+ All Categories
Home > Documents >  · COWIN.FA CP Power Tools-CUSTOMER CENTER-CHINA CREVIS CO., LTD Canon ANELVA Corporation Chang...

 · COWIN.FA CP Power Tools-CUSTOMER CENTER-CHINA CREVIS CO., LTD Canon ANELVA Corporation Chang...

Date post: 16-May-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
32
Transcript

� � � � �

� � � � �

� � � �

� � � � � �

� � � � � �

� � � �

� � � � �

� � � �

� � � � �

� � � � �

� � � � � �

� � � � � � � � � �

������ �� ������ ������ ����������� ����������� ���

Industry Standard family of industrial automation networksAs the world top runner, the CC-Link Partner Association (CLPA) takes lead to further open up industrial network.First from Asia, the field network CC-Link has been opening up ever further as CLPA takes the lead to develop and diffuse it globally. As a result of enthusiastic promotional activities ever since the establishment and the certification to the ISO and IEC, the CC-Link has grown into a global standard network.Now, as a solution to the needs for total system optimization that integrates various functions not only control but also device management (setting, monitoring), device maintenance (monitoring and failure detection) and data collection (operating condition), CLPA brings about an Ethernet-based industrial network vision and is making it come to being.It is the integrated network “CC-Link IE” that enables seamless data transfer from the information network layer to the field device layer. Backed up by the technology and proven services accumulated through the development of the CC-Link, CLPA is promoting to open it up further to meet your expectations.

In these globalized times, the manufacturing industry is facing harsh competition while at the same time welcoming opportunities for new development. Advances in information processing technology have given us a clearer image of the future manufacturing industry. In addition to flexibly restructuring the factory's manufacturing process or location according to the market situation and changes in technology, we are also able precisely manage the supplier chain in a broad sense from procurement of materials and parts, product sales and collection. It is said that promotion of this technology is a way to maintain and develop the manufacturing industry in technically advanced countries having a high infrastructure cost. On the other hand, this technology will be the foundation of industrial development especially in areas such as Asia. We expect major developments in the future.The industrial-use network plays a central role in this industrial development, functioning as a nervous system connecting nuclear functions that manage the system terminal actuators and sensors to the general system. This nervous system is not limited to business sites, but instead is incorporated into global activities and will continue to change as it transforms for major system optimization.We hope that the application range of CC-Link, originating in Japan, will continue to increase as an open network. We anticipate further development and diffusion so CC-Link may become backbone technology for future production system structuring.

Message

The Chairman of CLPAFumihiko KimuraFaculty of Science and Engineering, Department of Mechanical EngineeringProfessor emeritus of Tokyo University, Doctor of Engineering

CLPA, the organization promoting open network as well as your business partner.

Marketing Task Force

Technical Task Force

■Organization Chart for CC-Link Partner Association

Board of Directors

Chairman of the Association

Overseas Branches

Technical Task Force Marketing Task Force

Headquarters / Management Office

CC-Link Association partners (CLPA partners)

Distributing information

CC-Link IEspecification

Free distribution of CC-Link specifications

Conducting conformance tests

Technical support

Boardof

Directorfirms

Through global promotional activities for CC-Link and CC-Link IE, we increase the business opportunites for our partners and users.Under the motto “CC-Link, the open field network, will become world’s de facto stan-dard”, CLPA was established in November 2000. Ever since, the Board of Directors, Marketing Task Force and Technical Task Force have joined forces to help the ven-dors to develop compatible products and the users to build up open FA systems.

The Board of Directors consisting of nine firms operates CLPA and decides on major association issues.

Focuses on increasing the number of CLPA members & products, enhancing global adoption and expanding the use of CC-Link.

Oversees a wide variety of promotional activities world wide, including fairs, conferences, semi-nars, advertising programs, social media and other activities.

Oversees the future technical development of CC-Link IE and CC-Link. Also develops specifi-cations for conformance testing, network infra-structure and other vital technical guidance. These activities have been key to our networks becoming adopted globally.

Focuses on management of related technolo-gy and coordinates provision of information to members and outside standard-setting or-ganizations.

Get the membership to CLPA. The members can develop business opportunities and possibilities by receiving services such as support for developing compatible products.The member firms are entitled to obtain the most up-to-date technological information and CC-Link specifications for free. In addi-tion, support for conformance tests that are essential to establishing reliability is avail-able at various stages of developing compat-ible products.

■CLPA membership categories (price excluding tax)

Annual dues

Initiation fee

Acquisition of product specification Provided for free upon membership registration

Included in the annual membershipfee

Use of CC-Link logo

Technical support

Promotion at fairs

Information about eventsPosting of corporate name on CLPA web site

Including products in the on-line and paper product catalogues (no charge)

Master, local and intelligent device stations for CC-Link and normal station of CC-Link IE ControlMaster and local stations, intelligent device stations, remote device stations of CC-Link IE FieldCC-Link remote device and I/O stations, cables and miscellaneous productsCC-Link/LT master and slave stations, cables and miscellaneous products

Recommended network wiring parts for CC-Link IE Control and

CC-Link IE Field

*SLMP: Seamless Message Protocol

Approved software products

SLMP* connectable products

Registeredmember

Regularmember

JPY100,000

JPY300,000

Included

Included

Included

Included

Included

Included

Included

JPY200,000

JPY200,000

JPY100,000

JPY50,000

JPY20,000

CC-Link IE Field Basic JPY50,000

JPY20,000

JPY100,000

JPY50,000

JPY200,000

JPY1,000,000

JPY1,000,000

Executivemember

Boardmember

Conformance test fee (per device)

Recommended product test fees (per model)

License to useCC-Link technology

SLMP*

Other than SLMP*

Consolidating the forces of partner firms around the world, CC-Link will take another giant step forward.CC-Link···making the next leap foward with CLPA Partners!

Board ofdirectors

3M Company

3M Japan Limited

3M Korea Ltd.

A&D Co., Ltd.

ABB K.K.

ABB Oy

ABB Robotics

AC&T system CO.,LTD

ADVANCED SYSTEMS CO.,LTD.

AIOI•SYSTEMS CO.,LTD.

AITEC Corporation

ALPHA SYSTEMS CO.,LTD

ANRITSU INFIVIS CO., LTD.

ANYWIRE CORPORATION

ASAHI ENTERPRISE

ASAHI YUKIZAI CORPORATION

ASKA CORPORATION

Adullam Tech.

Advanet Inc.

Advantech Co., Ltd.

Advantech Japan Co., Ltd.

Ailes ELECTRONICS

Allied Telesis K.K.

Altima Corp.

Analog Devices

Asahi Glass Co., Ltd.

Atlas Copco Tools AB

Autonics Corporation

Azbil Corporation

B & PLUS K. K.

BEIJING ZLTC OPTICAL-ELECTRONICAL TECHNOLOGY, CO.,LTD.

BL AUTOTEC, LTD.

BROTHER INDUSTRIES LTD

Balluff GmbH

Beckhoff Industrie Elektronik

Beijing D&S FieldBus Technology Co., Ltd.

Beijing Durang Automatic System Technology Co.,Ltd

Belden Electronics Division

Bihl+Wiedemann GmbH

C&U CONTROL SYSTEM CO., LTD.

C.D.N CORPORATION

CALL ZEISS VISION(CHINA)

CCS Inc.

CHINO CORPORATION

CHUBU NIHON MARUKO CO., LTD.

