagan IV-A 0.954 60 C 0.435 0.141 0.300 - - - 87.60 *87.60% Satisfactory
Gershli Construction & Supply 28480 Const. of FMR at Brgy. Santor IV-A 1.926 90 C 0.321 0.200 0.300 - - - 82.10 *82.10% V . Satisfactory
Gershli Construction & Supply 28480 Const. of MPB at Brgy. Wawa IV-A 3.372 90 C 0.310 0.286 0.300 - - - 89.60 *89.60% V. Satisfactory
Gershli Construction & Supply 28480 Const. of Multi Purpose Building/Structure in Brgy. Bilaran IV-A 0.479 60 C 0.372 0.200 0.300 - - - 87.20 *87.20%
V. Satisfactory
Gershli Construction & Supply 28480 Impvt. of MPB, Cuenca C/S IV-A 0.289 60 C 0.345 0.277 0.300 - - - 92.20 *92.20% Outstanding
Gershli Construction and Supply 28480 Const. of Multi-Purpose Bldg., @ (Talipapa) Brgy. 2-A IV-A 0.478 60 C 0.379 0.200 0.300 - - - 87.90 *87.90%
V. Satisfactory
Gershli Construction and Supply 28480 Const. of Reinforced Concrete Box Culvert IV-A 0.191 45 C 0.367 0.200 0.300 - - - 86.70 *86.70%
V. Satisfactory
GES Construction 30299 PICAS-San Vicente CIS, Phase 7, Contingency PIO 531.923 30 C 0.349 0.219 0.300 - - - 86.80 86.80%
V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page174
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
GES Construction 30299 Taripa CIS PIO 1.012 90 O 0.359 0.238 0.100 0.015 0.029 0.100 84.14 -
Geto Construction 17689 Concreting of Interior Roads IV-A 1.910 90 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory
Gicar Construction 12624Conc. of Line Canal along Surigao-Wharf Road km. 1122+270 to km.
1122+560XIII 0.962 90 C 0.311 0.300 0.300 - - - 91.10 89.90%
V. Satisfactory
Gicar Construction 12624Conc. of Line Canal with Slope
Protection along Surigao-Agusan Road
XIII 1.927 90 C 0.388 0.166 0.300 - - - 85.40 84.38% V. Satisfactory
Gicar Construction 12624 Conc. of Surigao City-San Juan Coastal Road XIII 28.595 285 O 0.322 0.300 0.100 0.030 0.065 0.100 91.70 -
Gicar Construction 12624 Conc. of Surigao City-San Juan Coastal Road XIII 28.595 312 O 0.330 0.300 0.150 0.030 0.037 0.050 89.70 -
Gicar Construction 12624 Const. of Kag-ayongan Bridge and Approaches Phase I XIII 10.274 210 C 0.376 0.205 0.300 - - - 88.10 86.93%
V. Satisfactory
Gicar Construction 12624 Const. of Navarro Bridge & Approaches XIII 8.029 180 C 0.363 0.176 0.300 - - - 83.90 79.64%
Satisfactory
Gicar Construction 12624 Const./Widening of Dinagat-Loreto Road (Sto. Niño-Diegas Section) XIII 14.424 240 C 0.358 0.300 0.000 - - - 65.80 70.60%
Satisfactory
Gicar Construction 12624 Impvt./Conc. of Lantay-Maraboc-Pangantucan Road X 14.274 262 C 0.345 0.119 0.300 - - - 76.40 74.36%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page175
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Gicar Construction 12624 Replacement of San Isidro Bridge XIII 14.151 431 C 0.300 0.300 0.300 - - - 90.00 90.00% Outstanding
Gilbert D. Lim "GDL" Enterprise & Services 25499 Conc. of Bolod-Bolod-Catmon
Road VIII 4.650 180 C 0.210 0.200 0.300 - - - 71.00 *71.00% Satisfactory
Gind Construction and Enterprises 18679 Repair of Multi-Purpose Building
@ Poblacion Este I 0.567 36 C 0.363 0.200 0.300 - - - 86.30 87.56% V. Satisfactory
Giovanni Construction 12168 Conc. of Jct. Agusan-Misamis Nat'l Highway XIII 9.193 240 C 0.354 0.200 0.300 - - - 85.40 88.28%
V. Satisfactory
GJD Construction & Supply 25866 Const. of 2 CL Sch. Bldg. @ Titay NHS Malagandis Annex IX 0.871 100 C 0.332 0.230 0.300 - - - 86.20 68.91%
Fair
GJD Construction & Supply 25866 Const. of MPB @ Poblacion IX 0.475 42 C 0.372 0.181 0.300 - - - 85.30 *85.30% V. Satisfactory
GJD Construction & Supply 25866 Const. of Pedestrian Overpass @ Tigbungabong IX 2.859 90 C 0.175 0.300 0.300 - - - 77.50 65.14%
Fair
GJE Builders 18286 Conc. of Coral-San Francisco Road w/ Box Culvert III 4.709 120 C 0.283 0.300 0.300 - - - 88.30 87.76%
V. Satisfactory
GJE Builders 18286 Conc. of FMR @ Brgy. Bawa III 0.614 60 C 0.250 0.200 0.300 - - - 75.00 *75.00% Satisfactory
GJE Builders 18286 Conc. of Purok 5 Road III 1.675 75 C 0.313 0.200 0.300 - - - 81.30 *81.30% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page176
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
GJE Builders 18286 Concreting of Road at Fairlane Subdivision, Brgy. San Vicente III 2.821 90 C 0.422 0.196 0.300 - - - 91.80 *91.80%
V. Satisfactory
GJE Builders 18286 Const. of 1 CL Sch. Bldg. at San Juan de Valdez E/S III 0.423 45 C 0.290 0.257 0.300 - - - 84.70 *84.70%
V. Satisfactory
GJE Builders 18286 Construction of 2-CL School Buidling at Balaoang H/S Annex III 0.889 60 C 0.452 0.133 0.300 - - - 88.50 *88.50%
Satisfactory
GJE Builders 18286 Paving/Upgrading of Romulo Highway, Sta. Ignacia Section III 2.737 30 C 0.318 0.291 0.300 - - - 90.90 *90.90%
Outstanding
GLCT Construction 30657Completion/Continuation of
Unfinished Matain Bridge along Olongapo-Bugallon Road
III 5.519 90 C 0.328 0.149 0.300 - - - 77.70 78.66% Satisfactory
GLCT Construction 30657 Rehab./Impvt. of Bangal Bridge III 13.950 240 C 0.364 0.300 0.300 - - - 96.40 96.40% Outstanding
Global V Builders / HITRI Construction joint venture 29763
Boracay Environmental Infrastucture Project Drainage
SystemPTA 94.176 360 S 0.366 0.300 0.000 0.024 0.047 0.101 83.80 -
GNE Construction 21764
Conc. of Liloy-Labason Road (Osukan Sect.) Realigned to
Labason-Gutalac, Zamboanga del Norte
IX 4.631 149 C 0.395 0.291 0.300 - - - 98.60 94.22% \Outstanding
GNE Construction 21764 Const. of Modified 2 CL Sch. Bldg. E/S IX 0.765 60 C 0.336 0.200 0.300 - - - 83.60 *83.60%
V. Satisfactory
GNE Construction 21764 Const. of MPB, Poblacion IX 0.935 90 C 0.373 0.147 0.300 - - - 82.00 *82.00% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page177
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
GNGC Enterprises 29124
Conc. of Armstrong Ave. & Conc. & Drainage Impvt. of Sunset St.
(Package II) @ Brgy. Moonwalk & Brgy. San Antonio
NCR 3.305 45 C 0.284 0.200 0.300 - - - 78.40 *78.40% Satisfactory
Go Solid Builders, Inc. 32885Const. of 2 CL Secondary Sch. Bldg. @ Tacloban City National
High Sch.VIII 0.949 75 C 0.352 0.200 0.300 - - - 85.20 *85.20%
V. Satisfactory
Gold Rich Construction &Trading (Formerly: Gold Rich Const.) 16489 Const. of Classrooms at City High
School Annex CAR 7.531 120 C 0.390 0.130 0.300 - - - 82.00 *82.00% V. Satisfactory
Gold Rich Construction &Trading (Formerly: Gold Rich Const.) 16489 Const. of MPB @ Brgy. Gabriela
Silang CAR 1.909 90 C 0.396 0.195 0.300 - - - 89.10 *89.10% V. Satisfactory
Gold Rich Construction &Trading (Formerly: Gold Rich Const.) 16489 Rehab./Impvt. of Ferguson Road CAR 6.626 80 C 0.396 0.109 0.300 - - - 80.50 *80.50%
V. Satisfactory
Gold Rich Construction &Trading (Formerly: Gold Rich Const.) 16489 Rehab./Impvt. of Kennon Drive,
Kennon Road CAR 6.626 80 C 0.354 0.200 0.300 - - - 85.40 *85.40% V. Satisfactory
Gold Rich Construction &Trading (Formerly: Gold Rich Const.) 16489 Rehab./Impvt. of Outlook Drive CAR 6.626 80 C 0.391 0.107 0.300 - - - 79.80 *79.80%
Satisfactory
Gold Rich Construction &Trading (Formerly: Gold Rich Const.) 16489 Rehabilitation along City Limit-
Santo Tomas Road CAR 28.926 265 C 0.465 0.200 0.300 - - - 96.50 *96.50% Outstanding
Goldbern Construction 28509Repair / Rehabilitation of
Buildings 9 & 10 @ Bagong Lipunan Condominium (BLC)
NCR 1.690 90 C 0.393 0.300 0.300 99.30 *99.30% Outstanding
Golden Ridge Enterprises 29946 Masao Port Expantion Project PPA 91.102 420 C 27.982 30.000 30.000 - - - 86.61 86.61% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page178
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Golden Tech Construction 14820 Addalam River Irrigation Project NIA 9.792 370 O 0.325 0.240 0.150 0.023 0.038 0.050 82.57 -
Goldfin Construction 21343 Completion of Multi-Purpose Building VII 1.324 75 O 0.255 0.251 0.100 0.022 0.019 0.100 74.70 -
Goldfin Construction 21343Const. Additional Floor and
Repair/Repair of existing MPB (TESDA)
IX 4.718 315 C 0.385 0.257 0.300 - - - 94.20 81.57% V. Satisfactory
Goldfin Construction 21343 Const. of 1 unit, 4 Storey, 20 CL Tisa II E/S Bldg. VII 13.363 120 C 0.370 0.248 0.300 - - - 91.80 84.17%
V. Satisfactory
Goldfin Construction 21343 Const. of Camp Lapu-Lapu E/S VII 2.938 50 C 0.362 0.300 0.300 - - - 96.20 85.77% V. Satisfactory
Goldrich Construction 16489 Masantol River Wharf (Phase 2) Improvement Project PPA 16.879 120 O 0.362 0.240 0.100 0.015 0.035 0.067 81.84 -
Goldrich Construction 31884 Repair/Rehab. Multi-Purpose Building, San Jose St. NCR 2.879 127 C 0.494 0.166 0.300 - - - 96.00 *96.00%
V.Satisfactory
Goldrich Construction and Trading 16489 Const. of MPB @ Brgy. Gabriela
Silang CAR 1.909 90 C 0.394 0.300 0.300 - - - 99.40 *99.40% Outstanding
Goldrich Construction and Trading 16489
Impvt. of Bontoc-Tinglayan Road (Package 2), km. 396+500-km.
398+400CAR 12.407 118 C 0.338 0.200 0.300 - - - 83.80 78.52%
Satisfactory
Goldrich Construction and Trading 16489 Impvt. of Pico-Lamtang Road CAR 5.742 100 C 0.330 0.292 0.300 - - - 92.20 92.20%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page179
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Goldrich Construction and Trading (Formerly: Goldrich
Const.)16489
Rehab. of Kennon Road, Km. 242+966-Km. 243+066 and Km.
245+268-Km. 245+563CAR 9.361 80 C 0.322 0.265 0.300 - - - 88.70 *88.70%
V. Satisfactory
Goldrock Construction & Development Corp. 5389 Const. of Ilog-ilog Bridge, Rizal-
Panalingaan Road IV-B 15.616 255 C 0.291 0.279 0.300 - - - 87.00 83.04% V. Satisfactory
Goldrock Construction & Development Corp. 5389
Rehab. of El Nido-Taytay Road (Brgy. Mabini-Brgy. Sandoval
Section)IV-B 14.155 164 C 0.372 0.200 0.300 - - - 87.20 86.42%
V. Satisfactory
Goldrock Construction & Development Corp. 5389 Rehab. of Taytay Road (Sitio Igang
Brgy. Pamantolon Sect.) IV-B 14.157 164 C 0.351 0.200 0.300 - - - 85.10 *85.10% V. Satisfactory
Goldrock Construction & Development Corp. 5389 Rehab./Impv't of Quezon-Punta
Baja Road, 150+000-Km. 168+000 IV-B 14.230 210 C 0.397 0.200 0.300 - - - 89.70 82.23% Satisfactory
Gonzalo Construction 1826Impvt. along Acop-Kapangan-
Kibungan-Bakun Road, km 290+100 - Km. 294+700 (VS)
CAR 19.130 150 C 0.314 0.200 0.300 - - - 81.40 76.24% Satisfactory
Gonzalo Construction 1826Rehabilitation/Reconstruction of
Damanged Road along Abra-Kalinga Road
CAR 14.328 200 O 0.159 0.000 0.114 0.000 0.025 0.000 29.80 -
Gonzalo Construction 1826 Repair/Rehab. of MPB (DBM) CAR 9.637 210 O 0.364 0.300 0.100 0.030 0.021 0.100 91.50 -
Gonzalo Construction 1826 Repair/Rehab. of MPB (DBM) CAR 9.637 210 O 0.337 0.289 0.030 0.030 0.056 0.067 80.90 -
Gonzalo Construction 1826 Replacement/ Const. of Man-asok Bridge & Approaches CAR 9.305 255 C 0.355 0.000 0.300 - - - 65.50 80.14%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page180
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Gonzalodo Enterprises 30681Conc. of Bogo-Curva-Madellin-Daanbantayan Road, Antipolo
SectionVII 7.600 112 C 0.309 0.200 0.300 - - - 80.90 *80.90%
V. Satisfactory
Gonzalodo Enterprises 30681 Const./Repair/Rehab. of Multi-Purpose Building VII 0.470 60 C 0.402 0.200 0.300 - - - 90.20 *90.20%
V. Satisfactory
Gonzalodo Enterprises 30681 Const./Repair/Rehab. of Multi-Purpose Building VII 0.460 60 C 0.450 0.133 0.300 - - - 88.30 *88.30%
Satisfactory
Gonzalodo Enterprises 30681 Const./Repair/Rehab. of Multi-Purpose Building @ Tabugon VII 0.482 75 C 0.347 0.000 0.300 - - - 64.70 *64.70%
Poor
Gonzalodo Enterprises 30681 Impvt. of MPB VII 1.885 75 C 0.349 0.200 0.300 - - - 84.90 72.09% Satisfactory
Gonzalodo Enterprises 30681 Impvt. of MPB, Lapu-lapu Central School VII 0.921 60 C 0.314 0.200 0.300 - - - 81.40 *81.40%
V. Satisfactory
Good Fortune International, Inc. 9246 Const. of Arevalo-Sooc Bridge & Approaches VI 7.237 265 O 0.306 0.300 0.100 0.030 0.037 0.100 87.30 -
Good Fortune International, Inc. 9246 Improvement of Mandurriao-San Miguel-Alimodin-Maasim Road VI 11.564 150 O 0.313 0.231 0.050 0.023 0.035 0.067 71.90 -
Good Fortune International, Inc. 9246 Improvement of Mandurriao-San Miguel-Alimodin-Maasin Road VI 11.564 150 O 0.304 0.237 0.100 0.030 0.028 0.100 79.90 -
Good Fortune International, Incorporated 9246 Const. of Arevalo-Sooc Bridge &
Approaches VI 7.237 265 C 0.281 0.300 0.300 - - - 88.10 87.62% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page181
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Good Fortune International, Incorporated 9246 Const. of Bayunan Bridge VI 17.478 479 C 0.453 0.200 0.300 - - - 95.30 88.55%
Satisfactory
Good Fortune International, Incorporated 9246 Const. of Odol Bridge VI 12.223 240 C 0.383 0.300 0.000 - - - 68.30 77.11%
Satisfactory
Good Medal Construction and Supplies 19309 Const. of Drainage System @ San
Isidro V 0.143 90 C 0.200 0.300 0.300 - - - 80.00 *80.00% Satisfactory
Good Speed Construction & Services 20572 Asphalt Overlay at Brgy. Halang
going to Brgy. Real IV-A 1.921 15 C 0.388 0.200 0.300 - - - 88.80 *88.80% V. Satisfactory
Goodvibe Builders, Inc. 32686 Conc. of FMR @ Nancayasan I 0.475 40 C 0.223 0.300 0.300 - - - 82.30 *82.30% V. Satisfactory
Gospa Construction 15353 Impvt./Rehab. of MPB NCR 0.480 90 C 0.349 0.257 0.300 - - - 90.60 *90.60% Outstanding
Gowil Builders 18733 Conc. of FMR @ Brgy. Awihao VII 0.953 60 C 0.324 0.175 0.300 - - - 79.90 81.46% V. Satisfactory
Gowil Builders 18733 Const. of MPB, Bry. Cabitoonan VII 1.429 90 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
Gowil Builders 18733 Const./Completion of MPB (Covered Court) VII 4.225 120 C 0.417 0.197 0.300 - - - 91.40 *91.40%
V. Satisfactory
Gowil Builders 18733 Const./Completion of MPB (Covered Court) VII 1.406 120 C 0.389 0.055 0.300 - - - 74.40 *74.40%
Poor
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page182
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Gowil Builders 18733 Repair/Rehab. of Roads at N. Bacalso Ave. VII 4.795 10 C 0.276 0.300 0.300 - - - 87.60 *87.60%
V. Satisfactory
GP Construction 18653 Const. of MPB V 1.872 90 C 0.390 0.200 0.300 - - - 89.00 85.92% V. Satisfactory
GP Construction 18653 Const. of Spillway V 0.378 90 C 0.367 0.200 0.300 - - - 86.70 *86.70% V. Satisfactory
GPJ Construction 10613 Conc. of Makati Ave. (Phase III) NCR 0.712 30 C 0.398 0.300 0.300 - - - 99.80 *99.80% Outstanding
Grace Const. Corp./Dipolog Top Const. Dev't. Corp (JV) JV-08-016 Dipolog Airport Development
Project DOTC 163.779 360 O 0.352 0.300 0.150 0.030 0.051 0.050 93.30 -
Grace Construction Corporation 3771 Asphalt Overlay along Ozamis-Oroquieta Road X 9.634 120 C 0.291 0.200 0.300 - - - 79.10 *79.10%
Satisfactory
Grace Construction Corporation 3771
Completion of Tagoloan Parallel Bridge & Approaches along
Butuan-Cagyan de Oro-Iligan Road(SA #3)
X 54.184 390 O 0.396 0.300 0.100 0.030 0.055 0.100 98.10 -
Grace Construction Corporation 3771 Conc. of Oroquieta-Calamba Mt. Road X 2.863 120 C 0.294 0.300 0.300 - - - 89.40 85.02%
V. Satisfactory
Grace Construction Corporation 3771Const. of 108 m Steel Truss Bridge with one Pier Steel
ComponentsIX 62.851 365 O 0.331 0.291 0.100 0.022 0.033 0.100 87.70 -
Grace Construction Corporation 3771 Const. of Cagayan de Oro City 3rd Bridge & Approaches Phase V X 16.854 195 C 0.395 0.300 0.300 - - - 99.50 86.56%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page183
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Grace Construction Corporation 3771 Const. of Cagayan de Oro Third Bridge & Access Road Phase VI X 72.905 450 O 0.365 0.251 0.050 0.030 0.045 0.067 80.80 -
Grace Construction Corporation 3771 Const. of Cagayan de Oro Third Bridge & Access Road Phase VI X 72.905 450 O 0.365 0.300 0.100 0.030 0.035 0.100 93.00 -
Grace Construction Corporation 3771 Const. of Kipit II Bridge and Approaches IX 69.136 470 O 0.338 0.300 0.100 0.030 0.043 0.067 87.80 -
Grace Construction Corporation 3771 Const. of Kipit II Bridge and Approaches IX 69.136 470 O 0.293 0.193 0.100 0.024 0.037 0.100 74.70 -
Grace Construction Corporation 3771 Const. of Kipit II Bridge and Approaches IX 69.136 470 O 0.284 0.293 0.000 0.030 0.042 0.100 74.90 -
Grace Construction Corporation 3771 Const. of Limpapa Bridge & Approaches IX 60.097 360 O 0.226 0.240 0.100 0.030 0.047 0.100 74.30 -
Grace Construction Corporation 3771 Const. of Opao Bridge & Approaches IX 71.415 360 O 0.361 0.203 0.100 0.030 0.035 0.100 82.90 -
Grace Construction Corporation 3771 Const. of Tagoloan Bridge & Approaches X 38.345 450 O 0.340 0.300 0.100 0.030 0.045 0.100 91.50 -
Grace Construction Corporation 3771 Const. of Tagoloan Bridge & Approaches X 38.345 450 O 0.353 0.162 0.100 0.030 0.035 0.100 78.00 -
Grace Construction Corporation 3771 Const. of Upper Makar Bridge I XII 8.582 160 C 0.392 0.200 0.300 - - - 89.20 *89.20% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page184
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Grace Construction Corporation 3771
Const./Impv't. (PCCP) of CP-D: Sect. A-Monte Alegre Jct.-Aurora Road Sect. B-Monte Alegre Jct.-
Molave Road
KFAED 310.371 791 C 0.378 0.300 0.000 - - - 67.80 81.29% V. Satisfactory
Grace Construction Corporation 3771Imprv't./Repair of General Santos-Apopong-Marbel Road, Going to
CotabatoXII 18.891 90 O 0.367 0.240 0.150 0.030 0.035 0.050 87.20 -
Grace Construction Corporation 3771
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-Boston) Manay-Caraga Section,
Phase I
XI 192.466 898 O 0.347 0.300 0.100 0.030 0.037 0.100 91.40 -
Grace Construction Corporation 3771
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-Boston) Manay-Caraga Section,
Phase I
XI 192.466 898 O 0.367 0.300 0.100 0.030 0.030 0.100 92.70 -
Grace Construction Corporation 3771
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-Boston) Manay-Caraga Section,
Phase I
XI 192.466 898 O 0.246 0.300 0.100 0.030 0.060 0.100 83.60 -
Grace Construction Corporation 3771
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-Boston) Manay-Caraga Section,
Phase II
XI 178.716 862 O 0.324 0.300 0.100 0.030 0.060 0.100 91.40 -
Grace Construction Corporation 3771
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-Boston) Manay-Caraga Section,
Phase II
XI 178.717 862 O 0.322 0.300 0.150 0.030 0.060 0.050 91.20 -
Grace Construction Corporation 3771
Impvt./Conc. Paving of Dapitan City-Dakak Road, along Dapitan City-Dakak Coastal Loop Road
Phase II
IX 18.631 223 C 0.367 0.200 0.300 - - - 86.70 77.64% Satisfactory
Grace Construction Corporation 3771 Impvt./Conc. Paving of Dapitan City-Dakak Road, Phase I IX 48.030 340 O 0.400 0.300 0.100 0.018 0.051 0.100 96.90 -
Grace Construction Corporation 3771 Impvt./Conc. Paving of Dapitan City-Dakak Road, Phase I IX 48.038 340 O 0.329 0.229 0.100 0.030 0.038 0.100 82.60 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page185
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Grace Construction Corporation 3771 Impvt./Conc. Paving of Dapitan City-Dakak Road, Phase I IX 48.038 340 O 0.360 0.270 0.100 0.030 0.042 0.100 90.20 -
Grace Construction Corporation 3771Impvt./Rehab. of Butuan-Cagayan de Oro-Iligan Road, Salay-Dampil,
Lagonglong Section, LoocX 9.592 120 C 0.242 0.237 0.300 - - - 77.90 *77.90%
Satisfactory
Grace Construction Corporation 3771 Impv't/Conc. Paving of Dapitan City-Dakak Road, Phase II IX 47.488 702 O 0.337 0.277 0.150 0.030 0.035 0.050 87.90 -
Grace Construction Corporation 3771 Installation of Road Safety Devicesalong Dobleston-Butadon Road X 9.943 60 C 0.419 0.133 0.300 - - - 85.20 *85.20%
Satisfactory
Grace Construction Corporation 3771
Maint./Rehab. & Imp. of National Arterial & Secondary Rd.,
Oroquieta-Plaridel-Calamba-Sapang Dalaga Rd.
X 4.780 70 C 0.301 0.300 0.300 - - - 90.10 88.54% V. Satisfactory
Grace Construction Corporation 3771Rehab./Impvt. of Sayre Highway,
PCC to Damulog Section (Selective Section)
X 18.538 120 C 0.383 0.200 0.300 - - - 88.30 81.10% V. Satisfactory
Grace Construction Corporation/Ulticon Builders, Inc.
(JV) JV-05-061
Reconst. of Padada Bridge along Digos-Makar Road inc. Const. of Bypass Bridge and Approaches
XI 226.982 602 O 0.354 0.300 0.050 0.030 0.060 0.067 86.10 -
Grace Construction Corporation/Ulticon Builders, Inc.
(JV) JV-05-061
Reconst. of Padada Bridge along Digos-Makar Road inc. Const. of Bypass Bridge and Approaches
XI 226.982 602 O 0.373 0.300 0.050 0.030 0.065 0.067 88.50 -
Grace Construction Corporation/Ulticon Builders, Inc.
(JV) JV-05-061
Reconst. of Padada Bridge along Digos-Makar Road inc. Const. of Bypass Bridge and Approaches
XI 226.982 659 O 0.356 0.300 0.070 0.030 0.037 0.067 86.00 -
Grace Llan Const. & General Mdse. 1847 Const. of 2 Storey 8 Cl Sch. Bldg.
@ BNHS IV-A 14.247 150 C 0.389 0.231 0.300 - - - 92.00 79.40% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page186
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Graia Const. & Supply (Formerly: Graia Const. & Supplies 30826
Impvt./Rehab. of Mc-Donald Junction-Aguinaldo via Talaba
RoadIV-A 14.449 15 C 0.344 0.300 0.300 - - - 94.40 *94.40%
Outstanding
Graia Const. & Supply (Formerly: Graia Const. & Supplies) 30826 Repair/Rehab. Maragondon-
Magallanes Road IV-A 9.629 25 C 0.479 0.133 0.300 - - - 91.20 *91.20% V. Satisfactory
Granby Trading & Construction 27554 Conc. of Bayanan-Tiguihan Pola Port Access Road IV-B 4.747 75 C 0.398 0.133 0.300 - - - 83.10 77.46%
Unsatisfactory
Granby Trading & Construction 27554 Concreting of Brgy. Road @ Brgy. Sabang IV-A 1.917 150 C 0.386 0.200 0.300 - - - 88.60 88.55%
V. Satisfactory
Granby Trading & Construction 27554 Const. of Malvar Public Market IV-A 3.855 90 C 0.347 0.200 0.300 - - - 84.70 88.55% V. Satisfactory
Grand Builders 6845 Conc. of Tubod-Ganassi Road X 10.832 125 C 0.300 0.300 0.000 - - - 60.00 76.92% Satisfactory
Grand Builders 6845 Rehab. of Linamon-Zamboanga Road, Tubod Section X 9.057 150 C 0.306 0.300 0.000 - - - 60.60 75.60%
Satisfactory
Grand Tower Engineering Technology 31946
Const. of Library & Multi-Purpose HE Type Building (P-I) BNHS
AnnexX 0.471 90 C 0.343 0.300 0.300 - - - 94.30 83.59%
V. Satisfactory
Grand Tower Engineering Technology 31946 Const. of MPB @ Nabag-o X 0.471 120 C 0.346 0.300 0.300 - - - 94.60 66.46%
Fair
Great Lakes Enterprises 31429 Const. of Melgar Seawall IV-B 4.775 90 C 0.267 0.200 0.300 - - - 76.70 81.14% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page187
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Greco Construction and Supply 21884 Rehab./Asphalting along MSDR West Service Road NCR 4.825 20 C 0.270 0.300 0.300 - - - 87.00 *87.00%
V. Satisfactory
Green Horizons Landscapers and Developers, Inc. 18802
Conc. of Calapan South Road (Conc./Impvt. of Pasi II & Happy
Valley Section)IV-B 28.906 240 C 0.205 0.287 0.300 - - - 79.20 82.86%
V. Satisfactory
Green Horizons Landscapers and Developers, Inc. 18802 Conc. of CNR San Teodoro-Puerto
Galera Road, Tamaraw Section IV-B 19.165 210 C 0.363 0.300 0.300 - - - 96.30 91.02% Outstanding
Green Horizons Landscapers and Developers, Inc. 18802 Const. of MPB @ Sitio IV Agua IV-B 1.899 133 C 0.351 0.200 0.300 - - - 85.10 85.10%
V. Satisfactory
Greenwall Construction 14457 Repair/Impvt./Rehab. of San Luis-Ma. Aurora-Catañeda Road III 4.624 20 C 0.353 0.200 0.300 - - - 85.30 *85.30%
V. Satisfactory
Greg Construction and Trading 19455 Const. of Classrooms at Dr. Arcadio NHS NCR 4.770 90 C 0.253 0.200 0.300 - - - 75.30 78.31%
Satisfactory
Greyrock Construction 9296 Reconst. of Zamboanga City-Labuan-Limpapa Road IX 12.273 128 C 0.455 0.200 0.300 - - - 95.50 91.24%
V.Satisfactory
Guinhalinan Construction & Concrete Aggregates Supplies 28965 Completion of Baywalk XIII 1.910 150 C 0.320 0.300 0.300 - - - 92.00 92.00%
Outstanding
Guinhalinan Construction & Concrete Aggregates Supplies 28965 Const. of Flood Control Structures
along Shoreline XIII 1.920 60 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory
Guinhalinan Construction & Concrete Aggregates Supplies 28965 Rehab. of Tabon-Labisma-Lawigan
Road XIII 3.745 90 C 0.332 0.200 0.300 - - - 83.20 84.10% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page188
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
GVN Builders 29577 Rehab. of MPB @ Cupang West III 1.410 55 C 0.320 0.153 0.300 - - - 77.30 *77.30% Satisfactory
GVR Construction & Supply 31603 Const. of MPB (Atty. G.R. Banaag RCYDC) XIII 0.959 60 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
H R B Construction 10528 Concrete Pedestrian Bridge, San Francisco V 0.946 94 C 0.422 0.200 0.300 - - - 92.20 *92.00%
V. Satisfactory
H R B Construction 10528 Const. of Multi-Purpose Building (Phase III) San Ramon Pilot H/S V 0.473 90 C 0.457 0.133 0.300 - - - 89.00 *89.00%
Satisfactory
H R B Construction 10528 Const./Impvt. of Multi-Purpose Bldg. @ Gubat V 0.141 90 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
H R B Construction 10528 Opening of Salvacion-Del Rosario Road V 4.703 90 C 0.267 0.300 0.300 - - - 86.70 79.20%
Satisfactory
H.G. Lopez Construction 17691 Const. of Dagupan MPB CAR 0.466 90 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory
H.G. Lopez Construction 17691 Const. of Multi-Purpose Building (Phse II) Town Proper I 2.817 160 C 0.396 0.300 0.300 - - - 99.60 86.86%
V. Satisfactory
H.G. Lopez Construction 17691Const. of Road Leading to Christ the Redeemer, Brgy.1 (Lubrins
Hts.) I 1.099 60 O 0.328 0.238 0.100 0.022 0.018 0.100 80.60 -
H.G. Lopez Construction 17691 Const. of TESDA MPB CAR 1.906 60 C 0.350 0.200 0.300 - - - 85.00 88.15% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page189
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
H.G. Lopez Construction 17691Construction of Road leading to
Christ the Redeemer, Brgy. 1 (Lubrin Hts.)
I 1.099 88 C 0.409 0.172 0.300 - - - 88.10 83.60%Satisfactory
H.L.J. Construction & Enterprises 18080 Completion of Road Cementing and Drainage Canal VII 0.474 55 C 0.328 0.200 0.300 - - - 82.80 83.04%
V. Satisfactory
H.L.J. Construction & Enterprises 18080 Conc. of Balasan-Carles Road, Guinticgan-Abong Sction VI 15.755 405 C 0.226 0.285 0.300 - - - 81.10 85.80%
V. Satisfactory
H.L.J. Construction & Enterprises 18080 Conc. of Boracay Road (Lapus-Lapus, Fairways Sect.) VI 17.915 240 O 0.259 0.253 0.100 0.015 0.016 0.067 71.00 -
H.L.J. Construction & Enterprises 18080 Conc. of Boracay Road (Lapus-Lapus, Fairways Sect.) VI 19.686 289 O 0.312 0.296 0.150 0.018 0.050 0.033 85.90 -
H.L.J. Construction & Enterprises 18080 Conc. of Datag-Kamulayan FMR VII 1.267 90 C 0.291 0.300 0.300 - - - 89.10 *89.10% V. Satisfactory
H.L.J. Construction & Enterprises 18080 Conc. of Iloilo-Capiz Road (New Route) VI 18.190 270 C 0.348 0.300 0.300 - - - 94.80 91.04%
Outstanding
H.L.J. Construction & Enterprises 18080Conc. of Jct. Bearins along Tapi-
Magballo Road (Bantayan Section) at Brgy. Bantayan
VI 4.743 120 C 0.247 0.300 0.000 - - - 54.70 71.32% Satisfactory
H.L.J. Construction & Enterprises 18080Conc. of Jct. Bearins-Salong Tapi-Magballo Road (Magballo Section)
at Brgy. MagballoVI 4.662 120 C 0.268 0.300 0.000 - - - 56.80 72.16%
Satisfactory
H.L.J. Construction & Enterprises 18080
Conc. Paving of National Road along Dancalan-Candoni Road,
km. 104+058 - km. 104+372, Brgy. Dancalan
VI 2.957 182 C 0.392 0.200 0.300 - - - 89.20 85.66% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page190
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
H.L.J. Construction & Enterprises 18080
Conc. Paving of National Road along Dancalan-Candoni Road,
km. 105+447 - km. 105+777, Brgy. Dancalan
VI 3.047 120 C 0.436 0.200 0.300 - - - 93.60 82.20% Satisfactory
H.L.J. Construction & Enterprises 18080 Concrete Paving of Brgy. Carol-an-Ayungon Farm-to-Market Road VI 1.518 120 C 0.228 0.200 0.300 - - - 72.80 77.12%
Satisfactory
H.L.J. Construction & Enterprises 18080 Const. of 1 CL @ @ Hermenegilda F. Gloria Memorial H/S VII 0.432 105 C 0.301 0.300 0.300 - - - 90.10 90.45%
Outstanding
H.L.J. Construction & Enterprises 18080 Const. of 1 Unit 1 CL School Bldg. @ Daan Banua E/S VI 0.378 45 C 0.380 0.245 0.300 - - - 92.50 91.59%
Outstanding
H.L.J. Construction & Enterprises 18080 Const. of Naiba-Maningcao Road VII 0.940 100 O 0.308 0.234 0.100 0.008 0.025 0.100 77.50 -
H.L.J. Construction & Enterprises 18080 Const. of Pedestrian Overpass VII 4.522 135 C 0.398 0.300 0.300 - - - 99.80 94.25% Outstanding
H.L.J. Construction & Enterprises 18080 Const. of Sac-sac Road Lined Canal VII 1.373 145 C 0.300 0.300 0.300 - - - 90.00 *90.00%
Outstanding
H.L.J. Construction & Enterprises 18080 Const. of San Jose (Canaway) River Control Project VII 4.666 110 C 0.330 0.200 0.300 - - - 83.00 79.88%
Satisfactory
H.L.J. Construction & Enterprises 18080Impvt. of Roads leading to the
Twin Springs Project, Brgy. Bunga to Brgy. Baslay Road
VII 9.311 145 O 0.323 0.236 0.100 0.030 0.027 0.067 78.30 -
H.L.J. Construction & Enterprises 18080 Reconst. of Bacolod South Kabankalan Road VI 16.997 180 O 0.261 0.292 0.150 0.030 0.055 0.033 82.10 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page191
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
H.P.L. General Construction 22289 Concreting of Various Municipal and Barangya Roads II 1.708 120 O 0.329 0.240 0.100 0.022 0.030 0.100 82.10 -
H.S. Oaminal Construction & General Merchandise 10578 Completion of Dormitory Bldg. I
Phase I DOST 5.829 150 O 0.320 0.300 0.128 0.017 0.043 0.023 83.10 -
H.T.L. Construction 3962 Conc. of Burgos-Gen. Aguinaldo Road II 14.459 120 O 0.302 0.231 0.100 0.030 0.033 0.067 76.30 -
H.T.L. Construction 3962 Conc. of Burgos-Gen. Aguinaldo Road II 14.459 120 C 0.415 0.200 0.300 - - - 91.50 82.38%
Satisfactory
H.T.L. Construction 3962 Redecking of Ipil Bridge along Daang Maharlika II 11.560 90 C 0.438 0.200 0.300 - - - 93.80 84.08%
Satisfactory
Haidee Construction - AL B. Construction (JV) JV-07-081
Impvt./Widening/Conc. of McArthur Highway (MNR) Package IV, Apalit-San Simon-Minalin-Sto.
Tomas Section
III 64.127 180 C 0.443 0.200 0.300 - - - 94.30 *94.30%V. Satisfactory
Haidee Construction and Development Corp. 10365 Replacement of Dalaquitan Bridge
& Approaches, Package VI III 82.045 180 C 0.443 0.200 0.300 - - - 94.30 *94.30%V. Satisfactory
Haidee Construction and Development Corp./Al-B Const.
(JV)
SL2-SN-00774 / JV-
06-078
Impvt./Widening of Mc Arthur Highway, Phase III (Package III),
Replacement of Labangan Bridge No. 7
III 115.799 330 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding
Haidee Construction and Development Corporation 10365 Completion of Friendship Bridge &
Approaches, Phase V III 23.917 240 O 0.303 0.300 0.100 0.030 0.040 0.100 87.30 -
Haidee Construction and Development Corporation 10365 Const. of Friendship Bridge &
Approaches, Phase III III 23.478 150 O 0.274 0.204 0.100 0.030 0.054 0.100 76.20 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page192
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Halrey Construction, Inc. 2267 Const. (Conc.) of Marikina-Infanta Rd. P-II, Rizal Side IV-A 43.396 280 C 0.347 0.200 0.300 - - - 84.70 84.70%
V.Satisfactory
Halrey Construction, Inc. 2267Geometric
Improvement/Rehab./Reblocking of Portions of EDSA Q.C.
NCR 9.530 90 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
Halrey Construction, Inc. 2267Impvt./Conc. Blocking of
Katipunan Ave. & E. Rodriguez Jr. C-5 (Shuster St. to Ortigas Ave.)
NCR 14.314 150 C 0.329 0.300 0.300 - - - 92.90 95.48% Outstanding
Halrey Construction, Inc. 2267Rehab. (Concrete Blocking) of
EDSA from Quezon Ave. to Annapolis (South Bound)
NCR 9.554 150 C 0.382 0.300 0.300 - - - 98.20 96.88% Outstanding
Halrey Construction, Inc. 2267 Rehab./Reconst. (Conc.) of Naic-Jct.-Caylabne Road IV-A 28.922 180 O 0.328 0.300 0.100 0.030 0.028 0.100 88.60 -
Hanjin Heavy Industries & Const. Co. Ltd. FC-98-329
Const./Impv't. (PCCP) of C.P.A. Sect. A-Tukuran Rd., Dobliston
Jct. & Sect. B-Kapatagan-Dobliston Jct. Road
KFAED 633.001 1,189 C 0.304 0.300 0.300 - - - 90.40 89.65% V. Satisfactory
Hanjin Heavy Industries & Const. Co. Ltd. FC-98-329 CP-A: Const./Impvt. of Kapatagan-
Dobliston Jct. Road (Addendum) KFAED 1,305.817 365 O 0.396 0.300 0.100 0.030 0.056 0.100 98.20 -
Hanjin Heavy Industries & Const. Co. Ltd. FC-98-329 CP-A: Const./Impvt. of Kapatagan-
Dobliston Jct. Road (Addendum) KFAED 202.745 365 O 0.341 0.300 0.100 0.030 0.060 0.100 93.10 -
Hanjin Heavy Industries & Const. Co. Ltd.
SL2-SN-00646/FC-
03-010
IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of Tigum
& Aganan RiverMFCP I 1,194.106 1,080 O 0.391 0.200 0.100 0.030 0.055 0.200 97.60 -
Hanjin Heavy Industries & Const. Co. Ltd.
SL2-SN-00646/FC-
03-010
IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of Tigum
& Aganan RiverMFCP I 1,194.106 1,080 O 0.400 0.300 0.100 0.030 0.047 0.100 97.70 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page193
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Hanjin Heavy Industries & Const. Co. Ltd.
SL2-SN-00646/FC-
03-010
IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of Tigum
& Aganan RiverMFCP I 1,305.817 1,080 O 0.360 0.200 0.100 0.030 0.065 0.200 95.50 -
Hanjin Heavy Industries & Const. Co. Ltd.
SL2-SN-00646/FC-
03-010
IFCP Phase II, Package I, Const. of Jaro Floodway & Impvt. of Tigum
& Aganan RiverMFCP I 1,305.817 1,080 O 0.355 0.200 0.100 0.030 0.070 0.200 95.50 -
Hanjin Heavy Industries & Construction Co. Ltd.
SL2-SN-000445
Bohol Cicumferential Road Impv't. Project CP-1, Valencia-Tagbilaran-
Calape SectionPJHL 1,000.084 1,052 C 0.382 0.300 0.300 - - - 98.20 97.60%
Outstanding
Hanjin Heavy Industries & Construction Co. Ltd.
SLN-SN-000452
Bohol Irrigation Project, Stage 2 (BHIP2-C-2) BHIP 608.709 1,416 C 0.331 0.300 0.300 - - - 93.10 93.10%
Outstanding
Hanjin Heavy Industries & Construction Co. Ltd. FC-98-216 CP MN-A: Iligan-Aurora Road 6th
Road Project ADB 714.824 1,200 C 0.385 0.300 0.300 - - - 98.50 96.85% Outstanding
Hanjin Heavy Industries & Construction Co. Ltd. FC-98-329 CP-A Section A: Const./Impv't. of
Tukuran-Dobliston Road KFAED 577.304 1,005 O 0.368 0.297 0.050 0.030 0.042 0.100 88.70 -
Hanjin Heavy Industries & Construction Co. Ltd. FC-98-329 CP-A Section A: Const./Impv't. of
Tukuran-Dobliston Road KFAED 577.304 1,004 O 0.330 0.300 0.100 0.030 0.054 0.100 91.40 -
Hanjin Heavy Industries & Construction Co. Ltd.
SL2-SN-00556
CP-III, Reconst. of Four (4) Bridges along Arterial Roads Project,
Phase IV (Baroro Bridge)PJHL 128.692 720 O 0.363 0.300 0.070 0.030 0.050 0.067 88.00 -
Hanjin/Kurimoto JV SL2-SN-000452 Bohol Irrigation Project, Stage 2 NIA-IV 1561.392 1,352 C 0.380 0.300 0.300 - - - 98.00 98.00%
Outstanding
Hausland Construction 32378 Const. of MPB at Minuyan Proper Towerville E/S III 1.422 75 C 0.232 0.300 0.300 - - - 83.20 *83.20%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page194
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Hazama/ Taisei/ Nippon Steel HTN JV
S-05-09-001
Subic-Clark-Tarlac Expressway Project BCDA 9,097.880 850 O 0.374 0.279 0.070 0.030 0.056 0.033 84.15 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.352 0.300 0.070 0.024 0.047 0.033 82.58 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.357 0.300 0.070 0.030 0.042 0.000 79.90 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.350 0.293 0.050 0.024 0.047 0.067 83.07 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.354 0.300 0.070 0.030 0.060 0.033 84.70 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.335 0.295 0.070 0.030 0.051 0.033 81.49 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.385 0.289 0.070 0.018 0.051 0.067 88.08 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.373 0.275 0.070 0.030 0.047 0.033 82.79 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.374 0.279 0.070 0.030 0.056 0.033 84.15 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.378 0.298 0.050 0.030 0.047 0.033 83.62 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page195
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.365 0.296 0.050 0.012 0.051 0.033 80.69 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.362 0.299 0.050 0.023 0.056 0.067 85.58 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.362 0.295 0.050 0.030 0.047 0.033 81.69 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.389 0.299 0.070 0.030 0.042 0.033 86.40 -
Hazama/ Taisei/ Nippon Steel HTN JV FC-04-025 Subic-Clark-Tarlac Expressway
Project-Package 2 BCDA-III 9,097.880 850 O 0.378 0.293 0.070 0.024 0.042 0.067 87.41 -
Hazama-Taisei-Nippon Steel (HTN JOINT VENTURE) FC-04-025
Subic-Clark-Tarlac Expressway Project, Contract Package 2 of Additional Access Roads and
Interchange
BCDA 596.889 327 O 0.385 0.297 0.050 0.030 0.061 0.067 88.95 -
Hazama-Taisei-Nippon Steel (HTN JOINT VENTURE) FC-04-025
Subic-Clark-Tarlac Expressway Project, Contract Package 2 of Additional Access Roads and
Interchange
JBIC 596.889 327 O 0.348 0.300 0.050 0.030 0.038 0.067 83.25 -
HB Construction 32855 Const./Rehab of Drainage System, Sitio, Payong, Area, Phase 2 NCR 0.712 30 C 0.437 0.116 0.300 - - - 85.30 *85.30%
Satisfactory
HCM Construction Corporation 19382 Const. of Las Piñas-Muntinlupa-San Pedro Link Road NCR 9.519 75 C 0.369 0.300 0.300 - - - 96.90 *96.90%
Outstanding
HCM Construction Corporation 19382 Const. of Road/Bridge NCR 14.374 150 O 0.374 0.300 0.100 0.022 0.063 0.100 95.90 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page196
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
HCM Construction Corporation 19382 Const. of Road/Bridge NCR 14.374 150 O 0.384 0.300 0.100 0.030 0.051 0.100 96.50 -
HCM Construction Corporation 19382Const. of Slope Protection for the Zapote River Impv't Projects and
its TributariesNCR 18.753 120 C 0.400 0.198 0.300 - - - 89.80 *89.80%
V.Satisfactory
HCM Construction Corporation 19382 Slope Protection of Creek @ Brgy. Pulang Lupa & Manuyo NCR 9.600 130 C 0.376 0.300 0.300 - - - 97.60 94.84%
Outstanding
Henry S. Oaminal Const. & General Merchandise 10578 Conc. of Jct. (LIR) Carmen-
Sagbayan-Bacane Road VII 22.646 250 O 0.293 0.222 0.000 0.020 0.032 0.100 66.70 -
Henry S. Oaminal Const. & General Merchandise 10578
Concreting of Junction Dat-an, Carmen-Sierra Bullones-Pilar
RoadVII 32.041 238 O 0.333 0.234 0.150 0.030 0.051 0.050 84.80 -
Henry S. Oaminal Construction and General Merchandise 10578 Completion of Dormitory bldg.
Phase I DOST 5.829 150 O 0.320 0.300 0.128 0.017 0.043 0.023 74.80 -
Henry S. Oaminal Construction and General Merchandise 10578 PSHS CVC Construction of 3-
storey ACA Bldg. DOST 13.530 339 C 0.359 0.289 0.300 - - - 94.80 94.80% Very Satisfactory
Herbana Builders and Supply 32523 Construction of Sta. Cruz River Control V 4.680 180 O 0.360 0.233 0.150 0.030 0.054 0.050 87.70 -
Herbana Builders and Supply 32523 Rehab. of Jct. Tawad-Balud Road V 4.809 60 C 0.428 0.133 0.300 - - - 86.10 *86.10% Satisfactory
Herbert Malmis General Merchandise & Contractor, Inc. 4593 Concrete Paving of Tagbilaran-
Sikatuna Road VII 6.495 130 C 0.359 0.300 0.300 - - - 95.90 86.60% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page197
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Herefold Builders Construction and Supply 20789 Conc. of Road at Sinala-Gulibay IV-A 3.059 90 C 0.324 0.189 0.300 - - - 81.30 *81.30%
V. Satisfactory
Herefold Builders Construction and Supply 20789 Impvt.of MPB IV-A 0.099 45 C 0.417 0.200 0.300 - - - 91.70 87.36%
Satisfactory
HG III Construction & Dev't. Corp. 947 NBP Resettlement Project, Phase III NHA 155.483 270 O 0.16 0.24 0.1 0.02 0.0175 0.1 63.75 -
HG III Construction and Dev't Corp. 947 Sct. Ranger Housing Project,
Phase III NHA 49.688 180 O 0.395 0.300 0.100 0.030 0.047 0.100 97.19 -
HGG Builders and Supply 17824 Completion of Academic Building Phase III DOST 13.127 240 C 0.374 0.299 0.300 - - - 97.32 97.32%
Outstanding
HGG Builders and Supply 17824 Completion of Dormitory bldg. Phase III DOST 18.930 290 C 0.374 0.297 0.300 - - - 97.10 97.10%
Outstanding
HGG Builders and Supply 17824 Conc. of Brgy. Road, Andaya Highway Jct. to Municipal Hall V 0.926 120 C 0.336 0.200 0.300 - - - 83.60 *83.60%
V. Satisfactory
HGG Builders and Supply 17824 Const. of Conc. Drainage Canal, Brgy. Bigajo Norte V 0.946 120 C 0.396 0.200 0.300 - - - 89.60 *89.60%
V. Satisfactory
HGG Builders and Supply 17824 Const. of Multi-Purpose Building V 1.929 120 C 0.400 0.249 0.300 - - - 94.90 89.93% V. Satisfactory
HGG Builders and Supply 17824 Const. of Public Market, Brgy. Barcelona V 1.891 120 C 0.359 0.200 0.300 - - - 85.90 *85.90%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page198
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
HG-III Construction and Development Corporation 8431 Upgrading of Pantabangan-Canili-
Baler Road, Cadaclan Section III 46.840 120 O 0.282 0.300 0.150 0.030 0.028 0.050 84.00 -
HG-III Construction and Dev't. Corp. 8431 Land Development of Scout
Ranger Housing Project, Ph. 3 NHA 49.597 180 C 0.385 0.299 0.300 - - - 98.40 98.40% Outstanding
Hibiscus Trading and Construction Services 28280
Completion of Pedestrian Overpass Across Commonwealth
Ave.NCR 1.873 60 C 0.267 0.300 0.300 - - - 86.70 85.98%
V. Satisfactory
Hibiscus Trading and Construction Services 28280
Package 8: a) Renovation/Improvement of Multi-Purpose Bldg. Brgy. Socorro: b)
Completion of Multi-Purpose Bldg. Brgy. Masagana
NCR 1.590 120 C 0.282 0.277 0.300 - - - 85.90 86.32% V. Satisfactory
Hibiscus Trading and Construction Services 28280 Repair/Rehab. of Multi-Purpose
Building NCR 2.687 120 C 0.294 0.300 0.300 - - - 89.40 88.14% V. Satisfactory
Hilmarc's Construction Corporation 2748 Rehab. of Rizal MPB, Sports
Center (Phase II) NCR 38.595 240 C 0.314 0.300 0.300 - - - 91.40 91.40% Outstanding
Hi-point Construction Corporation 30744 Rehab./Conc. of Roads VIII 4.563 180 C 0.125 0.200 0.300 - - - 62.50 *62.50%
Fair
Hi-point Construction Corporation 30744
Repair/Rehab. of Catarman-Mondragon Road along Catarman
BridgeVIII 9.600 180 C 0.244 0.200 0.300 - - - 74.40 77.07%
Unsatisfactory
Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.
Supply)
23385 Completion of Tokyo Bridge along Catanduanes Circ. Road V 14.379 210 O 0.400 0.298 0.100 0.020 0.019 0.100 93.70 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page199
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.
Supply)
23385 Const. of MPB BUPC Admin. Center (Phase II) V 15.759 210 C 0.367 0.200 0.300 - - - 86.70 88.66%
V. Satisfactory
Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.
Supply)
23385 Const. of Sabang MPB V 9.556 490 C 0.494 0.133 0.300 - - - 92.70 88.29% Satisfactory
Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.
Supply)
23385 Const./Widening of Washington Drive to Lakandul Drive V 9.550 130 C 0.372 0.101 0.300 - - - 77.30 *77.30%
Satisfactory
Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.
Supply)
23385 Dredging of Panganiran River V 19.188 90 C 0.388 - 0.500 - - - 88.80 *88.80% V. Satisfactory
Hi-Tone Construction & Development Corporation (Formerly: Lo-Tone Const.
Supply)
23385 Opening/Const. of Tagoytoy-Taladong Road (Phase I) V 14.249 120 C 0.363 0.262 0.300 - - - 92.50 91.84%
Outstanding
Hi-Tri Development Corporation 1758 Const.of Dr. Damian Reyes Mem. Rd. (Missing Link) IV-B 77.147 320 O 0.384 0.255 0.150 0.030 0.035 0.050 90.40 -
Hi-Tri Development Corporation 1758 Impvt. of Masbate-Malinta & Masbate-Mobo Road V 10.387 180 C 0.188 0.135 0.300 - - - 62.30 *62.30%
Fair
Hi-Tri Development Corporation 1758Rehab./Impvt. Along Pili-Tigaon-
Albay Bdry. Road, km. 472+080 to km. 480+000
V 4.680 60 C 0.221 0.300 0.300 - - - 82.10 *82.10% V. Satisfactory
HLC Construction and Development Corporation 8775 Rehab./Impvt. of Panabo Coastal
Road, Arieta Section XI 11.096 295 O 0.375 0.300 0.070 0.030 0.065 0.067 90.70 -
HLJ Construction & Enterprises 18080 Concreting of Roads VI 0.892 105 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page200
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
HLJ Construction & Enterprises 18080 Const. of Pedestrian Bridge @ Hibbard Avenue VII 4.472 120 O 0.325 0.300 0.100 0.030 0.047 0.100 90.20 -
HLJ Construction & Enterprises 18080Impvt. of Roads leading to the
Twin Springs Project, Brgy. Bunga to Brgy. Baslay Road
VII 9.311 145 C 0.443 0.200 0.300 - - - 94.30 84.70%Satisfactory
Hoger Construction 24128 Repair/Rehab. of Jct. Buenavista-Lawaan Rd. VIII 3.342 150 C 0.301 0.200 0.300 - - - 80.10 *80.10%
V. Satisfactory
Homefixmix Builders Center 29997 Concreting of Bugbugcao Barangay Road I 0.191 18 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
Homefixmix Builders Center 29997 Concreting of Pagdildilan Barangay Road, Brgy. Pagdildilan I 0.099 25 C 0.446 0.133 0.300 - - - 87.90 *87.90%
Satisfactory
Homefixmix Builders Center 29997 Construction of Multi-Purpose Building, Phase II I 1.880 120 O 0.324 0.300 0.150 0.015 0.012 0.033 83.40 -
Homeworld Engineering 14725
Rehab./Reconst. of Damaged Paved Nat'l Roads Generated from
PMS/HDM-4, Sum-ag-Abuanan Road
VI 31.087 471 O 0.266 0.281 0.150 0.030 0.060 0.050 83.70 -
Homeworld Engineering 14725
Rehab./Reconst. of Damaged Paved Nat'l Roads Generated from
PMS/HDM-4, Sum-ag-Abunan Road
VI 30.687 268 O 0.400 0.300 0.100 0.030 0.050 0.100 98.00 -
Hony Trading and Construction 26898
Const., Rehab., Replacement, Completion & Repair of
Elementary & Secondary Sch. Bldg. at CP Teresa E/S
NCR 2.384 90 C 0.376 0.183 0.300 - - - 85.90 *85.90% V. Satisfactory
Horamabi Builders 24129Asphalt Overlay of Jct. Layac-Balanga-Mariveles Port Road
(Orion Section)III 1.924 8 C 0.381 0.200 0.300 - - - 88.10 *88.10%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page201
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Horamabi Builders 24129 Const. of MPB @ Bataan NHS III 1.881 90 C 0.253 0.300 0.300 - - - 85.30 77.53% Satisfactory
Horamabi Builders 24129Const. of One (1) CL School
Building @ Balanga Integrated Sch.
III 0.422 28 C 0.313 0.200 0.300 - - - 81.30 *81.30% V. Satisfactory
Horamabi Builders 24129 Const. of One (1) CL School Building @ Marina Bay E/S III 0.472 34 C 0.336 0.200 0.300 - - - 83.60 *83.60%
V. Satisfactory
Horamabi Builders 24129 Const. of Two (2) Classroom Sch. Bldg. @ E.C. Bernabe National HS III 0.887 58 C 0.366 0.187 0.300 - - - 85.30 89.64%
V.Satisfactory
Horamabi Builders 24129 Rehab. of Sch. Bldg. at Pablo Roman High School III 0.754 34 C 0.323 0.300 0.300 - - - 92.30 *92.30%
Outstanding
Horamabi Builders 24129Repair & Rehab. of Gov. J.J. Linao
Road, Balanga City to Bagac Section
III 9.446 16 C 0.273 0.205 0.300 - - - 77.80 *77.80% Satisfactory
Houserock Builders and Trading 18822 Rehab./Impvt. Along A.H. Lacson Ave. NCR 0.933 30 C 0.318 0.200 0.300 - - - 81.80 *81.80%
V. Satisfactory
HPL General Construction 22289 Completion of DPWH-NVSDEO Bldg. II 2.700 152 C 0.363 0.200 0.300 - - - 86.30 86.30%
V. Satisfactory
HPL General Construction 22289 Completion of Multi-Purpose Building II 0.426 60 C 0.327 0.250 0.300 - - - 87.70 82.38%
V. Satisfactory
HPL General Construction 22289 Concreting of Various Municipal and Brgy. Roads II 1.708 120 C 0.323 0.300 0.300 - - 92.30 89.48%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page202
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
HPL General Construction 22289 Const. of Tupang River Control II 1.871 120 C 0.373 0.300 0.300 - - - 97.30 71.92% Satisfactory
HPL General Construction 22289Const./Replacement of
Camanauan Bridge, along Dugo-San Vicente Road (DVSR)
II 4.240 240 O 0.396 0.217 0.100 0.030 0.028 0.067 83.80 -
HPL General Construction 22289Const./Replacement of
Camanauan Bridge, along Dugo-San Vicente Road (DVSR)
II 4.240 313 C 0.479 0.200 0.000 - - - 67.90 74.26% Poor
HRB Construction 10528 Road Concreting of Sta. Cruz-Ratay (CSSAC School Campus) V 0.620 60 C 0.357 0.300 0.300 - - - 95.70 *95.70%
Outstanding
HVC Sagittarius Commercial and Construction 12954 Completion of Multi-Purpose
Bldg., XII 2.751 225 C 0.375 0.292 0.300 - - - 96.70 86.31% V. Satisfactory
HVC Sagittarius Commercial and Construction 12954
Conc. of Sarangani Davao del Sur Coastal Road, Kalatungan-Punsad
SectionXII 9.429 210 O 0.316 0.277 0.100 0.030 0.043 0.067 83.30 -
HVC Sagittarius Commercial and Construction 12954
Conc. of Sarangani Davao del Sur Coastal Road, Kalatungan-Punsad
SectionXII 9.429 210 O 0.384 0.300 0.150 0.030 0.048 0.033 94.50 -
HVC Sagittarius Commercial and Construction 12954 Const. of MPB @ Brgy. Sinolon XII 0.759 98 C 0.281 0.300 0.300 - - - 88.10 84.74%
V. Satisfactory
Hypro Construction and Development Corporation 32745 Const. of Mompong Flood Control IV-B 4.825 70 C 0.284 0.300 0.300 - - - 88.40 *88.40%
V. Satisfactory
I & E Construction 10410 Improvement/Rehab. of city Streets (Rueda & Navarro Sts.) VIII 1.908 20 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page203
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
I & E Construction 10410 Impvt. (Conc.) of Mahogany Ave. IV-A 9.552 60 C 0.336 0.200 0.300 - - - 83.60 80.66% V. Satisfactory
I & E Construction 10410 Impvt. of Drainage along Maharlika Highway VIII 3.779 120 C 0.379 0.200 0.300 - - - 87.90 87.00%
V. Satisfactory
I & E Construction 10410 Impvt./Conc. of Marikina-Infanta Road (marcos Hi-way) P-III IV-A 14.354 180 C 0.347 0.200 0.300 - - - *84.70 84.70%
V. Satisfactory
I & E Construction 10410 Impvt./Rehab. of Dr. Damian Reyes Road-Boac Side (Phase I) IV-B 14.239 85 C 0.299 0.200 0.300 - - - 79.90 *79.90%
Satisfactory
I & E Construction 10410 Impv't./Rehab. of Roadside Lopez-Buenavista Road IV-A 4.728 20 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
I & E Construction 10410Impvt./Rehab. of Tanauan-Dagami-
Burauen Road, San Miguel- Barugo Road
VIII 19.296 60 C 0.376 0.200 0.300 - - - 87.60 *87.60% V. Satisfactory
I & E Construction 10410 Rehab./Impvt. of Old Road MSR , Brgy. San Antonio IV-A 19.204 90 C 0.287 0.200 0.300 - - - 78.70 *78.70%
Satisfactory
I & E Construction 10410
Repair/Rehab./Impvt. of Nat'l Roads along Bagahupi-Babatngon
Road, Tanauan-Dagami Road, Mainit-San Miguel Santoil Road
VIII 24.097 140 C 0.372 0.300 0.300 - - - 97.20 *97.20% Outstanding
I M B Construction 13259 Conc. Paving of Brgy. Catmon-Daan VII 0.926 60 C 0.316 0.300 0.300 - - - 91.60 *91.60%
Outstanding
I.D.A. Jr Builders & Construction Supply 32022 Const. of Drainage System @
Brgy. 69 & 14 VIII 0.964 60 C 0.471 0.200 0.300 - - - 97.10 *97.10% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page204
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
I.F. Blanco's Construction 25350 Conc. of Lumangbayan-Pili Road IV-B 9.410 140 C 0.361 0.300 0.300 - - - 96.10 87.64% V. Satisfactory
I.F. Blanco's Construction 25350 Conc. of Zone 1, Marfrancisco Road IV-B 9.485 140 C 0.367 0.200 0.300 - - - 86.70 *86.70%
V. Satisfactory
I.F. Blanco's Construction 25350 Const. of 1 CL Sch. Bldg. @ Sinampad P/S IV-B 0.479 50 C 0.384 0.200 0.300 - - - 88.40 82.24%
V. Satisfactory
I.F. Blanco's Construction 25350 Const. of Manihala-Apnagan Road IV-B 4.710 160 C 0.298 0.230 0.300 - - - 82.80 86.80% V. Satisfactory
I.F. Blanco's Construction 25350 Const. of Orconuma River Control (Gabion Type) IV-B 4.714 40 C 0.287 0.257 0.300 - - - 84.40 *84.40%
V. Satisfactory
I.M. Construction Corporation 20074 Concrete Reblocking along Gov. A. Pascual St. NCR 4.744 90 O 0.336 0.300 0.100 0.030 0.047 0.100 91.30 -
IBC International Builders Corporation 8576 Asphalt Overlay along Bacolod
North Road VI 9.638 60 C 0.439 0.133 0.300 - - - 87.20 *87.20% Satisfactory
IBC International Builders Corporation 8576
Asphalt Overlay along Mambusao-Imbug Road, Km. 97+200-Km.
98+000VI 9.941 100 C 0.332 0.200 0.300 - - - 83.20 *83.20%
V. Satisfactory
IBC International Builders Corporation 8576 Asphalt Overlay at Iloilo-Capiz
Road (New Route) VI 11.400 55 C 0.345 0.276 0.300 - - - 92.10 *92.10% Outstanding
IBC International Builders Corporation 8576 Asphalt Overlay of Barotac Nuevo-
Dumangas-Dacutan Coastal Road VI 9.310 195 C 0.326 0.233 0.300 - - - 85.90 87.64% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page205
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
IBC International Builders Corporation 8576
Asphalting of Priority Gravel Road Gap along Guimaras Circumferential Road
VI 2.722 100 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory
IBC International Builders Corporation 8576 Completion of Cabano Bridge
(Final) VI 4.776 180 C 0.355 0.253 0.300 - - - 90.80 *90.80% Outstanding
IBC International Builders Corporation 8576 Conc. of Iloilo-Capiz Road (Old
Route) VI 28.319 374 C 0.434 0.200 0.300 - - - 93.40 82.78% Satisfactory
IBC International Builders Corporation 8576 Conc. of Mandurriao-Pacquiad
Road VI 4.811 210 C 0.315 0.300 0.300 - - - 91.50 91.50% Outstanding
IBC International Builders Corporation 8576 Conc. of Oton-Pakiad Road VI 9.176 300 C 0.343 0.066 0.300 - - - 70.90 74.98%
Satisfactory
IBC International Builders Corporation 8576 Const. of Banayan Bridge VI 15.499 230 O 0.400 0.300 0.070 0.030 0.030 0.067 89.70 -
IBC International Builders Corporation 8576 Const. of Banayan Bridge VI 15.499 230 O 0.400 0.300 0.030 0.030 0.033 0.067 86.00 -
IBC International Builders Corporation 8576 Const. of Banayan Bridge VI 15.499 240 O 0.400 0.300 0.030 0.030 0.043 0.067 87.00 -
IBC International Builders Corporation 8576 Kalibo Airport Development
Project DOTC 48.088 300 O 0.386 0.273 0.150 0.030 0.057 0.050 94.60 -
IBC International Builders Corporation 8576 Preventive Maintenance, Asphalt
Overlay of Iloilo-Capiz Road VI 14.430 40 C 0.379 0.194 0.300 - - - 87.30 *87.30% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page206
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
IBC International Builders Corporation 8576 Rehab. of Batiano Bridge @ Molo
Blvd. VI 4.375 150 C 0.286 0.300 0.300 - - - 88.60 86.56% V. Satisfactory
IBC International Builders Corporation 8576
Repair/Rehab. along Iloilo-Capiz Road (New Route), Leganes-
ZarragaVI 9.608 30 C 0.438 0.194 0.300 - - - 93.20 *93.20%
V. Satisfactory
IBC International Builders Corporation 8576 Widening of Dungon Bridge IV,
Iloilo-Jaro Diversion Road VI 14.389 436 O 0.303 0.240 0.150 0.030 0.055 0.033 81.10 -
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corp.)8576 Asphalt Overlay of M. Laserma
Street-C. Laserma Street VI 2.404 70 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corp.)8576 Cabano Bridge along Guimaras
Circumferential Road VI 6.258 210 O 0.273 0.268 0.100 0.030 0.040 0.100 81.10 -
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corp.)8576 Cabano Bridge along Guimaras
Circumferential Road VI 6.258 229 O 0.274 0.300 0.100 0.030 0.037 0.100 84.10 -
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corp.)8576 Const. of Cuartero Bridge (Phase
I) VI 9.661 180 C 0.290 0.240 0.300 - - - 83.00 *83.00% V. Satisfactory
IBC International Builders Corporation (Formerly: IBC Iloilo
Builders Corp.)8576 Const. of Two (2) Storey Iloilo Hall
of Justice Building VI 12.629 240 C 0.368 0.191 0.300 - - - 85.90 87.41% V. Satisfactory
Icalina Builders and Construction Supply 26889 Const. of 3 CL 2 Storey Sch. Bldg.,
Macanhan E/S X 3.167 120 O 0.305 0.180 0.150 0.030 0.020 0.033 71.80 -
Icalina Builders and Construction Supply 26889 Const. of Multi-Purpose Pavement
Zone II X 0.932 120 C 0.388 0.200 0.300 - - - 88.80 *88.80% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page207
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Icalina Builders and Construction Supply 26889
Const. of Slope Protection along Misamis Oriental-Ma. Cristina Bdry. Road, Nunucan Section
X 4.234 110 C 0.309 0.200 0.300 - - - 80.90 82.34% V. Satisfactory
Icalina Builders and Construction Supply 26889 Rehab./Impvt./Conc. of Tubod
Ganassi National Road X 4.574 40 C 0.308 0.300 0.300 - - - 90.80 *90.80% Outstanding
IDI Trading & Contractor 29006 Completion of Multi-Purpose Building III 0.762 45 C 0.377 0.279 0.300 - - - 95.60 *95.60%
Outstanding
IKM Builders & Construction Supply 30252 Const. of 2 Storey Extension Bldg.
(RHUI) IV-A 4.812 150 C 0.292 0.255 0.300 - - - 84.70 *84.70% V. Satisfactory
IKM Builders & Construction Supply 30252
Rehab./Reconst. of Damaged National Road, Batangas-Lobo Road, Dagatan-Laurel Section
IV-A 9.647 120 C 0.255 0.300 0.300 - - - 85.50 *85.50% V. Satisfactory
ILG Enterprises 31985 Conc. of FMR Brgy. Cansuso to Sitio Calminue IVA 0.956 60 C 0.450 0.133 0.300 - - - 88.30 *88.30%
Satisfactory
ILG Enterprises 31985 Conc. of Public Market Road and Parking along Brgy. Biñan IV-A 0.955 30 C 0.375 0.200 0.300 - - - 87.50 *87.50%
V. Satisfactory
ILG Enterprises 31985 Const. of FMR at Sitio III (Balugbog) IV-A 2.873 60 C 0.361 0.300 0.300 - - - 96.10 *96.10%
Outstanding
ILG Enterprises 31985 Const./Rehab. of Drainage System along CSCF Jct. Paete Section IV-A 2.434 80 C 0.320 0.300 0.300 - - - 92.00 85.10%
V. Satisfactory
IM Construction Corporation 20074 Conc. Blocking of Susano Road NCR 2.873 60 C 0.367 0.300 0.300 - - - 96.70 *96.70% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page208
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
IM Construction Corporation 20074 Conc./Impvt. of Road along MH del Pilar St. NCR 9.480 120 C 0.361 0.300 0.300 - - - 96.10 *96.10%
Outstanding
IM Construction Corporation 20074 Concrete Reblocking along Gov. A. Pascual St. NCR 4.744 90 C 0.347 0.300 0.300 - - - 94.70 92.66%
Outstanding
IM Construction Corporation 20074Const. of 3-Storey, 6-Classroom School Building, Gen T. De Leon
E/SNCR 11.416 150 C 0.388 0.200 0.300 - - - 88.80 *88.80%
Satisfactory
IM Construction Corporation 20074 Const. of Pedestrian Overpass at IBP Road NCR 2.866 120 C 0.277 0.300 0.300 - - - 87.70 *87.70%
V. Satisfactory
IM Construction Corporation 20074 Impvt. of Roads with Drainage System along Dalagang Bukid St. NCR 14.259 150 C 0.208 0.200 0.300 - - - 70.80 *70.80%
Satisfactory
IM Construction Corporation 20074Impvt./Widening (Conc.) of Boni Serrano Ave., Marikina Side to
Quezon City SideNCR 13.637 150 C 0.364 0.300 0.300 - - - 96.40 91.33%
Outstanding
IM Construction Corporation 20074 Rehab./Impvt. of Kalayaan Ave. District II NCR 9.545 60 C 0.381 0.300 0.300 - - - 98.10 *98.10%
Outstanding
IM Construction Corporation 20074 Rehab./Reblocking of General Luis St. NCR 2.862 45 C 0.317 0.300 0.300 - - - 91.70 *91.70%
Outstanding
IM Construction Corporation 20074 Widening of North Avenue NCR 8.605 90 C 0.329 0.300 0.300 - - - 92.90 *92.90% Outstanding
IMB Construction 13259 Const. of Multi-Purpose Building VII 0.938 50 C 0.306 0.200 0.300 - - - 80.60 *80.60% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page209
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
INC Builders 25351 Construction of Multi-Purpose Building III 0.478 44 C 0.338 0.200 0.300 - - - 83.80 *83.80%
Satisfactory
Interchain Builders 28734 Const. of FMR @ Brgy. Magallanes-Brgy. Pating V 0.931 60 C 0.366 0.200 0.300 - - - 86.60 *86.60%
V. Satisfactory
Interior-Philworks Const. Joint Venture JV-06-026 Contract Package III, Libon-
Marocmoc, Pantao Road RRNDP 212.890 566 O 0.374 0.300 0.137 0.030 0.056 0.050 94.70 -
Interior-Philworks Const. Joint Venture JV-04-014
CP1, Ligao-Pio Duran Setion, Arterial Road Links Devt. (Phase
V)V 328.190 759 C 0.231 0.300 0.300 - - - 83.10 84.28%
V. Satisfactory
International Builders Corporation (IBC) 8576 Fort San Pedro Improvement
Project PPA 181.489 540 O 0.364 0.275 0.100 0.030 0.053 0.100 92.20 -
IRA Construction 33159 Concreting of Road Sitio Setan, Calabuanan III 0.934 75 C 0.425 0.133 0.300 - - - 85.80 *85.80%
Satisfactory
Irving Doyle T. Paras Construction 27362 Conc. of Caraycaray-Cabungan-
Libtong FMR VIII 0.944 90 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory
Irving Doyle T. Paras Construction 27362 Const. of River Control VIII 4.339 90 C 0.267 0.300 0.300 - - - *86.70 86.70%
V. Satisfactory
Isaga Builders 8652 Const. of Conner Central National High School CAR 0.864 115 C 0.326 0.265 0.300 - - - 89.10 84.97%
V. Satisfactory
Isaga Builders 8652 Const. of Sta. Marcela MPB CAR 1.439 43 C 0.264 0.200 0.300 - - - 76.40 *76.40% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page210
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Isaga Builders 8652Proposed Rehab./Impvt. along
Calanasan-Claveria Road, Magnas Section
CAR 9.272 416 O 0.282 0.287 0.150 0.030 0.043 0.033 82.50 -
Isaga Builders 8652 Rehab. of National Road along Abbut-Conner-Kabugao Road CAR 9.344 240 O 0.341 0.240 0.100 0.008 0.040 0.100 72.90 -
Isaga Builders 8652 Rehab. of National Road along Abbut-Conner-Kabugao Road CAR 9.344 359 O 0.370 0.296 0.150 0.030 0.055 0.050 95.10 -
Isaga Builders 8652Repair & Maintenance of Nat'l
Road & Bridges, Abbut-Conner-Kabugao Road
CAR 4.711 160 C 0.323 0.261 0.300 - - - 88.40 82.40% V. Satisfactory
Isaga Builders 8652 Repair/Rehab. of Calafug-Lipay-Masico FMR CAR 0.470 60 C 0.373 0.275 0.300 - - - 94.80 93.36%
Outstanding
Isaga Builders 8652 Repair/Rehab. of Priority FMR (Municipal wide) CAR 1.394 60 C 0.178 0.225 0.300 - - - 70.30 *70.30%
Satisfactory
ISH Construction Inc. 30407 Const. of one unit 3-Storey Elementary School Bldg., Pkg. 2 SLB 16.059 120 C 0.330 0.300 0.000 - - - 63.00 63.00%
Fair
ISH Construction Inc. 30407Construction of one(1) unit 3-
storey Elementary School Building, Package 2
NHA 16.059 120 O 0.22 0.25 0.05 0.015 0.017 0.067 61.90 -
ISH Construction Inc. 30407 Construction of Three-Storey School Building (12 Classrooms) SLB 17.201 150 O 0.400 0.246 0.100 0.020 0.053 0.100 91.80 -
ISH Construction, Inc. 30407 Const. of One Unit 3-Storey School Building NHA 17.762 75 C 0.394 0.295 0.300 - - - 98.94 83.95%
V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page211
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
ISH Construction, Inc. 30407 Const. of One Unit 3-Storey Elementary School Bldg. SLB-LPO 18.839 196 C 0.298 0.293 0.300 - - - 89.10 89.10%
V.Satisfactory
Italian-Thai Development Public Company Limited FC-03-043
CP III, Liloan-San Ricardo Sect. Under the Aterial Road links Dev't.
Project (Himayangan-Silago-Abuyog Road & Liloan-San
Ricardo Road Project) Phase IV
PJHL 1,010.701 1,132 C 0.374 0.300 0.300 - - - 97.40 93.74% Outstanding
Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of
ARLDP, Phase V PJHL 1,164.620 1,181 O 0.381 0.300 0.100 0.030 0.070 0.100 98.10 -
Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of
ARLDP, Phase V PJHL 1,164.622 1,181 O 0.351 0.300 0.100 0.030 0.070 0.100 95.10 -
Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of
ARLDP, Phase V PJHL 1,164.622 1,181 O 0.360 0.300 0.100 0.030 0.070 0.100 96.00 -
Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of
ARLDP, Phase V PJHL 1,164.622 1,238 O 0.369 0.300 0.100 0.030 0.070 0.100 96.90 -
Italian-Thai Development Public Company Limited FC-03-043 CP IV-A, Suyo-Cervantes Rd. of
ARLDP, Phase V PJHL 1,164.622 1,238 O 0.368 0.300 0.100 0.030 0.070 0.100 96.80 -
ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building NHA 18.300 197 C 0.400 0.300 0.300 100.00 100%
Outstanding
ITP Construction, Inc. 9392 Sct. Ranger Housing Project, Phase I NHA 51.850 180 O 0.400 0.300 0.100 0.030 0.032 0.100 96.23 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page212
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building NHA 17.202 150 O 0.378 0.262 0.070 0.020 0.053 0.067 84.93 -
ITP Construction, Inc. 9392 Construction of One (1) unit Three-Storey School Building NHA 17.202 150 O 0.395 0.286 0.030 0.020 0.053 0.033 81.62 -
ITP Construction, Inc. 9392 Sct. Ranger Housing Village Project. Phase I NCL 51.777 180 C 0.261 0.300 0.300 - - - 86.10 86.10%
V.Satisfactory
Ivahrick Contractors 13688 Const. of Flood Control NCR 2.858 94 C 0.340 0.200 0.300 - - - 84.00 77.64% Unsatisfactory
Ivy Michelle Trading & Construction 24093
Conc. of El Nido-Bataraza Road (Aboabo-Bataraza Sect.),
Marangas-Bonobono SectionIV-B 22.097 180 C 0.294 0.300 0.300 - - - 89.40 *89.40%
V. Satisfactory
Ivy Michelle Trading & Construction 24093
Conc. of El Nido-Bataraza Road (PPC-Narra-Aboabo Sect.), San
Isidro/Calategas SectionIV-B 23.990 210 C 0.185 0.293 0.300 - - - 77.80 84.52%
V. Satisfactory
Ivy Michelle Trading & Construction 24093
Conc. of Puerto Princesa South Road (PPSR), Burirao-AboAbo
SectionIV-B 11.395 150 C 0.226 0.299 0.300 - - - 82.50 *82.50%
V. Satisfactory
Ivy Michelle Trading & Construction 24093 Conc. of Quezon-Aramaywan
Road (Tabon Section) IV-B 24.965 210 O 0.344 0.236 0.100 0.030 0.048 0.100 85.80 -
Ivy Michelle Trading & Construction 24093 Conc. of Quezon-Aramaywan
Road (Tabon Section) IV-B 24.965 210 O 0.330 0.300 0.150 0.030 0.030 0.033 87.30 -
Ivy Michelle Trading & Construction 24093 Concreting of PPNR Roxas Taytay-
El Nido National Road IV-B 3.508 80 C 0.233 0.300 0.300 - - - 83.30 87.02% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page213
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ivy Michelle Trading & Construction 24093 Const. of 1 Cl Sch. Bldg. @ Narra
NHS IV-B 0.435 90 C 0.335 0.118 0.300 - - - 75.30 *75.30% Satisfactory
Ivy Michelle Trading & Construction 24093
Const. of 1-CL, New Barbacan E/S, Roxas North (part of CY 2004
DepEd School Building Program Clustered)
IV-B 0.381 123 C 0.390 0.285 0.300 - - - 97.50 83.92% V. Satisfactory
Ivy Michelle Trading & Construction 24093 Const. of Aramaywan-Berong-
Puerto Princesa Road IV-B 19.097 252 C 0.339 0.200 0.300 - - - 83.90 79.40% Satisfactory
J & A Pimentel Construction 7953 Completion of MPB Tago (Phase V) XIII 9.231 240 C 0.319 0.200 0.300 - - - 81.90 80.75%
V. Satisfactory
J & A Pimentel Construction 7953 Completion of MPB Tandag (Phase V) XIII 9.387 255 C 0.338 0.200 0.300 - - - 83.80 85.55%
V. Satisfactory
J & A Pimentel Construction 7953 Conc. of Junction Cortes-Nurcia Section (SDCR) XIII 19.280 150 C 0.361 0.200 0.300 - - - 86.10 79.92%
Unsatisfactory
J & A Pimentel Construction 7953 Const. of Balibadon 4 Bridge XIII 18.988 240 O 0.377 0.240 0.100 0.030 0.022 0.100 86.90 -
J & A Pimentel Construction 7953 Const. of Balibadon 4 Bridge XIII 18.988 270 O 0.377 0.251 0.150 0.030 0.037 0.050 89.50 -
J & A Pimentel Construction 7953 Const. of Balibadon I Bridge XIII 5.785 105 C 0.223 0.200 0.300 - - - 72.30 81.36% V. Satisfactory
J & A Pimentel Construction 7953 Const. of Bocawe Bridge & Approaches XIII 11.180 237 C 0.266 0.200 0.300 - - - 76.60 80.20%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page214
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
J & A Pimentel Construction 7953 Const. of Cagmino Bridge & Approaches XIII 11.830 220 C 0.380 0.300 0.300 - - - 98.00 *98.00%
Outstanding
J & A Pimentel Construction 7953 Construction of Tandag Shoreline Protection Project (Phase II) XIII 13.851 150 O 0.375 0.240 0.150 0.030 0.035 0.050 88.00 -
J & A Pimentel Construction 7953Impvt. of Bank Protection of
Anibongan Bailey Bridge along SCDR
XIII 5.174 60 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
J & A Pimentel Construction and Supply 7953 Const. of Banahaw Bridge Phase
VI XIII 19.263 285 O 0.343 0.300 0.050 0.022 0.032 0.067 81.40 -
J & A Pimentel Construction and Supply 7953 Const. of Multi-Purpose Building
Phase III XIII 4.522 150 C 0.362 0.300 0.300 - - - 96.20 81.15% V. Satisfactory
J & A Pimentel Construction and Supply 7953 Const. of Tandag Multi-Purpose
Bldg. Phase II XIII 4.546 150 C 0.131 0.300 0.300 - - - 73.10 75.41% Satisfactory
J & S Escuadra Construction & Supply 20077 Const. of 2 units CL @ Hagonoy
NHS Annex XI 0.952 60 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory
J D E Construction 19173 Const. of Two (2) unit CL @ West City Central School X 0.932 75 C 0.371 0.200 0.300 - - - 87.10 82.62%
V. Satisfactory
J D E Construction 19173 Impvt. of Waterways, Sapang Creek along ICBR X 4.667 135 C 0.354 0.200 0.300 - - - 85.40 83.72%
V. Satisfactory
J L A Construction & Supplies 24503 Const. of MPB at Almendras E/S XI 1.710 110 C 0.353 0.300 0.300 - - - 95.30 91.03% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page215
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
J L A Construction & Supplies 24503 Construction of Multi-Purpose Building, Brgy. Sibulan XI 2.854 110 C 0.365 0.200 0.300 - - - 86.50 *86.50%
Satisfactory
J L V Construction and Supply 9953 Impvt./Rehab. of Road IV-A 9.645 30 C 0.476 0.133 0.300 - - - 90.90 *90.90% V. Satisfactory
J. Bros. Construction 27587 Land Development of Sto. Domingo Resettlement Project NHA 45.895 240 O 0.336 0.291 0.000 0.030 0.042 0.033 73.20 -
J. Bros. Construction 27587 Land Development of Sto. Domingo Resettlement Project NHA 44.812 313 O 0.315 0.287 0.000 0.030 0.042 0.067 74.10 74.10%
Satisfactory
J. C. Baac Construction Corporation 25974 Impvt./Rehab. of Balbalan-
Pinukpuk Road CAR 26.052 260 O 0.323 0.234 0.100 0.020 0.030 0.067 77.40 -
J. C. Baac Construction Corporation 25974 Impvt./Rehab. of Bontoc-Lubuagan
Tabuk Road (Gongon Sect.) CAR 13.257 296 C 0.370 0.300 0.300 - - - 97.00 78.40% Satisfactory
J. C. Baac Construction Corporation 25974
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase II,
Suyo-Tangadan SectionCAR 47.214 360 O 0.385 0.296 0.150 0.030 0.032 0.033 92.60 -
J. C. Baac Construction Corporation 25974
Impv't/Rehab Larion Alto-Cabbo-Baliuag Road (going to Callao
Alternate Route)II 19.143 230 O 0.328 0.300 0.116 0.030 0.550 0.033 135.70 -
J. C. Baac Construction Corporation 25974 Replacement/Const. of Langso
Bridge CAR 7.699 195 C 0.291 0.200 0.000 - - - 49.10 67.97% Fair
J. Custorio Construction 16237 Impvt./Rehab. of Dagansa-Libjo Road VIII 4.797 60 O 0.314 0.300 0.050 0.020 0.037 0.050 77.10 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page216
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
J. Custorio Construction 16237Rehab./Conc. Paving along
Bantayan-Malobago-Pagsang-an-Genagdanan Road
VIII 0.477 60 C 0.247 0.200 0.300 - - - 74.70 *74.70% Satisfactory
J. Custorio Construction 16237 Rehab./Impv't. of DPWH-Northern Samar 2nd DEO VIII 0.246 30 C 0.396 0.158 0.300 - - - 85.40 *85.40%
V. Satisfactory
J.B. Alarcon Enterprises 18849 Completion of Approaches and Revetment of Gen. Luna Bridge IVA 3.105 75 C 0.340 0.200 0.300 - - - 84.00 87.42%
V. Satisfactory
J.B. Alarcon Enterprises 18849 Const. of 2 CL Sch. Bldg. @ Cavinti E/S IVA 0.681 90 C 0.370 0.200 0.300 - - - 87.00 86.72%
V. Satisfactory
J.B. De Jesus Builders and Design Services 22867 Const. of FMR at Brgy. San
Agustin III 4.693 60 C 0.318 0.204 0.300 - - - 82.20 *82.20% V. Satisfactory
J.D. Legaspi Construction 9608 Baseco Linear/Community Park cum Revetment Wall PRRC 139.778 365 O 0.386 0.300 0.100 0.030 0.070 0.100 98.60 -
J.D. Legaspi Construction 9608 Construction of Solano-Quezon Road II 62.893 540 O 0.365 0.300 0.150 0.030 0.055 0.050 95.00 -
J.D. Legaspi Construction 9608
CP 7: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road
(Manay-Boston) Baganga Section Phase II
XI 191.035 597 O 0.211 0.300 0.100 0.030 0.060 0.100 80.10 -
J.D. Legaspi Construction 9608 Pasig River Ferry Service Station PRRC 7.303 100 O 0.280 0.180 0.100 0.020 0.020 0.100 70.00 -
J.E. Arradaza Construction & Supply 25353 Const. of Duguan Communal
Irrigation Project NIA-II 2.338 150 C 0.326 0.300 0.300 - - - 92.60 92.60% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page217
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
J.E. Arradaza Construction & Supply 25353 Const. of Multi Purpose Pavement
at Brgy. Banilad VII 0.478 40 C 0.336 0.217 0.300 - - - 85.30 *85.30% V. Satisfactory
J.E. Arradaza Construction & Supply 25353 Const. of Public Market-Building
Phase II VIII 1.421 90 C 0.375 0.212 0.300 - - - 88.70 *88.70% V. Satisfactory
J.E. Manalo & Company, Inc. 422 Zamboanga Port Expansion Project PPA 282.050 540 O 0.400 0.300 0.100 0.030 0.059 0.100 98.92 -
J.G. & P Enterprises 5090 Const. of Pedestrian Foot Bridge along Gov. Drive (FCIE) IV-A 3.823 100 C 0.302 0.200 0.300 - - - 80.20 *80.20%
V. Satisfactory
J.G. & P Enterprises 5090Rehab. And Impvt. Along Kawit-Noveleta Diversion Road, Kawit
SectionIV-A 10.345 12 C 0.348 0.200 0.300 - - - 84.80 *84.80%
V. Satisfactory
J.G. & P Enterprises 5090 Ripraping of Imus River Brgy. Salinas IV-A 0.961 60 C 0.279 0.300 0.300 - - - 87.90 *87.90%
V. Satisfactory
J.G. Garcia Construction 21054 Construction of Multi-Purpos Bldg. @ Maasin E/S I 0.772 35 C 0.367 0.200 0.300 - - - 86.70 *86.70%
V. Satisfactory
J.G. Garcia Construction 21054 Opening/Rehab of Farm to Market Road at Two Brgys. I 0.964 30 C 0.418 0.200 0.300 - - - 91.80 *91.80%
V. Satisfactory
J.G. Oranza Construction 33370 Construction of Multi-Purpose Building, Brgy. Poblacion XII 0.847 60 C 0.475 0.200 0.300 - - - 97.50 *97.50%
Outstanding
J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge & Approaches (Phase I)
Sp. Bridges 174.420 569 O 0.352 0.180 0.030 0.030 0.065 0.067 72.40 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page218
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge & Approaches (Phase I)
Sp. Bridges 174.420 569 O 0.332 0.269 0.000 0.030 0.061 0.067 75.90 -
J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge & Approaches (Phase I)
Sp. Bridges 174.420 569 O 0.344 0.240 0.100 0.030 0.061 0.067 84.20 -
J.H. Pajara Construction Corp. 1890 Const. of Calaba Bridge & Approaches (Phase I)
Sp. Bridges 177.680 1,002 O 0.396 0.289 0.000 0.030 0.055 0.033 80.30 -
J.H. Pajara Construction Corp. 1890 Const. of Dalibubon Bridge, along Ipil-Jones-San Agustin II 239.834 1,886 C 0.393 0.284 0.000 - - - 67.70 79.96%
Satisfactory
J.H. Pajara Construction Corp. 1890CP 6, Restoration of Patapat
Viaduct under the Arterial Road Links Dev. Project, Phase V
PJHL 187.597 395 O 0.379 0.300 0.100 0.030 0.070 0.100 97.90 -
J.H. Pajara Construction Corp. 1890
NAIA Expressway & its Related Road Projects Phase I Package-
IVA Sales St. Viaduct Ramp Structure (M & E Retaining Wall)
URPO 348.561 680 C 0.302 0.300 0.000 - - - 60.20 68.66% Fair
J.I. Etac Construction & Supply 32722 Reconst. of Daang Maharlika (SM) San Isidro-San Juan Section VIII 9.606 210 C 0.343 0.200 0.300 - - - 84.30 68.76%
Fair
J.I. Etac Construction & Supply 32722 Repair of Salvacion E/S VIII 0.254 90 C 0.417 0.133 0.300 - - - 85.00 *85.00% Satisfacory
J.I. Etac Construction & Supply 32722 Repair/Rehab. of San Antonio Seawall VIII 1.918 180 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfacory
J.I. Viacrusis Construction 14382 Completion of 4CL, Storey School Building Balic-balic E/S III 0.889 75 C 0.378 0.242 0.300 - - - 92.00 84.51%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page219
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
J.I.L. Trading & Construction Co. 14634 Const. of Brgy Road @ Brgy. Kayumanggi IVA 1.921 150 C 0.349 0.200 0.300 - - - 84.90 *84.90%
V. Satisfactory
J.M. Luciano Const., Inc./Dimson (Manila), Inc. (JV)
JV-03-023/SLN-004452
Phil-Japan Friendship Highway Mindanao Section Rehabiltation
Project, Phase 1 (Contract Package 7 & 8)
PJHL 754.879 975 C 0.265 0.300 0.300 - - - 86.50 87.01% V. Satisfactory
J.M. Luciano Construction Inc. (Formerly: J.M. Luciano Const.) 2083
Impvt./Conc. of SCDR Cortes-Tandag-Marihatag Road, Tandag-
Marihatag SectionXIII 77.202 480 C 0.318 0.300 0.300 - - - 91.80 90.12%
Outstanding
J.M. Maligaya Construction & Construction Supply 15018 Asphalt Overlay of Pob. 3 IV-A 0.285 20 C 0.270 0.300 0.300 - - - 87.00 *87.00%
V. Satisfactory
J.M. Maligaya Construction & Construction Supply 15018 Conc. of Noveleta-Naic-Tagaytay
Road IV-A 28.880 150 O 0.374 0.300 0.103 0.030 0.033 0.050 89.00 -
J.M. Maligaya Construction & Construction Supply 15018
Concreting of Farm-to-Market Road @ Brgy. Asis II (Sitio
Magsili)IV-A 0.380 45 C 0.387 0.200 0.300 - - - 88.70 *88.70%
V. Satisfactory
J.M. Morales Construction & Supply (Formerly: J.M. Morales
Const.)15574 Impvt. of MPB III 5.780 120 C 0.387 0.270 0.300 - - - 95.70 70.64%
Satisfactory
J.M. Morales Construction & Supply (Formerly: J.M. Morales
Const.)15574 Upgrading/Rehab. of Lubao
Diversion Road III 4.777 60 C 0.369 0.183 0.300 - - - 85.20 *85.20% V. Satisfactory
J.N. Dela Torre Construction 24978 Const. of Canangcaan Road (ARISP), Phase II, Sofronio IV-B 6.219 120 C 0.376 0.200 0.300 - - - 87.60 86.40%
V. Satisfactory
J.N. Dela Torre Construction 24978 Const. of Multi-Purpose Building (PNP), Brgy. Poblacion IV-B 0.466 60 C 0.361 0.200 0.300 - - - 86.10 83.86%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page220
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
J.N. Dela Torre Construction 24978Const. of PPSR, Narra-Aboabo
Road Balitien Bridge I & II Approach
IV-B 5.553 150 C 0.297 0.292 0.300 - - - 88.90 88.90% V.Satisfactory
J.N. Dela Torre Construction 24978 Impvt. of MPB @ Pinaglabanan IV-B 0.365 90 C 0.282 0.218 0.300 - - - 80.00 *80.00% Satisfactory
J.P. Aquino & Bros. (Engineers, Developers, Architects, Builders) 13231 Const. of 1 CL Sch. Bldg. at
Bamban Gabaldon Elem. Sch. III 0.426 60 C 0.344 0.232 0.300 - - - 87.60 *87.60% V. Satisfactory
J.Q.G. Construction 10530 Conc. of Maluid-San Andres Road (Sitio Malinis) III 1.660 75 C 0.293 0.210 0.300 - - - 80.30 *80.30%
V. Satisfactory
J.Q.G. Construction 10530 Conc. of San Isidro-Penal Colony-Jct. Yapang Road IV-B 23.812 240 C 0.355 0.300 0.300 - - - 95.50 82.03%
V. Satisfactory
J.Q.G. Construction 10530 Const. of 3 Cl at Maungib H/S III 1.091 75 C 0.313 0.300 0.300 - - - 91.30 81.99% V. Satisfactory
J.Q.G. Construction 10530Traffic Management along Manila
North Road (MNR) Package I along MNR from Meycauayan to Malolos
III 46.677 188 C 0.337 0.300 0.300 - - - 93.70 93.70% Outstanding
J.R.C.F. Construction 31641 Const. of Multi-Purpose Building @ Various Sts. Brgy. Roxas NCR 0.662 45 C 0.396 0.300 0.300 - - - 99.60 *99.60%
Outstanding
J.S. General Contractor 15258 Const. of MPB, Brgy. 7 IV-A 0.476 90 C 0.356 0.267 0.300 - - - 92.30 *92.30% Outstanding
J.S. General Contractor 15258 Const. of Multi-Purpose Bldg. @ Brgy. Maranan I IV-A 0.475 45 O 0.344 0.200 0.100 0.030 0.027 0.100 80.10 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page221
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
J.S. General Contractor 15258 Const. of Water Supply System @ Pantihan 1,2, & 3 IV-A 0.575 120 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V. Satisfactory
J.S. General Contractor 15258 Drainage Impvt. Along Banaba Cerca IV-A 1.905 75 C 0.372 0.200 0.300 - - - 87.20 *87.20%
V. Satisfactory
J.S. General Contractor 15258 Improvement of School Building at Cavite State University IV-A 0.950 60 O 0.353 0.240 0.100 0.030 0.047 0.100 87.00 -
J.S. General Contractor 15258 Rehab. of Sch. Bldg., Cavite State University Gabaldon Bldg. IV-A 1.431 70 C 0.347 0.200 0.300 - - - 84.70 85.05%
V. Satisfactory
J.S. Layson & Co., Inc. (Formerly: J.S. Layson Construction) 2653
Reconstruction of Nanga Bridge, Km. 25+500 along Iloilo-Antique
RoadVI 19.050 395 C 0.361 0.200 0.300 - - - 86.10 77.22%
Satisfactory
J.T. Gamolo Construction 15759 Cementing of Road from Mountain View College to Bagontaas X 0.916 90 C 0.320 0.300 0.300 - - - 92.00 *92.00%
Outstanding
J.T. Gamolo Construction 15759 Completion of MPB @ Poblacion X 1.412 90 C 0.363 0.200 0.300 - - - 86.30 *86.30% Satisfactory
J.T. Gamolo Construction 15759 Completion of Quezon NHS X 2.790 120 C 0.397 0.300 0.300 - - - 99.70 95.82% Outstanding
J.T. Gamolo Construction 15759 Concreting of Dologon Busco-Quezon Road (Maramag Sect.) X 4.688 227 C 0.335 0.300 0.300 - - - 93.50 94.40%
Outstanding
J.T. Gamolo Construction 15759 Const. of Sayre Nat'l Highway (Don Carlos Section) X 14.008 210 C 0.244 0.300 0.300 - - - 84.40 83.89%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page222
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
J.T. Gamolo Construction 15759
CP A, Provision of Slope Protection, Const./Installation of Gabions & Const. of Retaining
Wall along Sayre Highway Alae-Kisolon Road
X 9.339 241 C 0.386 0.300 0.300 - - - 98.60 91.14% Outstanding
J.V. Lagon Construction Corporation 11561 Widening of Kapingkong Bridge
Bo. 2, XII 13.377 400 C 0.287 0.179 0.000 - - - 46.60 65.68% Fair
J.V. Loreto Const. & Dev't. Corp. 13120 Conc. of Villaba-Leyte Road, Leyte III VIII 28.880 300 C 0.174 0.200 0.300 - - - 67.40 76.06%
Satisfactory
J.V. Loreto Const. & Dev't. Corp. 13120 Const. of Marcasa Bridge VIII 9.370 150 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding
J.V. Loreto Const. & Dev't. Corp. 13120 Construction of PMO-Tacloban Port Operation Bldg. PPA 79.644 534 O 0.3999 0.299 0.03 0.03 0.0525 0.0667 87.81 -
J.V. Loreto Const. & Dev't. Corp. 13120 Rehab. Along Daang Maharlika Road VIII 50.156 125 C 0.332 0.300 0.300 - - - 93.20 *93.20%
Outstanding
J.V. Loreto Const. & Dev't. Corp. 13120 Rehab./Repair of Bernard Reed Bridge VIII 9.404 128 C 0.381 0.023 0.300 - - - 70.40 *70.40%
Satisfactory
Jadestress Builders 9753 Impvt. of Talobatibe-Jose Panganiban Road V 9.390 200 O 0.322 0.283 0.100 0.030 0.033 0.100 86.80 -
Jadestress Builders 9753 Rehab./Impv't of Inascan-Bubulusan Brgy. Road V 2.394 75 O 0.362 0.300 0.150 0.030 0.038 0.050 93.00 -
Jager Construction & Supply 13619 Const. of Multi Purpose Building @ San Pablo III 0.467 60 C 0.363 0.300 0.300 - - - 96.30 82.79%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page223
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Jagon Builders 24748 Completion of San Joaquin Elem. School NCR 4.776 60 C 0.469 0.161 0.300 - - - 93.00 *93.00%
V.Satisfactory
Jagon Builders 24748 Const. of Academic Classroom at Plainview E/S NCR 1.702 75 C 0.345 0.300 0.300 - - - 94.50 *94.50%
Outstanding
Jagon Builders 24748 Const./Completion of MPB @ Eshudama Sub. NCR 1.423 60 C 0.340 0.150 0.300 - - - 79.00 *79.00%
Satisfactory
Jagon Builders 24748Partial Completion of School Bldg.
and Const. of Sch. Facilities @ Garbriela Silang Annex I
NCR 7.510 150 C 0.315 0.288 0.300 - - - 90.30 76.65% Satisfactory
Jagon Builders 24748Upgrading/Conc. of Road with
Drainage Impvt. Along Lapu-lapu Ave.
