PAGE 2 CP161791/ MEDICAL SCIENCE BUILDING – REPLACE AHU-11 Addendum #1
Work to be performed Subcontractor Name, City, State __________________________________________________________________________ Mechanical Contractor: Electrical Contractor: Temperature Controls Contractor:
3. BID FOR LUMP SUM CONTRACT: a. Revise paragraph “6-a SUPPLIER DIVERSITY PARTICIPATION GOALS” to read:
The Contractor shall have as a goal subcontracting with Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), and Veteran Owned Business of Ten Percent (10%) of the awarded contract price for work to be performed for all four combined, and a goal subcontracting with Service Disabled Veteran Owned Business of Three Percent (3%) of awarded contract price for work to be performed.
Specifications:
1. 23 84 13 – Humidifiers:
a. Modify 2.2 to read as follows:
A. Steam Header / Separator: ASTM A666, Type 304 stainless steel, with integral heat exchanger which shall provide atmospheric condensate vaporizing and pressurized condensate return.
1. All dispersion tube-generated condensate that falls to the heat exchanger in the header shall be vaporized into humidification steam.
2. As condensate is vaporized in the header, pressurized condensate created in the heat exchanger shall return to main without need for additional pumps, valves, or controls.
NOTE: Contractor’s Option to provide a humidifier which complies with this specification except for the above described condensate management. In this case, Contractor shall consult humidifier manufacturer regarding required vented condensate reservoir, and provide submittal information for the condensate reservoir for Engineer’s review.
B. Humidifier Steam Control Valve: Comply with ANSI B16.15 Class 250; equal percentage flow characteristics; brass or bronze body globe valve with stainless steel seat, stem and plug; sized to meet humidification requirements.
1. Actuator: Electric modulating with spring return; normally closed. 2. Actuator: As specified in Division 23 Section “Control Systems.”
C. Heat Exchanger Control Valve: Two-position, normally closed, solenoid operated, on-off steam valve. Valve shall respond to a signal from a humidistat via 24 VAC signal.
PAGE 3 CP161791/ MEDICAL SCIENCE BUILDING – REPLACE AHU-11 Addendum #1
b. Remove 2.3 A Vapor Hose Kit in its entirety.
c. Add 2.3 A.1 to read: Humidifier panel assembly shall be contained within a Type 304 stainless steel metal casing to allow convenient mounting in air handler casings.
d. Modify 2.3 A.5 to read: Steam shall discharged in diametrically opposite directions, perpendicular to airflow, and shall be absorbed into the airstream such that no moisture accumulates on interior air handling unit surfaces more than 12 inches beyond the centerline of the steam dispersion grid at 500 fpm face velocity. The dispersion tube quantity and spacing, and vapor outlet ports quantity and spacing, shall be factory-engineered to meet this absorption requirement.
e. Modify 2.4 Accessory Hardware to read:
A. Steam Trap: Humidifier shall be provided with one float/thermostatic type trap
complying with Division 23 Section “Steam and Condensate Piping.”
B. Inlet Strainer: Humidifier shall be provided with one inlet strainer complying with Division 23 Section “Steam and Condensate Piping.”
f. Add 3.2 A to read: Humidifier shall be factory installed within air handling unit by air
handling unit manufacturer.
Drawings:
1. X-1: a. MODIFY Enlarged Site Plan: Revise Contractor parking area.
2. M000:
a. ADD Floor Protection Notes.
3. M001: a. MODIFY General Note 3. b. MODIFY Keyed Notes 5, 6, 7, and 8. c. ADD Keyed Notes 9, 10, 11, and 12. d. MODIFY Fifth Floor Temporary Cooling and Construction Phasing Plan: Revise
construction phase boundaries.
4. MD101: a. MODIFY First Floor Demolition Plan: Revise construction phase boundary. b. MODIFY Keyed Note 8.
5. MD102:
a. MODIFY Fifth Floor Ductwork Demolition Plan i. Remove ductwork demolition from fume hood ductwork in Labs M503 and M538. ii. Revise ductwork demolition work in M526 Research Office. iii. Remove keyed note 4 and renumber keyed notes accordingly.
6. MD103:
a. MODIFY General Note 3.
7. M101: a. MODIFY First Floor Piping New Work Plan: Revise construction phase boundaries. b. MODIFY Keyed Note 20. c. MODIFY Partial Fourth Floor Piping New Work Plan: Revise hot water supply and return
riser size.
PAGE 4 CP161791/ MEDICAL SCIENCE BUILDING – REPLACE AHU-11 Addendum #1
8. M102: a. MODIFY Fifth Floor Ductwork New Work Plan:
i. Remove manual volume dampers from fume hood ductwork in Labs M503 and M538.
ii. Revise supply and exhaust layout in Labs M529 and M531. b. ADD Keyed Note 12. c. MODIFY note on Detail 2 – Exhaust Duct Fitting Detail.
9. M201:
a. MODIFY Enlarged Fifth Floor Ductwork New Work Plan: i. Clarify shoe tap fitting on cold supply air duct serving north wing. ii. Revise supply air and exhaust air ductwork to maintain access to existing
electrical bus duct in Mechanical Room M524. b. MODIFY Enlarged Fifth Floor Piping New Work Plan:
i. Revise hot water supply and return layout and valve requirements in Mechanical Room M524.
c. ADD Keyed Notes 21 and 22.
10. M301: a. MODIFY Section D: Revise exhaust riser to provide required access to existing electrical
bus duct in Mechanical Room M524. b. ADD Keyed Note 2.
11. M401:
a. MODIFY Chilled Water Flow Diagram. b. MODIFY Heating Hot Water Flow Diagram.
12. M501:
a. MODIFY Detail 3 – AHU Humidifier Detail. b. MODIFY AHU-11 Air Handling Unit Components List: Remove reference to unit-mounted
outside air damper from component 1. 13. M601:
a. MODIFY Motorized Damper Schedule. Omit cold deck damper. b. MODIFY Humidifier Schedule: Revise note 2.