CHUO SEISAKUSHO, LTD.

CITIZEN FINE DEVICE CO., LTD.

CKD Corporation

CKD NIKKI DENSO CO., LTD.

COGNEX K.K.

CONTEC CO.,LTD

CORRENS CORPORATION

COWIN.FA

CP Power Tools-CUSTOMER CENTER-CHINA

CREVIS CO., LTD

Canon ANELVA Corporation

Chang Zhou Qinh Automation Co., Ltd

Changsha Hanguang Electronics Tech Co., Ltd.

Changsha SUNYE Electric Co., Ltd

Changzhou MVision IT Co.,Ltd.

China Electronics Technology Group Corporation No.23 Research Institute

Chiyoda Electronics Co.,Ltd.

Cisco Systems

Cognex K.K.

Conductix Wampfler

DAI-ICHI DENTSU, LTD.

DAIDEN CO., LTD.

DAIHEN Corporation

DAINCUBE Corp.

DE YANG JIE TONG TECHNOLOGY CO., LTD

DE-STA-CO Industries

DEGSON Electrical Co.,Ltd.

DENSO WAVE INCORPORATED

Daiichi Electronics Co., Ltd.

Dalian Konform Technical Ltd.

Danaher Setra - ICG (Tianjin) Co., Ltd.

Daqing Normal University

Datalogic s.r.l

Diatrend Corporation

Dyadic Systems Co.,Ltd.

EAST WEST ELECTRIC WIRE CO.,LTD.

EIKO SOKKI Co.,Ltd.

ELCO(TIANJIN) ELECTRONICS CO., LTD.

ENDO KOGYO CO.,LTD.

ESPEC TECHNO CORP.

ESTIC CORPORATION

EUMAX (SHANGHAI) CORP.

Eaton Cutler-Hammer

Electronic and Information Institute, Tongji University

FAG Industrial Services GmbH

FANUC LTD.

FAS Technology Co., Ltd.

FINECABLES ENTERPRISE COMPANY

FLAME

FOSHAN GUANGSHUN ELECTRICAL EQUIPMENT CO.,LTD

FUJI CONTROLS COMPANY LIMITED

FUJI ELECTRIC CABLE CO.,LTD.

FUJI ELECTRIC INDUSTRY CO., LTD.

FUJI Machine Mfg. Co., Ltd.

Far East Cable Co., Ltd

Festo AG & Co. KG

Fluidyne Control Systems (P) Ltd.

Fortinet Japan K.K.

Fortive ICG Japan Co., Ltd.

Foshan Herong CNC Software CO., LTD.

Fuji Electric Co., Ltd.

Fuji Electric Co., Ltd.

Fujikin Incorporated

Fukushima SiC Applied Engineering Inc.

fuji electric f-tech

GIKEN INDUSTRIAL CO., LTD.

GTS GENEL TEKNIK SISTEMLER LTD.STI.

Guangzhou Engineering Contractor GROUP CO.,Ltd

HAKARU PLUS CORPORATION

HANOVIC (Dong Guan) Limited

HANS GRONHI Grahic Technology Company Limited

HARBIN LONG-HIT ROBOT TECHNOLOGY CO.,LTD.

HARTING K.K

HEILONGJIANG INSTITUTE OF TECHNOLOGY

HELUKABEL GmbH

HERUTU ELECTRONICS CO., LTD.

HIGEN MOTOR CO., LTD.

HIROCON CORPORATION

HMS INDUSTRIAL NETWORKS

HMS INDUSTRIAL NETWORKS

HOKUYO AUTOMATIC CO., LTD.

HORIBA STEC Co., Ltd.

HUNAN SUPER INFORMATION CO., LTD

HYUNDAI HEAVY INDUSTRIES CO., LTD

Hakko Electronics Co., Ltd.

Hang Zhou Hang Ling Industrial Control Engineering Co., Ltd

HangZhou HeHua Electric Engineering CO., Ltd

Hangzhou Chaoxin Automation Engineering Co.,Ltd.

Hangzhou Yeegao Mech-tronics CO., Ltd.

Harbin Tianbo Hitech Co., Ltd

Harmonic Drive Systems.Inc

Hefei Sineva Intelligent Machine Co.,Ltd.

Hilscher GmbH

Hilscher GmbH

Hirata Corporation

Hirschmann Automation and Control KK.

Hitachi Industrial Equipment Systems Co.,Ltd.

Hitachi Metals, Ltd.

Hottinger Baldwin Messtechnik GmbH

Huabo CNC Equipment Co., Ltd.

IAI Corporation

IAR Systems K.K.

IDEC CORPORATION (Formerly Izumi Denki Co., Ltd.)

IHI Corporation

INFOHOBBY.LTD

ISOWA Corporation

ITOH DENKI CO., LTD

Industrial Control Communications, Inc

Industrial Software Co.

Industrial Technology Research Institute

Institute of Radioelectronics, Warsaw University of Technology

International Laboratory Corporation

igus GmbH / igus k.k.

JAPAN CONTROL ENGINEERING CO., LTD.

JCC Co., Ltd.

JEL SYSTEM CO.,LTD.

JINOID Co., Ltd.

JISANG ELECTRIC CO., LTD.

JMACS Japan Co., Ltd.

JTEKT CORPORATION

JVCKENWOOD Public & Industrial Systems Corporation

Japan Quality Assurance Organization (JQA)

Japan Telegartner Ltd.

JiangSu Saiyang Mechanical & Electrical Technology Co., Ltd.

Jiangsu libra Ltd., CO.

Jinan Credit Technologies Co.,Ltd.

K.MECS Co., Ltd.

KANEKIYO DENSHI Co. LTD

KEYENCE CORPORATION

KITAZAWA ELECTRIC WORKS Co., LTD.

KK TFF Fluke Networks

KOGANEI CORPORATION

KOYO ELECTRONICS INDUSTRIES CO., LTD.

KUNBUS GmbH

KURAMO ELECTRIC CO., LTD.

KURODA Pneumatics Ltd.

KWANG-IL ELECTRIC WIRE CO., LTD.

KYOEI ELECTRIC CO., LTD

KYOWA ELECTRONIC INSTRUMENTS CO., LTD.

Kawasaki Heavy Industries, LTD.

Kistler Lorch GmbH

Korea Electronics Technology Institute

Kubota Corporation

Kyorin-systemac Co., Ltd.

L Light

LEONI Cable (China) Co., Ltd.

LEONI Special Cables GmbH

LS Cable&system Ltd.

LSIS Co.,Ltd.

Lasertec Corporation

Lutze Inc.

M-System Co., Ltd.

MEIRYO TECHNICA CORPORATION

MELEC Inc.

METIS CO., LTD.

METTLER TOLEDO

METTLER TOLEDO AG

MINORI DESIGN OFFICE Co.Ltd

MISUMI Corporation

MITSUBISHI ELECTRIC CORPORATION

MITSUBISHI ELECTRIC ENGINEERING CO.,LTD.

MITSUBISHI ELECTRIC ENGINEERING COMPANY LIMITED

MITSUBISHI ELECTRIC FA INDUSTRIAL PRODUCTS CORPORATION

MITSUBISHI ELECTRIC MECHATRONICS SOFTWARE CORPORATION

MITSUBISHI ELECTRIC MICRO-COMPUTER APPLICATION SOFTWARE COMPANY LIMITED

MITSUBISHI HEAVY INDUSTRIES MECHATRONICS SYSTEMS,LTD.