NCR 9.495 120 C 0.342 0.200 0.300 - - - 84.20 *84.20% V. Satisfactory
Jag-Vail Construction & Supply 24055 Const. of Potenciano Gregorio Multi-Purpose Building V 1.156 120 C 0.390 0.300 0.300 - - - 99.00 *99.00%
Outstanding
Jag-Vail Construction & Supply 24055Seal Widening/Conc. of Shoulder
along Daang Maharlika, Oas Diversion Road
V 0.438 30 C 0.331 0.106 0.300 - - - 73.70 *73.70% Satisfactory
Jag-Vail Construction and Supply 24055 Gaba Port Development Project DOTC 4.788 90 C 0.404 0.200 0.300 - - - 90.40 90.40% Very Satisfactory
Jaime B. Ching 4256 Const. and Improvement of Taloc Main Drainage NIA 5.013 408 O 0.355 0.281 - 0.030 0.064 0.033 76.33 -
Jaime B. Ching Enterprises 4256Completion of Guintubhan
(Bagroy) Bridge along Binalbagan-Isabel Road
VI 19.164 361 O 0.389 0.240 0.100 0.030 0.045 0.067 87.10 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page224
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Jaime B. Ching Enterprises 4256Completion of Guintubhan
(Bagroy) Bridge along Binalbagan-Isabel Road
VI 19.164 366 O 0.215 0.240 0.100 0.030 0.042 0.100 72.70 -
Jaime B. Ching Enterprises 4256 Const. (Conc.) of Marikina-Infanta Rd. P-II, Laguna Side IV-A 48.422 300 C 0.384 0.200 0.300 - - - 88.40 89.72%
V. Satisfactory
Jaime B. Ching Enterprises 4256 Const. and Improvement of Taloc Main Drainage NIA 5.013 408 O 0.355 0.281 - 0.030 0.064 0.033 76.33 -
Jakboa Builders 31563 Repair/Renovation of PTRI Main Building DOST 2.964 85 C 0.414 0.200 0.000 - - - 61.40 *61.40%
Poor
Jalse Construction 13839 Const. of FMR , Lumbia-Canitoan Road X 1.889 150 O 0.359 0.300 0.100 0.030 0.048 0.100 93.70 -
Jameetrix Construction 19176Conc. of Additional 2-lanes along
Davao City Diversion Road, Buhangin-Maa Section
XI 9.236 240 C 0.350 0.300 0.300 - - - 95.00 95.00% Outstanding
Jameetrix Construction 19176 Conc. of Road at Brgy. Magtuod, Matina-Biao Road XI 9.435 90 C 0.350 0.300 0.300 - - - 95.00 *95.00%
Outstanding
Jan Sha Construction & Supply 19462 Rehabilitation of Mataoroc CIS, Taisan CIS & Tariric CIS NIA-V 1.763 60 C 0.323 0.244 0.300 - - - 86.70 *86.70%
V.Satisfactory
Jann-Norris Construction and Supplies 31814 Const. of Banganan Flood Control II 2.884 40 C 0.304 0.200 0.300 - - - 80.40 *80.40%
V. Satisfactory
Jann-Norris Construction and Supplies 31814
Rehab./Impvt. of Road protection along Daang Maharlika, Bonfal-
Solano Sect.II 4.644 90 C 0.323 0.200 0.300 - - - 82.30 *82.30%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page225
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Japuz-Jansol Enterprises 22869 Completion of Maac North Poblacion National Road X 4.822 70 C 0.378 0.200 0.300 - - - 87.80 *87.80%
V. Satisfactory
Japuz-Jansol Enterprises 22869 Const. / Completion of Mahinog Municipal Bldg., X 3.257 188 C 0.360 0.300 0.300 - - - 96.00 88.09%
V. Satisfactory
Japuz-Jansol Enterprises 22869 Const. of Agoho MPB X 1.861 105 C 0.360 0.300 0.300 - - - 96.00 96.00% Outstanding
Japuz-Jansol Enterprises 22869Const. of Lined Canal along
National Road (Poblacion Letecia & Poblacion San Roque)
X 2.106 140 C 0.244 0.300 0.300 - - - 84.40 *84.40% V. Satisfactory
Japuz-Jansol Enterprises 22869 Const. of Soro-Soro MPB X 2.383 130 C 0.396 0.200 0.300 - - - 89.60 *89.60% V. Satisfactory
Japuz-Jansol Enterprises 22869 Const./Impv't. of Yumbing Multi-Purpose Building X 1.395 89 C 0.311 0.300 0.300 - - - 91.10 *91.10%
Outstanding
Japuz-Jansol Enterprises 22869 Const./Rehab. of MPB Catarman C/S X 1.902 80 C 0.326 0.200 0.300 - - - 82.60 *82.60%
Satisfactory
Japuz-Jansol Enterprises 22869 Const./Rehab. of San Roque-Mahinog NHA Water System X 9.541 215 C 0.360 0.300 0.300 - - - 96.00 *96.00%
Outstanding
Japuz-Jansol Enterprises 22869 Construction of Teruvian Dam & Canal System NIA 4.178 90 O 0.352 0.180 0.150 0.030 0.064 0.050 82.55 -
Jargon Construction & Supply 23474 Completion of MPB at Brgy. Kernam (Brgy. Hall) XII 0.480 100 C 0.375 0.200 0.300 - - - 87.50 85.61%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page226
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Jargon Construction & Supply 23474 Completion of MPB, Brgy. Mapantig XII 1.248 80 C 0.399 0.199 0.300 - - - 89.80 *89.80%
V. Satisfactory
Jargon Construction & Supply 23474 Conc. of Sarangani-Davao del Sur Coastal Road, Punsad Section. XII 5.658 180 C 0.392 0.300 0.000 - - - 69.20 70.94%
Satisfactory
Jargon Construction & Supply 23474Conc. of Sarangani-Davao del Sur
Coastal Road, Taluya-Gumasa Section
XII 14.145 220 O 0.398 0.238 0.100 0.030 0.043 0.100 90.90 -
Jargon Construction & Supply 23474 Const. of 1 unit Sch. Bldg. at Kalawag II XII 0.372 80 C 0.372 0.075 0.300 - - - 74.70 *74.70%
Satisfactory
Jargon Construction & Supply 23474 Const. of MPB (Brgy. Stage) at Brgy. Baluntay XII 0.193 50 C 0.329 0.200 0.300 - - - 82.90 *82.90%
V. Satisfactory
Jargon Construction & Supply 23474 Const. of Valdez Street XII 0.939 100 C 0.311 0.200 0.300 - - - 81.10 88.42% V. Satisfactory
Jargon Construction & Supply 23474 Contruction of Multi-Purpose Building, Brgy. Talahik XII 0.800 98 C 0.409 0.200 0.300 - - - 90.90 *90.90%
V. Satisfactory
Jargon Construction & Supply 23474 Molo Flood Control XII 1.888 120 C 0.326 0.300 0.300 - - - 92.60 91.70% Oustanding
Jargon Construction & Supply 23474Rehab. of Sarangani-Sultan
Kudarat Coastal Road (Malisbong Section)
XII 4.746 110 C 0.398 0.200 0.300 - - - 89.80 84.10% Satisfactory
Jargon Construction & Supply 23474 Rehab. of Sitio Niño-Sitio Taclobo @ Brgy. Upper Mainit XII 3.660 120 C 0.000 0.000 0.300 - - - 30.00 38.64%
Poor
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page227
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Jargon Construction & Supply 23474 Road Upgrading, Falls Section. XII 10.414 217 O 0.362 0.300 0.150 0.015 0.030 0.050 90.70 -
Jaro Builders and Construction Supply 25560 Concreting of Road @ Patas IV-B 1.443 50 C 0.439 0.133 0.300 - - - 87.20 *87.20%
Satisfactory
Jaro Builders and Construction Supply 25560 Const. of MPB @ San Vicente East IV-B 0.474 45 C 0.343 0.300 0.300 - - - 94.30 *94.30%
Oustanding
Jaro Builders and Construction Supply 25560
Replacement of Slope Protection along National Rd., Minas-Macatoc
Sect.IV-B 1.566 60 C 0.217 0.000 0.300 - - - 51.70 *51.70%
Poor
Jasa Builders 31330 Conc. of Road at Sitio Camambugan I 0.473 42 C 0.266 0.300 0.300 - - - 86.60 *86.60%
V. Satisfactory
Jasa Builders 31330 Const. of 1 Cl Sch. Bldg. @ Magalong NHS I 0.436 40 C 0.279 0.173 0.300 - - - 75.20 *75.20%
Satisfactory
Jasa Builders 31330 Const. of MPB @ Agno C/S I 0.758 80 C 0.238 0.200 0.300 - - - 73.80 *73.80% Satisfactory
Jasa Builders 31330 Construction of Multi-Purpose Building at Alos I 0.475 40 C 0.425 0.200 0.300 - - - 92.50 *92.50%
V. Satisfactory
Jasa Builders/Alcel Construction (JV) JV-07-071
Rehab./Reconst. of Damaged Paved Nat'l Roads, Bani-Agno
RoadI 18.998 180 C 0.247 0.109 0.300 - - - 65.60 78.17%
Satisfactory
Jasmarc Builders and Construction Supply, Co. 31801 Const. of MPB @ Brgy. Mahayag XI 1.177 120 O 0.316 0.300 0.100 0.020 0.053 0.100 88.90 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page228
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Jasmig Construction Supply 26069Conc. of Road, Brgy. Dayap to
Brgy. Butucan & Brgy. Bulihan to Brgy. Looc
IV-A 4.774 90 C 0.363 0.300 0.300 - - - 96.30 *96.30% Outstanding
Jasmig Construction Supply 26069 Const. of 2 Storey 6 CL RGR Type S/B @ Bonifacio E/S IV-A 8.547 210 C 0.376 0.200 0.300 - - - 87.60 *87.60%
V. Satisfactory
Jasmig Construction Supply 26069 Const. of Brgy. MPB @ San Fernando IV-A 0.287 45 C 0.293 0.300 0.300 - - - 89.30 * 89.30%
V. Satisfactory
Jasmig Construction Supply 26069 Const. of MPB (PICPA Bldg.) IV-A 0.474 60 C 0.371 0.200 0.300 - - - 87.10 * 87.10% V. Satisfactory
Jasmig Construction Supply 26069 Const. of Open Canal @ Brgy. Coliat IV-A 0.964 90 C 0.312 0.200 0.300 - - - 81.20 *81.20%
V.Satisfactory
Jasmig Construction Supply 26069 Impvt./Rehab. of Catandala Road and Dumantay-Mahacot Road IV-A 9.648 28 C 0.319 0.300 0.300 - - - 91.90 *91.90%
Outstanding
Jasmig Construction Supply 26069 Impvt./Rehab. of Manila-Batangas Road IV-A 9.648 30 C 0.473 0.133 0.300 - - - 90.60 *90.60%
V. Satisfactory
Jasmig Construction Supply 26069 Impvt./Rehab. of Road at Gulod Itaas IV-A 9.648 30 C 0.477 0.194 0.300 - - - 97.10 *97.10%
Outstanding
Jasmin Construction 9561 Rehab. of Quezon-Carangonhan Road V 2.371 180 O 0.350 0.240 0.100 0.020 0.023 0.100 83.30 -
Jaykris Enterprises 30906 Conc. of Datu Panas St. IX 0.960 35 C 0.303 0.200 0.300 - - - 80.30 *80.30% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page229
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Jaykris Enterprises 30906 Const. of Road at Lanote St. IX 0.932 35 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
Jaykris Enterprises 30906 Rehab. of Road (Installation of Street Light) IX 0.275 25 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
Jay-mar Builder 7900 Completion of Multi-Pupose Building (Phase 2) NCR 1.906 60 C 0.371 0.169 0.300 - - - 84.00 *84.00%
Satisfactory
Jay-mar Builder 7900 Const. of MPB @ SAV 12 Brgy. San Isidro NCR 1.426 75 C 0.348 0.300 0.300 - - - 94.80 *94.80%
Outstanding
Jay-mar Builder 7900 Const. of Two (2) Storey Sch. Bldg., Tambo E/S, Brgy. Tambo NCR 1.906 60 C 0.370 0.200 0.300 - - - 87.00 *87.00%
V. Satisfactory
Jay-mar Builder 7900 Repair of Sidewalk/Roads of San Nicolas St. NCR 1.424 60 O 0.333 0.000 0.100 0.030 0.032 0.100 59.50 -
JBGM Construction 1987 Construction of Canal and Canal Structures (LMC-ARIP-03-06) NIA-II 4.919 210 C 0.360 0.200 0.000 0.020 0.060 0.200 84.00 84.15%
V.Satisfactory
JBGM Construction 1987 Construction of Canal and Canal Structures (LMC-ARIP-07-06) NIA-II 4.684 210 C 0.400 0.300 0.000 - - - 70.00 70.00%
Fair
JBGM Construction 19897Road Impv't along Cordon-Diffun-
Maddela-Aurora and its related Roads, Dumanisi-Pimentel Road
II 4.823 150 C 0.439 0.200 0.300 - - - 93.90 *93.90% V.Satisfactory
JBRC Construction 26019 Impvt. of Bago-Manarang Road I 1.896 64 C 0.394 0.295 0.300 - - - 98.90 *98.90% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page230
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
JCA Builders & Supply 20358 Rehab. of FMR, Little Panay-Kasilak Road XI 2.864 90 C 0.200 0.300 0.300 - - - 80.00 68.72%
Fair
JCA Builders & Supply 20358 Repair/Rehab. of Road @ Package 2, 02634 (A) Brgy. Cabantian XI 2.359 210 O 0.211 0.225 0.000 0.030 0.025 0.000 49.10 -
JCO Construction and Supply 32576 Const. of Bridge, Brgy. Kanluran V 0.658 60 C 0.461 0.133 0.300 - - - 89.40 *89.40% V. Satisfactory
JCW Construction 32161 Const./Impvt. of Silago Terminal Bldg. Complex VIII 0.469 90 C 0.389 0.200 0.300 - - - 88.90 *88.90%
V. Satisfactory
JDC Builders 32048 Rehab./Impvt. of MPB (Covered Court) Phase II VIII 1.918 90 C 0.373 0.300 0.300 - - - 97.30 *97.30%
Outstanding
JDC Builders - Branch 32048 Const. of Multi-Purpose Pavement at Brgy. Monte Alegre VIII 0.473 60 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
JDC Builders Branch 32048 Construction of Multi-Purpose Pavement, Brgy. Linao VIII 0.473 60 C 0.422 0.106 0.300 - - - 82.80 *82.80%
Satisfactory
JDC Builders Branch 32048
Repair of Pagsangaan Flood Control Structure along Palompon-
Isabel-Merida-Ormoc Road Section
VIII 6.690 402 O 0.274 0.245 0.150 0.020 0.021 0.050 76.00 -
Jeada Construction 17869 Conc. of Sorsogon Diversion Road V 5.988 120 C 0.222 0.200 0.300 - - - 72.20 *72.20% Satisfactory
Jeada Construction 17869Improvement/Rehabilitation of
Shore Protection alongside NHA, Sea Breeze Homes
V 6.745 90 O 0.377 0.300 0.100 0.024 0.028 0.100 92.90 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page231
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Jecel Construction Supply 21956 Completion of Multi-Purpose Building at North San Juan XI 0.510 60 C 0.437 0.133 0.300 - - - 87.00 *87.00%
Satisfactory
Jecel Construction Supply 21956Const. / Rehab. / Replacement /
Completion & Repair of E/S Bldg. @ Sixto Babao E/S
XI 0.833 115 C 0.276 0.300 0.300 - - - 87.60 84.38% V. Satisfactory
Jecel Construction Supply 21956 Const. of MPB @ San Miguel XI 0.952 60 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory
Jecel Construction Supply 21956 Const. of MPB @ Upper Limonzo XI 0.952 75 C 0.371 0.220 0.300 - - - 89.10 86.23% V. Satisfactory
Jeff Construction 14774Conc. of Bagong Silang-
Capalonga National Secondary Rd.
V 9.450 230 O 0.330 0.240 0.100 0.023 0.045 0.100 83.80 -
Jeff Construction 14774 Const. of Naboongan Bridge, Approaches & Detour V 15.665 360 O 0.329 0.300 0.070 0.030 0.028 0.067 82.40 -
Jeff Construction 14774Const. of Naboongan Bridge, Approaches & Detour, Brgy.
DaguitV 15.666 726 O 0.374 0.239 0.150 0.030 0.056 0.050 89.90 -
Jegma Construction & Dev't. Corporation 14775 Conc. of Liloy, Zamboanga del
Norte-Ipil Zamboanga, Sibugay IX 14.314 135 O 0.358 0.240 0.070 0.030 0.030 0.033 76.10
Jegma Construction & Dev't. Corporation 14775
Rehab./Reconst. of Damaged Paved Nat'l Roads, Camp Lapu-
lapu RoadVII 14.318 191 C 0.346 0.200 0.300 - - - 84.60 86.70%
V. Satisfactory
Jegma Construction & Dev't. Corporation 14775 Repair/Rehab. of Natalio Bacalso
Ave. VII 9.950 45 C 0.292 0.210 0.300 - - - 80.20 *80.20% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page232
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Jegma Construction and Development Corporation 14775
Conc. of Liloy Zamboanga Del Norte-Ipil, Zamboanga Sibugay
Road (Phase III)IX 14.314 130 C 0.418 0.200 0.300 - - - 91.80 82.38%
Satisfactory
Jegma Construction and Development Corporation 14776 Conc. of Titay-Ipil National
Road,Kitabog Section IX 9.533 120 C 0.390 0.200 0.300 - - - 89.00 *89.00% Satisfactory
Jegma Construction and Development Corporation 14775 Improvement of Multi-Purpose
Building VII 0.949 50 O 0.319 0.173 0.150 0.020 0.019 0.033 71.40 -
Jegma Construction and Development Corporation 14775 Repair/Maintenace of Trancentral
Highway VII 19.096 120 O 0.363 0.300 0.100 0.030 0.070 0.100 96.30 -
Jejor's Construction Corporation 5143 Rehab./ Impv't. of CCR, MAAC-Kalipagas Section X 8.994 405 C 0.272 0.200 0.300 - - - 77.20 82.78%
V. Satisfactory
Jejor's Construction Corporation 5143 Rehab./Impvt. of Camiguin Circ. Road, Tangub Sect. X 9.554 515 C 0.400 0.300 0.300 - - - 100.00 94.90%
Outstanding
Jejor's Construction Corporation 5143 Repair/Rehab. of Camiguin Circ. Road Selective of Conc. Pavement X 4.797 241 O 0.324 0.180 0.150 0.030 0.035 0.050 76.90 -
Jejor's Construction/Allado Construction-JV JV-06-052 Proposed Reclamation of Back-up
Area PPA 31.729 222 O 35.156 25.758 0.070 0.030 0.040 0.100 84.91 -
Jelm Construction 33230 Completion of 1-CL SB, San Roque E/S VIII 0.192 120 C 0.443 0.118 0.300 - - - 86.10 *86.10%
Satisfactory
Jemak Construction & Supply 32056 Conc. of Eco-Tourism @ Brgy. Guisguis IV-A 8.878 110 C 0.368 0.200 0.300 - - - 86.80 83.68%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page233
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Jemak Construction & Supply 32056Conc. of Mauban-Sampaloc-Lucban-Tayabas Circ. Road,
Phase IXIV-A 33.748 360 C 0.303 0.300 0.300 - - - 90.30 *90.30%
Outstanding
Jemak Construction & Supply 32056 Const. of MPB at Callejon NHS IV-A 1.341 60 C 0.392 0.227 0.300 - - - 91.90 83.99% V. Satisfactory
Jemak Construction & Supply 32056 Rehab./Impvt. of MSR-Jct. Tiaong-Dolores Road IV-A 14.389 120 C 0.366 0.300 0.300 - - - 96.60 87.78%
V. Satisfactory
Jemak Construction & Supply 32056Rehab./Reconst. and Conc. Paving of Catanauan-Buenavista National Road (Phase II-Buenavista Sect.)
IV-A 14.456 120 C 0.335 0.300 0.300 - - - 93.50 88.40% V. Satisfactory
Jenzab Construction & Design 30654 Completion of MPB VII 0.883 60 C 0.282 0.200 0.300 - - - 78.20 *78.20% Satisfactory
Jenzab Construction & Design 30654 Completion of various MPB @ Catmon-daan VII 1.326 60 C 0.337 0.200 0.300 - - - 83.70 *83.70%
V. Satisfactory
Jenzab Construction & Design 30654 Const. of 1 Cl Sch. Bldg @ Simeon Ayuda E/S VII 0.386 87 C 0.265 0.300 0.300 - - - 86.50 83.77%
V. Satisfactory
Jenzab Construction & Design 30654 Road Conc. At Brgy. Can-Ibuang VII 1.328 60 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory
Jenzab Construction & Design 30654 Road Conc. At Brgy. Sta. Catalina, Bagong Daan VII 0.741 45 C 0.168 0.300 0.300 - - - 76.80 *76.80%
Satisfactory
Jepa Construction and Supplies 30375 Concreting of Road III 0.628 60 C 0.322 0.200 0.300 - - - 82.20 *82.20% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page234
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Jepa Construction and Supplies 30375Const. of One (1) CL Sch. Bldg. @ R.E. Cayetano MES, Brgy. Malaya
BEPZIII 0.485 34 C 0.297 0.087 0.300 - - - 68.40 *68.40%
Fair
Jepa Construction and Supplies 30375 Repair/Rehab. of Multi-Purpose Pavement III 0.456 75 C 0.332 0.209 0.300 - - - 84.10 *84.10%
V. Satisfactory
Jerber Trading and Construction 19713 Conct. of One (1) CL S/B at Magpapalayok E/S III 0.468 45 C 0.317 0.200 0.300 - - - 81.70 *81.70%
V. Satisfactory
Jerber Trading and Construction 19713 Const. of Multi-Purpose Building/ Structure @ Brgy. Valle Cruz III 0.468 80 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
Jerber Trading and Construction 19713 Rehab. of Gapan-Peñafrancia-Fort Magsaysay Road III 4.727 30 C 0.307 0.207 0.300 - - - 81.40 *81.40%
V. Satisfactory
Jerry R. Santiago Construction 18453 Const. of MPB at NEUST, Sumacab Campus III 3.783 120 C 0.283 0.200 0.300 - - - 78.30 *78.30%
Satisfactory
Jerry S. Santiago Construction 18453Const. of Multi-Purpose Bldg. at
Nueva Ecija University of Science and Technology
III 7.283 150 O 0.280 0.300 0.150 0.030 0.029 0.050 83.90 -
Jervie Const. & Supply Corp. 7022 Completion of MPB @ Brgy. Bulwang VI 0.959 120 C 0.375 0.240 0.000 - - - 61.50 75.78%
Satisfactory
Jessie Construction Services 29878 Const. of Atok MPB CAR 0.480 35 C 0.351 0.147 0.300 - - - 79.80 79.80% Satisfactory
Jet Construction Supply 7063 Concreting of Ajuy-Concepcion Road VI 9.626 230 C 0.345 0.200 0.300 - - - 84.50 74.48%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page235
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Jetver Trading & Construction 25501 Rehab./Impv't of Caguisan Brgy. Stage IV-B 0.470 90 C 0.481 0.092 0.300 - - - 87.30 *87.30%
Satisfactory
Jetver Trading & Construction 25501 Const. of MPB @ Brgy. Poblacion IV-B 0.479 120 C 0.359 0.200 0.300 - - - 85.90 82.89% V. Satisfactory
Jetver Trading & Construction 25501 Const. of Sch. Bldg., Tagusao NHS (1 CL) IV-B 0.947 150 C 0.383 0.200 0.300 - - - 88.30 *88.30%
V. Satisfactory
JFAP Construction 21706 Const./Rehab. of Ormoc-Margen-Sitio Palimpinon Box Culvert VIII 0.381 45 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
JFAP Construction 21706Const./Rehab./Impv't. of Multi-
Purpose Bldg. Ormoc City Center for Sports & Development
VIII 0.480 45 C 0.374 0.241 0.300 - - - 91.50 *91.50% Outstanding
JFAP Construction 21706
Repair & Rehabilitation of Palo-Carigara-Ormoc Road, Km
984+753-Km 985+503 w/ exceptions
VIII 4.819 150 C 0.355 0.191 0.300 - - - 84.60 *84.60%Satisfactory
Jhall Marketing & Services 15760 Conc. of Carles-Balasan Road, Guinticgan Section VI 5.099 220 C 0.280 0.211 0.300 - - - 79.10 *79.10%
Satisfactory
Jhall Marketing & Services 15760 Const. of MPB in Sto. Rosario VI 1.369 90 C 0.279 0.300 0.300 - - - 87.90 86.36% V. Satisfactory
Jhall Marketing & Services 15760 Upgrading/Conc. of Capinang-San Dionisio Road VI 9.545 180 C 0.390 0.187 0.300 - - - 87.70 86.02%
Satisfactory
JHI Construction & Supply 19317 Const. of MPB (Phase V) I 0.948 50 C 0.257 0.300 0.300 - - - 85.70 *85.70% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page236
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
JHI Construction & Supply 19317 Impvt. of Viray-Depalo River Control Project I 4.823 75 C 0.367 - 0.500 - - - 86.70 *86.70%
V. Satisfactory
JHJ Construction 3781 Completion of Codingle Bridge VI 4.452 150 C 0.200 0.200 0.300 - - - 70.00 75.64% Satisfactory
JHJ Construction 3781Const. of Capiz State University
Auditorium, Capiz State University Main Campus
VI 5.708 278 C 0.348 0.300 0.300 - - - 94.80 85.21% V. Satisfactory
JHJ Construction 3781 Const. of Maragubdob Bridge VI 7.999 165 C 0.400 0.200 0.300 - - - 90.00 86.10% V. Satisfactory
JHJ Construction 3781 Const./Completion of DepEd Bldg. (Roof Deck Roofing) Phase I VI 0.949 0 C 0.364 0.100 0.300 - - - 76.40 *76.4%
Satisfactory
Jim-Jake Const. & Supply 23377 Conc. of Legazpi Road I 0.288 60 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Jireh Construction & Supply 8240 Const. of Libtong-Mobo Bridge, Phase XVI @ Estancia-Mobo VI 4.906 120 C 0.362 0.293 0.300 - - - 95.50 *95.50%
Outstanding
Jireh Construction & Supply 8240 Const./Impv't. of Sitio-Agtinga-Madrona Estate FMR, Camili ARC IV-B 17.443 310 C 0.232 0.267 0.000 - - - 49.90 70.48%
Satisfactory
Jirk Construction 29918 Const. of Cagayan River Control II 9.469 240 O 0.400 0.200 0.000 0.030 0.023 0.067 72.00 -
Jirk Construction 29918 Const. of Drainage Canal II 1.412 90 C 0.211 0.200 0.300 - - - 71.10 *71.10% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page237
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Jirk Construction 29918 Const. of Drainage Canal @ Bagumbayan and Tucalana II 0.435 150 C 0.260 0.104 0.300 - - - 66.40 *66.40%
Fair
JJ & J Construction & General Supply 3023 Rehabilitation of Owak Isidro
Communal Irrigation System NIA-VII 2.377 90 O 0.342 0.300 0.300 - - - 94.20 -
JJ & J Construction and General Supply 30231 Const. of MPB at Brgy. Bacayan VII 0.479 50 C 0.300 0.000 0.300 - - - 60.00 *60.00%
Poor
JJ & J Construction and General Supply 30231 Const. of Multi-Purpose Building
@ Brgy. Dumlog VII 1.138 97 C 0.366 0.300 0.300 - - - 96.60 91.46% Outstanding
JJ & J Construction and General Supply 30231 Const. of Triple Box Culvert VII 2.874 60 C 0.337 0.200 0.300 - - - 83.70 *83.70%
V. Satisfactory
JJ & J Construction and General Supply 30231 Const./Conc. of 2 lanes Access
Road to New City Hall (Phase I) VII 4.748 130 C 0.329 0.300 0.300 - - - 92.90 84.50% V. Satisfactory
JJ & J Construction and General Supply 30231 Const./Conc. of 4 lanes Access
Road to New Toledo City Hall VII 4.748 105 O 0.312 0.300 0.030 0.030 0.035 0.067 77.40 -
JJ & J Construction and General Supply 30231 Impvt. of Sapangdaku Riverwall VII 1.898 60 C 0.311 0.300 0.300 - - - 91.10 *91.10%
Outstanding
JJ & J Construction and General Supply 30231 Repair/Rehabilitation of Road VII 0.711 60 C 0.376 0.182 0.300 - - - 85.80 *85.80%
Satisfactory
JJ & J Construction and General Supply 30231 Repair/Rehabilitation of Road VII 0.711 60 C 0.257 0.182 0.300 - - - 73.90 *73.90%
Poor
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page238
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
JJA Construction and Supply 22676 Conc. of Calanan Jct.-Pinukpuk Jct. Road CAR 4.599 150 C 0.341 0.013 0.300 - - - 65.40 81.24%
V. Satisfactory
JJA Construction and Supply 22676 Const. of Dapasen Community Erosion Control CAR 0.192 120 C 0.147 0.300 0.300 - - - 74.70 *74.70%
Satisfactory
JJA Construction and Supply 22676 Impvt./Conc. of Mapaway-Appas via Ipil Road CAR 1.107 120 C 0.353 0.200 0.300 - - - 85.30 *85.30%
V. Satisfactory
JL Construction 31720 Impvt. of MPB and Drainage System CAR 0.953 45 C 0.308 0.200 0.300 - - - 80.80 *80.80%
V. Satisfactory
JLP Construction & Supply 26983 Academic Building 3 DOST 8.294 120 O 0.383 0.295 0.150 0.030 0.062 0.050 97.00 -
JLP Construction & Supply 26983 Girl's Dormitory DOST 3.960 365 O 0.345 0.300 0.015 0.030 0.059 0.050 79.90 -
JLP Construction & Supply 26983 San Ildefonso Ilocos Sur (Girls Dormitory) DOST 3.960 120 C 0.308 0.234 0.300 - - - 84.20 84.20%
Satisfactory
JLP Construction & Supply (Formerly: JLP Construction) 26983
Rehab. of 4 Cl Sch.Bldg. (Gabaldon Type) @ Solsona South
E/S I 2.842 67 C 0.345 0.300 0.300 - - - 94.50 86.73%
V. Satisfactory
JLP Construction Supply 26983 San Ildefonso Ilocos Sur (Girls Dormitory) DOST 3.960 120 C 0.308 0.234 0.300 - - - 84.20 84.20%
Very Satisfactory
JLV Construction & Supply 9953 Const. of Multi-Purpose Building IV-A 0.960 90 C 0.259 0.300 0.300 - - - 85.90 84.36% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page239
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
JLV Construction & Supply 9953 Const. of School and MPB @ Batuan CENTEX IV-A 1.430 120 C 0.262 0.268 0.300 - - - 83.00 *83.00%
V. Satisfactory
JLV Construction & Supply 9953 Const. of Taliba-Tejero FMR IV-A 0.949 80 C 0.250 0.300 0.300 - - - 85.00 *85.00% V. Satisfactory
JLV Construction & Supply 9953 Const./Rehab. of Road IV-A 0.284 45 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
JLV Construction & Supply 9953 Const./Rehab. of Road IV-A 0.284 45 C 0.306 0.210 0.300 - - - 81.60 *81.60% V. Satisfactory
JLV Construction & Supply 9953 Impvt./Rehab. of Multi-Purpose Building @ Brgy. Pantay Matanda IV-A 3.858 120 C 0.294 0.217 0.300 - - - 81.10 84.67%
V. Satisfactory
J-Marbel Construction and Supply 24268 Construction of Auditorium DOST 13.961 169 O 0.350 0.293 0.062 0.030 0.053 0.033 82.05 -
J-Marbela Construction and Supply 24268 Const. of 3 Cl Sch. Bldg. @ San
Roque E/S V 1.146 120 C 0.334 0.120 0.300 - - - 75.40 *75.40% Satisfactory
J-Marbela Construction and Supply 24268 Land Dev't. of Calabanga
Resettlement Project NIA-V 9.977 170 O 0.267 0.289 0.000 0.030 0.020 0.000 60.60 -
J-Marbela Construction and Supply 24268 Opening/Impvt. of San Roque-
Carangonhan Brgy. Road V 9.623 120 C 0.361 0.265 0.300 - - - 92.60 *92.60% Outstanding
JMLD Construction 22679 Conc. of Road at Zone 6, Grijalvo V 0.279 60 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page240
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
JMT Construction 14186 Conc. of Dapa-Cancohoy del Carmen Road (Sta. Fe Sect.) XIII 7.638 195 C 0.348 0.200 0.300 - - - 84.80 *84.80%
V. Satisfactory
JMT Construction 14186 Const. of Jagupit-Lilang FMR XIII 4.563 105 C 0.352 0.200 0.300 - - - 85.20 *85.20% V. Satisfactory
JMT Construction 14186 Impvt./Conc. of Dapa-Del Carmen Road XIII 9.522 287 C 0.365 0.300 0.000 - - - 66.50 73.48%
Satisfactory
JMT Construction 14186 Replacement of San Isidro Bridge (Phase II) XIII 19.280 241 C 0.371 0.200 0.300 - - - 87.10 82.18%
V. Satisfactory
JMU Construction 6877 Const. of MPB (Gym Phase I) II 4.822 120 C 0.260 0.200 0.300 - - - 76.00 76.00% Satisfactory
JMU Construction 6877 Const. of MPB (Muicipal Hall / Annex Bldg.) II 0.482 60 C 0.359 0.200 0.300 - - - 85.90 *85.90%
V. Satisfactory
JMU Construction 6877 Const. of Multi-Purpose Building (Gymnasium) II 1.888 150 O 0.317 0.300 0.070 0.015 0.027 0.050 77.90 -
JMU Construction 6877Construction of 1 CL Std. Sch.
Building @ San Juan Integrated School
II 0.483 60 C 0.372 0.200 0.300 - - - 87.20 *87.20% V. Satisfactory
JNA Construction 10615 Const. of FMR Cluster 1, Brgy. Poblacion III III 0.773 70 C 0.315 0.300 0.300 - - - 91.50 *91.50%
Outstanding
J'ner Cepada Construction 30212 Concrete Paving of Barangay Cambooc Road VIII 0.471 90 C 0.311 0.200 0.300 - - - 81.10 *81.10%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page241
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
J'ner Cepada Construction 30212 Concreting Road, Sta. Sofia-Tangkaan Road VIII 1.876 75 C 0.356 0.200 0.300 - - - 85.60 *85.60%
Satisfactory
J'ner Cepada Construction 30212 Const. of Libas MPB VIII 0.995 90 C 0.344 0.200 0.300 - - - 84.40 *84.40% V. Satisfactory
J'ner Cepada Construction 30212Repair/Impvt. of National Road
along Ilag-Liloan Section, Libagon-Liloan Road Section
VIII 4.761 180 C 0.346 0.242 0.300 - - - 88.80 *88.80% V. Satisfactory
Jobel Enterprises 19799 Completion of MPB (Phase 2), Brgy. Salac IV-A 0.384 30 C 0.391 0.200 0.300 - - - 89.10 *89.10%
V. Satisfactory
Jobel Enterprises 19799 Const. of Drainage System IV-A 0.476 30 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Jobel Enterprises 19799 Const. of MPB IV-A 0.477 60 C 0.270 0.226 0.300 - - - 79.60 *79.60% Satisfactory
Jobel Enterprises 19799 Const. of One (1) CL School Building @ Coralan E/S IV-A 0.466 40 C 0.364 0.200 0.300 - - - 86.40 *86.40%
V. Satisfactory
Jobel Enterprises 19799 Impvt./Rehab. of Bridge Approaches, CSCF Jct. IV-A 2.887 75 C 0.370 0.200 0.300 - - - 87.00 *87.00%
V. Satisfactory
John Arne Construction 24621 Const. of Pinamungajan Public Market, Cebu (Phase VII) VII 2.089 130 C 0.284 0.178 0.300 - - - 76.20 76.78%
Satisfactory
John Dee B. Bustamante Construction 30458 Conc. of Ipil-ipil St. III 0.743 75 C 0.239 0.300 0.300 - - - 83.90 *83.90%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page242
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
John Dee B. Bustamante Construction 30458 Conct. of 2 CL School Bldg.
Carmen T. Valenzuela E/S III 0.801 120 C 0.346 0.186 0.300 - - - 83.20 *83.20% V. Satisfactory
John Dee B. Bustamante Construction 30458
Const. of Drainage System along Burgos Ext. (Gloria St. to
Baclaran)III 0.473 60 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V. Satisfactory
John Dee B. Bustamante Construction 30458 Construction of One (1) Unit
Science CL, Rizal, E/S III 0.808 75 C 0.500 0.133 0.300 - - - 93.30 *93.30%V. Satisfactory
John Ray Developer & Supplies 20795 Conc. of Kidapawan-Magpet-Pangao-an Road, Mateo Section XII 5.607 100 C 0.353 0.277 0.300 - - - 93.00 *93.00%
Outstanding
John Ray Developer & Supplies 20795Const. of Drainage Canal along Cotabato-Davao Road (Central
Marketing/Metro Bank Side)XII 4.508 160 C 0.351 0.300 0.300 - - - 95.10 89.70%
V. Satisfactory
John Ray Developer & Supplies 20795 Const./Completion (Repair/Rehab.) of MPB @ BPI Balindog XII 0.466 50 O 0.300 0.240 0.100 0.030 0.023 0.100 79.30 -
John Ray Developer & Supplies 20795 Rehab./Impv't. of Cotabato 1st District Engineering office Bldg., XII 0.964 105 C 0.390 0.265 0.300 - - - 95.50 *95.50%
Outstanding
Jojo Construction & Dev't. Corp. (Formerly: Jojo Const.) 13174
Const. (Road Opening) of FMR with Drainage System @ Brgy.
Ilayang IyamIV-A 1.148 40 C 0.483 0.117 0.300 - - - 90.00 *90.00%
V. Satisfactory
Jojo Construction & Dev't. Corp. (Formerly: Jojo Const.) 13174 Impvt. of Flood Control &Drainage
along MSR-Tiaong Section IV-A 2.381 120 C 0.394 0.200 0.300 - - - 89.40 86.16% V. Satisfactory
Jomar Builders & Supply 9138 Conc. of Municipal Streets, Brgy. 1, 2, 3, & 4 V 0.941 60 C 0.298 0.200 0.300 - - - 79.80 *79.80%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page243
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Jomar Builders & Supply 9138 Const. of Multi-Purpose Building V 0.953 60 C 0.257 0.300 0.300 - - - 85.70 *85.70% V. Satisfactory
Jomar Builders & Supply 9138 Const. of Multi-Purpose Building @ Brgy. Bagumbayan V 0.469 60 C 0.286 0.100 0.300 - - - 68.60 77.63%
Satisfactory
Jomar Builders & Supply 9138 Rehab./Impvt. of DPWH Camarines Norte DEO V 1.885 90 C 0.382 0.200 0.300 - - - 88.20 *88.20%
V. Satisfactory
Jomarcann General Construction 30599 Const. Flood Control along Ambalanga River CAR 4.763 110 C 0.305 0.300 0.300 - - - 90.50 88.04%
V. Satisfactory
Jomarcann General Construction 30599Const. of Flood Control along Balili River, Km. 253+000 - Km.
255+000CAR 9.623 205 C 0.230 0.200 0.300 - - - 73.00 *73.00%
Satisfactory
Jomarcann General Construction 30599 Construction of Farm-to-Market Road, Ambaracao Norte I 1.924 60 C 0.279 0.200 0.300 - - - 77.90 *77.90%
Unsatisfactory
Jomarcann General Construction 30599 Construction of Multi-Purpose Building CAR 9.631 897 C 0.299 0.200 0.300 - - - 79.90 *79.90%
Unsatisfactory
Jomarcann General Construction 30599Repair & Maintenance of Laoag-Sarrat-Piddig-Solsona Road, km.
493+000-km. 501+000, Sarrat Sect.I 4.646 60 C 0.344 0.200 0.300 - - - 84.40 75.73%
Satisfactory
Jometron Engineering & Construction 23147 Conc. of Donsol-Banuang Road V 6.465 150 C 0.333 0.194 0.300 - - - 82.70 82.70%
V.Satisfactory
Jometron Engineering & Construction 23147 Const. of Castilla Flood Control V 4.778 90 C 0.373 0.200 0.300 - - - 87.30 84.36%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page244
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Joni Construction 26023 Completion of Boys Dormitory & Perimeter Fence DOST 7.049 120 C 0.307 0.287 0.300 - - - 89.40 89.40%
Very Satisfactory
Joni Construction 26023 Completion of Boys Dormitory & Perimeter Fence DOST 7.049 120 C
Joni Construction 26023 Const. of 1 CL Secondary Sch. Bldg. at Babatngon NHS VIII 0.503 60 C 0.334 0.200 0.300 - - - 83.40 *83.40%
V. Satisfactory
Joni Construction 26023Const. of Brgy. Cagbonga-Brgy.
Maypangdan FMR, Brgy. Cagbonga
VIII 4.759 219 O 0.340 0.236 0.150 0.030 0.047 0.033 83.60 -
Joni Construction 26023 Repair/Maintenance of Burayan Revetment VIII 1.190 60 C 0.280 0.200 0.300 - - - 78.00 *78.00%
Satisfactory
Jorvivs Construction 6527 Const. of 2 Storey 6 CL MalaybalayCity Central School X 4.242 210 C 0.393 0.226 0.000 - - - 61.90 72.15%
Satisfactory
Jorvivs Construction 6527
Const. of Tertiary School Bldg. Northern Bukidnon Community
College (Const. of 3-Storey Bldg. Phase I)
X 4.744 145 C 0.372 0.300 0.000 - - - 67.20 80.06% V. Satisfactory
Joselle Construction 16243 Conc. of Brgy. 2 @ Osmeña Ave. XIII 2.350 75 C 0.342 0.200 0.300 - - - 84.20 83.54% V. Satisfactory
Joselle Construction 16243 Concreting of Barangay Osmena-Magkiangkang Road XIII 2.821 150 C 0.459 0.133 0.300 - - - 89.20 *89.20%
V.Satisfactory
Joselle Construction 16243 Const./Completion of Multi-Purpose Building XIII 0.914 90 C 0.388 0.300 0.300 - - - 98.80 *98.80%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page245
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Joy Construction 14386 Const of 1-Unit, 1-CL School Building IX 0.362 140 C 0.385 0.257 0.300 - - - 94.20 82.09%
V. Satisfactory
Joy Construction 14386Const. & Repair/Rehab. of Various
School Bldg. (Clustered-2) 2nd Batch CY 2004
IX 0.657 60 C 0.378 0.000 0.300 - - - 67.80 82.22% V. Satisfactory
Joy Construction 14386 Const. of 1 unit 2 Cl at Port Holand E/S IX 0.675 115 C 0.277 0.188 0.000 - - - 46.50 54.27%
Poor
Joy Construction 14386 Const. of 1-Unit 1-CL School Building @ Tumahubong CES IX 0.366 115 C 0.362 0.200 0.300 - - - 86.20 *86.20%
V. Satisfactory
Joy Construction 14386 Impvt./Conc. of Isabela -Maluso National Road, Batungal Section IX 7.590 80 C 0.233 0.300 0.300 - - - 83.30 79.22%
Satisfactory
Joy-Ann Construction and Supplies 23148 Const. of MPB at Aduana St. City
Proper VI 2.887 120 C 0.333 0.284 0.000 - - - 61.70 59.88% Poor
JQD Construction and General Services 18852 Const. of Maasin City MPB
(Training Center) VIII 7.189 240 C 0.337 0.200 0.300 - - - 83.70 83.03% V. Satisfactory
JR Contractor 9638 Const. of Drainage System, V 0.951 150 C 0.267 0.200 0.300 - - - 76.70 78.44% Satisfactory
JR Contractor 9638 Const./Rehab. of Water Supply V 1.665 90 C 0.474 0.133 0.300 - - - 90.70 85.84% Satisfactory
JRPF Construction & Trading 31899 Const. of MPB @ Telabastagan E/S III 0.836 40 C 0.392 0.200 0.300 - - - 89.20 *89.20%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page246
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
JRPF Construction & Trading 31899 Const. of Pandacaqui Resettlement E/S III 1.901 62 O 0.243 0.252 0.100 0.023 0.038 0.100 76.00 *76.00%
Satisfactory
JSG Construction Company, Inc. 9350 Impvt./Rehab. of Argao-Moalboal Road, Intermittent Section VII 9.601 160 C 0.338 0.300 0.300 - - - 93.80 *93.80%
Outstanding
JSG Construction Company, Inc. 9350Impvt./Rehab. of Bangad-Fort
Magsaysay Road, Cabanatuan City& Sta. Rosa
III 19.143 90 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
JSG Construction Company, Inc. 9350 Impvt./Rehab. of Lipa-Mataas na Kahoy Road, Lipa Section IVA 14.458 120 C 0.289 0.208 0.300 - - - 79.70 83.54%
V. Satisfactory
JSG Construction Company, Inc. 9350Impvt./Rehab. of Natalio Bacalso Ave. Dalaguete-Boljo-on Section
(Phase 2)VII 9.600 182 C 0.231 0.300 0.300 - - - 83.10 *83.10%
V. Satisfactory
JSG Construction Company, Inc. 9350 Impvt./Rehab. of Roads at Brgy. San Isidro IVA 19.280 30 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
JSG Construction Company, Inc. 9350Impvt./Rehab. of Tanauan-Dagami
Road, Cansamada - District IV Sect. with exceptions
VIII 19.296 60 C 0.333 0.200 0.300 - - - 83.30 *83.30% V. Satisfactory
JSG Construction Company, Inc. 9350
Rehab./Impvt. Along Calubian-San Isidro-Tabango-Villaba-Palompon
Road, Km. 1005+346 - Km. 1028+355with exceptions
VIII 19.288 30 C 0.378 0.200 0.300 - - - 87.80 *87.80% V. Satisfactory
JSG Construction Company, Inc. 9350Rehab./Impvt. Along Lemon-Leyte-Biliran Road, Km. 0997+000 - Km.
1004+778 with exceptionsVIII 19.288 36 C 0.398 0.200 0.300 - - - 89.80 *89.80%
V. Satisfactory
JSG Construction Company, Inc. 9350Rehab./Impvt. Along St. Rosario-Villaba Road, Km. 1003+370 - Km.
1014+196 with exceptionsVIII 19.288 30 C 0.391 0.200 0.300 - - - 89.10 *89.10%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page247
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
JSG Construction Company, Inc. 9350 Repair/Impvt. of National Roads, Maasin-Malitbog Road VIII 14.399 140 C 0.355 0.142 0.300 - - - 79.70 *79.70%
Satisfactory
JSG Construction Company, Inc. 9350 Repair/Impvt. of National Roads, Malitbog-Bontoc Road VIII 14.394 140 C 0.376 0.125 0.300 - - - 80.10 *80.10%
V. Satisfactory
JUF Construction 17987 Const. of Brgy. Road @ Brgy. San Rufino VIII 0.952 60 C 0.365 0.262 0.300 - - - 92.70 *92.70%
Outstanding
JUF Construction 17987 Const. of Calbayog Diversion Road, Sta. 9+960-Sta. 10+960 VIII 19.089 240 C 0.496 0.196 0.300 - - - 99.20 *99.20%
Outstanding
JUF Construction 17987Impvt. Along Nabang-Bagaho
Road Section, Calbayog-Catarman via Lope de Vega Road
VIII 4.819 60 C 0.205 0.290 0.300 - - - 79.50 *79.50% Satisfactory
JUF Construction 17987
Rehab. of Damaged Portion of Cagmanipis Bridge along
Maharlika Highway, Calbayog-Allen Road Section
VIII 4.820 90 C 0.314 0.200 0.300 - - - 81.40 *81.40% V. Satisfactory
JUF Construction 17987
Repair/Rehab. of Caglanipao Bridge, Daang Maharlika,
Calbayog-Allen Road, Brgy. Caglanipao Tinambacan District
VIII 9.645 60 C 0.369 0.100 0.300 - - - 76.90 *76.90% Satisfactory
JUF Construction 17987Repair/Rehab. of Calbayog-
Catarman Road (Km. 784+739 to Km. 809+270)
VIII 9.643 210 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Juldan Builders 22810 Conc. of San Leonardo-Peñaranda-Gen. Tinio Road III 7.458 160 C 0.315 0.200 0.300 - - - 81.50 81.50%
V.Satisfactory
Julita Builders 13936
Conc. Paving of Critical Portion of National Circ. Rd., Culaba-
Caibiran Rd. (Maurang-Manlabang Rd. Sect.)
VIII 4.761 160 C 0.242 0.200 0.300 - - - 74.20 79.18% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page248
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Julita Builders 13936 Const. of Multi-Purpose Building @ Brgy. Parasan VIII 0.289 60 C 0.368 0.300 0.300 - - - 96.80 *96.80%
Outstanding
Julita Builders 13936 Construction of Multi-Purpose Building (Municipal Stage) VIII 1.928 90 C 0.396 0.200 0.300 - - - 89.60 *89.60%
V. Satisfactory
Julita Builders 13936 Construction of Multi-Purpose Building (Municipal Stage) VIII 0.949 90 C 0.366 0.055 0.300 - - - 72.10 82.25%
V. Satisfactory
Juncynth Const. & General Services 18385 Concreting of San Roque-San
Isidro Road VIII 0.939 114 C 0.414 0.141 0.300 - - - 85.50 *85.50%Satisfactory
Juncynth Construction General Services 18385 Const. of MPB @ Brgy.
Anahawan (Phase I) VIII 0.469 60 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory
Juncynth Construction General Services 18385 Const. of Bontoc MPB VIII 0.950 120 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V. Satisfactory
Junge Konstrukt 21275 Asphalting of Sunflower St., Brgy. Pasong Tamo NCR 0.954 15 C 0.402 0.200 0.300 - - - 90.20 *90.20%
V.Satisfactory
Jupa Construction 23577Lined Canal along Allen-Catarman
Road (Lavezares-Enriquita Section)
VIII 1.444 90 C 0.233 0.300 0.300 - - - 83.30 *83.30% V. Satisfactory
JV Lagon Construction Corporation 11561
Conc. of Sarangani Davao del Sur Coastal Road, Pangyan-Dungon
SectionXII 9.424 210 O 0.363 0.237 0.030 0.030 0.038 0.067 76.50 -
JV Lagon Construction Corporation 11561
Conc. of Sarangani Davao del Sur Coastal Road, Pangyan-Dungon
SectionXII 9.424 239 O 0.363 0.300 0.081 0.030 0.054 0.033 86.10 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page249
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
JV Lagon Construction Corporation 11561
Concreting of Chua Sect. along Isulan Highway Junction Dukay-Bagumbayan-Sen. Ninoy Aquino-
Lebak Road
XII 10.267 308 O 0.358 0.300 0.050 0.030 0.023 0.067 82.80 -
JV Lagon Construction Corporation 11561
Const. of Approach & Riverbed Protection of Sinawal Bridge II
along GSC Circumferential RoadXII 2.518 120 C 0.353 0.300 0.000 - - - 65.30 70.79%
Satisfactory
JV Lagon Construction Corporation 11561
Rehab./Reconst. of Damaged Roads Dulawan Marbel
(Tacurong-New Carmen Section)XII 19.022 435 O 0.365 0.300 0.099 0.030 0.035 0.050 87.90 -
JV Lagon Construction Corporation 11561 Widening of Kapingkong Bridge XII 13.377 400 O 0.370 0.300 0.000 0.030 0.023 0.000 72.30 -
JYP General Construction 32985 Const./Rehab. of Pongo-Mangga Small Scale Mining FMR CAR 0.312 26 C 0.218 0.200 0.300 - - - 71.80 *71.80%
Satisfactory
K.D.C.M. Construction 29023 Conc. of Abra-Kalinga Road (Cagaluan-Ableg Sect.) CAR 8.952 245 C 0.377 0.200 0.300 - - - 87.70 88.00%
V. Satisfactory
K.D.C.M. Construction 29023 Const. of Binwaan Bridge (Phase II) CAR 5.961 190 C 0.328 0.300 0.300 - - - 92.80 *92.80%
Outstanding
K.D.C.M. Construction 29023Const. of Flood Control Structures along Chico River from Calanan to
CabaruanCAR 4.816 158 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
Kajima Corporation SL2-SN-000286
Lower Agusan Dev't. Project, Stage 1, Phase II, Package IV
Masao River Improvements and Const. of Urban Drainage System
CARBDP 912.171 1,843 O 0.398 0.200 0.100 0.030 0.070 0.200 99.80 -
Kajima Corporation SL2-SN-000286
Masao River Improvement & Const. of Urban Drainage System
CP IV (Lower Agusan Development Project - Stage I,
Phase II)
CARBDP 1,083.477 2,143 C 0.382 0.300 0.300 - - - 98.20 99.00% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page250
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Kajima Corporation FC-04-023Const. of Cebu South Coastal Road Project, Segment 3B-2,
MCDP III, Subway Tunnel Section
CSCRP-MCDP 1,264.367 1,095 O 0.365 0.300 0.100 0.030 0.070 0.100 96.50 -
Kajima Corporation FC-04-023Const. of Cebu South Coastal Road Project, Segment 3B-2,
MCDP III, Subway Tunnel SectionMCDP III 1,264.367 1,095 O 0.358 0.300 0.100 0.030 0.065 0.100 95.30 -
Kajima Corporation FC-04-023Const. of Cebu South Coastal Road Project, Segment 3B-2,
MCDP III, Subway Tunnel SectionMCDP III 1,264.367 1,095 O 0.356 0.300 0.100 0.030 0.070 0.100 96.00 -
Kajima/ Obayashi/ JFE/ Mitsubishi KOJM JV FC-04-023 Subic-Clark-Tarlac Expressway
Project-Package 1 BCDA-III 13968.698 940 C 0.384 0.300 0.070 0.030 0.065 0.067 91.55 83.27% V.Satisfactory
Kalantas Construction & Development Corporation 23915 Conc. of Kinalablaban Bridge
Approaches XIII 17.074 285 C 0.217 0.200 0.300 - - - 71.70 72.78% Satisfactory
Kalantas Construction & Development Corporation 23915 Concreting of San Jose Road
(Boundary Trento Road Section) XIII 19.137 225 O 0.360 0.292 0.150 0.030 0.033 0.050 91.50 -
Kalantas Construction & Development Corporation 23915 Rehabilitation of Dughan-Gamut
FMR XIII 1.733 60 C 0.000 0.073 0.300 - - - 37.30 66.40% Fair
Kamagong Builders & Developers Corporation 1720 Const. of Molino Blvd. By Pass
(Inc. RROW Acquisition) IV-A 20.032 270 C 0.353 0.200 0.300 - - - 85.30 84.46% V. Satisfactory
Kamagong Builders & Developers Corporation 1720 Rehab. of Kawit-Noveleta
Diversion Road IV-A 14.448 90 C 0.308 0.300 0.300 - - - 90.80 83.48% V. Satisfactory
Kane Construction, Inc. 2888 Completion of 2 Storey 2 CL SB @ BCNHS-Main CAR 1.442 50 C 0.373 0.249 0.300 - - - 92.20 91.43%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page251
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Kane Construction, Inc. 2888Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Rd., Phase V,
Pingao-Tomiagan SectionCAR 47.225 300 O 0.317 0.273 0.150 0.030 0.048 0.050 86.80 -
Karangyan Builders & Traders 22622 Const. of 2-Classroom Building @ Polytechnic College of Calapan IV-B 0.951 80 C 0.366 0.300 0.300 - - - 96.60 81.34%
V. Satisfactory
Karpa Builders and Trading 33003 Const. of MPB Town Plaza III 0.476 60 C 0.297 0.300 0.300 - - - 89.70 *89.70% V. Satisfactory
Kasanga Construction 17024 Const. of MPB at Caagutayan IV-B 0.666 82 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory
Kasanga Construction 17024 Const. of MPB at Panggalaan IV-B 0.668 75 C 0.363 0.200 0.300 - - - 86.30 *86.30% V. Satisfactory
Kawi Construction 25844 Completion of Lengey MPB (Phase IV) CAR 2.389 102 C 0.336 0.200 0.000 - - - 53.60 67.11%
Fair
Kawi Construction 25844 Completion of MPB Phase III CAR 0.960 60 C 0.244 0.080 0.000 - - - 32.40 71.74% Satisfactory
KCS Construction & Supply 19641 Conc. of Cemetery Road, Brgy. Catabangan Proper V 0.460 90 C 0.323 0.119 0.300 - - - 74.20 *74.20%
Satisfactory
KCS Construction & Supply 19641 Conc. of Road at Cabuyao Road V 1.912 90 C 0.272 0.300 0.300 - - - 87.20 *87.20% V. Satisfactory
Kent Construction 8655 Conc. Paving of Dapa-Union Road (One Lane) XIII 5.732 145 O 0.233 0.200 0.050 0.030 0.032 0.067 61.20 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page252
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Kent Construction 8655 Conc. Paving of Dapa-Union Road (One Lane) XIII 5.732 145 O 0.325 0.236 0.000 0.030 0.032 0.033 65.60 -
Kent Construction 8655 Const. of MPB (Phase 2) XIII 0.480 125 C 0.374 0.200 0.000 - - - 57.40 71.82% Satisfactory
Kent Construction 8655 Jct. Osmeña-Pilar Road XIII 5.787 120 O 0.239 0.230 0.070 0.030 0.032 0.067 66.80 -
Kenwood Construction Enterprises 22186 Conc. of FMR at Brgy. Tarece I 0.471 90 C 0.256 0.300 0.300 - - - 85.60 82.48%
V. Satisfactory
Kenwood Construction Enterprises 22186 Const. of 12 Cl Building with CR I 4.816 150 C 0.310 0.200 0.300 - - - 81.00 81.00%
V.Satisfactory
Kenwood Construction Enterprises 22186 Const. of Multi-Purpose Covered
Court @ Lomboy E/S I 2.357 90 C 0.332 0.300 0.300 - - - 93.20 87.55% V. Satisfactory
Kenwood Construction Enterprises 22186 Const. of Multi-Purpose Gym
(Phase 1) I 2.892 70 C 0.336 0.300 0.300 - - - 93.60 *93.60% Outstanding
Kenwood Construction Enterprises 22186 Construction of Water System at
Brgy. Leet I 2.411 110 C 0.397 0.200 0.300 - - - 89.70 82.22%Satisfactory
Kenwood Construction Enterprises 22186 Rehab. of Acop-San Angel-
Salvacion Road I 9.637 100 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory
Kenwood Construction Enterprises 22186
Widening/Concreting of McArthur Highway (MNR) including Traffic
ManagementI 10.060 138 O 0.303 0.300 0.150 0.030 0.055 0.050 88.80 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page253
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Kez Enterprises (Formerly: I. Agripo Construction) 25556 Const. of Flood Control/Concrete
Canal X 0.800 75 C 0.391 0.300 0.300 - - - *99.10 99.10% Outstanding
Kez Enterprises (Formerly: I. Agripo Construction) 25556 Const. of MPB X 0.913 60 C 0.264 0.300 0.300 - - - 86.40 82.55%
V. Satisfactory
KGD Builders 21960 Concreting of Road XII 1.413 75 C 0.446 0.133 0.300 - - - 87.90 *87.90% Satisfactory
KGD Builders 21960 Const. of 2-CL Lanton E/S XII 0.796 90 C 0.384 0.178 0.300 - - - 86.20 *86.20% V. Satisfactory
KGD Builders 21960 Const. of Water System @ Purok Pag-asa 2 XII 0.752 45 C 0.318 0.200 0.300 - - - 81.80 *81.80%
V. Satisfactory
KGD Builders 21960 Drilling and Const. of Deepwell (Rotary Drilling) XII 1.124 112 C 0.385 0.200 0.300 - - - 88.50 85.98%
V. Satisfactory
Kilusang Magkaibigan M. P. Cooperative (KMMPC) 31666 Improvement of the Laoag City
General Hospital I 0.944 45 C 0.354 0.200 0.300 - - - 85.40 *85.40%Satisfactory
Kilusang Magkaibigan M.P. Cooperative (KMMPC) 31666 Conc. of Access Road (Jct.
Agusan-Davao Road) XI 4.245 120 C 0.331 0.200 0.300 - - - 83.10 87.84% V. Satisfactory
Kilusang Magkaibigan M.P. Cooperative (KMMPC) 31666 Impvt. of Brgy. San Isidro-Brgy.
Mabini FMR XI 1.882 120 O 0.218 0.247 0.100 0.008 0.048 0.100 72.10 -
Kilusang Magkaibigan M.P. Cooperative (KMMPC) 31666 Impvt. of Highway Jct.-Lantog
Bandera Road XI 4.712 180 O 0.227 0.300 0.100 0.008 0.048 0.100 78.30 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page254
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Kim Harold Trading Manufacturing and Const. 28019 Conc. of PPNR, Taytay El Nido Rd.
(Canduyog-Bato Section) IV-B 14.097 165 O 0.338 0.240 0.100 0.030 0.056 0.067 83.10 -
Kim Harold Trading Manufacturing and Const. 28019 Const. of 1 CL in Central Taytay
Naional High School IV-B 0.369 173 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory
Kim Harold Trading Manufacturing and Const. 28019 Const. of 1 CL Roxas North
Central Sch. IV-B 0.376 210 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satisfactory
Kim Harold Trading Manufacturing and Const. 28019 Repair/Maintenance of Kaylubong
I River Waterways IV-B 0.431 52 C 0.320 0.000 0.300 - - - 62.00 *62.00% Fair
Kim Harold Trading Manufacturing and Const./Orani
Builders & Suuply (JV)28019 Conc. of PPNR, Taytay El Nido Rd.
(Canduyog-Bato Section) IV-B 14.097 165 C 0.270 0.300 0.300 - - - 87.00 84.66% V. Satisfactory
Kim-Harold Trading, Manufacturing & Construction 28019 Rehab. of Roxas-Taytay-El Nido
Rd., PPNR IV-B 1.828 72 C 0.309 0.144 0.300 - - - 75.30 77.94% Satisfactory
Kimphil Construction 21890 Const. of Calapan South Road, Banti Section IV-B 1.408 72 C 0.375 0.300 0.300 - - - 97.50 *97.50%
Outstanding
Kimphil Construction 21890 Const. of Calapan South Road, Himpararay Section IV-B 2.351 89 O 0.348 0.300 0.100 0.007 0.028 0.100 88.30 -
King's Builders & Development Corporation 29199 Const. of 1-CL @ Vicente Ylagan
National High School IV-B 0.764 151 C 0.287 0.244 0.300 - - - 83.10 *83.10% V. Satisfactory
King's Builders & Development Corporation 29199 Const. of Calapan South Road
(San Francisco Sect.) IV-B 1.409 75 C 0.263 0.300 0.300 - - - 86.30 *86.30% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page255
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
King's Builders & Development Corporation 29199 Const. of Hospital Building at
Poblacion IV-B 2.836 120 C 0.311 0.200 0.300 - - - 81.10 81.31% V. Satisfactory
King's Builders & Development Corporation 29199 Const. of Line Canal at Brgy. Sta.
Teresita IV-B 0.941 40 C 0.279 0.229 0.300 - - - 80.80 77.26% Satisfactory
King's Builders & Development Corporation 29199 Const. of Orcunoma River Control IV-B 9.413 198 C 0.296 0.269 0.300 - - - 86.50 85.00%
V. Satisfactory
King's Builders & Development Corporation 29199 Construction of Community
Hospital IV-B 2.843 120 O 0.332 0.235 0.150 0.030 0.025 0.050 82.20 -
King's Builders & Development Corporation 29199 Improvement of Sta. Teresita
Section Road IV-B 0.937 60 C 0.458 - 0.500 - - - 95.80 92.56% Outstanding
King's Builders & Devt. Corp. / Orient Star Const. (J.V.) 29199 Impvt./Repair of Orconuma Dike IV-B 4.729 181 C 0.312 0.200 0.300 - - - 81.20 81.20%
V.Satisfactory
Kirskat Venture 32042 Completion of Multi Purpose Gymnasium DOST 61.723 150 O 0.332 0.285 0.070 0.030 0.047 0.100 86.40 -
Kirskat Venture 32042 Completion of PSHS WVC Gymnasium DOST 8.544 173 C 0.392 0.300 0.300 - - - 99.16 99.16%
Outstanding
Kirskat Venture 32042 Const. of Lupgupan Bridge along Iloilo-Capiz Road VI 9.631 180 C 0.345 0.300 0.300 - - - 94.50 *94.50%
Outstanding
Kirskat Venture 32042 Const. of Maayon River Control VI 3.197 255 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page256
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Kirskat Venture 32042Const. of Panay River Control, Brgy. Punta Tabuc-Roxas City, Iloilo-Capiz Road (New Route)
VI 3.656 225 C 0.345 0.200 0.300 - - - 84.50 87.14% V. Satisfactory
Kirskat Venture 32042 Const. of Side Slope Protection along Iloilo-Capiz (Old Route) VI 4.815 180 C 0.288 0.200 0.300 - - - 78.80 86.00%
V. Satisfactory
KJC Construction and Supply 33041Impvt./Widening of Bacolod-
Murcia-D.S. Benedicto-San Carlos City Road (Wawa Section)
VI 4.520 104 O 0.307 0.300 0.150 0.030 0.041 0.033 86.10 -
KLDS Trading and Construction 28091Const. of 2 Storey 2 Classroom
Schoolbuilding w/ CR @ Amuyong Elem. School
IV-A 1.333 90 C 0.396 0.200 0.300 - - - 89.60 *89.60% V. Satisfactory
KLDS Trading and Construction 28091 Const. of 2 Storey MPB IV-A 0.478 60 C 0.375 0.257 0.300 - - - 93.20 *93.20% Outstanding
KLDS Trading and Construction 28091 Drainage Impvt. Along Brgy. Alulod IV-A 5.281 150 C 0.357 0.200 0.300 - - - 85.70 *85.70%
V. Satisfactory
KLDS Trading and Construction 28091 Rehab./Impvt. of Drainage Canal along Silang By-Pass Road IV-A 0.803 45 C 0.360 0.300 0.300 - - - 96.00 85.32%
V. Satisfactory
Kobey Construction/B.E. Construction (JV) JV-06-065
Const. of Slope Protection of PalaypayBridge along Bugasong-
Valderrama RoadVI 4.782 150 O 0.340 0.160 0.100 0.022 0.048 0.200 87.00 -
Koronadal V & E Builders and Construction Supply 22187
Rehab./Reconst.of Damaged Paved Road along Marbel-Markar
Road, Saravia-Carpenter Hill Section
XII 13.209 252 O 0.385 0.240 0.150 0.030 0.043 0.033 88.10 -
Krenz Construction & Trading 19907 Const. of MPB @ Pamantasan ng Lungsod ng Maynila NCR 7.460 150 C 0.393 0.300 0.300 - - - 99.30 89.36%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page257
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Krisjohn Construction and Supply Corporation 31901 Repair/Rehab. of San Francisco
River Control V 0.905 60 C 0.400 0.200 0.300 - - - 90.00 87.84% V. Satisfactory
Krys-Jon Construction 24624 Construction of Classroom/School Bldg. at NEUST, Sumacab Este III 0.567 45 C 0.407 0.133 0.300 - - - 84.00 *84.00%
Satisfactory
KSS Hardware Consttruction and Supply 31239 Const. of Multi-Purpose Building
at Poblacion XII 0.960 104 C 0.451 0.086 0.300 - - - 83.70 *83.70% Satisfactory
Kuntel Construction 10234 Concreting of Road along Magsunday Bridge III VI 0.956 95 C 0.287 0.185 0.300 - - - 77.20 82.30%
V. Satisfactory
Kuntel Construction 10234 Rehab./Conc. of Himamaylan Road Section VI 8.040 205 C 0.323 0.200 0.300 - - - 82.30 84.82%
V. Satisfactory
Kuntel Construction 10234Widening/Impvt. of Bacolod South
Kabankalan Road (Bacolod City Sect.)
VI 7.874 210 C 0.299 0.200 0.300 - - - 79.90 77.18% Satisfactory
KV Constraction & Supply 17509 Rehabilitation of Pinagwarasan CIS NIA-V 3.189 150 C 0.371 0.180 0.300 - - - 85.10 *85.14%
V. Satisfactory
KV Construction and Supply 17509 Const. of Sahing Flood Control along MWCR IVB 12.012 130 C 0.240 0.200 0.300 - - - 74.00 75.92%
Satisfactory
KV Construction and Supply 17509Rehab. of Galocan Bridge along Manila South Road, Malangad-
BasudV 11.441 280 C 0.400 0.154 0.300 - - - 85.40 *85.40%
V. Satisfactory
KVC Construction 28959 Conc. of Baguio-Bontoc- Mt. Data Road (Bun-ayan-Pakya Sect.) CAR 9.783 180 C 0.234 0.200 0.000 - - - 43.40 54.58%
Poor
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page258
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
KVC Construction 28959 Conc. of Baguio-Itogon Road CAR 14.308 195 C 0.370 0.192 0.300 - - - 86.20 80.26% Unsatisfactory
KVC Construction 28959 Const. of Tocucan Bridge CAR 4.041 140 C 0.359 0.200 0.300 - - - 85.90 77.74% Satisfactory
KVC Construction 28959Impvt. Along Acop-Kapangan-
Kibungan Road (km. 278+300 - km. 280+760)
CAR 6.704 82 C 0.347 0.000 0.300 - - - 64.70 64.70% Fair
KVC Construction 28959 Rehab. Along Acop-Kapangan-Kibungan Road CAR 9.565 150 C 0.368 0.200 0.300 - - - 86.80 80.08%
V. Satisfactory
KVC Construction 28959 Rehab. Along Kennon Road CAR 8.412 150 C 0.372 0.192 0.300 - - - 86.40 78.54% Satisfactory
KVC Construction 28959 Repair/Rehab. Along Alapang-Labueg Road CAR 0.284 28 C 0.276 0.300 0.300 - - - 87.60 *87.60%
V. Satisfactory
KVCC Construction 27179 Rehab. of Brgy. Imelda-Brgy. Poblacion Road VIII 1.906 101 C 0.394 0.194 0.300 - - - 88.80 85.08%
Satisfactory
Kwikbuilt Construction 24577 Const. of Std. 1 unit 1Cl Sch. Bldg. @ Paglaum NHS NOSof Ext. VI 3.181 55 C 0.335 0.300 0.300 - - - 93.50 *93.50%
Outstanding
Kyro Builders 19567 Conc. of Roads at Sta. Cruz III 0.936 25 C 0.321 0.300 0.300 - - - 92.10 *92.10% Outstanding
Kyro Builders 19567 Concreting of Bantug-Sapang Cawayan FMR III 4.709 60 O 0.336 0.262 0.150 0.020 0.025 0.033 82.60 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page259
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Kyro Builders 19567 Const. of Multi-Purpose Building/Health Center III 7.488 120 C 0.348 0.200 0.300 - - - 84.80 75.21%
Satisfactory
L & L Construction 15108 Conc. of Initao Road X 0.960 45 C 0.325 0.300 0.000 - - - 62.50 *62.50% Fair
L & L Construction 15108 Const. of MPB, Brgy. Luyong Bonbon X 0.964 75 C 0.388 0.226 0.300 - - - 91.40 *91.40%
Outstanding
L. Baltonado Construction & Development Corporation 25250 Conc. of Tabing-Kawayan-
Sta.Rosa-Lawis-Tabango Road VIII 4.738 120 C 0.385 0.200 0.300 - - - 88.50 88.50% V.Satisfactory
L. Baltonado Construction & Development Corporation 25250 Conc. Paving of San Isidro-
Tabango Road VIII 2.846 120 C 0.364 0.200 0.300 - - - 86.40 *86.40% V. Satisfactory
L. Baltonado Construction & Development Corporation 25250 Const. of Multi-Purpose Building
(Bleacher & Gym) VIII 1.444 90 C 0.343 0.276 0.300 - - - 91.90 *91.90% Outstanding
L. P. O. Enterprises 20730 Const, of River Control in Brgy, Dela Paz IV-A 0.477 60 O 0.264 0.240 0.100 0.030 0.016 0.100 75.00 -
L.A. Arizola Construction & Supply 31060 Conc. of Fatima-Malabog Road XI 2.694 210 C 0.306 0.300 0.300 - - - 90.60 90.60%
Outstanding
L.A. Arizola Construction & Supply 31060
Conc. of Kidapawan Magnet-Pangaon-an Road inc. Marbel
Bridge and ApproachesXII 9.485 90 O 0.328 0.240 0.150 0.030 0.035 0.033 81.60 -
L.A. Arizola Construction & Supply 31060 Conc. of Road @ Brgy. Maa XI 9.441 90 C 0.346 0.300 0.300 - - - 94.60 *94.60%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page260
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
L.A. Arizola Construction & Supply 31060 Const. of 1 Cl 1 Storey Sch. Bldg.
@ Mulig NHS XI 0.452 210 C 0.275 0.300 0.300 - - - 87.50 *87.50% V. Satisfactory
L.A. Arizola Construction & Supply 31060
Impvt./Conc. of Additional 2 lanes from Church of Later Day Saints
up to CarmenXI 4.129 150 C 0.277 0.300 0.300 - - - 87.70 87.70%
V. Satisfactory
L.A. Arizola Construction & Supply 31060 Road Conc. @ Sitio Tamayong XI 0.914 120 C 0.389 0.200 0.300 - - - 88.90 *88.90%
V. Satisfactory
L.A. Clamor Construction 26413 Const. of 2 CL Sch. Bldg. at Canda NHS IV-A 2.013 50 C 0.392 0.200 0.300 - - - 89.20 *89.20%
V. Satisfactory
L.A. Clamor Construction 26413 Const. of MPB @ Brgy. Buenavista West IV-A 0.669 30 C 0.389 0.300 0.300 - - - 98.90 *98.90%
Outstanding
L.C. Construction 7024 Const. of 1CL Modified Standard School Building IX 0.476 40 C 0.462 0.175 0.300 - - - 93.70 *93.70%
V. Satisfactory
L.C. Construction 7024 Const. of One (1) unit Modified Sch. Bldg., Lantian Elem. Sch. IX 0.490 45 C 0.356 0.156 0.300 - - - 81.20 *81.20%
V. Satisfactory
L.C. Construction 7024 Construction/Rehabilitation/Repair of Multi-Purpose Bldg. IX 0.464 30 O 0.395 0.240 0.150 0.020 0.032 0.050 88.70 -
L.C. Construction 7024 Rehab. of Cagayan de Oro Port Road X 0.490 14 O 0.275 0.240 0.042 0.020 0.027 0.050 65.40 -
L.C. Ting Construction 23666Conc. of Additional Lane along
Iligan-Cagayan de Oro-Butuan CityLibertad-Bancasi Section
XIII 9.466 150 C 0.297 0.300 0.300 - - - 89.70 79.20% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page261
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
L.C. Ting Construction 23666 Conc. of Lake Mainit Circumferential Road XIII 9.618 195 C 0.379 0.200 0.300 - - - 87.90 84.36%
Satisfactory
L.C. Ting Construction 23666
Conc. of Surigao-Davao Coastal Road Hinatuan-Bislig (Tagasaka
Section) (Sta.1438+673.577-Sta.1439+415.61)
XIII 9.365 110 C 0.254 0.300 0.300 - - - 85.40 89.12% V. Satisfactory
L.C. Ting Construction 23666 Const. of Damaged Flood Control Structure along Napaliran River X 9.033 210 C 0.304 0.300 0.300 - - - 90.40 80.95%
V. Satisfactory
L.C. Ting Construction 23666 Const. of Matho Bridge and Approaches XIII 14.368 228 C 0.330 0.300 0.000 - - - 63.00 70.86%
Satisfactory
L.C. Ting Construction 23666 Const. of MAT-I Bridge and Approaches XIII 11.822 255 O 0.342 0.300 0.100 0.030 0.038 0.100 91.00 -
L.C. Ting Construction 23666 Const. of Olave Bridge and Approaches XIII 18.338 275 O 0.314 0.284 0.050 0.030 0.038 0.100 81.60 -
L.C. Ting Construction 23666 Rehab. of Amontay Bailey Bridge XIII 5.765 25 C 0.225 0.300 0.300 - - - 82.50 *82.50% V. Satisfactory
L.C. Ting Construction 23666 Rehab. of Libertad Bridge along Butuan City-Misamis Oriental Rd. XIII 10.856 195 C 0.323 0.300 0.300 - - - 92.30 91.16%
Outstanding
L.C. Ting Construction 23666 Rehab./Const.of Mamkas River Control @ Sitio Siringan Kitcharao XIII 9.534 135 C 0.345 0.300 0.300 - - - 94.50 80.16%
V. Satisfactory
L.C. Ting Construction / Davao L.A. Parts & Hardware
Corporation Joint VentureJV-07-102
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-
Boston) Manay SectionXI 47.225 166 O 0.272 0.298 0.100 0.030 0.055 0.067 82.20 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page262
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
L.C. Ting Construction / Davao L.A. Parts & Hardware
Corporation Joint VentureJV-07-102
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-
Boston) Manay SectionXI 47.218 303 O 0.303 0.300 0.021 0.030 0.055 0.033 74.20 -
L.D. Barcelona Construction and Supply 20963 Road Concreting at E.B. Magalona VI 0.906 60 C 0.328 0.196 0.300 - - - 82.40 82.64%
V. Satisfactory
L.G. Lasacar Construction 11960 Const. of Cross-Country Road at Catarman-Mambajao Section X 9.293 457 C 0.280 0.300 0.300 - - - 88.00 72.22%
Satisfactory
L.G. Lasacar Construction 11960 Const. of Road, Sitio Maubog, Balbagon X 0.949 65 C 0.401 0.133 0.300 - - - 83.40 *83.34%
Satisfactory
L.G. Lasacar Construction 11960Const./Improvement of Cross
Country Road, Catarman-Mambajao Section
X 4.368 187 C 0.349 0.008 0.300 - - - 65.70 84.24% V. Satisfactory
L.G. Lasacar Construction 11960 Rehab./Conc. of Upper Tupsan Brgy. Road X 0.920 85 C 0.353 0.300 0.300 - - - 95.30 *95.30%
Outstanding
L.L.A. Builders 15075 Const. of MPB IV-A 1.154 110 C 0.352 0.300 0.300 - - - 95.20 *95.20% Outstanding
L.M.G. Construction 5719 Completion of Multi-Purpose Building, Brgy. Signal Village NCR 7.675 120 O 0.361 0.226 0.150 0.030 0.012 0.033 81.20 -
L.M.G. Construction 5719 Daang Maharlika (LZ) III 18.916 300 O 0.334 0.180 0.100 0.020 0.028 0.100 76.20 -
L.M.G. Construction 5719 Daang Maharlika (LZ), Sta. 98+700 to Sta. 101+800 w/ exception III 18.916 300 C 0.423 0.200 0.300 - - - 92.30 82.64%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page263
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
L.M.G. Construction 5719
Repair/Rehab./Impvt. of Roadways (Inst. of Road Traffic Safety Devices), SLMAC Road (So.
Dimotol-By PassRd..)
III 4.624 25 C 0.224 0.200 0.300 - - - 72.40 *72.40% Satisfactory
L.M.G. Construction 5719 Repair/Rehab./Impvt. of San Jose-Lupao Road III 7.023 7 C 0.229 0.300 0.300 - - - 82.90 *82.90%
V. Satisfactory
L.N. Salvador Construction 16661 Completion of MPB at Pola Central E/S IV-B 4.803 180 C 0.361 0.200 0.300 - - - 86.10 85.12%
V. Satisfactory
L.N. Salvador Construction 16661 Const. of Drainage System at Malayas-Poblacion IV-B 4.642 110 C 0.337 0.221 0.300 - - - 85.80 86.13%
V. Satisfactory
L.P.O. Enterprises 20730 Consst. of MPB at Market Area IV-A 1.920 90 C 0.316 0.200 0.300 - - - 81.60 *81.60% V. Satisfactory
L.P.O. Enterprises 20730
Const. (Rehab., Replacement, Completion and Repair) of Two (2) Storey (4) Classroom Sch. Bldg. at
San Mateo E/S
IV-A 4.647 120 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
L.P.O. Enterprises 20730 Const. of 2 Storey 4 CL at Don Jose IV-A 4.045 120 C 0.364 0.200 0.300 - - - 86.40 83.32%
V. Satisfactory
L.P.O. Enterprises 20730 Const. of 2 Storey 4 CL at Pedro Guevarra MNHS IV-A 3.632 90 C 0.365 0.279 0.300 - - - 94.40 *94.40%
Outstanding
L.P.O. Enterprises 20730 Const. of 2 Storey 4 Cl Sch. Bldg. @ San Isidro NHS IV-A 5.549 150 O 0.356 0.297 0.100 0.030 0.027 0.100 *91.00 -
L.P.O. Enterprises 20730 Const. of FMR @ Brgy. Gatid IV-A 0.955 40 C 0.361 0.295 0.300 - - - 95.60 *95.60% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page264
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
L.P.O. Enterprises 20730 Const. of MPB (Phase II) IV-A 1.442 75 C 0.472 0.133 0.300 - - - 90.50 *90.50% V. Satisfactory
L.P.O. Enterprises 20730 Const. of River Control in Brgy. Dela Paz IV-A 0.477 60 O 264.000 240.000 0.100 0.030 0.016 0.100 75.00 -
L.P.O. Enterprises 20730 Const./Rehab. of School Bldg. @ Los Banos Community NHS IV-A 1.915 120 O 0.300 0.300 0.100 0.030 0.027 0.100 85.70 -
L.R. Tiqui Builders, Inc. 13810 Impv't. / Widening of Manila North Road (MNR) Package III Km.44+00-
Km.51+330 with exception,III 91.249 225 C 0.397 0.300 0.300 - - - 99.70 96.85%
Outstanding
L.R. Tiqui Builders, Inc. 13810 Asphalt overlay of Daang Maharlika II 39.996 80 O 0.388 0.225 0.150 0.030 0.059 0.050 90.20 -
L.R. Tiqui Builders, Inc. 13810 Conc. of Goa-Digdigon-San Isidro Road V 14.041 90 C 0.211 0.200 0.300 - - - 71.10 78.12%
Satisfactory
L.R. Tiqui Builders, Inc. 13810
Const. of Palilihan Bridge # 1 including approaches and Road
Right-of-Way along Roman Expressway
III 90.181 240 O 0.351 0.300 0.150 0.030 0.056 0.050 93.70 -
L.R. Tiqui Builders, Inc. 13810 Impv't. & Rehab. of Gen. Alejo Santos Highway III 82.002 210 C 0.389 0.200 0.300 - - - 88.90 *88.90%
Satisfactory
L.R. Tiqui Builders, Inc. 13810
Impvt. (Widening/Conc.) of Mc Arthur Highway (MNR)
Meycauayan to Mabalacat, Pampanga (Phase IV) Package 1
III 188.051 270 O 0.376 0.300 0.100 0.030 0.060 0.100 96.60 -
L.R. Tiqui Builders, Inc. 13810
Impvt. (Widening/Conc.) of Mc Arthur Highway (MNR)
Meycauayan to Mabalacat, Pampanga (Phase IV) Package II
III 70.394 180 O 0.377 0.300 0.100 0.030 0.050 0.100 95.70 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page265
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
L.R. Tiqui Builders, Inc. 13810
Impvt. (Widening/Conc.) of Mc Arthur Highway (MNR)
Meycauayan to Mabalacat, Pampanga (Phase IV) Package II
III 70.394 180 O 0.366 0.300 0.150 0.030 0.047 0.050 94.30 -
L.R. Tiqui Builders, Inc. 13810Impvt/Widening of Aguinaldo
Highway and other related road Phase II
IV-A 60.022 360 O 0.336 0.240 0.100 0.024 0.028 0.100 82.80 -
L.R. Tiqui Builders, Inc. 13810Impvt/Widening of Aguinaldo
Highway and other related road Phase II
IV-A 60.022 360 O 0.274 0.300 0.100 0.030 0.028 0.100 83.20 -
L.R. Tiqui Builders, Inc. 13810NCR/Bulacan Bdry.-Bigte-Ipo Dam
Road inc. Replacement of Kay Tialo Bridge
III 47.641 210 O 0.358 0.300 0.100 0.030 0.048 0.100 93.60 -
L.R. Tiqui Builders, Inc. 13810NCR/Bulacan Bdry.-Bigte-Ipo Dam
Road inc. Replacement of Kay Tialo Bridge
III 47.641 210 O 0.366 0.300 0.150 0.030 0.038 0.050 93.40 -
L.R. Tiqui Builders, Inc. 13810Reconst. of Tullahan/Ugong
Bridge, Gen. T. de Leon (near NLEX) near Bdry. of Caloocan
NCR 27.065 665 C 0.383 0.200 0.300 - - - 88.30 85.40% Satisfactory
L.R. Tiqui Builders, Inc. 13810Traffic Management along Manila
North Road, MNR from Meycauayan, (Package 2)
TEAM 138.317 239 O 0.371 0.300 0.150 0.030 0.060 0.050 96.10 -
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui Builders 13810 Const .of Palilihan Bridge No. 1
and Approaches III 46.781 195 C 0.377 0.300 0.300 - - - 97.70 *97.70% Outstanding
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui Builders 13810 Const. (Conc.) of Marikina-Infanta
Rd. P-III, Laguna Side IV-A 53.040 300 C 0.296 0.200 0.300 - - - 79.60 85.90% V. Satisfactory
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui Builders 13810 Const. of Plaridel By Pass
including connecting Roads III 28.425 240 C 0.284 0.300 0.300 - - - 88.40 88.28% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page266
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui Builders 13810
Reconst. of Tullahan/Ugong Bridge, Gen. T. de Leon (near
NLEX) near Bdry. Of Caloocan, Valenzuela, M.M.
NCR 27.066 90 O 0.368 0.240 0.100 0.030 0.033 0.067 83.80 -
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui Builders 13810 Roads and Drainage Impvt. Along
T. Santiago St. NCR 9.428 120 C 0.241 0.200 0.300 - - - 74.10 *74.10% Satisfactory
L.R. Tiqui Builders, Inc. (Formerly Luisito R. Tiqui Builders) 13810
Reconst. of Tullahan/Ugong Bridge, Gen. T. de Leon (near
NLEX) near Bdry. Of Caloocan, Valenzuela, M.M.
NCR 27.066 90 O 0.367 0.240 0.100 0.018 0.051 0.100 *87.60 -
L.S. Abelar Construction 31560 Const. of 2 CL School Bldg. @ Wakas Elem. Sch. IV-A 1.083 60 C 0.359 0.250 0.300 - - - 90.90 *90.90%
Outstanding
L.S. Abelar Construction 31560 Const. of Footbridge @ Brgy. Tanauan IV-A 0.237 60 C 0.276 0.300 0.300 - - - 87.60 *87.60%
V. Satisfactory
L.S. Abelar Construction 31560 Impvt. of Drainage Canal IV-A 0.096 10 C 0.250 0.200 0.300 - - - 75.00 * 75.00% Satisfactory
L.S. Visorde Construction & Trading 32026 Completion of MPB @ Brgy.
Tignoan IV-A 0.481 60 C 0.224 0.200 0.300 - - - 72.40 *72.40% Satisfactory
L.S. Visorde Construction & Trading 32026 Const. of Brgy. Hall & Day Care
Center (Part 2) at Brgy. 3 IVA 0.673 40 C 0.435 0.133 0.300 - - - 86.80 *86.80% Satisfactory
L.S.D. Construction & Supplies 8980 Asphalt Overlay of Manila North Road (Bamban & Capas Section) III 9.489 30 C 0.296 0.295 0.300 - - - 89.10 *89.10%
V.Satisfactory
L.S.D. Construction & Supplies 8980 Conc. of San Miguel-Cadre Road III 7.577 100 C 0.308 0.290 0.300 - - - 89.80 *89.80% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page267
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
L.S.D. Construction & Supplies 8980 Conc. of Sta. Cruz Road III 2.891 90 C 0.354 0.194 0.300 - - - 84.80 78.68% Satisfactory
L.S.D. Construction & Supplies 8980 Const. of 1 Cl Sch. Bldg @ Balibago II E/S III 0.377 45 O 0.320 0.254 0.100 0.030 0.029 0.100 83.30 -
L.S.D. Construction & Supplies 8980 Const. of 2 CL Sch. Bldg. @ Maliwalo H/S (Annex) III 0.811 60 C 0.386 0.150 0.300 - - - 83.60 *83.60%
V.Satisfactory
L.S.D. Construction & Supplies 8980 Construction (Concreting) of Munoz-Lupao Road III 46.812 150 C 0.332 0.200 0.300 - - - 83.20 *83.20%
Satisfactory
L.S.D. Construction & Supplies 8980 Construction of Sports Center Building III 23.631 90 O 0.400 0.225 0.150 0.020 0.042 0.050 88.70 -
L.S.D. Construction & Supplies 8980 Construction/Rehab/Improvement of Bamban Poblacion Road III 19.036 150 C 0.340 0.200 0.300 - - - 84.00 *84.00%
Satisfactory
L.V. Capule Construction 15578 Completion of Conc. of Road & Drainage @ Fausta III 2.838 60 C 0.366 0.300 0.300 - - - 96.60 92.46%
Outstanding
La Greta Construction 33080 Impvt.of MPB at Brgy. Progreso IV-A 0.142 30 C 0.308 0.300 0.300 - - - 90.80 *90.80% Outstanding
LA Milagrosa Enterprises 17404 Conc. of Cabu-an Brgy. Road X 1.850 145 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
LA Milagrosa Enterprises 17404 Conc. of Yumbing Road X 0.926 65 C 0.288 0.217 0.300 - - - 80.50 *80.50% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page268
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
LA Milagrosa Enterprises 17404 Rehab./Conc. of Balite Brgy. Road X 0.755 95 C 0.374 0.300 0.300 - - - 97.40 *97.40% Outstanding
La Prueba Construction 9923 Construction of Footbridge VII 2.958 120 O 0.400 0.000 0.150 0.020 0.016 0.017 60.30 -
La Prueba Construction 9923 Construction of Multi-Purpose Building (Phase II) VII 4.766 120 O 0.353 0.000 0.150 0.020 0.013 0.033 56.90 -
Labb Construction 13524Conc. Paving of Jct. Dat-an,
Carmen-Sierra Bullones-Pilar-Alicia Road
VII 9.113 175 C 0.382 0.200 0.300 - - - 88.20 74.82% Satisfactory
Labb Construction 13524Const. of Bridges along
Concepcion, Danao-Buenavista, Carmen Road
VII 13.914 446 O 0.346 0.227 0.150 0.023 0.042 0.050 83.80 -
Labb Construction 13524Const. of Bridges along
Concepcion-Danao-Buenavista Carmen Road
VII 9.564 350 O 0.343 0.238 0.100 0.030 0.037 0.100 84.80 -
Labb Construction 13524 Impvt./Conc. Paving of Jct. LIR Loay-Loboc-Carmen Road VII 8.760 140 C 0.317 0.300 0.300 - - - 91.70 88.16%
V. Satisfactory
Labb Construction 13524 Reconst. of Napo Bridge along Dauis-Panglao Road VII 6.502 160 C 0.361 0.300 0.300 - - - 96.10 86.50%
V. Satisfactory
Lady of Assumption Enterprises 25360 Const. of Brgy. Road VIII 0.467 97 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory
Lady of Assumption Enterprises 25360 Const. of Lanao Brgy. Road VIII 1.889 30 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page269
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Lady of Assumption Enterprises 25360 Const. of Maria Socorro Bridge VIII 0.944 45 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory
Lady of Assumption Enterprises 25360 Const. of Tomas Oppus MPB VIII 2.823 307 C 0.378 0.200 0.300 - - - 87.80 87.17% V. Satisfactory
Lady of Assumption Enterprises 25360 Const./Impv't of Multi-Purpose Building at Tomas Oppus VIII 1.876 240 O 0.333 0.279 0.150 0.015 0.029 0.033 83.90 -
Lady of Assumption Enterprises 25360 Const./Impvt. of Canturing River Control VIII 0.472 90 C 0.385 0.200 0.300 - - - 88.50 *88.50%
V. Satisfactory
Lady of Assumption Enterprises 25360 Rehab./Impvt. of Bato-Bontoc Road VIII 3.781 247 C 0.265 0.200 0.300 - - - 76.50 *76.50%
Satisfactory
Lakewood Construction Company 5294 Const. of Flood Control @ Brgy.
Sanito IX 9.495 210 O 0.171 0.192 0.000 0.030 0.037 0.067 49.70 -
Lakewood Construction Company 5294 Const. of Flood Control @ Brgy.
Sanito IX 9.495 210 O 0.280 0.146 0.030 0.023 0.030 0.133 64.20 -
Lakewood Construction Company 5294 Const. of Flood Control @ Brgy.
Sanito IX 9.495 366 O 0.338 0.300 0.000 0.030 0.030 0.033 73.10 -
Lambayong Construction and Supply 20800 Rehabilitation of Manin Canal (Sta.
16+626-21+714) NIA-I 12.594 150 C 0.250 0.300 0.300 - - - 85.00 84.87% V.Satisfactory
Lanao Builder & Enterprises 15982Construction of PSHS-CVC
Academic Bldg. I and Dormitory Bldg. I Phase I
DOST 9.59 330 O 0.3455 0.300 0.05 0.02 0.030 0.100 84.55 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page270
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Lanao Builder & Enterprises 15982 PSHS CVC Academic Bldg. 1 Dormitory Bldg. 1 Ph. 1 DOST 9.59 450 O 0.68 0.300 - - - - 98.00 -
Lanao Builder and Enterprises 15982 Conc. of Bacolod-Pagayawan-Munai-Tangkal Road X 4.645 37 C 0.280 0.200 0.300 - - - 78.00 82.98%
V. Satisfactory
Lanao Builder and Enterprises 15982 Conc. of Bito Abaga National Road X 9.551 89 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding
Lanao Builder and Enterprises 15982Conc. of Iligan-Bukidnon Road,
Sta. Filomena-Bonbonon, Digkilaan-Rogongon
X 27.643 360 C 0.365 0.200 0.300 - - - 86.50 88.80% V. Satisfactory
Lanao Builder and Enterprises 15982 Conc. of San Manuel Road X 0.139 50 C 0.367 0.300 0.300 - - - 96.70 *96.70% Outstanding
Lanao Builder and Enterprises 15982 Conc./Impvt. of Tubod-Ganassi Road X 13.785 210 C 0.299 0.300 0.300 - - - 89.90 87.74%
V. Satisfactory
Lanao Builder and Enterprises 15982 Const. of MPB @ Brgy. Lower Sta. Cruz X 0.189 50 C 0.369 0.300 0.300 - - - 96.90 *96.90%
Outstanding
Lanao Builder and Enterprises 15982 Const./Impv't. of Bacolod-Pagayawan-Munai-Tangkad Road X 11.988 116 C 0.361 0.300 0.300 - - - 96.10 86.14%
V. Satisfactory
Lanao Builder and Enterprises 15982Impvt. of Iligan-Aurora Road (Raw-
an-Magpaytao-Lanipao-Abaga Sect.)