14. M701:
a. MODIFY AHU-11 Control Diagram: i. Revise to show new single duct VAV terminal units for north wing. ii. Revise location of cooling coil temperature sensor. iii. Revise humidifier sequence of operation.
15. M702: a. MODIFY VAV Box with Reheat Control Diagram:
i. Add occupancy sensor. ii. Add Keyed Note 10.
Attachments:
1. X-1 – STAGING PLAN 2. M000 – MECHANICAL SYMBOLS, ABBREVIATIONS, AND GENERAL AND CONSTRUCTION
PHASING NOTES 3. M001 – FIFTH FLOOR TEMPORARY COOLING AND CONSTRUCTION PHASING PLAN 4. MD101 – FIRST FLOOR DEMOLITION PLAN 5. MD102 – FIFTH FLOOR DEMOLITION PLAN 6. MD103 – ENLARGED DEMOLITION PLANS 7. M101 – PIPING NEW WORK PLANS 8. M102 – FIFTH FLOOR DUCTWORK NEW WORK PLAN
PAGE 5 CP161791/ MEDICAL SCIENCE BUILDING – REPLACE AHU-11 Addendum #1
9. M201 – ENLARGED NEW WORK PLANS 10. M301 – SECTIONS 11. M401 – HYDRONIC FLOW DIAGRAMS 12. M501 – DETAILS 13. M601 – SCHEDULES 14. M701 – CONTROLS 15. M702 – CONTROLS
END OF ADDENDUM 1
Issued on 01/20/2017 with Addendum 1
1.A - 1
SECTION 1.A BID FOR LUMP SUM CONTRACT Date:____________________________ BID OF (hereinafter called "Bidder") a corporation* organized and existing under laws of the State of , a partnership* consisting of , an individual* trading as , a joint venture* consisting of . *Insert Corporation(s), partnership or individual, as applicable.
TO: Curators of the University of Missouri c/o Assistant Vice Chancellor – Facilities
Room L100 General Services Building University of Missouri – Columbia Columbia, Missouri 65211
1. Bidder, in compliance with invitation for bids for construction work in accordance with Drawings and Specifications prepared by Ross & Baruzzini, Inc., entitled "MEDICAL SCIENCE BUILDING – REPLACE AHU-11", project number CP161791, dated January 11, 2017 having examined Contract Documents and site of proposed work, and being familiar with all conditions pertaining to construction of proposed project, including availability of materials and labor, hereby proposes to furnish all labor, materials and supplies to construct project in accordance with Contract Documents, within time set forth herein at prices stated below. Prices shall cover all expenses, including taxes not covered by the University of Missouri’s tax exemption status, incurred in performing work required under Contract documents, of which this Bid is a part.
Bidder acknowledges receipt of following addenda:
Addendum No. Dated Addendum No. Dated Addendum No. Dated Addendum No. Dated 2. In following Bid(s), amount(s) shall be written in both words and figures. In case of discrepancy between words and figures, words shall govern.
3. BID PRICING
a. Base Bid: The Bidder agrees to furnish all labor, materials, tools, and equipment required to remove an existing air handling unit and associated ductwork, piping, conduits, controls, and auxiliary electrical equipment and install a new air handling unit and associated ductwork, piping, conduits, controls, and auxiliary electrical equipment, including the installation of new chilled water and heating hot water piping and conversion of the 5th floor north wing from constant volume dual duct to variable volume with hot water reheat; all as indicated on the Drawings and described in these Specifications for sum of:
DOLLARS ($ ).
Issued on 01/20/2017 with Addendum 1
1.A - 2
b. Additive Alternate Bids: NOT APPLICABLE c. Unit Prices: NOT APPLICABLE
4. PROJECT COMPLETION
a. Contract Period - Contract period begins on the day the Contractor receives unsigned Contract, Performance Bond, Payment Bond, and "Instructions for Execution of Contract, Bonds, and Insurance Certificates." Bidder agrees to complete project within one hundred and fifty (150) calendar days from receipt of aforementioned documents. Fifteen (15) calendar days have been allocated in construction schedule for receiving aforementioned documents from Bidder.
b. Commencement - Contractor agrees to commence work on this project after the "Notice to Proceed" is issued by the Owner. "Notice to Proceed" will be issued within seven (7) calendar days after Owner receives properly prepared and executed Contract documents listed in paragraph 4.a. above. c. Special scheduling requirements:
1.) Work associated with demolition of existing piping and installation of new piping on first floor shall be scheduled to occur between March 4, 2017 and March 12, 2017. Scheduled outage of heating hot water and chilled water systems shall occur during this time period. See drawings MD101 and M101 for affected areas.
2.) All equipment shutdowns and scheduling of work within occupied spaces shall be scheduled with the Owner’s Representative a minimum of 2 weeks in advance of the outage.
3.) Saw-cutting, core-drilling, use of hammer drills, and installation of powder-actuated fasteners shall occur only during the following time periods to minimize disruption of adjacent work and clinical study areas: 6:00 a.m. to 8:00 a.m., or 5:00 p.m. to 10:00 p.m.
4.) Prior to demolition, Contractor shall provide mobile cooling units to temporary cool select spaces. Units shall remain in place for entire AHU-11 shutdown duration. See drawing M001 for affected areas.
5.) Prior to demolition, Contractor shall coordinate with Owner’s Representative to obtain Owner-furnished window AC units salvaged from the Lathrop and Laws Demolition project to temporarily cool spaces with operable windows. Units shall remain in place for entire AHU-11 shutdown duration. See drawing M001 for affected areas.
6.) Construction schedule shall allow a minimum of two (2) weeks for system testing and balancing.
7.) Construction schedule shall allow a minimum of two (2) weeks for the Owner-provided programming and startup of Johnson Controls Metasys temperature controls system.