MITSUBISHI HEAVY INDUSTRIES PRINTING & PACKING MACHINERY, LTD.

MOXA Inc.

MTS Sensors Technology Corp.

MTT Corporation

MU INSTRUMENTS TRADING CORP.

MYUNGBO CABLE CO.,LTD.

Magnescale Co., Ltd.

Mason Electronics Limited Company

Matsusada Precision Inc.

Meidensha Corporation

Minebea Mitsumi Inc.

Mitsubishi Electric Europe B.V. UK Branch

Mitsubishi Electric Europe BV

Mitsubishi Electric India, PVT LTD

Mitsubishi Electric Information Network Corporation

Mitsubishi Electric System & Service Co., Ltd.

Mitutoyo Corporation

Molex

Murrelektronik GmbH

NACHI-FUJIKOSHI CORP.

NADA Electoronics ,LTD.

NADEX CO., LTD.

NANJING HUATAI AUTOMATION TECHNOLOGY CO.,LTD.

NEC Corporation

NICHIDEN SHOKO CO.,LTD.

NIDEC SANKYO CORORATION

NINGBO ROGHE WIRE CO.,LTD.

NIPPON DENKI KENKYUSHO CO., LTD.

NISSIN ELECTRIC CO., LTD.

NITTA CORPORATION

NKE CORPORATION

NSD Corporation

NSK Ltd.

NTT Communications Corporation

Nanjing Jingda Communication Technology Research Institute

Nanjing Tie Hai Mechanical & Electrical Equipment Co., Ltd

Net One Systems Co., Ltd.

Nichigoh communication electric wire Co., Ltd.

Ningbo Deetrue wire harness technology co., LTD

Nippon Seisen Cable, Ltd.

Northern Design (Electronics) Ltd.

Northwire, Inc.

O-DEAR INTERNATIONAL CORP.

OFS Fitel LLC

OKAMOTO MACHINE TOOL WORKS, LTD.

OKANO CABLE CO. LTD.

OMRON Corporation

ONTEC CO., LTD.

OPTEX FA CO.,LTD.

ORIENTAL MOTOR CO., LTD

ORION ELECTRONICS

ORing Industrial Networking Corp.

OSAKI ELECTRIC CLUTCH AND BREAKE Co.,Ltd.

Octopod Technology Limited

Ohkura Electric Co., LTD

Otari, Inc

PROFICIENT(SHANGHAI)INTERNATIONAL CO.,LTD

Panasonic Electric Works, Co.,Ltd.

Panasonic Industrial Devices SUNX Co., Ltd.

Panduit Corp.

Pepperl + Fuchs GmbH

Pepperl + Fuchs K.K.

Perle Systems K.K.

Pfeiffer Vaccum GmbH

Phoenix Contact GmbH & Co. KG.

Phoenix Contact K.K.

Pilz GmbH &Co

ProSoft Technology, Inc

Qingdao Gold will Co., Ltd.

Qingdao Seoho Electric Co.,Ltd.

Quan Zhou Hengjing Cobo Control Technologies, Inc

RKC INSTRUMENT INC.

ROBOTEC Inc.

Ransburg Industrial Finishing K.K.

Red Lion Controls

Reliance Electric Limited

Renesas Electronics Corporation

Robostar Co., Ltd

Rockford Contract Mfg. & Design

SAMWON ACT CO.,LTD.

SANSHA ELECTRIC MFG. CO.,LTD.

SANTEST CO., LTD.

Schneider Electric Japan Holdings Ltd.

SEIKO EPSON CORPORATION

SHANGHAI COHERE ELECTRONICS TECHNOLOGY CO.,LTD.

SHEN ZHEN ALEX CONNECTOR CO., LTD.

SHENZHEN ALEX ELECTRICIAN MATERIAL CO., LTD

SHENZHEN COMARK TECHNOLOGY CO.,LTD.

SHENZHEN CONNECTOR TECHNOLOGY CO.,LTD.

SHENZHEN HAILAN MACHINE&ELECTRONIC AUTOMATION EQUIPMENT LTD

SHENZHEN HEYI TECHNOLOGY CO., LTD.

SHENZHEN LAYSRV CONTROL TECHNOLOGY CO.,LTD

SHIMADEN CO., LTD.

SHINKO TECHNOS CO., LTD

SHIZUKI ELECTRIC CO., INC

SHOEI Electric CO., LTD.

SHOSHIN CORPORATION

SICHUAN ODOT AUTOMATION SYSTEM CO.,LTD.

SICK AG

SINFONIA TECHNOLOGY CO.,LTD.

SINKA JAPAN CO.,LTD.

SINSEONG IDOL

SINTOKOGIO, LTD.

SMC CORPORATION

SPG Co.,Ltd.

SR Technology Co., Ltd.

STRONGING TECHNOLOGY GROUT CHINA H.O.

SUNHO AUTOMATION

SUNKE(TIANJIN)MIC-CONTROLLED EQUIPMENT CO., LTD.

SUS Corporation

SWCC SHOWA CABLE SYSTEMS CO., LTD.

Sanyo Machine Works, Ltd.

Sasaki Sekkei Co., Ltd.

Schneider Electric SA

Seidensha Electronics co., ltd

Sekisui Jushi Cap-Ai System Co.,Ltd.

Servoland Corporation

Shandong Vanform High-energy Physics Technology Co., Ltd

ShangHai KongLing Automation Technology Co. Ltd.

Shanghai Guang Te Communication Co., Ltd.

Shanghai Handcom Automation Technology Co., Ltd

Shanghai Hirocon Corporation

Shanghai Hua Tai Digital-control CO., LTD

Shanghai Institute of Process Automation Instrumentation

Shanghai L&Y Hi-Tech Ltd. Company

Shanghai O-Solution Electronics & Technology Co., Ltd.

Shanghai Powerful Automation Technology Development Co., Ltd

Shanghai R&R Technologies Development Co.,Ltd.

Shanghai Ronyea Electronic Science and Technology Co.,Ltd.

Shanghai SUNCHU Electromechanical Device Co., Ltd.

Shanghai Sanyu Industry Co.,Ltd.

Shanghai Tengshi Computer Science Technology Co., Ltd.

Shanghai Wenjiang Electric Co., Ltd.

Shanghai YanHeng Science Technology

Shanghai Yaohua Weighing System Co., Ltd.

Shanghai Yuanben Magnetoelectric Tech. Co., Ltd.

Shanghai Yunchuang Science Technology Co., Ltd

Shanghai runfan automnational Co.,LTD

Shanxi Yingjun Industry Co., Ltd.

Sharp Corporation

Shenyang Institute of Automation Chinese Academy of Sciences

Shenyang REDTECH Electric CO., Ltd.

Shenzhen Best Motion Technology Company Limited

Shenzhen General Measure Technology Stock Co., Ltd

Shenzhen Hitech Reahch Optic cable Co.,Ltd.

Shenzhen UniMAT Automation Technology Co.,Ltd.

Soft Servo Systems, Inc.

Softlink Automation system Co.,Ltd.

Sojet Electronics(Xiamen) Co.,Ltd.

Sony DADC Corporation

Southwest China Normal University

Spectris Instrumentation and System Shanghai Ltd.

SuZhon Splendid Sucess Industry Lontrol Technology Co., SuZhou

Sumitomo Heavy Industries,Ltd.

Sungrim Measuring & Control Co., LTD

Surpass Industry Co., Ltd.