X 9.386 73 C 0.387 0.300 0.300 - - - 98.70 90.60% Outstanding
Lanao Builder and Enterprises 15982 Impvt./Const. of Maranding Drainage along Nat'l Highway X 4.692 183 C 0.362 0.200 0.300 - - - 86.20 85.54%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page271
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Lanao Builder and Enterprises 15982 Rehab. of Linamon-Zamboanga Roads, Kauswagan Section X 9.053 120 O 0.333 0.240 0.100 0.030 0.032 0.100 83.50 -
Lanao Builder and Enterprises 15982 Rehab. of Linamon-Zamboanga Roads, Linamon Section X 4.517 90 C 0.358 0.300 0.300 - - - 95.80 86.98%
V. Satisfactory
Lanao Builder and Enterprises 15982
Rehab./Reconst. of Damaged National Road along Linamon-Zamboanga Road, Donggo-an
Section
X 17.145 281 O 0.381 0.240 0.100 0.030 0.038 0.100 88.90 -
Lanao Builder and Enterprises 15982Widening of Kapatagan Road along Linamon-Zamboanga
National RoadX 7.429 79 O 0.378 0.240 0.100 0.030 0.038 0.100 88.60 -
Lanao Builder and Enterprises 15982Widening of Kapatagan Road along Linamon-Zamboanga
National RoadX 7.429 79 O 0.353 0.240 0.100 0.024 0.045 0.100 86.20 -
Lanao Builders and Enterprises 15982 Completion of ACA Bldg. I (Phase 3) DOST 11.364 270 O 0.382 0.300 0.000 0.030 0.063 0.050 82.50 -
Lanao Builders and Enterprises 15982 Completion of ACA Bldg., I Phase (Construction) DOST 11.364 270 O 0.339 0.289 0.093 0.030 0.060 0.050 86.12 -
Lanao Builders and Enterprises 15982 Completion of ACA Building I (Phase 3) DOST 11.364 270 O 0.339 0.289 0.093 0.030 0.060 0.050 86.12 -
Landmark Builders 7400 Completion of MPB (OPD, DOPH XI 0.472 60 C 0.341 0.300 0.300 - - - 94.10 *94.10% Outstanding
Landmark Builders 7400 Completion of MPB @ Brgy. Matiao (GSP) XI 1.132 90 C 0.318 0.200 0.300 - - - 81.80 *81.80%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page272
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Landmark Builders 7400 Concreting of Madang Road XI 9.446 150 C 0.356 0.200 0.300 - - - 85.60 87.49% V. Satisfactory
Landmark Builders 7400 Const. of MPB (Gymnasium) XI 2.800 135 O 0.317 0.244 0.000 0.015 0.023 0.067 66.60 -
Landmark Builders 7400 Const./Completion of Manolo Fortich Municipal Hall Bldg. (P-IX) X 7.590 120 C 0.380 0.300 0.300 - - - 98.00 93.73%
Outstanding
Landmark Builders 7400 Package 11, Const. of Multi-Purpose Bldg. (Gymnasium) XI 3.766 135 C 0.361 0.241 0.300 - - - 90.20 73.68%
Satisfactory
Landmark Builders 7400 Repair/Const. of Don Mariano E/S (H.E.) Bldg. XI 0.289 60 C 0.358 0.067 0.300 - - - 72.50 86.22%
V. Satisfactory
Landrock Construction 27541 Const. of Multi-Purpose Building, Litanville XII 0.940 75 O 0.371 0.240 0.150 0.030 0.035 0.033 85.90 -
Langit Construction 23462 Const. of 2 Storey 4 Classroom School Building IV-A 2.407 93 O 0.287 0.195 0.100 0.020 0.058 0.100 76.00 -
Langit Construction 23462 Const. of 2 Storey 4 Classroom School Building IV-A 2.407 93 O 0.388 0.300 0.000 0.030 0.047 0.067 83.20 -
Langit Construction 23462 Construction of Two (2) Storey, Four (4) CL S/B @ Paliparan III E/S IV-A 1.694 150 C 0.308 0.200 0.300 - - - 80.80 77.37%
Satisfactory
Larsen-Dutcher Constractor 29172 Rehab. of Roads, Brgy. Viente Reales NCR 1.884 60 C 0.278 0.200 0.300 - - - 77.80 *77.80%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page273
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Larsen-Dutcher Constractor 29172 Repair of MPB NCR 0.470 60 C 0.315 0.200 0.300 - - - 81.50 *81.50% V. Satisfactory
Laser's Builders 11817 Upgrading/Conc. of Roads with Drainage Improvement NCR 0.956 60 C 0.361 0.200 0.300 - - - 86.10 *86.10%
Satisfactory
LB Builders Center 14115 Conc. Paving of Calubian-San Isidro Road VIII 2.844 120 C 0.365 0.200 0.300 - - - 86.50 86.50%
V.Satisfactory
LB Builders Center 14115 Const. of 1 CL Sch. Bldg. at Cagnocot E/S VIII 0.469 60 C 0.372 0.200 0.300 - - - 87.20 *87.20%
V. Satisfactory
LB Builders Center 14115 Const. of 1 CL Sch. Bldg. at Villanueva E/S VIII 0.469 60 C 0.299 0.200 0.300 - - - 79.90 *79.90%
Satisfactory
Leadtek Construction Inc. 25978Const. of (1) Classroom (1) Unit School Building D. Moises E/S,
MalingawanXII 0.382 120 C 0.361 0.000 0.300 - - - 66.10 66.10%
Poor
Leadtek Construction Inc. 25978 Const. of Sinanguyan NHS X 0.595 60 O 0.229 0.000 0.000 0.030 0.032 0.033 32.40 -
Leadway Construction & Development Corp. (LCDC) 4378 Const. of MPB (Covered Court) III 1.871 45 C 0.253 0.293 0.300 - - - 84.60 *84.60%
V. Satisfactory
Leadway Construction & Development Corp. (LCDC) 4378
Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan, Bulacan to
Mabalacat, Pampanga, Phase IV Package VIII-Replacement of
Tulaoc-Sto.Domingo Bridge & Approaches
III 46.752 150 C 0.454 0.200 0.300 - - - 95.40 *95.40%V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page274
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Leda Construction Incorporated (Formerly: Leda Const.) 12229 Conc. of Jaro-Dagami-Burauen-La
Paz Road VIII 18.890 150 C 0.284 0.199 0.300 - - - 78.30 83.04% V. Satisfactory
Leda Construction Incorporated (Formerly: Leda Const.) 12229 Conc. of Jaro-Dagami-Burauen-La
Paz Road, Jaro Section VIII 12.280 150 C 0.317 0.200 0.300 - - - 81.70 83.92% V. Satisfactory
Leda Construction Incorporated (Formerly: Leda Const.) 12229 Conc. of Sta. Fe-Magtangtang to
Francisco Dagohoy Caves VII 4.740 160 C 0.288 0.300 0.300 - - - 88.80 88.47% V. Satisfactory
Leda Construction Incorporated (Formerly: Leda Const.) 12229 Const. of Concepcion, Danao-
Buenavista, Carmen Road VII 14.070 412 O 0.400 0.300 0.150 0.030 0.030 0.050 96.00 -
Leda Construction Incorporated (Formerly: Leda Const.) 12229
Construction of Pontaas Bridge along Buenavista, Carmen-Concepcion-Danao Road
VII 18.773 418 O 0.367 0.255 0.150 0.030 0.040 0.050 89.20 -
Leda Construction Incorporated (Formerly: Leda Const.) 12229 Rehab. of Palo-Carigara-Ormoc
Road VIII 18.889 150 O 0.381 0.239 0.100 0.015 0.020 0.100 85.50 -
Leda Construction Incorporated (Formerly: Leda Const.) 12229 Rehab. of Palo-Carigara-Ormoc
Road VIII 18.889 150 C 0.316 0.154 0.300 - - - 77.00 82.10%Satisfactory
Leda Construction Incorporated (Formerly: Leda Const.) 12229
Rehab./Impvt. of Palo-Carigara-Ormoc-Baybay-Maasin Road, Palo-Carigara-Ormoc-Baybay-Maasin
Road Section
VIII 11.338 150 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory
Leda Construction Incorporated (Formerly: Leda Const.) 12229 Rehab./Impvt. of Seawall VII 10.881 378 C 0.401 0.200 0.300 - - - 90.10 86.68%
Satisfactory
Legacy Construction 22465 Const. and Improvement of Punta Taytay Main Drainage NIA 5.936 408 O 0.344 0.192 0.150 0.030 0.057 0.050 82.29 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page275
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Legacy Construction 22465 Const. and Improvement of Punta Taytay Main Drainage NIA 5.936 408 O 0.344 0.192 0.150 0.030 0.057 0.050 82.29 -
Legacy Construction 22465 Rehabilitation and Improvement of Sibud Main Drainage NIA 6.636 231 C 0.468 0.247 0.200 - - - 91.50 91.50%
Very Satisfactory
Legacy Construction 22465 Widening/Impvt. of Bacolod South Kabankalan Road (Tangub Sect.) VI 7.870 180 O 0.259 0.237 0.100 0.030 0.045 0.100 77.10 -
Legazpi Premium Development Corporation 20701 Viga-Pilot Bridge & Approaches
along Viga-Panganiban Road V 17.346 180 O 0.381 0.200 0.000 0.008 0.023 0.100 71.20 -
Legazpi Premium Development Corporation 20701 Viga-Pilot Bridge & Approaches
along Viga-Panganiban Road V 17.346 180 O 0.354 0.300 0.100 0.020 0.023 0.100 89.70 -
Legazpi Premium Development Corporation 20701 Viga-Pilot Bridge & Approaches
along Viga-Panganiban Road V 17.346 180 O 0.200 0.300 0.100 0.023 0.019 0.100 74.20 -
Legazpi Premium Development Corporation 20701 Channelization of Lower Mabini
River V 13.377 90 C 0.389 - 0.500 - - - 88.90 *88.90% V. Satisfactory
Legazpi Premium Development Corporation 20701 Completion of Tokyo Bridge and
Approaches V 32.570 270 C 0.356 0.092 0.300 - - - 74.80 72.40% Satisfactory
Legazpi Premium Development Corporation 20701 Const. of Tilod Bridge Approaches
& Detour V 15.684 270 C 0.388 0.235 0.300 - - - 92.30 86.84% V. Satisfactory
Legazpi Premium Development Corporation 20701 Dredging of Hicming River
(Downstream) V 19.177 210 C 0.375 - 0.500 - - - 87.50 89.72% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page276
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Legazpi Premium Development Corporation 20701 Opening/Const. of Taladong-
Caguiba Road (Phase II) V 14.250 120 O 0.352 0.263 0.100 0.022 0.033 0.100 87.00 -
Legazpi Premium Development Corporation 20701 Opening/Const. of Taladong-
Caguiba Road (Phase II) V 14.250 120 O 0.369 0.086 0.100 0.020 0.033 0.067 67.50 -
Legazpi Premium Development Corporation 20701 Road Conc./Impvt. of Magallang-
Mararag Road V 14.387 150 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory
Legazpi Premium Development Corporation 20701
Vconst. of Viga-Piot Bridge & Approaches along Viga-
Panganiban RoadV 17.346 180 O 0.300 0.240 0.100 0.015 0.035 0.100 79.00 -
Lehci Construction 24196 Conc. Paving of Tigbao-Sta. Fe-San Miguel Rd. VIII 8.548 175 C 0.317 0.200 0.300 - - - 81.70 82.72%
V. Satisfactory
Lehci Construction 24196 Const. of MPB at Eastern Visayas State University, Phase III VIII 3.374 150 C 0.370 0.100 0.300 - - - 77.00 *77.00%
Satisfactory
Lehci Construction 24196 Const. of Seawall at Cogon VIII 0.962 90 C 0.376 0.200 0.300 - - - 87.60 *87.60% V.Satisfactory
Lehci Construction 24196 Repair/Rehab. of Mahayahay Creek VIII 4.747 100 C 0.288 0.200 0.300 - - - 78.80 79.88%
Satisfactory
Lenvoisa Construction 216721
Financing and Development of the Fifty (50) Hectares Reserved Area
for Socialized Housing under a Joint Venture arrangement (Phase
II)
NHA 154.223 270 O 0.382 0.300 0.100 0.024 0.042 0.100 94.80 -
Lenvoisa Construction, Incorporated 216721
Financing and Dev't. of the fifty(50)hectares reserved area for
socialized housing under joint venture arrangement, Phase II
NHA 154.223 270 O 0.39 0.3 0.1 0.03 0.06 0.1 98.00 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page277
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Lenvoisa Construction, Incorporated 216721 NBP Resettlement Project, Phase
II NHA 154.223 270 O 0.382 0.3 0.1 0.024 0.042 0.1 94.80 -
Leo-J Construction Services 27248 Const. of Slope Protection along Maculcol River Downstream III 4.753 90 C 0.373 0.120 0.300 - - - 79.30 *79.30%
Satisfactory
Leymarc Construction 22094 Completion of Zamboanguita Shoreline Protection VII 0.889 80 C 0.252 0.300 0.300 - - - 85.20 *85.20%
V. Satisfactory
Leymarc Construction 22094 Conc. of Roads (Brgy. Cansaging) VII 0.414 80 C 0.351 0.300 0.300 - - - 95.10 *95.10% Outstanding
Leymarc Construction 22094 Const. of 1 unit 1 Cl Sch. Bldg. @ Sta. Catalina North C/S VII 0.701 70 C 0.386 0.100 0.300 - - - 78.60 *78.60%
Satisfactory
Leymarc Construction 22094 Const. of Dumaguete Flood Control, Dumaguete North Road VII 4.717 140 C 0.293 0.184 0.300 - - - 77.70 79.74%
Satisfactory
Leza Construction and Supply 25565 Const. of 1 CL School Bldg. @ Buenlag NHS I 0.494 71 C 0.334 0.200 0.300 - - - 83.40 87.74%
V. Satisfactory
Leza Construction and Supply 25565 Const. of Drainage Canal System at Tuliao I 4.822 120 O 0.267 0.200 0.100 0.020 0.028 0.133 74.80 -
Leza Construction and Supply 25565 Const. of MPB at Turac E/S I 1.928 130 C 0.273 0.300 0.300 - - - 87.30 *87.30% V. Satisfactory
Leza Construction and Supply 25565 Construction of Drainage System at Tuliao I 4.822 120 C 0.434 0.200 0.300 - - - 93.40 82.24%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page278
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Leza Construction and Supply 25565Construction/Completion/Repair
of 1 Classroom, Doyong Malabago E/S
I 0.482 150 C 0.438 0.180 0.300 - - - 91.80 *91.80%V. Satisfactory
Leza Construction and Supply 25565Repair and Rehab. of Pagal Bridge
along Carmen Jct.-Bayambang-San Carlos-Manat Road
I 0.481 30 C 0.313 0.300 0.300 - - - 91.30 *91.30% Outstanding
LGC Trucking & Construction 14464Conc. of Talacogon-La Paz-Loreto-
Varuela-Sta. Josefa Marbon Section
XIII 9.483 325 O 0.277 0.300 0.150 0.030 0.032 0.050 83.90 -
LGC Trucking and Construction 14464 Const. of Andanan Flood Control Phase II XIII 9.374 120 O 0.350 0.200 0.100 0.030 0.043 0.200 92.30 -
LGC Trucking and Construction 14464 Const. of Lugom Bridge along Circumferential Road XIII 9.223 170 C 0.231 0.199 0.300 - - - 73.00 73.48%
Satisfactory
LGC Trucking and Construction 14464 Impvt. of Bank Protection of Mapaga RCDG Bridge XIII 6.591 135 C 0.320 0.200 0.300 - - - 82.00 85.06%
V. Satisfactory
Liberty Builders and Development Corporation 7224 Restoration of the Burnt Bureau of
Immigration Main Bldg. Sp. Bldgs 30.029 645 C 0.467 0.000 0.300 - - - 76.70 83.56% Satisfactory
Librius Construction and SuppplyCorporation 23580 Const. of 2 Storey RGR Type
School Building @ Batangas NHS IV-A 8.596 150 C 0.385 0.200 0.300 - - - 88.50 86.05% V. Satisfactory
Ligao Sto. Niño 9279 Rehabilitation of Canal Network (package 1) NIA-V 10.323 150 O 0.283 0.200 0.100 0.018 0.033 0.200 83.40 -
Ligao Sto. Niño Construction and Supply 9279 Land Development of Ligao
Resettlement Project NHA 9.974 150 O 0.299 0.262 0.1 0.03 0.019 0.1 81.00 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page279
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ligao Sto. Niño Construction and Supply 9279 Land Development of Ligao
Resettlement Project V 9.969 150 C 0.330 0.300 0.300 - - - 93.00 93.00% V.Satisfactory
Lim General Contractor 8482 Conc. of Buenavista-Cawayan Road (Cawayan Side) V 28.798 120 C 0.336 0.239 0.300 - - - 87.50 77.54%
Satisfactory
Lim General Contractor 8482 Conc. of Masbate-Cataingan Road, Balatucan-Uson Sect. V 9.498 60 C 0.288 0.200 0.300 - - - 78.80 77.72%
Satisfactory
Lim General Contractor 8482 Const. of Bagumbayan Bridge, Approaches, and Detour V 15.940 210 C 0.241 0.200 0.300 - - - 74.10 76.20%
Satisfactory
Lim General Contractor 8482 Const. of Buyo Bridge, Approaches & Detour V 19.200 270 C 0.199 0.123 0.300 - - - 62.20 70.87%
Satisfactory
Lim General Contractor 8482Const. of Jct. Guinhayan-Malbog-Sta. Fe Road (leading to San Jose
Island)IV-B 18.798 180 C 0.317 0.200 0.300 - - - 81.70 83.86%
V. Satisfactory
Lim General Contractor 8482 Const. of Luya Bridge V 15.827 305 C 0.341 0.300 0.300 - - - 94.10 89.18% V. Satisfactory
Lim General Contractor 8482 Const. of San Fernando North Road, San Fernando Section V 11.000 120 C 0.235 0.135 0.300 - - - 67.00 73.42%
Satisfactory
Lim General Contractor 8482 Const. of San Fernando South Road, Batuan Section V 11.250 120 C 0.195 0.109 0.300 - - - 60.40 71.68%
Satisfactory
Lim General Contractor 8482 Preventive Maintenance of Masbate-Cataingan Road V 9.496 75 C 0.377 0.100 0.300 - - - 77.70 81.18%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page280
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Lim General Contractor 8482
Rehab./Reconst. of Damaged National Road along San
Fernando North Rd., San Jacinto Section
V 18.898 233 C 0.437 0.133 0.300 - - - 87.00 72.30% Poor
Lim General Contractor 8482 Rehab./Reconst. of Tablas Circ. Road, Alcantara-Looc Section IV-B 18.798 167 O 0.307 0.240 0.100 0.030 0.038 0.100 81.50 -
Lim General Contractor 8482 Replacement of Damaged Bridge V 14.100 231 C 0.342 0.200 0.300 - - - 84.20 78.26% Satisfactory
Limar Construction 10203 Const. of Manlumay Bridge VIII 3.807 195 C 0.300 0.300 0.300 - - - 90.00 89.76% V. Satisfactory
Limestone Construction and Development Corporation 4453
Impv't. along Jct. PPH-Jones-Maddela Road (Km. 380+000-
Km.384+320)cDivisoria Norte-San Bernabe Sect.
II 8.200 90 C 0.256 0.300 0.300 - - - 85.60 82.54% V. Satisfactory
Limokun Builders & Supply 30997 Impvt./Rehab. of Porac-Guagua Road III 4.771 60 C 0.355 0.115 0.300 - - - 77.00 *77.00%
Satisfactory
Linear Construction Corporation 3575 NBP Resettlement Project, Phase IV NHA 148.89 270 O 0.392 0.232 0.1 0.024 0.04 0.1 88.80 -
Liong-Co Construction & Construction Supply 28361
Completion of Miputak-Turno By Pass Road with Drainage
ComponentsIX 4.716 180 C 0.470 0.200 0.300 - - - 97.00 85.54%
Satisfactory
Liong-Co Construction & Construction Supply 28361 Conc. of FMR at Purok Gampis IX 0.951 60 C 0.344 0.285 0.300 - - - 92.90 *92.90%
Outstanding
Liong-Co Construction & Construction Supply 28361 Const. of MPB (Covered Court) at
Sicayab E/S IX 2.268 180 C 0.392 0.200 0.300 - - - 89.20 89.20% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page281
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Liong-Co Construction & Construction Supply 28361 Const. of Multi Purpose Day Care IX 0.550 60 C 0.304 0.300 0.300 - - - *90.40 90.40%
Outstanding
Liong-Co Construction & Construction Supply 28361
Const./Completion of Multi-Purpose Building (Perimeter
Fence)IX 0.089 25 C 0.302 0.300 0.300 - - - 90.20 *90.20%
Outstanding
Liong-Co Construction & Construction Supply 28361 Const./Rehab. of Various School
Building Project (Clustered) IX 0.277 180 C 0.399 0.200 0.300 - - - 89.90 *89.90% V. Satisfactory
Lisa Construction 24134 Asphalt Overlay along CabanatuanCircumferential Road III 0.952 30 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
Lisa Construction 24134 Const. of Flood Control at San Vicente III 2.835 80 C 0.369 0.300 0.300 - - - 96.90 *96.90%
Outstanding
Liza Construction 24234
Regraveling/Completion of FMR in Brgy. Sta. Monica to San Eustacio La Purisima to Pantoc, Bibiclat &
Santiago to Magsaysay Road
III 46.812 150 C 0.344 0.200 0.300 - - - 84.40 *84.40%Satisfactory
LJPM Builders & Construction Supply 29981 Rehab./Impvt. of National Road
along Amaga-Liloan Road Section VIII 3.735 180 O 0.378 0.242 0.070 0.020 0.032 0.067 80.90 -
LJPM Builders & Construction Supply 29981 Rehab./Impvt. of National Road
along Amaga-Liloan Road Section VIII 3.735 180 O 0.380 0.240 0.100 0.020 0.037 0.100 87.70 -
LJPM Builders & Construction Supply 29981 Repair of Abuyog District Hospital VIII 0.470 30 C 0.378 0.200 0.300 - - - 87.80 *87.80%
V. Satisfactory
LJPM Builders & Construction Supply 29981 Repair of Multi-Purpose Building,
DTI Compound VIII 0.961 90 C 0.377 0.200 0.300 - - - 87.70 88.47% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page282
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
LJPM Builders & Construction Supply 29981 Repair/Impv't of National Roads
along Amaga-Liloan Road Section VIII 3.735 180 C 0.433 0.134 0.300 - - - 86.70 85.26%Satisfactory
Llaban Construction & Trucking 29504Conc. of Dualing-New Panay-
Midsayap Road, (Lawili-Arizona Section)
XII 9.523 120 C 0.355 0.119 0.300 - - - 77.40 77.70% Satisfactory
Llaban Construction & Trucking 29504 Const. of 1 Cl Bldg., San Pedro E/S XII 0.476 40 C 0.309 0.300 0.300 - - - 90.90 *90.90%
Outstanding
Llaban Construction & Trucking 29504 Const. of Hanging Bridge XII 1.309 71 C 0.340 0.300 0.300 - - - 94.00 79.12% Satisfactory
Llaban Construction & Trucking 29504 Const. of MPB @ Brgy. Upper Glad 1 XII 0.286 30 C 0.369 0.300 0.300 - - - 96.90 *96.90%
Outstanding
Llaban Construction & Trucking 29504 Rehab./Improvement of Cotabato 2nd DEO Building and Quarter XII 3.313 120 O 0.386 0.240 0.150 0.030 0.028 0.050 88.40 -
LLM Concrete Products 14235 Completion of MPB at Brgy. Magugpo West XI 1.884 90 C 0.336 0.056 0.300 - - - 69.20 79.14%
Satisfactory
LLM Concrete Products 14235 Const. of 1 CL Academic Bldg. @ Kapoc XI 0.322 90 C 0.332 0.300 0.300 - - - 93.20 93.34%
Outstanding
LLM Concrete Products 14235 Const. of Matanao National High School XI 0.865 60 C 0.324 0.200 0.300 - - - 82.40 *82.40%
V. Satisfactory
LLM Concrete Products 14235 Const. of MPB @ Goma, Digos City realigned to Conc. of FMR XI 0.944 45 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page283
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
LLM Concrete Products 14235 Const. of MPB @ Poblacion XI 1.885 120 C 0.239 0.300 0.300 - - - 83.90 *83.90% V.Satisfactory
LLM Concrete Products 14235 Const. of Multi-Purpose (Brgy Hall) Bato XI 0.755 75 C 0.378 0.300 0.300 - - - 97.80 92.90%
Outstanding
LLM Concrete Products 14235 Const. of Multi-Purpose Building XI 0.951 75 C 0.461 0.142 0.300 - - - 90.30 *90.30% V. Satisfactory
LLM Concrete Products 14235 Const. of Slope Protection along Buclad-Poblacion-Asuncion Sect. XI 3.845 150 C 0.265 0.200 0.300 - - - 76.50 *76.50%
Satisfactory
LLM Concrete Products 14235 Const. of Tagum Drainage along Agusan-Davao Road XI 2.830 90 C 0.230 0.300 0.300 - - - 83.00 *83.00%
V. Satisfactory
LLM Concrete Products 14235 Const./Rehab.of MPB @ Brgy. Ising XI 2.453 150 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
LM Construction and General Marketing 9213 Const. of CY 2004 School Building
Projects XIII 0.818 210 O 0.373 0.244 0.100 0.020 0.013 0.100 85.00 -
LM Construction and General Marketing 9213 Const. of CY 2004 School Building
Projects XIII 0.818 210 O 0.350 0.200 0.100 0.030 0.041 0.100 82.10 -
LMD Construction 9410 Const./Impvt. MPB (Municipal Hall) @ Poblacion San Miguel IX 4.595 225 C 0.348 0.247 0.300 - - - 89.50 86.07%
V. Satisfactory
LMD Construction 9410 Construction & Completion of Multi-Purpose Building IX 3.861 180 O 0.352 0.240 0.150 0.030 0.050 0.050 87.20 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page284
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
LMD Construction 9410 Impvt./Conc. Paving of KagawasanPitogo Road (Kagawasan Section) IX 4.595 100 C 0.353 0.300 0.300 - - - 95.30 71.36%
Satisfactory
Lo Tone Construction 23385 Land Dev't. of Anislag Resettlement Project, Phase II NHA 39.894 224 C 0.356 0.300 0.000 - - - 65.60 65.60%
Fair
Lo Tone Construction & Supply 23385 Const. of MPB BUPC Admin. Center (Phase 1) V 9.505 180 C 0.363 0.200 0.300 - - - 86.30 *86.30%
V. Satisfactory
Lo Tone Construction & Supply 23385 Const. of MPB BUPC Admin. Center (Phase II) V 15.759 210 O 0.399 0.239 0.100 0.030 0.027 0.100 89.50 -
Lo Tone Construction & Supply 23385 Const. of Multi-Purpose Hall-Phase II V 1.851 120 C 0.346 0.300 0.300 - - - 94.60 85.92%
V. Satisfactory
Lo Tone Construction & Supply 23385 Dredging of Bato River (Katipunan-Kilikilihan) V 19.180 210 C 0.492 - 0.500 - - - 99.20 65.60%
Fair
Lo Tone Construction & Supply 23385 Impvt. of Pag-asa Drainage System V 4.762 150 C 0.333 0.200 0.300 - - - 83.30 84.32%
V. Satisfactory
Lo Tone Construction & Supply 23385 Land Development of Anislag Resettlement Project (Phase II) NHA-V 39.895 150 O 0.326 0.261 0.050 0.023 0.028 0.033 72.10 -
Lo Tone Construction & Supply 23385 Land Development of Tagaytay Resettlement Project NHA 49.924 150 O 0.376 0.249 0.1 0.018 0.033 0.1 87.60 -
Lo Tone Construction & Supply 23385Rehab. Works Including Removal
of Slides along Catanduanes Circumferential Road
V 12.167 150 C 0.378 0.288 0.300 - - - 96.60 93.30% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page285
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Lo Tone Construction & Supply 23385 Rehab./Impv't. of Calayucay-Sula Road V 3.840 90 C 0.385 0.272 0.300 - - - 95.70 *95.70%
Outstanding
Lo Tone Construction & Supply 23385 Rehab./Impvt. of Hinipaan-Cahan Road V 19.260 240 C 0.390 0.293 0.300 - - - 98.30 *98.30%
Outstanding
Lo Tone Construction & Supply 23385 Road Impv't./Widening of Integrated Bus Terminal IX 4.640 100 C 0.232 0.000 0.300 - - - 53.20 78.76%
Satisfactory
Lo Tone Construction & Supply 23385 Road Opening of Damacan-Cagbulacao Road V 28.493 210 O 0.400 0.293 0.100 0.020 0.023 0.100 93.60 -
Lo Tone Construction & Supply 23385
Road Rehab./Impv't. of Bato, Bula, Minabalac (Excl. acquisition of Roads/Traffic Signs & Safety
Devices
V 9.407 120 C 0.258 0.300 0.300 - - - 85.80 86.64% V. Satisfactory
Lo Tone Construction & Supply 23385 Widening/Impvt. of Catanduanes Circ. Road (Codon Section) V 14.375 240 C 0.300 0.200 0.300 - - - 80.00 *80.00%
Satisfactory
Lo Tone Construction & Supply 23385Widening/Impvt. of Catanduanes
Circ. Road (Tibang-Puting Baybay Section)
V 28.495 270 C 0.393 0.293 0.300 - - - 98.60 90.14% Outstanding
Longwide Builders 20196 Const. of Public Market @ Brgy. Sumo-Sumo XIII 0.549 60 C 0.362 0.200 0.300 - - - 86.20 *86.20%
V. Satisfactory
Longwide Builders 20196 Construction of Telaje Flood Control XIII 4.565 150 O 0.400 0.240 0.150 0.030 0.035 0.050 90.50 -
Lorgen Construction 20197 Conc./Impvt. of F.P. Felix Ave. (formerly Imelda Ave.) IV-A 6.255 150 C 0.289 0.200 0.300 - - - 78.90 85.38%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page286
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Lotrim Construction 12273 Construction of DOST Caraga S & T Center DOST 14.233 345 O 0.367 0.208 0.130 0.030 0.060 0.030 82.50 -
Lotrim Construction Inc. 12273 Const. of Banaybanay Public Market XI 2.504 90 C 0.372 0.300 0.300 - - - 97.20 92.93%
Outstanding
Lotrim Construction Inc. 12273 Const. of MPB @ Flores Subd. XI 0.752 90 C 0.379 0.226 0.300 - - - 90.50 *90.50% Outstanding
Lotrim Construction Inc. 12273 Const. of MPB @ Rizal E/S XI 0.657 120 C 0.367 0.300 0.300 - - - 96.70 *96.70% Outstanding
Lotrim Construction Inc. 12273 Rehab. of MPB XI 4.715 240 C 0.361 0.200 0.300 - - - 86.10 *86.10% V.Satisfactory
Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Const. of Six CL @ Maragusan
NHS XI 6.560 180 C 0.337 0.300 0.300 - - - 93.70 89.01% V. Satisfactory
Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Const. of Three (3) Storey DBM
Regional Office Bldg. XIII 18.638 240 C 0.397 0.200 0.300 - - - 89.70 88.53% V. Satisfactory
Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Const./Impvt. of Drainage at J.P.
Laurel St. to Davao Beach Club XI 4.717 150 C 0.344 0.200 0.300 - - - 84.40 86.74% V. Satisfactory
Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Impvt./Conc. of Calinan-Bagiuo-
Cadalian Road XI 18.801 210 C 0.352 0.200 0.300 - - - 85.20 84.54% Satisfactory
Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Rehab. of Davao-Cotabato Road
Kinuskusan Section XI 19.279 210 C 0.378 0.200 0.300 - - - 87.80 82.52% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page287
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Lotrim Construction, Inc. (Formerly: Lotrim Const.) 12273 Rehab./Impvt. of DPWH Davao del
Sur 2nd DEO Bldg. XI 9.449 120 C 0.452 0.200 0.300 - - - 95.20 82.18% Satisfactory
Lubo Construction & Development 30508 Const. of MPB @ Calamagui 1st II 0.921 120 O 0.356 0.214 0.100 0.022 0.035 0.100 82.70 -
Lubo Construction & Development 30508 Const./Rehab. of Ilagan North
Central School II 1.192 115 C 0.336 0.200 0.300 - - - 83.64 78.21% Satisfactory
Lucban Builders and Construction Supply
Incorporated31336 Completion of MPB @ Paaralang
Elementarya ng Lucban IV-A 3.370 76 C 0.303 0.000 0.300 - - - 60.30 *60.30% Fair
Lucban Builders and Construction Supply
Incorporated31336 Const. of Daungan River Control IV-A 3.371 60 C 0.320 0.200 0.300 - - - 82.00 81.82%
V. Satisfactory
Lucban Construction 4819 Const. of MPB @ Paaralang Sekondarya ng Lucban IV-A 1.447 40 C 0.492 0.133 0.300 - - - 92.50 *92.50%
V. Satisfactory
Lucky Armn's Construction & Enterprises 23434 Conc. of Shoulder at Picas San
Jose DZR Airport Road VIII 1.898 50 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
Lug Square Construction 26623Conc. of Nueva Vizcaya-Ifugao-Mt.
Province Bdry. Rd. (Hingyon Section)
CAR 2.846 100 C 0.362 0.217 0.300 - - - 87.90 *87.90% V. Satisfactory
Lug Square Construction 26623Widening/Concreting along
Banaue-Mayoyao Road (Tulaed Section)
CAR 1.888 348 C 0.339 0.157 0.000 - - - 49.60 62.26% Poor
Lumel Glenn Construction 26817 Conc. of Sitio Tabtabong Road IV-B 1.413 50 C 0.209 0.300 0.300 - - - 80.90 *80.90% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page288
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Lumel Glenn Construction 26817 Const. of Drainage Canal @ Don Pedro IV-B 1.875 55 O 0.324 0.212 0.100 0.022 0.016 0.100 77.40 -
Lumel Glenn Construction 26817 Rehab. of Calapan South Road IV-B 3.782 91 C 0.358 0.200 0.300 - - - 85.80 87.48% V. Satisfactory
LUYM Construction and Development Corporation 24098
Const. of San Jose St. Drainage System-Outfall 1 of the Drainage
Facility of the Bohol Circ. Rd alongC.P. Garcia Ave.
VII 14.038 252 C 0.307 0.189 0.300 - - - 79.60 77.86% Satisfactory
LVRO Construction & Supply 18116 Concreting of Barangay Road XIII 1.924 95 C 0.430 0.200 0.300 - - - 93.00 *93.00% V. Satisfactory
LVRO Construction & Supply 18116 Concreting of Brgy. 3, Bliss Road XIII 2.786 90 C 0.384 0.300 0.000 - - - 68.40 80.76% V. Satisfactory
LVRO Construction & Supply 18116Rehab./Reconstruction of
Damaged Paved along Dinagat-Loreto Road
XIII 7.086 225 O 0.368 0.240 0.150 0.030 0.035 0.050 87.30 -
LVRO Construction & Supply 18116 Repair/Rehab. along Dinagat-Loreto Road XIII 9.649 190 O 0.372 0.282 0.082 0.030 0.035 0.033 83.40 -
LVRO Construction and Supply 18116 Conc. of Bay-ang-Calamba Provincial Road XIII 2.893 75 C 0.341 0.200 0.300 - - - 84.10 *84.10%
V. Satisfactory
LVRO Construction and Supply 18116 Conc. of Brgy. Sangay-Provincial Road XIII 1.927 75 C 0.302 0.200 0.300 - - - 80.20 *80.20%
V. Satisfactory
LVRO Construction and Supply 18116 Const. of 1 Cl Sch. Bldg. @ Tinago E/S XIII 0.385 150 C 0.386 0.200 0.300 - - - 88.60 *88.60%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page289
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
LVRO Construction and Supply 18116 Const. of Concepcion-Mt. Zion FMR XIII 4.553 105 C 0.389 0.295 0.300 - - - 98.40 74.70%
Satisfactory
LVRO Construction and Supply 18116 Const. of Culit Integrated School XIII 0.486 75 C 0.390 0.200 0.300 - - - 89.00 *89.00% V. Satisfactory
LVRO Construction and Supply 18116 Const. of Jct. Bolod-Bolod-Albor Road (Albor-San Antonio Section) XIII 6.620 238 C 0.321 0.200 0.300 - - - 82.10 *82.10%
V. Satisfactory
LVRO Construction and Supply 18116 Const./Rehab. of Cabadbaran River Dike XIII 2.841 105 C 0.248 0.200 0.300 - - - 74.80 *74.80%
Satisfactory
LVRO Construction and Supply 18116 Impvt./Conc. of New Public Market XIII 0.950 45 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory
LVRO Construction and Supply 18116Reconst. of Quezon-Mapawa-
Capalyan-Espina-Navarro Road-Arellano District
XIII 4.100 90 C 0.321 0.200 0.300 - - - 82.10 82.10% V. Satisfactory
LVRO Construction and Supply 18116 Repair/Rehab. Along Dinagat-Loreto Road XIII 9.649 160 O 0.307 0.168 0.100 0.023 0.038 0.100 73.60 -
LVRO Construction and Supply 18116 Surigao-Davao Coastal Road, Panhutungan Section XIII 4.300 90 C 0.341 0.200 0.300 - - - 84.10 82.42%
V. Satisfactory
LXS Builders & Supplies 25172 Const. of 1 CL School Bldg. @ Hermosa E/S I 0.493 72 C 0.323 0.200 0.300 - - - 82.30 87.90%
V. Satisfactory
LXS Builders & Supplies 25172 Const. of Drainage System at Mariposa Creek I 0.668 40 C 0.260 0.300 0.300 - - - 86.00 *86.00%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page290
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
M A M Construction & Trading (Formerly: MAM Construction) 19915 Const. of St. Tomas NHS III 0.901 80 C 0.309 0.300 0.300 - - - 90.90 *90.90%
Outstanding
M A M Construction & Trading (Formerly: MAM Construction) 19915 Repair and Rehab. of San Pablo
ES III 0.191 80 C 0.326 0.300 0.300 - - - 92.60 *92.60% Outstanding
M F Construction 22192 Completion of Multi-Purpose Building @ Tigbawan, Phase 2 VII 1.882 186 C 0.267 0.300 0.300 - - - 86.70 87.54%
V. Satisfactory
M M Construction 12012 Conc. of Bambang-Kasibu-Quezon-Solano Road (Labni Section) II 14.225 120 C 0.406 0.200 0.300 - - - 90.60 86.64%
Satisfactory
M M Construction 12012Rehab./Reconst. of Damaged
National Roads, Daang Maharlika, Poblacion Villaflores Section
II 14.468 200 O 0.374 0.240 0.100 0.030 0.047 0.067 85.80 -
M M Construction 12012Rehab./Reconst. of Damaged
National Roads, Daang Maharlika, Poblacion Villaflores Section
II 14.468 200 O 0.355 0.300 0.150 0.030 0.050 0.033 91.80 -
M. Montesclaros Enterprises, Inc. 6506Asphalt Overlay/Patching of
Bituminous Pavement @ Sayre Highway
X 9.338 45 C 0.387 0.200 0.300 - - - 88.70 84.80% V. Satisfactory
M. Montesclaros Enterprises, Inc. 6506 Conc. of Bukidnon-Davao Road (Dologon-Busco-Quezon Sect.) X 67.179 315 C 0.360 0.200 0.300 - - - 86.00 86.00%
V. Satisfactory
M. Montesclaros Enterprises, Inc. 6506 Const. of 135 lm Steel Bridge (Bridge Approaches X 22.665 271 O 0.360 0.240 0.150 0.030 0.045 0.050 87.50 -
M. Montesclaros Enterprises, Inc. 6506 Const. of Diversion Road at Kipolot-Palacapao Section X 14.111 330 O 0.400 0.294 0.100 0.030 0.038 0.100 96.20 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page291
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
M. Montesclaros Enterprises, Inc. 6506 Const. of Diversion Road at Kipolot-Palacapao Section X 14.101 330 O 0.383 0.300 0.100 0.030 0.045 0.100 95.80 -
M. Montesclaros Enterprises, Inc. 6506 Const. of MPB @ Palacapao X 9.375 180 O 0.381 0.300 0.100 0.030 0.061 0.100 97.20 -
M. Montesclaros Enterprises, Inc. 6506 Const. of MPB @ Palacapao X 9.375 180 O 0.276 0.300 0.100 0.030 0.047 0.100 85.30 -
M. Montesclaros Enterprises, Inc. 6506 Const. of Sayre National Highway X 33.060 330 C 0.293 0.300 0.300 - - - 89.30 90.23% Outstanding
M. Montesclaros Enterprises, Inc. 6506Patching/Asphalt Overlay along
Bukidnon-Davao City Road, Camp I- Kiuntod Section
X 4.689 30 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding
M. Montesclaros Enterprises, Inc. 6506Repair/Rehab. of Proposed Development of DPWH Ver
Overview Bldg.X 9.375 215 C 0.399 0.300 0.300 - - - 99.90 93.85%
Outstanding
M. Montesclaros Enterprises, Inc. 6506
Road Upgrading (Gravel to Concrete) based on GTRSTB
(HDM4 Analysis) along Kibawe-Kadingilan-Kalilangan Road
X 4.823 74 C 0.416 0.133 0.300 - - - 84.90 82.26% Satisfactory
M. Montesclaros Enterprises, Inc. 6506
Road Upgrading (Gravel to Concrete) Jct. SH Impasugong-
Patulangan By-Pass Road (Patulangan Section)
X 18.991 270 C 0.393 0.133 0.300 - - - 82.60 85.90% Satisfactory
M.B. Ang Const. and Supply 25001
Concreting of Caibiran,-Cabucgayan National
Circumferential Road (Uson-Gamay Section)
VIII 3.725 160 C 0.303 0.035 0.300 - - - 63.80 76.46%Unsatisfactory
M.B. Ang Construction and Supply 25001
Conc. of Caibiran-Cabucgayan National Circ. Road (Uson-Gamay
Section)VIII 3.725 160 O 0.337 0.240 0.100 0.030 0.042 0.100 84.90 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page292
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
M.C. Torio Construction 10534 Alibadabad CPIP NIA-II 2.193 120 C 0.300 0.296 0.300 - - - 89.60 85.47% V. Satisfactory
M.C. Torio Construction 10534 Const. of MPB (Community Center) II 0.283 45 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
M.C. Torio Construction 10534 Delfin Albano Communal Pump Irrigation Project NIA-II 8.706 343 C 0.298 0.240 0.300 - - - 83.80 82.3%
V.Satisfactory
M.C.B. Zamora Construction & Supplies 32006 Const. of MPB at Brgy. Calangain III 0.948 44 C 0.308 0.300 0.300 - - - 90.80 *90.80%
Outstanding
M.C.B. Zamora Construction & Supplies 32006 Const. of MPB at Poblacion III 2.845 60 C 0.380 0.279 0.300 - - - 95.90 *95.90%
Outstanding
M.C.B. Zamora Construction & Supplies 32006 Impvt./Rehab. of Pathwalk along
Porac River III 2.846 60 C 0.275 0.245 0.300 - - - 82.00 *82.00% V. Satisfactory
M.C.B. Zamora Construction & Supplies 32006 Rehab. of Pasbul-San Nicolas 2nd
Road III 4.743 90 C 0.361 0.224 0.300 - - - 88.50 *88.50% V. Satisfactory
M.E. Baning Construction 22682 Const. of MPB @ Brgy. Emmanuel IV-A 0.482 60 C 0.444 0.133 0.300 - - - 87.70 *87.70% Satisfactory
M.G. Cereno Construction 14979 Construction of Spillway V 0.469 45 C 0.428 0.133 0.300 - - - 86.10 *86.10% Satisfactory
M.G. Jacinto Construction 20617 Const. of Multi-Purpose Building (Learning Center) II 0.750 190 C 0.382 0.280 0.300 - - - 96.20 75.06%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page293
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
M.G. Salazar Const. Corp./Candace Const. (JV) JV-03-064
Impv't./Conc. Paving of Basilan Circumferential Rd., Isabela-
Maluso Rd.IX 36.385 288 O 0.296 0.300 0.050 0.030 0.051 0.100 82.70 -
M.G. Salazar Construction 4072 Construction of Girls Dormitory Bldg. DOST 30.572 285 O 0.352 0.260 0.150 0.030 0.048 0.050 89.00 -
M.G. Salazar Construction 4072 Site Development Project DOST 0.972 101 O 0.360 0.251 0.100 0.024 0.058 0.033 82.60 -
M.G. Samidan Construction 16779 Const. of Bolinawen Flood Control CAR 1.051 90 C 0.300 0.300 0.300 - - - 90.00 *90.00% V. Satisfactory
M.G. Samidan Construction 16779 Const. of Kin-iway-Tambo-an Tribal ARC, FMR CAR 21.993 278 C 0.345 0.300 0.300 - - - 94.50 *94.50%
Outstanding
M.G. Samidan Construction 16779Improvement of Access Road to
Tourism Hubs & Spokes as defined by DOT
CAR 12.222 277 O 0.298 0.298 0.300 - - - 89.60 -
M.G. Samidan Construction 16779Improvement of Benguet-Bontoc
(Mt. Province)-Tinglayan (Kalinga) Road Mt. Data Bontoc Section
CAR 8.188 170 C 0.384 0.300 0.300 - - - 98.40 89.10% V. Satisfactory
M.G. Samidan Construction 16779Impvt. of Baguio-Bontoc-Banaue Road, Conc. of Mt. Data-Bontoc
Road, Km. 352+980-Km. 355+621CAR 18.506 206 C 0.348 0.100 0.300 - - - 74.80 81.58%
V. Satisfactory
M.G. Samidan Construction 16779
Impvt. of Benguet-Bontoc (Mr. Prov.)-Tinglayan-Lubuagan
(Kalinga) Road At-Ato-Circle Section
CAR 7.286 218 C 0.374 0.300 0.300 - - - 97.40 92.33% Outstanding
M.G. Samidan Construction 16779
Widening/Conc. of Mt. Data-Bontoc Road, Lukib-Sadsadan
Section, Km. 349+210 - Km. 350+243
CAR 13.139 144 C 0.369 0.200 0.300 - - - 86.90 80.96% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page294
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
M.G.G. Construction & Supply 31228 Const. of MPB (Hall) III 1.233 45 C 0.375 0.200 0.300 - - - 87.50 *87.50% V.Satisfactory
M.H. Southern Construction 5841Conc. of Road & Reblocking, Marbel-Makar Road, Matinao
Silway 8 XII 14.169 180 O 0.346 0.300 0.150 0.030 0.040 0.050 91.60 -
M.H. Southern Construction 5841 Const. of Dungon Seawall XII 4.653 150 C 0.261 0.288 0.000 - - - 54.90 75.90% Satisfactory
M.H. Southern Construction 5841 Const. of Multi-Purpose Building XII 0.370 63 C 0.362 0.300 0.300 - - - 96.20 *96.20% Outstanding
M.H. Southern Construction 5841 Const. of Public Market @ Pob. Malungon XII 9.102 262 C 0.370 0.224 0.300 - - - 89.40 71.96%
Satisfactory
M.J. Apin Builders 12179 Const. of 1-Cl School Building @ Bacolod National High School V 0.378 150 C 0.300 0.000 0.300 - - - 60.00 56.01%
Poor
M.J. Apin Builders 12179 Const. of Sch. Bldg. Patong E/S V 0.468 60 C 0.291 0.200 0.300 - - - 79.10 *79.10% Satisfactory
M.P. Villegas Construction 16683 Administration Building DOST 6.975 171 C 0.351 0.275 0.300 - - - 92.60 92.60% Very Satisfactory
M.P. Villegas Construction 16683Construction of DOST Reg IV-A
Food Safety & Quality Assurance Laboratory Building
DOST 9.379 120 C 0.492 0.200 0.300 - - - 99.17 99.17% Outstanding
M.R. Oribiana Gravel & Sand Dealer & Construction 26070 Conc. of Critical Portion of FTMR IV-A 0.470 30 C 0.245 0.300 0.300 - - - 84.50 *84.50%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page295
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
M.R. Oribiana Gravel & Sand Dealer & Construction 26070 Conc. of FMR, Brgy. Sapaan to
San Andres-Labak IV-A 0.383 60 C 0.389 0.200 0.300 - - - 88.90 *88.90% V. Satisfactory
M.R. Oribiana Gravel & Sand Dealer & Construction 26070 Const. of MPB, Gumaca MAPC
MPCI IV-A 0.946 30 C 0.181 0.300 0.300 - - - 78.10 *78.10% Satisfactory
M.R. Santiago Construction 27329 Conc. of Road, Brgy. Maguinao III 0.947 60 C 0.377 0.200 0.300 - - - 87.70 *87.70% V. Satisfactory
M.R. Santiago Construction 27329 Const. of MPB @ San Roque E/S III 0.950 75 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding
M.R. Santiago Construction 27329 Rehab. of Camias-Sibut Road III 5.709 90 C 0.312 0.300 0.300 - - - 91.20 *91.20% Outstanding
M.R. Vargas Construction 8215 M'lang Airport Development Project DOTC 13.458 180 O 0.360 0.293 0.150 0.023 0.050 0.033 90.90 -
M.R.C. Bechaida Construction & Supply 32821 Conc. of Masagongsong Bridge
Approaches VIII 1.867 140 O 0.370 0.232 0.100 0.015 0.037 0.100 85.40 -
M.R.C. Bechaida Construction & Supply 32821 Concreting of Masagongsong
Bridge Approaches VIII 1.867 162 C 0.335 0.000 0.300 - - - 63.50 76.64%Unsatisfactory
M.S. Ramos Construction 31684Const. of two (2) Storey, 4CL
School Bldg., @ Heritage Homes Brgy. Loma de Gato
III 3.283 100 C 0.378 0.200 0.300 - - - 87.80 85.77% V. Satisfactory
M.S. Ramos Construction 31684 Const./Rehab. of FMR at Brgy. Ligas III 0.380 15 C 0.355 0.200 0.300 - - - 85.50 *85.50%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page296
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
M.S. Ramos Construction 31684 Impvt./Rehab of Mac Arthur Highway including drainage NCR 9.425 120 C 0.300 0.200 0.300 - - - 80.00 85.40%
V. Satisfactory
M.S. Ramos Construction 31684 Impvt./Rehab. of Roads Brgy. Pulong Buhangin III 2.857 80 C 0.353 0.200 0.300 - - - 85.30 85.30%
V. Satisfactory
M.S. Ramos Construction 31684 Rehab. of Rizal-Bulacan Boundary-Bigte Road III 5.038 85 C 0.304 0.300 0.300 - - - 90.40 *90.40%
Outstanding
M.S. Ramos Construction 31684 Rehab./Impv't. of Sibul-Biak na Bato Road III 47.623 210 C 0.360 0.200 0.300 - - - 86.00 *86.00%
Satisfactory
M.S.C. Construction / Persan Construction (JV)
SL2-SN-000820/JV-
07-158
Rehab./Impv't. of Gen. Alejo Santos Highway to CVR Junction
via San Rafael RoadIII 47.614 210 C 0.425 0.200 0.300 - - - 92.50 *92.50%
V.Satisfactory
M.V. Caldo Engineering Construction and Supplies 16938 Concreting with Drainage
Improvement of Hondradez St. NCR 1.781 90 C 0.371 - 0.500 - - - 87.10 87.10% V. Satisfacroty
M.V. Caldo Engineering Construction and Supplies 16938
Const. / Rehab. / Replacement / Completion and Repair of Plaridel
E/SNCR 0.959 75 C 0.327 0.300 0.300 92.70 *92.70%
Outstanding
M.V. Caldo Engineering Construction and Supplies 16938 Const. of MPB, Brgy. 385 NCR 0.576 60 C 0.345 0.200 0.300 84.50 *84.50%
V. Satisfactory
M.V. Caldo Engineering Construction and Supplies 16938 Const.Rehab. of Shallow
Well/Artesian Well @ Zone 13-24 NCR 0.932 90 C 0.222 0.300 0.300 82.20 81.84% V. Satisfactory
M.V. Caldo Engineering Construction and Supplies 16938 Proposed Const./Repair/Rehab/of
Multi-Purpose Bldg., Brgy. 776 NCR 0.962 30 C 0.382 0.038 0.300 - - - 72.00 *72.00% Poor
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page297
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
M.V. Confirm Construction & Development Inc. 32469 Const. of Six (6) Cl @ Santor E/S IVA 2.892 120 C 0.345 0.103 0.300 - - - 74.80 *74.80%
Satisfactory
M.V. Sabalburo Construction and Supply 32561 Completion of Antero P. Hermosa
E/S I 0.388 48 C 0.365 0.300 0.300 - - - 96.50 *96.50% Outstanding
M.V. Sabalburo Construction and Supply 32561 Repair of Cabusligan School
Bldg., Cabusligan E/S I 0.949 82 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory
M.Y. Reyes Builders & Development Corporation 26386 Const. of Multi-Purpose Covered
Court NHA 4.698 120 O 0.398 0.300 0.100 0.030 0.070 0.100 99.84 -
M.Y. Reyes Builders & Development Corporation 26386 Construction of One Unit 3-Storey
School Building NHA 17.198 150 O 0.353 0.300 0.100 0.020 0.018 0.100 89.00 -
M.Y. Reyes Builders & Dev't. Corporation 26386 Construction of a 3-storey School
Building NCL 17.363 187 C 0.397 0.300 0.300 - - - 99.7 99.70% Outstanding
M2R Construction 13431Asphalt Overlay along Olongapo-Bugallon Road, Phase 3, Panan
SectionIII 0.979 15 C 0.356 0.300 0.300 - - - 95.60 *95.60%
Outstanding
M2R Construction 13431 Const. of Multi-Purpose Building @ Palauig C/S III 1.061 180 C 0.481 - 0.500 - - - 98.10 88.23%
V. Satisfactory
M2R Construction 13431 Const. of Slope Protection East Dirita Bridge III 4.753 90 C 0.284 0.158 0.300 - - - 74.20 *74.20%
Satisfactory
M2R Construction 13431 Genaro Magsaysay Bldg., Batonlapoc E/S III 1.140 90 C 0.367 0.071 0.300 - - - 73.80 81.43%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page298
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
M2R Construction 13431 Improvement/Rehab. of Water Supply III 0.935 30 O 0.400 0.022 0.100 0.020 0.025 0.100 66.70 -
M2R Construction 13431 Various Water System III 1.955 90 C 0.302 - 0.500 - - - 80.20 80.20% V. Satisfactory
M3A Construction 32123 Const. of Roads V 4.776 120 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory
M3A Construction 32123 Construction of Pili-Tinangis Road V 14.186 90 C 0.422 0.200 0.300 - - - 92.20 *92.20% V. Satisfactory
M3A Construction 32123 Road Concreting of Bagong Sirang V 14.469 90 C 0.299 0.200 0.300 - - - 79.90 * 79.90%
Satisfactory
Ma. Gina M. Pador Construction 25600 Conc. of Concepcion Sur Nat'l Road IV-B 0.933 60 C 0.256 0.300 0.300 - - - 85.60 *85.60%
V. Satisfactory
Ma. Gina M. Pador Construction 25600Repair/Maint. of Ferrol-Odiongan
Road (Tubigon Section) Km. 120+800
IV-B 0.139 35 C 0.337 0.200 0.300 - - - 83.70 85.20% V. Satisfactory
Ma-an Construction Corp. 28751 Rehab./Impvt. of DPWH Leyte 2nd DEO VIII 4.746 180 C 0.427 0.139 0.300 - - - 86.60 82.40%
Satisfactory
Ma-an Construction Corporation 28751 Repair/Rehab. of Wright-Taft Road VIII 2.614 140 C 0.375 - 0.500 - - - 87.50 *87.50% V. Satisfactory
MAC Builders 7249Conc. of Calubian-San Isidro-
Tabango-Villaba Road (Tabango-Tabing Sect.)
VIII 17.943 220 C 0.265 0.146 0.300 - - - 71.10 80.16%Unsatisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page299
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
MAC Builders / Ubas Construction (JV) JV-05-021 Const. of Catarman Bridge
(Completion) VIII 58.313 360 O 0.293 0.300 0.100 0.030 0.030 0.067 82.00 -
MAC Builders / Ubas Construction (JV) JV-05-021 Const. of Catarman Bridge
(Completion) VIII 58.313 360 O 0.372 0.300 0.030 0.022 0.055 0.033 81.20 -
MAC Builders / Ubas Construction (JV) JV-05-021
Impvt. of Allen-Malaga Section along Maharlika Highway, Ferry
Terminal-AllenVIII 46.652 260 O 0.354 0.240 0.000 0.022 0.054 0.067 73.70 -
Mac-Morales General Merchandise & Construction
Supply2287 Conc. of FMR in Brgy. San Isidro
Ibaba IV-A 0.471 60 C 0.296 0.218 0.300 - - - 81.40 *81.40% V. Satisfactory
Madyaw Construction & Dev. Corporation 29598
Completion of Azpetia Bridge along NRJ-Awa-Prosperidad-
Lianga Road XIII 6.724 180 C 0.376 0.200 0.300 - - - 87.60 84.96%
Satisfactory
Madyaw Construction & Dev. Corporation 29598
Conc. of Talacogon-La Paz Road Section along Butuan City-
Talacogon-La Paz-Loreto-Varuela-Sta. Josefa Road
XIII 19.247 406 O 0.352 0.300 0.150 0.030 0.032 0.050 91.40 -
Madyaw Construction & Dev't. Corp. 29598 Completion of San Luis
Footbridge, Old Poblacion XIII 5.722 210 O 0.324 0.300 0.100 0.030 0.032 0.100 88.60 -
Madyaw Construction & Dev't. Corp. 29598 Conc. of Bayugan-San Luis-
Talacogon Circ. Road XIII 9.456 195 C 0.310 0.046 0.300 - - - 65.60 70.82% Satisfactory
Madyaw Construction & Dev't. Corp. 29598
Conc. of La Paz-Loreto Road section along Butuan City-
Talacogon-La Paz-Loreto-Varuela-Sta. Josefa Road
XIII 19.242 406 O 0.363 0.300 0.150 0.030 0.032 0.050 92.50 -
Madyaw Construction & Dev't. Corp. 29598 Const. of Phil. Normal University
MPB XIII 2.353 75 C 0.322 0.200 0.300 - - - 82.20 86.77% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page300
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Madyaw Construction & Dev't. Corp. 29598 Const. of San-Isidro-Hinimbangan
FMR XIII 19.235 300 C 0.293 0.300 0.300 - - - 89.30 89.30% V. Satisfactory
Maer Summit Konstruck Co. 25262 Conc. of Mapantad-Licop Road XI 0.943 90 C 0.350 0.200 0.300 - - - 85.00 87.16% V. Satisfactory
Maer Summit Konstruck Co. 25262 Conc. of Poblacion Road at Brgy. Central XI 0.943 90 C 0.322 0.300 0.300 - - - 92.20 *92.20%
Outstanding
Maer Summit Konstruck Co. 25262 Conc. of Tibanban-Lavigan Road (Checote-Monserat Sect.) XI 19.283 120 C 0.092 0.200 0.300 - - - 59.20 79.36%
Satisfactory
Maer Summit Konstruck Co. 25262 Conc. of Tibanban-Lavigan Road (Lilisan Sect.) XI 19.282 148 C 0.335 0.145 0.300 - - - 78.00 84.66%
Satisfactory
Maer Summit Konstruck Co. 25262 Conc. of Tua-tua Road XI 1.415 90 C 0.359 0.200 0.300 - - - 85.90 87.46% V. Satisfactory
Maer Summit Konstruck Co. 25262 Const. of MPB (Legislative Bldg., Phase II) XI 1.887 105 C 0.388 0.300 0.300 - - - 98.80 94.53%
Outstanding
Maer Summit Konstruck Co. 25262Impvt. of Davao Oriental-Surigao Sur Coastal Road (Banaybanay
Section)XI 10.324 120 C 0.310 0.300 0.300 - - - 91.00 *91.00%
Outstanding
Maer Summit Konstruck Co. 25262 Impvt. of Lanca-Luban Road XI 2.830 90 C 0.217 0.200 0.300 - - - 71.70 *71.70% Satisfactory
Maer Summit Konstruck Co. 25262 Impvt. of Lavigan-Impog Road XI 1.884 90 C 0.279 0.200 0.300 - - - 77.90 *77.90% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page301
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Maer Summit Konstruck Co. 25262 Impvt. of Manikling-Lavugan Road (Lavigan-Talisay Sect.) XI 14.464 150 C 0.347 0.200 0.300 - - - 84.70 82.12%
V. Satisfactory
Maer Summit Konstruck Co. 25262Rehab. of Davao or.-Surigao
Coastal Road, Banaybanay-Mati Section (Phase I)
XI 19.289 180 C 0.329 0.200 0.300 - - - 82.90 *82.90% V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit Konstrukt) 25262 Const. of DOSCST Nursing Blsg.,
Guang-Guang XI 2.359 75 C 0.386 0.200 0.300 - - - 88.60 87.97% V. Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit Konstrukt) 25262 Const. of MPB (Covered Court) XI 1.251 100 O 0.294 0.250 0.100 0.015 0.023 0.100 78.20 -
Maer Summit Konstrukt Co. (Formerly: Summit Konstrukt) 25262 Improvement of CDC - Poblacion
FMR (ARSIP II) XI 11.869 100 C 0.310 0.011 0.300 - - - 62.10 74.97% Satisfactory
Maer Summit Konstrukt Co. (Formerly: Summit Konstrukt) 25262 Impv't./Rehab. of Don Enrique
Lopez-Don Salvador Lopez FMR XI 7.364 120 C 0.384 - 0.500 - - - 88.40 88.40% V. Satisfactory
Mafil Enterprises 27226 Provision of Line Canal @ Km. 1546, 450-Km.1546.73 X 0.280 90 C 0.411 - 0.500 - - - 91.10 91.10%
Outstanding
Mafil Enterprises 27226Provision of Line Canal along Jct.
Dologon-Busco-Quezon Road Buni-Buni Section
X 0.278 30 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory
Maghuyop Construction 21641Completion of Multi-Purpose
Building, CVSCAFT, Tagbilaran City Campus
VII 0.915 115 C 0.497 0.138 0.300 - - - 93.50 *93.50%V. Satisfactory
Maghuyop Construction 21641 Conc. of FMR VII 1.925 120 C 0.343 0.300 0.300 - - - 94.30 86.98% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page302
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Maghuyop Construction 21641 Concreting of Multi-Purpose Pavement Tagbuane VII 0.137 110 C 0.416 0.200 0.300 - - - 91.60 *91.60%
V. Satisfactory
Maghuyop Construction 21641 Concreting of Road VII 2.784 120 C 0.345 0.222 0.300 - - - 86.70 83.88% V. Satisfactory
Maghuyop Construction 21641 Const. of 2 CL Sch. Bldg. w/o CR Guinacot H/S VII 0.853 90 C 0.352 0.256 0.300 - - - 90.80 88.98%
V. Satisfactory
Maghuyop Construction 21641 Const. of 4 Cl Sch. Bldg. at Pondol E/S VII 1.435 100 C 0.333 0.300 0.300 - - - 93.30 *93.30%
Outstanding
Maghuyop Construction 21641 Construction of ICL Datag E/S VII 0.459 120 O 0.396 0.242 0.150 0.030 0.064 0.033 91.50 -
Maghuyop Construction 21641 Construction of Multi-Purpose Pavement, Basac Dacu VII 0.137 110 C 0.450 0.133 0.300 - - - 88.30 *88.30%
Satisfactory
Maghuyop Construction 21641 Reconstruction of Balilihan Central Elementary School VII 3.525 180 C 0.494 0.181 0.300 - - - 97.50 96.31%
Outstanding
Maghuyop Construction 21641 Renovation of Multi Purpose Pavement VII 0.093 90 C 0.364 0.000 0.300 - - - 66.40 *66.40%
Fair
Magna Rich Trading & Construction 29108 Const. of FMR Brgy. San Antonio IV-A 0.955 45 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
Magscon Construction 25362 Const. of Multi-Purpose Building @ Brgy. Padu Grande I 0.189 22 C 0.368 0.300 0.300 - - - 96.80 *96.80%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page303
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mainbest Enterprise 26127 Completion of Multi-Purpose Building (Gymnasium), Gamis II 1.283 60 C 0.305 0.200 0.300 - - - 80.50 *80.50%
V. Satisfactory
Makapa Corporation 30029 Const. of Multi-Purpose Building V 1.380 100 C 0.391 0.300 0.300 - - - 99.10 83.77% V. Satisfactory
Makapa Corporation 30029 Const. of Sampaloc Seawall @ Sitio Little Mahingan V 3.803 104 C 0.400 0.000 0.300 - - - 70.00 78.50%
Satisfactory
Makapa Corporation 30029 Const./Impvt. of Cawayan River Control V 9.452 120 C 0.365 0.195 0.300 - - - 86.00 84.14%
V. Satisfactory
Makapa Corporation 30029 Rehab./Impvt. of Cawayan River Control V 4.728 90 C 0.306 0.300 0.300 - - - 90.60 *90.60%
Outstanding
Makapa Corporation 30029 Rehab./Retrofitting of Cawayan Bridge along Maharlika Highway V 19.016 210 C 0.383 0.200 0.300 - - - 88.30 *88.30%
V. Satisfactory
Makapa Corporation 30029 Repair/Rehab. of Cawayan River Control V 9.497 150 C 0.367 0.200 0.300 - - - 86.70 *86.70%
V. Satisfactory
Makati Development Corporation 2313 Const. of 10th & 11th Aveneus of Bonifacio Triangle Project BCDA 52.800 120 c.d. O 0.316 0.300 0.100 0.020 0.047 0.100 88.28 -
Makati Development Corporation 2313 Const. of 10th and 11th Avenues of Bonifacio Triangle BCDA 52.800 120 O 0.377 0.275 0.070 0.023 0.045 0.100 88.94 -
Makati Development Corporation 2313Const. of 34.5 KVA UPDS along
26th St., 32nd St. & McKinley Parkway, Phase 3
BCDA 12.084 163 O 0.400 0.300 0.100 0.020 0.045 0.067 93.17 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page304
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mak-Well Enterprises 25003 Const. of MPB at Brgy. Pansol IV-A 2.674 90 C 0.423 - 0.500 - - - 92.30 92.30% Outstanding
Mak-Well Enterprises 25003 Const. of Multi-Purpose Bldg. @ Los Banos Park IV-A 1.049 60 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
Mak-Well Enterprises 25003 Const. of Multi-Purpose Bldg. Barangay Batong Malake IV-A 0.955 36 C 0.433 - 0.500 - - - 93.30 *93.30%
Outstanding
Mak-Well Enterprises 25003 Const./Repair/Rehab. of MPB at Brgy. Tadlac IV-A 2.880 35 C 0.316 0.200 0.300 - - - 81.60 *81.60%
V. Satisfactory
Malihan Enterprises 6963 Concreting of Road, Brgy. San Antonio IV-A 0.954 45 C 0.467 - 0.500 - - - 96.70 *96.70%
Outstanding
MAM Construction & Trading 19915 Const. of Three 3-CL Building @ Bucanan Elem. School III 1.410 60 O 0.400 0.300 0.100 0.020 0.018 0.100 93.80 -
MAM Construction & Trading (Formerly: MAM Construction) 19915 Conc./Upgrading of Angeles-Porac
Dinalupihan Road III 5.689 72 C 0.282 0.272 0.300 - - - 85.40 *85.40% V. Satisfactory
MAM Construction & Trading (Formerly: MAM Construction) 19915 Const. of 2CL Sch. Bldg. at Sta.
Rita E/S III 0.765 88 C 0.368 0.200 0.300 - - - 86.80 *86.80% V. Satisfactory
MAM Construction & Trading (Formerly: MAM Construction) 19915 Const. of Elem. School Bldg. at
Sta. Cruz ES III 0.786 80 C 0.383 0.276 0.300 - - - 95.90 *95.90% Outstanding
MAM Construction & Trading (Formerly: MAM Construction) 19915 Repair and Rehab. of San Pedro
ES III 0.384 80 C 0.338 0.300 0.300 - - - 93.80 *93.80% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page305
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mamsar Enterprises Agro-Industrial Corporation 15885
Cluster B 2004: Const. of Various 2004 School Bldg. (Opol
NSTS.)under the 2nd Congressional District, Misamis
Oriental
X 9.049 150 O 0.308 0.300 0.100 0.030 0.032 0.100 87.00 -
Mamsar Enterprises Agro-Industrial Corporation 15885 Completion of Cumba Bridge &
Approaches X 16.484 298 C 0.380 0.300 0.300 - - - 98.00 86.64% V. Satisfactory
Mamsar Enterprises Agro-Industrial Corporation 15885
Completion of Mandulog Bridge I along Ma. Cristina-Misamis
Oriental Rd., Brgy. San Roque-Hinaplanon
X 13.667 315 C 0.317 0.300 0.300 - - - 91.70 94.08% Outstanding
Mamsar Enterprises Agro-Industrial Corporation 15885 Completion of Nunucan Bridge
Phase III, Brgy. Suarez X 7.608 220 C 0.425 - 0.500 - - - 92.50 88.96% V. Satisfactory
Mamsar Enterprises Agro-Industrial Corporation 15885 Const. of Mambu-ao Bridge &
Approaches X 22.223 395 C 0.353 0.293 0.300 - - - 94.60 89.66% V. Satisfactory
Mamsar Enterprises Agro-Industrial Corporation 15885 Const./Impvt. of Water Supply
Projects XIII 10.392 180 C 0.311 0.200 0.300 - - - 81.10 87.28% V. Satisfactory
Mamsar Enterprises Agro-Industrial Corporation 15885 Const.of Iligan-Bukidnon Road
(Digkila-an-Rogongon Sect.) X 7.769 255 C 0.276 - 0.500 - - - 77.60 77.48% Satisfactory
Mamsar Enterprises Agro-Industrial Corporation 15885 Iligan-Bukidnon Road Brgy. San
Roque X 8.037 180 C 0.444 - 0.500 - - - 94.40 93.86% Outstanding
Maningo Enterprises 13330 Const. of 2 Storey 6 CL E/S Bldg. VII 4.767 100 C 0.227 0.200 0.300 - - - 72.70 *72.70% Satisfactory
Maningo Enterprises 13330 Const. of 4-Cl, 2-Storey S/B @ Bangkal NHS VII 1.962 110 C 0.218 0.230 0.300 - - - 74.80 74.80%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page306
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Maningo Enterprises 13330 Road Asphalting/Conc. @ Brgy. Malubog VII 0.478 50 C 0.307 0.300 0.300 - - - 90.70 *90.70%
Oustanding
Manuel A. Dela Torre Jr. Builders 31024 Conc. of Fatima V III 0.949 55 C 0.344 0.300 0.300 - - - 94.40 *94.40% Outstanding
Manuel A. Dela Torre Jr. Builders 31024 Conc. of Road, Brgy Maasin III 0.379 60 C 0.380 0.286 0.300 - - - 96.70 *96.70% Outstanding
Map Alviola Construction 31951 Const. of Flood Control (Seawall) VII 0.943 45 C 0.327 0.200 0.300 - - - 82.70 *82.70% V. Satisfactory
Map Alviola Construction 31951 Const. of Water System VII 0.165 40 C 0.286 0.300 0.300 - - - 88.60 *88.60% V. Satisfactory
Mar Castillo Const. Supply Gravel & Sand 21073 Const. of Lined Canal @ Sta. Maria IV-A 0.283 45 C 0.431 - 0.500 - - - 93.10 93.10%
Outstanding
Marbel Dynamic Builders 6150 Const. of 2 Cl @ Marianito Villegas E/S XII 0.680 108 C 0.381 0.300 0.300 - - - 98.10 *98.10%
Outstanding
Marbel Dynamic Builders 6150 Const. of 2 Cl @ Surallah NHS XII 0.783 105 C 0.381 0.300 0.300 - - - *98.10 98.10% Outstanding
Marbel Dynamic Builders 6150 Const. of Koronadal NCHS Annex, Bacongco Campus XII 1.734 126 C 0.449 0.133 0.300 - - - 88.20 82.53%
Satisfactory
Marbel Dynamic Builders 6150Const. of Ladol flood Control
Protecting Sarangani-Davao del Sur Coastal Road
XII 1.234 60 O 0.323 0.200 0.000 0.010 0.021 0.133 68.70 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page307
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Marbel Dynamic Builders 6150 Const. of MPB @ Brgy. Assumption XII 0.190 49 C 0.360 0.200 0.300 - - - 86.00 * 86.00%
V. Satisfactory
Marbel Dynamic Builders 6150 Const. of Multi-Purpose Bldg. @ Brgy. Liberty XII 0.759 98 C 0.276 0.216 0.300 - - - 79.20 *79.20%
Satisfactory
Marbel Dynamic Builders 6150 Const. of Multi-Purpose Bldg., Brgy. Lake Seloton XII 0.760 98 C 0.330 0.200 0.300 - - - 83.00 84.19%
V. Satisfactory
Marbel Dynamic Builders 6150 Impvt. of MPB at Poblacion XII 0.961 123 C 0.275 0.200 0.300 - - - 77.50 *77.50% Satisfactory
Marcbilt Construction, Inc. 21844 Rehab./Reconst. (Conc.) of Dasmariñas-Carmona Road IV-A 28.920 180 O 0.341 0.202 0.100 0.030 0.037 0.100 81.00 -
Marcons Builder 8044 Const. of DPWH Building CAR (Phase IV) CAR 8.553 150 O 0.363 0.240 0.100 0.030 0.051 0.100 88.40 -
Marcons Builder 8044 Const. of DPWH Regional Office Building (Phase V) CAR 24.059 360 O 0.376 0.300 0.100 0.030 0.047 0.100 95.30 -
Marcons Builder 8044 Const. of DPWH Regional Office Building, Phase V CAR 24.058 360 O 0.361 0.276 0.150 0.030 0.056 0.033 90.60 -
Marcons Builder 8044 Const. of U.P. College Baguio Multi-Purpose Bldg. CAR 1.448 120 C 0.350 - 0.500 - - - 85.00 65.61%
Fair
Marcons Builder 8044 Impvt. of Benguet-Bontoc-Kalinga Road CAR 12.707 180 C 0.318 0.100 0.000 - - - 41.80 58.56%
Poor
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page308
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Marcons Builder 8044 Rehab./Impvt./Const. of DPWH Building (Phase III) CAR 14.475 300 C 0.357 0.267 0.300 - - - 92.40 92.05%
Outstanding
Marcphil Construction 10949 Conc. of Dangay Port Road IV-B 0.937 70 C 0.417 - 0.500 - - - 91.70 84.38% V. Satisfactory
Marcphil Construction 10949 Conc. of Port Road, Proper Bansud IV-B 1.889 56 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
Marcphil Construction 10949 Conceting of San Jose-Kaligtasan Road IV-B 0.945 50 C 0.398 - 0.500 - - - 89.80 89.80%
V. Satisfactory
Marcphil Construction 10949 Concreting of San Aquilino-Baroc Road IV-B 0.951 50 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
Marcphil Construction 10949 Impvt./Repair of San Mariano-Tauga Road IV-B 1.860 30 C 0.170 0.276 0.300 - - - 74.60 *74.60%
Satisfactory
Marcris Enterprises 32820Repair and Rehab. of Ilang Bridge
along Carmen Jct.-Bayambang San Carlos-Manat Road
I 0.963 45 C 0.303 0.300 0.300 - - - 90.30 *90.30% Outstanding
Marcus Construction 12601 Conc. of Midsayap-Makar Road, Salunayan-Tumbras Section XII 19.109 140 C 0.368 0.300 0.300 - - - 96.80 *96.80%
Outstanding
Marcus Construction 12601Const. of Drainage Canal from Buluan Bridge II to Libungan
River, Phase I, II & IIIXII 14.285 175 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V.Satisfactory
Marcus Construction 12601 Const. of Multi-Purpose Bldg. (ABC Hall) Phase I XII 0.932 70 C 0.470 - 0.500 - - - 97.00 76.49%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page309
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Marcus Construction 12601Const. of Multi-Purpose Bldg.,
(DSWD Crisis Intervention Bldg.) Brgy. Pob. (Realigned to Singao)
XII 0.909 60 C 0.372 0.300 0.300 - - - 97.20 *97.20% Outstanding
Marcus Construction 12601 Const. of Multi-Purpose Building @ Brgy. Capiton XII 1.906 69 C 0.350 0.300 0.300 - - - 95.00 83.24%
V. Satisfactory
Marcus Construction 12601Proposed Conc. of Liloy-Siocon
Road, Imelda-San Roque-Gutalac Sect.
IX 19.128 225 C 0.459 0.155 0.300 - - - 91.40 84.05% Satisfactory
Marcus Construction 12601Proposed Impv't./Conc. of
Labason-Gutalac Nat'l. Rd., Antonio-Labason River Sect.
IX 3.913 101 C 0.450 - 0.500 - - - 95.00 95.00% Outstanding
Marcus Construction 12601 Reblocking/Conc. Along Cotabato-Davao Road, Sadaan Sect. XII 4.625 65 O 0.325 0.200 0.100 0.030 0.047 0.100 80.20 -
Marcus Construction 12601Rehab./Impvt. of Banisilan-Guiling-
Alamada-Libungan Road, (Kapayawe-Grebona Section)
XII 4.742 72 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding
Marcus Construction 12601
Repair/Maintenance of Libungan Flood Control (Slope Protection Upstream of Approach "B" of
Libungan Bridge) Phase II
XII 1.315 40 C 0.325 0.300 0.300 - - - 92.50 *92.50% Outstanding
Marcus Construction 12601
Repair/Rehab./Impv't. of Damaged Road Section along Davao-
Cotabato Road, Pikit-Midsayap Section
XII 9.435 125 C 0.477 0.200 0.300 - - - 97.70 *97.70% Outstanding
Mar-Deb Construciton & Development 6715 Completion of 2-Storey Multi-
Purpose Building (Phase IV) II 0.936 148 C 0.306 0.300 0.300 - - - 90.60 86.12% V. Satisfactory
Mar-Deb Construciton & Development 6715 Concreting of PNP Regional
Training Center Road, Minante I II 0.561 45 C 0.341 - 0.500 - - - 84.10 84.10% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page310
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mar-Deb Construciton & Development 6715 Const. of Angad Bridge &
Approaches Angad II 7.906 346 C 0.459 - 0.500 - - - 95.90 86.72% V. Satisfactory
Mar-Deb Construciton & Development 6715 Gravelling of FMR II 0.470 45 C 0.354 - 0.500 - - - 85.40 85.40%
V. Satisfactory
Mar-Deb Construciton & Development 6715
Impv't./Gravelling/Concreting along CDMA Boundary and its
related RoadsII 3.396 120 C 0.312 - 0.500 - - - 81.20 71.42%
Satisfactory
Mar-Deb Construciton & Development 6715
Impv't./Rehab. of Jct. Cauayan-Cabatuan Road (Km.371+449-
Km.372+649)II 9.573 180 O 0.366 0.295 0.100 0.030 0.035 0.100 92.60 -
Mar-Deb Construciton & Development 6715 Widening/Regravelling of FMR
Munoz East II 0.940 30 C 0.367 - 0.500 - - - 86.70 84.60% V. Satisfactory
Mar-deb Construction & Development 6715 Cagayan River Basin Protection
Works, Macate Section II 19.269 210 C 0.259 0.300 0.300 - - - 85.90 *85.90% V. Satisfactory
Mar-deb Construction & Development 6715 Completion of Turod-Banquero
Concrete Overflow Bridge PhaseIII II 9.879 300 O 0.351 0.260 0.000 0.030 0.037 0.100 77.80 -
Mar-deb Construction & Development 6715 Conc. of Cauayan-Cabatuan
National Road, Cabatuan Section II 9.412 190 C 0.342 0.200 0.300 - - - 84.20 87.02% V. Satisfactory
Mar-deb Construction & Development 6715 Conc. of Cauayan-Cabatuan Road
(Cabatuan Sect.) II 9.563 150 C 0.439 0.200 0.300 - - - 93.90 91.68% V.Satisfactory
Mar-deb Construction & Development 6715 Conc. of Jct. Ipil-Quirino Bdry.
Road II 27.182 330 C 0.354 0.200 0.300 - - - 85.40 87.38% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page311
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mar-deb Construction & Development 6715 Const. of 2 Cl Sch. Bldg. @ Reina
Mercedes Vocational School II 0.817 60 C 0.390 0.178 0.300 - - - 86.80 *86.80% V. Satisfactory
Mar-Deb Construction & Development 6715 Const. of Bank Protection Works,
Phase III II 16.225 230 C 0.375 - 0.500 - - - 87.50 91.10% Oustanding
Mar-deb Construction & Development 6715 Const. of Bintacan Bridge &
Approaches II 24.964 270 O 0.382 0.300 0.030 0.030 0.019 0.033 79.40 -
Mar-Deb Construction & Development 6715 Const. of Centro Multi-Purpose
Building II 0.090 60 C 0.321 0.236 0.300 - - - 85.70 *85.70% V. Satisfactory
Mar-deb Construction & Development 6715 Const. of MPB (Phase II) @
Cauayan City C/S II 0.941 160 C 0.331 0.074 0.300 - - - 70.50 66.23% Fair
Mar-deb Construction & Development 6715 Const./Completion of MPB @ San
Mateo II 0.953 120 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory
Mar-deb Construction & Development 6715 Construction of Bintacan Bridge &
Approaches II 24.964 295 O 0.348 0.300 0.000 0.023 0.051 0.067 78.90 -
Mar-deb Construction & Development 6715 Construction of Bintacan Bridge &
Approaches II 24.964 446 C 0.393 0.300 0.000 - - - 69.30 77.32% Satisfactory
Mar-deb Construction & Development 6715 Impvt./Rehab. of Cauayan-
Cabatuan Road II 9.559 250 C 0.292 0.200 0.300 - - - 79.20 82.44% V. Satisfactory
Mar-deb Construction & Development 6715 Impvt./Rehab. of Daang Maharlika
Road (Widening) II 4.778 160 C 0.298 0.300 0.300 - - - 89.80 88.90% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page312
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mar-Deb Construction & Development 6715
Reblocking of Concrete Pavement along Jct. Cauayan-Cabatuan Road (Intermittent Section)
II 0.623 90 C 0.317 - 0.500 - - - 81.70 *81.70% V. Satisfactory
Mar-deb Construction & Development 6715 Reblocking of Concrete Pavement
along Santiago-Tuguegarao Rd. II 4.741 330 C 0.328 0.200 0.300 - - - 82.80 *82.80% V. Satisfactory
Mar-deb Construction & Development 6715 Rehab./Reconst. of Santiago-
Tuguegarao Road II 11.473 180 O 0.392 0.240 0.100 0.030 0.047 0.100 90.90 -
Mar-deb Construction & Development 6715 Rehab/Reconst. of Santiago-
Tuguegarao Road II 11.473 237 O 0.335 0.300 0.150 0.030 0.055 0.050 92.00 -
Mar-deb Construction & Development 6715 Repair/Rehab.of Pigalo Bridge
(Phase III) II 4.790 255 C 0.319 0.200 0.300 - - - 81.90 84.12% V. Satisfactory
Mar-deb Construction & Development 6715 Widening of Cauayan-Cabatuan
Road (Luna Section) II 3.344 120 C 0.442 0.200 0.300 - - - 94.20 92.04% V.Satisfactory
Margarita Construction 20201 Asphalt Overlay @ Brgy. Sucol IV-A 0.480 3 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory
Margarita Construction 20201 Const. of 3-Cl School Building (FFHNAS) III 1.415 75 C 0.479 - 0.500 - - - 97.90 94.68%
Outstanding
Margarita Construction 20201 Rehab. of Norzagaray-Bigte Road III 5.709 80 C 0.257 0.300 0.300 - - - 85.70 *85.70% V. Satisfactory
Margarita Construction 20201 Upgrading of Banga Road III 2.838 75 C 0.472 - 0.500 - - - 97.20 97.20% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page313
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Marier Construction & Supply 22878 Const. of One Unit 2 CL Sch. Bldg. at Siare Jhon HRN NHS IX 0.948 150 C 0.335 0.287 0.300 - - - 92.20 *92.20%
Outstanding
Marigold Development Corporation 4707 Const. of Multi-Purpose Building
@ Brgy. New Era NCR 1.432 90 C 0.394 0.300 0.300 - - - 99.40 *99.40% Outstanding
Marigold Development Corporation 4707 Construction of Multi-Purpose
Building @ Brgy. Baesa NCR 1.145 60 C 0.319 0.202 0.300 - - - 82.10 *82.10% V. Satisfactory
Marilag Construction 22813 Const. of Multi-Purpose @ Talangka E/S IV-A 0.240 40 C 0.339 0.300 0.300 - - - 93.90 *93.90%
Outstanding
Marilag Construction 22813 Const. of Multi-Purpose Bldg., (Senior Citizen) IV-A 0.478 40 C 0.380 0.200 0.300 - - - 88.00 *88.00%
V. Satisfactory
Marilag Construction 22813 Const. of Multi-Purpose Bldg., @ San Jose IV-A 0.287 30 C 0.398 0.224 0.300 - - - 92.20 *92.20%
Outstanding
Marknest Construction 16818 Concreting of Barangay Road III 0.475 30 C 0.263 0.300 0.300 - - - 86.30 *86.30% V. Satisfactory
Marknest Construction 16818 Const. of 2-Storey Bldg. with 12 Rooms Sindalan E/S III 1.418 40 C 0.427 - 0.500 - - - 92.70 87.94%
V. Satisfactory
Marknest Construction 16818 Const. of MPB @ Bo. Obrero E/S NCR 4.755 120 C 0.387 0.174 0.300 - - - 86.10 *86.10% V. Satisfactory
Marknest Construction 16818 Const./Repair/Completion of Water Supply III 0.954 60 C 0.381 0.258 0.300 - - - 93.90 *93.90%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page314
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Marknest Construction and Trading (Formerly: Marknest
Construction)16818 Const. of MPB at Nueva Victoria III 0.952 25 C 0.315 0.200 0.300 - - - 81.50 *81.50%
V. Satisfactory
Marquin Construction 13332 Conc. of Roads at Brgy. Cogon VII 0.882 45 C 0.314 0.184 0.300 - - - 79.80 *79.80% Satisfactory
Marquin Construction 13332 Const. of 3 CL SB @ Guinsay NHS VII 1.825 70 C 0.310 0.262 0.300 - - - 87.20 75.37% Satisfactory
Marquin Construction 13332 Const. Rehab. of SB at Ramon Durano Sr. Science & Tech. VII 0.894 70 C 0.361 0.300 0.300 - - - 96.10 *96.10%
Outstanding
Marquin Construction 13332 Construction of MPB Maslog E/S VII 0.902 70 C 0.335 0.200 0.300 - - - 83.50 *83.50% Satisfactory
Marquin Construction 13332 Proposed Const. of Line Canal VII 0.963 55 O 0.316 0.200 0.100 0.022 0.025 0.200 86.30 -
Marquin Construction 13332 Road Conc. @ St. James Poblacion VII 0.461 45 C 0.390 0.100 0.300 - - - 79.00 *79.00%
Satisfactory
Marquin Construction 13332 Road Concreting of Brgy. Bili VII 0.454 70 C 0.377 0.200 0.300 - - - 87.70 *87.70% Satisfactory
Marquin Construction 13332 Road Concreting of Brgy. TabunanBrgy. Managase VII 0.454 70 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Martha Construction Supply & General Merchandise 25827 Repair of Unpaved Shoulder II 0.418 60 C 0.326 0.200 0.300 - - - 82.60 *82.60%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page315
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mar-Vel Construction 23722 Completion of Multi-Purpose Building (LSPC) IV-A 0.475 60 C 0.383 0.150 0.300 - - - 83.30 *83.30%
V. Satisfactory
Mar-vel Construction 23722 Conc. of Drainage System along MSR Daang Maharlika Road IV-A 0.960 30 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfactory
Mar-vel Construction 23722 Conc. of Road @ Brgy. Real IV-A 0.289 30 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory
Mar-vel Construction 23722 Conc. of Road @ Brgy. Uno going to Brgy. Rizal IV-A 4.801 60 C 0.298 0.200 0.300 - - - 79.80 *79.80%
Satisfactory
Mar-Vel Construction 23722 Conc./Rehab. of Barangay Road IV-A 3.848 90 C 0.194 - 0.500 - - - 69.40 *69.40% Fair
Mar-vel Construction 23722 Const. Impv't. of Water Supply System IV-A 2.464 60 C 0.386 0.283 0.300 - - - 96.90 *96.90%
Outstanding
Mar-vel Construction 23722Const. of Flood Control
System/Riprapping @ Brgy. Estrella
IV-A 2.880 60 C 0.225 0.300 0.300 - - - 82.50 *82.50% V. Satisfactory
Mar-vel Construction 23722 Const. of MPB @ Brgy. Puypuy IV-A 0.480 30 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Mar-vel Construction 23722 Const. of Roads at Brgy. Bucal IV-A 0.334 15 C 0.316 0.200 0.300 - - - 81.60 *81.60% V. Satisfactory
Mar-vel Construction 23722Const./Impvt. of Flood Control and
Drainage @ Brgy. Tulo-Makiling Maharlika Highway
IV-A 0.286 60 C 0.359 0.200 0.300 - - - 85.90 *85.90% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page316
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mar-vel Construction 23722 Impv't. of Calauan-Nagcarlan Road IV-A 4.674 25 C 0.380 0.200 0.300 - - - 88.00 *88.00% V. Satisfactory
Mar-vel Construction 23722 Impvt./Rehab. of Flood Control IV-A 0.959 45 C 0.176 0.300 0.300 - - - 77.60 76.22% Satisfactory
Mar-vel Construction & Supply 23722 Const. of MPB at Ospital ng Biñan IV-A 4.801 55 C 0.492 0.185 0.300 - - - 97.70 *97.70% Outstanding
Mar-vel Construction & Supply 23722Const./Impvt. of Water Supply
Projects in Waterless Municipality at Langgam
IV-A 2.316 133 O 0.400 0.200 0.150 0.030 0.028 0.050 85.80 *85.80% Satisfactory
Masbate-Iloilo Const. & Trading Corporation 26579 Const. of Multi-Purposee Building
@ Cabatuan H/S VI 1.446 120 C 0.398 0.200 0.300 - - - *89.80 89.80% V. Satisfactory
Mash Construction 20806 Const. of 1 CL at Plaridel Elem. School IV-A 0.333 45 C 0.459 - 0.500 - - - 95.90 95.90%
Outstanding
Mash Construction 20806 Const. of MPB at Brgy. Mabini IV-A 1.444 120 C 0.400 0.200 0.300 - - - 90.00 *90.00% V. Satisfactory
Masulot Construction 10716 Widening of Cotabato-Allah-Gen. Santos Road including sidewalk XII 3.107 80 C 0.395 - 0.500 - - - 89.50 81.88%
V. Satisfactory
Matco Builders 12929Const./Repair/Rehab. of Brgy.
Rds. @ Brgy. Balibago & Ninoy Package II
III 3.768 60 C 0.411 - 0.500 - - - 91.10 91.10% Outstanding
Maverick & Wee Eng Joint Venture JV-07-105
CP 8: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road
(Manay-Boston) Baganga-Cateel Section
XI 191.290 597 O 0.381 0.240 0.100 0.030 0.060 0.100 91.10 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page317
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Maverick Builders 14466 Impv't/Conc. of Compostela-Cateel Road XI 66.371 369 C 0.365 0.300 0.300 - - - 96.50 97.10%
Outstanding
Maverick Builders Incorporated (Formerly: Maverick Builders) 14466
Rehab. of Davao-Or.-Surigao Coastal Road Banaybanay-Mati
Section (Phase II)XI 19.290 180 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfactory
Maverick Builders, Incorporated (Formerly: Maverick Builders) 14466 Conc. of Compostela-Cateel Road XI 67.990 590 O 0.266 0.300 0.150 0.030 0.032 0.050 82.80 -
Maverick Builders, Incorporated (Formerly: Maverick Builders) 14466
Rehab./Impv't. of Manay-Mati Sect. along Surigao Sur-Davao Oriental
Coastal Road, Badas-Baso Section
XI 48.132 161 O 0.388 0.300 0.150 0.030 0.059 0.050 97.70 -
Mayhaligue Cosntruction & Supply 29586 Const. of Dapdap MPB II 0.470 40 C 0.398 0.200 0.300 - - - 89.80 *89.80%
V. Satisfactory
Mayokins Construction 31486 Construction of Covered Walkway along Access Road PUP 2.565 74 C 0.400 0.284 0.300 - - - 98.40 98.40%
Outstanding
MBB Construction 11363 Concreting of Manila North Road Km. 343+000 - Km.344+000 I 9.597 115 C 0.371 0.200 0.300 - - - 87.10 83.26%
V. Satisfactory
MBB Construction 11363 Const. of Ilocos Sur 2nd DEO Bldg. I 14.140 365 O 0.261 0.240 0.100 0.030 0.037 0.100 76.80 -
MBB Construction 11363 Const. of Ilocos Sur 2nd DEO Bldg. I 14.140 365 O 0.251 0.115 0.030 0.022 0.025 0.067 51.00 -
MBB Construction 11363 Const. of MPB I 9.460 245 C 0.298 0.250 0.300 - - - 84.80 70.80% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page318
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
MBB Construction 11363 Const. of Santa Seawall I 19.211 210 C 0.320 0.200 0.300 - - - 82.00 *82.00% V. Satisfactory
MBB Construction 11363 Const. of Victory Bridge I 9.357 150 C 0.303 - 0.500 - - - 80.30 75.92% Satisfactory
MBB Construction 11363 Impv't. of Vigan-Sta. Catalina Road I 19.298 180 C 0.315 0.200 0.300 - - - 81.50 83.39% V. Satisfactory
MBB Construction 11363 MNR, Candon-Santiago Section I 18.920 200 O 0.338 0.034 0.100 0.022 0.022 0.067 58.30 -
MBB Construction 11363 Package III-Completion of Multi-Purpose Bldg., @ ISPSC I 0.946 21 C 0.352 - 0.500 - - - 85.20 85.20%
V. Satisfactory
MBB Construction 11363 Rehab. of Conc. Pavement along MNR, Candon Section I 9.449 120 C 0.221 0.300 0.300 - - - 82.10 83.66%
V. Satisfactory
MBB Construction 11363 Rehab./Reconst. of Vigan Airport Road I 19.014 180 C 0.037 0.200 0.300 - - - 53.70 83.52%
V. Satisfactory
MBB Construction 11363 Rehab./Reconst.of Damaged Nat'l Road, Candon-Salcedo Road I 18.990 252 O 0.305 0.160 0.100 0.008 0.022 0.067 66.20 -
MBB Construction 11363 Renovation of Narvacan Municipal Bldg. I 0.946 35 C 0.450 - 0.500 - - - 95.00 95.00%
Outstanding
MBB Construction 11363 Sta. Maria- Burgos Road I 1.698 124 C 0.339 0.200 0.000 - - - 53.90 65.54%Poor
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page319
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
MBD General Const./Duragold Trading & Const. (JV) JV-05-014 Const. of Sagayon Bridge &
Approaches X 23.811 330 C 0.396 0.300 0.300 - - - 99.60 89.88% V. Satisfactory
MBD General Construction 9991 Conc. of Calamba-Baliangao Road X 16.180 180 O 0.312 0.000 0.050 0.023 0.035 0.100 52.00 -
MBD General Construction 9991 Conc. of Oroquieta-Calamba Mt. Road X 7.146 120 O 0.258 0.085 0.100 0.023 0.025 0.100 59.10 -
MBD General Construction 9991 Conc. of Oroquieta-Calamba Mt. Road X 7.146 219 O 0.313 0.240 0.000 0.030 0.045 0.000 62.80 -
MBD General Construction 9991Const. /Cementing of
Circumferential Rd., from Purok Brgy. Mobod to Brgy. Villaflor
X 0.811 110 C 0.294 0.300 0.300 - - - 89.40 85.38% V. Satisfactory
MBD General Construction 9991Const. of Dalacon Bridge &
Approaches along Oroquieta-Calamba Mt. Rd.
X 15.545 300 C 0.279 0.138 0.300 - - - 71.70 81.30% V. Satisfactory
MBF Construction 9803 Concreting of Municipal Street, Siaton, Negros Oriental VII 2.027 110 C 0.299 - 0.500 - - - 79.90 73.12%
Satisfactory
MBF Construction 9803 Repair/Rehab./Impv't. of FMR, Licoan VII 0.486 217 C 0.450 - 0.500 - - - 95.00 95.00%
Outstanding
MC Torio Construction 10534 Construction of Canal and Canal Structures (LMC-ARIP-01-06) NIA-II 4.070 210 C 0.400 0.300 - - - - 70.00 *70.00%
Fair
MCB Construction & Supply 12128 Conc. of FMR @ Doyong I 4.723 90 C 0.300 0.300 0.300 - - - 90.00 *90.00% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page320
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
MCB Construction & Supply 12128 Const. of Water System @ Brgy. Doyong Nagsaing & Ambuetel I 4.820 90 C 0.380 0.200 0.300 - - - 88.00 *88.00%
V. Satisfactory
MCGR Engineering Services 22202 Concreting of Various Roads VIII 0.965 125 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory
MCGR Engineering Services 22202 Const. of Drainage System, Brgy. 43 & 43A VIII 0.964 60 C 0.473 0.200 0.300 - - - 97.30 *97.30%
Outstanding
MCGR Engineering Services 22202 Repair/Rehab. of Rizal Avenue Extension VIII 2.846 90 C 0.283 0.200 0.300 - - - 78.30 84.48%
V. Satisfactory
Mcguire Industrial Development Co. 31302 Concreting of FMR IV-A 0.467 45 C 0.355 0.200 0.300 - - - 85.50 *85.50%
V. Satisfactory
MCL Construction / RND Const. (JV) JV-03-116 Impv't./Conc. of Sitio Malasin FMR
San Macario Sur ARC I 7.749 150 C 0.284 - 0.500 - - - 78.40 72.58% Satisfactory
ME3 Construction 31364 Asphalting of Daang Maharlika (Surigao-Agusan Road Section) XIII 4.813 45 C 0.384 0.205 0.300 - - - 88.90 *88.90%
V. Satisfactory
ME3 Construction 31364 Impvt./Rehab. of Butuan-Malaybalay Road XIII 4.804 45 C 0.280 0.300 0.300 - - - 88.00 *88.00%
V. Satisfactory
Meditech Trade & Development 16545
Const./Rehab. of Multi-Purpose Pavement along McArthur
Highway, Mabini, Gacutan and Plaza del Rosario St.
III 2.809 120 C 0.346 0.200 0.300 - - - 84.60 *84.60% V. Satisfactory
Meditech Trade & Development 16545 Impvt. Along Ipil-Quirino Bdry. Road, Jones-San Agustin II 9.590 90 C 0.335 0.300 0.300 - - - 93.50 *93.50%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page321
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Meditech Trade & Development 16545 Impvt. of Macalelon-Gen Luna Road IV-A 19.282 50 C 0.356 0.300 0.300 - - - 95.60 *95.60%
Outstanding
Meditech Trade & Development 16545 Impvt. of Quezon-Guimba Road, Manacsac Section III 14.044 15 C 0.293 0.200 0.300 - - - 79.30 *79.30%
Satisfactory
Meditech Trade & Development 16545 Impvt./Rehab. Along Gamu-Roxas Road II 9.566 60 C 0.332 0.200 0.300 - - - 83.20 *83.20%
V. Satisfactory
Meditech Trade & Development 16545 Impv't./Rehab./Const. of MSR-Pagbilao Sect. IV-A 4.728 30 C 0.417 - 0.500 - - - 91.70 91.70%
Outstanding
Meditech Trade & Development 16545 Reblocking/Impvt. of Roman Expressway, Batangas II Section III 18.899 50 C 0.387 0.277 0.300 - - - 96.40 *96.40%
Outstanding
Meditech Trade & Development 16545Regravelling/Asphalt
Overlay/Rehabilitation/Impv't along Daang Maharlika
II 19.238 120 C 0.475 0.200 0.300 - - - 97.50 *97.50% Outstanding
Meditech Trade & Development 16545Rehab. of Catanauan-Lopez Road
(Additional Safety Warning Device)km. 252+000 - km. 255+000
III 4.820 22 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
Meditech Trade & Development 16545
Repair/Rehab. & Installation of Reflectorized Pavm't Stud along
Malicboy-P. Burgos-Unisan-Pototanin Rd. & Mulanay San
Narciso Rd.
IV-A 9.643 30 C 0.373 0.300 0.300 - - - 97.30 *97.30% Outstanding
Meditech Trade & Development 16545 Repair/Rehab. of Dinagat-Loreto Road XIII 4.489 90 C 0.331 - 0.500 - - - 83.10 *83.10%
V. Satisfactory
Meditech Trade & Development 16545 Repair/Rehab. of Road leading to Mt. Samat Shrine IV-A 9.254 28 C 0.279 0.300 0.300 - - - 87.90 *87.90%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page322
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mega Builders Corporation (Formerly: Gem Const. & Supply) 29732
Repair/Rehab. of Multi-Purpose/Academic Bldg., Batangas State University
IV-A 1.319 90 O 0.357 0.278 0.100 0.030 0.031 0.100 89.60 -
Mega M Builders 20515 Conc. of Line Canal, Brgy. Sta. Ana IV-A 4.823 50 C 0.257 0.300 0.300 - - - 85.70 *85.70%
V.Satisfactory
Mega M Builders 20515 Const. of Farm-to-Market Road IV-A 0.373 45 C 0.417 - 0.500 - - - 91.70 *91.70% Outstanding
Mega M Builders 20515 Const. of Multi-Purpose Hall @ Del Remedio (DPWH-Compound) IV-A 0.704 81 C 0.439 - 0.500 - - - 93.90 84.59%
V. Satisfactory
Mega M Builders 20515 Const./Rehab. of Road, Brgy. Sta. Ana IV-A 4.823 40 C 0.337 0.300 0.300 - - - 93.70 *93.70%
Outstanding
Mega M Builders 20515 Impvt. of FMR at Brgy. San Gregorio IV-A 0.335 27 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V.Satisfactory
Mega Plus Construction 28322 Const. of Multi-Purpose Building @ Brgy. Quiot VII 0.958 75 C 0.358 0.300 0.300 - - - 95.80 85.65%
V. Satisfactory
Mega Plus Construction 28322 Rehab./ of Multi-Purpose Bldg., @ Sitio Opra, Brgy. Kalunasan VII 0.767 90 C 0.403 - 0.500 - - - 90.30 90.30%
Outstanding
Megashine Builders Corporation (Formerly: Gem Const. & Supply) 29732
Repair/Rehab. of Multi-Purpose/Academic Bldg., Batangas State University
IV-A 1.319 90 C 0.361 0.246 0.300 - - - 90.70 89.93% V. Satisfactory
Megila Const. & Development Supply 19262 Completion of Catalunan Pequeno
E/S XI 0.471 60 C 0.297 0.300 0.300 - - - 89.70 *89.70% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page323
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Megila Const. & Development Supply 19262 Completion of MPB at Brgy.
18-B XI 0.468 90 C 0.390 0.146 0.300 - - - 83.60 *83.60% V. Satisfactory
Megila Const. & Development Supply 19262
Const / Rehab. / Replacement / Completion & Repair of E/S Bldg. @ Kapitan Tomas Monteverde E/S
XI 0.883 90 C 0.358 0.300 0.300 - - - 95.80 *95.80% Outstanding
Megila Const. & Development Supply 19262 Const. of 2CL, 2 Storey Bldg., @
Matina Aplaya E/S, Matina XI 1.440 150 O 0.382 0.300 0.100 0.030 0.064 0.100 97.60 -
Megila Construction and Development Supply 19262 Const. of MPB @ Leon Garcia
NHS XI 1.406 134 C 0.348 0.300 0.300 - - - 94.80 87.10% V. Satisfactory
Megila Construction and Development Supply 19262 PSHS SMC Perimeter Fence DOST 975.931 76 C 0.371 0.300 0.000 - - - 67.10 67.10%
Fair
Megila Construction Development and Supply 19262 PSHS SMC Perimeter Fence DOST 0.975 76 C 0.371 0.300 0.000 - - - 67.10 67.10%
Poor
Mel-Jean Const. Corp./ C.S. Rayos Const. & General Services JV-04-004 Const. impv't. of Ternate-Nasugbu
Road, Papaya-Hamilo Section IV-A 28.923 315 C 0.381 0.200 0.300 - - - 88.10 88.40% V. Satisfactory
Mel-Jean Construction Corp. (Formerly: Mel-Jean Enterprises) 16344 Const. of Balintawak Barangay
Hall IVA 1.432 120 C 0.435 - 0.500 - - - 93.50 *93.50% Outstanding
Mel-Jean Construction Corporation 16344 Conc. & Const. of Bridge at So.
Matuod-Inilahan Road IV-A 9.638 180 C 0.336 0.200 0.300 - - - 83.60 76.40% Satisfactory
Mel-Jean Construction Corporation 16344
Const. of 2 Storey RGR Type School Bldg., @ Don Juan Pastor
Memorial National H/S, Brgy. Talaibon
IV-A 8.596 210 O 0.356 0.205 0.100 0.030 0.023 0.067 78.10 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page324
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mel-Jean Construction Corporation 16344
Const. of 2 Storey RGR Type School Bldg., @ Don Leon
Memorial National H/S, Brgy. Mabalanoy
IV-A 8.506 210 O 0.364 0.235 0.100 0.030 0.023 0.067 81.90 -
Mel-Jean Construction Corporation 16344
Impvt./Upgrading of Sablayan-Penal Colony Road, Tabtaban
SectionIV-B 9.630 144 C 0.434 0.082 0.300 - - - 81.60 78.42%
Unsatisfactory
Mel-Jean Construction Corporation 16344 Rehab. of Rosario-San Juan Road IV-A 9.618 180 C 0.279 0.200 0.300 - - - 77.90 80.84%
V. Satisfactory
Mel-Jean Construction Corporation 16344
Rehab./Reconst. of Damaged National Roads, Batangas-Lobo
Road, Bacao SectionIV-A 19.298 150 C 0.473 0.133 0.300 - - - 90.60 87.90%
Satisfactory
Melrobe Builders & Const. Supplies 29752
Const. of 1 Cl. Mod. FFCCCII Type Bldg. SB-06 Banaybanay,
Dinagsaan E/SXI 0.385 45 C 0.378 0.300 0.300 - - - 97.80 *97.80%
Outstanding
Melrobe Builders & Const. Supplies 29752 Const. of MPB @ Brgy. Pintatagan XI 1.416 90 C 0.308 0.200 0.300 - - - 80.80 88.50%
V. Satisfactory
Melrobe Builders & Const. Supplies 29752 Const. of MPB CES and Sigaboy
AVHS, Brgy. Poblacion Sigaboy XI 1.813 120 C 0.368 0.100 0.300 - - - 76.80 79.04% Satisfactory
Melrobe Builders & Const. Supplies 29752 Const. of MPB CES under
Package 1A, Brgy. Central XI 2.143 183 C 0.478 0.200 0.300 - - - 97.80 78.13% Unsatisfactory
Melrobe Builders & Const. Supplies 29752 Const. of San Isidro MPB (Phase
II) XI 1.889 90 O 0.337 0.240 0.100 0.020 0.038 0.100 83.50 -
Melrobe Builders & Const. Supply 29752 Const. of Caganganan Multi-
Purpose Building XI 1.605 90 C 0.375 0.300 0.300 - - - 97.50 94.35% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page325
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Melrobe Builders & Const. Supply 29752 Package IV, Const. of MPB, Brgy.