5. SUBCONTRACTOR LIST:
Bidder hereby certifies that the following subcontractors will be used in performance of Work:
NOTE: Failure to list subcontractors for each category of work identified on this form or listing more than one subcontractor for any category of work without designating the portion of work performed by each shall be grounds for rejection of bid. List name, city, and state of designated subcontractor, for each category of work listed in Bid For Lump Sum Contract. If work within a category will be performed by more than one subcontractor, Bidder shall provide name, city, and state of each subcontractor and specify exact portion of work to be performed by each. If acceptance/non-acceptance of Alternates will affect designation of a subcontractor, Bidder shall provide information, for each affected category, with this bid form. If Bidder intends to perform any designated subcontract
Issued on 01/20/2017 with Addendum 1
1.A - 3
work by using Bidder's own employees, then Bidder shall list their own name, city, and state. The bidder may petition the Owner to change a listed subcontractor only within 48 hours of the bid opening. See Information For Bidders Section 16 List of Subcontractors for requirements.
_______________________________________________________________________________________________ Work to be performed Subcontractor Name, City, State _______________________________________________________________________________________________
Mechanical Contractor: _ Electrical Contractor: _ Temperature Controls Contractor: ________
6. SUPPLIER DIVERSITY PARTICIPATION GOALS
a. The Contractor shall have as a goal subcontracting with Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), and Veteran Owned Business of Ten Percent (10%) of the awarded contract price for work to be performed for all four combined, and a goal subcontracting with Service Disabled Veteran Owned Business of Three Percent (3%) of awarded contract price for work to be performed.
b. Requests for waiver of this goal shall be submitted on the attached Application For Waiver form. A determination by the Director of Facilities Planning & Development, UM, that a good faith effort has not been made by Contractor to achieve above stated goal may result in rejection of bid.
c. The Undersigned proposes to perform work with following Supplier Diversity participation level: MBE PERCENTAGE PARTICIPATION: _____________________ percent ( %) SDVE PERCENTAGE PARTICIPATION: _____________ percent ( %) WBE, DBE, and/or VETERAN PERCENTAGE PARTICIPATION:___________ percent ( %)
d. A Supplier Diversity Compliance Evaluation form shall be submitted with this bid for each diverse subcontractor to be used on this project.
7. BIDDER'S ACKNOWLEDGMENTS
a. Bidder declares that he has had an opportunity to examine the site of the work and he has examined Contract Documents therefore; that he has carefully prepared his bid upon the basis thereof; that he has carefully examined and checked bid, materials, equipment and labor required thereunder, cost thereof, and his figures therefore. Bidder hereby states that amount, or amounts, set forth in bid is, or are, correct and that no mistake or error has occurred in bid or in Bidder's computations upon which this bid is based. Bidder agrees that he will make no claim for reformation, modifications, revisions or correction of bid after scheduled closing time for receipt of bids.
b. Bidder agrees that bid shall not be withdrawn for a period of sixty (60) days after scheduled closing time for receipt of bids.
Issued on 01/20/2017 with Addendum 1
1.A - 4
c. Bidder understands that Owner reserves right to reject any or all bids and to waive any informalities in bidding.
d. Accompanying the bid is a bid bond, or a certified check, or an irrevocable letter of credit, or a cashier's check payable without condition to "The Curators of the University of Missouri" which is an amount at least equal to five percent (5%) of amount of largest possible total bid herein submitted, including consideration of Alternates.
e. Accompanying the bid is a Bidder's Statement of Qualifications. Failure of Bidder to submit the Bidder's Statement of Qualifications with the bid may cause the bid to be rejected. Owner does not maintain Bidder's Statements of Qualifications on file.
f. It is understood and agreed that bid security of two (2) lowest and responsive Bidders will be retained until Contract has been executed and an acceptable Performance Bond and Payment Bond has been furnished. It is understood and agreed that if the bid is accepted and the undersigned fails to execute the Contract and furnish acceptable Performance/Payment Bond as required by Contract Documents, accompanying bid security will be realized upon or retained by Owner. Otherwise, the bid security will be returned to the undersigned.
8. BIDDER'S CERTIFICATE
Bidder hereby certifies:
a. His bid is genuine and is not made in interest of or on behalf of any undisclosed person, firm or corporation, and is not submitted in conformity with any agreement or rules of any group, association or corporation.
b. He has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid.
c. He has not solicited or induced any person, firm or corporation to refrain from bidding.
d. He has not sought by collusion or otherwise to obtain for himself any advantage over any other Bidder or over Owner.
e. He will not discriminate against any employee or applicant for employment because of race, color, religion, sex or national origin in connection with performance of work.
f. By virtue of policy of the Board of Curators, and by virtue of statutory authority, a preference will be given to materials, products, supplies, provisions and all other articles produced, manufactured, mined or grown within the State of Missouri. By virtue of policy of the Board of Curators, preference will also be given to all Missouri firms, corporations, or individuals, all as more fully set forth in "Information For Bidders."
Issued on 01/20/2017 with Addendum 1
1.A - 5
9. BIDDER'S SIGNATURE
Note: All signatures shall be original; not copies, photocopies, stamped, etc.
Authorized Signature Date
Printed Name Title
Company Name
Mailing Address
City, State, Zip
Phone No. Federal Employer ID No.
Fax No. E-Mail Address
Circle one: Individual Partnership Corporation Joint Venture
If a corporation, incorporated under the laws of the State of__________
Licensed to do business in the State of Missouri? ____yes _____no
(Each Bidder shall complete bid form by manually signing on the proper signature line above and supplying required information called for in connection with the signature. Information is necessary for proper preparation of the Contract, Performance Bond and Payment Bond. Each Bidder shall supply information called for in accompanying "Bidder's Statement of Qualifications.")
END OF SECTION
Medical Science Building – Replace AHU-11
Date: January 20, 2017 University of Missouri
Addendum 1 MU Project No. CP 161791
HUMIDIFIERS 238413 - 1
SECTION 238413 - HUMIDIFIERS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
B. 23 0100 “Basic Mechanical Requirements,” and Section 23 0500 “Basic Mechanical Materials
and Methods” all apply to the work of this Section as if fully repeated herein.