Suzhou HYC. Electronic Technology Co.,Ltd.

sankoudengyo

TACHIBANA ELETECH CO., LTD.

TAIHAN ELECTRIC WIRE CO., LTD.

TAIYO CABLE (DONGGUAN) CO., LTD.

TAIYO ELECTRIC CO.,LTD.

TAIYO,LTd

TAIZHOU LUOKE Electronics Co.,Ltd.

TAKAOKA TOKO CO., LTD.

TAKEBISHI CORPORATION

TAMADIC Co., Ltd.

TAMAGAWA SEIKI CO., LTD.

TATSUNO CORPORATION

TEAC Corporation

TERAOKA SEIKO CO., LTD.

TESSERA TECHNOLOGY INC.

THK CO.,LTD.

TOGAMI ELECTRIC MFG. CO., LTD

TOKYO KEISO CO.,LTD

TOSHIBA CORPORATION FUCHU COMPLEX

TOSHIBA INDUSTRIAL PRODUCTS MANUFACTURING CORPORATION

TOSHIBA MACHINE CO., LTD.

TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION

TOYO ELECTRIC CORPORATION

TOYO GIKEN CO., LTD.

TOYODENKI SEIZO K.K

TPC Mechatronics Co., Ltd.

TSUBAKIMOTO CHAIN CO.

TUV Rheinland Beijing Office

TaiYin Industrial Technology(shanghai)Co.,Ltd

Taiyo Cabletec Corporation

Takikawa Engineering Co.,Ltd.

TangShan Kaicheng Electrical Equipment Co., Ltd

Tatsuta Electric Wire & Cable Co., Ltd.

Technical & Try Co., Ltd.

Teledyne LeCroy

Terada Seisakusho Co., Ltd.

Texas Instruments, Inc.

Thomas Cable Co., Ltd.

TianJin SIKelec co.,Ltd.

Tianjin Angel Group Co., Ltd

Tianjin Discovery Co., Ltd

Tianjin Huigao Magnetics Co.,LTD.

Tianjin Sentinel Electronics Co., Ltd.

Tianjin University of Technology, School of Electrical Engineering

Toho Technology Corporation

Tosei Engineering Corp.

Toshiba Schneider Inverter Corporation

Toyo Kohan Co., Ltd.

Transcell Electronic Scale (Nanjing) Co., Ltd.

Tsuchiya Electric Co.,LTD

Tyco Electronics AMP GmbH

Tyco Electronics Japan G.K.

takane electronics

U.I.Lapp GmbH

UNION DENSHI WORKS CO., LTD.

UNIPULSE Corporation

UNITEC Corp.

Unirise Electric Wire & Cable Co., Ltd

Uticor, a Division of AVG Automation

VAT Vakuumventile AG

Valcom Co.,LTD.

WECON Technology Co.Ltd

WITTENSTEIN ternary Co., Ltd.

WUXI PNEUMATIC TECHNICAL RESEARCH INSTITUTE CO.,LTD

Wago Company of Japan

Weidmueller Interface GmbH & Co. KG

WuXi Yun Chuan Electro-Mechanical Technology Co., LTD.

Wuhan Anli System Engineering Lo., Ltd

Wuxi Autowell Technology Co., Ltd.

Wuxi Hexun Automation Co., Ltd

Wuxi Institute of Commerce IOT Technology College

Wuxi Lingke Automation Technology CO.,LTD

Wuxi Tianchi Jingxi Fine Machinery Co., Ltd.

Xian Okay Electric Technology CO., Ltd.

Xianyang Huaqing Equipment Technology Co.,Ltd

Xifei Asia-pacific Aviation Simulation Co., Ltd.

YAMAHA MOTOR CO.,LTD IM Operations

YAMATO SCALE CO., LTD.

YASKAWA CONTROLS CO.,LTD

YASKAWA ELECTRIC CORPORATION

YOSHINOGAWA ELECTRIC WIRE&CABLE

YOSIO ELECTRONIC COMPANY

Yangtze Optical Fiber and Cable Company Ltd

Yinchuan BRL Technology Co., LTD.

Yokogawa Electric Corporation

ZDAUTO AUTOMATION TECHNOLOGY CO., LTD.

ZHUHAI LONGTEC CO.,LTD.

ZUKEN ELMIC,INC.

Zhejiang Zhaolong Cable Co.,Ltd

Zhengzhou Space Successor Electronics Co., LTD

Zhong Hang Automation Equipment Distribution Department

CC-Link goes further for the better to the manufacturing sites

in the world. CLPA keeps it advancing.These figures are self-explanatory about the development and growth on the global level.Many member firms come crossing the boarders to join CLPA.

A line of diversified CC-Link compatible products, as many as the number of user voices.

As a sign of our global acceptance, the total number of shipped devices is around 19 million.

Though starting with only 134 member firms when CLPA was established, it is expected to reach more than 2971 member firms in financial year 2016 (as of the end of March 2017). The overseas firms account for as much as 70 % of the memberships, providing a solid evidence that the world has recognized that CC-Link IE and CC-Link have become true global standards.

With the increasing number of vendor firms joining CLPA, the accumulated number of CC-Link IE and CC-Link compatible products is now over 1,600 models. Partner compa-nies also receive the benefit of their products being promoted in various CLPA activities free of charge, including the CC-Link Product Catalog.

The growth of the installed base is being driven by the automotive, sem-iconductor and LCD panel indus-tries. We expect that this growth will continue to accelerate as industries such as food and beverage, con-sumer packaged goods and others adopt our technology.

CC-Link, CC-Link Safety and CC-Link IE, ... The world keeps an eye with surprise on the industrial net work first from Japan.As a key measure of our promotion and the best opportunities to exchange more information with more vendors and users, CLPA has participated in trade shows and exhibitions in Japan and overseas. We are going to actively participate in more trade shows and exhibitions of diversified industries to promote the technological understand-ing and propose our future concept that is well-represented by the CC-Link IE.

In Japan

System Control Fair

In Europe and North America

SPS/IPC/DRIVES Show

In Korea

Automation World

In China

Roadshow

201620142003 2004 2005 2006 2007 2008 2009 2010 2012 20132011 2015 201620142003 2004 2005 2006 2007 2008 2009 2010 2012 20132011 2015 201620142003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2015

22002100200019001800170016001500 1450 1400 1350 1300 1250 12001150110010501000950900850800 750 700 650 600 550 500 450 400 350 300 250 200 150 100 50 0

1475

705

850

615

528

420

337274

216

950

1100

1260

3000

2900

2800

2700

2600

2500

2400

2300

2200

2100

2000

1900

1800

1700

1600

1500

1400

1300

1200

1100

1000

900

800

700

600

500

400

300

200

100

0

2328

1667

661

551

283

649

345

853

470

745

391

1016

580

810

1331

1182

699

1481

935

546

1632

1062

570

1875

1271

604

2097

1465

632

1441

961905

838

740

653

569

1047

1139

12191290

1356

2595

1905

690

2971

2239

732

1529

1666

1692

1919

1800

1700

1600

1500

1400

1300

1200

1100

1000

900

800

700

600

500

400

300

200

100

0

Overseas members

Members in Japan

Accum

ulated number of C

LPA m

embers

Accumulated number of CC-Link compatible products

Accumulated num

ber of CC

-Link compatible products

Accumulated number of nodes

Accum

ulated number of shipped nodes

◎Growing CLPA members ◎Increase of number of shipped nodes◎Increase of number of CC-Link compatible products

CLPA is a global operation with local offices in 11 regions worldwide. Each office works to increase the adoption of CLPA networks by device makers, machine builders and end-users operating in these regions.