Corporacion XI 2.786 100 C 0.396 0.231 0.300 - - - 92.70 85.49% V. Satisfactory
Mel's Construction and Concrete Products 32212 Rehab. of Gonzalo St. CAR 0.273 90 C 0.295 0.200 0.300 - - - 79.50 *79.50%
Satisfactory
Meltech Construction 14551 Const. of Two (2) Storey, 2 CL Sch. Bldg. III 1.896 55 C 0.287 0.200 0.300 - - - 78.70 *78.70%
Satisfactory
Menjer Construction 22815 Construction of Perimeter Fence DOST 8.853 180 O 0.349 0.242 0.150 0.018 0.025 0.033 81.70 -
Menjer Construction 22815 Construction of Perimeter Fence DOST 8.853 180 O 0.349 0.242 0.150 0.018 0.025 0.033 74.10 -
MEP Construction 18759 Completion of Baguio Health Center CAR 1.904 90 C 0.472 - 0.500 - - - 97.20 *97.20%
Outstanding
Mercado Concrete Products 4898 Asphalting of Road @ Brgy. Ermita VII 1.156 6 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
Mercado Concrete Products 4898 Const. of Lilingayon Elementary School X 0.422 45 C 0.377 0.235 0.300 - - - 91.20 *91.20%
Outstanding
Mercado Concrete Products 4898 Const. of Multi-Purpose Building X 0.471 75 C 0.355 - 0.500 - - - 85.50 *85.50% V. Satisfactory
Mercedita Benasas General Mdse. 31745
Completion/Conc. of Capt. Cario Road with Slope Protection &
Lined CanalIV-B 0.956 120 C 0.353 0.200 0.300 - - - 85.30 *85.30%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page326
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mercedita Benasas General Mdse. 31745 Conc. of Sablayan-Sta. Cruz Road,
Cabacungan-Pag-asa Section IV-B 9.554 120 C 0.358 0.200 0.300 - - - 85.80 63.42% Fair
Mercedita Benasas General Mdse. 31745 Concreting Brgy. Crlo Brgy. Road IV-B 1.862 75 O 0.344 0.200 0.100 0.030 0.022 0.100 79.60 -
Mercedita Benasas General Mdse. 31745 Repair / Reconst. of Pinamanaan
Flood Control IV-B 7.719 120 C 0.288 0.285 0.300 - - - 87.30 82.38% V. Satisfactory
Mesgo Construction 30677 Const. of Flood Control & Access Road Land Fill X 0.944 90 C 0.341 0.300 0.300 - - - 94.10 88.82%
V. Satisfactory
Mesgo Construction 30677 Repair of MPB VII 0.479 50 C 0.229 0.300 0.300 - - - 82.90 *82.90% V. Satisfactory
Meta Construction 28882 Construction of Multi-Purpose Building II 0.458 80 O 0.240 0.300 0.150 0.023 0.028 0.033 77.40 -
Meta Construction 28882 Repair/Rehab. of Ipil Bridge @ Daang Maharlika II 0.725 105 C 0.284 0.123 0.300 - - - 70.70 *70.70%
Satisfactory
Meta Construction 28882 Repair/Rehab. of Lined Canal along Jct. Ipil-Quirino Bdry. Road II 0.501 90 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
Meta Construction 28882 Repair/Rehab. of Sch. Bldg. @ Baptists E/S II 0.287 60 C 0.265 0.200 0.300 - - - 76.50 *76.50%
Satisfactory
Meta Construction 28882Repair/Rehab. of Scoured
Shoulders along Jct.Ipil-Panang-Quirino Bdry. Road, Dappig
II 0.257 40 C 0.214 0.223 0.300 - - - 73.70 *73.70% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page327
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Metrics Construction and Trading 18223 Const. of Multi-Purpose Bldg. NCR 4.789 14 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory
Metrics Construction and Trading 18223 Const. of Multi-Purpose Bldg. @ San Vicente E/S NCR 3.829 75 C 0.276 0.200 0.300 - - - 77.60 *77.60%
Satisfactory
MGBJ Rising Construction & Land Developer 18656 Asphalt Overlay/Upgrading of
Digos-Markar-Buayan Road XII 9.433 120 C 0.478 0.200 0.300 - - - 97.80 *97.80% Outstanding
MGBJ Rising Construction & Land Developer 18656 Conc. of Brgy. Road @ Brgy.
Poblacion XII 1.228 60 C 0.308 0.190 0.300 - - - 79.80 *79.80% Satisfactory
MGBJ Rising Construction & Land Developer 18656 Conc. of Road Network at PNP
Office 12 Command XII 2.376 75 C 0.384 0.200 0.300 - - - 88.40 *88.40% V. Satisfactory
MGBJ Rising Construction & Land Developer 18656
Concreting of Additional 2 Lanes along Marbel-Tupi-Makar Rd.
Upper Tupi Sect.XII 2.320 126 C 0.452 - 0.500 - - - 95.20 95.20%
Outstanding
MGBJ Rising Construction & Land Developer 18656 Const. of Lined Canal Bololmala XII 0.912 146 C 0.473 - 0.500 - - - 97.30 47.30%
Poor
MGBJ Rising Construction & Land Developer 18656 Impv't. of Drainage along Digos-
Makar Road, Lagao Section XII 0.695 70 C 0.313 0.207 0.300 - - - 82.00 84.94% V. Satisfactory
MGDJ Construction 29352 Const. of MPB @ Brgy. Quezon IV-A 1.444 120 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory
MGDJ Construction 29352 Const. of MPB @ Brgy. Rizal IV-A 1.433 90 C 0.361 0.203 0.300 - - - 86.40 *86.40% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page328
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
MGDJ Construction 29352 Const. of Multi-Purpose Bldg. At Brgy. 1 IV-A 0.957 90 C 0.451 - 0.500 - - - 95.10 95.10%
Outstanding
MGDJ Construction 29352 Const. of Multi-Purpose Building IV-A 1.340 120 C 0.372 0.200 0.300 - - - 87.20 *87.20% V. Satisfactory
MGDJ Construction 29352 Impvt. of Brgy. MPB @ Pob. 3 IV-A 0.191 45 C 0.367 0.300 0.300 - - - 96.70 *96.70% Outstanding
MGDJ Construction 29352 Impvt. of MPB, Tanauan School of Fisheries IV-A 0.192 60 C 0.320 0.300 0.300 - - - 92.00 *92.00%
Outstanding
MGDJ Construction 29352 Rehab. of Batangas-Lobo Road (Revetment) IV-A 0.964 90 C 0.257 0.296 0.300 - - - 85.30 86.68%
V. Satisfactory
Micah Construction and Supply 26625 Const. of Multi-Purpose Bldg., at Brgy. Sasa XI 0.942 60 C 0.393 - 0.500 - - - 89.30 89.34%
V. Satisfactory
Micah Construction and Supply 26625 Package IV-Const. of 2-Cl, 2-Cl SB @ Tugbok SPED XI 0.617 130 O 0.381 0.253 0.100 0.030 0.042 0.100 90.60 -
Michelle Const. Corp. 22204 Bobon, Seawall VIII 0.609 90 C 0.333 - 0.500 - - - 83.30 83.30% V. Satisfactory
Midnorth Luzon Construction and Development Corp. 31783 Const. of 2 Cl @ Maba-ay NHS
Bldg. (Lesseb Annex) CAR 0.716 60 C 0.347 0.300 0.300 - - - 94.70 *94.70% Outstanding
Milestone 888 Construction, Inc. 31224 Conc. of Domingo Municipal St. II 0.472 90 C 0.293 0.218 0.300 - - - 81.10 76.18% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page329
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Min Construction 14656 Conc. Const. of Gil Sanchez Lumbuyan FMR IX 1.854 51 C 0.354 - 0.500 - - - 85.40 75.44%
Satisfactory
Min Construction 14656 Conc. of Liloy-Siocon Road (Labason Proper-Osukan Section) IX 19.130 172 C 0.375 0.191 0.300 - - - 86.60 84.74%
V. Satisfactory
Min Construction 14656 Conc. of Liloy-Siocon Road with RCBC, Patawag Section IX 11.456 145 C 0.357 0.137 0.300 - - - 79.40 82.40%
V. Satisfactory
Min Construction 14656Const. of Drainage System along
Labason Seawall including Impv't. of existing Canal
IX 0.776 49 C 0.402 - 0.500 - - - 90.20 89.30% V. Satisfactory
Min Construction 14656Const. of Liloy-Siocon Road inc.
RCBC Dansalan-Labason Poblacion By-Pass Road
IX 19.130 308 O 0.384 0.264 0.150 0.030 0.035 0.050 91.30 -
Min Construction 14656 Const. of MPB (Tribal Hall) IX 0.925 70 C 0.268 0.182 0.300 - - - 75.00 80.46% V.Satisfactory
Min Construction 14656 Const. of Tribal Hall at Poblacion IX 0.943 70 C 0.394 0.200 0.300 - - - 89.40 *89.40% V. Satisfactory
Min Construction 14656 Impvt. of Imelda-Alicia Nat'l Road IX 9.628 208 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
Min Construction 14656Impvt./Conc. Paving of Imelda-
Alicia Road (Phase III) Guintolan-Lutiman Section
IX 33.460 359 C 0.434 0.200 0.300 - - - 93.40 83.14% Satisfactory
Min Construction 14656 Impvt./Conc. Paving of Imelda-Alicia Road, Lutiman Section IX 17.001 230 C 0.453 0.171 0.300 - - - 92.40 93.18%
V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page330
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Min Construction 14656Impvt./Conc. Paving of Siocon-
Sirawai Road, Brilliantes-Pangian Section
IX 23.971 240 C 0.320 0.119 0.300 - - - 73.90 81.16% V. Satisfactory
Min Construction 14656 Proposed Conc. of Liloy, Zamboanga del Norte-Ipil, Phase II IX 14.309 180 C 0.427 0.147 0.300 - - - 87.40 83.02%
Satisfactory
Min Construction 14656 Proposed Conc. of Liloy-Siocon Road (Kipit-Gutalac Section) IX 19.125 168 O 0.317 0.240 0.100 0.030 0.047 0.100 83.40 -
Min Construction 14656 Proposed Conc. of Liloy-Siocon Road (Kipit-Gutalac Section) IX 19.125 213 O 0.327 0.239 0.100 0.030 0.025 0.067 78.80 -
Min Construction 14656Proposed Concreting of Liloy-Labason Road (Malintuboan
Section)IX 4.631 158 C 0.481 - 0.500 - - - 98.10 89.58%
V. Satisfactory
Mindanao Rock 23479 Completion of Farmers Training Center (ABC Gym Phase X) X 0.959 120 C 0.408 - 0.500 - - - 90.80 91.64%
Outstanding
Mindanao Rock 23479 Conc. of Casul Road, Casul X 2.306 145 C 0.378 0.200 0.300 - - - 87.80 *87.80% Satisfactory
Mindanao Rock 23479 Const. of Flood Control Taguima X 0.479 75 C 0.404 - 0.500 - - - 90.40 89.50% V. Satisfactory
Mindanao Rock 23479 Const. of Migpangi Road (Extension) X 1.048 140 C 0.333 0.300 0.300 - - - 93.30 *93.30%
Outstanding
Mindanao Rock 23479Const. of Multi-Purpose Hall
(Jimenez Socio-Cultural Auditorium, Phase XII)
X 1.873 120 C 0.333 - 0.500 - - - 83.30 76.65% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page331
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mindanao Rock 23479 Const. of Phase III Multi-Purpose Building X 1.423 150 C 0.286 0.300 0.000 - - - 58.60 75.54%
Satisfactory
Mindanao Rock 23479 Impvt. of Ozamis-Oroquieta Road, Lapasan-Clarin-Tudela Section X 2.892 310 C 0.388 0.200 0.000 - - - 58.80 73.14%
Poor
Mindanao Rock 23479 Rehab. of Slip Section along CDO-Airport Road X 7.473 90 C 0.334 0.300 0.300 - - - 93.40 89.32%
V. Satisfactory
Minrock Multi-Builders 15845 Conc. of Road at Bishop Smith Ave., Rosary Heights 11 XII 0.940 24 C 0.307 0.200 0.300 - - - 80.70 *80.70%
V. Satisfactory
Minrock Multi-Builders 15845Const. of College School Building Cotabato City State Polytechnic
College (CCSPC)XII 1.904 110 C 0.313 0.274 0.300 - - - 88.70 85.55%
V. Satisfactory
Minrock Multi-Builders 15845 Const. of MPB @ Kimpo E/S, Rosary Heights 13 XII 1.896 65 C 0.362 0.181 0.300 - - - 84.30 79.05%
Satisfactory
Miracle Builders 28502
Impvt./Rehab. of Daang Maharlika along Calbayog-Allen Road, km.
723+700 - km. 729+700 with exceptions
VIII 4.823 120 C 0.361 0.200 0.300 - - - 86.10 *86.10% V. Satisfactory
Miracle Builders 28502 Rehab. of Road @ Patiis Brgy. Malanday IV-A 1.922 60 C 0.357 0.200 0.300 - - - 85.70 *85.70%
V. Satisfactory
Miracle Builders 28502Repair/Rehab. of H.E. Bldg. &
Comfort Room @ E. Rodriguez E/S
NCR 0.475 60 C 0.330 0.235 0.300 - - - 86.50 *86.50% V. Satisfactory
Mivico Builders and Developers 20551 Const. of Gymnasium (Multi-Purpose Hall) III 1.058 75 C 0.479 - 0.500 - - - 97.90 97.90%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page332
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
MJB Const. & Trading Corp. 15059 Const. of Drainage System Brgy. Ninoy Aquino III 1.652 50 C 0.390 - 0.500 - - - 89.00 89.00%
V. Satisfactory
MJB Const. & Trading Corp. 15059CP-II Const./Repair/Rehab. of
Brgy. Road @ Various Brgy. In San Francisco
III 0.473 30 C 0.388 - 0.500 - - - 88.80 88.80% V. Satisfactory
MJF Neulid Enterprises 29107 Concreting of Shoulder, Manlurip-McArthur Road VIII 1.771 55 C 0.455 - 0.500 - - - 95.50 95.50%
Outstanding
MJR Construction 18794 Const. of Road, Barangay Poblacion II 0.948 50 C 0.347 0.300 0.300 - - - 94.70 88.10%
V.Satisfactory
MKM Marketing 15586 Impvt. of Viray-Depalo River Control Project I 2.893 60 C 0.367 - 0.500 - - - 86.70 *86.70%
V.Satisfactory
ML Patawaran Trading & Const. 28869 Rehab. of Barangay Road III 0.475 35 C 0.385 - 0.500 - - - 88.50 88.50% V. Satisfactory
MN Revelo Construction 24789 Conc. of FMR at Brgy Dansulao IX 0.947 30 C 0.434 - 0.500 - - - 93.40 93.40% Outstanding
MN Revelo Construction 24789
Impvt./Conc. Paving of Usugan Bridge Approach along
Zamboanga City-Pagadian-Misamis Occidental Road
IX 1.858 60 C 0.268 0.205 0.300 - - - 77.30 85.10% V. Satisfactory
MN Revelo Construction 24789 Rehab. of Roads (5 Clustered Roads) IX 4.099 150 O 0.400 0.300 0.100 0.022 0.037 0.100 95.90 -
MNG Builders & Dev't. Corporation (Formerly MNG
Builders)16098 Const. of Doña Carmen Denia NHS
Multi-Purpose Hall XI 2.023 120 C 0.394 - 0.500 - - - 89.40 89.96% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page333
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Molina's General Builder 14845 Const. of FMR Brgy. Pook-Linga Road IV-A 0.477 30 C 0.329 0.200 0.300 - - - 82.90 *82.90%
V. Satisfactory
Molte Aries Construction & Industries 3684 Const. of 2Cl School Building I 0.671 120 C 0.341 - 0.500 - - - 84.10 *84.10%
V. Satisfactory
Molte Aries Construction & Industries 3684 Const. of Multi-Purpose Building
at Barangay Sevilla I 1.316 100 O 0.379 0.285 0.100 0.030 0.029 0.100 92.30 -
Molte Aries Construction & Industries 3684
Impvt. (Conc.) of San Fernando-Bagulin Road (Francisco L. Ortega
Highway) I 26.453 420 C 0.296 0.300 0.300 - - - 89.60 80.26%
V. Satisfactory
Molte Aries Construction & Industries 3684
Upgrading (Conc. Paving) of San Fernando By-Pass Road
ExtensionI 18.821 90 C 0.307 0.200 0.300 - - - 80.70 83.76%
V. Satisfactory
Monolithic Const. & Concrete Products, Inc. 5733
Construction of Diversion Work including Supply, Delivery,
Installation and Comissioning of Rubber Dam (Cabilogan-San Juan
CIP)
NIA 46.981 300 C 0.390 0.180 0.300 - - - 87.00 *87.00% V.Satisfactory
Monolithic Const. & Concrete Products, Inc. 5733
Construction of Diversion Work including Supply, Delivery,
Installation and Comissioning of Rubber Dam (South Quinale CIS)
NIA 68.027 300 C 0.389 0.200 0.070 0.030 0.047 0.067 80.30 80.30% V.Satisfactory
Monolithic Const. & Concrete Products, Inc. 5733 South Quinale Communal
Irrigation System NIA-V 68.027 442 C 0.375 0.263 0.300 - - - 93.80 85.71% V.Satisfactory
Monolithic Construction & Concrete Products, Inc. 5733
Impv't/Conc.Paving of Jct. Baliguian to Siocon Road, Jct. Baliguian-Nonoyan-Sta. Maria
Section
IX 48.006 380 O 0.386 0.263 0.099 0.030 0.037 0.033 84.80 -
Monolithic Construction & Concrete Products, Inc. 5733 Rehab./Conc. of Dr. Damian Reyes
Road (Boac Side) IV-B 64.609 280 O 0.338 0.239 0.150 0.030 0.042 0.050 84.90 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page334
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Monolithic Construction & Concrete Products, Inc. 5733 Rehab./Conc. of Marinduque Circ.
Rd. (Intermittent Section) IV-B 82.951 360 O 0.296 0.272 0.150 0.030 0.025 0.050 82.30 -
Monolithic Construction and Concrete Products, Inc. 5733 Talibon Small Reservoir Irrigation
Project NIA 49.099 390 O 0.367 0.175 0.100 0.030 0.042 0.200 91.40 -
Monro Construction & Supply Corp. 14084 Conc. Paving of Shoulder along
National Rd., @ Brgy. Guilijungan VI 0.915 56 C 0.444 - 0.500 - - - 94.40 91.16% Outstanding
Montaño Construction & Development Corporation 19473 Completion of Multi-Purpose
Building (Phase V) IX 3.734 95 C 0.450 - 0.500 - - - 95.00 *95.00% Outstanding
Montaño Construction & Development Corporation 19473 Conc. of Polanco-Macleodes Road
(Lebagon Section) IX 16.712 120 O 0.352 0.300 0.100 0.030 0.043 0.100 92.50 -
Montaño Construction & Development Corporation 19473 Conc. of Polanco-Macleodes Road
(Lebagon Section) IX 16.712 299 C 0.478 0.200 0.300 - - - 97.80 91.02% V. Satisfactory
Montaño Construction & Development Corporation 19473
Const. of De Venta Perla Bridge & App. (Phase I) along Dipolog-Sergio Osmeña-Pagadian City
Road
IX 28.395 528 C 0.321 0.300 0.300 - - - 92.10 *92.10% Outstanding
Montaño Construction & Development Corporation 19473 Const. of Dilawa Bridge &
Approaches IX 17.394 240 C 0.293 0.283 0.300 - - - 87.60 85.47% V. Satisfactory
Montaño Construction & Development Corporation 19473
Impv't. & Const. of Roadside Protection Structure along Dipolog-Punta-Dansullan
IX 3.945 100 C 0.369 - 0.500 - - - 86.90 83.00% V. Satisfactory
Montaño Construction & Development Corporation 19473
Impvt./Conc. Paving of Dipolog-Punta-Dansullan Sergio Osmeña
Nat'l Road (Macleodes-Dilawa Sect.)
IX 18.788 155 C 0.374 0.300 0.300 - - - 97.40 *97.40% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page335
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Monte Construction & Supply 19474Conc. of Danguilan St., @ Brgy. Osmeña Solano, Nueva Vizcaya
Brgy. OsmeñaII 0.270 30 C 0.459 - 0.500 - - - 95.90 95.90%
Outstanding
Monte Construction & Supply 19474 Const. of Calitlitan MPB II 0.284 44 C 0.339 0.200 0.300 - - - 83.90 *83.90% V. Satisfactory
Monte Construction & Supply 19474
Rehab. of Maddiangat Bridge Piers and Bank Protection, along Bambang-Kasibu-Quezon-Solano
Road
II 4.765 76 C 0.276 0.300 0.300 - - - 87.60 *87.60% V. Satisfactory
Monte Construction & Supply 19474Rehab. of Papaya-Malabing-
Wangal-Binugawan-Tadji-Runruno Road (Kinalabasa Section)
II 1.755 56 C 0.321 0.200 0.300 - - - 82.10 *82.10% V. Satisfactory
Monterey Builders 11103 Const. of Seawall with Wave Deflector, Brgy. Melgar A IV-B 0.948 80 C 0.333 - 0.500 - - - 83.30 74.72%
Satisfactory
Montphil Construction Corporation 24285
Conc. of Marleodes-Dilawa Section along Dipolog Punta-
Dansullan Sergio Osmeña National Road
IX 3.806 115 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
Montphil Construction Corporation 24285 Concrete Paving of Dipolog-
Polanco-Macleodes National Road IX 0.915 60 C 0.381 0.300 0.300 - - - 98.10 *98.10% Outstanding
Montphil Construction Corporation 24285 Concreting of Brgy. Dionum FMR IX 0.458 109 C 0.433 - 0.500 - - - 93.30 93.30%
Outstanding
Montphil Construction Corporation 24285 Const. of MPB @ Brgy. Silano IX 0.070 50 C 0.270 0.201 0.300 - - - 77.10 *77.10%
Satisfactory
Montphil Construction Corporation 24285
Const. of One (1) Unit 1 CL Modified Sch. Bldg. @ San Pedro
E/SIX 0.433 60 C 0.383 0.200 0.300 - - - 88.30 *88.30%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page336
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Montphil Construction Corporation 24285
Const. of Slope Protection Structure along Dipolog-Potanco-
Pinan Jct. Oroquieta Road (Guinles Section)
IX 0.940 77 C 0.311 0.300 0.300 - - - 91.10 *91.10% Outstanding
Montphil Construction Corporation 24285
Const./Completion of Multi-Purpose Bldg., (Mun. Hall Phase
III)IX 0.973 90 C 0.479 - 0.500 - - - 97.90 92.79%
Outstanding
Montphil Construction Corporation 24285 Const./Completion of Multi-
Purpose Building, Del Pilar IX 0.945 100 C 0.383 0.200 0.300 - - - 88.30 *88.30% Satisfactory
Montphil Construction Corporation 24285 Const./Extension of MPB
(Municipal Bldg.) IX 0.279 90 C 0.356 0.145 0.300 - - - 80.10 *80.10% V. Satisfactory
Montphil Construction Corporation 24285
Impvt./Conc. Paving of Dipolog-Punta-Dansullan-Sergio Osmeña
Nat'l Road (Brgy. Dansullan-Macleodes Sect.)
IX 2.788 90 C 0.366 0.163 0.300 - - - 82.90 83.08% V. Satisfactory
Morning Coffee Builders 29027 Const. of Multi-Purpose Building covered Court Lian Central School IV-A 0.948 120 C 0.434 - 0.500 - - - 93.40 93.40%
Outstanding
Morning Steel Construction 30698 Completion of Multi-Purpose Bldg., Sitio Diaboyo III 0.281 60 C 0.290 0.300 0.300 - - - 89.00 *89.00%
V. Satisfactory
Morning Steel Construction 30698 Const. of Flood Control III 0.846 72 C 0.417 - 0.500 - - - 91.70 *91.70% Outstanding
Morning Steel Construction 30698Construction of Dipaculao-Ma.
Aurora Road, Brgy. Mucdol-Maligaya Section
III 4.769 120 C 0.406 0.133 0.300 - - - 83.90 *83.90%Satisfactory
Morning Steel Construction 30698 Impvt./Conc. of Baler-Casiguran Road, Dibutunan-Ditale Section III 4.660 120 C 0.325 0.200 0.300 - - - 82.50 84.39%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page337
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mountaineers Engineering & Const. Services 6154 Completion of DPWH Resthouse
(Rehab. of DPWH Field Office) CAR 8.196 170 C 0.485 0.200 0.300 - - - 98.50 81.00% Unsatisfactory
Mountaineers Engineering & Const. Services 6154 Const. of Benguet NHS-Lubas
Extension CAR 3.606 190 C 0.344 0.129 0.300 - - - 77.30 81.26% V. Satisfactory
Mountaineers Engineering & Const. Services 6154 Const. of Benguet SPED Center La
Trinidad, Benguet CAR 0.522 114 C 0.364 - 0.500 - - - 86.40 *86.40% V. Satisfactory
Mountaineers Engineering & Const. Services 6154 Const. of BSU Multi-Purpose
Building (IPA Building) CAR 0.949 147 C 0.354 - 0.500 - - - 85.40 *85.40% V. Satisfactory
Mountaineers Engineering & Const. Services 6154 Const. of Maslog-Kabilisan FMR CAR 1.972 145 C 0.174 - 0.500 - - - 67.40 67.40%
Fair
Mountaineers Engineering & Const. Services 6154 Const. of Various School Building
(Labino-Aquiso E/S) CAR 0.671 120 C 0.324 - 0.500 - - - 82.40 82.89% V. Satisfactory
MP Villegas Construction 16683 Administration Bldg. DOST 6.975 171 C 0.351 0.275 0.300 - - - 92.60 92.60% Outstanding
MR. Santiago Constraction 27239 Rehabilitation of Lateral G Canal (Sta. 2+380-6+637) NIA-I 5.617 110 C 0.250 0.300 0.300 - - - 85.00 85.19%
V.Satisfactory
MRB Construction and Supply 17701 Jagna Port Expansion Project PPA 55.085 360 C 0.400 0.300 0.300 - - - 98.78 98.78% Outstanding
MRP Merchandising 13656 Concreting of Barangay Road V 0.459 75 C 0.378 - 0.500 - - - 87.80 *87.80% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page338
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
MRP Merchandising 13656 Concreting of Brgy. Road at Calagbangan to Bocol, Sipocot V 0.917 120 C 0.382 - 0.500 - - - 88.20 85.14%
V. Satisfactory
MRP Merchandising 13656 Const. of MPB at Zone II Brgy. Tara V 0.281 90 C 0.352 0.184 0.300 - - - 83.60 *83.60%
V. Satisfactory
MSF Construction 25307 Concreting of Various Barangay Road I 0.471 45 C 0.333 - 0.500 - - - 83.30 *83.30%
V. Satisfactory
MSF Construction 25307 Const. of Multi-Purpose Building Phase I I 2.385 160 C 0.308 0.200 0.300 - - - 80.80 82.76%
V. Satisfactory
MSF Construction 25307 Impvt./Rehab. of Farm to Market Road @ Brgy. Suba & Monte I 0.940 45 C 0.325 0.300 0.300 - - - 92.50 *92.50%
Outstanding
Mt. Guiting-Guiting Construction 17412 Repair/Maintenance of Agnipa River Control IV-B 0.277 42 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
Muaña Construction 9354 Const. of 1 unit, 4 Storey, 20 CL Mambaling E/S Bldg. VII 13.360 120 C 0.370 0.216 0.000 - - - 58.60 72.18%
Satisfactory
Muaña Construction 9354 Const. of Multi-Purpose Bldg., U.P.-Cebu High School Dept. VII 1.904 75 C 0.447 - 0.500 - - - 94.70 87.63%
V. Satisfactory
Mulaña Construction 30708Conc. of Toledo-Tabuelan-San
Remegio Road (Antonio Y De Pio Highway)
VII 7.606 119 C 0.323 0.169 0.300 - - - 79.20 *79.20% Satisfactory
Mulaña Construction 30708 Const. of Foot Bridge @ Sitio Napo, Sapangdaku VII 0.956 90 C 0.410 - 0.500 - - - 91.00 83.62%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page339
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Mulaña Construction 30708 Const. of Multi-Purpose Bldg. @ Poblacion VII 0.472 60 C 0.293 0.300 0.300 - - - 89.30 84.19%
V. Satisfactory
Mulaña Construction 30708 Const. of Multi-Purpose Bldg., Labangon-Bliss VII 0.669 75 C 0.316 - 0.500 - - - 81.60 79.08%
Satisfactory
Must Enterprises 13336 Const. of MPB at Brgy. Rajahmuda XII 0.285 30 C 0.321 0.200 0.300 - - - 82.10 *82.10% V.Satisfactory
Must Enterprises 13336Const. of Slope Protection Works
along Dualing-New Panay-Midsayap Road, Arizona Section
XII 3.303 95 C 0.377 0.200 0.300 - - - 87.70 87.28% V.Satisfactory
Must Enterprises 13336 Impvt./Regravelling of Marbel-Midsayap Road XII 9.642 65 C 0.372 0.133 0.300 - - - 80.50 *80.50%
Unsatisfactory
MV Confirm Construction & Development, Inc. 32469 Const. of MPB IV-A 3.858 150 C 0.364 0.256 0.300 - - - 92.00 84.65%
V. Satisfactory
MVVK Construction and Trading 25721 Const. of Multi-Purpose Bldg. Brgy. Tuyom VI 0.470 85 C 0.395 - 0.500 - - - 89.50 89.50%
V. Satisfactory
MWJ Construction 14882 Conc. of La Paz, Javier-Bito Road VIII 9.445 120 C 0.325 0.173 0.300 - - - 79.80 83.58% V. Satisfactory
MWJ Construction 14882 Concrete Paving of La-Paz-Burauen Rd., Brgy. Sta. Elena VIII 2.848 180 C 0.415 - 0.500 - - - 91.50 87.00%
V. Satisfactory
MWJ Construction 14882 Const. of Guingauan Flood Control VIII 0.960 90 C 0.347 0.200 0.300 - - - 84.70 88.18%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page340
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
MWJ Construction 14882 Rehab./Impvt. of National Arterial & Secondary Roads Public Infra VIII 0.979 90 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
MWJ Construction 14882 Road Concreting at Brgy. San Isidro VIII 0.188 30 C 0.370 0.200 0.300 - - - 87.00 *87.00%
V. Satisfactory
MWJ Construction 14882 Road Concreting of Burauen-La Paz Road VIII 0.939 90 C 0.308 0.300 0.300 - - - 90.80 *90.80%
Outstanding
MY Builders and Construction 22687 Const. of Multi-Purpose Bldg., @ Canaoay Community School I 0.939 68 C 0.303 0.200 0.300 - - - 80.30 *80.30%
V. Satisfactory
N & N Construction Corporation 30716 Const. of Geotextile Soil Reinforcement and Repair/Rehab IV-A 6.450 120 C 0.384 - 0.500 - - - 88.40 88.40%
V. Satisfactory
N & N Construction Corporation 30716 Impvt. of Catbalogan Drainage inc. Estero & Portion of Antiao River VIII 8.822 310 O 0.335 0.160 0.100 0.020 0.040 0.200 85.50 -
N.A. Ibarra Construction (Formerly: Diocletian's Const.) 24742 Road Concreting, Brgy. Baracbac I 0.855 18 C 0.367 0.200 0.300 - - - 86.70 *86.70%
Satisfactory
N.B. Avila Construction 13751 Conc. of Brgy. Pob. 4 Brgy. Road IV-A 0.381 25 C 0.481 0.133 0.300 - - - 91.40 *91.40% V. Satisfactory
N.B. Avila Construction 13751 Concreting of Pantihan Rd., & Const. of Multi-Purpose Pavement IV-A 2.293 120 C 0.404 - 0.500 - - - 90.40 90.40%
Outstanding
N.B. Avila Construction 13751 Const. of Macanda Bridge, Brgy. Kaytapos IV-A 0.477 60 C 0.258 0.300 0.300 - - - 85.80 *85.80%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page341
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
N.B. Avila Construction 13751 Const. of MPB IV-A 1.236 90 C 0.370 0.263 0.300 - - - 93.30 *93.30% Outstanding
N.B. Avila Construction 13751 Const. of One Classroom School Building, Bulihan E/S IV-A 0.475 55 C 0.396 - 0.500 - - - 89.60 *89.60%
V. Satisfactory
N.B. Avila Construction 13751 Const. of Secondary Sch. Bldg., Malabang NHS IV-A 1.283 120 C 0.338 0.250 0.300 - - - 88.80 *88.80%
V. Satisfactory
N.B. Avila Construction 13751 Riprapping of Kay Alaman River @ Brgy. Gomez-Zamora IV-A 0.855 60 C 0.333 0.200 0.300 - - - 83.30 *83.30%
V. Satisfactory
N.B. Garcia Construction 30983 Concreting of Poblacion Magsaysay FMR IV-B 0.478 30 C 0.414 - 0.500 - - - 91.40 91.40%
Outstanding
N.B. Garcia Construction 30983 Const. of 2 CL S/B Victoria NHS, Selina Annex IV-B 0.980 75 C 0.302 0.200 0.300 - - - 80.20 81.74%
V. Satisfactory
N.B. Garcia Construction 30983 Const. of San Jose National High School IV-B 0.952 60 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
N.B. Garcia Construction 30983Rehab. of Various Brgy. Rd., San Jose Area, Package IV (Conc. of
Baula Brgy. Rd.) Pag-asaIV-B 0.283 75 C 0.347 0.300 0.300 - - - 94.70 84.98%
V. Satisfactory
N.B. Salbo Construction 6091 Conc. of Golden Shower St. X 0.942 90 C 0.359 0.200 0.300 - - - 85.90 *85.90% V. Satisfactory
N.B. Salbo Construction 6091 Const. of MPB @ Cristino M. Paragas E/S IX 2.341 60 C 0.306 0.300 0.300 - - - 90.60 60.64%
Fair
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page342
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
N.B. Salbo Construction 6091 Const. of Poblacion El Salvador Flood Control X 9.462 180 C 0.384 0.300 0.000 - - - 68.40 73.44%
Satisfactory
N.B. Salbo Construction 6901 Const. of Poblacion El Salvador Flood Control X 9.462 180 O 0.281 0.200 0.050 0.030 0.037 0.200 79.80 -
N.B. Salbo Construction 6901 Const. of Poblacion El Salvador Flood Control X 9.462 180 O 0.337 0.200 0.000 0.030 0.038 0.133 73.80 -
N.B. Salbo Construction 6091
Rehab. / Reconst. of Damaged Road Sections along Linamon-
Zamboanga Road (Taguitic Section)
X 19.212 455 O 0.251 0.300 0.100 0.024 0.045 0.100 82.00 -
N.B. Salbo Construction 6091Road Upgrading (Gravel to
Concrete) based on GTRSTB, Gingoog-Claveria-Villanueva Road
X 19.293 165 O 0.347 0.233 0.150 0.030 0.050 0.033 84.30 -
N.F. Yamat Construction 5401 Rehab. of MPB @ Brgy. 72, Zone 6 NCR 0.420 60 C 0.299 0.300 0.300 - - - 89.90 80.73% V. Satisfactory
N.F. Yamat Construction 5401 Repair of School Building, PNHS Annex, Brgy. Don Galo NCR 0.948 75 C 0.321 0.160 0.300 - - - 78.10 *78.10%
Unsatisfactory
N.K. Enterprise 29292Concreting of Various Road
Segments along Anini-y-T Fornier-Hamtic Road Section
VI 0.964 65 C 0.293 0.132 0.300 - - - 72.50 74.36% Satisfactory
N.M. Parafina Builders Inc., (Formerly N.M. Parafina Builders) 11505 Const. of 1 Cl @ Pamantasang
Bayan, PUP IV-A 0.383 35 C 0.342 0.268 0.300 - - - 91.00 *91.00% Outstanding
N.M. Parafina Builders Inc., (Formerly N.M. Parafina Builders) 11505 Const. of One (1) Classroom
School Bldg. Atimonan Nat'l, H/S IV-A 0.377 30 C 0.448 - 0.500 - - - 94.80 94.80% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page343
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
N.M. Parafina Builders Inc., (Formerly N.M. Parafina Builders) 11505 Const./Impv't. of FTMR, Brgy.
Duhat IV-A 0.941 30 C 0.362 - 0.500 - - - 86.20 *86.20% V. Satisfactory
N.M. Parafina Builders Inc., (Formerly N.M. Parafina Builders) 11505
Repair/Const. of Multi-Purpose Pavemnet @ Purok Ilaya Brgy.
TagbakinIV-A 0.940 40 C 0.386 0.200 0.300 - - - 88.60 *88.60%
V. Satisfactory
N.M.E. Construction 22984a)Rep./Rehab. of H.E.Bldg. @
E.Delos Santos E/S b) Const. of Add'l. CL @ AA Quezon E/S
NCR 2.419 120 C 0.375 - 0.500 - - - 87.50 77.04% Satisfactory
N.M.E. Construction 22984 Completion of MPB @ Brgy. 589 NCR 1.443 45 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding
N.M.E. Construction 22984 Const. of Multi-Purpose Gymnasium IV-A 2.387 180 C 0.452 - 0.500 - - - 95.20 95.20%
Outstanding
N.M.E. Construction 22984 Improvement of Fire Exit in Front of Ferry Terminal PUP 529.175 45 C 0.341 0.291 0.300 - - - 93.20 93.20%
Very Satisfactory
N.M.E. Construction 22984 Proposed Const. of MPB at Brgy. 838 NCR 0.767 30 C 0.365 0.200 0.300 - - - 86.50 *86.50%
V. Satisfactory
N.M.E. Construction 22984 Proposed Rehab. of Syquia St. District VI NCR 9.584 120 C 0.257 0.300 0.300 - - - 85.70 *85.70%
V. Satisfactory
N.M.E. Construction 22984 Proposed Repair/Rehab. of Roads & Alleys and vicinities @ Brgy. 818 NCR 0.962 30 C 0.279 0.200 0.300 - - - 77.90 *77.90%
Satisfactory
N.M.E. Construction 22984 Rehab. of Jct. Layac-Balanga-Mariveles Port Road (Pilar Sect.) III 2.880 20 C 0.329 0.211 0.300 - - - 84.00 *84.00%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page344
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
N.M.E. Construction 22984 Repair/Rehab. Along Railroad Street (Phase II) NCR 2.881 20 C 0.181 0.300 0.300 - - - 78.10 *78.10%
Satisfactory
N.M.E. Construction 22984 Repair/Rehab. of MPB at Brgy. 889 NCR 1.419 105 C 0.323 0.200 0.300 - - - 82.30 87.20% V. Satisfactory
N.M.E. Construction 22984 Renovation of Hostel Main Lobby and Addition of Waiting Lounge PUP 2.296 65 C 0.385 0.300 0.300 - - - 98.50 98.50%
Outstanding
N.P. Uy Builders 16551 Const. of Malajog Shoreline Protection (Phase I) Bry. Malajog VIII 1.420 120 C 0.395 - 0.500 - - - 89.50 89.50%
V. Satisfactory
N.S. Construction and Supply 23203 Const. of Slope Protection along Naguilian Bridge, Dallipaoen I 1.927 120 C 0.274 0.226 0.300 - - - 80.00 71.63%
Satisfactory
N.T. Tulabut Construction and Supply 15846 Const. of MPB III 1.902 45 C 0.379 0.200 0.300 - - - 87.90 *87.90%
V.Staisfactory
N.T. Tulabut Construction and Supply 15846
Const. of MPB @ Brgy. San Vicente, Pilot Sch. For Phil.
Craftsment, Bulaon ResettlementIII 3.611 50 C 0.257 0.200 0.300 - - - 75.70 *75.70%
Satisfactory
N.V. Balbuena Construction 12055 Const. of Gabon-Hacienda FMR III 2.805 90 C 0.330 - 0.500 - - - 83.00 61.10% Fair
N.V. Balbuena Construction 12055 Const. of One (1) Classroom School Marina Bay E/S III 0.438 34 C 0.350 0.240 0.300 - - - 89.00 *89.00%
V.Staisfactory
N.V. Balbuena Construction 12055 Repair of Gapan-San Fernando-Olongapo Road III 0.961 60 C 0.348 0.200 0.300 - - - 84.80 *84.80%
V.Staisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page345
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
N.V. Balbuena Construction 12055
Repair/Rehabilitation of Junction-Layac-Balanga-Mariveles Port
Road (Mabatang Section)
III 0.474 30 C 0.354 0.200 0.300 - - - 85.40 *85.40% Satisfactory
N-22 Construction & Trading 25254 Const. of Drainage Canal at San Vicente III 0.477 30 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V.Staisfactory
N-22 Construction & Trading 25254 Const./Conc./Repair/Completion of San Nicolas Brgy. Road III 0.474 25 C 0.321 0.200 0.300 - - - 82.10 *82.10%
V.Staisfactory
N-22 Construction & Trading 25254 Const./Conc./Repair/Completion of Sapa Brgy. Road III 2.567 30 C 0.346 0.300 0.300 - - - 94.60 *94.60%
Outstanding
N-22 Construction & Trading 25254 Const./Impv't. of Amedo Dike Slope Protection San Simon III 0.950 60 C 0.477 0.500 - - - 97.70 97.70%
Outstanding
N-22 Construction & Trading 25254 Const./Rehab./Completion of Sampaloc Brgy. Road III 0.477 35 C 0.348 - 0.500 - - - 84.80 84.80%
V. Satisfactory
N-22 Construction & Trading 25254 Impvt. of Minalin-Sto. Tomas Road III 4.744 75 C 0.342 0.300 0.300 - - - 94.20 *94.20% Outstanding
Naga E.S. Construction and Supply 6593 Conc. of La Purisima Nuevo Road V 5.617 90 C 0.422 0.200 0.300 - - - 92.20 *92.20%
V. Satisfactory
Naga E.S. Construction and Supply 6593 Const. of Multi-Purpose Building V 0.938 90 C 0.362 0.300 0.300 - - - 96.20 93.61%
Outstanding
Naga E.S. Construction and Supply 6593 Road Concreting at Camanaba
Road V 1.891 60 C 0.263 0.300 0.300 - - - 86.30 *86.30% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page346
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Nale Construction 18552 Const. of Elementary Sch. Bldgs. At Pio Macahig ME/S VII 0.750 100 C 0.319 0.254 0.300 - - - 87.30 87.09%
V.Satisfactory
Nale Construction 18552 Repair/Rehab./Widening/Regravelling of FMR, Cantabon-Luzong VII 0.697 90 C 0.400 0.100 0.300 - - - 80.00 85.88%
V.Satisfactory
Nascon Builders 14786 Conc. of FMR, Calangahan X 0.962 45 C 0.376 0.200 0.300 - - - 87.60 *87.60% Satisfactory
Nascon Builders 14786 Impvt. of MPB X 1.085 60 C 0.423 0.133 0.300 - - - 85.60 *85.60% Satisfactory
NBL Construction 30396 Asphalt Overlay of Bauan-Mabini Road, Bagalangit Solo Sect. IV-A 9.996 20 C 0.284 0.300 0.300 - - - 88.40 *88.40%
V. Satisfactory
NBL Construction 30396 Conc. of FMR @ Brgy. Dao IV-A 1.888 60 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory
NBL Construction 30396 Conc. of Palico-Cadre Road IV-A 7.497 75 C 0.308 0.290 0.300 - - - 89.80 *89.80% V. Satisfactory
NBL Construction 30396Conc./Const./Rehab. of Bauan-Mabini Circ. Road, Malimotoc I
SectionIV-A 19.295 180 C 0.450 0.133 0.300 - - - 88.30 86.44%
Satisfactory
NBL Construction 30396 Const. of Bauan-Mabini Circ. Road IV-A 11.571 120 C 0.326 0.300 0.300 - - - 92.60 *92.60% Outstanding
NBL Construction 30396 Const. of Gasang Seawall, Phase II IV-A 3.134 30 C 0.311 0.200 0.300 - - - 81.10 *81.10% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page347
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
NBL Construction 30396Widening/Conc. of BauanMabini Circ. Road, San Teodoro-Mainit
Section, Phase IIV-A 19.289 120 C 0.304 0.300 0.300 - - - 90.40 *90.40%
Outstanding
Nescon Builders 24751 Const. of Multi-Purpose Building (Const. of Veterans Bldg.) VI 1.443 180 C 0.308 0.279 0.000 - - - 58.70 67.38%
Fair
Nessan Builders 25142 Const. of 2 Cl Bldg. @ Navaling P/S III 0.536 60 C 0.282 0.300 0.300 - - - 88.20 *88.20%
V. Satisfactory
Nessan Builders 25142 Const./Repair/Rehab/ of Brgy/ Roads, Brgy. Dau III 1.877 60 C 0.456 - 0.500 - - - 95.60 95.60%
Outstanding
Nessan Builders 25142 Package XIV-Const.of Multi-Purpose Covered Court III 1.403 60 C 0.222 - 0.500 - - - 72.20 72.20%
Satisfactory
Nes-san Builders 25142 Asphalt Overlay along Arayat-Magalang-Mabalacat Road III 4.763 6 C 0.366 0.300 0.300 - - - 96.60 *96.60%
Outstanding
Nes-san Builders 25142 Concreting of Road @ Avocado St., Brgy. San Francisco III 0.475 15 C 0.221 0.133 0.300 - - - 65.40 *65.40%
Poor
Nes-San Builders 25142Constn. of Drainage System
Along Don Juico & Don Meliton Aves.
III 9.770 230 O 0.349 0.300 0.300 - - - 94.91 93.38% Outstanding
Nes-san Builders 25142 Construction of Multi-Purpose Building @ Brgy. Duquit III 0.525 30 C 0.440 0.133 0.300 - - - 87.30 *87.30%
Satisfactory
Nestor D. Mercado Construction 18658 Conc./Repair Calanipawan Rd. VIII 1.873 55 C 0.350 - 0.500 - - - 85.00 85.00% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page348
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
New Arcond Builders Inc. 9614 Const. of UP National Institute of Physics Bldg. NCR 4.716 120 C 0.353 0.200 0.300 - - - 85.30 84.74%
V.Statisfactory
New Arcond Builders Inc. 9614 Impvt./Conc. Blocking along C.P. Garcia St. NCR 14.234 150 C 0.357 0.300 0.300 - - - 95.70 92.25%
Outstanding
New Arcond Builders Inc. (Formerly Arcond Builders) 9614
Concrete Blocking along Edsa, Quezon City (Km. 10+687-Km.
16+417)NCR 9.555 75 C 0.403 - 0.500 - - - 90.30 *90.30%
Outstanding
New Arcond Builders Inc. (Formerly Arcond Builders) 9614 Impv't./Rehab. of Quezon Avenue NCR 4.642 30 C 0.356 - 0.500 - - - 85.60 85.60%
V. Statisfactory
New Arcond Builders Inc. (Formerly Arcond Builders) 9614 Proposed Pedestrian Overpass
Crossing Roxas Blvd. NCR 8.437 120 C 0.382 0.300 0.300 - - - 98.20 81.79% V.Statisfactory
New Arcond Builders Inc. (Formerly Arcond Builders) 9614 Rehab./Improvement of Reparo
Road NCR 9.434 120 C 0.350 0.300 0.300 - - - 95.00 94.10% Outstanding
New Big Four J Construction Inc. 15104 Completion of Silverio School (Phase 2) NCR 2.385 60 C 0.405 0.200 0.300 - - - 90.50 *90.50%
V.Satisfactory
New Big Four J Construction Inc. 15104 Concreting of Roads, Sta. Lucia (Y), Zaragoza to Santiago III 0.946 25 C 0.370 0.190 0.300 - - - 86.00 *86.00%
Satisfactory
New Big Four J Construction Inc. (Formerly: Four J Construction) 15104 Widening of Quezon Avenue NCR 21.719 165 C 0.361 0.200 0.300 - - - 86.10 88.26%
V. Satisfactory
New Kanlaon Const., Inc/Markbilt Const./JV 896 Water Impounding/Earth Dam with
Spillway (Dauin Dam) NIA 158.868 540 O 0.325 0.174 0.100 0.030 0.055 0.200 88.38 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page349
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
New Kanlaon Construction, Inc. 896 Site Dev't and Construction of 2-Units 2-Storey School Building PRRC 25.777 210 O 0.378 0.29 0 0.03 0.062 0.1 86.00 -
New Mindoreños Lumber, Hardware and General
Merchandise (Formerly: Mercedita Benasas General
Merchandise)
31745 Const. of Banus Bridge with Detour Bridge IV-B 9.554 195 C 0.368 0.200 0.300 - - - 86.80 *86.80%
V. Satisfactory
New Mindoreños Lumber, Hardware and General
Merchandise (Formerly: Mercedita Benasas General
Merchandise)
31745 Const. of Casague MPB IV-B 0.864 45 O 0.329 0.240 0.100 0.030 0.027 0.100 82.60 -
New Mindoreños Lumber, Hardware and General
Merchandise (Formerly: Mercedita Benasas General
Merchandise)
31745 Const. of Seawall at Poblacion I & II Brgy. Mulawin IV-B 4.807 90 C 0.322 0.200 0.300 - - - 82.20 82.20%
V.Satisfactory
New Mindoreños Lumber, Hardware and General
Merchandise (Formerly: Mercedita Benasas General
Merchandise)
31745 Construction of Casague Multi-Purpose Building IV-B 0.864 45 C 0.494 0.091 0.300 - - - 88.50 *84.37%
Satisfactory
New Rich Gen. Contractor Services & Trading Co. Inc. 27629 Concreting of Road @ Brgy.
Bubukal IV-A 0.475 28 C 0.382 - 0.500 - - - 88.20 88.20% V. Satisfactory
New Rich Gen. Contractor Services & Trading Co. Inc. 27629 Const. of MPB (Annex) IV-A 0.475 30 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V.Satisfactory
New Rich Gen. Contractor Services & Trading Co. Inc. 27629 Impvt. of FMR at Brgy. Banca-
Banca IV-A 0.480 25 C 0.347 0.200 0.300 - - - 84.70 *84.70% V.Satisfactory
New San Fabian Builders & Supplies 16348 Const. of 2 CL Sch. Bldg.,
Galintuja P/S III 0.954 90 C 0.364 0.265 0.300 - - - 92.90 *92.90% Outstanding
New San Fabian Builders & Supplies 16348 Const. of Multi-Purpose Bldg.,
Brgy. Dianawan III 0.663 90 C 0.396 0.250 0.300 - - - 94.60 *94.60% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page350
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
New San Fabian Builders & Supplies 16348
Construction of Multi-Purpose Bldg., Aurora Nat'l Science High
SchoolIII 2.133 120 C 0.451 0.133 0.300 - - - 88.40 *88.40%
Satisfactory
New TBP Construction & Development Corp. 29155 Const. of Cross Drainage
Structures along MNR I 4.417 120 O 0.344 0.120 0.100 0.020 0.042 0.133 75.90 -
New TBP Construction & Development Corp. 29155
Const. of Multi-Purpose Building (Covered Court @ Haven for
Woman) Phase INCR 11.546 195 C 0.352 0.300 0.300 - - - 95.20 91.42%
Outstanding
Newadis Construction 23806 Completion of Lumang Bayan Water System IV-B 0.955 60 O 0.353 0.300 0.100 0.020 0.013 0.100 88.60 -
Newadis Construction 23806 Completion of the Conc. of Magsaysay-San Jose Road IV-B 9.619 120 C 0.294 0.300 0.300 - - - 89.40 81.66%
V. Satisfactory
Newadis Construction 23806 Const. of 2 CL Abra de Ilog NHS IV-B 0.954 50 C 0.284 0.200 0.300 - - - 78.40 *78.40% Satisfactory
Newadis Construction 23806 Const. of Pagbahan Flood Control (Phase II) IV-B 2.294 60 C 0.298 0.300 0.300 - - - 89.80 89.50%
V. Satisfactory
Newadis Construction 23806 Construction of Mamburao Seawall, Barangay 7 IV-B 2.683 120 C 0.433 0.069 0.300 - - - 80.20 *84.34%
Satisfactory
NFH Construction & Supply 16055 Const. of Adiangao Bridge # 2 & Approaches (Phase 1), V 8.396 290 C 0.392 0.300 0.000 - - - 69.20 76.82%
Satisfactory
NFH Construction & Supply 16055 Const. of Basag Bridge (Ligao-Sabloyon Road) V 23.780 210 O 0.367 0.240 0.100 0.030 0.023 0.100 86.00 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page351
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
NFH Construction & Supply 16055 Const. of Basag Bridge (Ligao-Sabloyon Road) V 23.780 487 O 0.335 0.239 0.150 0.030 0.061 0.050 86.50 -
NFH Construction & Supply 16055 Const. of Daguit 2 Bridge V 19.650 240 O 0.339 0.300 0.070 0.020 0.023 0.067 81.90 -
NFH Construction & Supply 16055 Const. of Daguit 2 Bridge V 19.650 330 O 0.342 0.300 0.070 0.030 0.028 0.067 83.70 -
NFH Construction & Supply 16055 Const. of Daguit 2 Bridge V 19.650 714 O 0.341 0.240 0.000 0.030 0.056 0.050 71.70 -
NFH Construction & Supply 16055 Const. of Nagas Bridge & Approaches V 15.512 270 C 0.353 0.200 0.300 - - - 85.30 77.83%
Satisfactory
NFL Builders 12524 Const. of Drainage Canal @ Barangay 17 X 0.474 135 O 0.253 0.200 0.100 0.015 0.000 0.200 76.80 -
N-Four General Contractor and Supply 19475 Concreting of San Isidro-Iraya
Brgy. Road V 0.275 160 C 0.394 - 0.500 - - - 89.40 *89.40% V. Satisfactory
N-Four General Contractor and Supply 19475 Const. of 2Cl School Bldg. @
Tanagan E/S V 0.945 60 C 0.307 0.259 0.300 - - - 86.60 *86.60% V. Satisfactory
N-Four General Contractor and Supply 19475 Impv't./Rehab. of Tanawan River
Control (Part of Cluster I) V 0.459 120 O 0.233 0.287 0.100 0.015 0.028 0.100 76.30 -
Nippon Steel Corp./Toa Corp. (JV)
SL2-SN/000598
/FC-04-001
Second Magsaysay Bridge & Butuan City By Pass Road PJHL 2,158.802 1,110 C 0.366 0.300 0.300 - - - 96.60 94.86%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page352
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Nirvana Construction and Supplies 18691 Const. of 2 Cl @ KNCHS XII 0.694 91 O 0.382 0.180 0.100 0.030 0.038 0.100 83.00 -
Nirvana Construction and Supplies 18691 Const. of 3 CL at Colon NHS
(Ireneo Lopez Annex) XII 1.301 90 C 0.305 0.248 0.000 - - - 55.30 *55.30% Poor
Nirvana Construction and Supplies 18691 Const. of MPB, Brgy. Zone 4 XII 1.429 161 C 0.472 0.133 0.300 - - - 90.50 84.97%
Satisfactory
Nirvana Construction and Supplies 18691 Impvt. of Lake Sebu-Maitum Road
Phase I, Brgy. Takunel XII 14.463 252 C 0.282 0.300 0.000 - - - 58.20 71.34% Satisfactory
Nishimatsu Construction Company Limited
SLN-SN-000579/FC-
02-036
KAMANAVA Area Flood Control & Drainage System Improvement
ProjectNIA 3,441.588 1,914 C 0.332 0.300 0.300 - - - 93.20 92.01%
Outstanding
NMJ Construction & Trading 31017 Const./Impvt. of FMR IX 0.465 25 C 0.380 0.200 0.300 - - - 88.00 *88.00% V. Satisfctory
NMJ Construction & Trading 31017 Const./Impvt. of FMR, Canacan-Sininan IX 0.464 40 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfctory
NMJ Construction & Trading 31017 Gravelling of Brgy. Del Pilar Road IX 0.285 14 C 0.432 - 0.500 - - - 93.20 93.20% Outstanding
Norm Construction 13754 Completion of Multi-Purpose Building VII 0.459 120 C 0.442 0.133 0.300 - - - 87.50 *87.50%
Satisfactory
Norm Construction 13754 Rehab. & Improvement of Municipal Roads VII 1.431 30 C 0.456 0.133 0.300 - - - 88.90 *88.90%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page353
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Norm Construction 13754 Conc. of Road Brgy. Poblacion DOS VII 0.933 30 C 0.350 0.300 0.300 - - - 95.00 *95.00%
Outstanding
Norsam Builders & Construction Supply 21184 Repair of Elem. Sch. Bldg.,
Bantayan Elem. Sch. VIII 0.239 90 C 0.323 0.100 0.300 - - - 72.30 *72.30% Satisfactory
Norsam Builders & Construction Supply 21184 Repair of Elem. Sch. Bldg.,
Pambujan Elem. Sch. VIII 0.655 90 C 0.376 0.100 0.300 - - - 77.60 *77.60% Satisfactory
Norsatek Engineering and Construction Supply 26627 Multi-Purpose Pavement under
Cluster CARP-04-D2-01 VIII 0.093 60 C 0.356 0.244 0.300 - - - 90.00 *90.00% V. Satisfactory
Northern / DMJ Construction (JV) JV-08-115 Construction of Baler-Casiguan
Road CP3 III 505.307 450 O 0.394 0.300 0.150 0.030 0.033 0.033 94.00 -
Northern / ZM Construction (JV) JV-07-148
Tarlac-Nueva Ecija-Dingalan Port Road, Sta. Rosa-Jct. Fort
Magsaysay Road (Phase 2) & Gabaldon-Dingalan Road (Phase
3)
III 238.983 300 O 0.367 0.300 0.150 0.030 0.032 0.050 92.90 -
Northern Builders 8789 Asphalt Overlay along Manila North Road III 9.743 30 C 0.431 0.195 0.300 - - - 92.60 *92.60%
V. Satisfactory
Northern Builders 8789 Asphalt overlay of Daang Maharlika II 38.996 85 C 0.470 0.200 0.300 - - - 97.00 *97.00%
Outstanding
Northern Builders 8789 Baliuag Boundary, Candaba Road III 33.886 144 C 0.430 0.181 0.300 - - - 91.10 *91.10%V. Satisfactory
Northern Builders 8789Completion of Ternate-Nasugbu
Road, Looc-Pingkian-Papaya-Hamilo Section
IV-A 24.124 240 C 0.296 0.300 0.300 - - - 89.60 89.78% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page354
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Northern Builders 8789Concrete Paving/Impv't of Jct.
National Road, Bitnong-Belance, Nueva Vizcaya Bdry. Road
II 125.412 540 O 0.354 0.300 0.150 0.030 0.045 0.050 92.90 -
Northern Builders 8789 Const. (Widening) of Calamba Bridge IVA 63.341 380 C 0.366 0.300 0.300 - - - 96.60 *96.60%
Outstanding
Northern Builders 8789 Const. of 6-Cl (2-Storey Bldg.) @ Sta. Maria E/S III 3.525 120 C 0.444 - 0.500 - - - 94.40 85.65%
V. Satisfactory
Northern Builders 8789 Const. of Water Supply System III 9.335 300 C 0.489 - 0.500 - - - 98.90 94.35% Outstanding
Northern Builders 8789 Const./Repair/Rehab. of Brgy. Road Brgy. Ninoy Aquino III 1.880 61 C 0.433 - 0.500 - - - 93.30 93.30%
Outstanding
Northern Builders 8789 Construction of Togbongon River Control XIII 9.585 149 O 0.300 0.300 0.150 0.030 0.033 0.050 86.30 -
Northern Builders 8789
Impv't./Widening of Manila North Road (MNR) Package V,
Km.118+700 to Km.119+338.40; Km.124+680 to Km.124+940; Km.129+390 to Km.132+500;
(Tarlac Section)
III 47.288 120 C 0.386 0.300 0.300 - - - 98.60 89.54% V. Satisfactory
Northern Builders 8789 Impvt./Widening of Manila North Road, Phase III III 93.589 213 C 0.295 0.300 0.300 - - - 89.50 82.66%
V. Satisfactory
Northern Builders 8789
Impvt./Widening/Conc. of McArthur Highway (MNR) Tarlac
Section Phase IV, Package II, Tarlac City Section
III 118.472 240 C 0.441 0.200 0.300 - - - 94.10 *94.10%V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page355
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Northern Builders 8789 Pangasinan-Nueva Vizcaya Rd. I 31.182 120 C 0.445 - 0.500 - - - 94.50 94.50% Outstanding
Northern Builders 8789 Rehab. of San Marcelino-San Narciso Rd. III 47.529 60 C 0.326 0.300 0.300 - - - 92.60 *92.60%
Outstanding
Northern Builders 8789 Rehab./Impvt. of MNR & Camp Dau Road III 14.197 15 C 0.314 0.205 0.300 - - - 81.90 *81.60%
V. Satisfactory
Northern Builders 8789 Rehab./Reconst. of Villa Cerveza Flood Mitigation Project IV-B 55.231 150 O 0.328 0.160 0.100 0.030 0.032 0.200 85.00 -
Northern Builders 8789 Repair of Angeles-Dinalupihan Road III 6.591 70 C 0.317 0.200 0.300 - - - 81.70 *81.70%
V. Satisfactory
Northern Builders 8789 Repair/Rehab. Along Romulo Highway III 9.320 30 C 0.378 0.205 0.300 - - - 88.30 *88.30%
V. Satisfactory
Northern Builders 8789 Repair/Strengthening of Insular Bilibid Prison Bridge NCR 6.049 90 C 0.171 0.300 0.300 - - - 77.10 *77.10%
Satisfactory
Northern Builders 8789 San Vicente-Apalit Road III 31.463 140 C 0.452 0.192 0.300 - - - 94.40 *94.40%V. Satisfactory
Northern Builders / Ferdstar Builders Contractors (JV) JV-07-118 Rehab/Reconst. of Tulaoc-Sto.
Domingo Road, Mexico Section III 96.425 300 O 0.337 0.281 0.150 0.030 0.047 0.050 89.50 -
Northern Builders / R.A. Pahati Gravel & Sand (JV) JV-08-008
Rehab/Impvt./Widening of Tarlac-Nueva Ecija-Dingalan Port Road,
Phase I, Fort Magsaysay-Laur Road Section
III 223.075 300 O 0.388 0.300 0.150 0.022 0.032 0.050 94.20 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page356
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Northern Builders / ZM Const. (JV) JV-07-685 Impvt./Upgrading/Widening of Jct.
Layac-Balanga-Mariveles Port Rd. III 107.887 300 C 0.464 0.200 0.300 - - - 96.40 94.84% V. Satisfactory
Northern Builders/DMJ Construction & Supply (JV) JV-06-076
Const. of Tarlac-Nueva Ecija-Dingalan Port Road (Tarlac City-
Sta. Rosa-Fort Magsaysay-PalayanCity-Laur-Gabaldon Road, Section
4, Sta. Rosa Fort Magsaysay
III 128.482 240 C 0.345 0.300 0.300 - - - 94.50 91.92% Outstanding
Northern Builders/Hanjin (JV) FC-06-007Completion/Const. of Subic-
Cawag-Balaybay Road, Phase II (Segment 4)
III 119.113 90 C 0.211 0.200 0.300 - - - 71.10 *71.10% Satisfactory
Northern Cotabato Construction and Supply 15515
Conc. of Banisilan-Guiling-Alamada-Libungan Road (Camansi
Nicaan Section) XII 4.785 74 C 0.357 0.200 0.300 - - - 85.70 81.86%
V. Satisfactory
Northern Cotabato Construction and Supply 15515
Conc. of Kidapawan-Calunasan-M'lang Road Magsaysay-Maligaya
Sect.XII 5.290 120 C 0.454 - 0.500 - - - 95.40 92.88%
Outstanding
Northern Cotabato Construction and Supply 15515
Rehabilitation of Grebona Bridge along Banisilan-Guiling-Alamada-
Libungan RoadXII 13.633 280 C 0.386 0.300 0.300 - - - 98.60 88.34%
V. Satisfactory
Northern Negros Construction & Dev't. 17962 Concreting of Leon Kilat Street VII 1.484 90 C 0.370 - 0.500 - - - 87.00 67.44%
Fair
Northern Negros Construction & Dev't. 17962 Const. of Calo River Control VII 0.876 85 C 0.397 - 0.500 - - - 89.70 88.74%
V. Satisfactory
Northpoint Development Corp. 29573 Const. of Footbridge with Drainage System VII 1.490 90 C 0.372 - 0.500 - - - 87.20 85.46%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page357
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Novanne Ventures Construction 22107 Const. of FMR Brgy. Lumpatan-Lapak-Sumaray Rd. VI 2.886 90 C 0.378 - 0.500 - - - 87.80 87.80%
V.Satisfactory
Novanne Ventures Construction 22107 Cont. of MPB at Brgy. Singcang VI 2.794 180 C 0.396 0.124 0.300 - - - 82.00 85.57% V. Satisfactory
Nueva Ecija Construction Company, Inc. 135 Const. of School Building, Cavite
State University IV-A 1.914 120 C 0.416 - 0.500 - - - 91.60 91.74% Outstanding
Nukaza Trading and Construction 32067 Impvt. of Road with Lined Canal at Summitville Subd., Putatan Itaas NCR 2.379 60 C 0.303 0.236 0.300 - - - 83.90 *83.90%
V. Satisfactory
Nulas Builders 32172 Const. of 1 CL Bldg. @ Pulong Bulo PS III 0.379 30 C 0.331 0.300 0.300 - - - 93.10 89.60%
V. Satisfactory
NVF Construction 13941 Const. of Ponong River Wharf V 0.655 75 C 0.392 0.165 0.300 - - - 85.70 *85.70% V. Satisfactory
O R C Construction & Supply 17337Rehab./Impvt. of Road Protection
along Daang Maharlika (Bontal Section)
II 0.932 42 C 0.239 0.225 0.300 - - - 76.40 *76.40% Satisfactory
O.G. Santos Construction 2050 Conc. of Aurora-Dipolog City Road, Josefina Section IX 13.353 210 C 0.251 0.201 0.300 - - - 75.20 74.87%
Satisfactory
O.G. Santos Construction 2050 Conc. of Mahayag-Dumingag RoadKaangayan Section IX 4.645 166 C 0.467 0.150 0.300 - - - 91.70 *91.70%
V. Satisfactory
O.G. Santos Construction 2050
Const. of Line Ext. Canal & Spillway at Various sections of
Newly completed Rehab. of Malalag-Malita-JAS Road
XI 2.878 95 C 0.274 0.300 0.300 - - - 87.40 87.34% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page358
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
O.G. Santos Construction 2050Impvt./Conc. of By-Pass Road
connecting Panabo Wharf Road and Panabo Coastal Road
XI 13.203 180 C 0.302 0.200 0.300 - - - 80.20 76.94% Satisfactory
O.L. De Leon Construction 16194 Conc. of Bagong Silang-Capalonga Road V 14.188 150 C 0.370 0.200 0.300 - - - 87.00 88.62%
V. Satisfactory
O.L. De Leon Construction 16194 Conc. of Talobatib-Jose Pang. Road V 1.881 90 C 0.234 0.200 0.300 - - - 73.40 80.12%
V. Satisfactory
O.L. De Leon Construction 16194 Concreting of Daet-Mercedes Road V 0.942 60 C 0.354 - 0.500 - - - 85.40 86.24%
V. Satisfactory
O.L. De Leon Construction 16194 Const. of 2 CL S/B P. Ponayo H/S Brgy. Mambelite V 0.719 60 C 0.351 - 0.500 - - - 85.10 85.10%
V. Satisfactory
O.L. De Leon Construction 16194 Road Opening of Matango-Singi Barangay Road V 4.604 120 O 0.323 0.230 0.100 0.010 0.028 0.100 79.10 -
O.R. Sarmiento Construction 1411 Conc. of Danao-Getafe Road VII 9.472 210 C 0.256 0.300 0.300 - - - 85.60 87.92% V. Satisfactory
O.R. Sarmiento Construction 1411 Conc. of Junction (TER), Jagna-Sierra-Bullones Road VII 81.102 300 O 0.387 0.169 0.070 0.030 0.056 0.100 81.20 -
O.R. Sarmiento Construction 1411 Conc. of Junction (TER), Jagna-Sierra-Bullones Road VII 81.102 300 O 0.337 0.223 0.000 0.030 0.059 0.100 74.90 -
O.R. Sarmiento Construction 1411Const. of Spillway - Phase I,
Talibon Small Reservoir Irrigation Project
NIA-II 8.708 280 O 0.358 0.200 0.070 0.023 0.014 0.200 86.50 86.50% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page359
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
O.R. Sarmiento Construction 1411Const./Impv't (Concrete Paving) of Concepcion, Danao-Buenavista-
Carmen RoadVII 9.592 620 C 0.429 0.144 0.300 - - - 87.30 88.56%
Satisfactory
O.R. Sarmiento Construction 1411 Naga-Toledo Road Project; Jct. Pajo to Brgy. Ibo to Boundary R-VII 18.733 315 C 0.394 - 0.500 - - - 89.40 88.14%
V. Satisfactory
O.R. Sarmiento Construction 1411 Talibon Small Reservoir Irrigation Project NIA 11.574 343 O 0.350 0.157 0.100 0.030 0.047 0.200 88.40 -
Octant Builders & Development Corp. 23668 Const. of Health Center at Saniboy
Health Center NCR 0.959 60 C 0.327 - 0.500 - - - 82.70 82.70% V. Satisfactory
OIC Construction & Supply 23727 Const. of Water Works System IV-A 2.406 90 C 0.343 0.200 0.300 - - - 84.30 *84.30% V. Satisfactory
OIC Construction & Supply 23727 Road Conc. @ Brgy. San Juan, Alitagtag and Brgy. San Isidro IV-A 0.291 45 C 0.277 0.300 0.300 - - - 87.70 *87.70%
V. Satisfactory
OIC Construction & Supply 23727 Waterworks Project (Level I) IV-A 2.468 120 C 0.389 0.200 0.300 - - - 88.90 86.50% V. Satisfactory
Omengan Construction and Development Corporation 5119 Const. of Bagu Bridge &
Approaches CAR 6.938 190 C 0.348 0.134 0.300 - - - 78.20 82.94% V. Satisfactory
Omengan Construction and Development Corporation 5119 Const. of Saltan Bridge &
Approaches CAR 76.227 345 O 0.341 0.300 0.100 0.030 0.040 0.100 91.10 -
Omengan Construction and Development Corporation 5119 Const. of Tuga Bridge & its
Approaches CAR 12.262 200 C 0.327 0.035 0.300 - - - 66.20 71.84% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page360
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Omengan Construction and Development Corporation 5119
Improvement/Widening/Concreting of Bontoc-Tabuk-Tuguegarao Road, Phase 1, Cobaet Bridge-
Gonogon Bridge
CAR 47.239 300 C 0.436 0.200 0.300 - - - 93.60 *93.60% V.Satisfactory
Omengan Construction and Development Corporation 5119
Improvement/Widening/Concreting of Bontoc-Tabuk-Tuguegarao
Road, Phase III, Dao Bridge-Cobaet Bridge
CAR 47.241 300 O 0.362 0.288 0.150 0.030 0.045 0.033 90.80 -
Omengan Construction and Development Corporation 5119
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase
VI, Mamaga Bridge-Basao Bridge, Km. 420+970-Km.429+940
CAR 83.149 365 O 0.331 0.240 0.100 0.030 0.045 0.067 81.30 -
Omengan Construction and Development Corporation 5119
Impvt./Widening/Conc. Of Bontoc-Tabuk-Tuguegarao Road, Phase
VI, Mamaga Bridge-Basao Bridge, Km. 420+970-Km.429+940
CAR 83.149 365 O 0.376 0.300 0.150 0.030 0.045 0.033 93.40 -
Omengan Construction and Development Corporation 5119
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road,
Tinglayan Bdry.-Lubuagan-Tabuk Sect. II Km. 472+500-Km.495+500
CAR 14.465 84 C 0.336 0.300 0.300 - - - 93.60 *93.60% Outstanding
Omengan Construction and Development Corporation 5119
Upgrading & Conc. of Tuguegarao-Tabuk-Tinglayan Road, Pingaan-
Dalimuno SectionCAR 14.329 150 C 0.266 0.016 0.300 - - - 58.20 72.90%
Satisfactory
Omicron Construction 9575Const. of Multi-Purpose Bldg. at
San Matias Realigned to Const. of MPB at San Jose
III 0.949 60 C 0.457 - 0.500 - - - 95.70 95.70% Outstanding
Omicron Construction 9575 Repair/Rehab. of Dike/Banks Clearing Sapang Maragul III 9.490 120 C 0.357 - 0.500 - - - 85.70 85.70%
V. Satisfactory
Omnicon Builders 22816 Concreting of Brgy Roads at Habay I, Molino I Proj. 18 & Niog II IV-A 0.959 38 C 0.267 - 0.500 - - - 76.70 76.70%
Satisfactory
Omnicon Builders 22816 Const. of 2 Cl Sch. Bldg. @ Pinagturilan NHS IV-B 1.339 90 C 0.257 0.300 0.300 - - - 85.70 70.51%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page361
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Omnicon Builders 22816 Partial Const. of 2CL S/B at Julian Felipe E/S IV-A 0.767 60 C 0.447 - 0.500 - - - 94.70 94.70%
Outstanding
Omnicon Builders 22816 Rehab./Impvt. of Punta-Looc-Odiongan-Anahao Road IV-B 9.577 160 C 0.179 0.200 0.300 - - - 67.90 74.50%
Satisfactory
On Top Construction 32696 Const. of Salingao Flood Control CAR 0.238 25 C 0.355 0.200 0.300 - - - 85.50 *85.50% V.Satisfactory
On Top Construction 32696 Const./Conc. of Singi FMR CAR 0.238 28 C 0.317 0.200 0.300 - - - 81.70 *81.70% V.Satisfactory
OP Reyes Builders & Supply 32271 Conc. of Road in Brgy. Malaruhatan IVA 0.470 60 C 0.292 0.216 0.300 - - - 80.80 *80.80%
V. Satisfactory
Open Builders and Supply 33342Repair/Rehab. of Cadat-Olan
Bridge Approach A along Catarman (Bdry.) Rawis Rd.
VIII 0.603 60 C 0.458 0.133 0.300 - - - 89.10 *89.10% V.Satisfactory
OQC Construction 22690 Addalam River Irrigation Project NIA 2.827 178 O 0.358 0.240 0.150 0.023 0.038 0.033 84.23 -
OQC Construction 22690 Completion of Multi-Purpose Building @ San Andres E/S II 0.522 60 C 0.322 0.300 0.300 - - - 92.20 91.64%
Outstanding
OQC Construction 22690 Const of San Vicente FMR II 2.863 120 C 0.236 0.239 0.300 - - - 77.50 77.50% Satisfactory
OQC Construction 22690 Const. of MPB (Phase II) @ Cagayan NHS II 4.749 200 C 0.350 0.000 0.000 - - - 35.00 *35.00%
Poor
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page362
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
OQC Construction 22690 Const. of MPB @ Brgy. 9 II 1.924 250 C 0.388 0.200 0.300 - - - 88.80 81.87% V. Satisfactory
OQC Construction 22690 Const. of MPB @ I.S.U. II 1.895 150 C 0.375 0.200 0.300 - - - 87.50 *87.50% V. Satisfactory
OQC Construction 22690 Const. of Multi-Purpose Building (Gymnasium) II 4.821 200 O 0.304 0.300 0.100 0.015 0.035 0.100 85.40 -
OQC Construction 22690 Const. of Multi-Purpose Building @ Cagayan National High School II 4.821 200 O 0.389 0.236 0.050 0.030 0.030 0.067 80.20 -
OQC Construction 22690Seal Widening along Daang
Maharlika km. 324+000-Km.327+700
II 9.543 165 C 0.294 0.000 0.300 - - - 59.40 76.64% Satisfactory
OQC Construction 22690Seal Widening of intersection at
Daang Maharlika & Jct. Ipil-Panang-Quirino Bdry Road
II 4.775 150 C 0.291 0.200 0.300 - - - 79.10 *79.10% Satisfactory
Orani Builders Supply 5349 Cluster CY 2004 DepEd School Building Program III 4.560 120 C 0.478 - 0.500 - - - 97.80 95.00%
Outstanding
Orani Builders Supply 5349 Const. of MPB @ Brgy. Camachile III 0.660 42 C 0.378 0.200 0.300 - - - 87.80 *87.80% V. Satisfactory
Orani Builders Supply 5349 Const. of Multi-Purpose Building San Vicente III 2.814 90 C 0.456 - 0.500 - - - 95.60 89.02%
V. Satisfactory
Orani Builders Supply 5349 Impvt. of Pentor-Balsik River Control, Sta. Isabel Section III 4.767 120 C 0.264 0.300 0.300 - - - 86.40 *86.40%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page363
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Orani Builders Supply 5349 Repair/Rehab. of Multi-Purpose Building VII 0.472 270 O 0.245 0.300 0.100 0.015 0.011 0.033 70.40 -
Orguer Trading & Construction 17111 Concreting of Road at Brgy. Concepcion IV-A 0.286 20 C 0.346 - 0.500 - - - 84.60 84.60%
V. Satisfactory
Orguer Trading & Construction 17111 Const. of Multi-Purpose Building @ Brgy. Poblacion IV-A 0.477 50 C 0.289 0.300 0.300 - - - 88.90 *88.90%
V.Satisfactory
Orguer Trading & Construction 17111 Repair of Hanging Bridge IV-A 0.190 30 C 0.083 - 0.500 - - - 58.30 *58.30% Poor
Orient Star Construction 7183 Const./Impvt. of Paclasan Seawall IV-B 1.881 70 C 0.320 0.200 0.300 - - - 82.00 *82.00% V.Satisfactory
Orient Star Construction 7183 Rehab. of CSR Bansud Section IV-B 4.710 90 C 0.301 0.300 0.300 - - - 90.10 *90.10% Outstanding
Orient Star Construction 7183 Repair/Maintenance of Cagancan River Control IV-B 1.887 60 C 0.336 0.200 0.300 - - - 83.60 *83.60%
V.Satisfactory
Oriental Sales Center & Contractor 3816
Conc. of Abra-Cervantes Road (km. 431+589 to Km. 432+185),
Lagangilang SectionCAR 4.730 40 C 0.293 0.186 0.300 - - - 77.90 51.14%
Poor
Oriental Sales Center & Contractor 3816 Const. of Bridge (Phase I) I 0.958 35 O 0.304 0.200 0.100 0.000 0.020 0.100 72.40 -
Oriental Sales Center & Contractor 3816 Const. of MPB at Sabangan E/S,
Bonuan-Guesset (Phase I) I 1.431 60 C 0.323 0.300 0.300 - - - 92.30 *92.30% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page364
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Oriental Sales Center & Contractor 3816
Repair/Maint. of National Roads (Package), Abra-Ilocos Sur Road
and Abra-Kalinga RoadCAR 9.521 21 C 0.228 0.190 0.300 - - - 71.80 *71.80%
Satisfactory
Orientech Construction & Development Corporation 8874
Const./Widening & Conc. of Dinagat-Loreto Road (Sta. Cruz-
Wilson Road)XIII 14.472 270 C 0.350 0.200 0.000 - - - 55.00 64.00%
Fair
Orzan Builders Enterprises 13382 Concreting of Ariman-Bulusan Lake Road V 2.750 90 C 0.321 - 0.500 - - - 82.10 89.66%
V. Satisfactory
Orzan Builders Enterprises 13382 Repair of Two CL Sch. Bldg. Pto. Diaz Central School V 0.288 90 C 0.298 0.220 0.300 - - - 81.80 *81.80%
V. Satisfactory
Oscan Builder 31158 Completion of MPB, Old Lukban E/S, Magsaysay Ave. CAR 0.953 44 C 0.368 0.200 0.300 - - - 86.80 *86.80%
V. Satisfactory
Oscan Builder 31158 Repair/Rehab. of Secondary Sch. Bldg. BCNHS-Main CAR 4.772 132 C 0.360 0.300 0.300 - - - 96.00 89.28%
V. Satisfactory
P. C. Panopio Construction and Trading 32824
Repair/Rehab. of Slope Protection of Flood Control along Camachile
River III 1.402 60 C 0.267 0.200 0.300 - - - 76.70 *76.70%
Satisfactory
P.B. Grey Construction 13383
Const. (Rehab., Replacement, Completion and Repair) of Two (2) Storey (6) Classroom Sch. Bldg. at
San Rafael E/S
IVA 6.934 150 C 0.398 0.200 0.300 - - - 89.80 *89.80% V. Satisfactory
P.B. Grey Construction 13383 Rehab. of Road @ Litex Village IVA 1.303 60 C 0.376 0.200 0.300 - - - 87.60 *87.60% V. Satisfactory
P.B. Grey Construction 13383 Rehab. of Road @ Sitio San Roque IVA 1.434 60 C 0.363 0.300 0.300 - - - 96.30 *96.30% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page365
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
P.B. Grey Construction 13383 Rehab./Impvt. of Angono Diversion Road IVA 9.602 180 C 0.461 0.133 0.300 - - - 89.40 82.98%
Satisfactory
P.B. Grey Construction 13383 Riprapping of Teresa River, Brgy. Dalig IVA 0.959 30 C 0.464 0.200 0.300 - - - 96.40 *96.40%
Outstanding
P.B. Obial Construction 16784 Const. of 1 unit, 4 Storey, 20 CL Bulacao H/S Bldg. VII 13.356 120 C 0.341 0.272 0.300 - - - 91.30 80.66%
V. Satisfactory
P.B. Obial Construction 16784 Const. of Multi-Purpose Building VII 0.289 30 C 0.355 0.300 0.300 - - - 95.50 94.31% Outstanding
P.B. Obial Construction 16784 Const. of Pedestrian Overpass VII 3.678 175 O 0.312 0.240 0.100 0.010 0.044 0.100 80.60 -
P.B. Obial Construction 16784 Const./Rehab. of Sch. Bldg. @ Mandaue City School for the Arts VII 1.446 80 C 0.377 0.100 0.300 - - - 77.70 *77.70%
Satisfactory
P.E.R.R.C. Construction & Development Corp. 23869 Const. of Sch. Bldg. At Hapay Na
Mangga IVA 6.222 178 C 0.384 0.200 0.300 - - - 88.40 *88.40% Satisfactory
P.J. Cruz Construction & Trading 14223 Const. of Additional Classroom (Sampaloc Site II E/S) NCR 1.420 60 C 0.343 - 0.500 - - - 84.30 78.70%
Satisfactory
P.J. Cruz Construction & Trading 14223Const. Partial of Two (2) Storey,
Four (4) Cl School Bldg. @ Unit 1, Baclaran E/S
NCR 2.861 90 C 0.335 0.300 0.300 - - - 93.50 78.70% Satisfactory
P.J. Cruz Construction & Trading 14223Repair/Rehab. of
Guardrails/Railings along Nat'l Roads anng Bridges
NCR 2.963 30 C 0.261 0.150 0.300 - - - 71.10 *71.10% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page366
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
P.J. Cruz Construction and Trading 14223 Completion of Multi-Purpose
Building, Phase 15, Brgy. Gulod NCR 1.632 90 C 0.406 0.200 0.300 - - - 90.60 *90.60% V.Satisfactory
P.J. San Pedro Const. Supply 14994Const. / Rehab. / Completion &
Repair of Secondary Sch. Bldg. @ Sta. Ana NHS
XI 1.323 120 C 0.376 0.300 0.300 - - - 97.60 *97.60% Outstanding
P.J. San Pedro Const. Supply 14994 Const. of MPB @ Km. 6, Brgy. Buhangin Proper XI 1.692 120 C 0.380 0.300 0.300 - - - 98.00 *98.00%
Outstanding
P.J. San Pedro Construction and Supply 14994 Completion of Multi Purpose
Gymnasium DOST 10.426 226 O 0.383 0.300 0.050 0.030 0.047 0.067 87.70 -
P.J. San Pedro Construction and Supply 14994 Completion of PSHS SMC Multi
Purpose Gymnasium DOST 10.692 298 C 0.369 0.300 0.300 - - - 96.90 96.90% Outstanding
P.J. San Pedro Construction and Supply 14994 Completion of PSHS SMC Multi
Purpose Gynasium DOST 10.692 298 C 0.369 0.300 0.300 - - - 96.90 96.90% Outstanding
P.J. San Pedro Construction and Supply 14994 Completion of School Bldg., 3-
Storey, 12 CL @ Bangoy NHS XI 9.633 225 C 0.383 0.300 0.300 - - - 98.30 91.86% Outstanding
P.J. San Pedro Construction and Supply 14994
Conc. of Road at Catalunan Pequeño (Project C) Mintal-Cawa-
cawa RoadXI 2.032 110 C 0.370 0.300 0.300 - - - 97.00 *97.00%
Outstanding
P.J. San Pedro Construction and Supply 14994
Const. of Water Works System, Brgy. Tamugan (Lower Patag),
Marilog DistrictXI 4.710 120 C 0.260 0.300 0.300 - - - 86.00 86.54%
V.Satisfactory
P.J. San Pedro Construction and Supply 14996 Construction of Multi-Purpose
Building, Brgy. Bato XI 2.265 180 O 0.334 0.300 0.150 0.030 0.038 0.033 88.50 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page367
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
P.J. San Pedro Construction and Supply 14994 Impvt. of Drainage along Agusan-
Davao Road XI 1.867 90 C 0.318 0.300 0.300 - - - 91.80 *91.80% Outstanding
P.L. Sebastian Construction 1076 Contract Package C, Malabang- Sultan Gumander Road KFAED 793.246 1,817 C 0.373 0.300 0.300 - - - 97.30 89.66%
V.Satisfactory
P.L. Sebastian Construction 1076 Baobo River Irrigation Project NIA 224.599 631 O 0.368 0.162 0.070 0.030 0.042 0.200 87.17 -
P.L. Sebastian Construction 1076 Const. of Bit-os Lat. Canal "D", Sta.0+920-6+032 (new station) NIA 72.059 818 O 0.345 0.151 - 0.030 0.070 0.200 81.15 -
P.L. Sebastian Construction 1076 Const. of Bit-os Main Canal & Regulating Pond NIA 247.675 2,169 C 0.299 0.300 0.300 - - - 85.47 88.47%
V. Satisfactory
P.L. Sebastian Construction 1076
Const. of Limpapa-Sibuco Road, Lintangan-Pasilnahut Sect., Phase
II along Zamboanga West Coast Road
IX 32.526 480 C 0.389 0.300 0.300 - - - 98.90 92.42% Outstanding
P.L. Sebastian Construction 1076 Const./Impv't. of Contract Package XI-A Liboton-Tupas Rd. XI 101.877 390 C 0.337 0.300 0.070 0.030 0.037 0.067 84.10 -
P.L. Sebastian Construction 1076
CP9: Impvt./Conc. of Surigao del Sur-Davao Oriental Coastal Road,
(Manay-Boston) Cateel-Boston Section)
XI 197.331 615 O 0.393 0.271 0.100 0.030 0.065 0.100 95.90 -
P.L. Sebastian Construction 1076
Impv't/Conc. of Kapalong-Talaingod-Valencia Bukidnon
Road, Brgy. Tiburcia to Brgy. Sto. Nino Sect.
XI 226.943 600 O 0.375 0.300 0.150 0.030 0.060 0.050 96.50 -
P.L. Sebastian Construction 1076Widening of Cotabato-Allah-General Santos National Rd.
Poblacion Shariff Aguak Sect.XII 6.170 78 C 0.436 - 0.500 - - - 93.60 82.98%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page368
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
P.S. Labasbas Construction 6302 Bunacan CIP NIA 2.125 150 C 0.447 0.120 0.300 - - - 86.68 *86.68% Satisfactory
P.S. Labasbas Construction 6302 Bunacan CIP NIA 0.840 150 C 0.441 0.120 0.300 - - - 86.05 *86.05% Satisfactory
P.T. Adhi Karya (Per Sero)/Vicente T. Lao Const. (J.V.) 7040
C.P. I-A: Replacement/Repair /Retrofitting of Thirteen Bridges
Iligan-Cagayan de Oro-Butuan Rd.X 190.137 693 O 0.365 0.286 0.100 0.030 0.061 0.100 94.20 -
P.T. Diamond Merchandise & Construction 15451
Completion/Continuation of Unfinished/On-going Bridge,
Sapilang along Manila North RoadI 3.542 300 C 0.329 0.200 0.300 - - - 82.90 *82.90%
Satisfactory
P.T. Diamond Merchandise & Construction 15451
Rehab./Slope Protection of Calaoaan, Tamurong FMR,
CalaoaanI 0.474 27 O 0.307 0.200 0.100 0.030 0.035 0.200 87.20 -
P.T. Diamond Merchandise & Construction 15451 Replacement of Sapilang Bridge
along MNR I 12.993 378 C 0.379 0.200 0.000 - - - 57.90 73.40% Satisfactory
P.V.B. Construction and Trading 13269 Conc. of FMR @ Brgy. Mining III 0.912 30 C 0.352 0.218 0.300 - - - 87.00 *87.00% Satisfactory
Pablo S. Labasbas Construction 6302 Concreting of Guiuan-Sulangan Road VIII 4.778 97 C 0.281 0.300 0.300 - - - 88.10 84.56%
V. Satisfactory
Pablo S. Labasbas Construction 6302 Const. of 1 Unit 2 CL Sch. Bldg., Guiuan National High School VIII 1.068 95 C 0.423 0.200 0.300 - - - 92.30 *92.30%
V. Satisfactory
Pablo S. Labasbas Construction 6302 Const. of 1 Unit 2 CL Sch. Bldg., Maypangdan National High School VIII 1.069 101 C 0.420 0.200 0.300 - - - 92.00 *92.00%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page369
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Pablo S. Labasbas Construction 6302 Const. of Gandara-Matuguinao Road VIII 24.121 240 O 0.351 0.240 0.150 0.030 0.047 0.033 85.10 -
Pablo S. Labasbas Construction 6302 Const. of Sta. Maria Bridge IVB 13.507 240 C 0.328 0.200 0.300 - - - 82.80 82.20% V. Satisfactory
Pablo S. Labasbas Construction 6302 Rehab./Impvt. Along Tablas Circumferential Road IVB 9.643 70 C 0.315 0.234 0.300 - - - 84.90 70.92%
Satisfactory
Pablo S. Labasbas Construction 6302 Rehabilitation of Cabacungan-Panoypoy Farm-to-Market Road VIII 0.954 90 C 0.355 0.300 0.300 - - - 95.50 *95.50%
Outstanding
Pacer Construction & Development Corporation 4839 Const. of Kabadiangan Bridge
(UK-Phase III) VIII 4.605 150 O 0.316 0.240 0.100 0.022 0.023 0.100 80.10 -
Pacer Construction & Development Corporation 4839 Conc. of Calubian Jct.-San Isidro-
Tabango Road VIII 4.737 150 C 0.301 0.201 0.300 - - - 80.20 *80.20% V. Satisfactory
Pacer Construction & Development Corporation 4839 Const. of Alawihaw Bridge &
Approaches VIII 6.407 180 C 0.394 0.200 0.300 - - - 89.40 85.20% V. Satisfactory
Pacer Construction & Development Corporation 4839 Const. of MPB, Brgy. 83-C, 60 &
107 VIII 0.678 90 C 0.364 0.100 0.300 - - - 76.40 80.11% V. Satisfactory
Pacer Construction & Development Corporation 4839 Rehab./Impvt. of Cabungaan-
Tabunok-Consuega Road VIII 7.115 180 C 0.350 0.200 0.300 - - - 85.00 80.86% V. Satisfactory
Pacific Construction 15800 Completion of the Rehab. of Pan-Phil. Hi-Way (Agas-Agas Sect.) VIII 14.092 375 C 0.388 0.300 0.300 - - - 98.80 85.61%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page370
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Pacific Star Erectors 14224 Completion of Conner Multi-Purpose Building CAR 0.962 255 C 0.322 - 0.500 - - - 82.20 86.05%
V. Satisfactory
Pacific Star Erectors 14224 Const. of Apayao Science H/S Phase IV CAR 1.591 90 C 0.314 0.300 0.300 - - - 91.40 86.89%
V. Satisfactory
Pacific Star Erectors 14224 Const. of Apayao State College CAR 1.854 210 C 0.395 0.200 0.300 - - - 89.50 89.50% V. Satisfactory
Pacific Star Erectors 14224 Const. of Apayao State College Multi-Purpose Bldg CAR 1.395 240 C 0.464 - 0.500 - - - 96.40 92.27%
Outstanding
Pacific Star Erectors 14224 Const. of DPWH Regional Office Bldg. (Phase IV) II 26.973 240 C 0.384 0.300 0.300 - - - 98.40 93.46%
Outstanding
Pacific Star Erectors 14224 Const. of Poblacion-Bulo-Waga FMR CAR 0.919 120 C 0.190 0.300 0.300 - - - 79.00 81.85%
V. Satisfactory
Pacific Star Erectors 14224 Const. of San Carlos Bridge & Approaches II 10.903 282 C 0.360 0.300 0.000 - - - 66.00 76.32%
Satisfactory
Pacific Star Erectors 14224 Const. of Tammang Bridge (Pier 2 and 3) CAR 9.254 120 C 0.343 0.300 0.000 - - - 64.30 75.07%
Satisfactory
Pacific Star Erectors 14224 Const./Road Impvt. of Calanasan-Ilocos Norte Road, Parina Section CAR 13.827 360 O 0.355 0.300 0.070 0.030 0.037 0.100 89.20 -
Pacific Star Erectors 14224 Construction of Apayao State College Multi-Purpose Building CAR 2.324 150 O 0.391 0.300 0.150 0.030 0.045 0.033 94.90 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page371
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Pacific Star Erectors 14224 Construction of Pudtol MPB (Gymnasium) Phase IV CAR 6.613 210 O 0.327 0.300 0.150 0.022 0.041 0.033 87.30 -
Pacific Star Erectors 14224Constrution/Improvement of
Calanasan - Ilocos Norte Road, Parina Section
CAR 13.826 620 C 0.436 0.200 0.300 - - - 93.60 90.96% V.Satisfactory
Pacific Star Erectors 14224 Maintenance/Rehab. & Impv't. of National Arterial Roads & Bridges II 2.825 150 O 0.311 0.257 0.070 0.015 0.016 0.067 73.60 -
Pacific Star Erectors 14224 Proposed Const. of Pudtol MPB (Gymnasium) CAR 1.427 90 C 0.215 0.300 0.300 - - - 81.50 *81.50%
V. Satisfactory
Pacific Star Erectors 14224 Replacement of Capagu Bridge along MNR II 12.913 180 C 0.381 0.200 0.300 - - - 88.10 83.78%
V. Satisfactory
Pader Construction and Supply 20213 Conc. of Dualing-Baliki-Silik Road (Dualing Section) XII 4.789 74 C 0.375 0.119 0.300 - - - 79.40 78.02%
Satisfactory
Pader Construction and Supply 20213 Conc. of Road @ Brgy. Ulamian XII 0.468 30 C 0.368 0.200 0.300 - - - 86.80 *86.80% V. Satisfactory
Pader Construction and Supply 20213 Const. of Water System @ Brgy. Upper Baguer XII 0.370 45 C 0.325 0.246 0.300 - - - 87.10 *87.10%
V. Satisfactory
Pader Construction and Supply 20213 Construction of 2 CL SB at Eliseo E/S XII 1.047 70 O 0.353 0.300 0.150 0.030 0.035 0.033 90.10 -
Pagadian Aggregates & Marketing 14886 Conc. of Brgy. Road, Opol X 1.445 60 C 0.389 0.200 0.300 - - - 88.90 *89.90%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page372
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Pagadian Aggregates & Marketing 14886 Conc. of Kimaya-Solana By-Pass
Road X 4.820 145 C 0.400 0.200 0.000 - - - 60.00 70.38% Poor
Pagadian Aggregates & Marketing 14886 Conc. of Nat'l Roads Lourmah-
Poblacion Section IX 1.858 60 C 0.342 0.200 0.300 - - - 84.20 82.22% V. Satisfactory
Pagadian Aggregates & Marketing 14886 Rehab. of Carmen-Patag-Bulua
Road X 9.410 143 C 0.395 0.133 0.300 - - - 82.80 83.58% Satisfactory
Palafox Construction 18424 Const. of FTMR @ Cacandungan I 0.480 32 C 0.286 - 0.500 - - - 78.60 78.60% Satisfactory
Palmares General Merchandise 24657 Completion of MPB at Brgy. Magsaysay XII 0.480 75 C 0.360 0.200 0.300 - - - 86.00 *86.00%
V. Satisfactory
Palmares General Merchandise 24657 Const. of Gymnasium Bldg. @ Brgy. Mayo XII 0.964 180 C 0.247 0.200 0.300 - - - 74.70 *74.70%
Satisfactory
Palmares General Merchandise 24657 Const. of MPB @ Brgy. Kenram (Health Center) XII 0.240 40 C 0.366 0.200 0.300 - - - 86.60 *86.60%
V. Satisfactory
Palmares General Merchandise 24657 Const. of Multi-Purpose Bldg. (Mini-Gym) Poblacion Uno XI 1.419 110 C 0.384 0.300 0.300 - - - 98.40 87.41%
V. Satisfactory
Palmares General Merchandise 24657 Const. of Multi-Purpose Building, Brgy. Ilian XII 0.962 110 C 0.401 0.200 0.300 - - - 90.10 *90.10%
V. Satisfactory
Palmares General Merchandise 24657 Const. of Sch. Bldg. @ Sultan Kudarat Polytechnic State College XII 0.921 120 C 0.396 0.200 0.300 - - - 89.60 *89.60%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page373
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Palmares General Merchandise 24657 Impvt. of Road from Koronadal City to Carpenter Hill XII 4.819 183 C 0.357 0.300 0.300 - - - 95.70 84.84%
V. Satisfactory
Palmares General Merchandise 24657 Widening/Conc. of Dulawan-Marbel Road (Kalandangan Sect.) XII 9.450 235 C 0.335 0.289 0.300 - - - 92.40 *92.40%
Outstanding
Panay East Coast Construction and Supply 26469 Reblocking of Pototan-Bangga
Polot-An Road VI 4.255 105 C 0.408 0.200 0.300 - - - 90.80 87.56% Satisfactory
Pangasinan New Wilson Lumber and Construction 8313 Conc. of Palapad-Torres Road,
Brgy. Palapad I 0.945 40 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satistfactory
Pangasinan New Wilson Lumber and Construction 8313 Const. of Multi-Purpose Bldg. for
Boy Scout I 0.944 60 C 0.298 - 0.500 - - - 79.80 *79.80% Satisfactory
Pangasinan New Wilson Lumber and Construction 8313 Const./Opening of Lipi Norte-Pao
Road (Phase II) I 1.919 40 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satistfactory
Paradox Construction 18557 Concreting of FTMR @ Palina East-Awed I 0.479 32 C 0.389 - 0.500 - - - 88.90 88.90%
V. Satisfactory
Paradox Construction 18557 Const. of Farm-to-Market Road Brgy. Cabaruan I 0.479 32 C 0.262 - 0.500 - - - 76.20 76.20%
Satisfactory
Paradox Construction 18557 Construction of Farm-to-Market Road I 0.477 45 C 0.272 0.300 0.300 - - - 87.20 *87.20%
V. Satisfactory
Paris Construction & Marketing 14306 Completion/Const. of Multi-Purpose Building XII 0.669 60 C 0.385 0.300 0.300 - - - 98.50 84.36%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page374
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Parojinog & Sons Construction Company 32765 Const. of MPB X 1.412 90 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
Parojinog & Sons Construction Company 32765 Const. of MPB X 2.384 60 C 0.250 0.200 0.300 - - - 75.00 *75.00%
Satisfactory
Parojinog & Sons Construction Company 32765 Rehab. of Guingona-Trigos Road X 2.328 116 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
Partido Construction and Supply 20631 Completion of Gubat-Tinawagan-Libod Road V 9.361 120 C 0.455 0.133 0.300 - - - 88.80 84.18%
Satisfactory
Partido Construction and Supply 20631 Conc. of Bagong Silang-Capalonga Road, Dolores Section V 11.978 195 C 0.356 0.290 0.300 - - - 94.60 89.80%
V. Satisfactory
Partido Construction and Supply 20631 Conc.of Goa-Tinambac Road, Payatan-Tupi-Tierra Nevaion V 4.704 165 O 0.388 0.240 0.150 0.030 0.056 0.050 91.40 -
Partido Construction and Supply 20631 Concreting of Brgy. Road Mabca V 0.183 120 C 0.401 - 0.500 - - - 90.10 90.10% Outstanding
Partido Construction and Supply 20631 Const. of 1 Cl School Buildings @ San Miguel V 0.337 60 C 0.373 0.200 0.300 - - - 87.30 93.67%
Outstanding
Partido Construction and Supply 20631 Const. of 1 Cl RM Sch. Bldg. @ Ipil E/S V 0.380 60 C 0.315 0.168 0.300 - - - 78.30 *78.30%
Satisfactory
Partido Construction and Supply 20631 Const. of 1 CL Sch. Bldg at Sibaguan Agro Industrial NHS V 0.518 90 C 0.372 0.203 0.300 - - - 87.50 *87.50%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page375
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Partido Construction and Supply 20631 Const. of Drainage along Baao-Iriga-Nabua Road V 4.681 120 C 0.362 0.200 0.300 - - - 86.20 78.88%
Satisfactory
Partido Construction and Supply 20631 Const. of Flood Control San Roque V 0.453 90 C 0.233 - 0.500 - - - 73.30 73.30%
Satisfactory
Partido Construction and Supply 20631 Const. of Igbac-San Pedro Road V 6.924 120 C 0.202 0.200 0.300 - - - 70.20 71.88% Satisfactory
Partido Construction and Supply 20631 Const. of Multi-Purpose Bldg. Goa Central School V 1.088 120 F 0.434 - 0.500 - - - 93.40 94.38%
Outstanding
Partido Construction and Supply 20631
Const. of Various School Buildings @ 3rd District Congressional District of
Camarines Sur
V 0.337 60 O 0.393 0.300 0.100 0.030 0.041 0.100 96.40 -
Partido Construction and Supply 20631 Construction of Multi-Purpose Building Phase II V 0.935 60 C 0.484 0.133 0.300 - - - 91.70 *91.70%
V. Satisfactory
Partido Construction and Supply 20631Impv't./Conc. of Binalay-Tamban
Road, Olag-Pequeño-Sitio-Malibtong-Antipolo Section
V 9.553 90 C 0.223 0.200 0.300 - - - 72.30 79.83% Satisfactory
Partido Construction and Supply 20631 Re-decking of 2nd Span & Repair of Bridge approaches Agos Bridge V 1.418 120 C 0.299 0.137 0.300 - - - 73.60 85.72%
V. Satisfactory
Partido Construction and Supply 20631Repair/Rehab. of Scoured Embankment along Daang
MaharlikaV 9.350 180 C 0.499 0.133 0.300 - - - 93.20 *93.20%
V. Satisfactory
Partido Construction and Supply/Jeff Const. (JV) JV-05-051 Const. of Gipangpang Bridge &
Approaches (Phase I) V 14.550 240 O 0.361 0.240 0.100 0.015 0.040 0.100 85.60 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page376
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Pastrana Construction 17340 Const./Rehab. of Havana-Bugnay Road VI 1.910 90 C 0.312 0.269 0.300 - - - 88.10 84.86%
V. Satisfactory
Patricia Builders 28745 Concreting of Farm-to-Market Road IV-A 0.467 65 C 0.325 - 0.500 - - - 82.50 *82.50%
V. Satisfactory
Patricia Builders 28745 Const. of Road, Brgy. San Francisco-Calihan IV-A 4.824 40 C 0.269 0.300 0.300 - - - 86.90 *86.90%
V. Satisfactory
Patricia Builders 28745
Implementation of Priority Projects in the 3rd District of
Laguna (Brgy. Sta. Veronica-San Bartolome to San Benito
IV-A 4.824 60 C 0.343 0.262 0.300 - - - 90.50 *90.50% Outstanding
Patricia Builders 28745 Impvt. of Brgy. San Jose FMR IV-A 0.467 25 C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory
Patrick Construction 27780 Rehab./Conc. of Casili Brgy. Road II 0.943 120 C 0.284 0.200 0.300 - - - 78.40 *78.40% Satisfactory
Patrila Builders Inc, 26628 Const. of Cuartero Bridge Phase III VI 9.960 240 C 0.340 0.300 0.000 - - - 64.00 81.46%
V. Satisfactory
Patrila Builders, Inc. 26628 Upgrading/Conc. of Ajuy-Concepcion Road VI 8.394 180 O 0.362 0.300 0.150 0.030 0.055 0.050 94.70 -
Paula Mae Buhong Construction 26128 Conc. of Jct. Alfonso Lista-Mt. Province Bdry. Road CAR 8.297 175 C 0.349 0.287 0.300 - - - 93.60 65.22%
Fair
Paula Mae Buhong Construction 26128 Const. of Municipal Health Center CAR 1.911 170 C 0.295 0.111 0.300 - - - 70.60 80.72% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page377
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Paula Mae Buhong Construction 26128 Impvt/ along Banawe-Mayoyao-Aguinaldo-Isabela Bdry. Road CAR 1.435 120 C 0.384 0.300 0.300 - - - 98.40 93.90%
Outstanding
Paula Mae Buhong Construction/PBO Construction
(JV)JV-07-152 Widening/Conc. of Banaue-Bontoc
Road (Halsema Highway) CAR 48.192 300 C 0.444 0.200 0.300 - - - 94.40 84.68% Satisfactory
Payunan Builders 16824
Impv't. of Sarangani-Davao del Sur Coastal Road (Jct. Alabel-Glan
Boundary) Sarangani-Davao del Sur
XII 13.433 235 C 0.307 0.289 0.000 - - - 59.60 65.14% Fair
PBO Construction 18403 Const. of Bulanao Flood Control CAR 9.500 180 C 0.330 0.200 0.300 - - - 83.00 88.64% V. Satisfactory
PBO Construction 18403 Const. of Lawig-Pieza Bridge CAR 9.027 230 C 0.317 0.300 0.300 - - - 91.70 85.36% V. Satisfactory
PBO Construction 18403Const. of Sta. Maria-Paracelis
Road, Phase II (Pinto-Caragasan Paraceln Section)
CAR 13.344 240 C 0.329 0.263 0.300 - - - 89.20 *89.20% V. Satisfactory
PBO Construction 18403 Const. of Tammang Bridge (Partial Completion) CAR 19.315 270 C 0.373 0.300 0.300 - - - 97.30 92.30%
Outstanding
PBO Construction 18403 Contruction of Habbang Bridge, Km. 362+303-Km. 302+460 CAR 20.145 414 C 0.389 0.300 0.300 - - - 98.90 *98.90%
Outstanding
PBO Construction 18403Impvt./Rehab. of Bontoc-LubuaganTabuk Rd., Mananggol, Lubuagan-
Wales Brook, TinglayanCAR 14.190 270 C 0.235 0.300 0.000 - - - 53.50 69.85%
Fair
PBO Construction 18403
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase IV, Km. 461+000-Km. 467+000, Lubuagan-Cagaluan Section
CAR 47.185 300 O 0.305 0.240 0.100 0.030 0.040 0.100 81.50 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page378
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
PBO Construction 18403
Impvt./Widening/Conc. of Bontoc-Tabuk-Tuguegarao Road, Phase IV, Km. 461+000-Km. 467+000, Lubuagan-Cagaluan Section
CAR 47.185 300 O 0.255 0.285 0.150 0.030 0.041 0.050 81.10 -
PBO Construction 18403 Rehab. of Balawag - Malin-awa FMR CAR 19.315 270 O 0.360 0.190 0.100 0.023 0.054 0.100 82.70 -
PBO Construction 18403
Repair/Rehab. of Romualdez-Santor-Calaocan-San Pascual Section, Babalag-Kinama-San
Francisco Section
CAR 9.537 181 C 0.406 0.133 0.300 - - - 83.90 78.02% Unsatisfactory
PBO Construction 18403Widening/Concreting of Mayoyao-
Aguinaldo Road, Km. 399+000 - Km. 419+000 (w/ exception)
CAR 68.468 420 O 0.296 0.136 0.150 0.022 0.032 0.017 65.30 -
PC Builders and Supply 19191 Impvt./ Repair of Shore Protection along side NHA-Seabreeze Homes V 2.871 90 C 0.388 - 0.500 - - - 88.80 88.80%
V. Satisfactory
Pentagon Industrial Development & Const. Co., Inc 12796 Improvement/Widening of Manila
North Road (MNR) Package II III 87.050 180 O 0.393 0.300 0.100 0.030 0.043 0.100 96.60 -
Pentagon Industrial Development & Construction Company,
Incorporated12796
Improvement (Widening/Concreting) McArthur
High(MNR) Meycauayan to Mabalacat Pampanga, Malolos-
Calumpit Section Phase IV, Package III
III 53.990 180 O 0.347 0.279 0.150 0.030 0.035 0.050 89.10 -
Pentagon Industrial Development & Construction Company,
Incorporated12796 Riprapping of Sapangbalen Creek III 0.941 30 C 0.167 0.300 0.300 - - - 76.70 60.86%
Fair
Performance Builders & Dev't. Corp. 5303 Const. of Calatrava Seawall IV-B 0.462 42 C 0.440 0.500 94.00 94.00%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page379
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Performance Builders & Dev't. Corp. 5303 Const. of Tan-Agan Bridge II IV-B 21.239 270 C 0.319 0.200 0.300 - - - 81.90 80.13%
V.Satisfactory
Performance Builders & Dev't. Corp. 5303 Desilting of Dubduban River IV-B 0.281 45 O 0.267 0.200 0.033 0.067 0.250 81.70 -
Persan Const. Inc. (Formerly: Persan Construction) 2852 Replacement of Loboc Bailey
Bridge VII 11.564 120 O 0.210 0.240 0.100 0.015 0.010 0.100 67.50 -
Persan Construction, Inc. 2852Asphalt Overlay of Putiao-Pilar-Donsol Road (Putiao-Bayasong
Section)V 40.123 216 C 0.397 210.000 0.300 - - - 90.70 93.94%
Outstanding
Persan Construction, Inc. 2852 CVR-Junction-San Miguel-DRT-Angat-Gen.Alejo Santos Highway III 47.605 210 C 0.439 0.200 0.300 - - - 93.90 *93.90%
V.Satisfactory
Persan Construction, Inc. 2852Improvement/asphalting of
Panglao Island Circumferential Road
VII 38.360 210 C 0.330 0.287 0.000 - - - 61.70 70.70% Satisfactory
Persan Construction, Inc. 2852Improvement/Const. of Bridge
along Panabo Coastal Road (Arieta Section)
XI 28.764 392 C 0.436 - 0.500 - - - 93.60 91.56% Outstanding
Persan Construction, Inc. 2852Impvt. & Rehab. of Daang
Maharlika Road, San Rafael-San Ildefonso Section
III 95.473 120 C 0.446 0.200 0.300 - - - 94.60 93.34% V.Satisfactory
Persan Construction, Inc. 2852Impvt. (Conc. Paving) along
Carmen-Sagbayan-Bacane Nat'l Road
VII 14.256 225 C 0.343 0.170 0.000 - - - 51.30 57.93% Poor
Persan Construction, Inc. 2852Impvt. (Conc. Paving) of Jct. Dat-
an Carmen-Sagbayan-Sierra Bullones, Pilar-Alicia Road
VII 30.557 210 C 0.341 0.200 0.300 - - - 84.10 82.42% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page380
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Persan Construction, Inc. 2852Impvt. And Rehab. of Daang
Maharlika Road, San Rafael-San Ildefonso Section
III 95.473 120 O 0.370 0.300 0.100 0.018 0.037 0.100 92.50 -
Persan Construction, Inc. 2852 Impvt. of Panabo Coastal Road, Arieta-Puyod Section XI 28.257 289 C 0.380 0.300 0.300 - - - 98.00 91.82%
Outstanding
Persan Construction, Inc. 2852 Impv't/Conc. of Kapalong-Talaingod Road XI 53.764 625 C 0.468 0.200 0.300 - - - 96.80 91.67%
V. Satisfactory
Persan Construction, Inc. 2852 Rehab. of Daang Maharlika Road, San Rafael-San Ildefonso III 16.496 70 C 0.310 0.300 0.300 - - - 91.00 *91.00%
Outstanding
Persan Construction, Inc. 2852 Rehab. of FMR, Brgy. Pintong Bukawe IV-A 18.711 150 O 0.375 0.276 0.150 0.030 0.033 0.050 91.40 -
Persan Construction, Inc. 2852Rehab. Old Daang Maharlika Road (Cagayan Valley Road), San Rafael
to San IldefonsoIII 28.640 100 O 0.395 0.225 0.100 0.030 0.035 0.100 88.50 -
Persan Construction, Inc. 2852 Repair/Rehab. of Cavite-Batangas Road, Sampaloc Section IV-A 9.904 15 C 0.211 0.300 0.300 - - - 81.10 *81.10%
V. Satisfactory
Persan Construction, Inc. 2852 Upgrading/Conc. With Drainage Impvt. P. Aquino St. NCR 11.515 135 C 0.356 0.200 0.300 - - - 85.60 80.26%
V. Satisfactory
Persan Construction, Inc. / Ulticon Builders, Inc. (JV) JV-07-108
Impv't/Conc. of Kapalong-Talaingod Bdry. Valencia
Bukidnon Road, Sitio Napisulan to Highway Bdry.