1.2 SUMMARY
A. This Section includes the following types of humidifiers:
1. Direct steam injection.
B. Related Sections: The following Sections contain requirements that relate to this Section:
1. Division 23 Section “Modular Air-Handling Units” for air handlers which will house
humidifier steam dispersion grids.
2. Division 23 Section “Steam and Condensate Piping” for steam and condensate lines,
steam traps, strainers, and other specialties associated with the humidifiers.
3. Division 23 Section “Control Systems” for humidistats and humidification controls.
1.3 SUBMITTALS
A. Product data including rated capacities of selected models, weights (shipping, installed, and
operating), supports, weight on each support, required clearances, furnished specialties, and
accessories.
B. Shop Drawings: Detail fabrication and installation of humidifiers. Include piping details, plans,
elevations, sections, details of components, manifolds, injection and dispersion elements, and
attachments to other work. Show support locations, type of support, weight on each support,
required clearances, and other details.
C. Field quality-control test reports.
D. Operation and Maintenance Data: For humidifiers to include in operation and maintenance
manuals specified in Division 01. Include detailed manufacturer’s instructions on startup,
shutdown, troubleshooting, preventive maintenance, and servicing. Include parts list and list of
accessories.
Medical Science Building – Replace AHU-11
Date: January 20, 2017 University of Missouri
Addendum 1 MU Project No. CP 161791
HUMIDIFIERS 238413 - 2
1.4 QUALITY ASSURANCE
A. Comply with AHRI 640 Commercial and Industrial Humidifiers.
1.5 COORDINATION
A. Coordinate physical size of humidifier steam dispersion manifold with interior dimensions of
the air handling unit for uniform steam distribution. At contractor’s discretion, ship steam
dispersion grids with complete written mounting instructions to air handling unit manufacturer’s
facility for incorporation into air handling units.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle humidifiers according to manufacturer’s recommendations.
B. Store humidifiers on elevated platforms in a dry location.
1.7 WARRANTY
A. General Warranty: Extended warranty specified in this Article shall not deprive Owner of other
rights Owner may have under other provisions of the Contract Documents and shall be in
addition to, and run concurrent with, other warranties made by Contractor under requirements
of the Contract Documents.
B. Manufacturer’s Extended Warranty: Submit written warranty, signed by manufacturer, agreeing
to repair or replace any component up to and including the entire unit, due to defects in
materials or workmanship. Warranty must include parts, labor, shipping and handling charges,
and applicable taxes; for no out-of-pocket cost to the Owner. Extended warranty period shall be
manufacturer’s standard, but not less than two years (2) after date of Substantial Completion.
PART 2 - PRODUCTS
2.1 HUMIDIFIERS, GENERAL
A. Manufacturers: Subject to compliance with requirements, provide humidifiers and humidifier
accessory products by one of the following manufacturers:
1. Dri-Steem Humidifier Company.
2. Armstrong International, Inc.
3. Herrmidifier Co., Inc.
4. Nortec Industries Inc.
5. Pure Humidifier Company.
Medical Science Building – Replace AHU-11
Date: January 20, 2017 University of Missouri
Addendum 1 MU Project No. CP 161791
HUMIDIFIERS 238413 - 3
2.2 DIRECT STEAM-INJECTION HUMIDIFIERS
A. Steam Header / Separator: ASTM A666, Type 304 stainless steel, with integral heat exchanger
which shall provide atmospheric condensate vaporizing and pressurized condensate return.
1. All dispersion tube-generated condensate that falls to the heat exchanger in the header
shall be vaporized into humidification steam.
2. As condensate is vaporized in the header, pressurized condensate created in the heat
exchanger shall return to main without need for additional pumps, valves, or controls.
NOTE: Contractor’s Option to provide a humidifier which complies with this specification
except for the above described condensate management. In this case, Contractor shall consult
humidifier manufacturer regarding required vented condensate reservoir, and provide submittal
information for the condensate reservoir for Engineer’s review.
B. Humidifier Steam Control Valve: Comply with ANSI B16.15 Class 250; equal percentage flow
characteristics; brass or bronze body globe valve with stainless steel seat, stem and plug; sized
to meet humidification requirements.
1. Actuator: Electric modulating with spring return; normally closed.
2. Actuator: As specified in Division 23 Section “Control Systems.”
C. Heat Exchanger Control Valve: Two-position, normally closed, solenoid operated, on-off steam
valve. Valve shall respond to a signal from a humidistat via 24 VAC signal.
2.3 STEAM-INJECTION DISPERSION MANIFOLD
A. Steam Dispersion Grid: Tube bank consisting of a header and required quantity of multiple
dispersion tubes, factory assembled in a rack sized to fit across entire cross-section of duct or
plenum and equipped with mounting hardware.
1. Humidifier panel assembly shall be contained within a Type 304 stainless steel metal
casing to allow convenient mounting in air handler casings.
2. Header shall be constructed of ASTM A666, Type 304 or 316 stainless steel and shall be
fitted with 1-inch, 1½-inch or 2-inch tee outlets for dispersion tube connections. The
header shall be baffled or otherwise internally balanced to ensure uniform steam flow to
each dispersion tube.
3. The dispersion tubes shall be constructed of ASTM A666, Type 304 or 316 stainless steel
and shall be engineered to limit airstream sensible heat gain to a maximum of 3ºF when
no humidification is required.
4. Vapor emission ports shall be sized and located along the dispersion tube for uniform
steam distribution across the grid. Dispersion tubes shall either be fully jacketed with
punched emission ports, or unjacketed with emission port sleeves extending to the center
of the dispersion tube; to minimize condensate carryover.
5. Steam shall discharged in diametrically opposite directions, perpendicular to airflow, and
shall be absorbed into the airstream such that no moisture accumulates on interior air
handling unit surfaces more than 12 inches beyond the centerline of the steam dispersion
grid at 500 fpm face velocity. The dispersion tube quantity and spacing, and vapor outlet
ports quantity and spacing, shall be factory-engineered to meet this absorption
requirement.