6th ,FL.,No.105,WU KUNG 3rd.Rd.WU-KU HSIANG,Taipei,Taiwan,TEL.+886-2-89901573 FAX.+886-2-89901572 E-mail:[email protected]

RM. 711, 7F GANGSEO HANGANG XI-TOWER A, 401 Yangcheon-ro, Gangseo-gu, Seoul 07528 KoreaTEL.+82-2-3663-6178 FAX.+82-2-6224-0158E-mail:[email protected]

500Corporate Woods Parkway,Vernon Hills,IL,60061,USATEL.+1-847-478-2647 FAX.+1-847-876-6611 E-mail:[email protected]

Postfach 10 12 17, 40832 Ratingen, GermanyTEL.+49-2102-486-7988 FAX.+49-2102-532-9740E-mail:[email protected]

307Alexandra Road#05-01/02 Mitsubishi Electric Building Singapore159943TEL.+656-470-2480 FAX.+656-476-7439 E-mail:[email protected]

CC-Link has been certified to conform to international standards, IEC Standards and SEMI Standards for the semiconductor and FPD industries, in addition to Japa-nese Industrial Standards, Chinese National Standards, ISO Standards, Korean National Standards and Taiwa-nese Standards. An established de facto standard in Ja-pan, now it is now also recognized as a global standard. It meets the conventional requirements for open net-works, communication compatibility and a diverse lineup of compatible products. In addition, it can drastically im-prove the production efficiency of manufacturing systems and applications. Its high technological level and ease of use are internationally appreciated.

Headquarters (Tongji University): School of Electronics and Information Engineering, Jiading Campus, Tongji University, Shanghai, P.R.China Head Office: 19F No.1386 Hong Qiao Road, Shanghai, P.R.ChinaTEL.+86-21-64940523 FAX.+86-21-64940525E-mail:[email protected]

2nd Floor, Tower A & B, Cyber Greens, DLF Cyber City,DLF Phase-III, Gurgaon-122002 Haryana, IndiaTEL.+91-124-4630300 FAX.+91-124-4630399E-mail:[email protected]

From a Japanese defacto standard to a Global Standard!!

CLPA's 11 global offices are located in Japan, Korea, Taiwan, North America, Europe, China, ASEAN, India, Turkey, Mexico and Thailand. These offices promote CC-Link/CC-Link IE technology and provide a wide range of services for CLPA members.

8 CLPA-Turkey(Turkey)

Serifali Mahallesi Nutuk Sokak.No:5 34775 Umraniye-istanbul /TurkeyTEL.+90-216-526-39-90 FAX.+90-216-526-39-95E-mail:[email protected]

Mariano Escobedo 69, Zona Industrial - Tlalnepantla, 54030, Estado de Mexico, MexicoTEL.+52-55-3067-7517E-mail:[email protected]

9 CLPA-Mexico

7

8

109

9th Floor, SV City Building, Office Tower1, 896/19 and 20, Rama3 Rd., Bangpongpang, Yanawa, Bangkok 10120 ThailandTEL.+66-2-682-6522 FAX.+66-2-682-9750 E-mail:[email protected]

●CC-Link Promotion Center Thailand10

The High-level Technology and Ease-of-UseISO15745-5: CC-Link approved in January 2007.IEC61158: CC-Link approved in December 2007.IEC61784: CC-Link approved in December 2007.IEC61158: CC-Link IE Field approved in August 2014.IEC61784: CC-Link IE Field approved in August 2014.IEC61784-3-8: CC-Link IE Safety approved in August 2016.SEMI E54.12: CC-Link approved in 2001.SEMI E54.23-0513: CC-Link IE Field approved in May 2013.GB/Z 19760-2005: CC-Link approved in December 2005.GB/T 20229.4-6 Chinese BA (Building Automation) standard: CC-Link appeared in December 2006.GB/T 19760-2008 Chinese highest standard for industrial networks: CC-Link approved in June 2009.GB/Z 29496.1.2.3-2013: CC-Link Safety approved in June 2013.GB/T 33537.1~.3-2017: CC-Link IE approved in April 2017.JIS TR B0031: CC-Link approved in May 2013.KSB ISO 15745-5: CC-Link approved in March 2008.KSC IEC 61158/61784: [CC-Link] Certified in December 2011.KSC IEC 61784-5-8: [CC-Link/CC-Link IE] Certified in December 2014.KS: CC-Link IE Safety to be approved in 2017.CNS 15252X6068: CC-Link approved in May 2009.

International Standard: ISO

International Standard: IEC

SEMI Standard

Chinese National Standard: GB

Japan Industrial Standard: JIS

Korean National Standard: KS

Taiwan Standard: CNS

For developing compatible products that attract world’s attention, come to CLPA. We will back you up in various scenes and stages.

To facilitate the quick development of CC-Link Family-compatible products that match market needs, the

CC-Link Partner Association provides a variety of support that includes everything from planning to

design, evaluation, production, and conformance testing, as well as product sales promotion for certified

products.

Design hardware and

software in detail based

on the products and

network configurations.

Produce a prototype

product to the design

drawings and eval-

uate it from various

aspects.

For developing and marketing

CC-Link compatible products,

you are requested to hold a

CLPA membership either as a

Regular member, Executive mem-

ber or Board member. To apply

for membership, please visit the

CC-Link Partner Association web-

site.

The CLPA provides CC-Link protocol spec sheets free of charge. Development metho-dologies (dedicated communication LSI or built-in modules) prepared for different kinds of products may be used when developing products. OEMs are also avail-able.

Provision of Technical Specs

CLPA offers the mem-ber firms the “CC-Link Conformance Test” specifications for free applicable to the de-veloped compatible products.

As part of the development sup-port, the members can take part in various CLPA-coordinated sem-inars and those promoted by a Development Methodology Part-ner. From members dealing with the CC-Link for the first time to those actually building up CC-Link, you have opportunities to gain technical knowledge that suits your purposes.

Development support

Development designand evaluation

Production of prototypeand its evaluationMembership registration

Developmentplanning

Providing the“CC-Link Conformance Test”

specifications

Mem

ber m

anu

facturers

C

L

P

A

Developing

products

compatible with

the following

specifications:

●CC-Link IE

●CC-Link

●CC-Link/LT

●CC-Link Safety CC-Link Partner Associationhttps://www.cc-link.org/

The member firm implements the conformance test according to the

“CC-Link Conformance Test” specifications for each product model.

To facilitate the conformance testing, CLPA has test centers in Ja-

pan and overseas.

CLPA promotes and expand marketing of compatible

products with materials highlighting their innovative, ex-

cellent features.

A catalog in a printed and an electronic form (CD-ROM) is available, fully covering all the CC-Link compatible products that the member manufactur-ers have developed and put on market. CLPA provides users with diversified solutions.

Product promotion

CLPA web site pro-vides information on the CC-Link compat-ible products devel-oped and marketed by the member manu-facturers.

Information registered anddisclosed on web site

Implementing conformance tests Marketing

* The conformance test is to ensure that the product meets the common specification

of CC-Link. The conformance test is not intended to ensure the performance and

quality of the product itself.

What is Conformance Test?