XI 738.154 780 O 0.399 0.300 0.150 0.022 0.055 0.050 97.60 -
Persan Construction/ A.L. Salazar Const., Inc. (JV) 2852/3899 Asphalt Overlay of Daang
Maharlika (MSR) V 41.038 341 C 0.450 - 0.500 - - - 95.00 93.62% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page381
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Peter Construction and Aggregate Supply 17343 Const. of MPB (Covered Court) @
Estaka E/S IX 2.036 135 C 0.330 0.173 0.300 - - - 80.30 *80.30% V. Satisfactory
Peter Construction and Aggregate Supply 17343 Const./Extension of River Control
Structure IX 2.762 90 C 0.285 0.217 0.300 - - - 80.20 81.64% V. Satisfactory
Peter Construction and Aggregate Supply 17343
Road Improvement/Const. of Drainage Canal Jct. Polo-Dapitan
Park Nat'l. Rd.X 1.847 105 C 0.490 - 0.500 - - - 99.00 93.87%
Outstanding
Peter G. Chua Builders 25367 Completion of Multi-Purpose Building at Brgy. West Rembo NCR 0.480 40 C 0.366 - 0.500 - - - 86.60 86.60%
V. Satisfactory
Peter G. Chua Builders 25367 Conc. of Gil Puyat Ave. NCR 4.768 40 C 0.377 0.300 0.300 - - - 97.70 *97.70% Outstanding
Peter G. Chua Builders 25367 Const. of Bridge at Pamplona 3 NCR 4.609 75 C 0.319 0.200 0.300 - - - 81.90 79.08% Satisfactory
Peter G. Chua Builders 25367 Const. of MPB, Phase II @ Pulanglupa I NCR 1.048 60 C 0.373 0.200 0.300 - - - 87.30 84.36%
V. Satisfactory
Peter G. Chua Builders 25367 Const./Completion of San Agustin Elem. Sch. NCR 0.761 60 C 0.378 0.300 0.300 - - - 97.80 95.42%
Outstanding
Peter G. Chua Builders 25367 Improvement/Concreting of Merville-Moonwalk Access Road NCR 0.961 60 C 0.278 0.200 0.300 77.80 77.02%
Satisfactory
Petrina Grocers Marketing 29695 Const. of 2-Cl School Building @ Cugman ES X 0.839 75 O 0.377 0.300 0.100 0.020 0.006 0.100 90.30 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page382
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Petrina Grocers Marketing 29695 Const. of MPB (Phase II) @ Brgy. Poblacion X 0.565 75 O 0.361 0.300 0.100 0.015 0.013 0.100 88.90 -
Petrina Grocers Marketing 29695 Const. of MPB at Lumbia NHS X 1.394 75 C 0.357 0.200 0.300 - - - 85.70 83.53% V. Satisfactory
Petrina Grocers Marketing 29695 Const. of Multi-Purpose Barangay Hall Capinonan X 0.925 75 C 0.355 - 0.500 - - - 85.50 73.04%
Satisfactory
Petrina Grocers Marketing 29695 Const. of Multi-Purpose Building (Phase I) X 0.942 105 C 0.376 0.212 0.300 - - - 88.80 86.42%
V. Satisfactory
Pett Builders 26825 Completion of Multi-Purpose Building @ JEM Subdivision NCR 1.428 60 C 0.369 0.300 0.300 - - - 96.90 *96.90%
Outstanding
PGO Construction 15153Rehab./Reblocking of Deteriorated
Conc. Pavement along Bacolod North Road
VI 9.231 220 O 0.343 0.225 0.100 0.022 0.048 0.067 80.50 -
PGO Construction 15153Rehab./Reblocking of Deteriorated
Conc. Pavement along Bacolod North Road
VI 9.231 220 O 0.331 0.300 0.150 0.030 0.060 0.033 90.40 -
Phil Manna Construction & Supply 10320 Const. of 1 CL Sch. Bldg. @
Taculod E/S Annex V 0.459 90 C 0.319 0.300 0.300 - - - 91.90 *91.90% Outstanding
Phil Manna Construction & Supply 10320 Const. of Multi-Purpose Building
at Sitio Maligay V 0.927 120 C 0.421 - 0.500 - - - 92.10 *92.10% Outstanding
Phil Manna Construction & Supply 10320 Const. of Multi-Purpose Building
at Sta. Cruz-Sta. Isabel V 0.851 60 C 0.389 0.200 0.300 - - - 88.90 *88.90% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page383
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Philippine Chemsteel Industries Inc. 16965 Const. of Water System XI 3.271 80 C 0.330 0.200 0.300 - - - 83.00 *83.00%
V. Satisfactory
Philippine Chemsteel Industries Inc. 16965
Repair/Rehab. Along National Roads @ CDO-Lumbia Airport-
Uguiban Rd.X 4.709 150 C 0.320 0.300 0.300 - - - 92.00 *92.00%
Outstanding
Philippines Chemsteel Industries Inc. 16965
Const. of Round Abouts Traffic Signal Lights & Road Signs and
Pavement MarkingsV 4.625 30 C 0.395 0.262 0.300 - - - 95.70 *95.70%
Outstanding
Philippines Chemsteel Industries, Inc. 16965 Const. of Multi-Purpose Pavement
@ Ringgit St. Kabute IVA 0.308 150 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
Philippines Chemsteel Industries, Inc. 16965 Rehab./Impvt. of Andalucia St. NCR 0.933 30 C 0.314 0.300 0.300 - - - 91.40 *91.40%
Outstanding
Philippines Chemsteel Industries, Inc. 16965
Repair/Rehab./Impvt. of Nat'l Roads along Calbiga Road-Jct.
Dolongan-Basey RoadVIII 9.625 70 C 0.197 0.300 0.300 - - - 79.70 *79.70%
Satisfactory
Philippines Chemsteel Industries, Inc. 16965 Roads on Various Brgys. IVA 3.927 150 C 0.492 0.133 0.300 - - - 92.50 *92.50%
V. Satisfactory
Philworks Construction & Supply (Formerly: Philworks Const.) 32103 Const. of Arimbay Bridge, Detour
& Approaches V 18.504 180 O 0.386 0.300 0.100 0.023 0.060 0.100 96.90 -
Philworks Construction & Supply (Formerly: Philworks Const.) 10181 Const. of Basud Bridge &
Approaches, Phase II-B V 55.604 590 C 0.405 - 0.500 - - - 90.50 88.94% V. Satisfactory
Philworks Construction & Supply (Formerly: Philworks Const.) 10181 Const. of Panagan Bridge and
Approaches (Phase II) V 12.497 240 O 0.316 0.259 0.100 0.020 0.028 0.100 82.30 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page384
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Philworks Construction & Supply (Formerly: Philworks Const.) 10181
Slope Protection of Various Slipped Sect. along Tigaon Mayon-
Rd, SibaguanV 4.506 150 C 0.333 - 0.500 - - - 83.30 90.26%
Outstanding
Philworks Construction and Supply 10181 Const. of Arimbay Bridge, Detour
& Approaches V 18.785 240 C 0.386 0.100 0.300 - - - 78.60 86.82% V. Satisfactory
Philworks Construction and Supply 32103 Const. of Cabotonan Bridge and
Approaches (Phase 1) V 17.749 344 C 0.384 0.232 0.300 - - - 91.60 82.87% V. Satisfactory
Philworks Construction and Supply 32103 Const. of Mabolo Flood Control V 9.460 120 C 0.317 0.300 0.300 - - - 91.70 *91.70%
Outstanding
Philworks Construction and Supply 32103 Const. of Tula-tula Bridge &
Detour V 8.523 467 C 0.327 0.225 0.300 - - - 85.20 *85.20% V. Satisfactory
Philworks Construction and Supply 32103 Impv't./Rehab./Reblocking of
Andaya Highway V 23.880 180 C 0.299 0.300 0.300 - - - 89.90 85.04% V. Satisfactory
Philworks Construction and Supply 32103
Reconst./Replacement of Damaged Bridge, Traversia
Bridge 1V 23.269 240 C 0.355 0.200 0.300 - - - 85.50 84.87%
V. Satisfactory
Philworks Construction and Supply 32103 Road Opening/Upgrading of Uson-
Tampuhan-Mambayawas-Awayan V 9.458 120 O 0.328 0.300 0.100 0.030 0.033 0.100 89.10 -
Phranaret Construction 16878 Ban-May-Agui-A. Lista Isabela Brgy. Road CAR 3.195 168 O 0.320 0.291 0.000 0.015 0.037 0.100 76.30 -
Phranaret Construction 16878Impvt. Along Banawe-Mayoyao-Aguinaldo-Alfonso-Lista-Isabela
Bdry. Road, Kinakin SectionCAR 3.195 168 O 0.339 0.300 0.000 0.000 0.019 0.050 70.80 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page385
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Phranaret Construction 16878Repair/Rehab. of Lamut River
Control, (Upstream of Lamut Bay) Pob. West
CAR 0.925 80 C 0.313 0.300 0.300 - - - 91.30 74.26% Satisfactory
Phranaret Construction 16878Widening/Conc. of Banaue-
Hungduan-Tinoc-Benguet Bdry. Road, Bokiawan Section
CAR 1.906 72 C 0.321 0.213 0.300 - - - 83.40 90.84% Outstanding
PIBS Trading & Construction 14734 Const. of Multi-Purpose Bldg. Isabela West E/S IX 0.459 72 C 0.397 - 0.500 - - - 89.70 89.70%
V. Satisfactory
PIBS Trading & Construction 14734 Rehab. of DPWH - Lanao del Norte DEO Bldg. & Emloyees' Quarteer X 2.814 181 C 0.437 0.133 0.300 - - - 87.00 84.62%
Satisfactory
Pietras Builders Inc. 26738Slope Protection & Reblocking of Sabulawan-Calaguise-Colubian
Road SectionVIII 2.340 70 C 0.399 0.200 0.300 - - - 89.90 *89.90%
V.Satisfactory
Pins Construction 13630 Rehab. of Drainage System San Pedro District IX 0.929 120 C 0.375 - 0.500 - - - 87.50 88.94%
V. Satisfactory
Pins Construction 13630 Repair of Farm to Market Road, Poblacion-Tambo X 0.192 30 C 0.288 0.254 0.300 - - - 84.20 *84.20%
V. Satisfactory
Pirra Construction Enterprises 10545 Const. of ACA Bldg. I & Dormitory Bldg. DOST 24.290 180 O 0.356 0.271 0.150 0.030 0.044 0.050 90.10 -
PJ Construction & Supply 32305 Const. of MPB Btgy. Panacan 2 IVB 0.474 60 C 0.349 0.300 0.300 - - - 94.90 *94.90% Outstanding
PJ San Pedro Const. And Supply 14994 Completion of Multi-Purpose Gymnasium DOST 10.426 226 O 0.383 0.300 0.050 0.030 0.047 0.067 87.70 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page386
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
PJ San Pedro Const. Supply 14994 Const. of Roads Brgy. 18-B XI 0.414 50 C 0.397 - 0.500 - - - 89.70 89.70% V. Satisfactory
PJ San Pedro Const. Supply 14994 Rehabilitation of Road @ Purok 5-Panalum Proper XI 0.365 90 O 0.373 0.000 0.100 0.030 0.033 0.100 63.60 -
PLD Construction 1859Asphalting of Brgy. Road 1: Dungoan, 2 San Isidro and 3
TacdogVII 1.646 30 C 0.437 - 0.500 - - - 93.70 93.70%
Outstanding
PLD Construction 1859
Const. of Main Building, Cebu State College of Science & Tecnology (CSCST) Bitoon
Campus
VII 19.084 160 O 0.366 0.300 0.150 0.030 0.057 0.050 95.30 -
PLD Construction 1859 Const. of Multi-Purpose Bldg. (Phase III) VII 1.929 97 C 0.494 - 0.500 - - - 99.40 99.40%
Outstanding
PLD Construction 1859 Const. of Pedestrian Overpass VII 2.986 90 C 0.374 0.281 0.300 - - - 95.50 91.36% Outstanding
PLD Construction 1859Opening/Conc. of Cebu-Toledo
Wharf Road, Linao-Talisay-Minglanilla
VII 18.693 160 O 0.281 0.217 0.100 0.023 0.022 0.100 74.30 -
PLD Construction 1859 Rehab. of Processional Rd. Including Const. of Bridge VII 1.274 75 O 0.325 0.300 0.100 0.030 0.040 0.100 89.50 -
PMC Construction Corporation 1630Const. of Covered Basketball
Court & Renovation of Viewdeck at BLC
NHA 5.657 120 C 0.371 0.300 0.300 - - - 97.10 98.57% Outstanding
Polangui Construction 8660Repair/Rehab. of Unpaved
Shoulder with Reblocking San Jose
V 0.360 45 C 0.368 - 0.500 - - - 86.80 86.80% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page387
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Polangui Construction 8660 Road Const./Rehab. @ Bongoran V 0.377 40 C 0.360 0.200 0.300 - - - 86.00 *86.00% V.Satisfactory
Polymer-vic Construction 6157 Const. of 2 CL School Bldg. @ Luakan NHS III 0.865 60 C 0.293 0.090 0.300 - - - 68.30 86.43%
V.Satisfactory
Polymer-vic Construction 6157 Const. of Concrete Revetment @ Brgy. Pagalanggang III 0.855 60 C 0.200 0.300 0.300 - - - 80.00 *80.00%
Satisfactory
Polymer-vic Construction 6157Rehab./Impvt./Asphalt Overlay of Gapan-San Fernando-Olongapo
Road (Phase I)III 4.794 30 C 0.440 0.200 0.300 - - - 94.00 92.14%
V.Satisfactory
Polymer-vic Construction 6157Rehab./Impvt./Asphalt Overlay of Gapan-San Fernando-Olongapo
Road (Phase II)III 4.794 30 C 0.366 0.200 0.300 - - - 86.60 91.16%
V.Satisfactory
Polymer-vic Construction 6157 Repair and Rehab. Along Roman Expressway (Phase I) III 9.950 60 C 0.346 0.300 0.300 - - - 94.60 *94.60%
Outstanding
Postema Construction & Development 15283
Conc. of Brgy Road going to Bulihan Cemetery, Brgy. Old
BulihanIV-A 1.901 60 C 0.337 0.200 0.300 - - - 83.70 *83.70%
V. Satisfactory
Postema Construction & Development 15283 Conc. of FMR @ Sitio Payad, Brgy.
Pulong Bunga IV-A 0.390 45 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory
Postema Construction & Development 15283 Concreting of Sitio Ilang-Ilang
Brgy. Batas FMR IV-A 0.952 120 C 0.306 - 0.500 - - - 80.60 83.42% V. Satisfactory
Postema Construction & Development 15283 Const. of Brgy. Hall at Medina IV-A 0.665 60 C 0.432 - 0.500 - - - 93.20 93.20%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page388
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Postema Construction & Development 15283 Const. of Multi-Purpose Building IV-A 2.121 90 C 0.399 0.300 0.300 - - - 99.90 *99.90%
Outstanding
Postema Construction & Development 15283 Const. of Pooc Bridge IV-A 5.703 180 O 0.400 0.188 0.100 0.030 0.038 0.100 85.60 -
Postema Construction & Development 15283
Repair of Flood Control & Drainage System @ Timala River
Brgy. Cabuco (Baquero Br.)IV-A 0.630 27 O 0.306 0.200 0.300 - - - *80.60 -
Postema Construction & Development 15283 Widening of Tejero Bridge Phase
IV IV-A 8.664 130 C 0.320 0.300 0.300 - - - 92.00 87.56% V. Satisfactory
Power Move Builders & Construction Supply 22894 MBC CY 2004 Dumaguete Airport
Road & DSR, DPR, DNR, BKR VII 2.710 144 C 0.443 - 0.000 - - - 44.30 58.10% Poor
PRC Construction 16631 Addalam River Irrigation Project NIA 2.607 209 C 0.300 0.240 0.300 84.000 *84.00% V. Satisfactory
PRC Construction 16631 Const. of 1-CL Acad Bldg., at Sanchez Mira C/S II 0.359 45 C 0.319 - 0.500 - - - 81.90 81.90%
V. Satisfactory
PRC Construction 16631 Construction of Canal and Canal Structures (LMC-ARIP-02-06) NIA-II 4.804 210 C 0.389 0.200 0.000 0.015 0.028 0.200 83.19 83.19%
V.Satisfactory
PRC Construction 16631 Construction of Canal and Canal Structures (LMC-ARIP-05-06) NIA-II 3.008 180 C 0.400 0.300 0.000 - - - 70.00 70.00%
Fair
PRC Construction 16631 Lapogan Communal Pump Irrigation Project NIA-II 5.541 407 C 0.261 0.240 0.300 - - - 80.10 80.80%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page389
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Precious Construction 32995Improvement of Farm-to-Market Road, Quinfermin-Bugbuga-San
Jose RoadI 9.630 133 O 0.315 0.300 0.150 0.020 0.025 0.050 86.00 -
Presli Deles Construction 22694Const. One (1) unit CL modified
std. Sch. Bldg., Brgy. Upper Laperian
IX 0.487 45 C 0.371 0.193 0.300 - - - 86.40 *86.40% V. Satisfactory
Prime Edge Construction & Concrete Products 7902 Concreting of Road at Camp 7
Brgy. CAR 0.961 60 C 0.349 0.200 0.300 - - - 84.90 *84.90% V. Satisfactory
Prime Edge Construction & Concrete Products 7902 Concreting of Road, Salud Mitra
Brgy. CAR 0.573 45 C 0.442 - 0.500 - - - 94.20 94.20% Outstanding
Prime Edge Construction & Concrete Products 7902
Const. of Road at Sto. Tomas Brgy. Sto. Tomas Proper leading
to Adiwang E/SCAR 1.233 60 C 0.389 0.300 0.300 - - - 98.90 92.66%
Outstanding
Prime Edge Construction & Concrete Products 7902
Const./ Rehab. of Health Facilities, Campo Filipino Health Center Campo Pilipino Health District
CAR 1.924 60 C 0.376 0.178 0.300 - - - 85.40 85.89% V. Satisfactory
Primitivo P. Eslabon Construction and Hardware 21904 Const. of Sta. Marcela Hall &
Pudtol Mun. Hall CAR 1.405 60 C 0.444 - 0.500 - - - 94.40 76.67% Satisfactory
Prodel Construction and Development Corporation 10839 Const. of School Bldg. @
Malabobo E/S I 0.864 45 C 0.352 0.200 0.300 - - - 85.20 *85.20% V. Satisfactory
Progressive Design & Construction 11826 Conc. of Camestizoan FMR I 0.190 12 C 0.328 0.300 0.300 - - - 92.80 *92.80%
Outstanding
Progressive Design & Construction 11826
Const. of FMR, Poblacion East Leading to Brgy. Sagneb, Arnap &
BelenI 0.474 60 C 0.200 - 0.500 - - - 70.00 70.00%
Fair
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page390
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Progressive Design & Construction 11826 Const. of Multi-Purpose Building
@ University of Northern Phils. I 0.569 70 O 0.393 0.204 0.100 0.020 0.018 0.100 83.50 -
Progressive Design and Construction 11826 Cocreting of Farm-to-Market Road,
Brgy. Parada-Brgy. Paras I 0.951 27 C 0.408 0.133 0.300 - - - 84.10 *84.10%Satisfactory
Progressive Resign & Construction 11826 Construction of Academic
Bldg I. DOST 4.295 148 O 0.353 0.241 0.07 0.015 0.028 0.1 80.70 -
P-Square Contracting Services 17963 Const. of Brgy. Roads at Munting Tubig IVA 0.193 90 C 0.364 0.200 0.300 - - - 86.40 79.80%
Satisfactory
P-Square Contracting Services 17963 Const. of Brgy. Roads at Pangao IVA 0.193 90 C 0.376 0.200 0.300 - - - 87.60 85.32% V. Satisfactory
Pulsar Construction 24422 Addalam River Irrigation Project NIA 7.952 227 O 0.330 0.259 0.150 0.023 0.038 0.033 83.30 -
Pulsar Construction 24422 Completion of Abbag Bridge & Approaches II 24.514 330 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V.Satisfactory
Pulsar Construction 24422 Conc. of Nabannaga West New Orlins-Cabatacan East Rd. II 11.984 300 C 0.386 - 0.500 - - - 88.60 83.20%
V. Satisfactory
Pulsar Construction 24422 Conc. Paving of Jct. Logac-Lasam-Gagabutan Road II 8.674 190 C 0.350 0.283 0.300 - - - 93.30 93.30%
Outstanding
Pulsar Construction 24422 Concrete Paving along JLLGR, San Pedro Section II 19.291 240 O 0.328 0.300 0.150 0.023 0.040 0.050 89.10 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page391
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Pulsar Construction 24422
Rehab. of Pinacanauan Bridge's Approaches & Extension of River
Bank Protection & Dredging works Phase IV
II 9.524 125 C 0.296 0.300 0.300 - - - 89.60 *89.60% V.Satisfactory
Pulsar Construction 24422Rehab. of Pinacanauan Bridge's
Approaches & Extension of River Bank Protection Works Phase III
II 4.598 120 C 0.267 0.300 0.300 - - - 86.70 *86.70% V.Satisfactory
Pulsar Construction 24422 River Control along Cagayan River Basin II 8.611 210 C 0.347 0.300 0.300 - - - 94.70 85.46%
V.Satisfactory
Pulsar Construction 24422 Upgrading of Abbut-Corner-Kabungao Road CAR 13.991 428 O 0.400 0.300 0.150 0.030 0.037 0.033 95.00 -
Pyramid Consolidated Builders & Gen. Merchandise 15599 Const. DPWH Misamis Oriental
2nd DEO Bldg. X 5.785 120 C 0.479 0.133 0.300 - - - 91.20 *91.20% V.Satisfactory
Pyramid Consolidated Builders & Gen. Merchandise 15599 Const. of 2-Cl Modified Standard
School Buildin Mahayag NHS IX 0.949 90 O 0.349 0.247 0.150 0.030 0.030 0.050 85.60 -
QM Builders 30743Asphalt Overlay of Santander-Barili-Toledo Road, Camboang
SectionVII 3.294 10 C 0.260 0.300 0.300 - - - 86.00 *86.00%
V.Satisfactory
QM Builders 30743 Asphalting of Sibonga-Dumanjug Road, Brgy. Bulak Proper Section VII 1.859 20 C 0.311 0.220 0.300 - - - 83.10 *83.10%
V.Satisfactory
QM Builders 30743 Concreting of Dungo-an-Bolinawan Rd (Cluster C) VII 1.404 65 C 0.424 - 0.500 - - - 92.40 92.40%
Outstanding
QM Builders 30743Const. of Flood Control (Water
Breaker, Seawall, Shore Protection)
VII 1.903 30 C 0.383 0.147 0.300 - - - 83.00 *83.00% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page392
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
QM Builders 30743 Const. of Flood Control Structure VII 3.555 55 C 0.375 0.200 0.300 - - - 87.50 *87.50% V.Satisfactory
QM Builders 30743 Const. of Multi-Purpose Building VII 1.056 90 O 0.334 0.300 0.100 0.030 0.006 0.100 87.00 -
QM Builders 30743 Const. of Pakigne Flood Control VII 2.862 60 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
QM Builders 30743 Impv't./Concreting of Kang-Actol Brgy. Rd. VII 1.088 60 C 0.429 - 0.500 - - - 92.90 83.96%
V. Satisfactory
QM Builders 30743Preventive Maint./Impv't. of
Sibonga-Dumanjug National Road Tubod-Dugo-an, Balagytiki Section
VII 9.979 30 C 0.374 0.200 0.300 - - - 87.40 *87.40% Satisfactory
QM Builders 30743 Rehab. & Repair of Brgy. Road @ Brgy. Manlapay VII 0.930 30 C 0.311 0.200 0.300 - - - 81.10 *81.10%
V.Satisfactory
QM Builders 30743 Rehab./Reconstruction of Cebu-Toledo Wharf Road VII 21.217 150 O 0.372 0.300 0.000 0.022 0.027 0.050 77.10 -
QM Builders 30743 Repair/Rehab. of Road at Perrelos VII 1.841 60 C 0.438 0.200 0.300 - - - 93.80 *93.80% V. Satisfactory
QM Builders 30743Repair/Rehab. of Sibunga-
Dumanjug Rd. (km. 51+950 - km. 53+298)
VII 9.645 26 C 0.311 0.300 0.300 - - - 91.10 *91.10% Outstanding
QM Builders 30743 Repair/Rehab. of Tangke Drainage VII 0.918 30 C 0.324 0.200 0.300 - - - 82.40 *82.40% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page393
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
QM Builders 30743 Repair/Rehab./Conc. of Trocio St. Brgy. Poblacion VII 5.158 90 C 0.367 0.200 0.300 - - - 86.70 *86.70%
V.Satisfactory
QM Builders 30743 Repair/Rehab./Impvt. of Simala-Lindogon Brgy. Road VII 9.478 45 C 0.324 0.300 0.300 - - - 92.40 *92.40%
Outstanding
Quality Builder Corporation 17790 Const. of Two Classroom School Bldg VII 1.350 55 C 0.425 - 0.500 - - - 92.50 92.50%
Outstanding
Queen City Builders 21535 Concreting of Road @ Sitio Habitat Coronon XI 0.611 60 C 0.361 - 0.500 - - - 86.10 86.10%
V. Satisfactory
Quezon Victory and Gen. Contractor 6631 Const. of Sta. Cruz Diversion Dam
for Sta. Sta Cruz RIS NIA 78.176 365 C 0.349 0.22 0.300 - - - 86.33 86.33% V. Satisfactory
Quezon Victory General Contractor 6631 Completion of Multi-Purpose Bldg
at Brgy. 3 Poblacion IV-A 0.235 30 C 0.410 - 0.500 - - - 91.00 91.00% Outstanding
Quezon Victory General Contractor 6631 Conc. of Bonliw FMR IVB 0.287 90 C 0.326 0.203 0.300 - - - 82.90 *82.90%
V. Satisfactory
Quezon Victory General Contractor 6631 Conc. of Brgy. Road @ Tanada St.
Brgy. San Vicente IV-A 0.283 30 C 0.397 0.000 0.300 - - - 69.70 *69.70% Fair
Quezon Victory General Contractor 6631 Conc. of MSR, Jct. Lopez-
Hondagua Port Road IVA 3.366 60 C 0.263 0.222 0.300 - - - 78.50 *78.50% Satisfactory
Quezon Victory General Contractor 6631 Conc. Reblocking along MSR
Diversion Road IV-A 0.288 24 C 0.267 0.200 0.300 - - - 76.70 *76.70% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page394
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Quezon Victory General Contractor 6631 Concreting of Brgy. Road, Brgy.
Villa Padua IV-A 0.283 60 C 0.410 - 0.500 - - - 91.00 91.00% Outstanding
Quezon Victory General Contractor 6631
Const. of 2 Storey 2 CL School Bldg., Library Bldg. @ Luis Palad
National H/SIV-A 1.060 60 C 0.162 0.300 0.300 - - - 76.20 *76.20%
Satisfactory
Quezon Victory General Contractor 6631 Const. of Drainage System at
Brgy. Cotta IV-A 0.755 36 C 0.473 - 0.500 - - - 97.30 *97.30% Outstanding
Quezon Victory General Contractor 6631 Const. of MPB IV-A 1.460 60 C 0.315 0.200 0.300 - - - 81.50 *81.50%
V. Satisfactory
Quezon Victory General Contractor 6631 Const. of MPB @ Brgy.
Peñafrancia IV-A 0.333 100 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory
Quezon Victory General Contractor 6631 Const. of MPB @ Infanta E/S IV-A 1.925 40 C 0.358 0.200 0.300 - - - 85.80 73.27%
Satisfactory
Quezon Victory General Contractor 6631 Const. of MPB, Brgy. Abo,
Nagcarlan IV-A 1.337 60 C 0.335 0.200 0.300 - - - 83.50 *83.50% V. Satisfactory
Quezon Victory General Contractor 6631 Const. of Multi-Purpose Hall @
Brgy. San Joaquin IV-A 0.862 30 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory
Quezon Victory General Contractor 6631 Impvt. of Water Supply System @
Brgy. Pacabit IV-A 0.964 50 C 0.377 0.300 0.300 - - - 97.70 *97.70% Outstanding
Quezon Victory General Contractor 6631
Maintenance, Rehab. & Impvt. of National Arterial Road along
Maharlika HighwayIV-A 9.969 45 C 0.357 0.200 0.300 - - - 85.70 *85.70%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page395
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Quezon Victory General Contractor 6631 Rehab./Impvt. of Quezon-Batangas
Road IV-A 5.746 86 C 0.363 0.300 0.300 - - - 96.30 88.56% V. Satisfactory
Quirante Construction 32827 Const. of 1 CL Sch. Bldg. @ Balud NHS VII 0.482 87 C 0.341 0.248 0.300 - - - 88.90 *88.90%
V. Satisfactory
Quirante Construction 32827 Const. of Multi-Purpose Building @ Tabunoc (Fire Station) VII 0.468 120 O 0.347 0.240 0.150 0.022 0.025 0.050 83.40 -
Quirante Construction 32827 Construction of Multi-purpose Building at Poblacion (Fence) VII 0.464 120 O 0.350 0.240 0.150 0.022 0.025 0.050 83.70 -
Quirante Construction 32827 Construction of Multi-Purpose Building at Poblacion (SWAT) VII 0.922 120 O 0.343 0.240 0.150 0.022 0.025 0.050 83.00 -
R A Ignacio Construction 29977 Const./Rehab. of MPB NCR 0.942 75 C 0.302 0.200 0.300 - - - 80.20 *80.20% V.Satisfactory
R C S Construction 12458 Construction of Multi-Purpose Bldg. @ Mt. View ES Polaries III 0.470 28 C 0.479 0.200 0.300 - - - 97.90 *97.90%
Outstanding
R C S Construction 12458 Rehabilitation of Drainage Facility at Brgy. Wakas III 0.231 28 C 0.416 0.200 0.300 - - - 91.60 *91.60%
V.Satisfactory
R L K Construction and Builders 32194 Conc. of Road in Carmen West I 1.925 60 C 0.356 0.200 0.300 - - - 85.60 *85.60% V. Satisfactory
R N V Construction 12570 Conc. of Dapawan-Torrel Road IV-B 4.693 80 C 0.358 0.200 0.300 - - - 85.80 *85.80% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page396
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R N V Construction 12570 Rehab./Impvt. of Romblon DEO IV-B 4.693 146 O 0.355 0.240 0.100 0.030 0.032 0.100 85.70 -
R N V Construction 12570 Repair/Rehab. of Odiongan North Central E/S IV-B 0.478 26 C 0.370 0.300 0.300 - - - 97.00 *97.00%
Outstanding
R. A. De Leon Construction 18078 Concreting of Binubusan Brgy. Road IV-A 0.945 90 C 0.389 - 0.500 - - - 88.90 88.90%
V. Satisfactory
R. Agullo Construction & Enterprises 11109 Const. of Health Center @ Brgy.
Can-Uguib VIII 0.233 25 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding
R. Agullo Construction & Enterprises 11109 Const. of MPB @ Brgy. Sto.
Rosario (Phase III) VIII 0.282 45 C 0.311 0.200 0.300 - - - 81.10 *81.10% V. Satisfactory
R. Agullo Construction & Enterprises 11109 Const. of Sta. Margarita NHS Bldg. VIII 0.508 60 C 0.384 0.200 0.300 - - - 88.40 *88.40%
V. Satisfactory
R. Allosa Construction 12964 Concrete Paving Tabango-San Isidro Rd VIII 3.893 160 C 0.421 - 0.500 - - - 92.10 92.10%
Outstanding
R. Anin Jr. Construction 14888 Const. of Cabacao Flood Control IV-B 1.926 70 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
R. Anin Jr. Construction 14888Resurfacing of Bulalacao-San
Jose Jct. Mapaya Road, Paclolo Section, Km.222+000-Km.225+500
IV-B 0.573 20 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding
R. B. Ombao Const. 17042 Replacement of Cabcaben Bridge Cabcaben III 4.709 195 C 0.393 - 0.500 - - - 89.30 73.34%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page397
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R. B. Ombao Const. 17042 Widening of Road, Barangay General Luna III 0.354 60 C 0.303 0.200 0.300 - - - 80.30 *80.30%
V. Satisfactory
R. Calingasan Construction 8173 Conc/ Widening of Road Brgy. IV-A 0.188 50 C 0.373 0.200 0.300 - - - 87.30 *87.30% V. Satisfactory
R. D. Interior Jr. Const./Brostan Const. Dev't (JV) JV-08-002 Pagadian Airport Development
Project DOTC 174.361 360 O 0.377 0.300 0.150 0.030 0.056 0.050 96.30 -
R. D. Ramos Const. & Enterprises 18771 Concreting of Road at Brgy. Pook
ni Kapitan IV-A 0.284 45 C 0.394 - 0.500 - - - 89.40 89.40% V. Satisfactory
R. G. Diaz Builders & Trading 23814Const./Repair/Rehab. of Multi-
Purpose School Bldg., @ Angeles City
IV-B 0.748 60 C 0.488 - 0.500 - - - 98.80 98.00% Outstanding
R. G. Roque Const. & Trading 21788 Rehab. of School Premises @ Mexico National H/S San Carlos III 0.952 75 C 0.468 - 0.500 - - - 96.80 96.80%
Outstanding
R. K. Engineering & Construction 12534
Conc. of Critical Section along National Circumferential (Salawad-
Pawikan- Baso Section)
VIII 4.755 130 C 0.291 0.300 0.300 - - - 89.10 88.20% V.Satisfactory
R. K. Engineering & Construction 12534 Const. of Biliran NAHS 2 Cl Bldg. VIII 0.830 70 C 0.340 0.101 0.300 - - - 74.10 *74.10% Satisfactory
R. K. Engineering & Construction 12534 Const. of Esperanza Drainage VIII 0.095 90 C 0.320 0.200 0.300 - - - 82.00 76.18% Satisfactory
R. Ochea Construction & Supplies 15775 Concreting of Toledo-Tabuelan-
San Remegio Road, Mangga Sect. VII 4.675 80 C 0.385 0.200 0.300 - - - 88.50 89.88% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page398
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R. Ochea Construction & Supplies 15575 Const. of Multi-Purpose Building VII 4.748 132 C 0.399 0.100 0.300 - - - 79.90 85.61%
V. Satisfactory
R. Ochea Construction & Supplies 15775 Const. of Multi-Purpose Building
at Poblacion Tuburan VII 4.748 132 O 0.373 0.240 0.100 0.015 0.027 0.100 85.50 -
R. R. Encabo Constructors and Traders 14716
Punta- Santa Ana URA Project, URA-MLA-02A 728 Housing
ProjectPRRC 218.4 363 O 0.33 0.3 0.1 0.03 0.05 0.1 91.34 -
R. R. Seismundo Construction and Supply 10961 Const. of 1 CL School Bldg., at
Montevista NHS, DNAS XI 0.469 45 C 0.335 0.000 0.100 0.020 0.032 0.100 58.72 60.40% Fair
R. Semilla Construction and Marketing 9263 Const. of Multi-Purpose Bldg.,
Lapulabao XI 0.939 90 C 0.404 - 0.500 - - - 90.40 59.74% Poor
R. Semilla Construction and Marketing 9263
Rehab./Impvt. of DPWH Davao del Sur 1st DEO inc. Employees
QuartersXI 7.700 24 C 0.476 0.200 0.300 - - - 97.60 92.07%
V. Satisfactory
R. V. Construction 6110 Ozamis Airport Development Project DOTC 4.793 120 C 0.466 0.200 0.300 - - - 96.60 96.60%
Outstanding
R. V. Construction 6110 San Antonio Airport Development Project DOTC 4.755 90 C 0.452 0.200 0.300 - - - 95.20 95.20%
Very Satisfactory
R. V. Construction 6110 San Antonio Airport Development Project DOTC 2.880 60 C 0.435 0.200 0.300 - - - 93.50 93.50%
Very Satisfactory
R. V. Construction 6110 San Antonio Airport Development Project DOTC 4.702 90 C 0.427 0.200 0.300 - - - 92.70 92.70%
Very Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page399
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.A. Abaño Construction 11828 Const. of Farm-to-Market Road IV-A 0.653 30 C 0.347 - 0.500 - - - 84.70 *84.70% V. Satisfactory
R.A. Abaño Construction 11828 Const. of Multi-Purpose Bldg. At Brgy. Malinao-Ilaya IV-A 0.236 40 C 0.464 - 0.500 - - - 96.40 96.40%
Outstanding
R.A. Del Rosario Construction 4636 Const. of MPB, Brgy. San Agustin III IV-A 4.778 90 O 0.322 0.231 0.100 0.015 0.029 0.100 79.70 -
R.A. Del Rosario Construction 4636 Const. of Two (2), Four (4)Cl School Building IV-A 2.857 180 C 0.367 0.300 0.300 - - - 96.70 70.17%
Satisfactory
R.A. Del Rosario Construction 4636Rehab./Reconst. (Concreting) of
Indang-Alfonso via Luksuhin Rd.
IV-A 39.525 210 O 0.325 0.300 0.100 0.020 0.028 0.100 87.30 -
R.A. Matias Const. & Developer 26346 Concreting of FTMR @ Poblacion East I 0.480 32 C 0.259 - 0.500 - - - 75.90 75.90%
Satisfactory
R.A. Matias Const. & Developer 26346Const. of Multi-Purpose San Vicente Brgy. Hall Brgy. San
VicenteI 0.336 35 C 0.390 - 0.500 - - - 89.00 89.00%
V. Satisfactory
R.A. Montejo Construction 21718 Const. of Box Culvert VIII 0.963 90 C 0.332 0.200 0.300 - - - 83.20 *83.20% V.Satisfactory
R.A. Montejo Construction 21718 Renovation of Research Bldg. @ Leyte Normal University VIII 0.945 60 C 0.393 0.300 0.300 - - - 99.30 *99.30%
Outstanding
R.A. Pahati Gravel and Sand 22495Rehab./Impvt. of Maculcol
Dike/Approach including Impvt. of Access Road
III 7.795 90 C 0.280 0.157 0.300 - - - 73.70 *73.70% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page400
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.A. Pahati Gravel and Sand 22495 Rehab./Impvt. of River Banks (Abitonan River) III 3.856 135 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V. Satisfactory
R.A. Pahati Gravel and Sand 22495Rehab./Impvt. of Concrete Slope Protection along Digmala River
ControlIII 4.753 90 C 0.289 0.300 0.300 - - - 88.90 *88.90%
V. Satisfactory
R.A. Yolangco Construction 15602 Const. of Farm-to-Market Road IV-A 0.962 30 C 0.380 0.300 0.300 - - - 98.00 *98.00% Outstanding
R.A. Yolangco Construction 15602 Const. of MPB (Coop. Union of Cavite) IV-A 1.433 50 C 0.376 0.247 0.300 - - - 92.30 *92.30%
Outstanding
R.A.M. Builders 10459 Conc. Of Quirino Highway, Quezon Side Phase XIV IV-A 14.420 90 C 0.255 0.199 0.300 - - - 75.40 *75.40%
Satisfactory
R.A.M. Builders 10549
Const. of Quezon Eco-Tourism Road (LUC-BAT CR) incl. RROW: Phase I, Guisguis-Talaan Sect.,
Conc. Of Guisguis Section
IV-A 17.780 206 O 0.337 0.300 0.100 0.030 0.037 0.100 90.40 -
R.A.M. Builders 10549 Impvt., Regravelling/Conc. of Road IV-A 14.387 80 C 0.122 0.300 0.300 - - - 72.20 79.52% Satisfactory
R.A.M. Builders 10549 Rehab./Impvt. of Lucena-Tayabas Road, Gulang-gulang Sect. IVA 19.209 190 C 0.497 0.123 0.300 - - - 92.00 89.18%
V.Satisfactory
R.A.M. Builders 10549 Rehab./Impvt. of MSR-Old Route IVA 14.328 277 C 0.432 0.200 0.300 - - - 93.20 89.18% V.Satisfactory
R.A.M. Builders 10549Rehab./Impvt. of San Pablo-
Boundary-Dolores-Pinagdanglayan Road
IV-A 13.424 150 C 0.313 0.300 0.300 - - - 91.30 90.55% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page401
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.B. Basista Construction & Supply 26829 Impvt. of San Isidro-Trujillo Road VIII 4.796 60 C 0.307 0.200 0.300 - - - 80.70 * 80.70%
V. Satisfactory
R.B. Candare Construction 8819 Conc. of Bay-ang-Calamba Prov. Road XIII 1.896 90 C 0.354 0.200 0.300 - - - 85.40 *85.40%
V. Satisfactory
R.B. Candare Construction 8819 Const. of MPB (Covered Court) XIII 1.875 120 C 0.395 0.200 0.300 - - - 89.50 *89.50% V. Satisfactory
R.C. Miranda Construction & Supplies 9036 Conc. of Sta. Ines-Matalapitap
Road Phase II III 5.795 150 C 0.325 - 0.500 - - - 82.50 80.88% V.Satisfactory
R.C. Tagala Construction 11597 Completion of Multi-Purpose Building VI 2.854 164 C 0.319 0.147 0.300 - - - 76.60 83.81%
V. Satisfactory
R.C. Tagala Construction 11597 Concreting of Calategas-Aramaywan Rd., Sect. IV-B 2.154 120 C 0.390 - 0.500 - - - 89.00 89.00%
V.Satisfactory
R.C. Tagala Construction 11597 Concreting of Parian-Cabuluan Road Section IV-B 3.749 150 C 0.424 - 0.500 - - - 92.40 93.88%
V. Satisfactory
R.C. Tagala Construction 11597 Concreting of Tugdan-Alcantara Looc Road IV-B 2.209 90 O 0.320 0.240 0.100 0.030 0.047 0.100 83.70 -
R.C. Tagala Construction 11597 Const. of Abra de Ilog-Puerto Galera Rd. (Occ/Or. Mindoro Bdry) IV-B 19.108 120 C 0.475 0.191 0.300 - - - 96.60 *96.60%
Outstanding
R.C. Tagala Construction 11597 Const. of Abra de Ilog-Puerto Galera Road IV-B 28.854 240 C 0.327 0.300 0.300 - - - 92.70 81.84%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page402
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.C. Tagala Construction 11597 Const. of Barokan Flood Control along MWCR, Phase II IV-B 11.902 130 C 0.282 0.200 0.300 - - - 78.20 *78.20%
Satisfactory
R.C. Tagala Construction 11597 Const. of Boac River Control IV-B 3.981 120 C 0.282 - 0.500 - - - 78.20 75.50% Satisfactory
R.C. Tagala Construction 11597 Const. of Libtangin River Control IV-B 4.748 150 C 0.313 0.296 0.300 - - - 90.90 90.90% Outstanding
R.C. Tagala Construction 11597 Const. of Manggamnan Bridge Approach IV-B 1.672 120 O 0.309 0.300 0.100 0.030 0.033 0.100 87.20 -
R.C. Tagala Construction 11597 Const. of Pagbahan Flood Control (Phase I) IV-B 13.920 180 O 0.266 0.200 0.100 0.023 0.025 0.200 81.40 -
R.C. Tagala Construction 11597 Const. of Sch. Bldg. (4 CL) Narra Pilot Sch. IVB 3.789 150 C 0.345 0.200 0.300 - - - 84.50 *84.50%
V. Satisfactory
R.C. Tagala Construction 11597Const. of Tanjay River Control,
Brgys. 1,2,3,4 and San Isidro alongthe Nautical Highway
VII 9.444 110 C 0.336 0.247 0.300 - - - 88.30 70.78% Satisfactory
R.C. Tagala Construction 11597 Const. of Taritien Bridge IV-B 4.230 240 C 0.369 0.300 0.300 - - - 96.90 86.88% V. Satisfactory
R.C. Tagala Construction 11597 Const. of Various School Bldg. (Tagumpay E/S) IV-B 9.043 273 C 0.393 - 0.500 - - - 89.30 80.34%
V. Satisfactory
R.C. Tagala Construction 11597 Impvt. of Aramaywan-Berong Road IV-B 18.964 252 C 0.372 0.200 0.300 - - - 87.20 80.06%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page403
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.C. Tagala Construction 11597 Impvt. of Quezon-Punta Baja Road IV-B 18.950 252 C 0.378 0.133 0.300 - - - 81.10 80.65% Unsatisfactory
R.C. Tagala Construction 11597 Reblocking of Jct. MWCR-San Jose Airport Rd.-Jct. Bubog Road IV-B 9.607 140 C 0.324 0.171 0.300 - - - 79.50 71.58%
Satisfactory
R.C. Tagala Construction 11597 Rehab. of Existing Asphalt and Const. of Lined Canal IV-B 5.491 128 C 0.376 - 0.500 - - - 87.60 49.54%
Poor
R.C. Tagala Construction 11597 Repair/Rehab. of FMR VII 0.464 270 C 0.293 0.300 0.300 - - - 89.30 79.04% Satisfactory
R.D. Cobacha Construction 20833 Const. of ABC Hall VIII 1.280 56 C 0.350 0.196 0.300 - - - 84.60 72.21% Satisfactory
R.D. Interior Junior Const./J.H. Pajara Const. Corp. (J.V.)
SL2-SN-000366/JV-
02-019
Const./Impv't. (PCCP) of C.P.B.: Sultan Gumander-Dobliston Jct.
RoadKFAED 608.260 1,362 C 0.334 0.300 0.300 - - - 93.40 90.58%
Outstanding
R.D. Interior Junior Construction 6483 Asphalt Overlay along Cordon-Aurora Brgy. Road II 4.920 35 C 0.392 0.300 0.300 - - - 99.20 *99.20%
Outstanding
R.D. Interior Junior Construction 6483Conc. of SDCR, Marihatag-
Hinatuan-Bislig Section, (Tagbina-Hinatuan Subsection)
XIII 282.908 345 O 0.331 0.300 0.100 0.030 0.050 0.100 91.10 -
R.D. Interior Junior Construction 6483 Const. of Runruno Bridge & Approaches II 7.803 240 C 0.480 - 0.500 - - - 98.00 97.46%
Outstanding
R.D. Interior Junior Construction 6483 Const. of Sinippil Bridge and Approaches II 13.688 305 C 0.335 0.277 0.300 - - - 91.20 86.90%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page404
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.D. Interior Junior Construction 6483 Const./Asphalting of Dumabato Norte Brgy. Road II 0.455 30 C 0.320 0.300 0.300 - - - 92.00 *92.00%
Outstanding
R.D. Interior Junior Construction 6483 Const./Asphalting of Guinalbin Brgy. Road II 0.932 30 C 0.356 0.200 0.300 - - - 85.60 *85.60%
V. Satisfactory
R.D. Interior Junior Construction 6483 Const./Asphalting of Villa Norte Brgy. Road II 1.388 30 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
R.D. Interior Junior Construction 6483 Impvt. of Maria Clara-Gabriela Road II 4.783 277 C 0.312 0.300 0.300 - - - *91.20 91.20%
Outstanding
R.D. Interior Junior Construction 6483Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkag
& San Vicente Bridge)XIII 289.168 570 O 0.342 0.300 0.100 0.030 0.055 0.100 92.70 -
R.D. Interior Junior Construction 6483Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkag
& San Vicente Bridge)XIII 289.168 570 O 0.370 0.300 0.106 0.030 0.061 0.033 90.00 -
R.D. Interior Junior Construction 6483Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkayo
& San Vicente Bridge)XIII 289.168 570 O 0.326 0.300 0.100 0.030 0.038 0.100 89.40 -
R.D. Interior Junior Construction 6483Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkayo
& San Vicente Bridge)XIII 289.168 570 O 0.294 0.281 0.100 0.022 0.055 0.100 85.20 -
R.D. Interior Junior Construction 6483Impvt./Conc. of Bislig-Manay Road (Boston-Bislig Sect. with Monkayo
& San Vicente Bridge)XIII 289.168 570 O 0.352 0.300 0.100 0.030 0.055 0.100 93.70 -
R.D. Interior Junior Construction 6483 Repair/Maint. of Nat'l Road along Santiago-Tuguegarao Road II 4.975 30 C 0.304 0.200 0.300 - - - 80.40 *80.40%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page405
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.D. Policarpio & Co., INC. 4414Construction of Overpasses
Project in the Province of Bataan, Pampanga and Tarlac
BCDA 208.033 476 C 0.351 0.300 0.300 - - - 95.07 91.17% Outstanding
R.D. Policarpio & Company, Inc. 4414
Impvt. (Widening/Conc. of McArthur Highway (MNR) Meycauayan (Bulacan) to
Mabalacat (Pampanga) Ph-IV Package VII, Replacement of
Tinajero Bridge & App
III 45.805 180 C 0.460 0.200 0.300 - - - 96.00 92.64%V. Satisfactory
R.D. Policarpio & Company, Inc. / Pumyang Construction Company,
Ltd. (JV)4414 ADB Sixth Road Impv't. Project CP
6MI-15 IX 740.582 1,972 O 0.360 0.300 0.000 0.024 0.037 0.067 78.80 -
R.D. Policarpio Company, Inc. 4414Contract Package "N":
Replacement/Retrofitting of Three (3) Bridges
ADB 67.207 799 O 0.335 0.300 0.000 0.030 0.042 0.000 70.70 -
R.D. Policarpio Company, Inc. 4414
CP 6: Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road
(Manay-Boston) Baganga Section Phase I
XI 157.077 492 O 0.339 0.240 0.100 0.030 0.055 0.100 86.40 -
R.D. Policarpio Company, Inc. 4414
Impvt. (Widening/Conc. of McArthur Highway (MNR) Meycauayan (Bulacan) to
Mabalacat (Pampanga) Ph-IV Package VII, Replacement of
Tinajero Bridge & App.
III 45.805 180 O 0.373 0.240 0.100 0.030 0.061 0.100 90.40 -
R.D. Policarpio Company, Inc. 4414 Sixth Road Project Component CP 4 Gen. Santos-Cotabato City Road XII 170.852 882 O 0.301 0.298 0.000 0.030 0.061 0.067 75.70 -
R.D. Sadsad Const. & Trading 19240 Concrete Reblocking with Rehab., Impvt. of Rizal Ave, III 5.414 60 C 0.323 0.300 0.300 - - - 92.30 *92.30%
Outstanding
R.D. Sadsad Const. & Trading 19240 Impvt./Rehab. of Anunas-Margot Road III 2.820 60 C 0.326 0.200 0.300 - - - 82.60 * 82.60%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page406
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.D. Sadsad Const. & Trading 19240 Package 16: Const./Rehab./Impv't. of FMR Porac, Sta. Rita & Guagua III 0.944 44 C 0.311 - 0.500 - - - 81.10 81.10%
V. Satisfactory
R.D. Sadsad Const. & Trading 19240 Rehab. of Canal @ Brgy. San Pablo II Road III 0.949 30 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
R.D. Sadsad Const. & Trading 19240 Rehab. of Road @ Brgy. Gulod Malagu IV-A 0.960 30 C 0.387 0.300 0.300 - - - 98.70 *98.70%
Outstanding
R.D. Sadsad Const. & Trading 19240 Repair/Rehab., Gapan-San Fernando-Olongapo (GSO) III 9.653 90 O 0.348 0.200 0.100 0.030 0.058 0.100 83.60 -
R.D. Sadsad Const. & Trading 19240 Upgrading/Impvt. of San Fernando-Lubao Road (Sto. Tomas Section) III 4.730 90 C 0.337 0.300 0.300 - - - 93.70 *93.70%
Outstanding
R.D. Sadsad Construction and Trading 19240 Repair/Rehab. of Gapan-San
Fernando-Olongapo Road III 9.653 90 C 0.430 0.200 0.300 - - - 93.00 87.36% Satisfactory
R.F. Diaz Construction 3398 Const. of School Building at University of Rizal System IV-A 9.609 150 C 0.155 0.300 0.300 - - - 75.50 69.83%
Fair
R.F. Diaz Construction 3998 Impvt./Completion of Calalay Bldg. @ Sto. Cristo E/S NCR 2.631 90 C 0.326 0.300 0.300 - - - 92.60 90.99%
Outstanding
R.F. Diaz Construction 3998 Impvt./Rehab. of MPB NCR 2.387 90 C 0.369 0.300 0.300 - - - 96.90 85.21% V. Satisfactory
R.F. Varquez Const. 24302 Completion of Timamana MPB, Brgy. Timamana XIII 1.638 90 C 0.332 0.300 0.300 - - - 93.20 *93.20%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page407
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.F. Varquez Construction 24302 Completion of Municipal Multi-Purpose Building XIII 2.341 90 C 0.450 0.168 0.300 - - - 91.80 *91.80%
V. Satisfactory
R.F.G. Construction 13188 Completion of MPB @ Brgy. Dayano XIII 0.555 60 C 0.377 0.221 0.300 - - - 89.80 68.73%
Fair
R.F.G. Construction 13188 Concreting of Shoulder along Surigao Wharf Road XIII 7.274 274 C 0.393 - 0.500 - - - 89.30 83.72%
V. Satisfactory
R.F.G. Construction 13188 Concreting of Surigao-San Juan Lipata Coastal Rd. XIII 1.548 120 C 0.411 - 0.500 - - - 91.10 84.74%
V. Satisfactory
R.F.G. Construction 13188 Const. of Banahaw Bridge, Phase IV XIII 9.904 300 C 0.367 0.300 0.300 - - - 96.70 91.30%
Outstanding
R.F.G. Construction 13188 Const. of MPB @ Brgy. 12 XIII 1.925 104 C 0.336 0.131 0.000 - - - 46.70 68.54% Fair
R.F.G. Construction 13188 Const. of Municipal Public Market, Phase III XIII 1.795 180 C 0.311 0.300 0.300 - - - 91.10 81.86%
V. Satisfactory
R.F.G. Construction 13188 Const. of Sabang Bridge III Phase V XIII 9.167 266 C 0.364 0.300 0.300 - - - 96.40 90.14%
Outstanding
R.F.G. Construction 13188 Const. of Sabang Bridge III, Phase IV XIII 4.583 210 C 0.328 - 0.500 - - - 82.80 79.38%
Satisfactory
R.F.G. Construction 13188 Const. of Toledo S. Pantilo MPB XIII 0.927 60 C 0.343 0.300 0.000 - - - 64.30 71.30% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page408
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.F.G. Construction 13188 Const.Completion of Tayaga Disaster Evacuation Center XIII 0.463 60 C 0.384 0.224 0.300 - - - 90.80 90.80%
Outstanding
R.G. Diaz Builders & Trading 23814Construction of Concepcion Public Market at San Nicolas
PoblacionIII 5.721 150 C 0.471 0.141 0.300 - - - 91.20 *91.20%
V. Satisfactory
R.G. Diaz Builders & Trading 23814Package XIV-Const. of Multi-
Purpose Bldg. (Covered Court) @ San Nicolas E/S
III 0.937 60 C 0.381 0.300 0.300 - - - 98.10 *98.10% Outstanding
R.G. Erillo Construction, Incorporated 932 Widening/Impv't. of Bacolod South
Kabankalan Rd. VI 9.623 180 C 0.396 - 0.500 - - - 89.60 90.68% Outstanding
R.G. Florentino Construction & Trading 18301 Concreting of Upper Jun Carlo
FMR IV-B 0.462 40 C 0.344 0.084 0.300 - - - 72.80 72.80% Satisfactory
R.G. Florentino Construction & Trading 18301 Const. of Brgy. Multi-Purpose
Bldg. Poblacion IV-B 0.268 30 C 0.388 - 0.500 - - - 88.80 88.80% V. Satisfactory
R.G. Florentino Construction & Trading 18301 Rep./Maintain of Colis RCDG
Bridge Approach Km.019+342 IV-B 0.189 35 C 0.433 0.500 - - - 93.30 93.30% Outstanding
R.J. Ibarra Construction 23538Asphalt Overlay & Conc.
Reblocking along Olongapo-Bugallon Rd.
III 4.670 60 C 0.333 0.300 0.000 - - - 63.30 77.34% Satisfactory
R.J. Ibarra Construction 23538 Completion of Bangal Bridge III 5.644 60 C 0.366 0.237 0.300 - - - 90.30 *90.30% Outstanding
R.J. Ibarra Construction 23538 Completion of Multi-Purpose Building, Brgy. Magsaysay III 0.476 45 C 0.478 0.195 0.300 - - - 97.30 *97.30%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page409
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.J. Ibarra Construction 23538 Const of 2 Classroom School Building Secondary III 2.062 90 C 0.353 0.200 0.300 - - - 85.30 80.12%
Unsatisfactory
R.J. Ibarra Construction 23538 Const. of 2 CL Sch. Bldg. Secondary III 2.062 90 O 0.260 0.266 0.100 0.030 0.023 0.100 77.90 -
R.J. Ibarra Construction 23538 Const. of MPB @ Brgy. Rizal III 0.930 90 C 0.272 0.300 0.300 - - - 87.20 83.49% V. Satisfactory
R.J. Ibarra Construction 23538 Const. of MPB @ San Marcelino III 2.072 90 C 0.305 0.151 0.300 - - - 75.60 76.23% Satisfactory
R.J. Ibarra Construction 23538 Repair/Rehab. of 3-Cl, 1-Storey S/B Bangal E/S III 0.281 150 C 0.473 - 0.500 - - - 97.30 81.87%
V. Satisfactory
R.J. Ibarra Construction 23538Repair/Rehab. of Slope Protection
along Linasin Creek, San Marcelino-San Antonio Road
III 1.930 90 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory
R.K.X. Odiamar Construction 16107 Const. of MPB @ Penfrancia V 1.498 120 C 0.365 0.200 0.300 - - - 86.50 *86.50% V. Satisfactory
R.M. Dela Cruz Construction 15895 Concreting/Improvement of Virgen delos Remedios-Ligaya Road BCDA 9.951 60 C 0.343 0.300 0.200 - - - 84.28 84.28%
Satisfactory
R.M. Dela Cruz Construction 15895Const. of Barangay Aranguren
Farm to Market Road Sta.0+000 to Sta. 0+163
III 0.945 30 C 0.352 0.200 0.300 - - - 85.20 *85.20%Satisfactory
R.M. Dela Cruz Construction 15895Const., Repair, Rehab. and
Completion of MPB at Brgy. Sta. Lucia
III 2.378 90 C 0.451 0.146 0.300 - - - 89.70 *89.70%V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page410
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.M. Nuñez Construction 26206Asphalt Overlay of Ninoy Aquino Ave., North Bound Kabihasnan
Duty Free w/ exceptionNCR 4.937 30 C 0.300 0.200 0.300 - - - 80.00 *80.00%
Satisfactory
R.M. Nuñez Construction 26206 Const. of Lower Bicutan Bridge NCR 3.297 50 C 0.235 0.200 0.300 - - - 73.50 *73.50% Satisfactory
R.M. Padillo Builders 31206 Completion of MPB @ Remedios T. Romualdez Elem. Sch. VIII 0.964 60 C 0.274 0.200 0.300 - - - 77.40 *77.40%
Satisfactory
R.M. Padillo Builders 31206 Const. of One (1) CL Secondary Sch. Bldg. @ Alang-alang NHS VIII 0.503 60 C 0.364 0.200 0.000 - - - 56.40 71.10%
Satisfactory
R.M. Padillo Builders 31206 Const. of One (1) CL Secondary Sch. Bldg. @ San Jose NHS VIII 0.501 45 C 0.381 0.100 0.300 - - - 78.10 *78.10%
Satisfactory
R.M. Padillo Builders 31205 Const. of Reinforced Concrete Box Culvert (RCBC) VIII 2.830 120 C 0.358 0.300 0.300 - - - 95.80 70.36%
Satisfactory
R.M. Padillo Builders 31206 Const./Repair/Rehab of MPB (San Isidro Parish MPC), Poblacion VIII 0.710 90 O 0.336 0.272 0.150 0.015 0.025 0.050 84.80 -
R.M. Padillo Builders 31206
Repair/Replacement of Lined Canal & Road Embankment
Protection at Daan Maharlika km. 903+400 - km. 906+200
VIII 2.848 120 C 0.337 0.200 0.300 - - - 83.70 83.64% V.Satisfactory
R.M. Pingol Const. & Dev't. Corporation 11163
CP IV-A, Jct. Maharlika Highway-Jaen-San Isidro Rd.(Km.98+453.0 to Km.105+256.275) w/ exception
III 34.837 270 O 0.372 0.300 0.000 0.012 0.025 0.033 74.20 -
R.M. Vitug Construction 9227 Conc. of Sta. Barbara Road III 4.026 90 C 0.361 - 0.500 - - - 86.10 86.10% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page411
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.M. Vitug Construction 9227 Const. of MPB III 0.931 90 C 0.313 0.200 0.300 - - - 81.30 83.89% V. Satisfactory
R.M. Vitug Construction 9227 Const./Impvt. of San Jose Road III 5.703 75 C 0.328 0.200 0.300 - - - 82.80 *82.80% V. Satisfactory
R.M. Vitug Construction 9227 Const./Repair/Rehab. of Various Road Brgy. Cutcut III 3.380 76 C 0.416 - 0.500 - - - 91.60 91.60%
Outstanding
R.M. Vitug Construction 9227 Improvement of Multi-Purpose Building III 0.187 60 C 0.437 - 0.500 - - - 93.70 90.34%
Outstanding
R.M. Vitug Construction 9227 Repair/Rehab. of Retaining Wall and Drainage Out Fall III 0.468 32 C 0.310 0.300 0.300 - - - 91.00 *91.00%
Outstanding
R.M. Vitug Construction 9227 Riprapping of Balimbing River, Country Homes, NCR 0.958 30 C 0.350 - 0.500 - - - 85.00 *85.00%
V. Satisfactory
R.M.A.J. Construction 18623 Conc. of Manburao-Paluan Rd. (Tayamaan Sect.) IV-B 1.433 90 C 0.327 - 0.500 - - - 82.70 65.24%
Fair
R.M.A.J. Construction 18623 Concreting of Paclolo FMR IV-B 0.937 42 C 0.409 - 0.500 - - - 90.90 90.90% Outstanding
R.M.A.J. Construction 18623 Rehab. of Abut. B of Mompong Bridge Approach "B" IV-B 2.894 90 C 0.317 0.300 0.300 - - - 91.70 *91.70%
Outstanding
R.N.G.M. Construction 20281 Const. of Multi-Purpose Pavement III 0.521 75 C 0.344 0.200 0.300 - - - 84.40 *84.40% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page412
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.N.G.M. Construction 20281 Construction of Real Bridge, Brgy. Real III 2.575 180 C 0.466 0.133 0.300 - - - 89.90 *89.90%
V. Satisfactory
R.N.G.M. Construction 20281 Water Supply Project @ Brgy. 3 & 4 III 2.353 120 C 0.311 0.300 0.300 - - - 91.10 85.50%
V. Satisfactory
R.O. Builders & Dev. Corp. 22393Conc. of Aritao-Dupax-Kasibu-
Quirino Road, Mangagyang-Banganan Section
II 6.566 135 C 0.366 0.172 0.300 - - - 83.80 89.38% V. Satisfactory
R.O. Builders & Dev. Corp. 22393 Const. of Banganan Flood Control,Upstream of Mangayang Bridge II 2.853 75 C 0.380 0.300 0.300 - - - 98.00 76.82%
Satisfactory
R.O. Builders & Dev. Corp. 22393 Const. of Inaban Bridge and Approaches II 7.939 340 C 0.472 - 0.500 - - - 97.20 97.20%
Outstanding
R.O. Builders & Dev. Corp. 22393 Const. of Mangayang Bridge Phase IV, Banganan II 14.449 233 C 0.466 - 0.500 - - - 96.60 94.26%
Outstanding
R.O. Builders & Dev. Corp. 22393 Const. of Namamparan Bridge & Approaches II 13.528 305 O 0.262 0.253 0.070 0.030 0.028 0.067 71.00 -
R.O. Builders & Dev. Corp. 22393Rehab. of Daang Maharlika
Intermittent Section, from Macate Section, Bambang-San Luis Sect.
II 19.289 90 C 0.267 0.300 0.300 - - - 86.70 86.40% V. Satisfactory
R.O. Builders & Dev. Corp. 22393 Repair/Maint./Rehab. & Impv't. of Daang Maharlika II 4.180 42 C 0.286 - 0.500 - - - 78.60 80.64%
V. Satisfactory
R.O. Builders & Development Corporation 22393 Conc. of Aritao-Dupax-Kasibu-
Quirino Road, Mangayang Section II 16.182 150 O 0.351 0.279 0.100 0.020 0.033 0.067 85.00 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page413
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.O. Builders & Development Corporation 22393 Conc. of Aritao-Dupax-Kasibu-
Quirino Road, Mangayang Section II 16.182 150 O 0.345 0.300 0.150 0.030 0.050 0.050 92.50 -
R.O.M. Builders 28654 Conc. of Roads in Brgy. Kapito IV-A 0.471 60 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory
R.O.M. Builders 28654 Conc. of Roads, Brgy. Gumamela IV-A 0.477 45 C 0.307 0.300 0.300 - - - 90.70 *90.70% Outstanding
R.P. Inducil Construction 8984 Conc. of Roads at Brgy. Poblacion III 0.949 70 C 0.342 0.300 0.300 - - - 94.20 *94.20% Outstanding
R.P. Parayno Construction 32862Dredging/Desilting & Const. of
Drainage @ Zone 1 7 III & Calambayan
I 1.435 122 O 0.364 0.120 0.100 0.020 0.042 0.133 77.90 -
R.R. A. Requillas Construction & Supply 20217 Const. of Revetment V 1.425 90 C 0.335 0.200 0.300 - - - 83.50 76.54%
Satisfactory
R.R. Encabo Const. & Traders 14716 Const. of 2 CL School Bldg. @ Cristo Rey H/S (ORES) III 0.885 60 C 0.297 0.272 0.300 - - - 86.90 *86.90%
V. Satisfactory
R.R. Encabo Const. & Traders 14716Punta-Santa Ana URA Project,
URA-MLA-02A 728 Housing Project
PRRC 218.400 363 O 0.333 0.300 0.100 0.030 0.050 0.100 91.34 -
R.R. Ricafort Construction 14402 Conc. of FMR @ Brgy. Balayang III 0.614 60 C 0.213 0.200 0.300 - - - 71.30 *71.30% Satisfactory
R.R. Ricafort Construction 14402 Conc. of Main Canal @ Rizal St. (San Gavino-Sta. Barbara Section) III 2.330 120 C 0.362 0.200 0.300 - - - 86.20 84.46%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page414
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.R. Ricafort Construction 14402 Const. of 1 CL Sch. Bldg. @ Paniqui South Central E/S III 0.480 45 C 0.263 0.300 0.300 - - - 86.30 * 86.30%
V. Satisfactory
R.R. Ricafort Construction 14402 Const. of 1 CL School Bldg. @ Carangian E/S III 0.376 45 O 0.356 0.262 0.100 0.030 0.029 0.100 87.70 -
R.R. Ricafort Construction 14402 Const. of North Central E/S III 0.373 60 C 0.322 0.300 0.300 - - - 92.20 *92.20% Outstanding
R.R. Ricafort Construction 14402Const. of Two (2) Storey 10 CL
Sch. Bldg. at Capas High School (Formerly Sto. Domingo H/S)
III 6.430 150 C 0.312 0.272 0.300 - - - 88.40 *88.40% V. Satisfactory
R.R. Ricafort Construction 14402 NHA-PNP Camp Macabulos Housing Project NHA 3.124 85 C 0.38 0.300 0.300 - - - 98.0 98.00%
Outstanding
R.R. Ricafort Construction 14402 Repair and Rehab. of Concepcion-Lapaz Road (Lapaz Section) III 4.746 45 C 0.371 0.216 0.300 - - - 88.70 *88.70%
V. Satisfactory
R.R. Ricafort Construction 14402Repair/Rehab. of MPB @ Tarlac North Command (North Luzon
Command)III 0.917 110 C 0.344 0.174 0.300 - - - 81.80 * 81.80%
V. Satisfactory
R.R. Ricafort Construction and Supplies 14402
Conc. of Sta. Cruz-Villa Aglipay Road (Completion) going to Eco-
Tourism ParkIII 2.820 90 C 0.359 0.200 0.300 - - - 85.90 *85.90%
Satisfactory
R.R. Ricafort Construction and Supplies 14402
Const./Impvt. of Eco-Tourism Road, Sta. 125+009 to Sta. 127+637, with exception
III 14.104 150 C 0.352 0.200 0.300 - - - 85.20 *85.20%Satisfactory
R.R. Ricafort Construction and Supplies 14402 Construction of Multi-Purpose
Building at Burgos, San Jose III 3.004 90 C 0.461 0.200 0.300 - - - 96.10 82.03%Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page415
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.R. Ricafort Construction and Supplies (Formerly: R.R. Ricafort
Construction)14402 Const. of MPB, Brgy. Burgos III 3.004 90 O 0.302 0.240 0.100 0.000 0.018 0.100 76.00 -
R.R. Seismundo Construction & Supply 10961
Conc. of Compostela Cateel Road-Osmeña Sect., Sitio Nursery Sec.
& Spur II-Pansansalan Sec.XI 46.270 330 O 0.283 0.288 0.150 0.030 0.038 0.033 82.20 -
R.R. Seismundo Construction & Supply 10961
Const. of Add'l Two (2) Lanes @ Nabunturan-Mainit Park Rd. Pob.
Nabunturan Sect.XI 3.557 180 C 0.207 - 0.500 - - - 70.70 77.78%
Satisfactory
R.R. Seismundo Construction & Supply 10961 Const. of One (1) Cl School Bldg.
in New Allegria ES XI 0.384 60 C 0.367 0.209 0.300 - - - 87.60 84.80% V. Satisfactory
R.R. Seismundo Construction & Supply 10961 Const. of One (1) CL School Bldg.,
at Montevista NHS, DNAS XI 0.469 45 O 0.352 0.000 0.100 0.020 0.032 0.100 60.40 -
R.R. Seismundo Construction & Supply 10961 Const. of Two (2) CL Bldg., @
Mawab Nat'l. High School XI 0.723 50 C 0.475 - 0.500 - - - 97.50 97.50% Outstanding
R.R. Tandem Construction Corporation 12846 Rehab. of Manila North Road III 6.659 70 C 0.304 0.275 0.300 - - - 87.90 *87.90%
V. Satisfactory
R.S. Reyna Construction 9648 Const. of Inopacan Seawall VIII 4.698 120 C 0.350 0.200 0.300 - - - 85.00 80.92% V. Satisfactory
R.S. Reyna Construction 9648 Const. of MPB @ Brgy. Maybog (Phase II) VIII 0.469 50 C 0.221 0.200 0.300 - - - 72.10 *72.10%
Satisfactory
R.S. Reyna Construction 9648 Const. of MPB @ Brgy. Proteccion (Phase II) VIII 0.471 45 C 0.356 0.200 0.300 - - - 85.60 *85.60%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page416
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.S. Sepian Construction and Trucking 20519 Impvt./Rehab. of Bontoc-Lubuagan
Tabuk Rd., Circle-Caluttit Road CAR 13.470 191 C 0.325 0.300 0.000 - - - 62.50 63.72% Fair
R.T. Lim Construction and Supply 17045 Conc. of Road, Pan-ay Diot X 0.877 90 C 0.313 0.200 0.300 - - - 81.30 *81.30% V. Satisfactory
R.T. Lim Construction and Supply 17045 Improvement of Roads Including Drainage, Ozamis-Oroquieta Road X 0.803 90 C 0.381 - 0.500 - - - 88.10 *88.10%
V. Satisfactory
R.T. Morabe Construction 11377 Completion of UP Tacloban Multi-Purpose Bldg. VIII 0.921 90 C 0.462 - 0.500 - - - 96.20 *96.20%
Outstanding
R.T. Morabe Construction 11377 Conc. of Municipal Road VIII 4.720 145 C 0.321 0.200 0.300 - - - 82.10 *82.10% V.Satisfactory
R.T. Morabe Construction 11377 Conc. of Oras-San Policarpio Road Sect. VIII 9.430 120 C 0.341 0.109 0.000 - - - 45.00 61.20%
Fair
R.T. Morabe Construction 11377Concreting of Tabango-Catmon
(La Fortuna) Manlawaan-Gimarco Road Km 1039+540-Km 1040+000
VIII 9.353 180 O 0.341 0.026 0.150 0.030 0.037 0.033 61.70 -
R.T. Morabe Construction 11377 Const. of Oras-Concepcion-Jipapad Rd VIII 11.428 237 C 0.385 - 0.500 - - - 88.50 83.46%
V.Satisfactory
R.T. Morabe Construction 11377 Impvt. of ABC Hall VIII 0.192 120 C 0.371 0.200 0.300 - - - 87.10 *87.10% V.Satisfactory
R.T.Y. Construction 10341 Completion of San Roque Bridge I along Eco-Tourism Road IV-A 14.291 80 O 0.329 0.240 0.100 0.030 0.042 0.100 *84.10 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page417
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.T.Y. Construction 10341Completion/Continuation of
Unfinished/On-going Bridge, San Roque Bridge I
IV-A 15.324 90 C 0.380 0.300 0.300 - - - 98.00 87.02% V. Satisfactory
R.T.Y. Construction 10341 Conc. of Bachao-Ibaba FMR IV-B 0.285 90 C 0.313 0.283 0.300 - - - 89.60 *89.60% V. Satisfactory
R.T.Y. Construction 10341Conc. of Boac-Mogpog
Circumferential Road (Murallon-Tampos Section)
IV-B 6.645 90 O 0.341 0.300 0.100 0.023 0.022 0.100 88.60 -
R.T.Y. Construction 10341 Conc. of Catanuan-San Roque (Agno) Road IV-A 6.750 90 C 0.306 0.200 0.300 - - - 80.60 *80.60%
V. Satisfactory
R.T.Y. Construction 10341 Conc. of Marinduque Circumferential Road, Dili Section IV-B 2.658 85 C 0.295 0.294 0.300 - - - 88.90 *88.90%
V. Satisfactory
R.T.Y. Construction 10341 Conc. of MCR (Bantauyan-Sibucao Section) IV-B 2.620 60 C 0.315 0.200 0.300 - - - 81.50 *81.50%
V. Satisfactory
R.T.Y. Construction 10341 Conc. of San Narciso-San Andres Road, San Narciso Sect. IV-A 6.750 90 C 0.324 0.200 0.300 - - - 82.40 *82.40%
V. Satisfactory
R.T.Y. Construction 10341 Conc./Impvt. of Boac-Gasan Nat'l Road IV-B 10.803 135 C 0.343 0.219 0.300 - - - 86.20 70.54%
Satisfactory
R.T.Y. Construction 10341 Concreting of Sumangga-MagapuaMalusak Section IV-B 2.004 90 C 0.415 - 0.500 - - - *91.50 91.50%
Outstanding
R.T.Y. Construction 10341 Const. & Impvt. of Plaridel Bridge IV-A 4.773 90 C 0.357 0.200 0.300 - - - 85.70 82.46% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page418
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.T.Y. Construction 10341 Const. (Completion) of San Roque Bridge I along Eco-Tourism Road IV-A 9.573 90 C 0.378 0.249 0.300 - - - 92.70 *92.70%
Outstanding
R.T.Y. Construction 10341 Const. of 1 CL Sch. Bldg. At Brgy. Ajos E/S, Brgy. Ajos IV-A 0.558 45 C 0.493 0.100 0.300 - - - 89.30 *89.30%
V. Satisfactory
R.T.Y. Construction 10341 Const. of 1 CL Sch. Bldg., Brgy. San Isidro Elem. Sch. IV-A 1.020 75 C 0.398 0.210 0.300 - - - 90.80 *90.80%
Outstanding
R.T.Y. Construction 10341 Const. of 1 CL Sch. Bldg., Brgy. San Isidro National High Sch. IV-A 0.558 45 C 0.389 0.200 0.300 - - - 88.90 *88.90%
V. Satisfactory
R.T.Y. Construction 10341Const. of 2 Classroom 2 Storey School bldg., Lusacan National
High SchoolIV-A 1.435 30 C 0.369 0.200 0.300 - - - 86.90 *86.90%
V. Satisfactory
R.T.Y. Construction 10341 Const. of 2 Storey 2 CL School Bldg., @ Luis Palad National H/S IV-A 1.439 120 C 0.396 0.217 0.100 0.030 0.015 0.100 85.80 85.80%
V. Satisfactory
R.T.Y. Construction 10341 Const. of 2-Cl, 2-Storey S/B @ Talao-Talao E/S IV-A 1.405 150 C 0.447 - 0.500 - - - 94.70 *94.70%
Outstanding
R.T.Y. Construction 10341 Const. of Bagtingon River Control IV-B 4.732 100 C 0.294 0.300 0.300 - - - 89.40 *89.40% V. Satisfactory
R.T.Y. Construction 10341 Const. of Flood Control at Brgy. Muliguin IV-A 2.892 120 C 0.386 0.300 0.300 - - - 98.60 *98.60%
Outstanding
R.T.Y. Construction 10341 Const. of Line Canal IV-A 0.240 90 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page419
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.T.Y. Construction 10341 Const. of Magsaysay Elem. School IV-A 0.481 40 C 0.355 0.200 0.300 - - - 85.50 *85.50% V. Satisfactory
R.T.Y. Construction 10341 Const. of Multi-Purpose Bldg. (Covered Court) at South E/S IV-A 1.137 90 C 0.473 - 0.500 - - - 97.30 97.30%
Outstanding
R.T.Y. Construction 10341 Const. of One (1) CL Sch. Bldg. at Brgy. Kalilayan E/S IV-A 0.541 50 C 0.382 0.200 0.300 - - - 88.20 *88.20%
V. Satisfactory
R.T.Y. Construction 10341 Const. of Prov. Hospital (Dr. Damian Reyes Memorial Hospital IV-B 6.972 120 C 0.277 0.240 0.300 - - - 81.70 80.55%
V. Satisfactory
R.T.Y. Construction 10341 Const. of Various FMR (Caganhao B/R) IV-B 5.720 120 C 0.417 - 0.500 - - - 91.70 82.82%
V. Satisfactory
R.T.Y. Construction 10341Const./Impv't. of Multi-Purpose Bldg. @ Don Gregorio C. Yumul
Sr. E/SIV-A 0.473 60 C 0.476 - 0.500 - - - 97.60 *97.60%
Outstanding
R.T.Y. Construction 10341 Const./Impv't. of Spillway Bridge IV-A 0.472 40 C 0.369 0.233 0.300 - - - 90.20 *90.20% Outstanding
R.T.Y. Construction 10341 Construction of TESDA Training Center IV-B 14.395 180 O 0.390 0.204 0.150 0.030 0.018 0.050 84.20 -
R.T.Y. Construction 10341 Impvt./Rehab. of Quirino Highway IV-A 19.015 30 C 0.478 0.133 0.300 - - - 91.10 *91.10% V. Satisfactory
R.T.Y. Construction 10341 Rehab./Conc. of Dr. Damian Reyes Road (Torrijos Side) IV-B 48.245 240 O 0.362 0.179 0.150 0.030 0.025 0.050 79.60 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page420
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.T.Y. Construction 10341Rehab./Recont. And Conc. Paving of San Francisco-San Andres Nat'l
Road, San Andres SectionIV-A 19.298 150 C 0.327 0.300 0.300 - - - 92.70 90.54%
Outstanding
R.T.Y. Construction 10341Road Upgrading (Gravel to Conc.) (HDM4 Project Analysis), Talaba-
Summit-Panaon RoadIV-A 14.465 60 C 0.348 0.300 0.300 - - - 94.80 *94.80%
Outstanding
R.U. Aquino Construction 23507 Repair and Rehabilitation of 70 Male and Female Comfort Room DBP 21.506 240 C 0.339 0.200 0.216 - - - 75.48 75.48%
Unsatisfactory
R.V. Construction 6110
Conc. of Calbayog-Catarman Road, Mag-ubay-Nabang Sect.,
km.798+800-km. 803+500 w/ exceptions
VIII 4.275 120 C 0.385 0.300 0.300 - - - 98.50 83.38% V. Satisfactory
R.V. Construction 6110 Const. of 1 Cl School Bldg. @ Brgy. Cag-Olango E/S VIII 0.477 45 C 0.275 0.300 0.300 - - - 87.50 *87.50%
V. Satisfactory
R.V. Construction 6110 Const. of Cabay Seawall VIII 2.821 180 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory
R.V. Construction 6110 Const. of Covered Court VIII 1.392 60 O 0.269 0.300 0.070 0.015 0.032 0.067 75.30 -
R.V. Construction 6110 Const. of Gandara-Matuguinao Road VIII 0.952 90 C 0.431 - 0.500 - - - 93.10 *93.10%
Outstanding
R.V. Construction 6110 Const. of MPB @ Brgy. Obrero VIII 1.929 120 O 0.400 0.263 0.150 0.030 0.033 0.050 92.60 -
R.V. Construction 6110
Impvt./Rehab. of Flood Control Structure along Calbayog-
Catarman Road, Brgy. Oquendo Road Section
VIII 4.820 240 C 0.353 0.200 0.300 - - - 85.30 85.00% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page421
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.V. Construction 6110 Impvt./Rehab. of Flood Control Structure, Brgy. Tinambacan VIII 3.850 120 C 0.359 0.200 0.300 - - - 85.90 81.34%
V. Satisfactory
R.V. Construction 6110 Rehabilitation of Gadgaran-Limarayon Brgy. Road VIII 0.952 60 C 0.307 0.300 0.300 - - - 90.70 *90.70%
Outstanding
R.V. Construction 6110 Repair/Maintenance of Lirang Revetment VIII 0.962 50 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V. Satisfactory
R.V. Construction 6110
Widening of Calbayog-Catarman Road, Mag-ubay-Nabang Sect.,
km.798+800-km. 803+500 w/ exceptions
VIII 4.275 120 O 0.190 0.300 0.100 0.020 0.023 0.100 73.30 -
R.V. Construction 6110 Widening of Existing Road, Brgy. Macawat-Brgy. Roxas II VIII 4.820 180 C 0.271 0.200 0.300 - - - 77.10 84.54%
V. Satisfactory
R.V. Construction 6110 Zamboanga Airport Development Project DOTC 5.738 180 C 0.466 0.200 0.300 - - - 96.60 96.60%
Outstanding
R.V. Gaitan Merchandising 7075 Const. of MPB @ Guimaras State College VI 1.283 110 C 0.314 0.200 0.300 - - - 81.40 *81.40%
V. Satisfactory
R.V. Gaitan Merchandising 7075 Const. of MPB @ Sta. Teresa E/S VI 0.419 70 C 0.370 0.200 0.300 - - - 87.00 80.42% V. Satisfactory
R.V. Gaitan Merchandising 7075 Const. of MPB, San Miguel VI 0.236 45 C 0.473 - 0.500 - - - 97.30 97.30% Outstanding
R.V. Laborte Builders 20459 Completio of Olongtao MPB IV-A 3.370 90 O 0.325 0.300 0.100 0.020 0.023 0.100 86.80 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page422
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.V. Laborte Builders 20459 Concreting of Tiaong By-Pass Road IV-A 9.435 54 C 0.362 0.200 0.300 - - - 86.20 *86.20%
V. Satisfactory
R.V. Laborte Builders 20459 Concreting of Torrijos-Buenavista National Road (Phase I) IV-B 2.869 70 C 0.422 - 0.500 - - - 92.20 91.00%
Outstanding
R.V. Laborte Builders 20459
Concreting of Torrijos-Buenavista Road with exception Km.78+034-Km.78+463 (Marilao Sect.) and
Km.72+300-Km.73+367, Banocboc Section
IV-B 8.687 165 C 0.314 0.300 0.300 - - - 91.40 90.14% Outstanding
R.V. Laborte Builders 20459 Const. of 1-Cl School Building IV-A 0.376 120 C 0.295 0.300 0.300 - - - 89.50 *89.50% V. Satisfactory
R.V. Laborte Builders 20459 Const. of 1-Cl School Building @ Jongo E/S IV-A 0.376 120 C 0.154 0.300 0.300 - - - 75.40 *75.40%
Satisfactory
R.V. Laborte Builders 20459 Const. of 2-Storey, 2-Cl S/B @ Gumaca 1 CS IVA 1.320 120 C 0.392 - 0.500 - - - 89.20 *89.20%
V. Satisfactory
R.V. Laborte Builders 20459 Const. of MPB @ Maasin Norte E/S IV-A 1.052 40 C 0.360 0.300 0.300 - - - 96.00 *96.00%
Outstanding
R.V. Laborte Builders 20459 Const./Impvt. of MSR, Daang Maharlika IV-A 14.457 40 C 0.382 0.200 0.300 - - - 88.20 *88.20%
V. Satisfactory
R.V. Laborte Builders 20459 Impvt. of (Geometric & Protective Wall) Tiaong By-Pass Road IV-A 10.495 166 C 0.304 0.200 0.300 - - - 80.40 81.78%
V. Satisfactory
R.V. Laborte Builders 20459 Impv't./Concreting of Various Municipal Roads IV-B 10.625 196 C 0.275 - 0.500 - - - 77.50 74.92%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page423
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R.V. Laborte Builders 20459 Rehab. of FMR, Sitio Yungib IV-A 0.383 90 C 0.347 0.300 0.300 - - - 94.70 85.76% V. Satisfactory
R.V. Laborte Builders 20459 Rehab./Impvt. of MSR-Jct.-Tiaong Dolores Road (Asphalt Section) IV-A 14.359 120 C 0.353 0.300 0.300 - - - 95.30 88.16%
V. Satisfactory
R.V. Laborte Builders 20459
Rehab./Recont. And Conc. Paving of Mulanay-San Francisco-San Andres Nat'l Road, San Andres
Section
IV-A 9.640 90 C 0.361 0.300 0.300 - - - 96.10 89.98% V. Satisfactory
R.V. Rieta Trading & Gen. Construction 28671 Conc. of Binakayan Diversion
Road IV-A 9.553 90 C 0.359 0.300 0.300 - - - 95.90 *95.90% Outstanding
R.V. Rieta Trading & Gen. Construction 28671 Concreting of Roads at San
Rafael III IV-A 0.288 60 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding
R.V. Rieta Trading & Gen. Construction 28671 Const. of 2 Storey MPB IV-A 0.575 120 O 0.295 0.263 0.100 0.030 0.018 0.100 80.60 -
R.V. Rieta Trading & Gen. Construction 28671 Const. of 4 CL Sch. Bldg. at
Bacoor E/S IV-A 1.720 130 C 0.260 0.225 0.300 - - - 78.50 *78.50% Satisfactory
R.V. Rieta Trading & Gen. Construction 28671 Const. of Concrete Pathway IV-A 0.191 45 C 0.295 0.300 0.300 - - - 89.50 *89.50%
V. Satisfactory
R.V. Rieta Trading & Gen. Construction 28671 Impvt. (Conc. Widening) of
Dasmarinas-Carmona Road IV-A 9.553 104 C 0.255 0.200 0.300 - - - 75.50 *75.50% Satisfactory
R.V. Rieta Trading & Gen. Construction 28671 Slope Protection along Ilang-ilang
River, Sta. Rosa & San Antonio II IV-A 4.033 90 C 0.250 0.200 0.300 - - - 75.00 *75.00% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page424
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R2K Builders Construction and Trading 29708 Const. of Sch. Bldg. at Brgy. High
School Poblacion III 1.896 60 C 0.366 0.269 0.300 - - - 93.50 *93.50% Outstanding
Rabbit Construction & Development Corporation 8545
Completion (Impvt./Conc. Paving) of Licomo-Quiniput Road,
Segment 1 (Sinoropan-Vitali Section)
IX 33.007 280 C 0.306 0.300 0.000 - - - 60.60 77.46% Satisfactory
Rabbit Construction & Development Corporation 8545 Reconst. of Zamboanga City-
Labuan-Limpapa Road IX 46.600 365 O 0.320 0.300 0.100 0.030 0.045 0.100 89.50 -
Rabbit Construction & Development Corporation 8545 Reconst. of Zamboanga City-
Labuan-Limpapa Road IX 46.600 365 O 0.346 0.243 0.150 0.030 0.060 0.050 87.90 -
Rachel Faye Construction 30339 Conc. of Modayan-Kitongan FMR CAR 0.284 30 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Rachki Enterprises (Formerly: Geto Const.) 17689 Const. of MPB at Bilibiran IV-A 0.288 60 C 0.306 0.200 0.300 - - - 80.60 83.61%
V. Satisfactory
Rachki Enterprises (Formerly: Geto Const.) 17689 Impvt./Rehab. of Drainage, Marcos
Highway (Intermittent Sections) IV-A 0.956 90 C 0.388 0.200 0.300 - - - 88.80 *88.80% V. Satisfactory
Rachki Enterprises (Formerly: Geto Const.) 17689
Riprapping/Impvt. of Various Brgys. (Package II) Upper East
Kamias CreekIV-A 2.586 150 C 0.305 0.200 0.300 - - - 80.50 *80.50%
V. Satisfactory
Racso Construction 14601 Const. of DPWH Ifugao DEO, Phase II CAR 2.378 60 C 0.339 0.118 0.000 - - - 45.70 71.22%
Satisfactory
Racso Construction 14601 Improvement of Nueva Viscaya-Ifugao-Mt. Province Bdry. Road CAR 1.196 92 C 0.415 - 0.500 - - - 91.50 82.92%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page425
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Racso Construction 14601 Impv't. along Nueva Viscaya-Ifugao-Mt. Province Bdry. Rd. CAR 0.985 56 C 0.373 - 0.500 - - - 87.30 85.86%
V.Satisfactory
Racso Construction 14601Preventive Maint. Along Nueva
Vizcaya-Ifugao-Mt. Province Bdry. Road
CAR 4.572 80 C 0.393 0.200 0.300 - - - 89.30 79.40% Unsatisfactory
Racso Construction 14601Widening/Conc. of Banaue-
Hungdan-Tinoc-Benguet Bdry. Road, Gohang-Ujah Section
CAR 1.899 60 C 0.351 0.088 0.300 - - - 73.90 70.72% Satisfactory
Radd Construction 9649 Construction of Multi-Purpose Building III 0.715 75 C 0.481 0.133 0.300 - - - 91.40 *91.40%
V. Satisfactory
Radiance Traders & Builders 32891 Const. of Aurora DEO III 1.909 75 C 0.385 0.247 0.300 - - - 93.20 *93.20% Outstanding
Radiance Traders & Builders 32891 Construction of Two (2) CL School Building, Gupa E/S, Brgy, Gupa III 1.189 90 C 0.474 0.149 0.300 - - - 92.30 *92.30%
V. Satisfactory
Raf General Construction 6699 Const. of Baguinge-Mappit FMR CAR 0.465 60 O 0.322 0.196 0.100 0.007 0.030 0.100 *75.50 -
Raf General Construction 6699 Const. of Chico River Flood Control, Bontoc Section CAR 4.815 130 C 0.248 0.200 0.300 - - - 74.80 *74.80%
Satisfactory
Raf General Construction 6699 Const. of Flood Control X 4.787 140 C 0.239 0.300 0.300 - - - 83.90 *83.90% V.Satisfactory
Raf General Construction 6699 Const. of MPB @ Upper Jasaan X 1.445 95 C 0.362 0.259 0.300 - - - 92.10 *92.10% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page426
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Rain Construction 15959 Const. of Multi-Purpose Pavement @ Alabang E/S NCR 1.717 45 C 0.389 0.300 0.300 - - - 98.90 *98.90%
Outstanding
Rain Construction 29977 Const./Rehab. of MPB NCR 2.489 165 C 0.371 0.200 0.300 - - - 87.10 *87.10% V.Satisfactory
Rain Construction 15959 Drainage Impvt.of Aguinaldo St. and Col. Santos St. NCR 2.860 75 C 0.374 0.200 0.300 - - - 87.40 *87.40%
V. Satisfactory
Ramar Enterprises 8092Const. of Iriga Flood Control and
Drainage Structure PNR, San Francisco-San Roque
V 4.618 200 C 0.434 - 0.500 - - - 93.40 90.10% Outstanding
Ramar Enterprises 8092Deepening/Earthdiking of
Nancascasan River, Balangibang-Apad-Lanigay Sect.