Medical Science Building – Replace AHU-11
Date: January 20, 2017 University of Missouri
Addendum 1 MU Project No. CP 161791
HUMIDIFIERS 238413 - 4
6. Provide 1/8-inch thick, PVDF insulation on thermal dispersion tubes and humidifier grid
header. Insulation shall have a maximum rating under UL 723 (ASTM E84) flame
spread/smoke developed of 25/50; high temperature rated for 300ºF continuous
operation; closed-cell construction that will not absorb moisture and therefore not support
microbial growth; zero particle erosion per ASTM C1071, and resistant to UV light.
2.4 ACCESSORY HARDWARE
A. Steam Trap: Humidifier shall be provided with one float/thermostatic type trap complying with
Division 23 Section “Steam and Condensate Piping.”
B. Inlet Strainer: Humidifier shall be provided with one inlet strainer complying with Division 23
Section “Steam and Condensate Piping.”
2.5 FIELD PIPING
A. As specified in Division 23 Section “Steam and Condensate Piping.”
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine air-handling units for compliance with requirements for installation tolerances and
other conditions affecting performance.
B. Examine roughing-in for piping systems to verify actual locations of piping connections before
humidifier installation.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A. Humidifier shall be factory installed within air handling unit by air handling unit manufacturer.
B. Install humidifiers as indicated, in accordance with manufacturer’s written instructions and
AHRI 640.
C. Install humidifiers with required clearance for service and maintenance.
D. Seal humidifier manifold duct or plenum penetrations with flange.
E. Install manifold supply piping pitched to drain condensate back to humidifier.
Medical Science Building – Replace AHU-11
Date: January 20, 2017 University of Missouri
Addendum 1 MU Project No. CP 161791
HUMIDIFIERS 238413 - 5
3.3 CONNECTIONS
A. Piping installation requirements are specified in other Division 23 Sections. Drawings indicate
general arrangement of piping, fittings, and specialties.
1. Install piping adjacent to humidifiers to allow service and maintenance.
3.4 FIELD QUALITY CONTROL
A. Perform tests and inspections and prepare test reports.
B. Tests and Inspections:
1. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest
until no leaks exist.
2. Operational Test: After electrical circuitry has been energized, start units to confirm
proper motor rotation and unit operation.
3. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and
equipment.
C. Remove and replace malfunctioning units and retest as specified above.
3.5 DEMONSTRATION
A. Engage a factory-authorized service representative to train Owner’s maintenance personnel to
adjust, operate, and maintain humidifiers.
1. Train Owner’s maintenance personnel on procedures and schedules for starting and
stopping, troubleshooting, servicing, and maintaining equipment and schedules.
2. Review data in maintenance manuals. Refer to Division 01.
3. Schedule training with Owner, through Architect, with at least seven days’ advance
notice.
END OF SECTION 238413
HOSPITAL DRIVE
MA
RY
LA
ND
AV
EN
UE
MA
RY
LA
ND
AV
EN
UE
DE
AN
S D
RIV
E
MEDICAL SCIENCE
FIELD
STANKOWSKI
CROWDER
LIBRARY
LOTTES
NURSING
MARYLAND AVENUEGARAGE
CRITICAL
CARE
MCHANEY
HALL
MA
SO
N E
YE
INS
TIT
UT
E
DIA
BE
TE
S
HOSPITAL
CONCOURSE
HOSPITAL & CLINICS
CLINICAL SUPPORT
& EDUCATION BLDG
MED SCIENCE
ADDITION
COOLINGTOWER
BIO-WASTE
MIS
SO
UR
I
PS
YC
HIA
TR
IC
CE
NT
ER
HAWTHORN
DOGWOOD
GA
LE
NA
STAGING PLANNO SCALE
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:5
4 P
M
505-106
X-1
DPP
STAGING PLAN
JCS
01/11/2017
DOUBLE DOOR ON THIS END OF THEFACILITY SHALL BE THE PRIMARYMEANS OF BRINGING EQUIPMENT ANDMATERIALS INTO MEDICAL SCIENCEBUILDING. THIS DOOR ENTERS INTOTHE HALLWAY ADJACENT TO THEFREIGHT ELEVATOR.
SERVICE DRIVE SHALL REMAINACCESSIBLE THROUGH ENTIREDURATION OF CONSTRUCTION
ACCESS DRIVE SHALL REMAINACCESSIBLE THROUGH ENTIREDURATION OF CONSTRUCTION
CONTRACTOR PARKING. TWO(2) SPACES WILL BE MADEAVAILABLE. COORDINATE WITHOWNER'S REPRESENTATIVE.
GRAVEL STAGING AREA AVAILABLE FOR ENTIRE DURATION OFCONSTRUCTION. CONTRACTOR SHALL INSTALL TEMPORARYPROTECTIVE FENCING AROUND ENTIRE STAGING AREA. FENCING SHALLBE LEFT IN PLACE THROUGHOUT DURATION OF CONSTRUCTION.CONTRACTOR SHALL TAKE CARE TO NOT DAMAGE OR DISRUPTEXISTING ELECTRICAL EQUIPMENT WITHIN THIS AREA.