· ensure the communication reliability of your product in CC-Link, andBy conducting the

conformance test, you can … · easily design system configuration where products of different manufacturers and models are connected.

Power supply noise test (AC/DC) Fully loaded network test - 64 stations

Communication line noise test Interoperability test

Test Cases

Tested station Master station

Master station

Powercable

Communication line (CC-Link)

Tested station

(64 stations)Master station

Master stationTested station

Tested station

●Conformance test is to be conducted on each model to ensure high-ly reliable communication between CC-Link compatible products.

●Your products need to be tested in CC-Link communication to be certified if your products meet CC-Link communication specifications and can be connected to CC-Link networks.

●Automatic test tools are available for CC-Link IE Field Network Basic and SLMP.

The member firms use the conformance test facilities to test CC-Link compatible products from various aspects. The noise test, hard-ware test, software test and combined test among others enable to appropriately check whether for instance, CC-Link compatible products can communicate normally.

Laboratory testing

Laboratory

Mitsubishi Electric Engineering Co., Ltd.Nagoya Office CC-Link Test Center139, Aza-Shimoyashiki, Shimoyashiki-cho, Kasugai-shi, Aichi 486-0906Phone: 0568-36-3863 (Direct line) Fax: 0568-36-2045E-mail: [email protected]

Kanagawa Institute of Industrial Science and Technology705-1, Shimoimaizumi, Ebina-shi, Kanagawa 243-0435, JapanPhone: +81-46-236-1500 (Main switchboard) Fax: +81-46-236-1525http://www.kanagawa-iri.jp/

The Industrial Ethernet network that realizes high reliability by duplexing the transmission path. The core network that bundles each field or motion network and provides controller-level distributed control with Gigabit speed large data capacity. With the newly added safe communication function, safety data can be shared between controllers.

CC-Link is the existing fieldbus network for typical field control applications. CC-Link/LT is a cost saving network for small I/O applications. CC-Link Safety is specialized for use to meet demanding safety network requirements.

The new Industrial Ethernet field network for intelligent manufacturing systems. Provides real-time integrated distributed control of I/O while also linking numerous networks at Gigabit speed. The safe communication function and motion communication function have been newly added allowing systems to be configured simply.

F e a t u r e s

Continuously evolvingThe evolution will not stop!CC-Link IE concept of CLPA, raising to the higher state covering information system to production fields.Each new day brings greater expectation in regard to CC-Link IE and its potential as the next-generation, Ethernet-based in-tegrated network. CLPA’s CC-Link IE enables seamless data transmission from information systems to production fields, and greatly changes the concept of industrial networks.

Optimal network choice for complete manufaturing control up to the business information system level.

CC-Link IE is a vertically integrated and Ethernet-based network from IT layer to field layer.

Ultra high speed & ultra large capacity network with real-time performance

The SLMP (Seamless Message Protocol) is a common protocol for realizing system management and operation regardless of the differences between networks. The SLMP ensures direct transmission of information between production site and IT system and facilitates extensive information sharing.

3G networks cloud

Internet

SeamlessMessageProtocol

SLMP

Equipmentmaintenance

Productionorder terminal

LAN (Ethernet)

HMI

Man

ufu

cturin

g

PLC

MES (Manufacturing Execution System)

Equipmentmonitoring

PLC (Master)

SafetyPLC

BoardHMI

Switch

Servo

Safety remote I/O

PLC (Local)

Controller dispersion

Synchro-nization

Synchro-nization

Info

rmatio

n S

ystem

I/O Robot Inverter

I/O control

Realizing CC-Link IE communication using general-purpose Ethernet on field network applicable to small-scale equipment

HTTP/FTP etc.

Application Common Protocol Seamless Message Protocol

Application software

Ethernet protocol stack

Ethernet communication driver

TCP/UDP

IP

Ethernet EIA-485

※SLMP:Seamless Message Protocol

Robot Remote I/O HMI

Sample programs for slaves

Seamless information sharing by SLMP compatible devices

Commercially available switch

Wi-Fi router

Cyclic communicationbetween master and

slave stations

Sample programsFor PLC and IPC

Master station

Barcodereader

Visionsensor

Inverter

Ex) Parameter setting and status monitor by WEB server with built-in slaves

Remote maintenance based on machine life diagnostic information and status information from devices compatible with CC-Link IE Field Basic

Data information from slaves

Typical Office Ethernet communication(HTTP,FTP, etc.)

Servo motors with built-in positionersOperation of

built-in positioners

Network

Cyclic communication on CC-Link IE Field network is realized by software.The system can be developed easily, and a wide lineup of applicable devices can be provided earlier.

The communication can be done simultaneously with standard Ethernet TCP/IP communication (HTTP, FTP, etc.).

Wiring for control is not required, and the Ethernet network can be unified.

A field network system compatible with standard Ethernet communication can be constructed at low cost.

The master station can be easily realized on IPC or personal computer.The master station can be realized without a dedicated interface board.*Cyclic communication is implemented as application software on Ethernet based on sample source code.

CC-Link IE communication using general-purpose Ethernet technology which can be easily applied to small-scale equipment not requiring high-speed control and is easy to use and develop. Realizing cyclic communication on the CC-Link IE Field network by software.

Data (Robot)Station down(Error station)

Cable Broken

Broken

Down

Communication speed / data link control

Network topology

Data transmission reliability method

Data transmission control method

Size of network shared memory

Communication medium

Connector

Maximum Number of stations

Station-to-station distance (When multi mode optical fiber is used)

Overall distance (When multi mode optical fiber is used)

1Gbps / based on Ethernet standard

Loop

Double loop

Token passing

MAX. 256Kbytes

IEEE 802.3z multimode optical fiber cable (GI)

IEC 61754-20 LC connector

Twisted pair cable with shield (category 5e)

RJ45 connector, M12 X-code connector (duplex connector)

120 stations

MAX. 550 m

MAX. 66,000 m

Basic communication functionNetwork shared memory communication (Cyclic communication: real time communication)

Message communication (Transient communication: non real time communication)

CC-Link IE Control network Specifications

A wide factory backbone network utilizing Gigabit Ethernet technology.

Network shared memory for cyclic communication with ultra high speed & ultra large capacity

CC-Link IE is designed to ensure a highly reliable network through the use of full duplex fiber optic

transmission paths, delivering high-speed, large-capacity distributed control.

It’s the backbone network that provides assured control of each field network.

To achieve stable communication independent of transmission

delay CC-Link IE adopts a token passing protocol for data trans-

mission control.

Each controller passes data to the network shared memory only

when it has the token, ensuring fully deterministic and high

speed real-time comunication.

High speed & reliability by redundant fiber optic loop technology

By adoption of redundant loop topology, each station continues

communication by looping back upon detection of a broken

cable or station error.

This integrated redundancy is provided without additional equip-

ment and without increasing network cost.

Data (PC)

Data (PLC)

Data (PLC)

Additional controllers

Cable adapters can be installed within 550 m

LC Connector Adapter

IEC061508 SIL3 IEC61784-3 (2010) Compliant Safety Communication FunctionThe safety communication function has been added to the CC-Link IE Control network allowing safe communication to be shared between controllers.

PLC

Safety PLC (Safety control)

CC-Link IE Control

Safety PLC (Safety control)

Standardinput

Safetyinput

Safetyinput Safety output

Standardoutput

E-stop switch Warning light

Light curtainRestart switch

Adoption of standard Ethernet cables, connectors and adapters

Easy and world-wide purchasing of standard Ethernet cabling

parts by using Ethernet technology.