V 19.155 90 C 0.400 - 0.500 - - - 90.00 *90.00% V. Satisfactory
Ramar Enterprises 8092 Rehab. of Malinta-Tigbao Road V 4.738 60 C 0.371 0.300 0.300 - - - 97.10 91.46% Outstanding
Ramconstrack Dev't Services & Supplies 22821 Rehab. of Old Hospital Building,
Malasin II 1.904 163 C 0.297 0.200 0.300 - - - 79.70 55.97% Poor
Ramconstrak Dev't Services & Supplies 22821 Conc. of Anting Road II 1.445 48 C 0.262 0.200 0.300 - - - 76.20 *76.20%
Satisfactory
Ramijo Construction 10963 Const. of MPB VII 0.958 50 C 0.264 0.300 0.300 - - - 86.40 *86.40% V. Satisfactory
Ramijo Construction 10963 Repair/Rehab. of Road VII 0.712 75 C 0.459 0.200 0.300 - - - 95.90 *95.90% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page427
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ramijo Construction 10963 Repair/Rehab. of Road VII 0.711 75 C 0.355 0.199 0.300 - - - 85.40 *85.40% Satisfactory
Ramises Construction 17351 Const. of Lake Mainit Circumferential Road XIII 6.219 120 C 0.454 - 0.500 - - - 95.40 95.40%
Outstanding
Ramona Construction & Enterprises 14661 Const. of Multi-Purpose Bldg VII 0.865 90 C 0.396 - 0.500 - - - 89.60 71.89%
Satisfactory
Ramona Construction & Enterprises 14661 Repair/Rahab./Impv't. of FMR at
Olo VII 0.372 65 C 0.413 - 0.500 - - - 91.30 91.30% Outstanding
Ramona Construction and Enterprises 14661
Conc. of Jct. Tubod-Lakewood Nat'l Secondary Road (Biswangan-
Lukuan Section)IX 9.189 132 C 0.355 0.114 0.300 - - - 76.90 74.86%
Satisfactory
Ramona Construction and Enterprises 14661 Conc. of Midsalip-Sominot Road IX 4.645 98 C 0.317 0.200 0.300 - - - 81.70 77.98%
Satisfactory
Ramona Construction and Enterprises 14661 Concreting of Poblacion Malangas
Road IX 0.933 35 C 0.375 0.200 0.300 - - - 87.50 *87.50% Satisfactory
Ramona Construction and Enterprises 14661
Concreting of Siquijor Circumferential Road Sta. 0+000-
Sta.0+130VII 1.867 180 C 0.341 0.300 0.300 - - - 94.10 92.06%
Outstanding
Ramona Construction and Enterprises 14661 Const. of 2 CL School Bldg. @
Payao NHS IX 0.871 100 C 0.369 0.218 0.300 - - - 88.70 74.00% Satisfactory
Ramona Construction and Enterprises 14661 Const. of MPB Phase 1 IX 4.600 175 C 0.285 0.169 0.300 - - - 75.40 73.65%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page428
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ramona Construction and Enterprises 14661 Const. of Multi-Purpose Building VII 4.722 240 C 0.378 0.168 0.300 - - - 84.60 87.47%
V. Satisfactory
Ramona Construction and Enterprises 14661 Repair/Rehab. of Campalanas to
Lower Cabangcalan Brgy. Road VII 0.928 120 C 0.341 0.213 0.300 - - - 85.40 *85.40% V.Satisfactory
Ramona Construction and Enterprises 14661 Repair/Rehab. of FMR at
Campalanas-Cangmunag VII 0.744 80 C 0.289 0.300 0.300 - - - 88.90 *88.90% V. Satisfactory
Ramona Construction and Enterprises 14661 Repair/Rehab. of Licoan (to Bonga
to Capisacan) Brgy. Road VII 0.931 120 C 0.350 0.206 0.300 - - - 85.60 *85.60% V.Satisfactory
Ramsa Construction 25580 Completion of Home Economics Bldg., Pug-os E/S I 0.283 49 C 0.473 - 0.500 - - - 97.30 97.30%
Outstanding
Ramsa Construction 25580 Conc. of MNR Solot-Solot Road I 0.608 16 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory
Ramsa Construction 25580 Const. of Tagudin Bridge I 0.758 24 C 0.305 - 0.500 - - - 80.50 *80.50% V. Satisfactory
Ramsa Construction 25580 Improvement/Concreting of FMR Bayubay Sur I 0.473 16 C 0.375 - 0.500 - - - 87.50 87.50%
V. Satisfactory
Ramsa Construction 25580 Impv't./Concreting of Farm-to-Market Road, Brgy. Nanerma I 0.472 16 C 0.285 - 0.500 - - - 78.50 78.50%
Satisfactory
Rano's Construction 11433 Const. of Public Market XII 1.366 87 C 0.358 0.300 0.300 - - - 95.80 62.62% Fair
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page429
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Rano's Construction 11433 Repair/Rehab. & Impv't. of Cabidianan-Mainit Sect. XI 4.815 52 C 0.300 - 0.500 - - - 80.00 80.00%
Satisfactory
Rasec Builders & General Merchandise 13866 Const. of MPB @ Brgy. Caduawan VII 0.186 77 C 0.335 0.300 0.300 - - - 93.50 *93.50%
Outstanding
Raykin Construction and Supply 14404 Const. of School Bldg., @ Tagum National High School XI 0.944 60 C 0.437 - 0.500 - - - 93.70 88.94%
V. Satisfactory
Raykin Construction and Supply 14404 Improvement of National Road along Cateel-Baganga Section XI 9.434 180 C 0.358 0.200 0.300 - - - 85.80 *85.80%
V.Satisfactory
Raykin Construction and Supply 14404 Impv't. of Roads along Caraga Sect. XI 4.704 113 C 0.384 - 0.500 - - - 88.40 88.82%
V. Satisfactory
Raykin Construction and Supply 14404 Impvt./Rehab. of Lumao-San Antonio Section XI 9.209 180 C 0.331 0.200 0.300 - - - 83.10 83.34%
V.Satisfactory
Raymundo H. Tecson Const. 21681 Impv't./Concreting of Baguio-Cadalian Road XI 4.091 180 C 0.447 - 0.500 - - - 94.70 71.48%
Satisfactory
Raymundo H. Tecson Construction 21681 Const. of Bridge @ Purok 2 XI 1.354 100 C 0.302 - 0.500 - - - 80.20 *80.20%
V. Satisfactory
RBM Construction 5961 Const. of Multi-Purpose Bldg. Brgy. Gen. Luna III 0.468 60 C 0.451 - 0.500 - - - 95.10 73.82%
Satisfactory
RBM Construction 5961 Const. of Salian Concrete Revetment Brgy. Salian III 0.470 60 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page430
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
RBT Construction 15290 Impv't. of Multi-Purpose Bldg., @ Brgy. Nangkaan IV-A 0.191 45 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
RCD Gen. Contractor & Construction Supply 21616 Rehab. of Don Andres, Valdez &
Ferdinand Road I 2.143 83 C 0.425 - 0.500 - - - 92.50 92.50% Outstanding
RCD General Contractor & Construction Supply 21616 Completion of Banna Multi-
Purpose Hall I 2.850 180 C 0.386 0.200 0.300 - - - 88.60 85.94% V. Satisfactory
RCD General Contractor & Construction Supply 21616 Const. of MPB (Phase I) at Brgy.
Madamba I 0.379 45 C 0.194 0.300 0.300 - - - 79.40 *79.40% Satisfactory
RCDG Construction Corp. 5063
Impv't./Widening of Z.C. West Coast Road (Caragasan-Maasin Sect.) & Const. of 1 Barrel RCBC with exception of Maasin Bridge
IX 11.560 330 O 0.382 0.239 0.100 0.030 0.058 0.100 90.90 -
RCDG Construction Corp. 5063Widening of Zamboanga City West
Coast Road, Const. of Three (3) Barrels RCBC
IX 4.678 178 O 0.349 0.240 0.100 0.030 0.059 0.100 87.80 -
R'Cel Gen. Contractor & Gen. Merchandise 13385 Const. of MPB at Brgy. Pob. 1 IV-A 1.337 60 C 0.461 0.155 0.300 - - - 91.60 *91.60%
V. Satisfactory
R'Cel Gen. Contractor & Gen. Merchandise 13385 Rehab. Reconst. of MSR San
Pablo Section IV-A 19.254 15 C 0.477 0.131 0.300 - - - 90.80 *90.80% V. Satisfactory
R'Cel General Contractor & General Merch. 13385 Concreting of Mabunga-San Isidro
Brgy. Road IV-A 0.471 20 C 0.398 - 0.500 - - - 89.80 89.80% V. Satisfactory
R'Cel General Contractor & General Merch. 13385 Concreting of Road at Hugo St.
Brgy. San Antonio IV-A 0.476 30 C 0.415 - 0.500 - - - 91.50 91.50% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page431
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R'Cel General Contractor & General Merch. 13385 Const. of FTM Road @ Nagcarlan-
Calauan Road IV-A 2.336 90 C 0.451 - 0.500 - - - 95.10 *95.10% Outstanding
R'Cel General Contractor & General Merchandise 13385 Completion of MPB @ Sta. Ana IV-A 0.955 50 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V. Satisfactory
R'Cel General Contractor & General Merchandise 13385 Completion of MPB @ Sto. Angel
Sur IV-A 0.955 45 C 0.372 0.200 0.300 - - - 87.20 *87.20% V. Satisfactory
R'Cel General Contractor & General Merchandise 13385 Const. of Academic Classroom at
Prudencia Fule NHS IV-A 1.465 75 C 0.353 0.259 0.300 - - - 91.20 *91.20% Outstanding
R'Cel General Contractor & General Merchandise 13385 Const. of Atingay Suspension
Bridge (Phase II) IV-A 2.192 45 C 0.308 0.278 0.300 - - - 88.60 *88.60% V. Satisfactory
R'Cel General Contractor & General Merchandise 13385 Const. of Drainage System IV-A 0.479 30 C 0.333 0.300 0.300 - - - 93.30 *93.30%
Outstanding
R'Cel General Contractor & General Merchandise 13385 Const. of FMR, Brgy. Bubukal IV-A 1.911 60 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
R'Cel General Contractor & General Merchandise 13385 Const. of Three (3) Storey, Six (6)
Classroom IV-A 4.776 184 O 0.397 0.180 0.100 0.023 0.053 0.067 82.00 -
R'Cel General Contractor & General Merchandise 13385 Const./Completion of Limao-Perez
Bridge IV-A 14.250 360 C 0.340 0.200 0.300 - - - 84.00 77.85% Satisfactory
R'Cel General Contractor & General Merchandise 13385 Const./Conc. of Tala-Malasena
FMR IV-A 1.896 45 C 0.290 0.293 0.300 - - - 88.30 *88.30% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page432
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
R'Cel General Contractor & General Merchandise 13385 Impvt. of FMR at Brgy. San
Agustin IV-A 0.477 30 C 0.352 0.200 0.300 - - - 85.20 *85.20% V. Satisfactory
R'Cel General Contractor & General Merchandise 13385 Repair/Rehab. of FMR, Brgy. San
Andres & San Ildefonso IV-A 0.478 45 C 0.338 0.200 0.300 - - - 83.80 *83.80% V. Satisfactory
RD Cobacha Construction 8878 Const. of MPB @ Brgy. Lamak VIII 0.950 60 C 0.354 0.200 0.300 - - - 85.40 *85.40% V. Satisfactory
RD Cobacha Construction 8878 Const. of MPB, Andaya Bldg., Naval Institute of Technology VIII 0.950 110 C 0.183 0.249 0.300 - - - 73.20 78.80%
Satisfactory
RD Cobacha Construction 8878 Const. of Shoreline Protection, Phase II District I VIII 0.723 60 C 0.267 0.300 0.300 - - - 86.70 *86.70%
V. Satisfactory
RD Cobacha Construction 8878 Rehab. of Drainage System @ Brgy. 62-A VIII 1.445 75 C 0.498 0.139 0.300 - - - 93.70 *93.70%
V. Satisfactory
RD Cobacha Construction 8878 Rehab./Impvt. of Bangon Flood Control VIII 1.920 90 C 0.371 0.200 0.300 - - - 87.10 89.38%
V. Satisfactory
RD Cobacha Construction 8878 Repair of Main DPWH Bldg., Eastern Samar DEO VIII 0.856 60 C 0.400 0.194 0.300 - - - 89.40 *89.40%
V.Satisfactory
RD Cobacha Construction 8878 Road Opening / Rehab. of FMR @ Tangay-Aligarog Road VIII 2.829 124 C 0.324 0.200 0.000 - - - 52.40 *52.40%
Poor
RD Pimentel Construction 19487 Completion of Multi-Purpose Building CAR 0.282 30 C 0.451 - 0.500 - - - 95.10 *95.10%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page433
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
RD Pimentel Construction 19487 Const. of Flood Control @ Magsaysay Private Road Barangay CAR 0.953 40 C 0.267 0.200 0.300 - - - 76.70 *76.70%
Satisfactory
RDF Construction and Supply 12843 Const. of Barangay Hall @ Tubod XI 0.561 60 C 0.357 - 0.500 - - - 85.70 81.22% V. Satisfactory
RDF Construction and Supply 12843 Const. of MPB @ F. Bustamante E/S XI 0.809 112 C 0.367 0.300 0.300 - - - 96.70 88.72%
V.Satisfactory
RDG Construction & Supply (Formerly: RDG Construction) 19488 Const. of Multi Purpose Pavement
@ Bastida E/S Science Park XI 1.181 90 C 0.346 0.300 0.300 - - - 94.60 93.04% Outstanding
Readycon Trading & Const. Corp. 15452 Asphalt Overlay along P. Burgos-Pototanin Jct. Road IV-A 12.124 15 C 0.429 0.200 0.300 - - - 92.90 *92.90%
V. Satisfactory
Readycon Trading & Const. Corp. 15452 Impvt./Rehab. of San Juan-Laiya Road, Calubcub Section IV-A 12.537 181 C 0.470 0.133 0.300 - - - 90.30 *90.30%
V. Satisfactory
Readycon Trading & Const. Corp. 15452
Repair & Maint. of Nat'l Road & Bridges (Asphalt Overlay) alon P. Burgos-Potatanin Road (Malicboy
Section)
IV-A 9.949 10 C 0.362 0.200 0.300 - - - 86.20 *86.20% V. Satisfactory
Readycon Trading & Const. Corp. 15452Repair/Impvt. Asphalt Overlay of Marikina-Victoria Valley-Antipolo
RoadIV-A 14.430 120 C 0.286 0.200 0.300 - - - 78.60 *78.60%
Satisfactory
Readycon Trading & Const. Corp. 15452 Repair/Rehab. of MSR Old Route IV-A 14.401 15 C 0.274 0.200 0.300 - - - 77.40 *77.40% Satisfactory
Rebcor Construction 18427 Const. of NOGROCOMA Brgy. Rizal III 2.325 90 C 0.400 0.161 0.300 - - - 86.10 *86.10%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page434
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Rebsons Construction 17118 Const. of Mambalili-Sitio Bong FMR XIII 7.545 285 C 0.400 0.200 0.300 - - - 90.00 88.26%
V. Satisfactory
Red Mole Construction 15710 Const. of Uyugan Diversion Road II 1.922 140 C 0.417 - 0.500 - - - 91.70 91.70% Outstanding
Red Scorpion Construction & Supply 32046 Completion of San Roque E/S NCR 0.812 75 C 0.355 0.300 0.300 - - - 95.50 *95.50%
Outstanding
Red Scorpion Construction & Supply 32045 Const. of Multi-Purpose Hall, Brgy.
Guitnang Bayan I IV-A 0.958 60 C 0.226 0.281 0.300 - - - 80.70 *80.70% V. Satisfactory
Redcar Trading & Construction 27368 Const. of Multi-Purpose Hall at Topland NCR 1.878 75 C 0.457 - 0.500 - - - 95.70 95.70%
Outstanding
Redcar Trading & Construction 27368Impvt. of Multi-Purpose Pavement @ Victoria Homes E/S (Tunasan
E/S Annex)NCR 2.372 60 C 0.387 0.206 0.300 - - - 89.30 *89.30%
V. Satisfactory
Redcar Trading & Construction 27368 Renovation of MPB, Rainbow Village, Brgy. San Isidro NCR 1.428 70 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
Redcar Trading & Construction 27368 Repair/Rehab. of MPB NCR 2.383 60 C 0.391 0.300 0.300 - - - 99.10 92.52% Outstanding
Redcar Trading & Construction 27368Repair/Rehab. of MPH, JPA
Subdivision (Biason Covered Court)
NCR 1.152 45 C 0.294 0.200 0.300 - - - 79.40 *79.40% Satisfactory
REE Construction 10342 Conc. of FMR @ Brgy. Luna IVA 0.374 45 C 0.397 - 0.500 - - - 89.70 *89.70% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page435
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
REE Construction 10342 Conc. of Road at Brgy. Bulihan IVA 0.471 60 C 0.357 0.216 0.300 - - - 87.30 *87.30% V. Satisfactory
Regenterprises Const. *Fabrication* Supplies & Gen.
Services17177 Conc. of Bambang-Kasibu-Solano
National Road, Caloocan Section II 9.349 90 C 0.274 0.300 0.300 - - - 87.40 *87.40% V. Satisfactory
Regenterprises Const. *Fabrication* Supplies & Gen.
Services17177 Const. of Abatan E/S School Bldg. II 0.442 91 C 0.328 0.137 0.300 - - - 76.50 71.32%
Satisfactory
Regenterprises Const. *Fabrication* Supplies & Gen.
Services17177 Const. of Drainage along Daang
Maharlika II 4.649 150 O 0.310 0.157 0.100 0.030 0.044 0.200 84.10 -
Regional Infrastructure Development Corporation 26373 Conc. of Bah-bah-Prosperidad
Road XIII 2.819 150 C 0.347 0.200 0.300 - - - 84.70 *84.70% V. Satisfactory
Regional Infrastructure Development Corporation 26373 Conc. of Talacogon-La Paz Road XIII 9.593 163 C 0.326 0.200 0.300 - - - 82.60 81.01%
V. Satisfactory
Regional Infrastructure Development Corporation 26373 Conc. of Trento-Bislig Road
(Salvacion Section XIII 9.580 300 C 0.267 0.300 0.300 - - - 86.70 84.72% V. Satisfactory
Regional Infrastructure Development Corporation 26373 Conc. of Zillovia Road Section
along Talacogon San Luis Road XIII 2.342 135 C 0.388 0.200 0.300 - - - 88.80 92.94% Outstanding
Regional Infrastructure Development Corporation 26373 Concreting of Brgy. Marbon along
Secondary Road XIII 1.885 90 C 0.299 0.300 0.300 - - - 89.90 89.12% V. Satisfactory
Regional Infrastructure Development Corporation 26373 Concreting of Osmeña-
Magkiangkang Road XIII 2.780 160 C 0.234 0.300 0.300 - - - 83.40 89.58% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page436
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Regional Infrastructure Development Corporation 26373 Concreting of Talacogon-DPWH
Road Section XIII 2.330 100 C 0.365 0.200 0.300 - - - 86.50 *86.50% V. Satisfactory
Regional Infrastructure Development Corporation 26373
Const. of Earth Canal at Talacogon-La Paz Road, along
Circumferential Road XIII 3.733 120 O 0.333 - 0.200 0.050 0.040 0.250 87.30 -
Regional Infrastructure Development Corporation 26373 Const. of Mas-Omot Road,
Prosperidad ARC XIII 24.656 405 C 0.339 0.300 0.300 - - - 93.90 91.34% Outstanding
Regional Infrastructure Development Corporation 26373
Gravelling of Talacogon-La Paz-Loreto-Veruela-Sta. Josefa
Circumferential Rd., Desamparados-Osmena-Silco-
Waloe Sect.
XIII 11.515 215 C 0.250 0.200 0.300 - - - 75.00 73.68% Satisfactory
Regional Infrastructure Development Corporation 26373
Restoration of Andanan Bank Protection & Installation of Spur Dike along Agusan-Davao Road
XIII 10.792 225 C 0.237 0.186 0.300 - - - 72.30 84.27% V. Satisfactory
Regional Infrastructure Development Corporation 26373 Restoration of Shore Protection,
Afga Slip Agusan-Davao Road XIII 7.493 200 C 0.306 0.200 0.300 - - - 80.60 80.30% V. Satisfactory
Regional Planners and Builders 13636 Suclaran Port Development Project DOTC 4.791 120 C 0.463 0.200 0.300 - - - 96.30 96.30%
Outstanding
Reko General Konstruct 14663 Conc. of Baguio-Itogon-Dalupirip Rd. km. 248+906.5-km. 249+119.5 CAR 2.890 60 C 0.328 0.200 0.300 - - - 82.80 *82.80%
V. Satisfactory
Reko General Konstruct 14663Conc. of Gurel-Bokod-Kabayan
Buguias Road, km. 304+240-Km. 394+978
CAR 6.669 150 C 0.355 0.100 0.300 - - - 75.50 81.53% V. Satisfactory
Rely Construction & Supply 10433 Asphalt Overlay Jct.-Malalag, Davao del Sur XI 4.750 60 C 0.470 0.140 0.300 - - - 91.00 *91.00%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page437
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Rely Construction & Supply 10433 Conc. of Bislig-Trento Road XIII 18.949 150 C 0.152 0.300 0.300 - - - 75.20 73.82% Satisfactory
Rely Construction & Supply 10433 Conc. of Juction Lingig-Trento Road XIII 28.878 230 O 0.342 0.212 0.100 0.030 0.043 0.100 82.70 -
Rely Construction & Supply 10433 Conc. of Juction Lingig-Trento Road XIII 28.878 230 O 0.329 0.300 0.150 0.030 0.037 0.050 89.60 -
Rely Construction & Supply 10433 Const. of Bigaan Bridge XIII 14.383 270 C 0.230 0.200 0.300 - - - 73.00 76.90% Satisfactory
Rely Construction & Supply 10433 Const. of Brgy. Roads Tubigon XI 1.886 90 C 0.379 0.060 0.300 - - - 73.90 76.60% Satisfactory
Rely Construction & Supply 10433 Const. of Flood Control XI 4.381 75 C 0.301 0.200 0.300 - - - 80.10 84.30% V. Satisfactory
Rely Construction & Supply 10433Const. of Libuganon Flood Control
crossing Agusan-Davao River, Tagum-Asuncion Area
XI 9.436 90 C 0.201 0.300 0.300 - - - 80.10 77.40% Satisfactory
Rely Construction & Supply 10433Const. of Pigsapawan Bridge & Approaches, Tibanban-Lavigan
RoadXI 10.792 200 C 0.302 0.300 0.300 - - - 90.20 79.16%
Satisfactory
Rely Construction & Supply 10433 Impvt. of Cadalian-Baguio Road XI 14.164 210 O 0.389 0.278 0.100 0.030 0.043 0.100 94.00 -
Rely Construction & Supply 10433 Impvt./Rehab. of Dapnan-Lambajon Section XI 9.607 180 C 0.336 0.200 0.300 - - - 83.60 85.34%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page438
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Rely Construction & Supply 10433 Impv't/Conc. of Calinan-Baguio-Cadalian Road XI 9.599 210 C 0.345 0.287 0.300 - - - 93.20 93.20%
Outstanding
Rely Construction & Supply 10433Impv't/Widening of Agusan-Davao
Road, Daang Maharlika, Pob. Carmen and Pob. Panabo
XI 38.575 270 O 0.337 0.252 0.150 0.030 0.043 0.050 86.20 -
Rely Construction & Supply 10433 Rehab./Impv't. of Damian Reyes Memorial Road (Boac Side) IV-B 14.244 70 C 0.241 0.300 0.300 - - - 84.10 *84.10%
V. Satisfactory
Rely Construction & Supply 10433
Rehab./Impv't. of Tagum-Asuncion-Kapalong-Sto. Tomas-Dapecol-
Panabo Circ. Road, Kapalong-Sto. Tomas Sect.
XI 14.461 60 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
Rely Construction & Supply 10433 Rehab./Repair of Butuan City-Masao Port Road XIII 4.469 60 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Rely Construction & Supply 10433Repair/Rehab. of T-A-K-ST.-D-P
Circ. Road and Jct. Agusan-Davao Road-Panabo Wharf Road
XI 4.714 90 C 0.319 0.300 0.300 - - - 91.90 *91.90% Outstanding
Remigio General Construction 2298Conc. Over Renolith Roads,
MMSU-Bakukang Rd. Cangrunaan Rd. & Mabaleng Rd
I 2.856 101 C 0.447 - 0.500 - - - 94.70 93.08% Outstanding
Remigio General Construction 2298 Concreting of Farm-to-Market Road, Brgy. Talugtog I 1.925 55 C 0.331 0.200 0.300 - - - 83.10 *83.10%
Satisfactory
Remigio General Construction 2298 Const. of Reinforced concrete Flume along Ilocos Norte-Abra Rd. I 4.742 75 C 0.311 0.300 0.300 - - - 91.10 *91.10%
Outstanding
Remjie's Construction Development 13768 Conc. of Lino Type St., Four
Estate, San Antonio NCR 1.907 60 C 0.381 0.200 0.300 - - - 88.10 *88.10% V Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page439
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Remjie's Construction Development 13768 Conc. of San Andres St., Ramos
Compound, Sun Valley NCR 1.429 60 C 0.334 0.200 0.300 - - - 83.40 *83.40% V Satisfactory
Remp Enterprises 25916 Asphalting of Mars St., Coral St. & Osmundson St., Gordon Heights III 1.907 30 O 0.380 0.200 0.000 0.030 0.028 0.017 65.50 -
Remp Enterprises 25916 Const. of Drainage System @ Mercury St. III 0.465 30 O 0.310 0.175 0.100 0.030 0.029 0.200 84.40 -
Rene T. Bayawa Construction & Hauling Services 20740 Const. of 1 Unit 2 CL School Bldg.
@ Balok E/S IX 0.757 90 C 0.275 0.214 0.300 - - - 78.90 *78.90% Satisfactory
Rene T. Bayawa Construction & Hauling Services 20740 Repair/Rehab. of Library Bldg. at
Sindangan NHS IX 0.283 40 C 0.270 0.300 0.300 - - - 87.00 *87.00% V. Satisfactory
RENZ Const. & Trading 25605 Completion of Itbud Diversion Road II 0.479 50 C 0.458 - 0.500 - - - 95.80 95.80%
Outstanding
Revere Construction & Supply 17426 Const. of Rancho Bridge & Approaches IV-A 17.041 210 C 0.370 0.212 0.300 - - - 88.20 *88.20%
V. Satisfactory
Revere Construction & Supply 17426Rehab./Reconst. of Damaged
National Roads, Batangas-Quezon Road, Padre Garcia Section
IV-A 14.470 120 C 0.313 0.292 0.300 - - - 90.50 *90.50% Outstanding
Revere Construction & Supply 17426 Road Upgrading of Talisay-Laurel-Agoncillo Road IV-A 13.506 150 C 0.481 0.133 0.300 - - - 91.40 89.72%
V. Satisfactory
Revere Construction & Supply 17426 Asphalt Overlay of Lipa-Rosario Road IV-A 13.192 45 C 0.358 0.200 0.300 - - - 85.80 *85.80%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page440
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Revere Construction & Supply 17426 Const. of Multi-Purpose Bldg., @ Bilibinwang IV-A 0.336 45 C 0.364 0.207 0.300 - - - 87.10 *87.10%
V. Satisfactory
Revere Construction and Supply 17426 Asphalt Overlay of Brgy. Poblacion IV-A 1.147 90 C 0.490 - 0.500 - - - 99.00 *99.00%
Outstanding
Revere Construction and Supply 17426 Const. of 2 Cl @ Quiling E/S IV-A 0.770 60 C 0.265 0.300 0.300 - - - 86.50 *86.50% V. Satisfactory
Revere Construction and Supply 17426 Rehab. & Impvt. of Lipa-Balete Road, Km. 77+476 to Km. 80+876 IV-A 9.996 150 C 0.385 0.200 0.300 - - - 88.50 *88.50%
V. Satisfactory
Revere Construction and Supply 17426 Repair/Improvement of Lipa City Museum & Library IV-A 1.843 180 C 0.470 - 0.500 - - - 97.00 97.00%
Outstanding
Revere Construction and Supply 17426 Widening/Impvt. of Manila-Batangas Road, Lipa Section IV-A 9.641 150 C 0.388 0.200 0.300 - - - 88.80 *88.80%
V. Satisfactory
Rex E. Morales Construction 17427 Const. of Multi-Purpose Pavement VIII 0.944 75 C 0.418 - 0.500 - - - 91.80 *91.80% Outstanding
Reydan Builders 13059Concerting of Road & Reblocking Markel-Makar, Crossing Rubber
SectionXII 11.332 120 C 0.459 0.200 0.300 - - - 95.90 *95.90%
V. Satisfactory
Reydan Builders 13059 Const. of MPB @ Brgy. Lamba XII 0.950 105 C 0.376 0.300 0.300 - - - 97.60 97.53% Outstanding
Reydan Builders 13059 Const. of MPB @ Carpenter Hill XII 0.770 98 C 0.397 0.200 0.300 - - - 89.70 *89.70% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page441
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Reydan Builders 13059 Const. of Multi-Purpose Bldg., Open Warehouse (Mini-Gym) XI 1.218 110 C 0.446 - 0.500 - - - 94.60 62.12%
Fair
Reydan Builders 13059 Const. of Multi-Purpose Building (Mini Gym) XI 1.418 110 C 0.394 0.251 0.300 - - - 94.50 82.95%
V. Satisfactory
Reydan Builders 13059 Const. of Multi-Purpose Building @ Polomolok XII 0.460 63 C 0.394 - 0.500 - - - 89.40 *89.40%
V. Satisfactory
Reydan Builders 13059 Const. of Pedestrian Overpass XI 4.718 120 C 0.395 0.293 0.300 - - - 98.80 97.66% Outstanding
Reydan Builders 13059 Const. of San Felipe RCDG Bridge XII 3.856 168 C 0.387 0.145 0.300 - - - 83.20 84.88% V. Satisfactory
Reydan Builders 13059 Const. of Shadol I Bridge XII 4.308 285 C 0.381 0.293 0.300 - - - 97.40 88.91% V. Satisfactory
Reydan Builders 13059 Construction of Multi-Purpose Building, Brgy. M. Roxas XII 0.800 98 C 0.449 0.200 0.300 - - - 94.90 *94.90%
V. Satisfactory
Reyrose Construction 20748 Conc. of Various Municipal and Brgy. Roads II 1.149 120 O 0.327 0.240 0.100 0.023 0.025 0.100 81.50 -
Reyrose Construction 20742 Const. of Drainage System at Centro II 0.942 60 C 0.296 0.200 0.300 - - - 79.60 *79.60%
Satisfactory
RFN Construction and Development Corporation 8722 Const. of Special Education Bldg.,
(Additional 2Cl) NCR 1.444 75 C 0.290 - 0.500 - - - 79.00 82.90% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page442
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
RG & K Construction and General Merchandise 33021 Rehab. of MPB, Brgy. Poblacion X 0.240 30 C 0.421 0.133 0.300 - - - 85.40 *85.40%
Satisfactory
RGP Builders 20680 Concreting of Malvar-Punta FMR IV-A 1.875 120 C 0.432 - 0.500 - - - 93.20 93.20% Outstanding
RGP Builders 20680 Concreting of Unisan Seawall (Extension) IV-A 0.749 60 C 0.392 - 0.500 - - - 89.20 89.20%
V. Satisfactory
RGP Builders 20680 Const. of 3 Units School Building with CRs IV-A 1.347 120 O 0.383 0.300 0.100 0.030 0.022 0.100 93.50 -
RGP Builders 20680 Const. of Water Works System III 0.288 45 C 0.428 - 0.500 - - - 92.80 *92.80% Outstanding
RGP Builders 20680 Impvt. of Gen. Luna Public Market IV-A 0.478 30 C 0.250 0.300 0.300 - - - 85.00 *85.00% V.Satisfactory
RGP Builders 20680 Repair/Rehab. of Drainage System along Gen. Luna-Catanauan Road III 1.155 45 C 0.422 - 0.500 - - - 92.20 *92.20%
Outstanding
RGS Construction 14095 Const. of Various Multi-Purpose Building IX 0.314 30 C 0.366 0.200 0.300 - - - 86.60 *86.60%
V. Satisfactory
RGS Construction 14095 Concreting of Purok 4, FMR IX 0.180 34 C 0.425 - 0.500 - - - 92.50 92.50% Outstanding
RGS Construction 14095 Concreting/Widening of Dipolog-Aurora Road Sinaman IX 3.138 193 C 0.378 - 0.500 - - - 87.80 87.80%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page443
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
RGS Construction 14095 Const. of New Two (2) Storey MPB (TESDA) IX 4.722 315 C 0.316 0.200 0.300 - - - 81.60 74.46%
Satisfactory
RGS Construction 14095 Const. of Two (2) Storey Bldg. @ Jose Rizal Memorial State College IX 1.368 120 C 0.399 0.200 0.300 - - - 89.90 93.33%
Outstanding
RHH Construction 11467 Conc. of Burgos-General Aguinaldo National Road II 18.329 240 C 0.356 0.300 0.300 - - - 95.60 93.20%
Outstanding
RHH Construction 11467 Conc. of Jct. National Potia Road II 10.697 180 C 0.381 0.200 0.300 - - - 88.10 *88.10% V. Satisfactory
RHH Construction 11467Const. of Dalibubon Bridge
(Remaining Works) and Approaches (Partial Const.)
II 11.337 120 O 0.228 0.299 0.100 0.018 0.040 0.100 78.50 -
Rhodamay Construction Supply 25989 Const. of Multi-Purpose Bldg. Sitio Tina Brgy. Tagusao IV-B 0.188 60 C 0.414 - 0.500 - - - 91.40 91.40%
Outstanding
Rhodamay Construction Supply 25989 Const. of Multi-Purpose Building, Brgy. Poblacion IV-B 0.466 60 C 0.393 0.136 0.300 - - - 82.90 87.52%
V. Satisfactory
Rhodamay Construction Supply 25989 Const. of Panacan River Control IV-B 0.922 100 C 0.375 - 0.500 - - - 87.50 87.50% V. Satisfactory
Rhodamay Construction Supply 25989 Const., of E/S Building Brgy. Taritien IV-B 0.282 60 C 0.230 0.079 0.300 - - - 60.90 63.21%
Fair
Rhodwill Parts and Hardware 18871 Conc. of Davao Oriental-Surigao Coastal Road XI 13.812 220 C 0.280 0.300 0.300 - - - 88.00 *88.00%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page444
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Rhodwill Parts and Hardware 18871 Conc. of Mati-Maragusan Road (Buso Section) XI 19.298 145 C 0.402 0.200 0.300 - - - 90.20 85.40%
Satisfactory
Rhodwill Parts and Hardware 18871 Const. of Manikling Multi-Purpose Building XI 1.606 90 C 0.361 0.300 0.300 - - - 96.10 92.18%
Outstanding
Rhodwill Parts and Hardware 18871 Improvement of National Road along Baganga-Cateel Section XI 9.443 180 C 0.376 0.200 0.300 - - - 87.60 *87.60%
V. Satisfactory
Rhodwill Parts and Hardware 18871 Impvt. of Manikling-Lavigan Road (Cambaleon-Talisay Section) XI 14.470 150 C 0.309 0.300 0.300 - - - 90.90 *90.90%
Outstanding
Rhodwill Parts and Hardware 18871 Impvt./Rehab. of Manhoc-Ban-ao Section XI 9.605 180 O 0.298 0.300 0.100 0.030 0.060 0.100 88.80 -
Rhodwill Parts and Hardware 18871 Rehab./Impvt. of Compostela-Cateel Road XI 4.720 120 C 0.283 0.300 0.000 - - - 58.30 72.88%
Satisfactory
Rhodwill Parts and Hardware 18871 Repair of Scoured Approach Carabatuan Bridge App. A XI 1.924 100 C 0.366 0.200 0.300 - - - 86.60 *86.60%
V. Satisfactory
Rhyes Builders & Supply 22115 Conc. of Roads, Brgy. Buenos Aires VIII 0.959 80 C 0.392 0.200 0.300 - - - 89.20 *89.20%
V. Satisfactory
Rhyes Builders & Supply 22115 Impvt./Rehab. of Caragas-Baribadon Road VIII 1.439 120 C 0.419 0.200 0.300 - - - 91.90 *91.90%
V. Satisfactory
Richmar Construction 18797 Conc. of Nabua-Balatan Road (Mang-it Section) V 8.509 105 C 0.302 0.234 0.300 - - - 83.60 81.02%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page445
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Richmar Construction 18797 Conc./Impvt. of Polangui Upland Rd. (Cepres-Itaran Section) V 9.595 150 C 0.346 0.189 0.300 - - - 83.50 *83.50%
V. Satisfactory
Richmar Construction 18797 Concreting of Irosin-Bulusan Asphalt Road V 3.276 120 C 0.344 0.208 0.300 - - - 85.20 *85.20%
V. Satisfactory
Richmar Construction 18797Construction of Checkgate, Canal
with Lining & Canal Structures (Muladbucad Grande CIP)
NIA 3.903 160 C 0.358 0.087 0.300 - - - 74.40 *74.40% Satisfactory
Richmark Construction 14227 Completion of Antiao Bridge Approaches VIII 3.209 100 C 0.461 - 0.500 - - - 96.10 70.06%
Satisfactory
Richpil Builders 30923 Widening/Concreting of Binangonan Diversion Rd. IV-A 1.909 75 C 0.407 - 0.500 - - - 90.70 90.70%
Outstanding
Ricomar Construction 31606 Sch. Bldg. Project (C.P.G. H/S) VII 0.437 100 C 0.328 0.300 0.300 - - - 92.80 85.31% V. Satisfactory
R-II Builders Inc. 11235 Dev't. of 50-Hectare Reserved Area, NBP Compound, Ph. I NHA 155.77 270 O 0.380 0.300 0.100 0.030 0.056 0.100 96.6 -
R-II Builders, Inc./J.M. Luciano Const./310 Const. (JV) JV-01-041 Rehab. of Surigao-Davao Coastal
Road (Manay-Mati Section) IBRD 746.066 1,429 C 0.293 0.200 0.300 - - - 79.30 85.36% V. Satisfactory
R-II Builders,Inc./Bauer Int'l Phil./PhilEco Sys Corp/Supermax
Phils.,Inc.
Consortium
Comp. of Remaining Land Dev. Works,Garbage Disposal,Const of
STPs and Repair of Permanent Housing
NHA 217.993 365 D 0.374 0.300 0.000 0.018 0.019 0.000 71.10 71.10% Satisfactory
Rim Construction 15938 Conc. of Bulanao-Paracelis Road CAR 3.199 180 C 0.393 - 0.500 - - - 89.30 87.98% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page446
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Rim Construction 15938 Rehab./Impvt. of Bontoc-LubuaganTabuk Road CAR 11.469 285 C 0.302 0.300 0.300 - - - 90.20 *90.20%
Outstanding
Rim Construction 15938Rehab./Impvt. of Mountain Province-Ilocos Sur Road
via TueCAR 19.012 369 O 0.351 0.300 0.150 0.030 0.050 0.050 93.10 -
Ritche-Nathalie Builders and General Merchandise 27501 Concreting to Tangub-Polao Road X 1.250 75 C 0.425 - 0.500 - - - 92.50 95.02%
Outstanding
Ritche-Nathalie Builders and General Merchandise 27501 Const. of River Control @
Migcanawang River X 4.768 120 C 0.290 0.300 0.300 - - - 89.00 89.18% V. Satisfactory
Ritche-Nathalie Builders and General Merchandise 27501 Const. of Seawall/Shore
Protection Northern Poblacion X 0.385 45 C 0.315 - 0.500 - - - 81.50 81.50% V. Satisfactory
Ritche-Nathalie Builders and General Merchandise 27501 Rehab./Impvt. of Bonifacio-Don
Victoriano National Road X 2.860 150 C 0.328 0.283 0.300 - - - 91.10 71.54% Satisfactory
Ritche-Nathalie Builders and General Merchandise 27501 Repair/Rehab. of Multi-Purpose
Bldg. X 0.475 75 C 0.381 0.300 0.300 - - - 98.10 85.10% V. Satisfactory
Ritche-Nathalie Builders and General Merchandise 27501 Tangub-Polao By-Pass Road X 8.581 189 C 0.353 0.133 0.000 - - - 48.60 73.86%
Poor
Ritz Commercial 19132 Concreting of Dapdap East Brgy. Road IV-A 4.752 120 O 0.356 0.300 0.050 0.030 0.028 0.067 83.10 -
Ritz Commercial 19132 Impvt. of Rizal-San Jose Road III 9.361 10 C 0.320 0.200 0.300 - - - *82.00 82.00% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page447
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ritz Commercial 19132Impvt./Rehab. Along Daang
Maharlika Road, km. 390+000-km. 390+170, Naguilian-Gamu
II 9.567 60 C 0.378 0.261 0.300 - - - 93.90 *93.90% Outstanding
Ritz Commercial 19132 Impvt./Rehab. Along Ganu-Roxas Road, km. 408+900-km. 410+000 II 9.566 60 C 0.340 0.300 0.300 - - - 94.00 *94.00%
Outstanding
Ritz Commercial 19132Reblocking/Impvt. of Roman
Expressway Alas-asin Section (Phase I)
III 9.445 32 C 0.375 0.290 0.300 - - - 96.50 *96.50% Outstanding
Riva Construction 23820 Cluster I- Const. of Various School Bldg. VII 10.280 22 C 0.363 - 0.500 - - - 86.30 87.98%
V. Satisfactory
River of Life Engineering Construction & Aggregates 30516 Const. of 2 Storey 4 Cl Sch. Bldg.
@ Benguet NHS CAR 1.640 90 C 0.302 0.231 0.300 - - - 83.30 *83.30% V.Satisfactory
River of Life Engineering Construction & Aggregates 30516 Impvt. Along Acop-Kapangan-
Kibungan Road CAR 4.775 150 C 0.335 0.202 0.300 - - - 83.70 *83.70% V.Satisfactory
RKX Odiamar Construction 16107 Const. of Seawall at Kinahulugan V 0.183 90 C 4.160 - 0.500 - - - 91.60 91.60% Outstanding
RLK Construction and Builders 32194 Const. of Sch. Bldg. @ Bakit-Bakit E/S I 0.385 15 C 0.365 0.300 0.300 - - - 96.50 *96.50%
Outstanding
RLK Construction and Builders 32194 Construction of Drainage at San Vicente I 0.478 26 C 0.428 0.200 0.300 - - - 92.80 *92.80%
V. Satisfactory
RM Joyce Construction & Supplies 16642 Const. of Bauan-Mabini Circ. Road
(Mainit Section) IVA 0.664 75 C 0.303 0.300 0.300 - - - 90.30 *90.30% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page448
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
RM Joyce Construction & Supplies 16642 Const./Impvt. of MPB at Malimatoc
I IVA 0.380 90 C 0.166 0.200 0.300 - - - 66.60 *66.60% Fair
RM Joyce Construction & Supplies 16642 Const./Rehab. of Road at
Malimatoc II IVA 0.285 90 C 0.377 0.200 0.300 - - - 87.70 *87.70% V. Satisfactory
RMAJ Construction 18623 Const. of Mompong Flood Control IV-B 0.954 45 C 0.309 0.205 0.300 - - - 81.40 *81.40% V. Satisfactory
RMS Builder and Supply 19490 Rehab. of Farm-to-Market Road @ Cangmohao VII 0.932 90 O 0.400 0.300 0.100 0.000 0.023 0.050 87.30 -
RNN Construction 24880 Repair/Strengthening of Old Viejo Bridge NCR 3.222 60 C 0.265 0.300 0.300 - - - 86.50 *86.50%
V.Satisfactory
RNV Construction 12570 Const. of Odiongan Multi-Purpose Bldg. IV-B 0.456 30 C 0.377 - 0.500 - - - 87.70 87.70%
V. Satisfactory
RNV Construction 12570 Rehab. of Boliganay FMR IV-B 0.901 45 C 0.352 - 0.500 - - - 85.20 85.20% V. Satisfactory
Road Edge Trading & Development Services 33140 Impvt./Conc. Along Daang
Maharlika II 4.822 80 C 0.370 0.200 0.300 - - - 87.00 *87.00% V.Satisfactory
Road Edge Trading & Development Services 33140 Impvt./Rehab. of del Carmen-San
Benito Road XIII 4.817 90 C 0.352 0.200 0.300 - - - 85.20 *85.20% V.Satisfactory
Road Edge Trading & Development Services 33140 Repair/Rehab. Along del Carmen-
San Benito-Sta. Monica Road XIII 4.817 90 C 0.324 0.200 0.300 - - - 82.40 *82.40% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page449
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Road Edge Trading & Development Services 33140 Repair/Rehab. of Jct. Osmeña-
Pilar Road XIII 4.817 60 C 0.334 0.200 0.300 - - - 83.40 *83.40% V.Satisfactory
Roadtech Construction 17580 Conc.of Brgy. La Paz Road I 1.927 50 C 0.232 0.300 0.300 - - - 83.20 78.46% Satisfactory
Roadtech Construction 17580 Const. of School bldg., at San Jacinto E/S I 4.699 120 C 0.498 - 0.500 - - - 99.80 94.62%
Outstanding
Roadtech Construction 17580
Maintenance, Rehab. & Impvt. of Nat'l Road & Secondary Road
(Rehab. Of Drainage & Shoulder along Camiling-Wawa-Bayambang-
Malasiqui-Sta. Barbara)
I 0.998 45 C 0.350 0.300 0.300 - - - 95.00 *95.00% Outstanding
Roadtech Construction 17580
Rehab/Replacement of Calvo Bridge (Span 4 & 5), Carmen-Jctn.-
Bayambang-San Carlos-Manat Road
I 48.245 506 C 0.468 0.159 0.300 - - - 92.70 82.59%Satisfactory
Roadtech Construction 17580 Repair/Rehab. of Sinucalan Bridge along Urd. Jct.-Dagupan Rd I 2.704 120 C 0.375 - 0.500 - - - 87.50 92.48%
Outstanding
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Completion of MPB XII 0.942 75 C 0.352 0.293 0.300 - - - 94.50 *94.50%
Outstanding
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Completion of School Building at
Sison Elem. School XII 0.375 60 C 0.345 0.285 0.300 - - - 93.00 86.84% V.Satisfactory
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175
Conc. of Kapingkong Bridge Approaches along Kidapawan-
Allah Jct. RoadXII 8.489 170 C 0.353 0.288 0.300 - - - 94.10 94.10%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page450
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175
Concreting of Jct. Kapaya Section along Dukay-Sen. Ninoy Aquino-
Lebak RoadXII 7.199 200 O 0.392 - 0.500 - - - 89.20 -
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Const. of 3-Cl School Building XII 1.146 140 O 0.318 0.300 0.100 0.030 0.018 0.100 86.60 -
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Const. of Multi Purpose Bldg. XII 0.954 67 C 0.304 0.300 0.300 - - - 90.40 *90.40%
Outstanding
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Const. of Multi Purpose Bldg. at
Brgy. Dansuli XII 0.458 75 C 0.362 0.200 0.300 - - - 86.20 *86.20% V.Satisfactory
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Road Upgarding, Gamasil Section XII 14.048 225 O 0.161 0.300 0.100 0.030 0.043 0.100 73.40 -
Robeth Gen. Mdse., Const. & Supplies-Isulan Branch 23175 Road Upgrading, Gamasil Section XII 14.048 225 O 0.390 0.300 0.150 0.030 0.060 0.050 98.00 -
Robitan Construction 10553 Concreting of Brgy. Rd., Brgy. Sapaan IV-A 0.471 60 C 0.366 - 0.500 - - - 86.60 86.60%
V. Satisfactory
Rocali Construction & Trading 18779 Const./Rehab./Impv't. of Road Drainage NCR 0.932 90 C 0.450 - 0.500 - - - 95.00 95.00%
Outstanding
Rockstone Construction Services and Supply 22702 Const. of MPB at Simsiman XII 0.767 70 C 0.317 0.200 0.300 - - - 81.70 82.47%
V.Satisfactory
Rockstone Construction Services and Supply 22702 Const. of MPB, Lugan National
High School XII 0.754 105 C 0.500 0.133 0.300 - - - 93.30 84.83% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page451
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Rockstone Construction Services and Supply 22702
Const. of Sch. Bldg., Siodina Elementary School, Brgy. Gen.
Paulino Santos XII 0.470 70 C 0.485 0.200 0.300 - - - 98.50 *98.50%
Outstanding
Rockstone Construction Services and Supply 22702 Impvt. of MPB at Surallah National
Agricultural School (SUNAS) XII 1.437 210 C 0.322 0.200 0.300 - - - 82.20 *82.20% V.Satisfactory
Rockworld Industries 7582 Const. of Drainage Sytem @ Daan Maharlika, Picas-Apitong Road VIII 1.887 95 O 0.400 0.169 0.100 0.015 0.028 0.200 91.20 -
Rockworld Indutries 7582 Conc. of Shoulders, Tacloban-Lilo-an Road VIII 4.748 120 C 0.392 0.200 0.300 - - - 89.20 *89.20%
V.Satisfactory
Rockworld Indutries 7582 Conc. Paving of San Victor-Ada-San Victor Calsadahay Rd. VIII 1.927 90 C 0.337 0.200 0.300 - - - 83.70 80.46%
V.Satisfactory
Rockworld Indutries 7582 Const. of Drainage Sytem @ Daan Maharlika, Picas-Apitong Road VIII 1.930 95 C 0.280 0.300 0.300 - - - 88.00 89.92%
V.Satisfactory
Rockworld Indutries 7582 Const. of FMR at Brgy. Plaridel VIII 1.414 60 C 0.240 0.200 0.300 - - - 74.00 *74.00% Satisfactory
Rockworld Indutries 7582 Const. of FMR at Ciabu-Zacarito VIII 1.420 60 C 0.340 0.200 0.300 - - - 84.00 *84.00% V.Satisfactory
Rockworld Indutries 7582 Road Conc.at Brgy. Lapay VIII 0.193 90 C 0.326 0.200 0.300 - - - 82.60 *82.60% V.Satisfactory
Rocky 5 G Builders 32506 Repair/Rehab. of Tam-Awan Longlong Road CAR 0.187 45 C 0.368 0.100 0.300 - - - 76.80 85.50%
V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page452
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Roda Construction & Gen. Supply 19674 Completion of Multi-Purpose Building V 1.418 75 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
Roda Construction & Gen. Supply 19674 Concreting of San Isidro FMR V 0.461 120 C 0.341 - 0.500 - - - 84.10 87.22% V.Satisfactory
Roda Construction & Gen. Supply 19674 Const. of Allanosa National High School Bldg. San Pedro V 1.375 150 C 0.437 - 0.500 - - - 93.70 77.60%
Satisfactory
Roda Construction & Gen. Supply 19674 Const. of Ariman Seawall, Brgy. Ariman V 0.183 90 C 0.433 - 0.500 - - - 93.30 93.30%
Outstanding
Roda Construction & Gen. Supply 19674 Repair of Marok-Barok Spillway V 0.327 60 C 0.333 0.300 0.300 - - - 93.30 *93.30% Outstanding
Roda Construction and General Supply 19674 Completion of Public Market V 0.477 30 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
Roda Construction and General Supply 19674 Conc. of Pathway V 0.480 99 C 0.434 0.200 0.300 - - - 93.40 *93.40%
V.Satisfactory
Roda Construction and General Supply 19674 Const. of 1 Cl Sch. Bldg. @ San
Juan Bag-o HS V 0.528 90 C 0.397 0.122 0.300 - - - 81.90 *81.90% V. Satisfactory
Roda Construction and General Supply 19674 Const. of Multi-Purpose Pavement V 0.288 99 C 0.482 0.133 0.300 - - - 91.50 *91.50%
V. Satisfactory
Roda Construction and General Supply 19674 Hand-laid Rock bed with concrete
facing of Buenavista River Control V 0.907 45 C 0.300 0.200 0.300 - - - 80.00 79.64% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page453
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Roda Construction and General Supply 19674 Repair/Rehab. of Brgy. J.P. Laurel
going to Inararan FMR V 0.945 60 C 0.395 0.300 0.300 - - - 99.50 70.16% Satisfactory
Roim Builders & Construction Supply 20226 Completion of Bayugan 2, Apogan
Road XIII 2.797 150 O 0.267 0.300 0.150 0.030 0.037 0.033 81.70 -
Roim Builders & Construction Supply 20226 Conc. of Bucac-Marcelina Road XIII 2.808 135 C 0.344 0.200 0.300 - - - 84.40 81.55%
V. Satisfactory
Roim Builders & Construction Supply 20226 Concreting along Patin-ay-La
Caridad Road XIII 1.846 105 C 0.192 0.300 0.300 - - - 79.20 79.86% Satisfactory
Roim Builders & Construction Supply 20226 Concreting of BAHBAH Road
(Road Network) XIII 1.823 120 C 0.199 0.300 0.300 - - - 79.90 85.54% V. Satisfactory
Roim Builders & Construction Supply 20226 Concreting of Barangay 1
Municipal Street XIII 1.864 105 C 0.268 0.300 0.000 - - - 56.80 72.52% Satisfactory
Roim Builders & Construction Supply 20226 Repair/Rehab. of Unsayawon
PSCG Bridge XIII 2.848 150 C 0.340 0.200 0.000 - - - 54.00 61.98% Fair
Roim Builders and Construction Supply 20226 Gravelling of Bitan-Agan-Das-
Agan Road XIII 1.832 50 C 0.400 0.200 0.300 - - - 90.00 84.06% V. Satisfactory
Rolingbell Construction & Trading 32543 Construction of Multi-Purpose
Building III 1.907 60 C 0.356 0.300 0.300 - - - 95.60 *95.60% Outstanding
Rol-Mar Developer and Enterprises 26151 Const. of Multi-Purpose Bldg.,
Youth Council Bldg. X 0.943 90 C 0.333 0.300 0.000 - - - 63.30 69.60% Fair
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page454
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Romanjo Construction 32485 Const. of 1 Cl Sch. Bldg. @ Lorenzo P. Ziga H/S V 0.518 60 C 0.396 0.197 0.300 - - - 89.30 *89.30%
V. Satisfactory
Romhead S.J. Builders and Development Incorporated 30279 Const. Macalelon Seawall IV-A 2.890 90 C 0.333 0.300 0.300 - - - 93.30 87.42%
V. Satisfactory
Romina Construction 32090 Const. of MPB at G. Perfecto H/S NCR 2.989 90 C 0.381 0.200 0.300 - - - 88.10 83.31% V. Satisfactory
Ronwood Const. Supply 25311 BRS Pilot Project for Conc. along Dapa-Cabugao-Lobogon Rd. XIII 3.845 90 C 0.345 0.200 0.300 - - - 84.50 87.20%
V. Satisfactory
Ronwood Const. Supply 25311 Conc. of Brgy. Ilihan Crossing XIII 2.829 120 C 0.280 0.200 0.300 - - - 78.00 *78.00% Satisfactory
Ronwood Const. Supply 25311 Const. of Catangan-Cabitoonan-Libertad Road & Bridges XIII 9.644 180 O 0.284 0.213 0.100 0.030 0.032 0.100 75.90 -
Ronwood Const. Supply 25311 Const. of Drainage System XIII 0.928 45 C 0.381 0.300 0.300 - - - 98.10 93.48% Outstanding
Ronwood Const. Supply 25311 Const. of River Protection @ Mambayaan Bridge II (Phase I) X 4.720 210 C 0.369 0.219 0.300 - - - 88.80 88.56%
V. Satisfactory
Ronwood Const. Supply 25311Dela Carmen-San Benito-San Isidro Road along Cancohoy
SectionXIII 7.718 145 O 0.307 0.272 0.100 0.030 0.032 0.100 84.10 -
Ronwood Const. Supply 25311Impvt./Conc. of Siargao Circ. Road (San Juan, San Benito, & Alegria,
Sapao)XIII 9.458 230 C 0.270 0.200 0.300 - - - 77.00 78.74%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page455
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ronwood Const. Supply 25311 Replacement of Asinan Timber Bridge II to RCBC XIII 4.824 132 C 0.295 0.200 0.300 - - - 79.50 69.00%
Fair
Ronwood Const. Supply 25311 Slope Protection along Jct. Osmeña-Pilar Road XIII 5.447 120 C 0.343 0.300 0.000 - - - 64.30 82.12%
V. Satisfactory
Ronwood Construction & Supply 25311 Cluster EQ: Rehabilitation of FMR Pook, X 0.951 210 C 0.321 0.300 0.300 - - - 92.10 *92.10%
Outstanding
Ronwood Construction & Supply 25311 Clustered Conc. of Municipal Streets XIII 1.130 52 C 0.474 - 0.500 - - - 97.40 97.40%
Outstanding
Ronwood Construction & Supply 25311 Conc.of FMR Brgy. Del Carmen XIII 0.944 90 C 0.478 - 0.500 - - - 97.80 *97.80% Outstanding
Ronwood Construction & Supply 25311Concreting of Dapa-Sayak-Cancohoy Road, Sta. Fe.
Lobongon Sect.XIII 6.112 120 C 0.404 - 0.500 - - - 90.40 89.86%
V. Satisfactory
Ronwood Construction & Supply 25311 Const./Regravelling of Rd. XIII 0.940 70 C 0.427 - 0.500 - - - 92.70 92.70% Outstanding
Ronwood Construction and Supply 25311 Improvement of Dapa-Del Carmen
Road (Slope Protection) XIII 1.373 105 O 0.367 0.200 0.300 - - - *86.70 -
Ronwood Construction Supply 25311 Concohoy-San Isidro-Pilar Road XIII 5.787 143 C 0.479 0.149 0.300 - - - 92.80 *92.80% V. Satisfactory
Ronwood Construction Supply 25311 Concreting of SAFRAGEMC Subdivision Road XIII 2.825 150 O 0.324 0.252 0.150 0.030 0.037 0.050 84.30 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page456
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ronwood Construction Supply 25311 Const. of Catangan-Cabitoonan-Libertad Road & Bridges XIII 9.644 194 O 0.353 0.237 0.150 0.030 0.032 0.050 85.20 -
Ronwood Construction Supply 25311 Del Carmen-San Benito-San Isidro Road along Cancohoy Section XIII 7.718 165 C 0.409 0.144 0.300 - - - 85.30 84.58%
Satisfactory
Roprim Construction 8546 Const. of Cuartero Bridge, Phase II VI 8.881 100 C 0.350 0.300 0.300 - - - 95.00 92.00%
Outstanding
Roprim Construction 8546 Const. of Janiuay-Badiangan Road, Km.36+320-Km.37+620 VI 13.886 160 C 0.295 0.200 0.000 - - - 49.50 69.72%
Fair
Roprim Construction 8546 Const. of Nabitasan River Control VI 4.756 180 O 0.400 0.200 0.100 0.023 0.056 0.200 97.90 -
Roprim Construction 8546 Const. of Nabitasan River Control VI 4.756 180 O 0.356 0.200 0.070 0.023 0.047 0.133 82.90 -
Roprim Construction 8546 Const. of Tumalalud Bridge (Phase II) VI 1.430 240 C 0.357 0.208 0.000 - - - 56.50 71.29%
Satisfactory
Roprim Construction 8546 Reblocking of Pototan-Mina Janiuay Road VI 9.546 120 O 0.293 0.225 0.100 0.015 0.032 0.100 76.50 -
Roprim Construction 8546 Reblocking of Pototan-Mina Janiuay Road VI 9.545 232 O 0.348 0.300 0.150 0.030 0.060 0.050 93.80 -
Rosand Builders 15781 Beautification of K-H Park, Brgy. West Kamias NCR 0.700 60 C 0.392 - 0.500 - - - 89.20 89.20%
V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page457
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Rosand Builders 15781Const. of Flood Control within the vicinity of Brgy. Tamugan Bridge
at Sitio AcaciaXI 4.714 120 C 0.287 0.200 0.300 - - - 78.70 82.00%
V.Satisfactory
Rosand Builders 15781 Const. of MPB (Student Pavillion) CSSP NCR 0.473 60 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
Rosand Builders 15781 Const. of Sch. Bldg. @ UP College of Music NCR 0.946 75 C 0.390 0.300 0.300 - - - 99.00 *99.00%
Outstanding
Rosand Builders 15781 Const. of Tugbok Lined Canal along Davao-Bukidnon Road XI 2.822 180 C 0.267 0.205 0.300 - - - 77.20 82.42%
V.Satisfactory
Rosand Builders 15781
Impvt. of Davao River Flood Control along Davao-Cotabato
Road, Generoso Bridge II (Downstream Right Side)
XI 2.826 120 C 0.293 0.300 0.300 - - - 89.30 *89.30% V.Satisfactory
Rosand Builders 15781 Impvt./Conc. of 20th Ave. NCR 4.752 75 C 0.305 0.300 0.300 - - - 90.50 *90.50% Outstanding
Rosand Builders 15781
Impvt./Conc. of Surigao Sur-Davao Oriental Coastal Road (Manay-Boston Section) Manay-Caraga
Section
XI 14.633 157 C 0.328 0.237 0.300 - - - 86.50 *86.50% V.Satisfactory
Rosand Builders 15781 Riprapping along Lagarian Creek, Brgy. West Kamias NCR 2.276 45 C 0.000 0.150 0.300 - - - 45.00 *45.00%
Poor
Rosvar Enterprises and General Contractor 17998 Const. of Farm-to-Market Road IV-A 0.570 30 C 0.266 - 0.500 - - - 76.60 *76.60%
Satisfactory
Rosvar Enterprises and General Contractor 17998 Const. of Flood Control/Drainage
System IV-A 2.866 75 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page458
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Rosvar Enterprises and General Contractor 17998 Const. of FMR @ Municipalty of
Victoria IV-A 0.934 20 C 0.431 - 0.500 - - - 93.10 93.10% Outstanding
Rosvar Enterprises and General Contractor 17998 Const. of MPB at Brgy. San Felix IV-A 1.143 60 C 0.359 0.200 0.300 - - - 85.90 *85.90%
V. Satisfactory
Rosvar Enterprises and General Contractor 17998 Const. of Multi-Purpose Hall IV-A 0.938 60 C 0.449 - 0.500 - - - 94.90 *94.90%
Outstanding
Rovilla Construction 19514 Const. of 2-CL S/B (Part of Cluster A) VII 0.491 150 C 0.380 - 0.500 - - - 88.00 *88.00%
V. Satisfactory
Rovilla Construction 19514 Construction of 1-CL S/B at Tominjao NHS VII 0.480 75 C 0.366 0.153 0.300 - - - 81.90 *81.90%
V. Satisfactory
Rovilla Construction 19514 Construction of 2-CL S/B at San Remegio NHS VII 0.964 75 C 0.350 0.155 0.300 - - - 80.50 *80.50%
V. Satisfactory
Rowie's Construction 23595Completion of School Building
(New Admin.), SSPSC San Miguel Campus
XIII 2.030 75 C 0.323 0.200 0.300 - - - 82.30 *82.30% V. Satisfactory
Rowie's Construction 23565 Const. of Lambunao Flood Control XIII 4.715 75 C 0.336 0.300 0.300 - - - 93.60 *93.60% Outstanding
Rowie's Construction 23595
Impvt. of Road Slip/Slope protection along Surigao-Davao Coastal Road (SDCR), Daniog
Road Section
XIII 4.790 89 C 0.453 0.125 0.300 - - - 87.80 *87.80% Satisfactory
Rowie's Construction 23595
Impvt. of Road Slip/Slope protection along Surigao-Davao,
Coastal Road (SDCR), Antao Road Section,
XIII 4.790 99 C 0.438 0.133 0.300 - - - 87.10 *87.10% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page459
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Royal Crown Monarch Const. & Supplies Corp. 9036 Concreting of Farm-to-Market
Road Buenlag III 1.544 80 C 0.384 0.200 0.300 - - - 88.40 88.10% V. Satisfactory
Royal Crown Monarch Const. & Supplies Corp. 9036 Concreting of Rizal-Caramutan-
Dumarais Road III 1.850 90 C 0.335 0.287 0.300 - - - 92.20 *92.20% Outstanding
Royal Crown Monarch Const. & Supplies Corp. 9036 Rehab. of Sto. Domingo Road III 8.261 90 C 0.361 0.289 0.300 - - - 95.00 *95.00%
Outstanding
Royal Crown Monarch Construction & Supplies
Corporation (Formerly: R.C. Miranda Const. & Supplies)
9036 Const. of MPB @ Brgy. San Francisco East Anao (Phase I) III 9.235 160 O 0.308 0.221 0.100 0.030 0.048 0.100 80.70 -
Royal Crown Monarch Construction & Supplies
Corporation (Formerly: R.C. Miranda Const. & Supplies)
9036 Const. of MPB @ Brgy. San Francisco East Anao (Phase I) III 9.364 160 C 0.383 0.269 0.300 - - - 95.20 85.05%
V. Satisfactory
Royal Crown Monarch Construction & Supplies
Corporation (Formerly: R.C. Miranda Const. & Supplies)
9036 Const./Rehab. of Tarlac River Dike Flood Control III 4.177 90 C 0.373 0.200 0.300 - - - 87.30 83.34%
V. Satisfactory
Royal Crown Monarch Construction & Supplies
Corporation (Formerly: R.C. Miranda Const. & Supplies)
9036 Rehab. Of Old Manila North Road III 7.063 51 C 0.339 0.218 0.300 - - - 85.70 *85.70% V. Satisfactory
Royal Sea Bees Construction 30099 Const. of Provincial Cooperative Office MPB CAR 0.473 150 C 0.133 0.300 0.300 - - - 73.30 *73.30%
Satisfactory
Royal Sea Bees Construction 30099 Implementation of Various Projects under Package 15 CAR 0.933 120 O 0.241 0.214 0.100 0.030 0.030 0.067 68.20 -
Royal Sea Bees Construction 30099Widening/Regravelling incl. slope protection & drainag of Bontoc-
Lubuagan-Tabuk RoadCAR 4.787 130 C 0.326 0.237 0.300 - - - 86.30 81.50%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page460
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
RPBJ Trading & Construction 30006 Const. of Drainage System along Nulatula VIII 2.046 90 C 0.354 - 0.500 - - - 85.40 85.40%
V.Satisfactory
RPBJ Trading & Construction 30006Const. of Multi-Purpose Bldg.,
(Covered Court) at Brgy. 82 (PhaseII)
VIII 0.950 45 C 0.398 - 0.500 - - - 89.80 51.93% Poor
RPBJ Trading & Construction 30006 Road Conc. of Brgy. Dagami-Pastrana Road VIII 0.937 90 C 0.329 0.300 0.300 - - - 92.90 *92.90%
Outstanding
RPBJ Trading and Construction 30006 Completion/Repair of 3 CL ES Building @ Sangkahan ES VIII 0.499 30 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V.Satisfactory
RPBJ Trading and Construction 30006 Const. of 2 CL SB at Brgy. P. Barrantes Primary School VIII 0.965 120 C 0.376 0.200 0.300 - - - 87.60 *87.60%
V.Satisfactory
RPBJ Trading and Construction 30006 Impvt. of Drainage System @ Brgy. #73 VIII 0.964 70 C 0.475 0.200 0.300 - - - 97.50 *97.50%
Outstanding
RPBJ Trading and Construction 30006 Road Junction, Rechannelization at Maharlika-PHHC Anibong Road VIII 1.897 60 C 0.370 0.200 0.300 - - - 87.00 *87.00%
V.Satisfactory
RREncabo Constructors & Traders 14716 Fort Santiago Linear Park Project PRRC 13.595 180 O 0.349 0.300 0.100 0.030 0.050 0.100 92.90 -
RRMD Construction & Supply (Formerly: RRMD Const.) 23615 Conc. of Iligan-Bukidnon Road X 8.939 212 C 0.366 0.133 0.300 - - - 79.90 84.04%
Satisfactory
RRMD Construction & Supply (Formerly: RRMD Const.) 23615 Const. of Linamon-Zamboanga
Road, Kalabugan Section X 9.061 120 C 0.353 0.200 0.300 - - - 85.30 83.50% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page461
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
RRN Construction 20228Const. of Concrete Lined Ditch
along Jct. A. H. Aglayan-Kibangay Rd. Poblacion Lantapan Sect.
X 0.321 60 C 0.470 - 0.500 - - - 97.00 95.44% Outstanding
RSP Enterprises Inc. 16795 Concreting of Road at Brgy. Tagakpan XI 0.940 150 C 0.333 - 0.500 - - - 83.30 81.02%
V.Satisfactory
RSP Enterprises Inc. 16795Const. of Flood Control/Drainage,
Guadalupe Village, Matina Crossing
XI 0.661 120 C 0.319 0.300 0.300 - - - 91.90 *91.90% Outstanding
RSP Enterprises Inc. 16795 Const. of Multi Purpose Pavement at Brgy. 7A XI 0.661 120 C 0.345 0.300 0.300 - - - 94.50 88.74%
V. Satisfactory
RSP Enterprises, Inc. 16795 Const. of 1-Cl, School Bldg. @ Elias Lopez Memorial H/S XI 0.330 210 C 0.309 - 0.500 - - - 80.90 87.20%
V. Satisfactory
RTY Construction 10341 Concreting of Balanacan FMR Balanacan IV-B 0.239 90 C 0.013 0.300 0.300 - - - 61.30 *61.30%
Fair
Ruby Jade Construction 19202 Rehab. of Brgy. Road, Brgy. Salay III 4.606 105 C 0.255 0.253 0.300 - - - 80.80 80.62% V. Satisfactory
Ruby Lim Const. & Supplies 11685 Conc. of Cudamos Brgy. Road New Dagupan IV-B 0.366 120 C 0.449 - 0.500 - - - 94.90 94.90%
Outstanding
Ruby Lim Const. & Supplies 11685 Conc. of San Fernando-Talisay Road V 12.672 120 C 0.318 0.229 0.300 - - - 84.70 79.54%
Satisfactory
Ruby Lim Const. & Supplies 11685 Const. of MPB V 9.448 120 C 0.355 0.200 0.300 - - - 85.50 76.47% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page462
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ruby Lim Const. & Supplies 11685 Const. of MPB (Gymnasium) Phase IV V 4.720 90 C 0.300 0.200 0.300 - - - 80.00 *80.00%
Satisfactory
Ruby Lim Const. & Supplies 11685 Const. of Multi-Purpose Pavement V 0.364 45 C 0.332 0.100 0.300 - - - 73.20 *73.20% Satisfactory
Ruby Lim Const. & Supplies, Inc. 11685 Concreting of San Fernardo South Road V 16.000 195 C 0.432 0.133 0.300 - - - 86.50 *86.50%
Satisfactory
Ruby-Jade Construction 19202 Construction of Brgy. Lobbot Road III 4.703 150 O 0.329 0.300 0.124 0.023 0.018 0.033 82.70 -
Ruiz Engineering Construction 16643 Construction of Multi-Purpose Building (Covered court) XIII 2.242 120 C 0.393 0.200 0.300 - - - 89.30 *89.30%
V.Satisfactory
Rumil Construction 13484 Const. of S/B @ Barobo NHS (Main), Package 1 XIII 1.156 120 C 0.369 0.200 0.300 - - - 86.90 86.34%
V. Satisfactory
Rumil Construction 13484 Const. of USEP-Bislig MPB @ Brgy. Maharlika XIII 1.923 150 C 0.213 0.300 0.300 - - - 81.30 81.65%
V. Satisfactory
Rusmen Builders & Development Corporation 10674 Asphalt Overlay of Lipa-Rosario
Road IV-A 10.543 45 C 0.366 0.200 0.300 - - - *86.60 86.60% V. Satisfactory
Rusmen Builders & Development Corporation 10674
Completion of Multi-Purpose Sch. Bldg. in Dr. Crisogono Ermita Sr.
NHSIV-A 3.858 90 C 0.387 0.200 0.300 - - - 88.70 *88.70%
V. Satisfactory
Rusmen Builders & Development Corporation 10674 Const. of Brgy. Road at Brgy.
Maugat West (Sitio Ilaya) IV-A 1.928 120 C 0.357 0.200 0.300 - - - 85.70 *85.70% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page463
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Rusmen Builders & Development Corporation 10674 Rehab. of Banay-banay-Cuenca
Road (San Jose Section) IV-A 4.798 180 C 0.366 0.300 0.300 - - - 96.60 *96.60% Outstanding
Rusmen Builders & Development Corporation 10674
Rehab./Reconst. of Damaged National Roads, Banay-Banay-Cuenca-Mojon Road, San Jose
Section
IV-A 13.509 120 C 0.347 0.267 0.300 - - - 91.40 *91.40% Outstanding
Rusmen Builders & Development Corporation (Formerly: Rusmen
Builders)10674 Const. of Roads, Brgy. Dayap-
Brgy. Butucan IV-A 9.549 120 C 0.479 0.133 0.300 - - - 91.20 *91.20% V. Satisfactory
Rusmen Builders & Development Corporation (Formerly: Rusmen
Builders)10674
Rehab./Reconst. of Banay-Banay-Mojon Road, Cuenca Rd. Section
1IV-A 19.295 150 C 0.440 0.200 0.300 - - - 94.00 *94.00%
V. Satisfactory
Rusmen Builders & Development Corporation (Formerly: Rusmen
Corporation)10674 Const. of Multi-Purpose Building IV-A 4.769 210 O 0.369 0.200 0.100 0.030 0.043 0.100 84.20 -
Rusmen Builders & Dev't. Corp. 10674 Const of San Jose Market Brgy. Taysan IV-A 8.595 210 O 0.400 0.217 0.100 0.030 0.020 0.100 86.70 -
Rusmen Builders & Dev't. Corp. 10674 Impv't. of Manila-Batangas By Pass Road Phase I IV-A 9.562 180 C 0.456 - 0.500 - - - 95.60 95.60%
Outstanding
RWD Construction 27116 Maintenance/Rehab. & Impvt. of GSO Road III 0.995 60 C 0.358 0.200 0.300 - - - 85.80 *85.80%
V. Satisfactory
S & G Construction 11773 Const. of Tacurong Drainage Canal XII 6.624 417 C 0.323 - 0.500 - - - 82.30 88.98%
V. Satisfactory
S & G Construction 11773 Rehabilitation of Manin Canal (Sta. 21+714-26+526) NIA-I 7.304 150 C 0.250 0.300 0.300 - - - 85.00 84.87%
V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page464
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
S & K Builders, Inc. 24039 Const. of 5-CL School Building @ Quezon NHS X 1.406 60 C 0.347 0.000 0.500 0.000 0.000 0.000 84.70 77.91%
Satisfactory
S B G Construction 12022 Concreting of Brgy. Road, Bonbon X 0.960 45 C 0.353 0.218 0.300 - - - 87.10 *87.10% V. Satisfactory
S. S. Tria Construction 18002 Rehab. of Public Market, New Dagupan IV-B 0.576 60 C 0.379 0.300 0.300 - - - 97.90 67.38%
Fair
S.A. Gomez Construction 6265 Const. of Malasag Eco-Tourism Facilities PTA 11.167 211 O 0.373 0.300 0.070 0.015 0.039 0.067 86.43 -
S.J. Yu Construction 17048Rehabilitation of Various
Buildings @ C.L. Montelibano Regional Hospital
VI 4.090 230 O 0.361 0.195 0.000 - - - 55.60 -
S.M. Castro Management & Construction Services 18216 Const. of Capinahan Bridge VIII 3.931 120 C 0.452 - 0.500 - - - 95.20 93.28%
Outstanding
S.M. Castro Management & Construction Services 18216
Gravelling of Roadway & Installation of Guardrails along
Dinagat-Loreto RoadXIII 4.814 120 C 0.311 0.200 0.300 - - - 81.10 74.56%
Satisfactory
S.M. Castro Management & Construction Services 18216 Impvt. Along Gamu-Roxas Road
(Guardrails Installation) II 9.644 60 C 0.272 0.225 0.300 - - - 79.70 *79.70% Satisfactory
S.M. Castro Management & Construction Services 18216
Impv't/Rehab./Conc. of Butuan City-Malaybalay Road,
Sta.1239+832-Sta.1272+248 with exception,
XIII 9.626 150 C 0.396 0.200 0.300 - - - 89.60 *89.60% V.Satisfactory
S.M. Castro Management & Construction Services 18216 Rehab. & Maintenance of Roads
along Gamut-San Miguel Sect. XIII 14.390 60 C 0.400 0.146 0.300 - - - 84.60 *84.60% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page465
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
S.M. Castro Management & Construction Services 18216 Rehab./Impvt. of General Luna-
Dapa-Sayak Airport Road XIII 19.290 120 C 0.441 0.133 0.300 - - - 87.40 *87.40% Satisfactory
S.R. Baldon Construction & Supply 15405 Concreting of Cabid-an Road
(Seabreeze), Cabid-an V 0.920 60 C 0.268 0.000 0.500 0.000 0.000 0.000 76.80 *76.80% Satisfactory
S.R. Baldon Construction & Supply 15405 Const. of Multi-Purpose Building,
Madlawan V 0.240 150 C 0.372 0.000 0.500 0.000 0.000 0.000 87.20 *87.20% V. Satisfactory
S.T. Hidalgo Construction 22498 Construction of Flood Control VIII 4.745 90 O 0.312 0.300 0.150 0.020 0.019 0.033 83.40 -
S.W. Taya-an Construction 33085 Const. of Mapaway Deepwell with Elevated Tank CAR 0.958 45 C 0.267 0.200 0.300 - - - 76.70 *76.70%
Satisfactory
Sabutan Construction 5520 Const. of Footbridge, Brgy. Labnig IVA 0.479 60 C 0.270 0.300 0.300 - - - 87.00 82.20% V. Satisfactory
Sabutan Construction 5520Repair/Rehab. of Manila South
Road, Pagbilao-Atimonan Section, Phase III
IVA 4.999 30 C 0.390 0.200 0.300 - - - 89.00 *89.00% V.Satisfactory
Sabutan Construction 5520
Road Support Peace & Dev't in Mindanao & Other Conflict
affected Area, Quirino Highway, Sto. Niño-Sta. Monica-Sta. Cecilia
(Int. Section)
IVA 47.701 148 C 0.474 0.133 0.300 - - - 90.70 *90.70% V. Satisfactory
Sabutan Construction 5520Road Widening of
Canggumantong-Poo-Lazi Interior Road
VII 1.391 150 C 0.400 0.193 0.300 - - - 89.30 89.54% V. Satisfactory
Saint Bernard Construction 28368 Concrete Pedestrian Bridge V 0.947 112 C 0.420 0.200 0.300 - - - 92.00 *92.00% V.S atisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page466
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Salidummay Gen. Construction 21403 Completion of Multi-Purpose Building CAR 0.476 45 C 0.384 0.250 0.300 - - - 93.40 *93.40%
Outstanding
Salidummay Gen. Construction 21403 Const. of Multi-Purpose Building, Pinsao-Pilot Brgy. CAR 1.620 90 C 0.398 0.000 0.500 0.000 0.000 0.000 89.80 63.34%
Fair
Samjan Builders 27855 Completion of Multi Purpose Bldg. At Campo Filipino Brgy. CAR 0.953 60 C 0.345 0.300 0.300 - - - 94.50 *94.50%
Outstanding
Samjan Builders 27855 Rehabilitation along Pico-Lamtang Road CAR 2.173 111 C 0.383 0.000 0.500 0.000 0.000 0.000 88.30 86.74%
V. Satisfactory
Sammi Construction Company , Ltd. FC-05008 CP IV, Const./Impvt. of Looc-
Odiongan-San Andres Road IV-B 649.871 750 O 0.400 0.300 0.050 0.030 0.070 0.067 91.70 -
Sammi Construction Company , Ltd. FC-05-008 CP IV, Const./Impvt. of Looc-
Odiongan-San Andres Road IV-B 649.871 750 O 0.365 0.300 0.030 0.030 0.070 0.067 86.20 -
Samurai Construction 32214 Const. of Multi Purpose Pavement @ Brgy. Sarong IV-B 0.208 60 C 0.173 0.000 0.300 - - - 47.30 *47.30%
Poor
San Fernando Builders 21295 Conc. of Calingcamasan Road I 0.470 26 C 0.393 0.200 0.300 - - - 89.30 *89.30% V. Satisfactory
San Fernando Builders 21295 Const. of Multi-Purpose Bldg. I 2.846 90 C 0.349 0.300 0.300 - - - 94.90 *94.90% Outstanding
San Fernando Builders 21295 Const. of Multi-Purpose Structure at Brgy. Sili I 0.187 90 C 0.303 0.000 0.500 0.000 0.000 0.000 80.30 *80.30%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page467
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
San Fernando Builders 21295 Construction of Multi-Purpose Bldg. I 5.646 109 C 0.376 0.252 0.300 - - - 92.80 *92.80%
Outstanding
San Fernando Builders 21295 Construction of Multi-Purpose Bldg. @ Brgy. Ortega I 0.940 74 C 0.321 0.253 0.300 - - - 87.40 *87.40%
V. Satisfactory
San Fernando Builders 21295 Repair/Impvt. of FMR I 0.096 60 C 0.366 0.200 0.300 - - - 86.60 *86.60% V. Satisfactory
San Fernando Builders 21295 Repair/Impvt. of FMR @ Brgy. Sta. Rita West I 0.096 30 C 0.254 0.300 0.300 - - - 85.40 *85.40%
V. Satisfactory
San Fernando Builders 21295 Repair/Impvt. of FMR @ Brgy. Sto. Rosario East I 0.096 30 C 0.291 0.300 0.300 - - - 89.10 *89.10%
V. Satisfactory
San Guillermo Const. and Trading Corp. 25661 Const. of MPB @ La Consolacion NCR 1.627 75 C 0.270 0.300 0.300 - - - 87.00 *87.00%
V. Satisfactory
San Rafael Builders 30496 Rehab. of DPWH-Region IVA Building IV-A 1.915 70 C 0.391 0.200 0.300 - - - 89.10 85.46%
V. Satisfactory
Sandstorm Construction 23411 Const. of Flood Control System @ Brgy. Zone 13 IV-A 0.471 48 C 0.374 0.300 0.300 - - - 97.40 *97.40%
Fair
Sandstorm Construction 23411 Const. of Line Canal IV-A 0.189 45 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
Sandstorm Construction 23411 Const. of MPB/Structure (2nd Floor) in Mahabang Ludlod IV-A 0.479 60 C 0.263 0.200 0.300 - - - 76.30 *76.30%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page468
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sandstorm Construction 23411 Const. of Multi-Purpose Building at Brgy. Sta. Elena IV-A 0.477 60 C 0.450 - 0.500 - - - 95.00 *95.00%
Outstanding
Sanlahi Group of Builders, Inc. 11874 Conc. of Calapan North Road (Calapan-puerto Galera Sec.) IV-B 48.152 270 O 0.251 0.223 0.150 0.030 0.042 0.050 74.60 -
Sanlahi Group of Builders, Inc. 11874 Concreting of Baco-Puerto Galera Road (Phase II) IV-B 9.500 260 C 0.314 0.300 0.300 - - - 91.40 81.50%
V. Satisfactory
Sanlahi Group of Builders, Inc. 11874 Concreting of Brgy. Panikian Road, Naujan IV-B 1.894 80 C 0.198 0.000 0.500 0.000 0.000 0.000 69.80 71.96%
Satisfactory
Sanlahi Group of Builders, Inc. 11874 Concreting of Road @ Kalinisan IV-B 1.909 75 C 0.300 0.200 0.300 - - - 80.00 80.48% V. Satisfactory
Sanlahi Group of Builders, Inc. 11874Const. of Drainage System
(w/cover) Brgy. Tawiran-Sta. Isabel,
IV-B 4.035 105 C 0.356 0.000 0.500 0.000 0.000 0.000 85.60 85.60% V. Satisfactory
Sanlahi Group of Builders, Inc. 11874 Const./Repair of Multi-Purpose Building, Masipit IV-B 0.947 70 C 0.391 0.000 0.500 0.000 0.000 0.000 89.10 89.10%
V. Satisfactory
Sanlahi Group of Builders, Inc. 11874 Rehab./Reconst. of Calapan South Road IV-B 9.503 100 C 0.380 0.078 0.300 - - - 75.80 79.76%
Unstisfactory
Sanlahi Group of Builders, Inc. 11874 Widening of Libis-Lumangbayan-Sta. Isabel Road IV-B 6.441 152 C 0.378 0.300 0.300 - - - 97.80 94.32%
Outstanding
Sanlahi Group of Builders, Inc./811 Trading & Const. (JV) JV-06-067
Conc. of East Coast Road, Calapan-Mansalay Section,
Palaypay SectionIV-B 19.240 210 C 0.295 0.300 0.300 - - - 89.50 88.06%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page469
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Santech Builders 16797 Concreting of Molimono-Pili Road, Cawayan (Phase VII) XIII 4.587 200 C 0.369 0.200 0.300 - - - 86.90 84.86%
V. Satisfactory
Santech Builders 16797 Const. of Magtangale-Macopa Road, San Francisco XIII 2.651 140 C 0.366 0.000 0.500 0.000 0.000 0.000 86.60 86.42%
V. Satsifactory
Santech Builders 16797 Const. of Multi-Purpose Building XIII 4.652 209 C 0.274 0.300 0.300 - - - 87.40 82.92% V. Satisfactory
Santech Builders 16797 Const. of Rosita Bridge III, PSCG (Type IV-B) XIII 4.608 210 C 0.377 0.300 0.300 - - - 97.70 87.38%
V. Satisfactory
Santech Builders 16797 Impvt. of Kinabutan River Control XIII 4.765 90 O 0.393 0.155 0.100 0.020 0.028 0.200 89.60 -
Santech Builders 16797 Impvt. of Kinabutan River Control XIII 4.765 90 O 0.357 0.200 0.050 0.015 0.035 0.200 85.70 -
Santech Builders 16797 Impvt. of Kinabutan River Control XIII 4.765 331 O 0.347 0.300 0.111 0.030 0.037 0.033 85.80 -
Sanvar Development Corporation 2342Repair/Renovation of DBP
Commonwealth Branch Bldg. and Premises
DBP 2.249 270 C 0.411 0.200 0.141 - - - 75.20 75.20% Unsatisfactory
Sapdoy Enterprises 21995 Completion of MPB @ BGH Compound CAR 0.952 48 O 0.301 0.300 0.100 0.023 0.032 0.100 *85.60 -
Sarangani Rockmixer 6549Asphalt Overlay/Upgrading of Digos-Markar Road, Ligaya
Section XII 18.880 180 O 0.382 0.300 0.150 0.030 0.038 0.050 95.00 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page470
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sarangani Rockmixer 6549 Completion/Concreting of Crossing Rubber-Tampakan Road XII 5.583 126 C 0.465 - 0.500 - - - 96.50 96.44%
Outstanding
Sarangani Rockmixer 6549Const. of GSC Circumferential Road, San Isidro Section, Brgy.
San IsidroXII 4.698 100 C 0.435 0.000 0.500 0.000 0.000 0.000 93.50 *93.50%
Outstanding
Sarangani Rockmixer 6549 Rehab./Impvt. of Digos-Makar Road (Intermittent Section) XII 11.000 80 C 0.340 0.191 0.300 - - - 83.10 83.10%
V.Satisfactory
Sarangani Rockmixer 6549Widening of Additional 2 Lanes of
Marbel-Tupi-Makar Road, Carpenter Hill Sect.
XII 14.455 280 C 0.369 0.205 0.300 - - - 87.40 86.08% V. Satisfactory
Sarangani Rockmixer 6549 Widening of Makar-Tupi-Marbel Road (Labangal-Apopong Section) XII 7.150 127 C 0.369 0.200 0.300 - - - 86.90 81.26%
V. Satisfactory
Sarca Estate Development Corporation 20520 Asphalt Overlay along Tayabas-
Mainit-Mauban Rd. IV-A 14.461 20 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
Sarca Estate Development Corporation 20520
Completion of Municipal Health Center & Const. of Health Center
@ Brgy. GumianIV-A 0.964 40 C 0.311 0.282 0.300 - - - 89.30 *89.30%
V. Satisfactory
Sarca Estate Development Corporation 20520 Const. of Municipal Health Center IV-A 0.964 70 C 0.271 0.300 0.300 - - - 87.10 82.62%
V. Satisfactory
Sarca Estate Development Corporation 20520 Rehab. of Famy-Real-Infanta-
Dinahican Port Road IV-A 14.458 200 C 0.270 0.300 0.300 - - - 87.00 84.84% V. Satisfactory
Sards Construction 15408 Conc. (Concrete Reblocking) of 1,220 lm Nat'l Road VI 9.411 180 C 0.300 0.100 0.300 - - - 70.00 71.98%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page471
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sarex Builders 23734 Completion of Gutalac Public Market, Gutalac IX 0.739 80 C 0.482 0.000 0.500 0.000 0.000 0.000 98.20 88.20%
V. Satisfactory
Sarex Builders 23734 Conc. of Dualing-Baliki-Silik Road, Dualing Section XII 9.403 90 C 0.377 0.228 0.300 - - - 90.50 *90.50%
Outstanding
Sarex Builders 23734 Conc. of Road at Brgy. Dagupan XII 0.469 30 C 0.335 0.287 0.300 - - - 92.20 87.70% V. Satisfactory
Sarex Builders 23734 Concreting of Road at Molave Street, Poblacion Carmen XII 1.878 60 C 0.345 0.000 0.500 0.000 0.000 0.000 84.50 *84.50%
V. Satisfactory
Sarex Builders 23734 Const. of MPB XII 0.286 40 C 0.388 0.264 0.300 - - - 95.20 *95.20% Outstanding
Sarex Builders 23734 Const. of MPB @ Brgy Ilbocean XII 0.330 30 C 0.330 0.300 0.300 - - - 93.00 *93.00% Outstanding
Sarex Builders 23734 Const. of Multi-Purpose Bldg. @ Brgy. Gen. Luna XII 0.235 35 C 0.432 0.000 0.500 0.000 0.000 0.000 93.20 *93.20%
Outstanding
Sarex Builders 23734 Const. of Multi-Purpose Pavement at Brgy. Presbitero XII 0.473 51 C 0.370 0.200 0.300 - - - 87.00 *87.00%
V. Satisfactory
Sarex Builders 23734 Const. of Water Supply / Spring Development Brgy. Malitubog XII 0.462 45 C 0.336 0.000 0.300 - - - *63.60 79.56%
Satisfactory
Sarex Builders 23734 Impvt. of Molo River Control/Flood Control, Molo Section XII 4.807 70 C 0.326 0.231 0.300 - - - 85.70 *85.70%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page472
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sarex Builders 23734 Proposed Const. of Seawall Manil Leon Postigo IX 0.779 83 C 0.416 0.000 0.500 0.000 0.000 0.000 91.60 *91.60%
Outstanding
Sarex Builders 23734 Redecking of Carmen Bridge (Phase 2) XII 3.744 150 C 0.375 0.200 0.300 - - - 87.50 *87.50%
V. Satisfactory
Sarex Builders 23734Rehab./Conc. of Road along
Davao-Cotabato Road, ManuanganPanatan Section
XII 9.472 204 C 0.482 0.200 0.300 - - - 98.20 *98.20% Outstanding
Sargasso Construction and Development Corp. 6587 Const. of Manggamnan Bridge IV-B 13.332 240 O 0.267 0.240 0.000 0.023 0.035 0.067 63.20 -
Sargasso Construction and Dev't. Corp. 6587 Const./ Replacement of
Manggamnan Bridge IV-B 13.347 240 O 0.289 0.237 0.100 0.030 0.047 0.100 80.30 -
Satrap Construction Company, Inc. 2526 Asphalting of Shoulder along MNR
San Ildefonso I 1.256 30 C 0.317 - 0.500 - - - 81.70 81.76% V. Satisfactory
Satrap Construction Company, Inc. 2526 Improvement of San Fernando
Airport BCDA 471.406 615 C 0.382 0.300 0.300 - - - 98.21 98.21% Outstanding
Satrap Construction Company, Inc. 2526 Rehab./Replacement of Bussawit
Bridge 2 along MNR I 8.364 368 C 0.391 0.200 0.300 - - - 89.10 89.52% V. Satisfactory
Satrap Construction Company, Inc. 2526
Rehabilitation/Reconstruction of Manila North Road, Sto. Domingo-
Magsingal SectionI 28.931 150 C 0.454 0.133 0.300 - - - 88.70 *88.70%
Satisfactory
Satrap Construction Company, Inc. 2526 Replacement of Bantaoay Bridge
along Manila North Road I 21.240 437 C 0.468 0.155 0.300 - - - 92.30 90.23%V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page473
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
SB & T Construction 25313 Improvement of Multi-Purpose Building VII 0.475 65 O 0.315 0.200 0.150 0.030 0.031 0.025 75.10 -
SBB Construction & Supply 31238 Conc. of Road at Catmon St., Sto. Nino-YCF XI 0.417 60 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
SBB Construction & Supply 31238 Construction of Multi-Purpose Building, Digos CES XI 2.375 110 C 0.469 0.149 0.300 - - - 91.80 *91.80%
V. Satisfactory
SBB Construction and Supply 31238 Concreting of Road @ Dama de Noche XI 0.462 60 C 0.303 - 0.500 - - - 80.30 85.70%
V. Satisfactory
SBB Construction and Supply 31238 Const. of 1CL 1 Storey S/B at Mintal E/S XI 0.425 45 C 0.378 0.176 0.300 - - - 85.40 *85.40%
V. Satisfactory
SBF Construction & Dev't Corp. 11470 Conc. of Passi-Calinog Road VI 13.509 180 C 0.342 0.300 0.300 - - - 94.20 85.56% V. Satisfactory
SC Balinagay Builders 32249 Asphalt Overlay at Bangad-Forrt Magsaysay Road III 4.751 20 C 0.444 0.200 0.300 - - - 94.40 *94.40%
V. Satisfactory
SCP Construction 8797Conc. of SDCR, (Tagasaka-Bislig
Subsection) along Hinatuan-Bislig-Boston Section
XIII 158.872 375 O 0.278 0.184 0.100 0.030 0.030 0.100 72.20 -
SCP Construction 8797 Const. of Brgy. Cuarenta-Luna Road, San Jose XIII 13.026 432 C 0.383 0.300 0.000 - - - 68.30 72.98%
Satisfactory
SCP Construction 8797
Rehab./Reconst. of Damaged Paved National Roads along
Butuan City-Cagayan de Oro City-Iligan City Road
X 18.867 210 O 0.365 0.240 0.100 0.030 0.035 0.067 83.70 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page474
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
SCP Construction 8797
Rehab./Reconst. of Damaged Paved National Roads along
Butuan City-Cagayan de Oro City-Iligan City Road
X 18.867 234 O 0.327 0.240 0.055 0.030 0.045 0.033 73.00 -
SCP Construction / Persan Construction / G & P Builders,
Incorporated (JV)JV-99-175
Const./ Impv't. of Bulua (Jct. ICB Road)P.N. Road-Lumbia (Jct.
Airport Road)X 121.472 470 C 0.367 0.300 0.300 - - - 96.70 93.19%
Outstanding
SCV Construction 14523 Const. of Multi-Purpose Building X 0.933 120 O 0.341 0.225 0.100 0.000 0.008 0.100 77.40 -
Segal Construction 17243 Const. of Drainage System, New Lucban Brgy. CAR 0.959 60 C 0.399 - 0.500 - - - 89.90 89.90%
V. Satisfactory
Sercher Development Corporation 26332 Const. of Flood Control &
Drainage System VII 0.477 45 C 0.276 0.300 0.300 - - - 87.60 87.60% V.Satisfactory
Serg Construction 8003Construction of 1-CL School Building @ Don Carlos NHS, Gupaco PS & Sinayawan PS
X 1.400 75 C 0.379 0.230 0.300 - - - 90.90 *90.90% Outstanding
Serra Ty Construction 7373Conc. of East/West Lateral Road,
(Tandag-Gamut-San Miguel-Bayugan Road)
XIII 19.274 209 C 0.426 0.200 0.300 - - - 92.60 82.58% Satisfactory
Serra Ty Construction 7373 Concreting of Road from Airport to Brgy. Awasian XIII 1.353 70 C 0.357 0.000 0.500 0.000 0.000 0.000 85.70 *85.70%
V. Satisfactory
Serra Ty Construction 7373Impvt. of Road Slip and other
related activities, Cortes-Junction Section
XIII 2.885 104 C 0.244 0.200 0.300 - - - 74.40 76.38% Satisfactory
Serra Ty Construction 7373 Rehab./Impvt. of Gamut-Unaban Section, along SCDR XIII 9.605 160 C 0.285 0.268 0.300 - - - 85.30 78.34%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page475
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Settlers Builder 21643 Conc. of Sibalom-San Remegio-Leon Road, Barangbang Section VI 2.746 90 C 0.278 0.276 0.300 - - - 85.40 83.72%
V. Satisfactory
Settlers Builder 21643 Const. of Libonan Bridge VI 7.199 210 C 0.400 0.200 0.300 - - - 90.00 88.26% V. Satisfactory
Seven Digit Construction & Supplies 25471 Conc. of PPSR, Km. 222+505.5 -
km. 223+063.50 IV-B 5.680 120 C 0.313 0.300 0.300 - - - 91.30 *91.30% Outstanding
Seven Digit Construction & Supplies 25471 Concreting of Road, Barangay 3
(Infront of DEO) IV-B 0.473 50 C 0.458 0.133 0.300 - - - 89.10 *89.10% V.Satisfactory
Seven Digit Construction & Supplies 25471 Concreting of Roads in Brgy. 3 IV-B 0.473 60 C 0.376 0.200 0.300 - - - 87.60 *87.60%
V. Satisfactory
Seven Digit Construction & Supplies 25471 Const. of 1CL at Panindigan E/S IV-B 0.376 100 C 0.386 0.200 0.300 - - - 88.60 *88.60%
V. Satisfactory
Seven Digit Construction & Supplies 25471 Const. of Caramay Seawall (Phase
2) IV-B 0.473 60 C 0.365 0.200 0.300 - - - 86.50 *86.50% V. Satisfactory
Seven Digit Construction & Supplies 25471 Const. of Pre-Stress Conc. Bridge,
Dayandante Bridge I IV-B 9.347 208 C 0.322 0.200 0.300 - - - 82.20 *82.20% V. Satisfactory
Seven Digit Construction & Supplies 25471 Const. of Pre-Stress Conc. of
Bridge, Talog Bridge IV-B 9.348 646 C 0.442 0.137 0.300 - - - 87.90 84.18% Satisfactory
Seven Digit Construction & Supplies 25471
Raising of Grade of Puerto Princesa-Roxas, Taytay-El Nido
RoadIV-B 3.642 120 C 0.283 0.300 0.300 - - - 88.30 89.62%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page476
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Seven Digit Construction & Supplies 25471 Reconst. of Kaylubong Bridge II IV-B 8.454 128 C 0.261 0.300 0.300 - - - 86.10 89.16%
V. Satisfactory
Seven Digit Construction & Supplies 25471 Rehab./Improvement of San
Vicente Airport Runway IV-B 9.139 90 C 0.280 0.300 0.300 - - - 88.00 83.86% V. Satisfactory
Seven Digit Construction & Supplies 25471 Repair/Maintenance of Puerto
Princesa North Road (PPNR) IV-B 9.513 120 O 0.358 0.159 0.100 0.030 0.048 0.100 79.50 -
Seven Digits Construction & Supplies 25471 Rehabilitation of San Jose-Port
Barton Road IV-B 4.102 140 C 0.389 0.209 0.300 - - - 89.80 85.66% V. Satisfactory
Seven Digits Construction & Supplies 25471 Repair/Rehab. & Const. of
Bagiong Bayan Bebeladan FMR IV-B 2.660 72 C 0.387 - 0.500 - - - 88.70 85.76% V. Satisfactory
Seven Digits Construction & Supply 25471 Const. of Flood Control at
Barangay Sowangan IV-B 0.947 60 C 0.389 0.000 0.500 0.000 0.000 0.000 88.90 *88.90% V. Satisfactory
SGB Concrete Products & General Merchandise 20745 Rehab./Impv't. of Antipolo-Tukulan
Road IVA 1.917 103 C 0.359 - 0.500 - - - 85.90 91.00% Outstanding
SGL Trading 27767 Concreting of Agtangao-Manila Road, Benguet CAR 0.452 45 C 0.344 0.000 0.500 0.000 0.000 0.000 84.40 *84.40%
V. Satisfactory
SGSS Construction 27502 Const. of Covered Line Canal @ Brgy. Pob. 8 IV-A 0.192 45 C 0.300 0.300 0.300 - - - 90.00 *90.00%
V. Satisfactory
SGSS Construction 27502 Const. of Multi-Purpose Building IVA 0.287 45 C 0.401 - 0.500 - - - 90.10 *90.10% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page477
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Shak Construction and Supply 28289 Const. of 1 CL Tamborong E/S VI 0.500 60 C 0.290 0.300 0.300 - - - 89.00 *89.00% V. Satisfactory
Shak Construction and Supply 28289 Const. of Passenger Cargo Terminal Roof Shed, Sto. Rosario VI 2.711 90 C 0.442 0.200 0.300 - - - 94.20 *94.20%
V. Satisfactory
Sheen-Sheen Construction 29015 Concreting of Soro-Soro Road X 0.917 93 C 0.341 0.300 0.300 - - - 94.10 91.04% Outstanding
Sheen-Sheen Construction 29015 Const. of Agoho Multi-Purpose Building X 1.395 120 O 0.365 0.300 0.100 0.030 0.038 0.100 93.30 -
Sheen-Sheen Construction 29015 Const. of MPB @ Yumbing E/S X 0.376 50 C 0.363 0.174 0.300 - - - 83.70 *83.70% V. Satisfactory
Sheen-Sheen Construction 29015 Const./Conc. of Sitio Vulcan Brgy. Naasag Road X 0.921 95 C 0.343 0.200 0.300 - - - 84.30 80.52%
V. Satisfactory
Sheen-Sheen Construction 29015 Rehab. of CCR, Maac-Kalipagas Section X 9.536 197 O 0.360 0.240 0.150 0.030 0.040 0.033 85.30 -
Sheen-Sheen Construction 29015 Rehab./Conc. of Brgy. Butay Road X 0.556 60 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding
Shinsung Eng'g. & Construction Corp. Co. Ltd.