SERVICE DRIVE
DE
AN
'S D
RIV
E
1
1 01/20/17 ADDENDUM 1
M
EXISTING TO REMAIN
AHU
1
FLEXIBLE DUCT
PIPE SYSTEM ABBREVIATIONS
KEYED NOTE
SECTION NUMBER
SHEET WHERE LOCATED
INTERFACE, EXISTING TO NEW
CWS
CWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
LPS
HWS
HWR
LPR LOW PRESSURE CONDENSATE RETURN
LOW PRESSURE STEAM SUPPLY
HEATING WATER SUPPLY
HEATING WATER RETURN
ROUND DUCT SIZE, (ACTUAL SIZE INDICATED)
ACCESS PANEL, TOP OR SIDE
TURNING VANES
CHANGE OF ELEVATION - RISE (R) OR DROP (D)
FLEXIBLE DUCT CONNECTION
UNIT NUMBER
EQUIPMENT DESIGNATION
SUPPLY AND OUTSIDE AIR SECTION UP
RETURN AIR SECTION UP
DRAIND
MOTORIZED DAMPER
MANUAL VOLUME DAMPER
FIRE DAMPER
TYPE OF SERVICE: S = SUPPLYR = RETURNE = EXHAUSTT = TRANSFER
AIR QUANTITY
IN CFM
SMOKE DAMPER
FIRE/SMOKE DAMPER
S-1
100
FLOW ARROW DOWNSTREAM OF FAN
FLOW ARROW UPSTREAM OF FAN
SCHEDULEDDEVICE NO
SPIRAL FLAT-OVAL DUCT SIZE, FIRST FIGUREIS SIDE SHOWN (ACTUAL SIZE INDICATED)
DEMO TO BE REMOVED
NEW WORK
UNIT NUMBER
DAMPER TYPE DESIGNATIONFSD
1
DUCT SIZE
12x12
12x12
12x12
12ø
12 x 10ø
R
AP
DUCT SIZE
DUCT SIZE, FIRST FIGURE IS SIDE SHOWN(CLEAR INSIDE, ADJUST FOR LINER)
PIPE LINE SYMBOLS
1
M101
SIM
M
SUPPLY AND OUTSIDE AIR SECTION DOWN
RETURN AIR SECTION DOWN
SHUT OFF VALVE (SEESPECIFICATION FOR TYPE)
BUTTERFLY VALVE
CHECK VALVE
CALIBRATED - ORIFACEBALANCING VALVE
IN-LINE PUMP
ELBOW DOWN
ELBOW UP
TEE DOWN
TEE UP
CAP
FLANGE
DEMO TO BE REMOVED
CONCENTRICREDUCER/INCREASER
ECCENTRICREDUCER/INCREASER
Y - PATTERN STRAINER
TWO-WAY CONTROL VALVE
MEDIUM DETAIL FINE DETAIL
MOTORIZED BUTTERFLYVALVE
UNION
AIR VENT (M - MANUAL,A - AUTOMATIC)
RELIEF VALVE
GENERAL NOTES:
TEMPERATURE SENSORT
PRESSURE ANDTEMPERATURE TEST PORT
EQUIPMENT DESIGNATION
GENERAL ABBREVIATIONS GENERAL ABBREVIATIONS, CONTINUED
#
BALL VALVE
M
DUCT SYSTEM SYMBOLS
GENERAL SYMBOLS
EXHAUST AIR SECTION UP
EXHAUST AIR SECTION DOWN
PLAN NUMBER
SHEET WHERE LOCATED
1
M101
PC PUMPED CONDENSATE
CONSTRUCTION PHASING NOTES:THE FIRST FLOOR INSTRUCTIONAL LAB AREA OF THE MEDICAL SCIENCESBUILDING WILL BE UNOCCUPIED BETWEEN MARCH 4, 2017 AND MARCH 12,2017. SCHEDULED OUTAGE OF HEATING HOT WATER AND CHILLED WATERSYSTEMS SHALL OCCUR DURING THIS TIME PERIOD. CONTRACTOR SHALLDEMOLISH ALL EXISTING FIRST FLOOR PIPING SHOWN TO BE REMOVED,INSTALL ALL NEW FIRST FLOOR HEATING HOT WATER PIPING, AND PROVIDEVALVED AND CAPPED CONNECTIONS FOR NEW VERTICAL HEATING HOTWATER AND CHILLED WATER RISERS. VERTICAL RISERS MAY BE INSTALLEDAT A LATER DATE. HEATING HOT WATER AND CHILLED WATER SYSTEMSSHALL BE FILLED, TESTED, AND MADE OPERATIONAL AGAIN BY THEFOLLOWING MONDAY MORNING (MARCH 13TH) TO RESTORE OPERATION OFTHE VARIOUS HVAC SYSTEMS WITHIN THE FACILITY AND ALLOW FORCOMPLETE AND NORMAL BUSINESS ACTIVITIES TO RESUME BY 6:00 AM ONTHAT SAME MONDAY MORNING (MARCH 13TH).
ALL EQUIPMENT SHUTDOWNS AND SCHEDULING OF WORK WITHINOCCUPIED SPACES SHALL BE COORDINATED WITH THE OWNER'SREPRESENTATIVE WITH A MINIMUM 2 WEEKS ADVANCE NOTICE.
SAW-CUTTING, CORE-DRILLING OF SLABS AND WALLS, USE OF HAMMERDRILLS, AND INSTALLATION OF POWDER-ACTUATED FASTENERS SHALLOCCUR ONLY DURING THE FOLLOWING TIME PERIODS TO MINIMIZEDISRUPTION OF ADJACENT WORK AND CLINICAL STUDY AREAS: 6:00 AM TO8:00 AM, OR 5:00 PM TO 10:00 PM.
PRIOR TO SHUTTING DOWN AHU-11, CONTRACTOR SHALL INSTALLTEMPORARY COOLING SYSTEMS FOR 5TH FLOOR LABS AND SUPPORT AREASAS SHOWN ON SHEET M001. CONTRACTOR SHALL COORDINATE WITHOWNER'S REPRESENTATIVE TO OBTAIN OWNER-FURNISHED WINDOW UNITS.CONTRACTOR SHALL PROVIDE AND INSTALL TEMPORARY ROLL-IN SPOTCOOLERS, WHERE REQUIRED.
SEE CONSTRUCTION PHASING PLAN ON M001 FOR SPECIFIC SCHEDULINGCONSTRAINTS ASSOCIATED WITH WORK ON THE FIFTH FLOOR.
1.
2.
3.
4.
5.
SUPPLY DIFFUSER AS SCHEDULED ARROWS INDICATEDIRECTION OF AIR DISCHARGE. IF NO ARROWS ARE SHOWNON PLAN, DEFAULT IS A 4-WAY THROW.