By using cable adapters, wiring debugging and installation can

be started even if all the equipment in the line has not been fully

installed.

IEEE802.3z (1000BASE-SX)LC connector (IEC61754-20)

Ultra High Speed

CC-Link IE Field is an ultra high speed & ultra large capacity network, which provides both synchronous deterministic (cyclic) communication and asynchronous on-demand messaging (transient) communication. I/O control, motion control and safety functions can be combined seamlessly.

Easy network trouble shooting

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

PULL

POWER

Master Slave Slave SwitchSlave

Slave

Slave

PCSwitch

Ultra-high-speed ... supremely useable ... seamless ... and fully compatible with the Ethernet standardsWe’re bringing the benefits of “Gigabit & Ethernet” to the field level!

Gigabit transmission and real-time protocol enables easy and reliable data communication and remote I/O communication independent of transmission delay.

High-speed communication for the management information of the devices and trace information as well as the transmission of control data.

Flexible network topology (ring, line and star are all possible)

The network shared memory allows communication among controllers and field devices.

Easy configuration and network diagnosis enables a total engineering cost reduction from system start-up to maintenance.

Easy Networking

Bandwidth for cyclic communications

Bandwidth for transient communications1Gbps

(broad bandwidth)

DETERMINISTIC

Reserves dedicated bandwidthfor cyclic communication andtransient communication. Thisrealizes stable high speedcommunication anddeterministic communication

Disconnected

Unstable

Display the network

structure same as

actual system

When the trouble occurs, the cause can be found. Then system down time can be minimized.

Ethernet cable RJ-45 Connector Ethernet Switch

Since the physical and data link layers of the CC-Link IE Field Network use standard Ethernet technology, conventional cables, switches and hubs can be used.The availability of materials and selectivity of equipment for the network installation and adjustment are enhanced.

Ethernet Cable and Connector

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

0123456789ABCDEF

0123456789ABCDEF

STATION NO.

X10

X1

MODE

NC

DA

DB

DG

1

3

5

7

6

4

2

PULL

POWER

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

0123456789ABCDEF

0123456789ABCDEF

STATION NO.

X10

X1

MODE

NC

DA

DB

DG

1

3

5

7

6

4

2

PULL

POWER

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

STATION NO.X10 X1

5

0 1

46

23

5

0 1

46

9237

8

0 1

4

23

0

PW

1 2 3 4 5 6 7 8 9 A B C D E F

L RUN SD RD L ERR.

DA DG

DB SLD

(FG)

1 3 5 7 9 11 13 15 17 19 21 23 25 27

2 4 6 8 10 12 14 16 18 20 22 24 26

+24V 24G

B RATE

Flexible network topology

Star topology

Star topology

Ring topology

Line topology

CC-Link IE Field can access field devices directly by remote engneering tools, across the network hierarchy.

Devices can be monitored or configured from anywhere in the network, which increases the engineering efficiency with remote management.

Seamless Networking

The safety communication function has been added to the CC-Link IE Field network allowing safe communication at the field level.

Allows flexible arrangement matching the device layout by connecting the PLC and Safety PLC with a single network.

IEC061508 SIL3 IEC61784-3 (2010) Compliant Safety Communication Function

Highly accurate synchronization is possible by compensating the delay time in propagating data from the master station to the slave station.

Able to set up not only the synchronization required, but also the information of I/O and sensors which synchronization is not required, on the same CC-Link IE Field network.

Motion communication function capable of highly accuracy synchronous communication

Ethernet Adapter

Ethernet equipment connection CC-Link connection

Controller distribution

In addition to data control, stress free information exchange of control, monitoring, and diagnosis data are possible.The network shared memory enables communication among controllers

Easily realize the management and configuration of increasing amounts of motion data

Easily realize a safe communication function at the field level

Ethernet equipment can connect easily

Seamless connection with existing CC-Link via gateway

Switch

I/O Control Motion control Safe communication function

Gateway

In addition to high speed 10 Mbps operation, CC-Link is extremely

deterministic. Being able to rely on a predictable, unvarying I/O re-

sponse allows system designers to provide reliable, real-time control.

CLPA provides a “memory mapped profile” that definesdata for

each product type. This definition includes the control signal

and data layout (addressing). Multiple vendors can develop

CC-Link compatible products to match this “profile”. Users are

then able to easily change from one product brand to another

without needing to change connections or control programs.

The maximum overall cable length is 100 meters when 10

Mbps is selected. This length can be extended to 1.2 km when

the network speed is 156 Kbps. The use of cable repeaters

and optical repeaters allows even greater distances to be cov-

ered. CC-Link supports large-scale applications and reduces

the work needed for wiring and device installation.CC-Link significantly reduces the amount of control and power wir-

ing needed in today’s complex production lines. It reduces wiring

and installation costs, minimizes the work needed to accomplish

the wiring and drastically improves maintenance operations.

■Link scan time

■Memory mapped Profile

■CC-Link transmission distance

0 20 40 60

0

1

2

3

4

5

6

RX0

RWr0

(Each occupy one station)

(Each occupy one station)

Number of devices

RX10

RWr10

CC-Link

0 2,000 4,000 6,000 8,000 10,000 12,000 14,000

156kbps

625kbps

2.5Mbps

5Mbps

10Mbps

[m]

CC-Link Provides Compatibility between Multiple Vendor Products

High-speed and Highly Deterministic Input-Output Response

Easy to Extend Transmission Distance

Efficiency through Reduced Wiring

The RAS (Reliability, Availability, Serviceability) function is another

of CC-Links features. Functions including stand-by master, detach-

ing slave station, automatic return and testing and monitoring pro-

vide high reliability net-work system and allow the system down time

to minimize.

M

R3R1 L1R2

CC-Link Realizes High Reliability with RAS Function.

Market NeedsMore improvement wiring, maintaining same high-speed performance as CC-Link Small points dispersion.Size of I/O is smallerOpen network the level of reducing wiring network and sensor network.

as little as

Safety communication speeds of 10Mbps.

Accurate detection of communication errors.

Unitize original assets and equipment for the safety network.

Maintain central network error and failure information.

failsafe

This system automatically conveys metal molds according to in-

structions received from an upper level cell controller. It con-

trols AGV route switching and interfaces with an NC machine

through the CC-Link. The CC-Link network drastically reduced

wiring and the work period. A significant part of the wiring re-

duction was due to the high noise immunity of CC-Link, which

imposed very few constraints on the routing of wires.

This line assembles automobile body with spot-welding and

arc-welding robots. The line consists of 46 PLCs, installed 7 to

8 CC-Link master units in each, and the total 2000 to 3000 of

remote I/O units. The CC-Link reduced drastically wiring and

cost. Also the time needed to do field installation work and wir-

ing was drastically shortened because the easy connection of

CC-Link to each piece of equipment. The efficiency and speed

of the conveyor system was increased due to the high speed

communication to the remote I/O made possible by CC-Link.

This system monitors the automatic operation and alarm condi-

tions for machine rooms and electric equipment rooms. LAN

connections and phone lines enable remote monitoring and

maintenance. CC-Link I/O modules drastically reduce the wir-

ing to air-conditioning units and other electrical equipment.

The high-speed data link allows real-time display of the current

status and error condition of equipment being monitored.