SL2-SN-000402
Contract Package 3, Monkayo Tagum Section Compostella
ValleyPJHL 1,508.785 1,175 C 0.377 0.300 0.300 - - - 97.70 95.71%
Outstanding
Silk & Steel Construction 25314 Completion of One CL 2-Storey ESH @ Rizal Central School VIII 0.819 75 C 0.377 0.100 0.300 - - - 77.70 *77.70%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page478
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Silk & Steel Construction 25314 Conc. of Road Shoulders @ Brgy. 101 VIII 0.964 50 C 0.421 0.200 0.300 - - - 92.10 *92.10%
V. Satisfactory
Silk & Steel Construction 25314 Const. of 1 CL Sch. Bldg. at Abuyugon E/S VIII 0.435 60 C 0.272 0.183 0.300 - - - 75.50 *75.50%
Satisfactory
Silk & Steel Construction 25314 Const. of 1-Unit, 2-Cl RM School Building @ Brgy. Pinggan VIII 0.856 156 C 0.272 0.279 0.300 - - - 85.10 *85.10%
V. Satisfactory
Silliman Avenue Construction & Supply 22759 Completion of MPB VII 0.870 100 O 0.391 0.153 0.100 0.015 0.018 0.100 77.70 -
Silliman Avenue Construction & Supply 22759 Const. of Provincial Road-Purok 2
Sulop Cemetery XI 0.469 45 C 0.324 0.000 0.500 0.000 0.000 0.000 82.40 79.64% Satisfactory
Silliman Avenue Construction & Supply 22759 Const./Completion of San Jose
Public Market (Phase II) XIII 2.595 240 C 0.383 - 0.500 - - - 88.30 *88.30% V. Satisfactory
Silver Dragon Construction Lumber & Glass Supply 30835 Rehabilitation and Improvement of
Sibud Main Drainage NIA 6.683 267 C 0.449 0.300 0.200 - - - 94.90 94.90% Very Satisfactory
Simplified Builders 20747 Const. of 2 CL School Building @ Solana North C/S II 0.951 90 C 0.329 0.190 0.300 - - - 81.90 *81.90%
V. Satisfactory
Sixteen Enterprises 18187Conc. of Calapan South
(Himpaparay-San Antonio Section), Mansalay
IV-B 4.020 90 C 0.396 0.000 0.500 - - - 89.60 89.60% V. Satisfactory
Sixteen Enterprises 18187 Const. of Bucayao River Control, Calapan City IV-B 4.749 110 C 0.442 0.000 0.500 - - - 94.20 94.20%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page479
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sixteen Enterprises - Calapan Branch 18187 Conc. of Calapan North Road, San
Teodoro and Puerto Galera Road IV-B 17.896 210 C 0.349 0.300 0.300 - - - 94.90 92.56% Oustanding
Sixteen Enterprises - Calapan Branch 18187 Conc. of Pinamalayan Airport
Road IV-B 9.464 140 O 0.308 0.256 0.100 0.023 0.043 0.100 *83.00 -
Sixteen Enterprises - Calapan Branch 18187
Const. of Bucayao-Magasawang Tubig River Flood Control
Mitigation ProjectsIV-B 4.038 66 C 0.417 0.000 0.500 0.000 0.000 0.000 91.70 89.60%
V. Satisfactory
Sixteen Enterprises - Calapan Branch 18187 Const. of MPB at Happy Valley IV-B 0.669 60 C 0.383 0.200 0.300 - - - 88.30 *88.30%
V. Satisfactory
Sixteen Enterprises - Calapan Branch 18187
Const. of Protection Dike and Riprapping at Sitio 2-13N Proper
AlcateIV-B 1.909 60 C 0.290 0.300 0.300 - - - 89.00 *89.00%
V. Satisfactory
Sixteen Enterprises - Calapan Branch 18187 Const. of San Rafael Road Roxas IV-B 1.897 72 C 0.431 0.000 0.500 0.000 0.000 0.000 93.10 *93.10%
Oustanding
Sixteen Enterprises - Calapan Branch 18187 Rehab./Reconst. of CNR along
Calapan North Road IV-B 9.500 100 C 0.351 0.200 0.300 - - - 85.10 *85.10% V. Satisfactory
Sixteen Enterprises - Calapan Branch 18187
Road Upgrading @ CNR KM.59+081-KM. 60+504 (Intermittent Section)
IV-B 14.204 120 C 0.436 0.130 0.300 - - - 86.60 *86.60% Satisfactory
SKI Const. Group, Inc. (Formerly: Summa Kumagai, Inc.) 3381
NAIA Expressway and its Related Roads Project, Phase I, Package I,
Sales Interchange ComponentsURPO 180.000 1,023 C 0.284 0.300 0.000 - - - 58.40 74.89%
Satisfactory
SNR Builder 14539 Const. of MPB @ Brgy. Ramos West II 0.956 120 C 0.493 0.000 0.000 0.000 0.000 0.000 49.30 74.33%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page480
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
So Construction 17714 Const. of 1 CL Sch. Bldg., Dinalungan Central Sch. III 0.907 150 C 0.331 0.258 0.300 - - - 88.90 *88.90%
V. Satisfactory
So Construction 17714 Const. of Multi-Purpose Bldg., Brgy. Wenceslao III 0.185 60 C 0.373 0.300 0.300 - - - 97.30 *97.30%
Outstanding
So Construction 17714 Rehab. of MPB at Baler C/S III 0.927 90 C 0.298 0.237 0.300 - - - 83.50 81.33% V. Satisfactory
So Construction 17714 Rehab./Conc. of Road leading to Municipal Hall III 4.634 180 C 0.431 - 0.500 - - - 93.10 85.96%
V. Satisfactory
Socor Construction Corporation 8020 Asphalt Overlay of Mis. Or.-Lanao Road, Opol-Lugait Section X 9.614 45 C 0.325 0.300 0.300 - - - 92.50 *92.50%
Outstanding
Socor Construction Corporation 8020 Impvt./Asphalt Overlay of Road NCR 2.509 30 C 0.377 0.300 0.300 - - - 97.70 *97.70% Outstanding
Socor Construction Corporation 8020Impvt./Rehab. of Iligan-Cagayan de
Oro-Butuan Road (Initao-Lugait Section)
X 14.305 60 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding
Socor Construction Corporation 8020Rehab./Impvt. of Asphalt
Pavement along Sulat-Borongan Road Section
VIII 9.461 90 C 0.355 0.300 0.300 - - - 95.50 *95.50% Outstanding
Socor Construction Corporation 8020 Repair/Rehab. of Limon-Leyte-Biliran Road VIII 9.474 60 C 0.303 0.200 0.300 - - - 80.30 *80.30%
V. Satisfactory
Socor Construction Corporation 8020 Repair/Rehab. of P. del Rosario St. (Sta. 2+007-Sta. 2+505) VII 6.269 30 C 0.327 0.274 0.300 - - - 90.10 *90.10%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page481
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Socor Construction Corporation 8020Repair/Rehab./Impvt. of National
Road (Asphalt Overlay) Borongan-Guiuan
VIII 24.115 150 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory
Socorro Villamor Enterprises 1529 Conc. of E. Rodriguez Ave. & Impvt. of Drainage IVA 4.166 120 C 0.289 0.300 0.300 - - - 88.90 *88.90%
V. Satisfactory
Socorro Villamor Enterprises 1529 Improvement of San Vicente Port, Ivana II 0.942 115 C 0.433 0.000 0.500 - - - 93.30 93.30%
Outstanding
Solfio P. Jacinto Construction 17799 Concreting of Road in Brgy Valdefuente III 3.260 90 O 0.356 0.300 0.100 0.030 0.022 0.100 90.80 -
Solid M Construction 30293 COLAB-OG CIS (Irrigation) NIA 0.774 90 C 0.337 0.176 0.300 - - - 81.30 *81.30% V.Satisfactory
Solid M Construction 30293 San Jose CIS (Irrigation) NIA 1.038 120 C 0.356 0.170 0.300 - - - 82.62 *82.62% V. Satisfactory
Solid Merchandising 31609 Const. of 3 Cl Sch. Bldg. @ Colong Colong NHS VI 1.085 105 C 0.378 0.200 0.300 - - - 87.80 86.82%
V. Satisfactory
Solid North Construction and Development Corporation 8204 Rehab. of Various Farm-to-Market
Roads I 0.473 60 C 0.364 - 0.500 - - - 86.40 *86.40% V. Satisfactory
Solid Rock Construction 8958 Concreting of Brgy. Road St. Anthony IV-A 1.910 90 C 0.456 - 0.500 - - - 95.60 95.60%
Outstanding
Solid Rock Construction 8958 Const. of Congressional Avenue Extension, Phase V NCR 8.114 180 C 0.338 0.200 0.300 - - - 83.80 91.18%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page482
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Solid Rock Construction 8958
Proposed Const./Rehab./Completion &
Repair of Elem. & Secondary Sch. Bldg., Marcelo Marcela Elem. Sch.
NCR 2.142 90 C 0.360 0.300 0.300 - - - 96.00 *96.00% Outstanding
Solid Rock Construction 8958 Rehab. of MPB @ Brgy. Sta. Monica NCR 1.439 120 C 0.342 0.300 0.300 - - - 94.20 93.99%
Outstanding
Solid Rock Construction 8958 Rehab./Asphalting of Sucat Road (Phase II) NCR 9.613 30 C 0.286 0.206 0.300 - - - 79.20 *79.20%
Satisfactory
Solid Rock Construction 8958 Widening/Conc. of Commonwealth Ave. NCR 48.138 180 C 0.353 0.300 0.300 - - - 95.30 *95.30%
Outstanding
Solid Rock Construction 8958 Widening/Conc. of Commonwealth Avenue NCR 96.608 240 C 0.418 0.200 0.300 - - - 91.80 *91.80%
V.Satisfactory
Solid Square Construction 28566 Const. of Multi-Purpose Building @ Dugayong II 0.476 90 C 0.397 0.300 0.000 - - - 69.70 47.90%
Poor
Solid Square Construction 28566 Repainting of Ipil Bridge along Daang Maharlika II 0.268 30 C 0.311 0.300 0.300 - - - 91.10 *91.10%
Outstanding
South Builders and Construction Supplies 20238 Const. of FTM Road at Brgy.
Laguan IV-A 0.653 50 C 0.472 - 0.500 - - - 97.20 97.20% Outstanding
South Builders and Construction Supplies (Formerly:
South Builders Const.)20238 Completion of Home Economics
Bldg. @ Unisan C/S IV-A 0.571 75 C 0.313 0.197 0.300 - - - 81.00 *81.00% V. Satisfactory
South Builders and Construction Supplies (Formerly:
South Builders Const.)20238 Const. of Water Supply System IV-A 0.722 60 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page483
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
South Builders and Construction Supplies (Formerly: South
Builders Const.)20238
Const. of 1 CL Sch. Bldg. at Brgy. Kinagunan NHS /Danlagan
ExtensionIV-A 0.541 50 C 0.339 0.262 0.300 - - - 90.10 *90.10%
Outstanding
South Pacific Builders Center, Inc. 24594
Iloilo Flood Control Proj., Ph II, Package III (Road Network) Sooc,
MandurriaoVI 29.561 400 C 0.466 0.000 0.500 - - - 96.60 93.00%
Outstanding
Southern Dawn Development Company 12294 Concreting of Barangay Road IVA 0.471 40 C 0.375 - 0.500 - - - 87.50 *87.50%
V. Satisfactory
Southern Dawn Development Company 12294 Const. of Multi-Purpose Building
(Covered Court) IV-A 1.420 120 C 0.454 0.000 0.500 - - - 95.40 *95.40% Outstanding
Southern Dawn Dev't Company 12294Const. of 2 Storey Acad. Bldg. w/ 2
Seater Attached Toilet & Septic Vault at Bocohan E/S
IVA 2.147 60 C 0.479 0.163 0.300 - - - 94.20 *94.20% V. Satisfactory
Soy Eng Construction 15533
Completion/Repair of Widening/Slope Protection along Rizal Shrine-Rizal Town Coastal
Loop Road
IX 2.788 100 C 0.359 0.300 0.300 - - - 95.90 94.16% Outstanding
Soy Eng Construction 15533Conc. Paving of Rizal Shrine-Rizal
Town Coastal Loop Road, Banbanan-Guimputian Sect.
IX 1.782 60 O 0.283 0.236 0.100 0.020 0.042 0.100 *78.10 -
Soy Eng Construction 15533 Concrete Paving of Canlucani-Tag-Ulo Road, Canlucani Section IX 1.681 130 C 0.435 0.000 0.500 - - - 93.50 *93.50%
Oustanding
Soy Eng Construction 15533Concreting of Rizal Shrine-Rizal
Town Coastal Loop Road (Talisay-Taguilon Section)
IX 2.788 100 C 0.377 0.230 0.300 - - - 90.70 90.58% Outstanding
Soy Eng Construction 15533 Const. of Multi-Purpose Building Brgy. Liyang E/S IX 0.929 90 C 0.490 0.000 0.500 - - - 99.00 90.60%
Oustanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page484
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Soy Eng Construction 11533 Const./Completion of MPB (Farmer's Building) IX 0.950 60 C 0.400 0.200 0.350 - - - 95.00 *95.00%
Outstanding
Soy Eng Construction 11533 Const./Completion of MPB (Municipal Gym) IX 2.836 140 C 0.330 0.200 0.300 - - - 83.00 73.97%
Satisfactory
Soy Eng Construction 11533 Const./Completion of MPB at Mutia IX 0.945 70 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
Soy Eng Construction 15533
Const./Completion of Multipurpose Bldg. (Subanen
Tribe), Jose Rizal Memorial State College
IX 0.462 60 C 0.334 0.221 0.300 - - - 85.50 *85.50% V. Satisfactory
Soy Eng Construction 15533Const./Completion of
Multipurpose Bldg., Jose Rizal Memorial State College
IX 0.703 75 C 0.345 0.194 0.300 - - - 83.90 *83.90% V. Satisfactory
Spam Engineering Enterprise 14205Impvt of NRJ Agusan-Misamis-R. Calo-Agusan Pequeno, Butuan
City (Phase II)XIII 6.260 90 C 0.444 - 0.500 - - - 94.40 87.32%
V. Satisfactory
Spectrum Builders 8124Impvt./Rehab. of Cuna-Sitio
Magkailaw Road Sitio Makailaw Cuna
X 2.245 135 C 0.323 0.242 0.100 0.030 0.048 0.100 84.30 -
Speed Movers Construction 19206 Completion of Del Rosario Bridge Approach (Tiaong Side) IV-A 2.046 45 C 0.392 0.000 0.500 - - - 89.20 *89.20%
V. Satisfactory
SPNR Builders 31329 Completion of Concreting of Road & Drainage Canal @ Guinhawa III 3.796 72 C 0.062 0.292 0.300 - - - 65.40 72.24%
Satisfactory
SPNR Builders 31329 Rehab. of Roman Expressway (Bilolo Section) III 2.880 45 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page485
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
SPNR Builders 31329 Road Concreting at Sta. Cruz III 0.477 12 C 0.349 0.200 0.300 - - - 84.90 *84.90% V. Satisfactory
Spring Star Construction and Supply 20240
Const. of S.B. Sen. Rene Cayetano Science & Technology Memorial
H/SNCR 2.865 90 C 0.372 0.300 0.300 - - - 97.20 *97.20%
Outstanding
Springfield Construction 14097 Const. of Multi-Purpose Bldg., (Public Market) III 0.473 45 C 0.368 0.263 0.300 - - - 93.10 88.06%
V. Satisfactory
Springfield Construction 14097 Const. of Sto. Niño Public Market IV-B 1.800 60 C 0.344 0.300 0.300 - - - 94.40 *94.40% Outstanding
Square Cube Trading Division and Consruction Division 25120 Completion of MPB @ del Carmen
Este VII 0.093 160 C 0.276 0.100 0.300 - - - 67.60 36.94% Poor
Square Cube Trading Division and Consruction Division 25120 Conceting/Improvement of Loay
and Carmen VII 14.155 180 C 0.384 0.239 0.000 - - - 62.30 71.66% Satisfactory
Square Cube Trading Division and Consruction Division 25120 Const./Improv't. of Multi-Purpose
Building at Liloan VIII 0.937 75 C 0.335 0.181 0.300 - - - 81.60 *81.60%Unsatisfactory
Square Cube Trading Division and Consruction Division 25120 Impvt. of MPB @ Brgy. Kalunasan VII 0.948 60 C 0.289 0.300 0.300 - - - 88.90 *88.90%
V. Satisfactory
Square Cube Trading Division and Construction Division 25120
Const. of Farm-to-Market Road (Sta. 0+000-Sta. 3+820) Brgy. Capt.
ClaudioVII 9.439 210 O 0.311 0.024 0.100 0.010 0.013 0.100 55.80 -
St. Bernard Construction 28368 Concreting of Brgy. Road, Brgy. Rebbron to Brgy. Lupi V 0.926 60 C 0.384 0.000 0.500 - - - 88.40 *88.40%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page486
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
St. Bernard Construction 28368 Const. of Health Center @ Brgy. San Isidro V 0.378 120 C 0.367 0.200 0.300 - - - 86.70 *86.70%
V. Satisfactory
St. Bernardine Construction 18474 Completion of MPB V 1.425 120 C 0.342 0.200 0.300 - - - 84.20 *84.20% V. Satisfactory
St. Bernardine Construction 18474 Conc. of Barangay Road Brgy. SanJose-Alanao, Lupi V 0.458 90 C 0.194 0.000 0.500 - - - *69.40 69.40%
Fair
St. Bernardine Construction 18474 Conc. of Busak Bypass Road V 2.837 120 C 0.310 0.222 0.300 - - - 83.20 87.10% V. Satisfactory
St. Bernardine Construction 18474 Concreting of Sta. Lucia-Magarao Road, Sta. Lucia V 0.461 135 C 0.373 0.000 0.500 - - - *87.30 87.30%
V. Satisfactory
St. Bernardine Construction 18474 Const. of MPB at Brgy. Colacling V 0.468 90 C 0.385 0.100 0.300 - - - *78.50 78.50% Satisfactory
St. Bernardine Construction 18474 Const. of MPB, Municipal Hall Complex V 0.950 120 C 0.381 0.214 0.300 - - - 89.50 *89.50%
V. Satisfactory
Sta. Anastacia Builders 32472 Rehabilitation of Sta. Cruz RIS NIA 4.178 120 O 0.378 0.1574 0.1 0.023 0.045 0.1 80.35 -
Sta. Cruz Construction 9301 Concreting of Barangay Road, Brgy. Grijalvo, San Fernando V 0.459 75 C 0.246 0.000 0.500 - - - 74.60 *74.60%
Satisfactory
Sta. Cruz Construction 9301 Const. of MPB (Lying-in Center) V 1.405 120 C 0.378 0.154 0.300 - - - 83.20 83.20% V.Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page487
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sta. Isabel Construction Corporation 26774 Const. of Drainage System @
Brgy. Poblacion IV-B 1.637 80 C 0.391 0.222 0.300 - - - 91.30 *91.30% Outstanding
Sta. Isabel Construction Corporation 26774 Const. of Multi-Purpose Building IV-B 0.472 80 O 0.365 0.211 0.100 0.010 0.013 0.100 79.90 -
Stars & Stripes Construction 23484Const. of 1 Unit - 2 CL School Bldg. @ Maras National High
School, MarasIX 0.627 90 C 0.397 0.000 0.500 - - - 89.70 89.70%
V. Satisfactory
Stars & Stripes Construction 23484 Repair of 3 CL School Building Miputak East Central School IX 0.730 45 C 0.418 0.000 0.500 - - - 91.80 *91.80%
Outstanding
Stay Construction 23323Conc. along Itogon-Dalupirip-San
Manuel Boundary Road, Km. 267+00 - 274+055 (vs)
CAR 19.021 207 C 0.378 0.200 0.300 - - - 87.80 77.54% Unsatisfactory
Stay Construction 23323 Const. of Buiguias NHS, Bot-oan Extension CAR 2.633 120 C 0.343 0.032 0.300 - - - 67.50 71.25%
Satisfactory
Steel City Fabricators Corporation 27035 Const. of 1 CL Sch. Bldg. at
Mimbunga NHS X 0.494 84 C 0.366 0.236 0.300 - - - 90.20 *90.20% Outstanding
Steel City Fabricators Corporation 27035 Const. of 1-CL Steeltek School
Building @ Laguindingan CES X 8.445 210 C 0.466 0.000 0.500 - - - 96.60 *96.60% Outstanding
Steel City Fabricators Corporation 27035 Const. of Various S/B (1-Cl S/B)
Brgy. Garcia, Tagoloan X 0.312 210 C 0.319 0.000 0.500 - - - 81.90 88.76% V. Satisfactory
Steven Construction and Supply 21987 Const. of 2 Storey MPB (Phase I) @ Brgy. GRS V 0.940 120 C 0.396 0.100 0.300 - - - 79.60 77.78%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page488
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Steven Construction and Supply 21987 Const. of Conc. Pavements, Rizal Ave. Ext. VIII 0.700 60 C 0.486 0.000 0.300 - - - 78.60 *78.60%
Unsatisfactory
Steven Construction and Supply 21987 Const. of Covered Court, Catbalogan V CES VIII 1.814 78 C 0.328 0.300 0.300 - - - 92.80 82.09%
V. Satisfactory
Steven Construction and Supply 21987 Repair/Impv't. of DPWH Bldg., Albay Engineering District V 0.919 84 C 0.360 0.300 0.300 - - - 96.00 *96.00%
Outstanding
Sto. Cristo Construction 26096 Const. of 1 Cl Sch. Bldg. at San Roque E/S III 0.477 35 C 0.296 0.200 0.300 - - - 79.60 *79.60%
Satisfactory
Sto. Cristo Construction 26096 Const. of Two (2) Cl Sch. Bldg. at San Vicente-San Francisco NHS III 0.822 35 C 0.287 0.300 0.300 - - - 88.70 *88.70%
V. Satisfactory
Sto. Cristo Construction 26096 Const./Repair/Completion of Sto. Domingo Brgy. Road III 0.475 30 C 0.391 - 0.500 - - - 89.10 88.44%
V. Satisfactory
Sto. Cristo Construction 26096 Impvt. of San Vicente FMR III 1.901 30 C 0.250 0.200 0.300 - - - 75.00 74.64% Satisfactory
Sto. Niño Construction 4867 Conc. of Jct. Blancia-Molave-Josefina Road (Blancia Section) IX 16.900 150 O 0.219 0.229 0.100 0.030 0.037 0.100 71.50 -
Sto. Niño Construction 4867 Conc. of Jct. Blancia-Molave-Josefina Road (Blancia Section) IX 16.690 150 O 0.357 0.230 0.100 0.030 0.030 0.067 81.40 -
Sto. Niño Construction 4867 Conc. of Jct. Blancia-Molave-Josefina Road (Blancia Section) IX 16.690 348 O 0.364 0.249 0.150 0.030 0.035 0.050 87.80 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page489
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sto. Niño Construction 4867 Conc. of Jct. Blancia-Molave-Josefina Road (Mahayag-Josefina) IX 18.549 150 O 0.318 0.160 0.100 0.030 0.042 0.100 75.00 -
Sto. Niño Construction 4867 Conc. of Jct. Blancia-Molave-Josefina Road (Mahayag-Josefina) IX 18.549 150 O 0.374 0.240 0.100 0.030 0.035 0.100 87.90 -
Sto. Niño Construction 4867 Conc. of Jct. Blancia-Molave-Josefina Road (Mahayag-Josefina) IX 18.549 343 O 0.360 0.255 0.150 0.030 0.040 0.050 88.50 -
Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road (Molave-Mahayag Section)
IX 18.550 150 O 0.237 0.223 0.100 0.030 0.042 0.100 73.20 -
Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road (Molave-Mahayag Section)
IX 18.550 150 O 0.340 0.220 0.100 0.030 0.030 0.100 82.00 -
Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road (Molave-Mahayag Section)
IX 18.550 348 O 0.372 0.244 0.150 0.030 0.035 0.050 88.10 -
Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road, Blancia-Mahayag Section
IX 18.550 150 O 0.223 0.180 0.100 0.030 0.032 0.100 66.50 -
Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road, Blancia-Mahayag Section
IX 18.550 150 O 0.340 0.220 0.100 0.030 0.030 0.067 78.70 -
Sto. Niño Construction 4867Conc. of Jct. Blancia-Molave-
Josefina Road, Blancia-Mahayag Section
IX 18.550 348 O 0.365 0.262 0.150 0.030 0.035 0.050 89.20 -
Sto. Niño Construction 4867 Conc. of Jct. Blancia-Poblacion-Molave-Josefina Road IX 18.550 332 C 0.435 0.154 0.300 - - - 88.90 83.14%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page490
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sto. Niño Construction 4867 Conc. of Loguilo By-Pass Road X 8.679 160 C 0.380 0.133 0.300 - - - 81.30 82.74% Satisfactory
Sto. Niño Construction 4867 Conc. of Midsalip-Sominot Road IX 9.299 123 C 0.298 0.107 0.300 - - - 70.50 75.48% Satisfactory
Sto. Niño Construction 4867Conc. of Pagadian City-Buug Rd. (Kamalarang Section), Pagadian-
Ipil RoadIX 27.550 340 C 0.431 0.200 0.300 - - - 93.10 83.14%
Satisfactory
Sto. Niño Construction 4867Conc. of Provincial Road Jct.
Lower Dimaya-Pob. Dinas Zamboanga Del Sur
IX 10.264 135 C 0.202 0.188 0.300 - - - 69.00 69.96% Fair
Sto. Niño Construction 4867 Const. of MPB @ Brgy. 24 X 0.943 56 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory
Sto. Niño Construction 4867 Const. of Multi-Purpose Building IX 0.484 74 C 0.365 0.249 0.300 - - - 91.40 *91.40% Outstanding
Sto. Niño Construction 4867 Const. of Poblacion Opol Flood Control X 9.642 208 C 0.344 0.200 0.300 - - - 84.40 86.20%
V. Satisfactory
Sto. Niño Construction 4867 Const. of River Control @ Salug Diut River IX 9.310 340 O 0.382 0.240 0.150 0.030 0.035 0.050 88.70 -
Sto. Niño Construction 4867 Const. of River Control @ Salug River IX 9.310 150 O 0.272 0.120 0.100 0.030 0.035 0.200 75.70 -
Sto. Niño Construction 4867 Const. of River Control at Maclob Bridge IX 1.667 120 C 0.223 0.200 0.300 - - - 72.30 *72.30%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page491
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sto. Niño Construction 4867Const./Extension of Dipolog Flood Control Dipolog City-Dapitan City
RoadIX 4.712 180 C 0.347 0.200 0.300 - - - 84.70 76.36%
Satisfactory
Sto. Niño Construction 4867 Construction of Multi-Purpose Building IX 0.465 40 C 0.458 0.133 0.300 - - - 89.10 *89.10%
V. Satisfactory
Sto. Niño Construction 4867 Impvt./Conc. of Poblacion to Aromahon Road X 9.643 150 C 0.364 0.200 0.300 - - - 86.40 87.96%
V. Satisfactory
Sto. Niño Construction 4867 Impvt./Conc. Paving along Jct. Kagawasan-Tabina Rd. IX 4.759 70 C 0.214 0.285 0.300 - - - 79.90 77.86%
Satisfactory
Sto. Niño Construction 4867Impvt./Conc. Paving of Aurora-Dipolog City Road, Mahayag-
Josefina SectionIX 18.450 254 C 0.345 0.300 0.000 - - - 64.50 72.78%
Satisfactory
Sto. Niño Construction 4867Impvt./Conc. Paving of Imelda-Alicia Road, (Phase I), Baluran-
Guintolan SectionIX 34.948 320 C 0.317 0.190 0.300 - - - 80.70 77.54%
Satisfactory
Sto. Niño Construction 4867Impvt./Conc. Paving of Imelda-
Alicia Road, (Phase II), Guintolan Section
IX 33.916 350 C 0.439 0.200 0.300 - - - 93.90 83.01% Satisfactory
Sto. Niño Construction 4867Impvt./Conc. Paving of Imelda-
Alicia Road, (Phase III), Guintolan Section
IX 33.916 320 O 0.295 0.235 0.100 0.030 0.042 0.100 80.20 -
Sto. Niño Construction 4867 Rehab. of Bawang-Silupa Roads IX 0.954 45 C 0.186 0.300 0.300 - - - 78.60 *78.60% Satisfactory
Sto. Niño Construction 4867 Rehab. of Oroquieta City-Calamba Mt. Road X 15.675 150 O 0.373 0.260 0.000 0.023 0.038 0.067 76.10 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page492
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sto. Niño Construction 4867Repair/Rehab. of Brgy.
Kauswagan, Diplahan, Zamboanga Sibugay
IX 0.941 40 C 0.460 - 0.500 - - - 96.00 *96.00% Outstanding
Sto. Niño Construction 4867 Repair/Rehab. of Farm-to-Market Road, Diplo-Sanlagmanok Road IX 4.520 78 C 0.477 - 0.500 - - - 97.70 95.60%
Outstanding
Stocon Construction Service 26111 Concreting of Cugman By Pass Road X 1.412 45 C 0.359 0.273 0.300 - - - 93.20 81.50%
V. Satisfactory
Stoneline Construction 13132 Conc. of Cotabao City Diversion Road XII 9.627 115 C 0.250 0.300 0.300 - - - 85.00 78.64%
Satisfactory
Stoneline Construction 13132Conc. of Cotabato City
Circumferential Highway, (Lugay-Lugay-Kalanganan Section)
XII 4.780 45 C 0.337 0.200 0.000 - - - 53.70 71.82% Satisfactory
Stoneline Construction 13132Conc. of Western Circumferential
Roads (Purok Balas-Purok Sagingan Sect.)
XII 1.901 25 C 0.343 0.200 0.300 - - - 84.30 76.20% Satisfactory
Stoneline Construction 13132 Concrete Reblocking of Cotabato-Alla-Marbel National Road XII 4.761 100 C 0.331 0.200 0.000 - - - 53.10 67.38%
Fair
Stoneline Construction 13132 Const. of MPB XII 0.761 84 O 0.347 0.240 0.100 0.020 0.027 0.100 83.40 -
Stoneline Construction 13132 Const. of Multi-Purpose Building, Brgy. Sarmeinto, Parang XII 1.889 65 C 0.298 0.133 0.300 - - - 73.10 73.10%
Poor
Stoneline Construction 13132 Const. of Road at Esteros Rosario heights 9 XII 1.380 32 C 0.200 0.200 0.300 - - - 70.00 77.68%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page493
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Stoneline Construction (Formerly: Abubakar Engineering
Exponent)13132 Concreting of SKC Lugay-Lugay
Road XII 3.717 42 O 0.358 0.300 0.100 0.030 0.053 0.100 94.10 -
Stoneline Construction (Formerly: Abubakar Engineering
Exponent)13132 Const. of MPB XII 0.761 84 C 0.359 0.225 0.300 - - - 88.40 84.90%
V. Satisfactory
Struktura Teknika Services Company 16646 Const. of 1 Unit Sch. Bldg. @
PILMES, Poblacion IVA 0.964 60 C 0.500 0.133 0.300 - - - 93.30 *93.30% V. Satisfactory
Struktura Teknika Services Company 16646 Const. of 2 Storey RGR Type Sch.
Bldg. Phase II IVA 5.752 210 C 0.398 0.200 0.300 - - - 89.80 87.98% V. Satisfactory
Struktura Teknika Services Company 16646 Const. of MPB @ M. Naval St. NCR 5.682 150 C 0.399 0.300 0.300 - - - 99.90 87.58%
V.Satisfactory
Stvinta Construction 32620 Conc. of road Valcres, Mabolo III 0.962 15 C 0.297 0.200 0.300 - - - 79.70 *79.70% Satisfactory
STX Enterprises 21547 Const. / Improvement of MWCR, Balansay Section IV-B 1.412 50 C 0.335 - 0.500 - - - 83.50 80.92%
V. Satisfactory
Subcon Corporation 25079 Conc. of Mactan St. III 1.387 60 C 0.386 0.200 0.300 - - - 88.60 *88.60% V. Satisfactory
Subcon Corporation 25079 Concreting of E-25th St. and 26th St. (Elicano St.,-Dead End) East III 1.302 60 C 0.377 0.200 0.300 - - - 87.70 82.90%
V. Satisfactory
Subcon Corporation 25079 Const. of Multi-Purpose Building III 2.056 90 C 0.335 0.188 0.300 - - - 82.30 *82.30% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page494
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sui Generis Construction 28174 Const. of Lasti-Tadloc Riverside Road (Phase I) IVB 3.819 120 O 0.318 0.300 0.100 0.023 0.028 0.100 86.90 -
Sui Generis Construction 28174
Const. of Molino Blvd., Niog-Mambog-Molino Section, Sta.
0+510 - Sta. 7+770.29 (Intermittent Section)
IV-A 43.393 360 O 0.324 0.243 0.050 0.030 0.059 0.100 80.60 -
Sulim Construction & Supply 26588 Rosario CIS (Irrigation) NIA 0.763 120 C 0.358 0.174 0.300 - - - 83.26 *83.26% V.Satisfactory
Sumitomo Construction Co. Ltd. FC-04-010 CP V, Agas-Agas Bridge Project PJHL 869.429 780 O 0.394 0.300 0.100 0.024 0.070 0.100 98.80 -
Sumitomo Construction Co. Ltd. FC-04-010 CP V, Agas-Agas Bridge Project PJHL 869.429 780 O 0.386 0.300 0.100 0.030 0.070 0.100 98.60 -
Sumitomo Mitsui Construction Co. Ltd. FC-04-010 CP V, Agas-Agas Bridge Project PJHL 995.037 990 O 0.367 0.298 0.150 0.030 0.070 0.050 96.50 -
Summa Kumagai, Incorporated 3381NAIA Expressway & Its related Proj., Phase I, Package I, Sales
Interchange ComponentURPO 164.128 472 O 0.348 0.300 0.100 0.030 0.043 0.100 92.10 -
Summa Kumagai, Incorporated 3381NAIA Expressway and its Related Roads Project, Phase I, Package I,
Sales Interchange ComponentsURPO 164.128 472 O 0.320 0.300 0.100 0.030 0.065 0.100 91.50 -
Summercap Const. and Allied Services 30787 Completion of Lengey MPB CAR 2.279 90 C 0.334 0.219 0.000 - - - 55.30 73.01%
Satisfactory
Summercap Const. and Allied Services 30787 Const. of Poblacion-Bulo-Magabta
FMR CAR 1.331 104 C 0.370 0.300 0.300 - - - 97.00 *97.00% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page495
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sunstone Construction 11122 Conc. of Cotabao City Diversion Road XII 9.267 115 O 0.258 0.236 0.100 0.015 0.035 0.100 74.40 -
Sunstone Construction 11122Conc. of Dualing-New Panay-
Midsayap Road (New Leon-New Panay Sect.)
XII 9.437 165 C 0.439 0.200 0.300 - - - 93.90 88.44% Satisfactory
Sunstone Construction 11122 Conc. of Road @ Brgy. Barongis XII 0.478 45 C 0.370 0.283 0.300 - - - 95.30 *95.30% Outstanding
Sunstone Construction 11122 Conc. of Road @ Brgy. Central Katingawan XII 0.826 30 C 0.351 0.300 0.300 - - - 95.10 75.06%
Satisfactory
Sunstone Construction 11122 Concreting of Road @ Brgy. Nasapian XII 4.727 60 C 0.439 0.200 0.300 - - - 93.90 *93.90%
V. Satisfactory
Sunstone Construction 11122 Const. of FTMR @ Barangiran XII 0.428 25 C 0.442 - 0.500 - - - 94.20 94.20% Outstanding
Sunstone Construction 11122 Const. of MPB @ Brgy. Batiocan XII 0.287 30 C 0.340 0.300 0.300 - - - 94.00 *94.00% Outstanding
Sunstone Construction 11122 Rehab./Conc. of Davao-Cotabato Road, Dualing Section XII 5.692 101 C 0.313 0.300 0.000 - - - 61.30 75.10%
Satisfactory
Sunwest Construction & Development Corporation 15906 Davao Port Expansion Project PPA 396.089 720 O 0.400 0.030 0.300 0.030 0.07 0.100 93.00 -
Sunwest Construction & Development Corporation 15906 Lamoa Port Expansion Project PPA 98.213 360 O 0.383 0.300 0.030 0.030 0.060 0.033 83.60 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page496
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sunwest Construction & Development Corporation 15906 Proposed Davao Port Expansion PPA 396.089 720 O 0.400 0.300 0.100 0.024 0.065 0.100 98.90 -
Sunwest Construction and Development Corporation 15906 Asphalt Overlay of Lapu-Lapu St.
Elizondo St., V 19.206 60 C 0.429 0.133 0.300 - - - 86.20 *86.20% Satisfactory
Sunwest Construction and Development Corporation 15906 Bulan Airport Development
Project DOTC 81.889 270 O 0.327 0.300 0.150 0.030 0.047 0.050 90.40 -
Sunwest Construction and Development Corporation 15906 Channelization Nasisi River V 14.420 90 C 0.417 - 0.500 - - - 91.70 *91.70%
Oustanding
Sunwest Construction and Development Corporation 15906 Channelization of Padang River V 7.183 50 C 0.333 - 0.500 - - - 83.30 *83.30%
V. Satisfactory
Sunwest Construction and Development Corporation 15906 Channelization of Tubli River V 28.497 180 C 0.300 - 0.500 - - - 80.00 *80.00%
Satisfactory
Sunwest Construction and Development Corporation 15906 Const. of Bahi Seawall, Rock
Causeway & Access Road V 47.945 243 C 0.450 0.500 - - - 95.00 95.12% Outstanding
Sunwest Construction and Development Corporation 15906 Dredging of Talisay River V 19.225 90 C 0.250 - 0.500 - - - 75.00 83.46%
V. Satisfactory
Sunwest Construction and Development Corporation 15906 Legaspi Airport Development
Project DOTC 59.212 180 O 0.351 0.296 0.150 0.020 0.057 0.050 92.40 -
Sunwest Construction and Development Corporation 15906 Opening / Impv't of Roads in
Magallang-Sagrada Road V 19.226 120 C 0.450 - 0.500 - - - 95.00 *95.00% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page497
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sunwest Construction and Development Corporation 15906 Proposed Davao Port Expansion PPA 396.089 720 C 40.000 30.000 30.000 - - - 99.39 99.39%
Outstanding
Sunwest Construction and Development Corporation 15906
Repair/Impvt./Asphalt Overlay of Shoulders of Calayucay-Sula-
Mosboron RoadV 11.415 240 C 0.389 0.200 0.300 - - - 88.90 *88.90%
V. Satisfactory
Sunwest Construction and Development Corporation 15906 Replacement of Bubulusan Bridge V 17.328 310 C 0.451 0.200 0.300 - - - 95.10 89.82%
V. Satisfactory
Sunwest Construction and Development Corporation 15906 Restoration of Yawa Flood Control
(Phase I) V 19.103 240 C 0.439 0.200 0.300 - - - 93.90 *93.90% V.Satisfactory
Sunwest Construction and Development Corporation 15906 Road Opening leading to Orok-
Osok Falls V 28.499 270 C 0.398 0.296 0.300 - - - 99.40 96.10% Oustanding
Sunwest Construction and Development Corporation 15906 Road Opening of Obi to Orok-
Osok Falls V 28.496 270 C 0.327 0.137 0.300 - - - 76.40 86.12% V. Satisfactory
Sunwest Construction and Development Corporation 15906 Road Opening of Tilod-Batolinao-
Pacugon Road V 19.260 180 C 0.400 0.277 0.000 - - - 67.70 73.14% Satisfactory
Sunwest Construction and Development Corporation 15906 Road Opening/Improvement of
Caricot Sagrada Road V 19.107 105 C 0.479 - 0.500 - - - 97.90 *97.90% Outstanding
Sunwest Construction and Development Corporation 15906 Road Opening/Improvement of
Caricot-Montenegro Road V 19.107 110 C 0.437 0.500 - - - - 93.70 *93.70% V.Satisfactory
Sunwest Construction and Development Corporation 15906
Widening / Improvement of National Road, Bagamanoc-
Pandan RoadV 14.195 270 C 0.387 0.293 0.300 - - - 98.00 96.62%
Oustanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page498
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sunwest Construction and Development Corporation 15906 Widening of Catanduanes Circ.
Road (Bato-Baras Section) V 28.495 210 C 0.395 0.287 0.300 - - - 98.20 95.92% Oustanding
Sunwest Construction and Development Corporation 15906 Widening of Catanduanes Circ.
Road (Hinipaan Section) V 28.511 240 C 0.397 0.288 0.300 - - - 98.50 91.90% Oustanding
Superpower Construction 17149 Conc. of Brgy. Road, Brgy. Parang IV-A 0.577 40 C 0.350 0.200 0.300 - - - 85.00 *85.00% V. Satisfactory
Superpower Construction 17149 Const. of One (1) CL Sch. Bldg. at Brgy. Calangcang E/S IV-A 0.554 45 C 0.479 0.075 0.300 - - - 85.40 *85.40%
Satisfactory
Superpower Construction 17149 Const. of Pahinga Norte-Malabanban Sur Spillway IV-A 1.893 90 C 0.335 0.000 0.500 0.000 0.000 0.000 83.50 *83.50%
V. Satisfactory
SWACS Enterprises 30009 Conc. of Road going to the E/S @ Pinget Brgy. CAR 1.432 44 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
SWACS Enterprises 30009 Rehab. of Abatan-Poblacion FMR CAR 0.481 32 C 0.365 0.200 0.300 - - - 86.50 *86.50% V. Satisfactory
SY Construction 30009 Rehab. of Drainage Canal @ St. Theresa St. CAR 0.285 30 C 0.252 0.119 0.300 - - - 67.10 *67.10%
Fair
SY Construction 12333 Rehabilitation/Restoration of Farm-to-Market Road IV-A 1.924 25 C 0.389 0.300 0.000 - - - 68.90 81.80%
V. Satisfactory
Sydglen Builders and Enterprises 28848Conc. of Shoulders along Daan Maharlika-Naga-Naga Anibong
Sect.VIII 1.895 75 C 0.282 0.300 0.300 - - - 88.20 *88.20%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page499
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Sydglen Builders and Enterprises 28848 Const. of 1 Cl Sch. Bldg. @ Alang-alang I C/S VIII 0.507 45 C 0.359 0.300 0.300 - - - 95.90 *95.90%
Outstanding
Sysmic Enterprises & Construction 29697 Const. of Hernani Seawall,
Hernani VIII 0.914 45 C 0.312 0.000 0.500 0.000 0.000 0.000 81.20 *81.20% V. Satisfactory
System One Builders 26480Proposed Partial Const. of Zobel
Roxas Extension Alabastro to Onyx St.
NCR 4.719 120 C 0.414 0.000 0.500 0.000 0.000 0.000 91.40 81.14% V. Satisfactory
T R Construction 11697 Concreting of EM's Barrio Brgy. Road V 0.226 30 C 0.452 0.000 0.500 0.000 0.000 0.000 95.20 *95.20%
Oustanding
T. Solomon Construction 10046 Const. of Road @ Brgy. Banjo East IV-A 0.963 90 C 0.298 0.300 0.300 - - - 89.80 *89.80%
V. Satisfactory
T. Solomon Construction 10046 Const. of Six (6) CL Sch. Bldg. @ Brgy. Gonzales IV-A 2.890 120 C 0.334 0.200 0.300 - - - 83.40 *83.40%
V. Satisfactory
T. Solomon Construction 10046 Repair/Impvt. of MPB at Brgy. Balele IV-A 3.375 120 C 0.373 0.300 0.300 - - - 97.30 *97.30%
Outstanding
T.A.D. Construction 14098 Const. of Brgy. Road at Brgy. San Roque IVA 0.381 40 C 0.370 0.300 0.300 - - - 97.00 *97.00%
Outstanding
T.A.D. Construction 14098Const. of Flood Control Pilot Project at Kinanliman River
ControlIV-A 9.640 200 C 0.360 0.300 0.300 - - - 96.00 81.78%
V. Satisfactory
T.A.D. Construction 14098 Const. of MPB @ Quezon National Agricultural IVA 1.929 60 C 0.327 0.300 0.300 - - - 92.70 *92.70%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page500
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
T.A.D. Construction 14098 Const. of Multi-Purpose Bldg. (BSP) @ Tayabas East (E/S) IVA 4.810 180 C 0.454 - 0.500 - - - 95.40 *95.40%
Outstanding
T.A.D. Construction 14098 Const. of Olo Bridge VII 2.744 120 C 0.327 0.300 0.300 - - - 92.70 *92.70% Outstanding
T.A.D. Construction 14098 Const./Completion of MPB at Caitican VII 0.472 150 C 0.261 0.237 0.300 - - - 79.80 *79.80%
Satisfactory
T.A.D. Construction 14098Repair/Maintenance of Lined
Canal along Lucena Bdry.-TayabasLucban Road
IVA 0.289 24 C 0.232 0.300 0.300 - - - 83.20 *83.20% V. Satisfactory
T.J. Velasco Construction & Supply 10560 Administration Building DOST 4.895 165 C 0.395 0.293 0.300 - - - 98.80 98.80%
Outstanding
T.J. Velasco Construction and Supply 10560 Const. of 14 Core Housing Units NHA
Region I 3.023 120 C 0.394 0.300 0.300 - - - 99.40 85.40% V.Satisfactory
T.N.J. Buhong Construction 19687 Impvt. along Ban-Hung-Benguet Bdry. Road Alimit-Hiwang Sect. CAR 2.455 94 C 0.366 - 0.500 - - - *86.60 86.60%
V. Satisfactory
T.N.J. Buhong Construction 19687 Impvt. Along Jct. Potia-Mt. Province Bdry. Road, Pob. Section CAR 1.580 140 C 0.341 0.300 0.300 - - - 94.10 81.44%
V.Satisfactory
T.N.J. Buhong Construction 19687Impvt. along Nueva Viscaya-Ifugao
Mt. Province Bdry. Road, Km. 297+000-Km. 300+000
CAR 0.488 38 C 0.390 - 0.500 - - - 89.00 *89.00% V. Satisfactory
T.N.J. Buhong Construction 19687Widening/Conc. of Poblacion-
Banaue-Brgy. Bangaan, Awaan-Banagan Section
CAR 23.123 270 O 0.268 0.126 0.070 0.008 0.030 0.033 53.50 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page501
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
T.N.J. Buhong Construction 19687Widening/Conc. of Poblacion-
Banaue-Brgy. Bangaan, Awaan-Banagan Section
CAR 23.084 270 O 0.369 0.295 0.150 0.022 0.037 0.033 90.60 -
T.R.A. Builders 26775 Const. of MPB, Don Jose Ynares Sr. MNHS IV-A 1.633 90 C 0.376 0.200 0.300 - - - 87.60 *87.60%
V. Satisfactory
Tabs Construction & Construction Supplies 10495
Replacement of Deteriorated Macadam Road to PCCP along
Davao-Cotabato Road (NORCIT-KPES Sect.)
XII 5.217 120 C 0.472 - 0.500 - - - 97.20 90.18% Outstanding
Tacloban Ras Construction Corporation 17184
Rehab./Impvt. of Asphalt Road leading to San Juanico Bridge
Field OfficeVIII 1.996 25 C 0.267 0.200 0.300 - - - 76.70 *76.70%
Satisfactory
Tacolod Enterprises 10721 Const. of One (1) Unit, 1-CL School Bdlg. @ Andulawan NHS VI 0.357 45 C 0.462 - 0.500 - - - 96.20 88.92%
V. Satisfactory
Taisei Philippine Construction Incorporated / Marubeni (JV)
SL2-SN-000432
Const. of Cebu South Coastal Road Project-Segment 3B-1,
offshorre Ramps SectionMCDP 695.488 1,037 O 0.352 0.300 0.100 0.030 0.065 0.100 94.70 -
Tango Romeo General Construction 18926 Conc. of Legarda Road CAR 2.810 72 C 0.279 0.300 0.300 - - - 87.90 *87.90%
V. Satisfactory
Tango Romeo General Construction 18926 Conc./Widening of La Chesa @
Brgy. Upper Tadiangan CAR 2.782 76 C 0.298 0.300 0.300 - - - 89.80 *89.80% V. Satisfactory
Tango Romeo General Construction 18926 Concreting/Widening of Road,
Trancoville Brgy. CAR 1.142 68 C 0.390 - 0.500 - - - 89.00 *89.00% V. Satisfactory
Tango Romeo General Construction 18926 Rehab./Impvt. of Harrison Road 2 CAR 4.724 60 C 0.394 0.108 0.300 - - - 80.20 *80.20%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page502
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Tantuco Const. and Trading Corp. 7255 Rehab./Impvt. of Road at Purok
Pinag-isa, Brgy. Cotta IV-A 0.329 45 C 0.375 - 0.500 - - - 87.50 87.50% V. Satisfactory
Tantuco Const. and Trading Corp. (Formerly: Tantuco Lumber
& Const. Supply)7255 Conc. of San Pablo Boundary-
Dolores-Pinagdanglayan Road IV-A 7.509 64 C 0.269 0.200 0.300 - - - 76.90 *76.90% Satisfactory
Tantuco Const. and Trading Corp. (Formerly: Tantuco Lumber
& Const. Supply)7255 Const. of Elevated Water Tank
with Pipelines IV-A 0.944 40 C 0.352 0.300 0.300 - - - 95.20 *95.20% Outstanding
Tantuco Const. and Trading Corp. (Formerly: Tantuco Lumber
& Const. Supply)7255
Const. of Quezon Eco-Tourism Road (LUC-BAT CR) inc. RROW: Phase II, Guisguis-Bantilan Sect., Conc. of Guisguis-Bignay I Sect.
IV-A 17.750 125 C 0.348 0.265 0.300 - - - 91.30 *91.30% Outstanding
Tantuco Construction and Trading Corporation 7255
Const. of Eco-Tourism Road (LUC-BAT CR) inc. RROW: Phase II,
Guisguis-Bantilan Sect., Conc. of Bignay II Sect.
IV-A 9.770 115 C 0.464 0.152 0.300 - - - 91.60 *91.60% V. Satisfactory
Tarifa Construction & Supplies 33239 Concreting of Farm to Market Road, Brgy. San Francisco III 1.879 75 C 0.327 0.200 0.300 - - - 82.70 *82.70%
Satisfactory
Tarifa Construction & Supplies 33239 Construction of Multi-Purpose Building at Brgy. Palacpalac III 2.361 75 O 0.205 0.239 0.150 0.030 0.035 0.050 70.90
Tarifa Constuction & Supplies 33239 Const. of Road (FMR), Sito Sto. Rosario, Brgy. Baculong III 1.685 90 C 0.330 0.279 0.300 - - - 90.90 *90.90%
Outstanding
TCAT Construction 20822 Const. of Municipal Hall VIII 0.961 95 C 0.479 - 0.500 - - - 97.90 97.90% Outstanding
TDR Construction & Supply 8560 Conc. of Brgy. Road @ Brgy. Kawit IVA 0.470 60 C 0.275 0.300 0.300 - - - 87.50 *87.50%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page503
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Teddie Construction Development Inc. 6313 Zamboanga Airport Development
Project DOTC 61.672 150 C 0.476 0.200 0.300 - - - 97.60 97.60% Outstanding
Teddie Construction Development Inc./Wee Eng
Const., Inc. (J.V.)JV-07-116 Zamboanga Airport Development
Project DOTC 105.729 300 O 0.398 0.300 0.150 0.020 0.054 0.033 95.50 -
Teddie Construction Development, Inc. 6313
Const. (New Opening) of Zamboanga West Coast Road, Sirawai-Sibuco Road, Bitugan-
Tapanayan-Talabiga Section
IX 32.446 340 O 0.160 0.043 0.000 0.030 0.042 0.100 37.50 -
Teddie Construction Development, Inc. 6313 Const. of Bangayan Bridge and
Approaches IX 6.054 255 C 0.376 0.201 0.300 - - - 87.70 84.46% V. Satisfactory
Teddie Construction Development, Inc. 6313
Impvt. of Nat'l Road (Asphalt Overlay along Maria Clara L.
Lobregat HighwayIX 14.998 31 C 0.279 0.300 0.300 - - - 87.90 90.06%
Outstanding
Teddie Construction Development, Inc. 6313 Impvt./Road Widening of Sangali
Nat'l Road IX 9.201 163 C 0.356 0.200 0.300 - - - 85.60 81.16% V. Satisfactory
Teddie Construction Development, Inc. 6313
Rehab./Impvt. of Nat'l Road (Asphalt Overlay Labuan-Limpapa
Road along Zamboanga City)IX 11.676 45 C 0.320 0.100 0.300 - - - 72.00 *72.00%
Satisfactory
Tessa Construction & Trading 26437 Concrete Paving of Brgy. Muñoz West Road II 0.944 75 C 0.259 - 0.500 - - - 75.90 *75.90%
Satisfactory
Tessa Construction & Trading 26437 Const. of Multi-Purpose Building II 1.889 180 O 0.365 0.300 0.070 0.015 0.027 0.067 84.40 -
Tessa Construction & Trading 26437 Rehab./Const. of Road II 1.889 90 O 0.330 0.294 0.100 0.030 0.055 0.100 90.90 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page504
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Tessa Construction & Trading 26437 Repair/Rehab. of Multi-Purpose Building with CR, Brgy. Marulas NCR 0.444 30 C 0.333 - 0.500 - - - 83.30 *83.30%
V. Satisfactory
Tessa Construction & Trading 26437 Road Impvt. Along Gamu-Roxas Road II 4.940 20 C 0.400 0.200 0.300 - - - 90.00 *90.00%
V. Satisfactory
The Steadfast Builders 8176 Const. of Drainage System at Sto. Simona, Brgy. San Isidro IV-A 0.955 75 C 0.451 - 0.500 - - - 95.10 *95.10%
Outstanding
The Steadfast Builders 8176 Const. of Multi-Purpose Building (Dialysis) NCR 2.812 120 C 0.459 - 0.500 - - - 95.90 *95.90%
Outstanding
The Steadfast Builders 8176 Const. of Two (2) Storey, Six (6) Classroom IV-A 4.662 150 C 0.382 0.300 0.300 - - - 98.10 60.75%
Fair
The Steadfast Builders 8176
Maintenance by Contract Package I, CY-2003 R-10, Tayuman,
Zaragosa, Moriones and Juan Luna
NCR 5,279 365 C 0.408 - 0.500 - - - 90.80 83.30% V. Satisfactory
The Steadfast Builders 8176 Rehab. of MPB at Brgy. Nayong Kanluran (Covered Court) NCR 2.697 111 C 0.316 0.198 0.300 - - - 81.40 82.17%
Satisfactory
The Steadfast Builders 8176 Rehab./Const. of MPB @ Zone 25, 26, 29, 32, & 33 NCR 1.827 90 C 0.384 0.300 0.300 - - - 98.40 94.20%
Outstanding
The Steadfast Builders 8176 Rehab./Impvt. of F.P. Felix Ave. (Formerly Imelda Ave.) IV-A 14.417 150 C 0.365 0.200 0.300 - - - 86.50 *86.50%
V. Satisfactory
The Steadfast Builders 8176 Rehab./Impvt. of Drainage and Flood Control IV-A 9.602 150 C 0.300 0.300 0.300 - - - 90.00 79.56%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page505
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
The Steadfast Builders 8176Upgrading/Concreting with
Drainage Impv't. of Brgy. 118, Zone 9
NCR 2.052 90 C 0.380 0.200 0.300 - - - 88.00 *88.00% V. Satisfactory
The Tuscan Structures and Supplies 18257 Conc. of Bugko-Nenita Road VIII 14.313 144 C 0.317 0.200 0.300 - - - 81.70 *81.70%
V. Satisfactory
The Tuscan Structures and Supplies 18257 Const./Impvt./Rehab. of Bantayan-
Malobago Road VIII 18.795 240 O 0.289 0.245 0.100 0.023 0.047 0.100 80.40 -
The Tuscan Structures and Supplies 18257
Const./Rehab./Completion/Repair of Elementary & Secondary Sch.
Bldg., Brgy. OquendoVIII 0.520 60 C 0.363 0.200 0.300 - - - 86.30 *86.30%
Satisfactory
The Tuscan Structures and Supplies 18257
Const./Rehab./Completion/Repair of Elementary & Secondary Sch. Bldg., Pilar National High Sch.
VIII 0.517 60 C 0.423 0.200 0.300 - - - 92.30 *92.30% V. Satisfactory
The Tuscan Structures and Supplies 18257 Rehab. of Naga to Mombon Sect.
along Calbayog Diversion Road VIII 9.630 179 C 0.389 0.158 0.300 - - - 84.70 84.58% Satisfactory
Thel Construction & Supplies 17671 Conc. of Dualing-New Panay-Midsayap Road (Katalicanan Sect.) XII 4.775 74 C 0.330 0.300 0.000 - - - 63.00 71.82%
Satisfactory
Thel Construction & Supplies 17671 Concreting of Road at Brgy. Poblacion XII 9.422 105 O 0.360 0.237 0.150 0.015 0.035 0.033 83.00 -
Thel Construction & Supplies 17671 Const. of 1-Cl School Building XII 0.375 40 C 0.325 - 0.500 - - - 82.50 *82.50% V. Satisfactory
Thel Construction & Supplies 17671 Const. of MPB @ Brgy. Sta. Cruz XII 0.282 30 C 0.320 0.300 0.300 - - - 92.00 *92.00% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page506
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Three W Builders, Inc 19722 Repair/Rehabilitation/ Construction of Butas Dam NIA 34.95 217 C 0.3358 0.2184 0.300 - - - 85.41 85.41%
V. Satisfactory
Three W Builders, Inc. 10722Rehab./Reconst. (Selective
Concrete Paving & Asphalt) along Ozamis-Pagadian Road
X 38.659 240 O 0.330 0.300 0.150 0.030 0.045 0.050 90.50 -
Three W Builders, Inc. 10722
Road Support Peace & Dev't in Mindanao & Other Conflict
affected Area, Quirino Highway, San Luis I & II
IV-A 38.318 148 C 0.473 0.133 0.300 - - - 90.60 *90.60% V. Satisfactory
Three W Builders, Incorporated 10722Completion (conc.) of Ternate-
Nasugbu Road, Balaytigue-Calayo-Looc Section
IV-A 23.988 240 C 0.342 0.300 0.300 - - - 94.20 91.17% Outstanding
Three W Builders, Incorporated 10722 Const. of 2- Storey, 4-CL School Building IV-A 2.784 180 C 0.393 - 0.500 - - - 89.30 86.78%
V. Satisfactory
Three-In-One Construction & Trading 14695 Conc. of Brgy. Road @ Brgy.
Callulut III 0.475 30 C 0.315 0.274 0.300 - - - 88.90 *88.90% V. Satisfactory
Thrivelight Enterprises & Construction 26842 Const. of MPS @ Brgy.
Ambangonan, Rosaario I 0.930 28 C 0.331 - 0.500 - - - 83.10 *83.10% V. Satisfactory
Thunder Construction 17247 Conc. of Poblacion Pilar-Dalit Road CAR 1.884 44 C 0.277 0.200 0.300 - - - 77.70 *77.70%
Satisfactory
Thunder Construction 17247 Const. of MPB Completion of MPB (Package), Brgy. Calaba CAR 2.364 28 C 0.268 0.200 0.000 - - - 46.80 *46.80%
Poor
Thunder Construction 17247Const. of Slope Protection Work
along Abra-Cervantes Road, Bucay Section
CAR 4.722 144 C 0.200 0.116 0.300 - - - 61.60 72.52% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page507
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Thunder Construction 17247
Const./Road Opening of Abra-Cervantes Road, Gangal-Subusob-
Salapay Section, km. 445+000 - km. 457+945
CAR 12.076 262 C 0.229 0.200 0.000 - - - 42.90 53.82% Poor
Thunder Construction 17247 Rehabilitation of FMR @ Villa Mercedes CAR 0.468 56 C 0.284 0.200 0.300 - - - 78.40 74.08%
Satisfactory
Thunder Construction 17247
Repair and Maint. of National Road Abra-Ilocos Sur Road, Km.
388+150 - Km. 388+653 (part of Package)
CAR 4.770 18 C 0.362 0.190 0.300 - - - 85.20 *85.20% Satisfactory
Thunder Construction 17247 Road Upgrading , Abra-Cervantes Road, Km. 430+450 - Km. 445+450 CAR 14.268 208 O 0.126 0.224 0.120 0.030 0.022 0.017 53.90 -
Thunder/Gonzalo Joint Venture
SL1-SN-004984 (JV-07-
003)
Const. of Masiwsiw RCDG Bridge & Approaches CAR 15.537 296 C 0.353 0.100 0.300 - - - 75.30 76.84%
Satisfactory
Thunderheads Construction Corporation 22420 Conc. of Road @ San Isidro IV-B 0.951 60 C 0.347 0.280 0.300 - - - 92.70 91.62%
Outstanding
Thunderheads Construction Corporation 22420 Const. of Paclasan Seawall IV-B 0.875 56 C 0.396 - 0.500 - - - 89.60 89.60%
V. Satisfactory
Tibaraw Construction 22710 Cagbonga CIS NIA 3.467 150 C 0.435 0.120 0.300 - - - 85.46 *85.46% Satisfactory
Tibaraw Construction 22710 Const. of Multi-Purpose Building VIII 1.702 140 C 0.370 0.200 0.300 - - - 87.00 85.71% V. Satisfactory
Tibaraw Construction 22710 Const./Rehab. of FMR, Bagacay-Concord Road VIII 1.789 45 C 0.000 - 0.500 - - - 50.00 40.00%
Poor
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page508
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Tibaraw Construction 22710 Mantang CIP NIA 2.147 90 C 0.425 0.120 0.300 - - - 84.49 *84.49% Satisfactory
Tibaraw Construction 22710 San Gabriel CIS NIA 2.224 150 C 0.424 0.120 0.300 - - - 84.43 *84.43% Satisfactory
Titanium Builders Inc. 24921 Concreting of Barangay Road, Brgy. Poblacion X 0.964 60 C 0.337 0.300 0.300 - - - 93.70 88.18%
V. Satisfactory
Titanium Builders, Inc. 24921 Conc. of Purok Mutya-Brgy. Katipunan Road, Villanueva X 0.955 30 C 0.422 - 0.500 - - - 92.20 *92.20%
Outstanding
Titanium Builders, Inc. 24921 Const. of Brgy Maputi Flood Control, Naawan X 0.239 45 C 0.445 - 0.000 - - - 44.50 *44.50%
Poor
TJT Construction 10047 Completion of Multi-Purpose Building NCR 1.625 30 C 0.412 0.158 0.300 - - - 87.00 *87.00%
Satisfactory
TKS Builders and Supplies 23415 Concreting of Roads at Sitio Batulosa Bangkas Heights XI 1.407 90 C 0.456 - 0.500 - - - 95.60 95.60%
Outstanding
TKS Builders and Supplies 23415 Const. of MPB at Brgy. Fire Station XI 2.599 210 C 0.364 0.300 0.300 - - - 96.40 96.82%
Outstanding
TKS Builders and Supplies 23415 Const. of MPB at Camanchiles XI 1.575 110 C 0.326 0.300 0.300 - - - 92.60 90.92% Outstanding
TLI Construction 19209Const. of MPB (Haven for the
elderly) inside the National Training School for Boys
IV-A 9.615 150 C 0.311 0.300 0.300 - - - 91.10 *91.10% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page509
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
TM Abad Construction 9302 Completion/Conc. of Road @ Panorama Hills, Etn. Brgy. Cupang IV-A 0.431 45 C 0.290 0.244 0.300 - - - 83.40 *83.40%
V. Satisfactory
TM Abad Construction 9302 Const. of MPB @ J.P. Rizal E/S NCR 2.894 120 C 0.383 0.300 0.300 - - - 98.30 89.20% V. Satisfactory
TM Abad Construction 9302 Riprapping of Putting Kahoy Creek IV-A 1.050 75 C 0.375 - 0.500 - - - 87.50 *87.50%
V. Satisfactory
Toa Construction
FC-01-054/SLI-
SN-004426
Const. of the Agno River Control Project, Phase II, Package I MFCDP-II 708.981 945 O 0.296 0.200 0.100 0.024 0.059 0.200 87.90 -
Toa Construction
FC-01-054/SL2-
SN-000567
Const. of the Agno River Control Project, Phase II, Package I MFCDP-II 925.116 1,536 O 0.355 0.200 0.100 0.030 0.065 0.200 95.00 -
Tokwing Construction 9650 Const. of Mindanao Ave. Extension (Segment C) NCR 161.879 360 O 0.375 0.180 0.100 0.030 0.042 0.067 79.40 -
Tokwing Construction 9650 Construction of Calaba Bridge and Approaches (Phase II)
Sp. Bridges 143.959 510 O 0.355 0.235 0.150 0.022 0.040 0.033 83.50 -
Tokwing Construction 9650 Repair/Rehab. of Ayala Bridge NCR 42.303 180 C 0.324 0.300 0.300 - - - 92.40 90.12% Outstanding
Tokwing Construction/ZM Construction (JV) JV-05-006
Const. of Maculcul Bridge & Approaches along Iba-South Road
(Phase III)III 93.730 300 O 0.377 0.300 0.100 0.030 0.037 0.100 94.40 -
Tokwing Construction/ZM Construction (JV)
SL1-SN-004749
Const. of Maculcul Bridge (Phase II) III 47.664 180 O 0.356 0.300 0.100 0.030 0.040 0.100 92.60 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page510
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Tokwing Construction/ZM Construction (JV)
JV-060-054
Const. of Tarlac-Nueva Ecija-Dingalan Port Road, (Tarlac City-
Sta. Rosa-Fort Magsaysay-PalayanCity-Laur Gabaldon-Dingalan
Road)
III 52.105 240 C 0.338 0.300 0.300 - - - 93.80 93.20% Outstanding
Tokwing Construction/ZM Construction (JV) JV-05-006
Construction of Maculcul Bridge & Approaches along Iba-South Road
(Phase III)III 94.890 300 C 0.389 0.300 0.300 - - - 98.90 96.20%
Outstanding
Toledo Const. Corp./ Advanced Foundation Const. System Corp.
(JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3,
Skyway RampsURPO 414.099 545 O 0.355 0.256 0.100 0.030 0.065 0.100 90.60 -
Toledo Const. Corp./ Advanced Foundation Const. System Corp.
(JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3,
Skyway RampsURPO 457.260 1,102 O 0.336 0.240 0.000 0.023 0.055 0.067 72.10 -
Toledo Const. Corp./ Advanced Foundation Const. System Corp.
(JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3,
Skyway RampsURPO 597.836 1,361 O 0.284 0.240 0.000 0.024 0.061 0.100 70.90 -
Toledo Const. Corp./ Advanced Foundation Const. System Corp.
(JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3,
Skyway RampsURPO 597.836 1,476 O 0.283 0.240 0.050 0.024 0.059 0.100 75.60 -
Toledo Const. Corp./ Advanced Foundation Const. System Corp.
(JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3,
Skyway Ramps 2 & 3URPO 597.836 1,476 O 0.294 0.291 0.000 0.024 0.047 0.100 75.60 -
Toledo Const. Corp./ Advanced Foundation Const. System Corp.
(JV)JV-02-063
NAIA Expressway & its Related Road Proj. Phase I, Package 3,
Skyway Ramps 2 & 3URPO 721.651 1,543 O 0.330 0.300 0.000 0.030 0.047 0.100 80.70 -
Toledo Construction Corporation 6349 Completion of Approaches/Slope Protection of Kaliraya Bridge NCR 7.623 165 C 0.371 0.300 0.300 - - - 97.10 70.58%
Satisfactory
Toledo Construction Corporation 6349 Sct. Ranger Housing Village Project. Phase 2 NCL 51.090 180 C 0.203 0.296 0.300 - - - 79.90 79.90%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page511
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Tonka Construction 4064Asphalt Overlay of Angeles-Porac-
Dinalupihan Road Km. 86+850- Km. 96+761 with exception
III 19.085 32 C 0.418 0.126 0.300 - - - 84.40 *84.40% Satisfactory
Tonka Construction 4064 Upgrading/Asphalting of Manila North Road (Mabalacat Section) III 4.697 45 C 0.470 - 0.500 - - - 97.00 *97.00%
Outstanding
Tonn Builders (Phils.) Const., Inc. 5815Const. (Widening) of Soro-Soro
Bridge, MSR-Rizal Boundary, San Pedro-Calamba Section)
IVA 26.570 240 O 0.322 0.240 0.100 0.030 0.035 0.100 82.70 -
Tonn Builders (Phils.) Const., Inc. 5815Const. (Widening) of Soro-Soro
Bridge, MSR-Rizal Boundary, San Pedro-Calamba Section)
IVA 28.940 330 O 0.318 0.240 0.100 0.023 0.033 0.100 81.40 -
Tonn Builders (Phils.) Const., Inc. 5815 Const. of Lepote Bridge & Approaches (Phase I & II) IVA 22.899 180 O 0.366 0.237 0.100 0.022 0.033 0.100 85.80 -
Top Most Development and Marketing Corporation 13361
Concreting of Lambunao-Pototan Road (Lambunao Poblacion
Portion)VI 2.595 90 C 0.431 - 0.000 - - - 43.10 71.45%
Satisfactory
Top Most Development and Marketing Corporation 13361 Const. of Nato Bridge VI 3.304 120 C 0.434 - 0.500 - - - 93.40 72.70%
Satisfactory
Top Most Development and Marketing Corporation 13361
Const. of Pociento Bridge & Approaches, Phase II, Brgy.
CanipayanVI 2.712 163 C 0.385 0.200 0.300 - - - 88.50 *88.50%
Satisfactory
Top Most Development and Marketing Corporation 13361
Repair/Rehab. of National Road (Secondary Arterial), Bugnay-
Constancia SectionVI 6.629 150 C 0.334 0.300 0.300 - - - 93.40 *93.40%
Outstanding
Top Tech Trading & Construction 25522 Asphalt Overlay/Rehab. of Palico-Balayan-Batangas Road IV-A 4.995 30 C 0.366 0.300 0.300 - - - 96.60 *96.60%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page512
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Top Tech Trading & Construction 25522 Conc. of Barangay Road @ Brgy. Gulod IV-A 0.470 60 C 0.343 0.300 0.300 - - - 94.30 *94.30%
Outstanding
Top Tech Trading & Construction 25522 Concreting of FMR, Brgy. Dita IV-A 0.473 60 C 0.433 - 0.500 - - - 93.30 *93.30% Outstanding
Top Tech Trading & Construction 25522Const. of Drainage along Palico-Balayan-Batangas Road, Lemery
SectionIV-A 1.102 60 C 0.413 - 0.500 - - - 91.30 *91.30%
Outstanding
Topform Builders, Inc. 31760 Rehab. of M. Paterno St. NCR 6.687 60 C 0.402 0.190 0.300 - - - 89.20 *89.20% V.Satisfactory
Toreja's Construction Supply Corporation 15453
Asphalt Overlay-Preventive Maintenance Palico-Balayan-
Batangas Rd. (Balayong-Manghinao I Sect.)
IV-A 20.740 120 C 0.231 0.300 0.300 - - - 83.10 *83.10% V. Satisfactory
Toreja's Construction Supply Corporation 15453 Conc. of Road @ Brgy. Simlog IV-A 4.744 120 C 0.333 0.281 0.300 - - - 91.40 *91.40%
Oustanding
Toreja's Construction Supply Corporation 15453 Conc. of Roads, Brgy. Putat-Brgy.
Dayap (Brgy. Putat Sect.) IVA 9.548 120 C 0.460 0.126 0.300 - - - 88.60 *88.60% Satisfactory
Toreja's Construction Supply Corporation 15453 Const. of Open Canal IV-A 0.475 120 C 0.400 - 0.500 - - - 90.00 *90.00%
V. Satisfactory
Toreja's Construction Supply Corporation 15453 Impvt./Rehab. of Lipa-Rosario
Road IV-A 4.817 120 C 0.340 0.200 0.300 - - - 84.00 *84.00% V. Satisfactory
Toreja's Construction Supply Corporation 15453 Impvt./Rehab. of Rosario-Taysan
Road IV-A 4.817 120 C 0.200 0.300 0.300 - - - 80.00 *80.00% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page513
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Toreja's Construction Supply Corporation 15453
Rehab./Reconst. of Lobo-Malabrigo-San Juan Road,
Malabrigo, Soloc-Sawang & Mabilog na Bundok Section
IV-A 19.294 120 C 0.270 0.300 0.300 - - - 87.00 *87.00% V. Satisfactory
Toyo Construction Co. Ltd. SL1-SN-004893
Rehab./Enhancement of Ormoc Flood Mitigation Structures MFCDP-II 121.513 270 C 0.389 0.300 0.300 - - - 98.90 94.36%
Oustanding
Toyo Construction Co., LTD SL1-SN-004890
Const. of Super Diversion Canal(Sta. 26+600 to Sta. 29+240) NIA-III 506.085 670 O 0.373 0.200 0.100 0.024 0.047 0.200 94.40 -
Toyo-Nippon Steel-Miyaji Joint Venture FC-06-038
Const. of CP I, Urgent Bridges Const. Projects for Rural Devt.
(Quirino Bridge)UBCPRD 625.614 840 O 0.356 0.300 0.100 0.030 0.065 0.100 95.10 -
Toyo-Nippon Steel-Miyaji Joint Venture FC-06-038
Const. of CP I, Urgent Bridges Const. Projects for Rural Devt.
(Sarrat Bridge)UBCPRD 576.844 840 O 0.359 0.300 0.100 0.030 0.060 0.100 94.90 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Bacao Bridge)
UBCPRD 23.103 10 mos. O 0.320 0.300 0.100 0.030 0.037 0.100 88.70 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Gusay Bridge)
UBCPRD 16.616 16 mos. C 0.381 0.200 0.000 - - - 58.10 77.68% Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Madugo Bridge)
UBCPRD 11.819 19 mos. C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Nagpatay Bridge)
UBCPRD 37.840 762 C 0.382 0.200 0.300 - - - 88.20 *88.20% V. Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Piela Bridge)
UBCPRD 25.177 397 C 0.373 0.200 0.300 - - - 87.30 84.60% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page514
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Salitran Bridge)
UBCPRD 57.188 759 C 0.388 0.200 0.300 - - - 88.80 82.68% V. Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Tiguisan Bridge)
UBCPRD 14.821 20 mos. C 0.383 0.200 0.300 - - - 88.30 *88.30% V. Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Bacao Bridge)
UBCPRD 23.103 9 mos. O 0.308 0.259 0.100 0.030 0.051 0.100 84.80 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Basiao Bridge)
UBCPRD 22.310 300 O 0.399 0.300 0.000 0.024 0.061 0.067 85.10 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Batolinao Bridge)
UBCPRD 18.351 330 O 0.379 0.300 0.000 0.024 0.061 0.000 76.40 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Borbocolan Bridge)
UBCPRD 23.577 11 mos. C 0.372 0.300 0.000 - - - 67.20 78.66% Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Catmon Bridge)
UBCPRD 12.936 9 mos. C 0.387 0.200 0.000 - - - 58.70 75.38% Satisfactory
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Gusay Bridge)
UBCPRD 16.616 16 mos. O 0.370 0.271 0.050 0.030 0.055 0.067 84.30 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Hulugan Bridge)
UBCPRD 17.240 360 O 0.386 0.300 0.000 0.024 0.061 0.067 83.80 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Langgang Bridge)
UBCPRD 14.949 13 mos. C 0.356 0.300 0.000 - - - 65.60 78.17% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page515
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Piela Bridge)
UBCPRD 25.177 10 mos. O 0.370 0.202 0.070 0.030 0.056 0.100 82.80 -
Toyo-Tobishima (JV) FC-06-034Const. of Package III, Urgent
Bridges Const. Projects for Rural Devt. (Salitran Bridge)
UBCPRD 57.188 10 mos. O 0.310 0.240 0.050 0.030 0.056 0.100 78.60 -
Toyo-Tobishima (JV) FC-06-034 CP III UBCPRD - Const. of Pantal Bridge & Approaches UBCPRD 933.106 700 C 0.360 0.300 0.300 - - - 96.00 95.64%
Oustanding
TR Construction 11697Repair/Restoration of Legazpi-Punta De Jesus Road, Imalnod
SectionV 1.436 90 C 0.305 0.200 0.300 - - - 80.50 81.52%
V. Satisfactory
Tracsom Builders Inc. 5935 Const. of School Building @ Highway Hills E/S NCR 9.542 309 O 0.400 0.204 0.100 0.030 0.035 0.100 86.90 -
Tracsom Builders Incorporated 5935Const. of 4 Storey 82 Classrooms
Academic Building @ Eulogio Rodriguez E/S
NCR 14.316 180 C 0.256 0.201 0.300 - - - 75.70 72.64% Satisfactory
Tracsom Builders Incorporated 5935Construction of 4-Storey, 16
Classroom School Building @ Sta. Lucia H/S
NCR 23.864 210 O 0.348 0.285 0.000 0.030 0.047 0.033 74.30 -
Traffic Supplies and Construction Corp. 19584
Improvement of Midsayap-Dulawan-Marbel Road (Sta. Km.
1776-Sta. Km. 1793+000)XII 0.946 42 C 0.375 0.000 0.500 0.000 0.000 0.000 87.50 *87.50%
V. Satisfactory
Trams Construction 32964 Conc. of Access Road CAR 1.894 72 C 0.264 0.200 0.300 - - - 76.40 *76.40% Satisfactory
Trams Construction 32964 Const. of MPB CAR 0.945 36 C 0.313 0.200 0.300 - - - 81.30 *81.30% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page516
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Trans-Aurora Construction 11388 Conc. of Road leading to Dr. Juan C. Angara Airport III 4.703 80 C 0.306 0.300 0.300 - - - 90.60 *90.60%
Outstanding
Trans-Aurora Construction 11388Impvt./Conc. of San Luis-Ma.
Aurora-Castaneda Road, Brgy. Baubo -Brgy. Sto. Tomas Proper
III 13.453 240 C 0.360 0.200 0.300 - - - 86.00 89.06% V. Satisfactory
Trans-Aurora Construction 11388Impvt./Conc. of San Luis-Ma.
Aurora-Castaneda Road, Brgy. Sto. Tomas Proper
III 13.646 240 C 0.334 0.200 0.300 - - - 83.40 *83.40% V. Satisfactory
Trans-Aurora Construction 11388 Impvt./Conc. of Nat'l Road SLMAC Road, Wenceslao Section III 7.177 150 C 0.299 0.227 0.300 - - - 82.60 84.82%
V. Satisfactory
Trans-Aurora Construction / B.M.K. Construction (JV) JV-07-144 Concreting/Improvement of Baler-
Cemento Road via Dicaloyungan III 22.425 240 C 0.398 0.200 0.300 - - - 89.80 *89.80%V. Satisfactory
Trez Construction and General Merchandise 32769 Const. of Malapatan Flood Control XII 1.908 120 C 0.319 0.200 0.300 - - - 81.90 77.70%
Satisfactory
Triad A Construction 30840 Const. of Drainage System @ Brgy. 51-A & 2 VIII 0.961 90 C 0.486 0.200 0.300 - - - 98.60 *98.60%
Outstanding
Tribu Design Construction 12756 Const. of Pantal Bailey Bridge CAR 0.665 120 C 0.284 0.161 0.300 - - - 74.50 *74.50% Satisfactory
Tri-dom Trading and Construction 10843 Const. of Viga River Control V 3.856 155 C 0.260 0.300 0.300 - - - 86.00 *86.00%
V. Satisfactory
Tri-dom Trading and Construction 10843
Const. of Virac Drainage System along Francia-Lanao-Constantino
& MoonwalkV 8.191 180 C 0.270 0.100 0.300 - - - 0.67 67.00%
Fair
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page517
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Tri-dom Trading and Construction 10843 Road Opening of Dagui-Wala-
Simamla Road V 3.986 150 C 0.492 0.186 0.300 - - - 97.80 91.98% V. Satisfactory
Trilex Builders Construction and Supply 26590 Completion of MPB at Albert Elem.
Sch. NCR 1.919 90 C 0.379 0.217 0.300 - - - 89.60 *89.60% V. Satisfactory
Trilex Builders Construction and Supply 26590 Const. of MPB at the Albert E/S
(Phase I) NCR 1.919 90 O 0.231 0.300 0.100 0.030 0.047 0.100 80.80 -
Trinnadel Const. & Supply 15801 Asphalting of Access Road, Poblacion III 4.681 20 C 0.200 0.300 0.300 - - - 80.00 *80.00%
Satisfactory
Trinnadel Const. & Supply 15801 Const. of Multi-Purpose Building III 2.794 120 O 0.229 0.000 0.100 0.018 0.029 0.100 47.60 -
Triparco Development Corporation 23327 Asphalt Overlay/Impvt. of Butuan-
Masao Port Road XIII 4.820 60 C 0.379 0.200 0.300 - - - 87.90 *87.90% V. Satsifactory
Triparco Development Corporation 23327 Const. of Sangay-San Isidro FMR,
Kitcharo XIII 1.804 75 C 0.310 0.000 0.500 0.000 0.000 0.000 81.00 *81.00% V. Satsifactory
Triple 8 Construction & Supply 10684 Concreting/Upgrading of Bustamante/M.H. del Pilar St. NCR 4,030 120 C 0.429 - 0.500 - - - 92.90 85.64%
V. Satisfactory
Triple 8 Construction & Supply 10684 Rehab./Repair of Various Road / Alleys and Drainage System NCR 0.954 60 C 0.317 0.300 0.300 - - - 91.70 *91.70%
Outstanding
Triple 8 Construction & Supply 10684 Repair/Impvt. of Manila North Road III 14.798 60 C 0.318 0.300 0.300 - - - 91.80 82.80%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page518
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Triple 8 Construction & Supply 10684Upgrading/Conc. of Roads with Drainage Impvt. Of Gov. Pascual
Ave. NCR 9.492 120 C 0.374 0.200 0.300 - - - 87.40 *87.40%
V. Satisfactory
Triple 8 Construction & Supply 10684 Widening of Ortigas Ave. Phase II NCR 9.544 120 C 0.314 0.300 0.300 - - - 91.40 91.64% Outstanding
Triple 8 Construction & Supply 10684Widening/Concreting with
Drainage Improvement along M.H. Del Pilar St.
NCR 3.778 105 C 0.389 - 0.500 - - - 88.90 *88.90% V. Satisfactory
Triple P Construction 31616 Const. of District IV MPB (Reservist Phase II) II 0.747 60 C 0.400 0.240 0.300 - - - 94.00 *94.00%
Outstanding
Triple P Construction 31616 Const. of Domang MPB (Phase II) II 0.481 30 C 0.299 0.300 0.300 - - - 89.90 85.70%
V. Satisfactory
Triple P Construction 31616 Const. of Mabulso MPB II 0.469 50 C 0.341 0.300 0.300 - - - 94.10 *94.10% Outstanding
Triple P Construction 31616 Const. of Malasin MPB II 0.285 45 C 0.358 0.220 0.300 - - - 87.80 *87.80% V. Satisfactory
Triple P Construction 31616 Const. of Mauan Women's Association MPB II 0.188 30 C 0.381 0.200 0.300 - - - 88.10 *88.10%
V. Satisfactory
Triple P Construction 31616 Construction of NVGCHS Annex, 1CL Dep Ed Type II 0.502 92 C 0.458 0.133 0.300 - - - 89.10 *89.10%
V.Satisfactory
Tri-sons Construction and Supply 16890 Const. of Gymnasium Bldg. @ Brgy. Paitan XII 0.963 180 C 0.371 0.300 0.000 - - - 67.10 62.20%
Fair
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page519
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Triumph Builders & Steel, Inc. 2272 Const. of MPB at Mauban South Elem. School IV-A 2.701 60 O 0.343 0.300 0.150 0.030 0.037 0.050 91.00 -
Triumph Builders and Steel Inc. 2272 Const. of one(1) unit Three-Storey School Building NHA 18.007 136 C 0.383 0.300 0.300 - - - 98.30 98.30%
Outstanding
TRM Construction & Dev't. Corp. 30713
Package IV-Concreting & Drainage Rehab. of Sorsogon St., Brgy.
Nayong Kanluran & East Riverside/Aragon St.,
NCR 1.914 45 C 0.426 - 0.500 - - - 92.60 *92.60% Outstanding
TRPL Construction 14236 Const. of Pagduque-Rosario Road VI 2.376 75 C 0.354 - 0.500 - - - 85.40 70.04% Satisfactory
TSD Builders Construction and Supply 22129 Conc. of Bacolod-Granada-City
Bdry. Road VI 2.751 110 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
TSD Builders Construction and Supply 22129
Conc./Repair/Rehab. of Tangub Bridge I, along Bacolod-South
Kabankalan RoadVI 1.569 150 C 0.291 0.300 0.300 - - - 89.10 88.26%
V. Satisfactory
TSD Builders Construction and Supply 22129 Const. of Talisay Road at Brgy.
Zone1 VI 0.916 60 C 0.304 0.197 0.300 - - - 80.10 81.54% V. Satisfactory
TSD Builders Construction and Supply 22129 Widening of Bacolod-South
Kabankalan Road VI 1.294 80 C 0.294 0.300 0.300 - - - 89.40 *89.40% V. Satisfactory
T-Square Builders 14268Completion of Big Margus RCDG Bridge along Sarangani-Davao del
Sur Coastal RoadXII 4.716 180 C 0.314 0.134 0.300 - - - 74.80 72.22%
Satisfactory
T-Square Builders 14268 Conc. of Additional 2-lanes along Digos Junction Road XI 2.581 60 C 0.351 0.300 0.300 - - - 95.10 94.38%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page520
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
T-Square Builders 14268Conc. of Road & Reblocking, Marbel-Makar Road, Palian
Section XII 15.102 180 O 0.363 0.240 0.150 0.030 0.035 0.050 86.80 -
T-Square Builders 14268Conc./Widening of Marbel-Tupi-Makar Road, Crossing Rubber-
Palian SectionXII 9.158 280 C 0.383 0.107 0.300 - - - 79.00 85.03%
V. Satisfactory
T-Square Builders 14268 Const. MPB @ Brgy. Poblacion (Municipal Hall) XII 4.751 120 C 0.361 0.300 - - - - 66.10 77.09%
Satisfactory
T-Square Builders 14268 Const. of 1-Cl at Malibago E/S Sitio Cassava VII 183.115 42 C 0.414 - 0.500 - - - 91.40 *91.40%
Outstanding
T-Square Builders 14268 Const. of MPB XII 0.477 60 C 0.277 0.300 0.300 - - - 87.70 *87.70% V. Satisfactory
T-Square Builders 14268
Const./Conc. of General Santos City Circumferential Road (Western Section) Brgy.
Sinawal/Fatima
XII 7.917 132 C 0.355 0.157 0.300 - - - 81.20 *81.20% V. Satisfactory
T-Square Builders 14268 Const./Widening of Digos Junction Road XI 9.424 153 C 0.318 0.200 0.300 - - - 81.80 86.18%
V. Satisfactory
T-Square Builders 14268 Impvt./Conc. of Road at Bansalan-Mt. Apo National Park Road XI 28.919 270 O 0.214 0.279 0.100 0.030 0.040 0.100 76.30 -
T-Square Builders 14268 Impvt./Conc. of Road at Bansalan-Mt. Apo National Park Road XI 28.919 270 O 0.274 0.273 0.150 0.030 0.054 0.033 81.40 -
T-Square Builders 14268Package I-Concreting of Various Road with Lined Canal Brgy. San
IsidroXII 1.439 120 C 0.366 - 0.500 - - - 86.60 *86.60%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page521
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
TTK Construction Corporation 31907 Cluster II: Const. of Multi-Purpose Bldg. CAR 0.940 269 C 0.373 0.117 0.300 - - - 79.00 87.26%
V. Satisfactory
Tuchar Construction 13644 Completion of Multi-Purpose Building at Strip 70 NCR 0.609 45 C 0.435 - 0.500 - - - 93.50 *93.50%
Outstanding
Tuchar Construction 13644 Conc./Drainage Impvt. of Block 3, Sct. Borromeo NCR 0.474 60 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V. Satisfactory
Tuchar Construction 13644 Repair/Rehabilitation A. Bonifacio Avenue NCR 4.869 90 C 0.346 0.200 0.300 - - - 84.60 *84.60%
V. Satisfactory
Turquoise Construction 21801 Upgrading of National Road San Fernando - Lagundi III 4.771 120 C 0.385 - 0.500 - - - 88.50 88.50%
V. Satisfactory
Turquoise Construction & Trading 21801 Construction of Multi-Purpose
Building (Phase III & IV) I 14.472 120 C 0.352 0.200 0.300 - - - 85.20 *85.20%Satisfactory
Twin Dragon Construction 11392 Const. of Odiongan Multi-Purpose Bldg. IV-B 2.864 90 C 0.398 0.198 0.300 - - - 89.60 *89.60%
V. Satisfactory
Twin Dragon Construction 11392 Const. of Panique-Trangkalan Farm to Market Road IV-B 0.908 70 C 0.374 - 0.500 - - - 87.40 *87.40%
V. Satisfactory
Twin Dragon Construction 11392 Lining Ditches along Looc-Ferrol Rd., Km. 114+450 - 114+600 IV-B 0.283 68 C 0.444 0.500 - - - 94.40 94.40%
Outstanding
Twin Dragon Construction 11392 Repair of Odiongan Public Market IV-B 1.888 90 C 0.352 0.184 0.300 - - - 83.60 *83.60% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page522
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Twin Dragon Construction 11392 Repair/Maint. of Bangon River Control IV-B 0.375 30 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V. Satisfactory
Twina Builders and Supply 23897 Const. of Water Supply Brgy. Luna, Kapalong XI 0.754 90 C 0.350 - 0.500 - - - 85.00 89.09%
V. Satisfactory
Twina Builders and Supply 23897 Rehab. of MPB (Cons. of Fire Station Bldg. Phase V) XI 4.714 240 C 0.354 0.200 0.300 - - - 85.40 88.27%
V. Satisfactory
Twina Builders and Supply 23897 Repair/Rehab. of MPB (Phase IV) @ Brgy. New Pandan XI 1.880 120 O 0.340 0.240 0.100 0.020 0.041 0.100 84.10 -
Twintech Builders & Developers, Inc. 23511 Conc. of Abra-Ilocos Sur Road,
Km. 387+200-Km. 407+000 CAR 4.754 224 C 0.294 0.195 0.300 - - - 78.90 *78.90% Satsifactory
Twintech Builders & Developers, Inc. 23511 Conc. of Riang-Penarrubia FMR CAR 2.843 140 C 0.206 0.300 0.300 - - - 80.60 *80.60%
V. Satisfactory
Twintech Builders & Developers, Inc. 23511 Const. of Multi-Purpose Building,
Dolores CAR 3.680 220 C 0.421 - 0.500 - - - 92.10 75.72% Satisfactory
Twintech Builders & Developers, Inc. 23511 Const. of Sinalang River Irrigation
Flume CAR 3.749 262 C 0.397 - 0.500 - - - 89.70 90.81% Outstanding
Twintech Builders & Developers, Inc. 23511
Const./Road Opening of Abra-Ilocos Norte Road, km. 436+000 -
km. 446+020, Sogao-Malango Section
CAR 10.663 380 O 0.400 0.300 0.070 0.015 0.028 0.067 88.00 -
Twintech Builders & Developers, Inc. 23511
Const./Road Opening of Abra-Ilocos Norte Road, km. 446+020 - km. 452+620, Singit-Nagbolang-
Atip Section
CAR 11.680 220 O 0.380 0.000 0.100 0.008 0.038 0.100 62.60 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page523
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Two Aces Construction and Supplies 15413 Conc. of Lapucon Cemetery Road XIII 3.749 135 C 0.358 0.300 0.300 - - - 95.80 *95.80%
Outstanding
Two Aces Construction and Supplies 15413 Const. of Poblacion Drainage
Canal, Kitcharo XIII 0.453 45 C 0.319 - 0.500 - - - 81.90 77.22% Satisfactory
U & N Engineering Services 16743 Concreting of Municipal Streets, Malabuyoc VII 1.893 208 C 0.386 - 0.500 - - - 86.90 *86.90%
V. Satisfactory
Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road VIII 14.160 270 O 0.400 0.300 0.100 0.020 0.023 0.033 87.60 -
Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road VIII 14.160 270 O 0.132 0.300 0.100 0.030 0.037 0.100 69.90 -
Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road VIII 14.160 270 O 0.344 0.225 0.050 0.030 0.032 0.067 74.80 -
Ubas Construction 18875 Const./Impvt./Rehab. of La Perla-Cabulaloan-Yabyaban Road VIII 14.160 467 O 0.251 0.225 0.070 0.030 0.037 0.050 66.30 -
UGM Construction 22047 Const. of Secondary Sch. Bldg.(3 Cl) IV-B 1.184 90 C 0.367 0.300 0.300 - - - 96.70 *96.70%
Satisfactory
UKC Builders, Inc. 10759 Cebu North Coastal Road, Phase 1 (Sta. 0+094.25-Sta. 1+300) VII 43.189 410 C 0.450 0.200 0.300 - - - 95.00 88.52%
Satisfactory
UKC Builders, Inc. 10759 Cebu North Coastal Road, Phase I VII 43.189 228 O 0.380 0.225 0.070 0.030 0.037 0.100 84.20 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page524
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
UKC Builders, Inc. 10759 Const. of Cagayan de Oro City 3rd Bridge & Approaches Phase II X 63.689 270 C 0.390 0.300 0.300 - - - 99.00 92.64%
Outstanding
UKC-Equi-Parco, Joint Venture 0624S Backup Area for the Newly Constructed Wharf PPA 429.380 720 C 0.396 0.300 0.300 99.64 99.64%
Outstanding
Ulticon Bluilders, Inc. 17267 Const./Impvt./Widening of Caraga-Maragusan Sect. Road, Phase III XI 47.149 350 C 0.235 0.106 0.300 - - - 64.10 79.28%
Satisfactory
Ulticon Bluilders, Inc. 17267CP 10: Impv't./Conc. of Surogao Sur-Davao Oriental Coastal Road (Manay-Boston) Boston Section
XI 286.479 600 O 0.345 0.284 0.100 0.030 0.060 0.100 91.90 -
Ulticon Bluilders, Inc. 17267 Impvt. of Monkayo-Diwalwal Road XI 92.878 505 O 0.374 0.277 0.100 0.030 0.037 0.100 91.80 -
Ulticon Bluilders, Inc. 17267 Impvt. of Monkayo-Diwalwal Road XI 92.878 505 O 0.332 0.300 0.100 0.030 0.043 0.100 90.50 -
Ulticon Bluilders, Inc. 17267Maint./Impv't. of Malalag-Malita-
Jose Abad Santos Road, Kumassie-Bagsak Sect.
XI 19.268 90 C 0.328 0.300 0.300 - - - 92.80 90.52% Outstanding
Ulticon Bluilders, Inc. 17267Rehab./Impvt. of Bukidnon-Davao City Road, Puntian-Sinuda Section
(selective Sections)X 13.810 90 C 0.292 0.200 0.300 - - - 79.20 * 79.20%
Satisfactory
Ulticon Builders, Inc. 17267Const. of Pundaquitan Bridge & Approaches Tibanban-Lavigan
Road.XI 9.342 231 O 0.318 0.255 0.100 0.023 0.048 0.100 84.40 -
Ulticon Builders, Inc. 17267Const. of Pundaquitan Bridge & Approaches Tibanban-Lavigan
Road.XI 9.342 237 O 0.395 0.300 0.100 0.030 0.048 0.100 97.30 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page525
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ulticon Builders, Inc. 17267 Const. of Tubay-La Fraternidad-Binuangan FMR XIII 2.746 200 C 0.397 0.295 0.300 - - - 99.20 97.42%
Outstanding
Ulticon Builders, Inc. 17267 Impvt. of Mawab-Sawangan-Maco Alternate Road, Phase II XI 9.400 240 C 0.422 - 0.500 - - - 92.20 92.53%
Outstanding
Ulticon Builders, Inc. 17267 Rehabilitation & Improvement of Davao-Cotabato Road XI 18.869 106 C 0.330 0.205 0.300 - - - 83.50 82.42%
V. Satisfactory
Ultron Construction and Supply 30275Const. of San Roque Bridge I
along Quezon Eco-Tourism Road (Phase I)
IV-A 4.687 258 C 0.267 0.300 0.300 - - - 86.70 81.00% V. Satisfactory
Ultron Construction Corporation 14313 Const. of San Antonio II Flood Control IV-A 0.960 50 C 0.150 - 0.500 - - - 65.00 75.86%
Satisfactory
Uni Construction 13198 Concreting of Brgy. Road, Sitio Paitan V 0.916 90 C 0.337 0.220 0.300 - - - 85.70 86.78%
V. Satisfactory
Uni Construction 13198Const. of MPB (Brgy. Covered
Court and Perm. Roofing over the Social Hall in front of Stage)
V 0.954 120 C 0.476 0.200 0.300 - - - 97.60 89.86% V. Satisfactory
Unicon Construction 26990 Repair/Rehab. of Burgos Ave. (Vicinity of McDonald Jct) IV-A 3.468 6 C 0.235 0.300 0.300 - - - 83.50 * 83.50%
V. Satisfactory
Unitec Builder, Inc. 4803 Const. of Labason Bridge and Approaches IX 14.626 336 C 0.343 0.200 0.000 - - - 54.30 74.31%
Satisfactory
Unitec Builders, Inc. 4803 Widening of Sinunuc Bridge &
Approaches, Phase I, along Zamboanga City-Labuan Road
IX 21.668 436 O 0.354 0.289 0.100 0.030 0.045 0.100 91.80 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page526
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Unitec Builders, Inc. 4803
Completion (Impvt./Conc. Paving) of Licomo-Quiniput Road,
Segment IV (Curuan Poblacion Section)
IX 16.521 210 C 0.342 0.230 0.300 - - - 87.20 89.60% V. Satisfactory
Unitec Builders, Inc. 4803
Completion of Road Widening (Gap Section) @ San Bernardino
Bridge, Maria Clara Lobregat Highway
IX 6.201 386 C 0.304 0.200 0.300 - - - 80.40 77.72% Satisfactory
Unitec Builders, Inc. 4803 Const. of MPB at San Roque VIII 0.946 60 C 0.319 0.200 0.300 - - - 81.90 *81.90% V. Satisfactory
Unitec Builders, Inc. 4803
Impv't./Widening of Z.C. West Road (Caragasan Section)
including the Const. of 1 Barrel RCBC w/ except of Caragasan
Bridge
IX 12.112 316 C 0.336 0.200 0.300 - - - 83.60 87.04% V. Satisfactory
Unitec Builders, Inc. 4803
Proposed Widening of Sinunuc Bridge & Approaches, Phase I, along Zamboanga City-Labuan
Road
IX 21.672 436 O 0.311 0.240 0.000 0.030 0.042 0.067 69.00 -
Unitec Builders, Inc. 4803 Rehab./Impvt. of Balite-Seven Hills-Happy Valley Section VIII 19.176 180 O 0.294 0.205 0.150 0.030 0.047 0.050 77.60 -
Urban Infrastructures Incorporated 16144
Cluster III-Const. of School Building Projects-(E.B. Magalona
NHS)VI 0.410 83 C 0.365 0.099 0.300 - - - 76.40 81.51%
V. Satisfactory
Uy Construction & Development/ARN Builders (JV) JV-07-001 Conc. of Bais-Kabankalan Road @
Intermittent Section VII 95.268 300 O 0.388 0.238 0.100 0.024 0.055 0.100 90.50 -
Uy Construction & Development/ARN Builders (JV) JV-07-001 Conc. of Bais-Kabankalan Road @
Intermittent Section VII 95.268 300 O 0.295 0.221 0.070 0.030 0.065 0.100 78.10 -
Uy Construction and Development 12558 Asphalting of Valencia-Baconf
Road VII 1.163 60 C 0.415 - 0.500 - - - 91.50 *91.50% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page527
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Uy Construction and Development 12336 Conc. of Dumaguete South Road
(DSR) VII 21.705 160 O 0.380 0.300 0.100 0.030 0.038 0.100 94.80 -
Uy Construction and Development 12336 Conc. of Dumaguete South Road
(DSR) VII 21.739 190 O 0.389 0.225 0.150 0.030 0.061 0.033 88.80 -
Uy Construction and Development 12336 Concreting of Jct. S.H.- Banglud -
Mailog-By Pass Road, Mailag X 4.439 150 C 0.470 - 0.500 - - - 97.00 97.00% Outstanding
Uy Construction and Development 12558 Const. of Canturing River Control
(Bogo Section) VIII 3.762 180 C 0.373 0.122 0.300 - - - 79.50 *79.50% Satisfactory
Uy Construction and Development 12336 Const. of Weighbridge Station
along DNR VII 2.793 170 C 0.400 - 0.500 - - - 90.00 89.68% V . Satisfactory
Uy Construction and Development 12336 Const./Repair/Rehab. of School
Bldg. @ Buenavista E/S VIII 0.378 300 C 0.346 0.300 0.300 - - - 94.60 86.97% V. Satisfactory
Uy Construction and Development 12336 Dumaguete Airport Development
Project DOTC 81.824 150 C 0.460 0.200 0.300 - - - 96.00 96.00% Very Satisfctory
Uy Construction and Development 12336
Rehab. of Dumaguete North Road Sta. 110+000-Sta. 135+000 (Asphalt Overlay along Sta.