RETURN GRILLE OR REGISTER AS SCHEDULED
SIDEWALL DIFFUSER AS SCHEDULED
SIDEWALL RETURN OR EXHAUST AS SCHEDULED
EXHAUST GRILLE OR REGISTER AS SCHEDULED
ELEVATOR PROTECTION NOTES:THE INTEGRITY OF EXISTING FREIGHT ELEVATOR MUST BE MAINTAINEDDURING CONTRACTOR'S ACTIVITIES. THE FOLLOWING ELEVATORPROTECTION NOTES SHALL APPLY:
CONTRACTOR SHALL FULLY PROTECT THE INTERIOR OF THE ELEVATOR,INCLUDING BUT NOT LIMITED TO THE FLOOR, WALLS, CEILINGS, ANDELEVATOR CONTROLS.
ELEVATOR PROTECTION SHALL BE INSTALLED PRIOR TO THE START OFCONSTRUCTION AND SHALL REMAIN THROUGHOUT THE ENTIRE DURATIONOF CONSTRUCTION ACTIVITIES REQUIRING ELEVATOR USE.
1.
2.
FLOOR PROTECTION NOTES:THE INTEGRITY OF EXISTING FLOORING SURFACES THROUGHOUT THEFACILITY MUST BE MAINTAINED DURING CONTRACTOR'S ACTIVITIES. THEFOLLOWING FLOORING PROTECTION NOTES SHALL APPLY:
MOVEMENT OF MATERIAL AND EQUIPMENT INTO AND FROM THE FACILITYREQUIRES PROTECTION OF ALL FLOORING SURFACES THROUGHOUTTRAVEL PATH. CONTRACTOR SHALL UTILIZE PLASTIC PROTECTION SHEETSUNDER PLYWOOD OR MASONITE SHEETS OVER THE ENTIRE FLOORSURFACE TO PROTECT EXISTING TILE OR CARPETED FLOOR SURFACESFROM DAMAGE.
ANY EXISTING FLOORING SURFACES DAMAGED AS A RESULT OF THISCONSTRUCTION WORK SHALL BE REPAIRED BY CONTRACTOR TO THESATISFACTION FO THE OWNER'S REPRESENTATIVE.
1.
2.
1
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:4
3 P
M
505-106
M000
DPP
MECHANICAL SYMBOLS,ABBREVIATIONS, AND
GENERAL ANDCONSTRUCTION PHASING
NOTES
JCS
01/11/2017
ACU AIR CONDITIONING UNIT
AF AIR FILTER
AHU AIR HANDLING UNIT
BCU BLOWER COIL UNIT
CAV CONSTANT AIR VOLUME
CC COOLING COIL
CU CONDENSING UNIT
EAV EXHAUST AIR VALVE
EF EXHAUST FAN
F FAN
FAV FUME AIR VALVE
FCU FAN COIL UNIT
FD FIRE DAMPER
FSD COMBINATION FIRE/SMOKE DAMPER
H HUMIDIFIER
HC HEATING COIL
HEV HOOD EXHAUST VALVE
HPU HEAT PUMP UNIT
HWP HEATING WATER PUMP
L LOUVER
MD MOTORIZED DAMPER
P PUMP
PICV PRESSURE INDEPENDENT CONTROL VALVE
RHC TERMINAL REHEAT COIL
RTU ROOFTOP UNIT
SAV SUPPLY AIR VALVE
SD SMOKE DAMPER
SF SUPPLY FAN
ST STEAM TRAP
UH UNIT HEATER
VAV VARIABLE AIR VOLUME BOX
MANU MANUFACTURER
MAX MAXIMUM
MBH THOUSAND BRITISH THERMAL UNITS PER HOUR
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MERV MINIMUM EFFICIENCY REPORTING VALUE (ASHRAE 52.2)
MFR MANUFACTURER
MIN MINIMUM OR MINUTE (PER CONTEXT)
MTD MOUNTED
MTL METAL
MV MANUAL VENT
NC NORMALLY CLOSED OR NOISE CRITERIA (PER CONTEXT)
NIC NOT IN CONTRACT
NO NORMALLY OPEN OR NUMBER (PER CONTEXT)
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OT OIL TRAP
PA PIPE ANCHOR
PBD PARALLEL BLADE DAMPER
PD PRESSURE DROP
PENT PENTHOUSE
PH PHASE
PHC PREHEAT COIL
PLBG PLUMBING
PNEU PNEUMATIC
PPH POUNDS PER HOUR
PRESS PRESSURE
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
QTY QUANTITY
RA RETURN AIR
REFR REFRIGERANT
REQ REQUIRED
RH RELATIVE HUMIDITY
RM ROOM
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SAN SANITARY
SEC'N SECTION
SEER SEASONAL ENERGY EFFICIENCY RATIO
SENS SENSIBLE
SF SQUARE FOOT
SH SENSIBLE HEAT
SHT SHEET
SND SOUND
SOL SOLENOID
SP STATIC PRESSURE
SPD STATIC PRESSURE DIFFERENTIAL
SPT STATIC PRESSURE TRANSMITTER
SQ SQUARE
SST STAINLESS STEEL
STL STEEL
STM STEAM
T&P TEMPERATURE AND PRESSURE
TC TEMPERATURE CONTROL
TD THERMODYNAMIC OR TEMPERATURE DIFFERENTIAL (PER CONTEXT)
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TOT TOTAL
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UC UNDERCUT DOOR
UNO UNLESS NOTED OTHERWISE
V VOLTS
VAC VACUUM
VD VOLUME DAMPER (MANUAL)
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
VTR VENT THRU ROOF
W WATT OR WIDTH (PER CONTEXT)
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER COLUMN
WG WATER GAUGE
WPD WATER PRESSURE DIFFERENTIAL
WT WEIGHT
A AIR OR AMP (PER CONTEXT)
ACC ACCESSORIES
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFS AIR FLOW SWITCH