CC-Link application stories

Overground I/F PLC

Remote for eachcontrol I/F

Remote for eachcontrol I/F

Remote I/O forroot switching

Information System

Information System

InformationSystem

Side-Mainline

Intranetconnection

Telephoneline

Remotemaintenance

TFTtouch panel

Color LCD (10.4 inch)

Touch paneloperation

Electricalequipment

Performs operation of each equipment device, and monitors equipment status and faults

Air-conditioningunit

Sanitaryequipment

Securityequipment

RR-FURline

Large NC machine fordie manufacture

Large NC machine fordie manufacture

CC-Link master x 4 50 connection modules

Repeater improves network flexibility

Auto-warehouse

System application: Combination of CC-Link and CC-Link/LT

A wide range of devices can be connected

Products from multiple manu-facturers can be connected

Easy connection of various types of sensors

Seamless communication with a CC-Link to CC-Link to CC-Link/LT bridge

Easy maintenance

DDCC

DDCC

DDCC

DDCC

CC-Link Specification

Maximum number of link points

Number of link points per unit

Maximum number of occupied stations

inter-station cablelength

Difference between CC-Link Ver.1.10 and Ver.2.00 in the number of connected units

CC-Link Ver. 1.00 model (Differences from Ver. 1.10)

CC-Link/LT specification

CC-Link Safety specification

CC-Link IE Control network specification

Communication medium

Connector

Distance between stations (max.)

Item Specification

Transmission line type

Optical fiber cable

Twisted

pair cableCC-Link IE Field Network Specifications

Ethernet Standards

Communication speed

Communication media

Communication control method

Topology

Maximum number of connected units

Maximum station-to-station distance

IEEE802.3ab (1000BASE-T) compliant

1Gbps

Shielded twisted pair cable (Category 5e), RJ-45 connector

Token passing method

Line, star, ring

254 modules (total of master and slave stations)

100m

Cyclic communication(Master slave method)

Transient communication (message communication)

Message size: Max. 2048 bytes

Control signal (bit data): max. 32768 bits (4096 bytes)RX (slave → master): 16384 bitsRY (master → slave): 16384 bitsControl data (word data): Max. 16384 words (32768 bytes)RWr (slave → master): 8192 wordsRWw (master → slave): 8192 words

Outline specifications for CC-Link IE Field Network BasicCommunication speedImplementation methodConnection formCableMax. number of connected stations per network (open specification)Cyclic communication

Max. number of link points/network

Max. number of link points/station (More than one station can be occupied.)

Link scan time (16 stations connected)Transient transmissionMix of communication protocols, TCP and IP

100MbpsSoftwareStart (connection with switching hub)Ethernet category 5e or higher64Allowed512 bytes each (4K points)4K bytes each (2K points)8 bytes each (64 points) (fixed)64 bytes each (32 points) (fixed)10msPossible (max. 2K bytes)Allowed

RX,RYRWr,RWwRX,RYRWr,RWw

LB

LW

LX

LY

LB

LW

LX

LY

The CC-Link IE Control network achieves a communication speed of 1 Gbps. It uses token passing as the data transfer control method. This prevents frame collisions, improving the throughput of communication. Therefore, it is optimal for networks where regularly scheduled communication is required.

32768 bits

131072 words

8192 bits

8192 bits

16384 bits

16384 words

8192 bits

8192 bits

1 Gbps

Up to 120 stations

239

32

Optical fiber cable for 1000BASE-SX (MMF)

IEC60793-2-10 Types A1a.1(50/125 μm multimode)

3.5 (dB/km) or less (λ=850 nm)

500 (MHz・km) or more (λ=850 nm)

66 km (when 120 stations are connected)

550 m (core/clad = 50/125 (μm))

Duplex LC connector

IEC61754-20: LC type connector

0.3 (dB) or less

PC polishing

Dual loop

Shielded twisted pair cable (category 5e)

RJ45 connector, M12 X-Code connector

100m

Max. number of link points per network

Max. number of link points per station

Optical fiber specificationsStandard

Transmission loss (max.)

Transmission band (min.)

Standard

Connection loss

Polished surface

Communication speed

Number of connected stations per network

Max. number of networks

Max. number of groups

Total length (total length of optical cable)

Distance between stations (max.)

Connector specifications

CLPA Office LocationsCLPA – Japan (Head Office)6F Ozone-front Building,3-15-58, Ozone, Kita-ku,Nagoya 462-0825, JapanPhone: +81-52-919-1588 Fax: +81-52-916-8655E-mail: [email protected]: http://www.cc-link.org

CLPA – Americas500 Corporate Woods Parkway,Vernon Hills, IL, 60061, U.S.A.Phone: +1-847-478-2647 Fax: +1-847-876-6611E-mail: [email protected]: http://www.cclinkamerica.org

CLPA – Europe (Germany)Postfach 10 12 17, 40832 Ratingen, GermanyTEL: +49-2102-486-7988 Fax: +49-2102-532-9740E-mail: [email protected]: https://eu.cc-link.org/en/new window

CLPA – Europe (U.K. Office)Travellers Lane, Hatfield, Hertfordshire, AL10 8XB U.K.(P.O. Box 50, Hatfield, AL10 8XB U.K.)Phone: +44-1707-278953 Fax: +44-1707-282873E-mail: [email protected]: http://www.clpa-europe.com

CLPA – KoreaRM. 711, 7F GANGSEO HANGANG XI-TOWER A,401 Yangcheon-ro, Gangseo-gu, Seoul 07528 KoreaPhone: +82-2-3663-6178 Fax: +82-2-6224-0158E-mail: [email protected]: http://www.cc-link.or.kr/

CLPA – ChinaHeadquarters (Tongji University): School of Electronics and Information Engineering, Jiading Campus, Tongji University, Shanghai, P.R.ChinaHead Office: 19F No.1386 Hong Qiao Road, Shanghai, P.R.ChinaTEL: +86-21-64940523 Fax: +86-21-64940525E-mail: [email protected]

CLPA – Taiwan6th FI, No.105, Wu Kung 3 Rd., Wu-Ku Hsiang, Taipei, TaiwanPhone: +886-2-8990-1573 Fax: +886-2-8990-1572E-mail: [email protected]: http://www.cc-link.org.tw/

CLPC – ASEAN (Singapore)307 Alexandra Road #05-01/02,Mitsubishi Electric Bldg., Singapore 159943Phone: +656-470-2480 Fax: +656-476-7439E-mail: [email protected]

CLPA – India (India)2nd Floor, Tower A & B, Cyber Greens, DLF Cyber City,DLF Phase-III, Gurgaon-122002 Haryana, IndiaPhone: +91-124-4630300 Fax: +91-124-4630399E-mail: [email protected]

CLPA – Turkey (Turkey)Serifali Mahallesi Nutuk Sokak.No:5 34775 Umraniye-istanbul /TurkeyPhone: +90-216-526-39-90E-mail: [email protected]

CLPA – MexicoMariano Escobedo 69, Zona Industrial - Tlalnepantla, 54030, Estado de Mexico, MexicoTEL.+52-55-3067-7517E-mail:[email protected]

CC-Link Promotion Center Thailand9th Floor, SV City Building, Office Tower1, 896/19 and 20, Rama3 Rd., Bangpongpang, Yanawa, Bangkok 10120 ThailandTEL.+66-2-682-6522 FAX.+66-2-682-9750E-mail:[email protected]

© 2008 CC-Link Partner Association. All rights reserved.

New publication, effective Nov. 2017Specifications subject to change without noticeCC1011-04-Y


Recommended