126+570-Sta. 127+920)
VII 9.995 57 C 0.394 0.200 0.300 - - - 89.40 *89.40% Satisfactory
Uy Construction and Development 12336 Rehab./Conc. of Hinigaran-Isabela
Road (Rumirang) VI 14.238 272 C 0.324 0.205 0.300 - - - 82.90 83.62% Satisfactory
Uy Construction and Development 12336 Rehab./Impvt. of Pob. NRJ-Ninoy
Aquino FMR X 11.846 270 C 0.352 0.281 0.300 - - - 93.30 77.10% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page528
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Uy Construction and Development 12336
Widening/Asphalting-Overlay of Bais-Kabankalan Road including
ReConst. of (2) Bridges-Cang-abok & Canlumbong
VII 22.315 180 C 0.384 0.300 0.300 - - - 98.40 94.98% Outstanding
V N Grande Builders & Supply 32238 Const. of MPB (Justice Hall) VI 3.314 150 C 0.313 0.300 0.300 - - - 91.30 86.68% V. Satisfactory
V N Grande Builders & Supply 32238 Const. of Road, Poblacion Ilaya to Maravilla St. VI 0.941 60 C 0.322 0.300 0.300 - - - 92.20 *92.20%
Outstanding
V T J Construction & Supply 11250Widening of Quezon Ave.
(Mabuhay Rotonda to Elliptical Road)
NCR 21.677 150 C 0.371 0.300 0.300 - - - 97.10 89.30% V. Satisfactory
V.B. Manubay Construction 32705 Const. of 1 CL Sch. Bldg. at Arabiat E/S II 0.416 270 C 0.370 0.238 0.300 - - - 90.80 *90.80%
Outstanding
V.B. Manubay Construction 32705 Rehab. Along Santiago-Tuguegarao Road II 4.822 60 C 0.304 0.300 0.300 - - - 90.40 *90.40%
Outstanding
V.B. Manubay Construction 32705 Rehab. of Farm to Market Road at Salinungan West II 1.902 90 C 0.350 0.200 0.300 - - - 85.00 *85.00%
V. Satisfactory
V.B. Manubay Construction 32705 Rehab./Regravelling along Ilagan-Delfin Albano-Mallig Road II 4.822 60 C 0.377 0.200 0.300 - - - 87.70 *87.70%
V. Satisfactory
V.B. Manubay Construction 32705 Rehab./Regravelling along Santiago-Tuguegarao Road II 4.822 60 C 0.375 0.200 0.300 - - - 87.50 *87.50%
V. Satisfactory
V.C. Bautista Construction 21114 Concreting of Barangay Lebueg Road, Laoac I 0.480 32 C 0.295 - 0.500 - - - 79.50 *79.50%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page529
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
V.C.P. Concrete Products 7713 Concreting of Bislig-Surigao Road XIII 4.651 60 C 0.189 0.277 0.000 - - - 46.60 71.98% Satisfactory
V.C.P. Concrete Products 7713Rehab./Reconst. of Damaged
Pavement along Surigao-Davao Coastal Road
XIII 9.594 120 C 0.239 0.300 0.300 - - - 83.90 81.08% V. Satisfactory
V.E. Solis Construction 30751 Const. of 1 CL @ Cabubugan E/S (Spacial Plan) VI 0.479 90 C 0.367 0.200 0.300 - - - 86.70 87.40%
V. Satisfactory
V.F. Construction 10048 Completion of Road, Barangay Salian, Abucay III 1.440 60 C 0.442 - 0.500 - - - 94.20 *94.20%
Outstanding
V.F. Construction 10048 Const. of FMR, Barangay Sta. Isabel III 0.468 60 C 0.282 - 0.500 - - - 78.20 *78.20%
Satisfactory
V.F. Construction 10048 Const. of Gabon-Decena Road III 1.871 90 C 0.356 0.164 0.300 - - - 82.00 *82.00% V. Satisfactory
V.F. Construction 10048 Const. of Salian Farm-to-Market Road III 1.868 70 C 0.300 - 0.500 - - - 80.00 48.20%
Poor
V.O. Chupuico Construction 17585 Rehab. of Drainage System Mantuyong-Ibabao VII 0.905 60 C 0.352 0.300 0.300 - - - 95.20 90.22%
Outstanding
V.R. Duque Construction 22233 Const. of 2-Classroom School Building @ Mabuhay E/S IV-B 0.953 120 C 0.283 0.300 0.300 - - - 88.30 83.12%
V. Satisfactory
V.R. Duque Construction 22233 Const. of MPB @ Ilaya IV-B 0.475 30 C 0.234 0.242 0.300 - - - 77.60 *77.60% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page530
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
V.R. Duque Construction 22233 Rehabilitation of Multi-Purpose Bldg., Brgy. Ilaya IV-B 0.474 45 C 0.331 0.300 0.300 - - - 93.10 89.53%
V.Satisfactory
V.R. Guevarra Construction & Trading 31565 Const. of 1 Unit Free Flowing
Artesian Well III 0.596 90 C 0.207 0.300 0.300 - - - 80.70 * 80.70% V. Satisfactory
V.R. Patron Builders & Developers 13487 Const. (Conc.) of Crisanto M. de
los Reyes Ave., Amadeo Section IV-A 28.930 180 C 0.320 0.200 0.300 - - - 82.00 84.88% V. Satisfactory
V.R. Patron Builders & Developers 13487 Improvement of Quilo-Quilo Road,
Padre Garcia Integrated ARC IV-A 6.550 150 O 0.347 0.250 0.100 0.030 0.040 0.100 86.70 -
V.R. Patron Builders & Developers 13487 Improvement of Quilo-Quilo Road,
Padre Garcia Integrated ARC IV-A 6.550 150 O 0.395 0.200 0.100 0.030 0.042 0.100 86.70 -
V.R. Patron Builders & Developers 13487 Impvt./Rehab. of Banay-banay
Mojon Jct. Road IV-A 3.816 210 C 0.328 0.300 0.300 - - - 92.80 *92.80% Outstanding
V.R. Patron Builders & Developers 13487
Impvt./Rehab. of Flood Control Project along Tagaytay-Tuy-
Nasugbu Road, Kaylaway SectionIV-A 4.775 90 C 0.307 0.300 0.300 - - - 90.70 *90.70%
Outstanding
V.R. Patron Builders & Developers 13487
Rehab./Reconst. of Damaged National Roads, Manila-Batangas
Road, Lipa Section IV-A 19.292 150 C 0.478 0.133 0.300 - - - 91.10 90.08%
V. Satisfactory
V.R. Patron Builders & Developers 13487 Repair/Rehab. of Municipal Hall IV-A 0.955 90 C 0.412 - 0.500 - - - 91.20 91.20%
Outstanding
V.R. Patron Builders & Developers 13487 Road Conc. @ Brgy. Dalipit East IV-A 0.191 45 C 0.365 0.300 0.300 - - - 96.50 *96.50%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page531
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
V.R.D.J. Construction 19837 Const. of 1 CL Std. School Bldg. at Josefina T. Albano NHS II 0.474 55 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
V.R.D.J. Construction 19837 Const. of Sto. Tomas MPB II 3.818 120 O 0.317 0.240 0.100 0.030 0.037 0.067 79.10 -
V.R.D.J. Construction 19837 Rehab./Impvt. of Namnama Brgy Road II 0.317 45 C 0.317 0.012 0.000 - - - 32.90 *32.90%
Poor
V.R.D.J. Construction 19837 Repair/Rehab. of Pilitan E/S Bldg. II 0.094 24 C 0.400 0.200 0.300 - - - 90.00 * 90.00% V. Satisfactory
V.R.P. Builders Construction and Supply 25056 Concreting of FTM Road at Brgy.
Malaya IV-A 0.764 60 C 0.447 - 0.500 - - - 94.70 94.70% Oustanding
V.R.P. Builders Construction and Supply 25056
Const. of Two (2) School Building at Pinagtung-Ulan NHS Pinagtung-
UlanIV-A 0.955 90 C 0.477 - 0.500 - - - 97.70 *97.70%
Outstanding
V4M Construction 3211 Const.of Canal @ Maloma III 0.477 45 C 0.267 0.300 0.300 - - - 86.70 *86.70% V. Satisfactory
Valley Construction & Aggregates 14315
Cluster I a) Conc. of Dantay-Sagada Rd., b) Conc. of Dantay-
Sagada Rd.,Ambasing Suyo Balili Rd.
CAR 10.754 180 C 0.360 0.300 0.300 - - - 96.00 92.70% Outstanding
Valley Construction & Aggregates 14315 Completion of MPB @ New
Lucban Brgy. CAR 1.904 80 C 0.332 0.300 0.300 - - - 93.20 *93.20% Outstanding
Valley Construction & Aggregates 14315 Const. of Senior Citizen's MPB at
East Quirino Hill Brgy. CAR 1.926 90 C 0.384 0.172 0.300 - - - 85.60 *85.60% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page532
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Valley Construction & Aggregates 14315
Continuation of Road Widening along Purok 4, Imelda Village
BarangayCAR 0.953 45 C 0.373 0.200 0.300 - - - 87.30 *87.30%
V. Satisfactory
Valley Construction & Aggregates 14315 Impvt. of the Acop-Kapangan
National Road CAR 18.822 240 O 0.321 0.240 0.100 0.023 0.030 0.100 81.40 -
Valley Construction & Aggregates 14315 Impvt. of the Acop-Kapangan-
Kibungan National Road CAR 18.822 253 C 0.454 0.200 0.300 - - - 95.40 86.73% Satisfactory
Valley Construction & Aggregates 14315 Rehab. Along Acop-Kapangan-
Kibungan Road CAR 19.100 229 C 0.473 0.200 0.300 - - - 97.30 87.76% Satisfactory
Vanmarvil Construction 19224Const. of MPB (Police Precinct) @ Commonwealth Ave. Cor. Tandang
SoraNCR 1.909 120 C 0.362 0.200 0.300 - - - 86.20 *86.20%
V. Satisfactory
Vannie General Merchandise 27335 Completion of Public Market VI 1.924 150 C 0.390 0.257 0.300 - - - 94.70 90.15% Outstanding
Vannie General Merchandise 27335 Const. of 425 ln.m. Drainage Canal VI 5.738 154 O 0.320 0.200 0.070 0.030 0.032 0.133 78.50 -
Vannie General Merchandise 27335 Const. of 425 ln.m. Drainage Canal, Purok Riverside VI 5.793 564 O 0.281 0.300 0.150 0.030 0.042 0.050 85.30 -
Vans Turf Construction Corporation 13778 Const. of MPB III 3.253 90 C 0.357 0.294 0.300 - - - 95.10 *95.10%
Outstanding
Vans Turf Construction Corporation 10813 Const. of Multi-Purpose Building IV-A 2.708 120 C 0.439 - 0.500 - - - 93.90 *93.90%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page533
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Vans Turf Construction Corporation 13778 Const. of Multi-Purpose Building
@ Meycauayan III 2.837 90 C 0.483 - 0.500 - - - 98.30 *98.30% Outstanding
Vans Turf Construction Corporation 13778 Contruction of Multi-Purpose
Building III 2.591 110 C 0.457 - 0.500 - - - 95.70 95.70% Outstanding
Vanvi Construction 29387 Completion of MPB at Langub E/S XI 0.752 135 C 0.382 0.300 0.300 - - - 98.20 96.52% Outstanding
Vanvi Construction 29387 Const. of MPB at Clib XI 1.429 110 C 0.368 0.300 0.300 - - - 96.80 *96.80% Outstanding
Vanvi Construction 29387 Const. of Multi-Purpose Building at Purok San Vicente XI 0.419 60 C 0.438 0.200 0.300 - - - 93.80 *93.80%
V. Satisfactory
Vanvi Construction 29387 Const. of Water System at Sinaragan XI 1.411 90 C 0.388 0.300 0.300 - - - 98.80 87.11%
V. Satisfactory
VAR Builders 20327 Sagay City Resettlement Project NHA 5.910 180 C 0.323 0.300 0.300 - - - 92.30 *92.30% Outstanding
Various Construction 26640 Concreting of Upper Pinget Brgy. Road CAR 0.956 30 C 0.341 - 0.500 - - - 84.10 62.20%
Fair
VCD Construction 13949 Const. of Various Day Care Center I 0.329 50 C 0.291 - 0.500 - - - 79.10 *79.10% Satisfactory
VCD Construction 13949 Rehabilitation of Ilocos Norte National School I 3.827 177 C 0.298 0.300 0.300 - - - 89.80 92.88%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page534
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
VCH Construction and Trading 32050 Const. of MPB IV-B 0.479 90 C 0.299 0.300 0.300 - - - 89.90 *89.90% V. Satisfactory
VCH Construction and Trading 32050 Const. of Sch. Bldg. (1CL) Panacan NHS IV-B 0.945 150 C 0.343 0.200 0.300 - - - 84.30 *84.30%
V. Satisfactory
VCV Const. & Development Corp. 12575 Const. of Conc. Revetment @ Tenejero River, Phase I III 3.456 72 C 0.300 0.200 0.300 - - - 80.00 *80.00%
Satisfactory
VCV Const. & Development Corp. 12575 Const. of MPB III 2.829 60 C 0.382 0.234 0.300 - - - 91.60 *91.60% Outstanding
VCV Const. & Development Corp. 12575 Const. of MPB @ Brgy. Pilar VIII 3.339 70 C 0.327 0.272 0.300 - - - 89.90 *89.90% V. Satisfactory
VCV Const. & Development Corp. 12575 Const. of MPB @ Prov. Police Headquarters III 3.741 68 C 0.330 0.224 0.300 - - - 85.40 *85.40%
V. Satisfactory
VCV Const. & Development Corp. 12575 Const. of MPB at Bgry. Alas-Asin III 3.310 36 C 0.381 0.215 0.300 - - - 89.60 *89.60% V. Satisfactory
VCV Const. & Development Corp. 12575 Impvt. of Water Supply Project III 1.888 56 C 0.361 0.200 0.300 - - - 86.10 *86.10% V.Satisfactory
VCV Const. & Development Corp. 12575 Repair/Rehab. of San Marcelino-San Antonio Road III 9.851 60 C 0.371 0.200 0.300 - - - 87.10 *87.10%
V. Satisfactory
Ven Ray Construction 18310 Completion of MPB @ Suba E/S VII 2.647 90 O 0.314 0.000 0.150 0.030 0.019 0.050 56.30 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page535
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ven Ray Construction 18310Conc. of Antonio de Pio Highway,
(Tigabawan-Olivio-Luyang Section)
VII 14.154 90 O 0.295 0.300 0.000 0.010 0.022 0.100 72.70 -
Ven Ray Construction 18310Conc. of Toledo-Pinamungajan-
Aloguinsan Barili Na'tl. Road Km. 84+450 - Km. 85+891
VII 19.093 180 O 0.205 0.040 0.000 0.010 0.016 0.050 32.10 -
Ven Ray Construction 18310
Concreting of Antonio Y. De Pio Highway (Tigbawan-Olivo-Luyang Section, Tabuelan-San Remigio
Section)
VII 14.155 90 C 0.175 0.139 0.300 - - - 61.40 68.18% Poor
Ven Ray Construction 18310 Concreting of P. Gicain St., Pasamanos, Dawis Norte VII 0.385 45 C 0.335 - 0.500 - - - 85.50 *85.50%
V. Satisfactory
Ven Ray Construction 18310 Concreting of Roads Sitio Sta. Cruz VII 0.245 90 O 0.273 0.000 0.150 0.015 0.030 0.050 51.80 -
Ven Ray Construction 18310 Concreting of Roads, Brdy. Tuburan Sur-Sandayong Sur VII 0.637 90 O 0.139 0.000 0.150 0.008 0.016 0.050 36.30 -
Ven Ray Construction 18310 Const. of 2 CL S/B @ Bulwang E/S Compostela VII 0.895 70 C 0.359 0.249 0.300 - - - 90.80 *90.80%
Outstanding
Ven Ray Construction 18310 Const. of 2 CL Sch. Bldg. @ Liloan NHS VII 1.936 70 C 0.436 0.181 0.300 - - - 91.70 87.85%
Satisfactory
Ven Ray Construction 18310 Const. of 2-Storey, 4-Cl Science High School VII 4.469 90 C 0.388 0.240 0.300 - - - 92.80 *92.80%
Outstanding
Ven Ray Construction 18310 Const. of 3 CL Sch. Bldg. @ Sogod Central School VII 1.394 100 C 0.341 0.200 0.300 - - - 84.10 * 84.10%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page536
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ven Ray Construction 18310 Const. of 4th Flr. Extension at Beatriz D. Durano Memorial NHS VII 1.768 90 C 0.366 0.300 0.300 - - - 96.60 *96.60%
Outstanding
Ven Ray Construction 18310 Const. of Annex Bldg. of Bogo Public Market VII 1.868 120 C 0.383 - 0.500 - - - 88.30 *88.30%
V. Satisfactory
Ven Ray Construction 18310 Const. of Drainage Sytem VII 0.445 45 C 0.263 0.200 0.300 - - - 76.30 *76.30% Satisfactory
Ven Ray Construction 18310 Const. of New Public Market VII 0.931 30 C 0.330 0.200 0.300 - - - 83.00 *83.00% V. Satisfactory
Ven Ray Construction 18310 Const. of One (1) Storey Two (2) CL Sch. Bldg. Guinsay NHS VII 0.866 60 C 0.256 0.300 0.300 - - - 85.60 * 85.60%
V. Satisfactory
Ven Ray Construction 18310Reconst./Reblocking/Asphalt Overlay of Cebu Toledo Wharf
RoadVII 37.225 200 C 0.387 0.205 0.300 - - - 89.20 *89.20%
V. Satisfactory
Ven Ray Construction 18310 Rehab./Conc. of Roads at Barangay Poblacion VII 0.459 30 C 0.391 0.300 0.300 - - - 99.10 92.62%
Outstanding
Ven Ray Construction 18310Rehab./Reconst. of Siquijor Circ.,
Larena-Enrique Villanueva Rd. Sect.
VII 46.671 330 O 0.331 0.246 0.100 0.022 0.027 0.100 82.60 -
Ven Ray Construction 18310Rehab./Reconst. of Siquijor Circ.,
Larena-Enrique Villanueva Rd. Sect.
VII 46.671 368 O 0.319 0.219 0.150 0.023 0.033 0.033 77.70 -
Ven Ray Construction 18310 Rehab./Reconst. of Siquijor Circ., Siquijor-Larena Rd. Sect. VII 31.737 313 O 0.363 0.238 0.100 0.030 0.032 0.100 86.30 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page537
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Ven Ray Construction 18310 Rehab./Reconst. of Siquijor Circ., Siquijor-Larena Rd. Sect. VII 31.733 328 O 0.340 0.222 0.150 0.030 0.047 0.033 82.20 -
Ven Ray Construction 18310Repair/Rehab. of Luyang-
Canggumantong Rd. (Intermittent Section)
VII 9.645 120 C 0.214 0.202 0.300 - - - 71.60 83.24% V. Satisfactory
Ven Ray Construction 18310Repair/Rehab./Impvt./Maint. of
Siquijor Circ. Road, Larena-Enrique Villanueva Road Section
VII 24.989 150 C 0.371 0.200 0.300 - - - 87.10 *87.10% V. Satisfactory
Venus Engineering & Construction 18358 Const. of MP Hall Realigned to
Impvt. of MP Hall Brgy. Buenavista VIII 0.187 160 C 0.460 - 0.500 - - - 96.00 79.55% Satisfactory
Verca Const. Trading & Services 14477 Const. of FMR @ Brgy. Bacong III 0.475 60 C 0.368 0.200 0.300 - - - 86.80 *86.80% V. Satisfactory
Verca Const. Trading & Services 14477 Const. of Multi-Purpose Bldg. at Tenejero E/S III 0.610 40 C 0.381 0.300 0.300 - - - 98.10 *98.10%
Outstanding
Versatile Builders 12069 Const. of MPB @ Vitali NHS IX 4.679 90 C 0.398 0.152 0.300 - - - 85.00 80.84% V. Satisfactory
Vertical Builders 14029 Conc. of Sarangani-Davao del Sur Coastal Road, Gumasa Section XII 9.422 189 C 0.276 0.300 0.000 - - - 57.60 66.60%
Fair
Vertical Builders 14029 Const. of 2 Cl @ FVR E/S III 1.351 120 O 0.346 0.240 0.100 0.030 0.059 0.100 87.50 -
Vertical Builders 14029 Construction of Multi-Purpose Building XII 1.882 90 C 0.476 0.133 0.300 - - - 90.90 *90.90%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page538
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Vertical Builders 14029 Datu Paglas Resttlement Project NHA 5.925 150 O 0.387 0.300 0.070 0.023 0.042 0.100 92.10 -
Vertical Builders 14029 Saub River Flood Control XII 1.897 60 C 0.315 0.225 0.300 - - - 84.00 82.98% V. Satisfactory
Vertical Builders 14029 Small Margus Seawall XII 4.769 150 C 0.379 0.300 0.000 - - - 67.90 71.68% Satisfactory
VF Construction 10048Const. of Drainge Canal from RBM
Ent. To ER Venzon Plant Brgy. Panillao & Brgy. Sta. Rosa
III 0.845 45 C 0.374 0.300 0.300 - - - 97.40 *97.40% Outstanding
VF Construction 10048 Impvt. of Multi-Purpose Pavement @ Brgy. Pto. Rivas III 0.488 30 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V. Satisfactory
VF Construction 10048 Rehab./Impv't. of Roman Expressway (Sabatan Section) III 0.990 35 C 0.295 0.300 0.300 - - - 89.50 *89.50%
V. Satisfactory
Vicente T. Lao Construction 7040 Cotabato Airport Development Project DOTC 14.404 75 C 0.443 0.200 0.300 - - - 94.30 94.30%
Very Satisfactory
Vicente T. Lao Construction 7040 CP MN - D3 (Katipunan-Manukan Road) ADB 462.152 610 O 0.376 0.291 0.000 0.030 0.047 0.100 84.40 -
Vicente T. Lao Construction 7040 CP MN-D (3-1) Nipaan -Sindangan Rd., Oroquieta-Sindangan Road ADB 184.345 240 O 0.366 0.277 0.100 0.024 0.070 0.100 93.70 -
Vicente T. Lao Construction 7040Impvt. of Tagum-Asuncion-
Kapalong-Sto. Tomas-Dapecol-Panabo Circ. Road, Left Side
XI 16.396 150 C 0.220 0.300 0.300 - - - 82.00 *82.00% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page539
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Vicente T. Lao Construction 7040 Impvt./Conc. Paving of Sindangan-Siayan-Dumingag Road IX 28.546 475 O 0.304 0.240 0.000 0.030 0.042 0.100 71.60 -
Vicente T. Lao Construction 7040 Impvt./Conc. Paving of Sindangan-Siayan-Dumingag Road IX 28.948 345 O 0.345 0.240 0.100 0.030 0.040 0.100 85.50 -
Vicente T. Lao Construction 7040Impvt./Concrete Paving of Gutalac-Baliguian-Siocon Road, Nonoyan-
Sta. Maria SectionIX 48.156 539 O 0.378 0.261 0.150 0.030 0.047 0.050 91.60 -
Vicente T. Lao Construction 7040Impvt./Concrete Paving of Gutalac-Baliguian-Siocon Road, Sta. Maria
SectionIX 48.156 290 O 0.270 0.252 0.000 0.030 0.042 0.100 69.40 -
Vicente T. Lao Construction 7040Impvt./Rehab. of Butuan-Cagayan
de Oro-Iligan Road, Dampil-Kabulawan Section
X 9.461 120 C 0.263 0.206 0.300 - - - 76.90 88.90% V. Satisfactory
Vicente T. Lao Construction 7040Impvt./Rehab. of Dipolog-Polanco-
Piñan Jct. Oroquieta Road, Barcelona-Polanco Sect.
IX 14.316 120 C 0.291 0.122 0.300 - - - 71.30 *71.30% Satisfactory
Vicente T. Lao Construction 7040Impvt./Rehab. of Dipolog-
Sindangan-Liloy Road, Talinga-Bacungan Section
IX 28.943 150 C 0.307 0.200 0.300 - - - 80.70 *80.70% V. Satisfactory
Vicente T. Lao Construction 7040 Impvt./Rehab. of Road, Davao-Cotabato Road XI 12.408 120 C 0.339 0.300 0.300 - - - 93.90 *93.90%
Outstanding
Vicente T. Lao Construction 7040 Impvt./Rehab. of Sindangan-Liloy Road IX 4.899 35 C 0.388 0.300 0.300 - - - 98.80 *98.80%
Outstanding
Vicente T. Lao Construction 7040Impv't/Conc. Paving of Dipolog-
Punta-Dansullan-S. Osmeña Road (Dilawa Section)
IX 19.092 210 O 0.368 0.300 0.150 0.030 0.030 0.050 92.80 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page540
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Vicente T. Lao Construction 7040Impv't/Conc. Paving of Dipolog-
Punta-Dansullan-S. Osmeña Road, Macleodes Sect.
IX 19.092 210 O 0.376 0.300 0.150 0.030 0.030 0.050 93.60 -
Vicente T. Lao Construction 7010 Laguindingan Airport Development Project DOTC 17.846 390 C 0.457 0.200 0.300 - - - 95.70 95.70%
Very Satisfactory
Vicente T. Lao Construction 7040 Laguindingan Resettlement Project, Phase II NHA 40.606 355 C 0.371 0.300 0.300 - - - 97.06 97.06%
Outstanding
Vicente T. Lao Construction 7040 Pagadian Airport Development Project DOTC 28.846 150 C 0.432 0.200 0.300 - - - 93.20 93.20%
Very Satisfactory
Vicente T. Lao Construction 7040 Pagadian Airport Development Project DOTC 54.878 300 C 0.460 0.200 0.300 - - - 96.00 96.00%
Very Satisfactory
Vicente T. Lao Construction 7040Reconst. of Dipolog-Polanco-
Piñan Jct. Oroquieta Nat'l Road, Pob. Piñan Section
IX 19.092 90 C 0.387 0.201 0.300 - - - 88.80 *88.80% V. Satisfactory
Vicente T. Lao Construction 7040 Rehab. Along Junction Polo-Dapitan Park Road IX 4.818 30 C 0.390 0.200 0.300 - - - 89.00 *89.00%
V.Satisfactory
Vicente T. Lao Construction 7040Rehab./Impvt. (Asphalt Overlay) of Sarangani-Davao del Sur Coastal
Road, Gian Padidu SectionXII 14.456 90 C 0.365 0.277 0.300 - - - 94.20 87.12%
V. Satisfactory
Vicente T. Lao Construction 7040Rehab./Impvt. of Banisilan-Guiling-Alamada-Libungan Road (Nicaan-
Montay Section)XII 11.433 95 C 0.359 0.234 0.300 - - - 89.30 *89.30%
V. Satisfactory
Vicente T. Lao Construction 7040 Rehab./Impvt. of Digos-Makar Road, Malalag Cogon Section XII 14.466 90 C 0.375 0.300 0.300 - - - 97.50 *97.50%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page541
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Vicente T. Lao Construction 7040Rehab./Impvt. of Dualing-New
Panay-Midsayap Road Kimagango Highway Junction
XII 14.288 105 C 0.360 0.258 0.300 - - - 91.80 *91.80% Outstanding
Vicente T. Lao Construction 7040 Rehab./Impvt. of National Road Ozamis City-Oroquieta City Road X 14.366 30 C 0.200 0.300 0.300 - - - 80.00 *80.00%
Satisfactory
Vicente T. Lao Construction 7040
Rehab./Impvt. of Nat'l Roads Preventive Maint. (Asphalt
Overlay), Oroquieta-Plaridel-Calamba-Sapang Dalaga Road
X 14.384 70 C 0.376 0.300 0.300 - - - 97.60 *97.60% Outstanding
Vicente T. Lao Construction 7040 Remaining Works of Asphalt Overlay of Makar-Kiamba Road XII 39.554 150 C 0.374 0.300 0.300 - - - 97.40 80.72%
V. Satisfactory
Vicente T. Lao Construction 7040 Repair/Aspahlt Overlay along TitayIpil Road, Poblacion Ipil Section IX 4.960 75 C 0.479 0.144 0.300 - - - 92.30 *92.30%
V. Satisfactory
Vicente T. Lao Construction 7040
Upgrading/Impvt./Rehab. Along Dipolog By Pass Road Ph III,
Dicayas-Minaog Section (Supply & Installation of Traffic
Eng'g)
IX 9.635 45 C 0.283 0.300 0.300 - - - 88.30 *88.30% V. Satisfactory
Vicente T. Lao Construction 7040
Upgrading/Impvt./Rehab. of Dipolog-Oroquieta Road (Supply & Installation of Traffic
Eng'g)
IX 14.456 60 C 0.346 0.136 0.300 - - - 78.20 84.23% V. Satisfactory
Vicmar Construction Inc. 28997 Conc. of Brgy. Road @ Poblacion IV-A 1.416 90 O 0.300 0.300 0.100 0.030 0.035 0.067 83.20 -
Vicmar Construction Inc. 28997 Conc. of Palapag-Mapanas Gamay-Lapinig Road VIII 77.044 298 O 0.349 0.237 0.150 0.030 0.047 0.050 86.30 -
Vicmar Construction Inc. 28997 Const. of Baywalk Facilities, Foreshore Area, Phase 3, Brgy. 11 IV-A 9.594 150 C 0.495 0.133 0.300 - - - 92.80 90.63%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page542
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Vicmar Construction Inc. 28997 Const. of Bridge at Batangas-Lobo Road (San Miguel Sect.) IV-A 9.498 150 C 0.339 0.200 0.300 - - - 83.90 81.02%
V. Satisfactory
Vicmar Construction Inc. 28997 Const. of MPB @ Balayan West E/S IV-A 1.431 90 C 0.467 0.165 0.300 - - - 93.20 *93.20%
V. Satisfactory
Vicmar Construction Inc. 28997 Const. of MPB @ Poblacion IV-A 1.423 120 O 0.300 0.275 0.100 0.030 0.037 0.100 84.20 -
Vicmar Construction Inc. 28997 Const. of Seawall @ Brgy. Wawa IV-A 0.476 60 C 0.450 - 0.500 - - - 95.00 95.00% Outstanding
Vicmar Construction Inc. 28997 Rehab./Impvt. of Batangas-Lobo Road IV-A 6.803 60 C 0.437 0.200 0.300 - - - 93.70 92.32%
V. Satisfactory
Vicmar Construction Inc. 28997
Rehab./Impvt. of Damaged National Road at Batangas-Tabangao-Lobo Road, Pulot
Aplaya-Talahib Pandayan Section
IV-A 19.295 90 C 0.461 0.181 0.300 - - - 94.20 92.22% V. Satisfactory
Victoria Development and Construction Supply 32638 Conc. of Belen-Consuegra Road VIII 9.473 180 C 0.288 0.200 0.300 - - - 78.80 75.92%
Satisfactory
Victoria Development and Construction Supply 32638 Const. of MPB VIII 0.933 90 C 0.351 0.200 0.300 - - - 85.10 *85.10%
V. Satisfactory
Victoria Development and Construction Supply 32638 Rehab./Impvt. of Villaba Flood
Control VIII 3.785 150 C 0.307 0.200 0.300 - - - 80.70 82.56% V. Satisfactory
Victoria Development and Construction Supply 32638 Repair/Impv't of Multi-Purpose
Building, Brgy. Pob. Del Norte VIII 0.188 40 C 0.494 0.035 0.300 - - - 82.90 *82.90%Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page543
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Victoria Trading 15717 Const. of Drainage @ Brgy. Calapandayan III 0.354 45 C 0.247 0.300 0.300 - - - 84.70 *84.70%
V. Satisfactory
Victoria Trading 15717 Const. of Multi-Purpose Building @ Brgy. Calapacuan III 0.606 60 C 0.273 0.200 0.300 - - - 77.30 *77.30%
Satisfactory
Victoriano C. Lim Construction 25318 Const. of Multi-Purpose Bldg., (Public Market) X 9.331 195 C 0.341 0.300 0.300 - - - 94.10 84.02%
V. Satisfactory
Victoriano C. Lim Construction 25318 Const. of Multi-Purpose Building (Phase I), Calamba X 1.445 120 C 0.439 - 0.500 - - - 93.90 85.5%
V. Satisfactory
Victoriano C. Lim Construction 25318 Const. of Ozamiz City Coastal By Pass Road @ Brgy.Malaubang X 11.823 240 C 0.309 0.300 0.300 - - - 90.90 82.86%
V. Satisfactory
Victoriano C. Lim Construction 25318 Gravelling of Guimad-Guingona-Trigos Road X 2.826 180 C 0.317 0.300 0.000 - - - 61.70 *61.70%
Fair
Victoriano C. Lim Construction 25318
Gravelling/Concreting of Pavement Ozamis By-Pass
Circumferential- Bangkal Airport Road
X 2.020 120 C 0.470 - 0.500 - - - 97.00 97.00% Outstanding
Victoriano C. Lim Construction 25318 Impvt./Rehab. of Lagbas Creek X 9.546 210 C 0.290 0.300 0.300 - - - 89.00 82.70% V. Satisfactory
Victoriano C. Lim Construction 25318 Ozamis Airport Development Project DOTC 28.851 180 C 0.432 0.200 0.300 - - - 93.20 93.20%
Very Satisfactory
Victoriano C. Lim Construction 25318 Ozamis Airport Development Project DOTC 3.855 120 C 0.469 0.200 0.300 - - - 96.90 96.90%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page544
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Victoriano C. Lim Construction 25318 Regravelling of Litapan-Manaka-Gala Road X 2.822 180 C 0.381 - 0.500 - - - 88.10 75.50%
Satisfactory
Victoriano C. Lim Construction 25318 Rehab./Impvt. of Alae-Kisolon Road (Maluko Slip Section) X 14.457 400 C 0.373 0.133 0.000 - - - 50.60 66.98%
Poor
Victoriano C. Lim Construction 25318 Rehab./Impvt. of Alae-Kisolon Road (Mangima Section) X 14.451 180 C 0.366 0.200 0.000 - - - 56.60 68.34%
Fair
Victoriano C. Lim Construction 25318 Rehab./Impvt. of S.H. Alae-Kisolon Road (Mangima Section) X 14.451 180 O 0.336 0.300 0.030 0.030 0.041 0.000 73.70 -
Victoriano C. Lim Construction 25318 Rehabilitation of Manaca-Gala Road X 1.903 120 C 0.395 0.231 0.300 - - - 92.60 88.64%
V. Satisfactory
Victoriano C. Lim Construction 25318 San Juro CIP MOPIO 10.103 282 C 0.342 0.240 0.300 - - - 88.15 *88.15% V.Satisfactory
Victoriano C. Lim Construction 25318 Sumasap-Panaon Communal Irrigation Project
CARP-IC ARCD 8.380 150 C 0.342 0.242 0.300 - - - 88.45 *88.45%
V.Satisfactory
Victorino Baroña, Jr. Construction 15166 Const. of Sinalang Bridge &
Approaches CAR 10.890 195 C 0.352 0.212 0.300 - - - 86.40 85.80% V. Satisfactory
Victorino Baroña, Jr. Construction 15166 Impvt. of Abra-Kalinga Road,
Baguio Section, Baay-Licuan CAR 3.135 144 C 0.387 - 0.500 - - - 88.70 *88.70% V. Satisfactory
Victorino Baroña, Jr. Construction 15166 Impvt. of Denden-Callao Road,
Villaviciosa ARC CAR 15.862 472 C 0.334 0.300 0.300 - - - 93.40 87.28 V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page545
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Victorino Baroña, Jr. Construction 15166 Rehabilitation of Abra-Ilocos Norte
Road CAR 0.941 56 C 0.372 - 0.500 - - - 87.20 *87.20% V. Satisfactory
Vicvera Builders, Inc. 13903 Const. of Three (3) Storey, 12 CL School Bldg. at Alabang E/S NCR 4.569 90 C 0.336 0.300 0.300 - - - 93.60 85.34%
V. Satisfactory
Vicvera Builders, Inc. 13903 Rehab. of Road, Brgy. Poblacion NCR 2.087 60 C 0.257 0.197 0.300 - - - 75.40 *75.40% Satisfactory
Vigan Fortune Construction 3887 Candon-Salcedo Road I 18.922 240 O 0.344 0.060 0.100 0.022 0.025 0.067 61.80 -
Vigan Fortune Construction 3887 Const. of Darapidap Seawall I 9.454 160 C 0.333 0.200 0.300 - - - 83.30 85.70% V. Satisfactory
Vigan Fortune Construction 3887 Const. of Santa Seawall & Flood Control I 9.493 183 C 0.320 0.300 0.300 - - - 92.00 77.36%
Satisfactory
Vigan Fortune Construction 3887 Continuation of Const. of Candon City Hospital I 4.744 100 C 0.358 - 0.500 - - - 85.80 85.80%
Satisfactory
Vigan Fortune Construction 3887Continuation of the Phil. Science High School Bldg. (PSHS) Ilocos
Region CampusI 7.952 183 C 0.296 - 0.500 - - - 79.60 72.53%
Satisfactory
Vigan Fortune Construction 3887 Impvt. of San Emilio-del Pilar Road I 9.451 140 O 0.335 0.194 0.070 0.022 0.025 0.067 71.30 -
Vigan Fortune Construction 3887 Impv't. of Sta.Lucia-Salcedo Road I 4.002 134 C 0.272 - 0.500 - - - 77.20 58.12% Poor
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page546
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Vigan Fortune Construction 3887 Rehab./Replacement of Gongogong Bridge along MNR I 7.127 365 C 0.310 0.200 0.300 - - - 81.00 81.42%
V. Satisfactory
Vigan Fortune Construction 3887 Rehab/Replacement of Paing Bridge 2 along MNR I 8.473 486 C 0.333 0.200 0.300 - - - 83.30 83.63%
Satisfactory
Vigan Fortune Construction 3887Stone Masonry of Sabangan Seawall, Phase III, Sabangan,
SantiagoI 1.207 60 C 0.293 - 0.500 - - - 79.30 *79.30%
Satisfactory
Viguz Construction Corporation 8178 Const. of Candi-is Bridge VIII 5.518 150 C 0.348 0.189 0.300 - - - 83.70 77.94% Satisfactory
Viguz Construction Corporation 8178 Const. of Malirong Bridge VIII 4.655 150 C 0.381 0.180 0.300 - - - 86.10 83.94% V. Satisfactory
Viguz Construction Corporation 8178 Construction of Multi-Purpose Building (ABC Bldg.) Phase 1 VIII 0.945 120 C 0.423 0.133 0.300 - - - 85.60 *85.60%
Satisfactory
Viguz Construction Corporation 8178Rehabilitation along Maharlika
Highway (Paril Section Km 986+280)
VIII 7.130 222 O 0.343 0.226 0.000 0.030 0.025 0.050 67.40 -
Viguz Construction Corporation 8178 Road Slip along Liloan-Sogod Road Section VIII 9.542 240 O 0.320 0.246 0.150 0.030 0.030 0.050 82.60 -
Viguz Construction Corporation 8178 Road Widening of Carigara Wharf VIII 1.424 120 C 0.353 0.200 0.300 - - - 85.30 *85.30% V. Satisfactory
Viguz Construction Corporation (Formerly: Viguz Const.) 8178 Conc. of Burauen-Mahagnao Road VIII 9.448 120 C 0.271 0.168 0.300 - - - 73.90 81.52%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page547
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Viguz Construction Corporation (Formerly: Viguz Const.) 8178 Const. of Maasin Flood Control VIII 9.442 360 C 0.341 0.156 0.300 - - - 79.70 84.08%
V. Satisfactory
Viguz Construction Corporation (Formerly: Viguz Const.) 8178 Const./Extension of Canturing
River Control (Bogo Section) VIII 9.449 280 C 0.130 0.300 0.300 - - - 73.00 81.40% V. Satisfactory
Vijisi Construction 26643 Impvt./Concrete Paving of Don Federico Sison St. I 0.617 40 C 0.355 0.300 0.300 - - - 95.50 *95.50%
Outstanding
Viking Construction and Supplies 18129 Completion of Bigbiga Multi-Purpose Building I 0.759 32 C 0.385 0.287 0.300 - - - 97.20 88.94%
V. Satisfactory
Viking Construction and Supplies 18129 Completion of MPB I 3.743 18 C 0.300 0.200 0.300 - - - 80.00 *80.00% Satisfactory
Viking Construction and Supplies 18129 Conc. of Eco-Tourism Road I 14.395 180 C 0.324 0.200 0.300 - - - 82.40 86.84% V. Satisfactory
Viking Construction and Supplies 18129 Rehab. of Concrete Pavement along MNR, Candon Section I 9.484 180 C 0.277 0.200 0.300 - - - 77.70 80.46%
V. Satisfactory
Viking Construction and Supplies 18129 Rehab. of Manila North Road I 4.739 105 C 0.175 0.300 0.300 - - - 77.50 *77.50% Satisfactory
Viking Construction and Supplies 18129 Repair/Rehab. of MPB I 0.189 16 C 0.318 0.300 0.300 - - - 91.80 *91.80% Outstanding
Viking Construction and Supplies 18129 Sta. Lucia-Salcedo Road I 9.457 102 O 0.305 0.092 0.050 0.015 0.027 0.067 55.60 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page548
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Villaflor Construction and Supplies 21631 Const. of Multi-Purpose Hall,
Phase II VI 1.439 150 C 0.363 0.210 0.300 - - - 87.30 90.17% Outstanding
Virac NRC Construction 11396 Const. of Multi-Purpose Building (Phase I) V 0.944 90 C 0.391 - 0.500 - - - 89.10 *89.10%
V. Satisfactory
Virginia Construction 12893 Concreting of Farm-to-Market Brgy. Saang Bago III 0.374 45 C 0.293 - 0.500 - - - 79.30 *79.30%
Satisfactory
Virlo Construction 5765 Conc. of Antonio de Pio Highway, Luyang-Victoria-Kinawahan Sect. VII 30.402 185 C 0.327 0.133 0.300 - - - 76.00 76.78%
Unsatisfactory
Virlo Construction 5765 Conc. of Bacolod South Road (Su-ay Section) VI 22.306 319 O 0.335 0.225 0.100 0.010 0.038 0.067 77.50 -
Virlo Construction 5765 Conc. of Bacolod South Road (Su-ay Section) VI 22.306 319 O 0.231 0.300 0.150 0.030 0.060 0.050 82.10 -
Virlo Construction 5765Const/Rehab. of 4-CL, 2-Storey
S/B @ Central Lilo-An E/S Poblacion
VII 1.516 80 C 0.406 - 0.500 - - - 90.60 90.60% Outstanding
Virlo Construction 5765 Impv't/Conc. of JCT.LIR Carmen-Sagbayan-Bacani Road VII 23.600 252 O 0.388 0.200 0.150 0.030 0.047 0.033 84.80 -
Virlo Construction 5765 Repair/Impvt./Rehab. of Bonbon-Sinsin Road VII 9.996 160 C 0.212 0.200 0.300 - - - 71.20 *71.20%
Satisfactory
Virlo Construction 5765 Repair/Rehab. of S. Osmena Blvd. VII 9.646 40 C 0.054 0.100 0.300 - - - 45.40 72.16% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page549
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Virlo Construction 5765 Road Widening of Osmeña St. Radaza Plaza to Petron VII 20.948 110 C 0.377 0.200 0.300 - - - 87.70 87.04%
V. Satisfactory
Vision 3000 Builders 32327 Const. of MPB, Region I Medical Center I 2.110 120 C 0.294 0.300 0.300 - - - 89.40 *89.40%
V. Satisfactory
Vites Construction & Development Corporation 9444 Rehab./Const. of Multi-Purpose
Building @ Zone 38 (Brgy. 377) NCR 5.035 120 C 0.328 0.300 0.300 - - - 92.80 91.26% Outstanding
Vites Construction & Development Corporation (Formerly: Vites Trading &
Const.)
9444 Drainage Impvt. With Concreting/Upgrading NCR 1.151 75 C 0.386 0.200 0.300 - - - 88.60 *88.60%
V. Satisfactory
Vivid Construction 21115 Proposed Const. of 2 Storey MPB NCR 1.925 60 C 0.285 0.237 0.300 - - - 82.20 *82.20% V. Satisfactory
Vivid Construction 21115 Proposed Rehab. of Roads and Drainage, Brgy. 874 / 875 NCR 1.927 60 C 0.367 0.166 0.300 - - - 83.30 *83.30%
Satisfactory
Vivid Construction 21115 Rehab. of Roxas Boulevard Service Road NCR 9.649 15 C 0.231 0.200 0.300 - - - 73.10 *73.10%
Satisfactory
Vivid Construction 21115 Riprapping of Creek at Sitio Tanag IVA 0.959 90 C 0.360 0.200 0.300 - - - 86.00 *86.00% V. Satisfactory
VNKC Construction 12614Construction, Fabrication &
Installation of Garbage Conveyor System with Boomtrap
PRRC 17.008 120 C 0.499 0.338 0.100 - - - 93.70 *93.70% Outstanding
VRF Construction 15301 Conc. of Bertese-Sta. Rita Road, Quezon Section III 6.465 120 C 0.337 0.200 0.300 - - - 83.70 *83.70%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page550
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
VRF Construction 15301 Paving/Upgrading of Bongabon-Rizal Road (Rizal Section) III 8.250 70 C 0.299 0.200 0.300 - - - 79.90 *79.90%
Satisfactory
VRF Construction 15301 Repair/Rehab. of Gapan-Peñaranda-Fort Magsaysay Road III 7.720 90 C 0.337 0.200 0.300 - - - 83.70 *83.70%
V. Satisfactory
VRP Builders Construction and Supply 25056 Road Conc. @ Brgy. Maugat IV-A 0.481 60 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfactory
VTJ Construction & Supply 11250 Const. of Multi-Purpose Building at Brgy. Geronimo IV-A 0.964 60 C 0.459 - 0.500 - - - 95.90 *95.90%
Outstanding
VUC Engineering 7918Conc. of Luna-Kabugao-Pudtol-Luna Road, Cabatacan-Dagupan
SectionCAR 9.395 340 C 0.339 0.200 0.300 - - - 83.90 80.51%
V. Satisfactory
VUC Engineering 7918Concreting of Dagupan-
Palongkada Section Kabugay-Pudtol-Luna Road
CAR 7.692 180 C 0.425 - 0.500 - - - 92.50 86.11% V. Satisfactory
VUC Engineering 7918 Const. of Lanna Retaining Wall, Lanna CAR 0.873 60 C 0.352 0.300 0.300 - - - 95.20 *95.20%
Outstanding
VUC Engineering 7918 Impvt./Conc. of Tabuk-Tinglayan Road (Bantay Section) CAR 4.777 150 O 0.299 0.300 0.100 0.023 0.063 0.100 88.50 -
VUC Engineering 7918 Rehabilitation & Concreting of Magsaysay-Mapaway Road CAR 7.615 210 C 0.353 - 0.500 - - - 85.30 *85.30%
V. Satisfactory
VUC Engineering 7918 Road Impvt. of Dagupan-Palangkada Section, Luna CAR 7.692 180 C 0.264 0.235 0.070 0.030 0.030 0.100 72.90 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page551
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
VUC Engineering 7918Upgrading & Conc. of Tuguegarao-
Tabuk-Tinglayan Road (Banat-Gonogon Section)
CAR 9.510 150 C 0.215 0.051 0.300 - - - 56.60 70.28% Satisfactory
Vulcan Development Construction 19080 Concreting of Jct. Milagros-Aroroy
Road V 9.592 120 O 0.321 0.240 0.100 0.023 0.037 0.067 78.80 -
Vulcan Development Construction 19080 Const. of Circumferential Road @
Brgy. Ibingay V 9.490 180 C 0.360 0.200 0.300 - - - 86.00 83.00% V. Satisfactory
VVER Construction 14122 Completion of East Central Home Economics Bldg. VII 0.548 80 C 0.342 0.200 0.300 - - - 84.20 *84.20%
V. Satisfactory
VVER Construction 14122 Completion of MPB (Day Care Center) @ Brgy. Batinguel VII 0.277 65 C 0.331 0.200 0.300 - - - 83.10 *83.10%
V. Satisfactory
VVER Construction 14122 Concreting of Punta Beach Road, Poblacion VII 1.836 222 O 0.388 0.200 0.150 0.030 0.033 0.050 85.10 -
VVER Construction 14122 Const. of 1-Unit, 3-Cl School Building @ Olandao E/S VII 1.033 80 O 0.369 0.240 0.070 0.030 0.029 0.067 80.50 -
VVER Construction 14122 Const. of Brgy. Road at Canlasog VII 1.400 150 C 0.278 0.246 0.300 - - - 82.40 78.44% Satisfactory
VVER Construction 14122 Const. of Cambagahan E/S VII 0.442 50 C 0.395 0.200 0.300 - - - 89.50 *89.50% V. Satisfactory
VVER Construction 14122 Const. of MPB at Poblacion VII 0.949 85 C 0.307 0.032 0.300 - - - 63.90 *63.90% Fair
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page552
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
VVER Construction 14122 Const. of MPB/Center at Cang-Alwang VII 0.469 60 C 0.267 0.300 0.300 - - - 86.70 84.95%
V. Satisfactory
VVER Construction 14122 Construction of (1) unit School Building at Liloan Elem. School VII 1.173 90 C 0.482 0.133 0.300 - - - 91.50 *91.50%
V. Satisfactory
VVER Construction 14122Construction of Drainage Canal (Flood Control System), Brgy.
JawaVII 0.420 70 C 0.500 0.133 0.300 - - - 93.30 *93.30%
V. Satisfactory
VVER Construction 14122 Continuation of MPB at Sibulan VII 0.917 65 C 0.289 0.300 0.300 - - - 88.90 84.49% V. Satisfactory
VVER Construction 14122 Repair/Rehab. of Upper Cabangcalan VII 1.393 160 C 0.337 0.207 0.300 - - - 84.40 *84.40%
V.Satisfactory
VVER Construction 14122 Repair/Rehabilitation of Punta Road, Poblacion VII 1.832 193 O 0.400 0.200 0.150 0.030 0.033 0.033 84.60 -
W B X Construction 28370 Const. of Multi-Purpose Building at Senior Citizens Federation III 0.473 12 O 0.368 0.284 0.150 0.030 0.020 0.017 86.90 -
W B X Construction 28370 Impvt. of Farm to Market Road, Brgy. Bagbaguin Sto. Tomas Road III 2.569 60 C 0.324 0.300 0.300 - - - 92.40 *92.40%
Outstanding
W B X Construction 28370 Repair/Rehab. of Roads Brgy. Pinagkuartelan III 0.382 15 C 0.372 0.200 0.300 - - - 87.20 *87.20%
V. Satisfactory
W B X Construction 28370 Repair/Rehab. of two (2) units of Classroom Bldg. at Caingin E/S III 0.954 60 C 0.343 0.300 0.300 - - - 94.30 *94.30%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page553
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
W B X Construction 28370 Road Concreting San Pedro III 0.478 8 C 0.369 0.200 0.300 - - - 86.90 *86.90% V. Satisfactory
W. Palma Construction 11988Const. of 4 Storey 12 Cl Secondary
Sch. Bldg. @ Roman Duterte Memorial NHS
VII 6.895 120 C 0.376 0.100 0.300 - - - 77.60 *77.60% Satisfactory
W. Rivera Construction & Equipment Rentals 31378
Const. of 2 Storey RGR Type Sch. Bldg. @ Sta. Maria & San Pedro
E/SIVA 9.546 150 C 0.376 0.246 0.300 - - - 92.20 91.57%
Outstanding
W.C. Doyola Construction 26044 Paguite CIS PIO 833.488 45 C 0.339 0.175 0.300 - - - 81.35 81.35% V.Satisfactory
W.D. Navarro Construction Co. 14327 Const. of Cagayan River Control II 14.238 318 C 0.465 0.200 0.300 - - - 96.50 88.37% Satisfactory
W.D. Navarro Construction Co. 14327Upgrading/Impvt. of Manila North
Road (Jct. Bangag-Mabanguc-Paruddun Sect.)
II 20.042 300 O 0.320 0.240 0.100 0.020 0.033 0.067 78.00 -
W.J. Construction 19497 Installation of Pipeline @ Brgy. Camaysa IVA 0.477 32 C 0.200 0.300 0.300 - - - 80.00 *80.00%
Satisfactory
W.J.P. Construction and Supply 23192 Conc. of Balicanaway Road I 2.886 90 C 0.321 0.200 0.300 - - - 82.10 *82.10% V. Satisfactory
W.J.P. Construction and Supply 23192 Concreting of San Vicente to Poblacion West I 2.893 37 C 0.371 0.200 0.300 - - - 87.10 *87.10%
Satisfactory
W.M. Salayog Construction and General Merchadise 12851 Conc. of Cristobal Road, Brgy.
Sapangi I 0.568 30 C 0.318 0.200 0.300 - - - 81.80 *81.80% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page554
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
W.S. Aniar Trading & Construction 23192 Conc. of Casanicolasan Road I 0.960 46 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
W.S. Aniar Trading & Construction 20471 Const. of Multi Purpose Pavement
@ Brgy. Sapa IV-B 0.208 90 C 0.244 0.000 0.300 - - - 54.40 *54.40% Poor
Walter Ng Lao Construction 23739 Concreting of Oroqueta-Calamba Mt. Rd., X 1.603 105 O 0.351 0.300 0.000 - - - 65.10 -
Walter Ng Lao Construction 23739 Panansalan-Cartagena Communal Irrigation System NIA 5.787 148 O 0.370 0.160 0.070 0.015 0.053 0.200 86.72 -
Wangjo Construction 29924 Conc. of Sta. Maria-Paracelis Road (Phase I), Busilac-Pito Section CAR 9.529 200 C 0.362 0.287 0.300 - - - 94.90 58.84%
Poor
Wangjo Construction 29924 Const. of Hapid Bridge (Phase III) CAR 1.601 52 C 0.261 0.288 0.300 - - - 84.90 86.52%
V. Satisfactory
Wangjo Construction 29924 Const. of Poblacion East Lamut MPB CAR 0.477 46 C 0.383 0.300 0.300 - - - 98.30 *98.30%
Outstanding
Wangjo Construction 29924 Installation of Tupaya Bridge CAR 0.946 60 C 0.335 0.300 0.300 - - - 93.50 90.02% Outstanding
WBX Construction 28370 Completion of 4 Cl 2 Storey Bldg. @ Bagbagin E/S III 1.520 90 C 0.250 0.291 0.300 - - - 84.10 *84.10%
V. Satisfactory
WBX Construction 28370 Const. of Brgy. Multi-Purpose Bldg., Brgy. Andaya III 0.468 54 C 0.296 0.300 0.300 - - - 89.60 87.29%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page555
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
WBX Construction 28370 Rehab. of Sta. Maria By Pass Road III 5.711 90 C 0.264 0.300 0.300 - - - 86.40 *86.40% V. Satisfactory
WBX Construction 28370 Road Rehabilitation Pulang Gubat III 0.376 10 C 0.370 0.200 0.300 - - - 87.00 *87.00% V. Satisfactory
WCS Construction Inc. 6516 Const. of Multi-Purpose Hall-Phase II V 1.865 120 C 0.296 0.300 0.300 - - - 89.60 *89.60%
V. Satisfactory
WCS Construction Inc. 6516Development/Const. of Sula Seawall "A" and "B" and its
Access RoadV 9.355 210 C 0.254 0.252 0.300 - - - 80.60 85.94%
V. Satisfactory
WCS Construction Inc. 6516 Improvement of Lidong-Polangui Road V 33.052 210 C 0.304 0.200 0.300 - - - 80.40 87.00%
V. Satisfactory
WCS Construction Incorporated 6516 Land Development of Polangui Resettlement Project NHA 23.994 150 O 0.38 0.300 0.100 0.03 0.045 0.100 95.5 -
WCS Construction Incorporated 6516 Land Development of Polangui Resettlement Project SLB 23.994 150 O 0.332 0.243 0.000 0.030 0.065 0.033 70.29 -
WCS Construction, Inc. 6516 Conc. of San Juanico-Basey-Sohotan Road VIII 18.697 150 O 0.357 0.000 0.110 0.030 0.033 0.050 58.00 -
WCS Construction, Inc. 6516 Const. of Buang River Control V 8.073 120 C 0.337 0.200 0.300 - - - 83.70 *83.70% V. Satisfactory
WCS Construction, Inc. 6516 Const. of Lubad Bridge V 23.885 260 C 0.386 0.172 0.300 - - - 85.80 80.49% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page556
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
WCS Construction, Inc. 6516 Const. of MPB Covered Court (Phase I) V 4.279 180 C 0.357 0.200 0.300 - - - 85.70 86.05%
V. Satisfactory
WCS Construction, Inc. 6516 Construction of Flood Control Higabu River V 3.838 180 C 0.491 0.133 0.300 - - - 92.40 *92.40%
V. Satisfactory
WCS Construction, Inc. 6516 Land Dev't. of Polangui Resettlement Project NHA 23.994 211 C 0.368 0.300 0.000 - - - 66.82 66.82%
Fair
WCS Construction, Inc. 6516 Opening/Const. of Iluluan-Mapaco Road V 19.230 120 C 0.363 0.244 0.300 - - - 90.70 90.16%
Outstanding
WCS Construction, Inc. 6516 Yawa River (Banag Section & Culiat Section) V 47.661 210 C 0.333 0.200 0.300 - - - 83.30 83.03%
V. Satisfactory
WDM Construction & Supplies 18877 Cluster EM: Concreting of FMR Agay-Ayan-Sitio Kulgao Rd. X 0.456 210 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
WDM Construction & Supplies 18877 Conc. of FMR at South Poblacion X 0.462 120 C 0.460 0.133 0.300 - - - 89.30 83.84% Satisfactory
WDM Construction & Supplies 18877 Concreting of FMR, Barangay 24 X 0.477 120 C 0.385 0.300 0.300 - - - 98.50 *98.50% Outstanding
WDM Construction & Supplies 18877 Const. of FMR, Odiongan-Malinao-Sio-an Rd. X 0.953 180 C 0.347 0.300 0.300 - - - 94.70 *94.70%
Outstanding
WDM Construction & Supplies 18877 Const. of MPB X 0.464 90 C 0.309 0.200 0.300 - - - 80.90 *80.90% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page557
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
WDM Construction & Supplies 18877 Const. of MPB X 0.187 90 C 0.341 0.200 0.300 - - - 84.10 *84.10% V. Satisfactory
WDM Construction & Supplies 18877 Const. of MPB X 0.940 105 O 0.347 0.240 0.150 0.030 0.035 0.050 85.20 -
WDM Construction & Supplies 18877 Const. of Multi-Purpose Building (Initial) X 1.908 180 C 0.367 0.300 0.300 - - - 96.70 91.31%
Outstanding
WDM Construction & Supplies 18877 Rehab. of Butuan-Cagayan-Iligan Road, Medina By-Pass X 9.293 180 C 0.337 0.300 0.300 - - - 93.70 *93.70%
Outstanding
WDM Construction and Supplies 18877 Construction of Bench Flume & Fab. of Teruvian Grills NIA 3.481 90 C 0.368 0.180 0.300 - - - 84.84 *84.84%
Satisfactory
WDM Construction and Supplies 18877 Construction of Bench Flume, Sta. 0+477.50-Sta. 0+698.45 NIA 3.381 90 C 0.344 0.180 s - - - 52.36 *82.36%
Satisfactory
Wearr Enterprises & Devt. Corp. 14123 Concreting of Milagrosa Road V 0.474 200 O 0.376 0.240 0.150 0.030 0.048 0.050 89.40 -
Wearr Enterprises & Devt. Corp. 14123 Repair/Impvt. of Cabilogan River Control V 14.474 210 C 0.350 0.200 0.300 - - - 85.00 73.42%
Satisfactory
Wearr Enterprises & Devt. Corp. 14123 Restoration of San Vicente River Control V 4.750 314 C 0.340 0.200 0.300 - - - 84.00 *84.00%
V. Satisfactory
Wearr Enterprises & Devt. Corp. 14123 Road Conc. of Dolongan-Basey Road VIII 9.347 225 O 0.387 0.000 0.150 0.030 0.042 0.050 65.90 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page558
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Wee Builders 16375
Completion (Impvt./Conc. Paving) of Licomo-Quiniput Road,
Segment III (Mulawin-Tigbalabag Section)
IX 36.863 270 C 0.363 0.125 0.000 - - - 48.80 70.04% Satisfactory
Wee Eng Construction, Inc. 16380
Concreting of Surigao-Davao Coastal Road (Marihatag-San
Agustin-Lianga), Salvacion-Lianga Section Section
XIII 373.799 405 O 0.330 0.300 0.150 0.030 0.047 0.050 90.70 -
Wee Eng Construction, Inc. 16380 Const. of Reiforced Box Culvert, Macalelon-Mulanay Road IV-A 1.939 90 C 0.376 0.200 0.300 - - - 87.60 *87.60%
V. Satisfactory
Wee Eng Construction, Inc. 16380Const. of Reinforced Conc. Box
Culvert along Macalelon-Mulanay Road
IV-A 0.816 45 C 0.373 0.300 0.300 - - - 97.30 *97.30% Outstanding
Wee Eng Construction, Inc. 16380
Const. of SCDR Marihatag-Barobo Section (Conc. of Amontay-Sto.
Niño Section with Toril & Amontay Bridges)
XIII 122.026 465 C 0.374 0.300 0.300 - - - 97.40 89.56% V. Satisfactory
Wee Eng Construction, Inc. 16380Const. of SCDR Marihatag-
Hinatuan-Bislig Road (Marihatag-San Agustin-Lianga Sect)
XIII 146.935 480 O 0.351 0.300 0.100 0.030 0.045 0.100 92.60 -
Wee Eng Construction, Inc. 16380Const. of SDCR (Lianga-Barobo
Subsection) along Marihatag-Hinatuan-Bislig Sect
XIII 257.508 480 O 0.317 0.300 0.100 0.030 0.065 0.100 91.20 -
Wee Eng Construction, Inc. 16380 Rehab./Impvt. of Rtalomo River Control, NHA Village XI 18.871 210 C 0.382 0.300 0.300 - - - 98.20 *98.20%
Outstanding
Wee Eng Construction, Inc./P.L Sebastian Construction (JV) JV-06-056
CP-3, Const./Impv't. of Maguindanao-Sultan Kudarat-Bdry. Lebak-Kalamansig Road
XII 764.659 670 O 0.347 0.300 0.149 0.030 0.070 0.033 92.90 -
Welex Const. / Goldrock Const. & Dev. Corp. JV-03-004 Soil Erosion Protection Project
(Rehab. of Taytay-El Nido Road) SPIADP 898.994 1,060 C 0.342 0.294 0.300 - - - 93.60 94.54% Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page559
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Welex Construction 9323 Land Dev't. of Taysan Resettlement Project Region V 49.807 211 O 0.372 0.275 0.000 0.030 0.065 0.100 84.20 -
Welex Construction 9323 Land Dev't. of Taysan Resettlement Project
SLBMO-Region V 49.802 244 O 0.382 0.288 0.000 0.030 0.070 0.067 83.70 -
Werr Corporation (International) 14133 Const. of 2-Cl, 2-Storey S/B @ Bangoy NHS XI 0.683 150 O 0.189 0.250 0.000 0.015 0.018 0.033 50.50 -
Werr Corporation (International) 14133 Const. of 4-CL, 2-Storey S/B @ Eulogio Rodriguez, Jr. E/S IVA 5.550 150 C 0.368 0.300 0.300 - - - 96.80 *96.80%
Outstanding
Werr Corporation (International) 14133 Const. of Bucal Bypass Bridge (Phase I) IVA 10.176 150 C 0.371 0.200 0.300 - - - 87.10 *87.10%
V. Satisfactory
Westan Construction and Supply 24331 Const. of Flood Control @ Brgy. Parparoroc I 4.689 113 O 0.354 0.106 0.100 0.023 0.030 0.133 74.60 -
Westmin Enterprises and Construction Services 20989
Conc. Paving along Rizal Shrine, Rizal Town Coastal Loop Road,
Tag-ulo-Guimputlan Sect.IX 2.747 100 C 0.354 0.220 0.300 - - - 87.40 *87.40%
V. Satisfactory
Westmin Enterprises and Construction Services 20989 Const. of MPB @ Rizal IX 0.945 60 C 0.387 0.200 0.300 - - - 88.70 *88.70%
V. Satisfactory
Westmin Enterprises and Construction Services 20989 Const. of River Bank Protection
(Phase 1) IX 4.771 165 C 0.446 0.200 0.300 - - - 94.60 *94.60% V. Satisfactory
Westmin Enterprises and Construction Services 20989 Const./Completion of MPB
(Municipal Gym) IX 2.842 130 C 0.287 0.200 0.300 - - - 78.70 80.24% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page560
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Westmin Enterprises and Construction Services 20989 Const./Completion of Multi-
Purpose Building IX 1.908 120 C 0.422 0.175 0.300 - - - 89.70 *89.70% V. Satisfactory
Westmin Enterprises and Construction Services 20989 Const./Impvt. of MPB IX 0.099 60 C 0.340 0.300 0.300 - - - 94.00 *94.00%
Outstanding
Westmin Enterprises and Construction Services 20989
Improvement/Concrete Paving along Rizal Shrine-Rizal Town
Coastal Road, Guimputlan-Banbanan-Carang Road Section (Guimputlan- Banbanan
Sect.)
IX 2.758 155 C 0.388 0.200 0.300 - - - 88.80 91.92% Outstanding
Westmin Enterprises and Construction Services 20989
Impv't./Conc. Paving along Rizal Shrine, Rizal Town Coastal Loop
RoadIX 2.743 90 C 0.361 0.300 0.300 - - - 96.10 90.34%
Outstanding
Westmin Enterprises and Construction Services 20989 Rehab. of Banbanan-Carang Road IX 1.893 60 C 0.326 0.225 0.300 - - - 85.10 79.10%
Satisfactory
Westwalk Corporation 30650 Const. of MPB NCR 2.101 90 C 0.369 0.200 0.300 - - - 86.90 *86.90% V. Satisfactory
WG & J Construction 26257 Construction of Multi-Purpose Building, Divisoria E/S II 0.479 120 C 0.336 0.200 0.300 - - - 83.60 *83.60%
Satisfactory
Whee Bon Construction & Supply 21731 Repair//Rehab. of Classroom @ Gumaca Nat'l. H/S IV-A 0.094 40 C 0.400 0.000 0.335 - - - 73.50 *73.50%
Satisfactory
Wilfer Construction, Inc. 1632 M'lang Airport Development Project DOTC 21.143 180 C 0.408 0.200 0.300 - - - 90.80 90.80%
Very Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page561
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Wilper Construction Inc. 1632Concreting of San Carlos-
Dumaguete Road, Dumaguete City & Bais City
VII 44.001 310 O 0.391 0.221 0.150 0.030 0.051 0.033 87.60 -
Wilper Construction, Inc. 1632Asphalt Overlay along Sayre Highway Alae-Kisolon Road
(Dalirig Section)X 4.815 82 C 0.428 0.133 0.300 - - - 86.10 *86.10%
Satisfactory
Wilper Construction, Inc. 1632Asphalt Overlay along Sayre Highway Alae-Kisolon Road
(Maluko Section)X 4.815 77 C 0.442 0.133 0.000 - - - 57.50 *57.50%
Poor
Wilper Construction, Inc. 1632 Conc. of Tigbao-Pulac Sta. Fe-San Miguel Road VIII 9.629 120 C 0.362 0.200 0.300 - - - 86.20 87.28%
V. Satisfactory
Wilper Construction, Inc. 1632 Impvt. of Drainage Canal System along SLMAC III 4.701 120 C 0.323 0.200 0.300 - - - 82.30 *82.30%
V. Satisfactory
Wilper Construction, Inc. 1632 M'lang Airport Development Project DOTC 28.833 210 C 0.400 0.200 0.300 - - - 90.00 90.90%
Very Satisfactory
Wilper Construction, Inc. 1632 Widening/Lowering/Impvt. of Baler-Casiguran Road, Abuleg Sect. III 5.864 150 C 0.316 0.200 0.300 - - - 81.60 *81.60%
V. Satisfactory
Wilper Construction, Inc. 1632 Widening/Lowering/Impvt. of Baler-Casiguran Road, Pimpolisan Sect. III 5.856 150 C 0.308 0.200 0.300 - - - 80.80 75.46%
Satisfactory
Wilpres Enterprises 19698 Conc. of FMR @ Brgy. Bocaclew I 0.482 36 C 0.273 0.200 0.300 - - - 77.30 *77.30% Satisfactory
Wilsam Construction & Dev. Corp. 27046 Continuation of Concreting of
Borongan Boulevard VIII 9.162 240 O 0.346 0.000 0.100 0.030 0.032 0.100 60.80 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page562
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Winley Tan Construction 22368 Completion of School Building with CR @ Siparok E/S IX 0.182 25 C 0.387 0.200 0.300 - - - 88.70 *88.70%
V. Satisfactory
Winley Tan Construction 22368 Const. of 1-Unit, Two (2) CL School Bldg. @ Roxas E/S IX 0.719 90 C 0.379 0.200 0.300 - - - 87.90 93.36%
Outstanding
Winley Tan Construction 22368 Const. of MPB (Covered Court) at Galas E/S IX 2.367 180 C 0.361 0.200 0.300 - - - 86.10 91.63%
Outstanding
Winley Tan Construction 22368Const. of One (1) CL Sch. Bldg. at Pamansalan Ecotech High
Sch. IX 0.563 90 C 0.383 0.200 0.300 - - - 88.30 *88.30%
V. Satisfactory
Winley Tan Construction 22368
Const. of Patunan River Control (Downstream) crossing Nat'l
Highway along Dipolog Dumingag Drainage Section
IX 4.746 180 C 0.348 0.200 0.300 - - - 84.80 85.94% V. Satisfactory
Winley Tan Construction 22368 Repair/Rehab. of Sch. Bldg. (ESP Bldg.) @ JRMSC IX 0.448 45 C 0.307 0.200 0.300 - - - 80.70 *80.70%
V. Satisfactory
Wizard Enterprises 27504 Const. of Water Works System IV-A 0.964 60 C 0.343 0.300 0.300 - - - 94.30 *94.30% Outstanding
Wizard Trading & Const. / Kyro Builders & Supply (JV) JV-07-139 Rehab./Reconstruction (Asphalt
Overlay), San Jose-Lupao Road III 37.449 150 C 0.405 0.200 0.300 - - - 90.50 *90.50%V. Satisfactory
Wizard Trading and Construction 21921 Conc. of San Jose-Llanera Road III 2.980 60 C 0.354 0.209 0.300 - - - 86.30 *86.30% V. Satisfactory
Wizard Trading and Construction 21921 Const. of Box Culvert III 2.300 30 C 0.325 0.200 0.300 - - - 82.50 *82.50% V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page563
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Wizard Trading and Construction 21921 Const. of MPB @ Brgy. Bagong Flores III 1.695 50 C 0.310 0.269 0.300 - - - 87.90 *87.90%
V. Satisfactory
Wizard Trading and Construction 21921 Const. of MPB @ Namulandayan E/S III 1.264 45 C 0.335 0.300 0.300 - - - 93.50 84.54%
V. Satisfactory
Wizard Trading and Construction 21921 Const. of MPB at Balbalungao E/S III 0.752 40 C 0.304 0.300 0.300 - - - 90.40 *90.40% Outstanding
Wizard Trading and Construction 21921 Const. of MPB, Brgy. Cordero III 1.030 30 C 0.369 0.200 0.300 - - - 86.90 83.75% V. Satisfactory
WMLC Trading & Construction Supply 24535 Rehab. of San Juan-Laiya Road IV-A 14.468 90 C 0.320 0.202 0.300 - - - 82.20 *82.20%
V. Satisfactory
Worldwide Builders 31408 Construction of Multi-Purpose Building VII 0.479 50 C 0.310 0.000 0.300 - - - 61.00 *61.00%
Fair
Worldwide Builders 31408 Const. of 2 CL Academic Sch. Bldg., Mantalongon NHS VII 0.888 60 C 0.290 0.300 0.300 - - - 89.00 *89.00%
V. Satisfactory
Worldwide Builders 31408 Improvement of Multi-Purpose Building VII 0.948 50 O 0.342 0.277 0.150 0.030 0.019 0.050 86.80 -
Worldwide Builders 31408 Rehab. & Repair of Duldol-Bitoon Rd. VII 0.934 75 C 0.383 0.200 0.300 - - - 88.30 *88.30%
V. Satisfactory
Worldwide Builders 31408 Rehab. & Repair of Poblacion-Bunlan Road VII 0.932 30 C 0.310 0.300 0.300 - - - 91.00 *91.00%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page564
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
WSR Enterprises 17589 Rehabilitation of Caugahan Bridge I V 0.755 100 C 0.250 0.300 0.300 - - - 85.00 *85.00%
V. Satisfactory
WT Construction, Inc. 5490Const. of CP MN-D2, Oroquieta-
Sindangan Rd., Barcelona-Katipunan Section
ADB 267.525 480 O 0.382 0.300 0.070 0.030 0.042 0.067 89.10 -
WT Construction, Inc. 5490 Const. of CP PY-C, Kalibo-Nabas Road VI 208.009 748 C 0.375 0.300 0.300 - - - 97.50 88.83%
V. Satisfactory
WTG Construction and Development Corporation 7494 Asphalt Overlay of Antonio Y. de
Pio Highway VII 6.468 8 C 0.313 0.204 0.300 - - - 81.70 *81.70% V. Satisfactory
WTG Construction and Development Corporation 7494 Conc. of Toledo-Pinagmungajan-
Aloguinsan-Mantalongon Road VII 45.741 420 C 0.438 0.200 0.300 - - - 93.80 82.38% Satisfactory
WTG Construction and Development Corporation 7494 Concrerting of Road @ Brgy.
Dacudao, Brgy. Dacudao XI 1.880 120 C 0.280 0.300 0.300 - - - 88.00 74.40% Satisfactory
WTG Construction and Development Corporation 7494 Const. of Asturias Bridge VII 7.899 225 C 0.365 0.300 0.300 - - - 96.50 *96.50%
Outstanding
WTG Construction and Development Corporation 7494
Const. of Bango Bridge & Approaches, Compostela-Cateel
RoadXI 9.834 115 C 0.365 0.300 0.300 - - - 96.50 *96.50%
Outstanding
WTG Construction and Development Corporation 7494 Const. of DPWH Regional Office
No. VII Bldg. (Phase III) VII 9.384 191 C 0.373 0.200 0.300 - - - 87.30 84.40% V. Satisfactory
WTG Construction and Development Corporation 7494
Const. of Gov. Cuenco Flyover, Gov. Cuenco Ave. , Jct. A.S.
Fortuna St. VII 86.914 300 O 0.281 0.220 0.100 0.030 0.047 0.100 77.80 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page565
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
WTG Construction and Development Corporation 7494
Const. of Gov. Cuenco Flyover, Gov. Cuenco Ave. , Jct. A.S.
Fortuna St. VII 95.036 559 O 0.301 0.300 0.150 0.030 0.054 0.050 88.50 -
WTG Construction and Development Corporation 7494
Const. of Mambusao Bridge & Approaches, Compostela-Cateel
RoadXI 6.669 68 C 0.395 0.300 0.300 - - - 99.50 94.94%
Outstanding
WTG Construction and Development Corporation 7494 Impv't of Binawan-Cabantian Road XI 9.440 210 C 0.337 0.300 0.300 - - - 93.70 *93.70%
Outstanding
WTG Construction and Development Corporation 7494
Naga-Toledo Road Project, Jct. Proog to Jct. Sangi, Sta. 20+504-
Sta.32+000VII 91.674 390 C 0.285 0.261 0.300 - - - 84.60 88.80%
V. Satisfactory
WTG Construction and Development Corporation 7494 Widening of Velez Bridge VII 12.301 265 C 0.338 0.300 0.300 - - - 93.80 82.34%
V. Satisfactory
WYNN Construction 19358 Bien Unido Port Development Project DOTC 478.918 15 C 0.458 0.200 0.300 - - - 95.80 95.80%
Very Satisfactory
WYNN Construction 19358 Bien Unido Port Development Project DOTC 2.884 90 C 0.361 0.200 0.300 - - - 86.10 86.10%
Satisfactory
WYNN Construction 19358 Tagbilaran Airport Development Project DOTC 2.404 60 C 0.458 0.200 0.300 - - - 95.80 95.80%
Very Satisfactory
X.Y.Z. Construction & Supplies 31816 Conc. of Roads, Brgy. Bisaya IV-A 0.954 60 C 0.435 0.133 0.300 - - - 86.80 *86.80% Satisfactory
Y.S. Construction 11928 Const. of Sagbayan Multi-Purpose Building VII 0.891 180 C 0.367 0.300 0.300 - - - 96.70 92.36%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page566
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Yakal Construction 9685 Asphalt Overlay of Lapaz-Javier-Bito Road VIII 9.635 40 C 0.329 0.200 0.300 - - - 82.90 *82.90%
V. Satisfactory
Yakal Construction 9685Conc. of Toledo-Pinamungajan-Aloguinsan-Mantalongon Road
(Bojo Section)VII 9.470 90 C 0.273 0.300 0.300 - - - 87.30 83.76%
V. Satisfactory
Yakal Construction 9685 Conc. of Toledo-Tabuelan-San Remegio Road VII 9.469 100 C 0.354 0.200 0.300 - - - 85.40 84.08%
V. Satisfactory
Yakal Construction 9685 Const. of Anas Flood Control VIII 3.798 90 C 0.350 0.300 0.300 - - - 95.00 83.00% V. Satisfactory
Yakal Construction 9685 Const. of Balaquid Bridge VIII 3.649 120 C 0.360 0.300 0.300 - - - 96.00 80.76% V. Satisfactory
Yakal Construction 9685 Const. of Catbalogan Diversion Road (Phase VI) VIII 28.949 300 O 0.400 0.283 0.030 0.022 0.043 0.033 81.10 -
Yakal Construction 9685 Rehab. Along Tacloban-Baybay South Road, Maihi Section VIII 1.890 90 C 0.347 0.200 0.300 - - - 84.70 *84.70%
V. Satisfactory
Yakal Construction 9685 Rehab. of Dale River Control, Catarman-Rawis Road VIII 9.463 200 C 0.397 0.200 0.300 - - - 89.70 *89.70%
V. Satisfactory
Yakal Construction 9685Rehab. of Salog Bridge &
Approaches along Tac-Ormoc-Baybay-Maasin Rd.
VIII 6.085 150 C 0.343 0.200 0.300 - - - 84.30 84.60% V. Satisfactory
Yakal Construction 9685 Rehab./Impv't. of Tagnipa-Batwan-Tomoy Tomoy FMR VIII 14.467 320 C 0.383 0.300 0.300 - - - 98.30 87.80%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page567
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Yakal Construction 9685 Rehabilitation of Roxas City Roads VI 4.736 120 C 0.340 0.300 0.300 - - - 94.00 88.78% V. Satisfactory
Yakal Construction 9685
Rehabilitation of Tagbilaran North Road, Clarin-Talibon Section, Km.
58.000-112.500 (w/ exception)
VII 14.077 240 O 0.360 0.229 0.150 0.030 0.033 0.050 85.20 -
Yap Mabuhay Enterprises, Inc. 15540 Completion of Multi-Purpose Bldg., Brgy. Benitez XII 0.943 112 C 0.376 0.300 0.300 - - - 97.60 90.32%
Outstanding
Yap Mabuhay Enterprises, Inc. 15540 Const. of MPB @ Brgy. Lopez Jaena XII 0.758 98 O 0.312 0.240 0.100 0.020 0.027 0.100 79.90 -
Yap Mabuhay Enterprises, Inc. 15540 Const. of MPB @ Brgy. Lopez Jaena XII 0.711 98 C 0.270 0.300 0.300 - - - 87.00 82.03%
V. Satisfactory
Yap Mabuhay Enterprises, Inc. 15540Widening to 4 Lanes of Marbel-Tupi-Makar Road, Saravia Sect.,
Brgy. SaraviaXII 16.394 230 C 0.278 0.300 0.300 - - - 87.80 85.49%
V. Satisfactory
Yap Mabuhay Enterprises, Incorporated 15540 Completion of Multi-Purpose Bldg.
@ Zone II XII 0.865 112 C 0.236 0.267 0.300 - - - 80.30 82.47% V. Satisfactory
YCT Builders Center Co. 23830 Const. of 1 Cl Standard Sch. Bldg. at Jimalalud NHS VII 0.406 90 C 0.362 0.257 0.300 - - - 91.90 85.35%
V. Satisfactory
YCT Builders Center Co. 23830 Impvt. of Guihulngan-Isabela National Road VII 3.764 65 C 0.200 0.300 0.300 - - - 80.00 *80.00%
Satisfactory
YCT Builders Center Co. 23830 Impvt. of Guihulngan-Isabela National Road, Luz Section VII 5.710 262 C 0.350 0.300 0.300 - - - 95.00 *95.00%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page568
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
YCT Builders Center, Co. Inc. 23830 Const. of 2CL S/B @ Dungcan E/S VII 0.711 105 C 0.367 0.100 0.300 - - - 76.70 77.96% Satisfactory
YCT Builders Center, Co. Inc. 23830Impvt. of Nat'l Road (Missing Link) along Vallehermoso-La Castellana
RoadVII 2.454 107 C 0.330 0.149 0.300 - - - 77.90 *77.90%
Satisfactory
YCT Builders Center, Co. Inc. (Formerly YCT Builders Center
Co.)23830 Impv't./Repair of DNR Sta. Cruz,
Tayasan VII 0.886 70 C 0.321 0.290 0.300 - - - 91.10 57.08% Poor
YL Trading General Merchandising 22543 Conc. of Hamtic-Bia-an-Egana-
Sibalom Road, Catungan Section VI 19.259 300 O 0.280 0.294 0.150 0.024 0.050 0.033 83.10 -
YL Trading General Merchandising 22543 Conc. of Iloilo-Antique Rd. along
Pob. Culasi VI 9.622 300 C 0.353 0.300 0.300 - - - 95.30 93.29% Outstanding
YL Trading General Merchandising 22543
Conc. of Iloilo-Antique Rd. along Poblacion Culasi, Antique National
Road ( w/ exception)VI 9.622 300 O 0.340 0.261 0.100 0.030 0.047 0.100 87.80 -
YL Trading General Merchandising 22543 Conc. of the Gap Portion of Iloilo-
Antique Road, Culasi Section VI 4.814 270 O 0.365 0.225 0.100 0.023 0.037 0.100 85.00 -
YL Trading General Merchandising 22543
Conc. of the Gap Portion of Iloilo-Antique Road, Culasi, Tibiao &
Barbasa SectionVI 19.237 270 C 0.346 0.200 0.300 - - - 84.60 85.74%
V. Satisfactory
YL Trading General Merchandising 22543 Concreting of 247.50 L.M. National
Road VI 2.886 120 C 0.345 0.115 0.300 - - - 76.00 78.10% Satisfactory
Yoyen Enterprises 15541 Completion of Multi Purpose Hall @ Brgy. Jaena VIII 0.462 60 O 0.264 0.263 0.100 0.000 0.027 0.100 75.40 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page569
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Yoyen Enterprises 15541 Conc. of Culaba-Caibiran National Circ. Road, Culaba-Looc Section VIII 3.742 160 O 0.320 0.281 0.100 0.015 0.037 0.100 85.30 -
Yoyen Enterprises 15541 Conc. of Dayhagan-Salvacion-Coob-Libertad Road VIII 12.537 150 O 0.317 0.220 0.100 0.020 0.038 0.100 79.50 -
Yoyen Enterprises 15541 Conc. of Kananga-Tungonan Road (Hotspring ) VIII 14.461 200 C 0.325 0.200 0.300 - - - 82.50 *82.50%
V. Satisfactory
Yoyen Enterprises 15541
Conc. Paving of Critical Portion of National Circ. Road, Caibiran-
Cabucgayan Road (Rawid Road Section)
VIII 3.807 140 C 0.266 0.200 0.300 - - - 76.60 82.60% V. Satisfactory
Yoyen Enterprises 15541Const. of Divisoria-Libertad-
Antipolo-Mabini-Liong-Nabangig Road
V 3.673 150 O 0.272 0.225 0.100 0.015 0.014 0.100 72.60 -
Yoyen Enterprises 15541 Const. of Farm-to-Market Road VIII 1.840 80 C 0.261 0.300 0.300 - - - 86.10 76.44% Satisfactory
Yoyen Enterprises 15541 Const. of Multi-Purpose Pavement, INAVS VIII 0.465 60 C 0.353 0.200 0.300 - - - 85.30 *85.30%
V. Satisfactory
Yoyen Enterprises 15541Construction of 2-Classroom
School Building Liloan National High School
VIII 0.808 263 C 0.351 0.200 0.300 - - - 85.10 *85.10%Satisfactory
Yoyen Enterprises 15541 Rehab./Deepening of Can-Untog River Control VIII 9.461 180 C 0.381 0.275 0.300 - - - 95.60 *95.60%
Outstanding
Yoyen Enterprises 15541 Rehab./Deepening of Panilahan River Control VIII 9.567 180 C 0.320 0.200 0.300 - - - 82.00 *82.00%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page570
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Yoyen Enterprises 15541 Repair/Restoration of Buenavista Slope Protection VIII 0.248 20 C 0.331 0.300 0.300 - - - 93.10 *93.10%
Outstanding
YS Construction 11928 Conc. of Critical Sections along Danao-Sagbayan Road VII 4.690 120 C 0.328 0.300 0.300 - - - 92.80 92.14%
Outstanding
YS Construction 11928Conc. of Sta. Fe-Magtangtang
Road Leading to Francisco Dagohoy Cave
VII 0.947 90 C 0.307 0.300 0.300 - - - 90.70 75.64% Satisfactory
YS Construction 11928Const. of Drainage Project
(Outfall), Tagbilaran City-San Jose St.
VII 9.380 210 C 0.294 0.300 0.300 - - - 89.40 87.48% V. Satisfactory
YS Construction 11928 Const. of MPB VII 4.665 135 C 0.345 0.300 0.300 - - - 94.50 *94.50% Outstanding
YSL Builders 19516 Conc./Rehab. of Punta-Dansullan-Cogon-Sergio Osmena Road IX 2.706 150 C 0.251 0.193 0.300 - - - 74.40 83.70%
V. Satisfactory
YSL Builders 19516 Concreting of Liloy-Labason Road (Ganase-Patawag Sect.) IX 4.637 168 C 0.355 0.300 0.300 - - - 95.50 92.50%
Outstanding
YSL Builders 19516 Const. of MPB (Covered Court) @ Olingan E/S IX 2.367 180 C 0.336 0.300 0.300 - - - 93.60 *93.60%
Outstanding
YSL Builders 19516 Const. of MPB (Gymnasium Phase IV) IX 0.957 70 C 0.389 0.187 0.300 - - - 87.60 *87.60%
V. Satisfactory
YSL Builders 19516 Const. of MPB (Mini Gym) IX 1.079 80 C 0.383 0.000 0.300 - - - 68.30 *68.30% Fair
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page571
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
YSL Builders 19516 Proposed Concreting of Liloy-Labason Road (Patawag Section) IX 4.632 165 C 0.392 0.295 0.300 - - - 98.70 96.78%
Outstanding
Yu Construction 10470 Concreting of Corella-Sikatuna Road VII 9.187 145 O 0.342 0.247 0.100 0.030 0.037 0.100 85.60 -
Yu Construction 10470Concreting of Tagbilaran-Corella-Sikatuna-Loboc Road, Sta 17+670
to Sta 19+800VII 28.246 199 C 0.397 0.200 0.300 - - - 89.70 *89.70%
V. Satisfactory
Yu Construction 10470 Const. of 8 CL Bldg. for CVSCAFT VII 11.135 190 C 0.356 0.300 0.300 - - - 95.60 83.49% V. Satisfactory
Yu Construction 10470 Impvt. (Conc. Paving) of Jct. Ter, Trinidad-Bien Unido Rd. VII 18.950 380 C 0.349 0.300 0.300 - - - 94.90 89.80%
V. Satisfactory
Yu Construction 10470Rehab./Const. of Damaged Paved National Road along TER (Loay-
Jagna)VII 15.052 320 C 0.437 0.133 0.300 - - - 87.00 87.06%
Satisfactory
Yu Construction 10470 Talibon Small Reservoir Irrigation Project SRIP 14.630 373 O 0.322 0.177 0.100 0.030 0.047 0.200 87.60 -
YU Construction - ARN Builders joint venture JV-06-006
Const. of Dam Embankment - Phase III, Talibon Small Resrvior
Irrigation ProjectNIA 14.799 250 O 0.293 0.300 0.300 - - - *89.30 -
Z & L Construction & Supplies 25322 Const. of Multi-Purpose Bldg. X 0.681 90 C 0.396 0.259 0.300 - - - 95.50 90.53% Outstanding
Z & L Construction & Supplies 25322 Talakag IP NIA 4.748 240 O 0.323 0.251 0.150 0.023 0.063 0.050 85.93 -
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page572
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Z.A.S. Construction 8971Concreting of Critical Portion along Julita-Balaquid Road
SectionVIII 2.678 180 C 0.349 0.300 0.300 - - - 94.90 72.97%
Satisfactory
Z.A.S. Construction 8971 Const. of 1 CL Sch. Bldg. of Carigara Sch. of Fisheries VIII 0.499 60 C 0.327 0.200 0.300 - - - 82.70 *82.70%
V. Satisfactory
Z.A.S. Construction 8971 Const. of MPB Phase I, Brgy. San Pedro VIII 0.469 45 C 0.357 0.200 0.300 - - - 85.70 *85.70%
V. Satisfactory
Z.A.S. Construction 8971 Const. of Multi-Purpose Building (Health Center) VIII 0.189 90 C 0.365 0.300 0.300 - - - 96.50 93.42%
Outstanding
Z.A.S. Construction 8971 Const. of One (1) CL Elem. School Bldg. @ Mercyville E/S VIII 0.440 45 C 0.395 0.100 0.300 - - - 79.50 *79.50%
Satisfactory
Z.F. Construction 17676 Const. of 2-CL Building III 0.809 120 C 0.345 0.300 0.300 - - - 94.50 *94.50% Outstanding
Z.F. Construction 17676Impvt./Conc. of San Luis-Ma. Aurora Rd., So. Hilltop-So.
Gulugod Baboy, Brgy. DianawanIII 18.346 300 C 0.318 0.300 0.300 - - - 91.80 *91.80%
Outstanding
Zabu Engineering 31104 Completion of School Bldg., at SPED Center CAR 0.293 28 C 0.362 0.300 0.300 - - - 96.20 *96.20%
Outstanding
Zabu Engineering 31104 Const./ Rehab./Impv't. of Angngalipan FMR Road CAR 0.960 60 C 0.267 0.300 0.300 - - - 86.70 90.48%
Outstanding
Zabu Engineering 31104 Repair/Rehab. of Liwan West-Santor FMR CAR 1.910 90 C 0.236 0.300 0.300 - - - 83.60 *83.60%
V. Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page573
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Zacarias Enterprise 17446 Const. of MPB III 0.473 24 C 0.379 0.259 0.300 - - - 93.80 *93.80% Outstanding
Zamboanga Engineers & Contractors, Inc. 6239 Const. of MPB @ Mercedes Nat'l
High School IX 3.774 80 C 0.326 0.200 0.300 - - - 82.60 80.15% V. Satisfactory
Zillion Builders 15655Completion of Marouy Multi-
Purpose Building, DPWH Compound
IVA 4.810 180 O 0.369 0.240 0.100 0.030 0.055 0.100 89.40 -
Zillion Builders 15655 Const. of Waterworks at Brgy. San Pedro II IVA 1.579 120 C 0.354 0.200 0.300 - - - 85.40 *85.40%
V. Satisfactory
Zion Construction 14881 Const. of Bato II Bridge along Santander-Barili-Toledo Road VII 11.021 150 C 0.361 0.257 0.300 - - - 91.80 *91.80%
Outstanding
Zion Construction 14881 Const./Replacement of Giligaon Bridge VII 14.410 240 C 0.376 0.300 0.300 - - - 97.60 93.04%
Outstanding
Zion Construction (Formerly: Masterpiece Const. & Supply 14881 Const./Repair of Two (2) Storey
Industrial Building At Badian NHS VII 1.855 60 C 0.255 0.300 0.300 - - - 85.50 *85.50% V. Satisfactory
Zion Construction (Formerly: Masterpiece Const. & Supply) 14881
Asphalt Overlay of Natallio Bacalso Ave. (NBA), Bojoon-Oslob
SectionVII 14.998 45 C 0.308 0.300 0.300 - - - 90.80 *90.80%
Outstanding
Zion Construction (Formerly: Masterpiece Const. & Supply) 14881
Asphalt Overlay of Natallio Bacalso Ave. (NBA), Oslob
SectionVII 11.998 30 C 0.340 0.300 0.300 - - - 94.00 *94.00%
Outstanding
Zion Construction (Formerly: Masterpiece Const. & Supply) 14881 Const. of Retaining Wall (Riprap)
along Butuanon River, Tambis VII 1.394 75 C 0.244 0.200 0.300 - - - 74.40 *74.40% Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page574
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Zion Construction (Formerly: Masterpiece Const. & Supply) 14881 Widening of H. Abellena Road VII 4.656 261 O 0.343 0.300 0.150 0.030 0.027 0.050 90.00 -
ZM / DMJ Construction (JV) JV-07-084
Impvt./Widening/Conc. of McArthur Highway (MNR) Meycauayan, Bulacan to
Mabalacat, Pampanga, Phase IV Package V City of San Fernando, Pampanga & Mabalacat Section
III 93.521 270 C 0.452 0.200 0.300 - - - 95.20 *95.20%V. Satisfactory
ZM / DMJ Construction (JV) JV-08-056 Replacement of Bravo Bridge III 42.820 180 O 0.382 0.300 0.150 0.030 0.033 0.050 94.50 -
ZM / VRF Construction (JV) JV-08-014
Construction of Bridge and Approaches
(Contact Package II)III 38.937 210 O 0.357 0.244 0.150 0.020 0.028 0.050 84.90 -
ZM Construction 9052 Asphalt Overlay along Iba NationalRoad Candelaria Section III 4.850 30 C 0.373 0.207 0.300 - - - 88.00 *88.00%
V. Satisfactory
ZM Construction 9052 Concreting of Balacbac Brgy. Road III 0.933 90 C 0.479 - 0.500 - - - 97.90 81.90%
V. Satisfactory
ZM Construction 9052 Impvt./Rehab. of Bataan Expressway, Mabatang Section III 14.342 60 C 0.259 0.205 0.300 - - - 76.40 76.40%
Satisfactory
ZM Construction 9052 Rehab./Asphalting of Road, Slope Protection along Iba North Road III 7.165 32 C 0.358 0.300 0.300 - - - 95.80 *95.80%
Outstanding
ZM Construction 9052 Rehab./Widening of Consuelo Bridge along Iba South Road III 18.705 240 C 0.321 0.289 0.300 - - - 91.00 *91.00%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page575
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
ZMS Construction 10471 Conc. of Imelda-Alicia Road, Guintolan Section IX 4.810 144 C 0.238 0.208 0.300 - - - 74.60 74.30%
Satisfactory
ZMS Construction 10471Conc. of Tubod-Lakewood-
Pob.Lakewood Nat'l Secondary Road, Sibuwan-Tubod Section
IX 14.235 194 C 0.316 0.115 0.300 - - - 73.10 *73.10% Satisfactory
ZMS Construction 10471Conc. of Tubod-Lakewood-
Pob.Lakewood Nat'l Secondary Road, Tubod-Sibuwan Section
IX 14.248 216 C 0.348 0.112 0.300 - - - 76.00 *76.00% Satisfactory
ZMS Construction 10471Conc. Paving of Siquijor
Circumferential Road, Lazi-San Juan Section
VII 4.674 180 C 0.239 0.300 0.300 - - - 83.90 *83.90% V. Satisfactory
ZMS Construction 10471Const. of Demorok Bridge &
Approaches, Phase II, Josefina-Sergio Osmena Nat'l Road
IX 4.499 160 C 0.155 0.300 0.300 - - - 75.50 79.76% Satisfactory
ZMS Construction 10471Impvt./Conc. Paving of Pagadian-Buug Road Section (Segment VI)
along Pagadian-Ipil RoadIX 30.684 300 C 0.263 0.291 0.300 - - - 85.40 85.76%
V. Satisfactory
ZMS Construction 10471Impvt./Conc. Paving of Pagadian-Buug Road Section (Segment VIII)
along Pagadian-Ipil RoadIX 41.843 260 C 0.271 0.300 0.000 - - - 57.10 75.88%
Satisfactory
ZMS Construction 10471
Impv't./Concrete Paving of Road Pagadian-Buug Road Section,
Segment II, Phase I along Pagadian-Ipil Road
IX 23.264 235 C 0.367 0.225 0.300 - - - 89.20 89.98% V. Satisfactory
ZMS Construction 10471Rehab. & Conc. Paving of Jct.
Tubod-Lakewood Road ( Lukuan-Tubod Section)
IX 19.199 167 C 0.207 0.200 0.300 - - - 70.70 *70.70% Satisfactory
Zoe Builders an d Supplies Company 20991 Concreting of Road @ Gulod IV-B 1.443 50 C 0.395 0.133 0.300 - - - 82.80 *82.80%
Satisfactory
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page576
CIAP-PDCB CONSTRUCTORS PERFORMANCE SUMMARY REPORTCPES Reports-On-going and Completed Projects from July 1, 2007 to June 30, 2009
STATUS CPES VISIT RATINGWMS MTL TIME FAC
FINAL RATING/QUALIT
ATIVE DESCRIPTION
AMOUNT (Php, M) DUR (C.D.)
CONTRACT
ESH RDR*IMPL. AGENCYPROJECTNAME OF CONSTRUCTOR LICENSE
NO.
Zoniuq Enterprises 25223 Improvement of Roads, Salasad (Brgy. Lumot-Mahipon) IV-A 0.286 40 C 0.406 - 0.500 - - - 90.60 *90.60%
Outstanding
Zota Trading & Construction 32641 Concreting of Farm-to-Market Road at Various Barangay I 4.799 60 C 0.362 0.200 0.300 - - - 86.20 *86.20%
Satisfactory
Zota Trading and Construction 21424 Const. of Multi-Purpose Building @ Ceralde E/S I 0.479 45 C 0.366 0.206 0.300 - - - 87.20 *87.20%
V. Satisfactory
ZPM General Merchandise 28726 Completion of Camp Siongco High School Datu Odin Sinsuat XII 2.491 95 C 0.458 0.133 0.300 - - - 89.10 *89.10%
V. Satisfactory
ZPM General Merchandise 28726 Const. of MPB, Canizales High School XII 1.907 65 C 0.328 0.300 0.300 - - - 92.80 *92.80%
Outstanding
07 August 2009* 1st/Final* For DPWH, only the region and PMO office are listed 9th CPES Release Page577