AI ANALOG SIGNAL INPUT
AMB AMBIENT
AO ANALOG SIGNAL OUTPUT
AP ACCESS PANEL
APD AIR PRESSURE DROP
APPROX APPROXIMATE
ARCH ARCHITECTURE/ARCHITECT
AUX AUXILIARY
AV AUTOMATIC VENT
AVG AVERAGE
BDD BACK DRAFT DAMPER
BFC BELOW FINISHED CEILING
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BI BINARY SIGNAL INPUT
BMS BUILDING MANAGEMENT SYSTEM
BO BINARY SIGNAL OUTPUT
BOB BOTTOM OF BEAM
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BS BEAM SPACE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CAV CONSTANT AIR VOLUME
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CLG COOLING DUCT (COLD DUCT)
CO CLEAN OUT
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
CORR CORRIDOR
CV CONTROL VALVE
D DEPTH
DB DRY BULB
DBA A-WEIGHTED DECIBELS
DEFL DEFLECTION
DEG DEGREES
DEG F DEGREES FAHRENHEIT
DES DESIGN
DIA DIAMETER
DIM DIMENSION
DISCH DISCHARGE
DIV DIVISION
DN DOWN
DP DIFFERENTIAL PRESSURE SENSOR
DPS DIFFERENTIAL PRESSURE SWITCH
DPT DIFFERENTIAL PRESSURE TRANSMITTER
DTL DETAIL
DWG(S) DRAWING(S)
EA EXHAUST AIR OR EACH (PER CONTEXT)
EAT ENTERING AIR TEMPERATURE
EFF EFFICIENCY
ELEC ELECTRIC
ELEV ELEVATION
EQ EQUAL
ESP EXTERNAL STATIC PRESSURE
EWB ENTERING AIR WET BULB TEMPERATURE
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST, EX EXISTING
EXT EXTERNAL
F FAHRENHEIT
FC FLEXIBLE CONNECTION
FD FLOOR DRAIN
FIN FINISHED
FLR FLOOR
FPF FINS PER FOOT
FPM FEET PER MINUTE
FT FEET
FT-HD HEAD IN FEET
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
H HEIGHT
HD HEAD
HEV HOSE END VALVE
HORIZ HORIZONTAL
HP HORSEPOWER
HR HOUR
HTG HEATING DUCT (HOT DECK)
HVAC HEATING, VENTILATING & AIR CONDITIONING
HW HOT WATER
HZ HERTZ
IN INCH/INCHES
INDIC INDICATOR
ISP INTERNAL STATIC PRESSURE
JS JOIST SPACE
KW KILOWATTS
L LENGTH
LAT LEAVING AIR TEMPERATURE
LB(S) POUNDS
LF LINEAR FEET
LVL LEVEL
LWT LEAVING WATER TEMPERATURE
MAN MANUAL
THESE PLANS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR SHALL BE PREPARED TO MAKE SOME ALTERATIONS TO THE EXACTLOCATION OF DUCTWORK, PIPING AND EQUIPMENT FROM THE LOCATION INDICATED ON THESE DRAWINGS TO FIT ACTUAL JOBCONDITIONS.
ALL ELBOWS, FITTINGS, ETC., IN PIPING AND DUCTWORK REQUIRED TO CLEAR ALL JOB OBSTRUCTIONS ARE NOTNECESSARILY INDICATED. ALL NECESSARY TRANSITIONS, FITTINGS AND OFFSETS ARE REQUIRED WHETHER SHOWN OR NOT.
BECAUSE OF THE LIMITED SPACE AVAILABLE TO INSTALL ALL OF THE MECHANICAL WORK, COORDINATION BETWEENTHE VARIOUS TRADES IS OF THE UTMOST IMPORTANCE.
THE CONTRACTOR SHALL COORDINATE STAGING AND SCHEDULING WITH THE OWNER'S REPRESENTATIVE.
EXISTING CONDITIONS ARE BASED ON INFORMATION OBTAINED FROM PREVIOUS CONSTRUCTION DOCUMENTS AND INFORMAL FIELDOBSERVATION AND SHALL NOT BE CONSTITUTED AS "AS BUILT." THE CONTRACTOR SHALL FIELD-VERIFY EXISTING CONDITIONSBEFORE THE ONSET OF CONSTRUCTION.
DEMOLISH ALL PIPING, DUCTWORK EQUIPMENT, ETC., SHOWN TO BE REMOVED, IN ITS ENTIRETY,INCLUDING ALL HANGERS ANDSUPPORTS.
WHERE CONTRACTOR IS REQUIRED TO CONCEAL NEW WORK, REMOVE OR MODIFY EXISTING CONSTRUCTION OR EQUIPMENT, ORATTACH TO EXISTING CONSTRUCTION, THE CONTRACTOR SHALL REPAIR OR REPLACE EXISTING CONSTRUCTION AND MATERIALS TOMATCH CONDITIONS AT THE ONSET OF CONSTRUCTION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REMOVE AND REPLACE EXISTINGCEILINGS AND WALLS REQUIRED FOR INSTALLATION OF MECHANICAL SYSTEMS.
THE OWNER SHALL MAINTAIN ALL SALVAGE RIGHTS OF EQUIPMENT AND MATERIALS REMOVED. ALL EQUIPMENT AND MATERIALS NOTCLAIMED BY THE OWNER SHALL BE REMOVED FROM THE PREMISES BY THIS CONTRACTOR.
ALL EXISTING DDC CONTROLS LOCATED IN THE 5TH FLOOR MECHANICAL ROOM SHALL BE REMOVED BY ONLY THE OWNER.
ALL WORK SHALL BE INSTALLED PER THE REFERENCE DETAILS, REGARDLESS OF WHETHER OR NOT THE DETAILS ARE CALLED OUT ONTHE PLANS. SEE 500 SERIES SHEET(S).
PROVIDE VENTS AT ALL HYDRONIC PIPING HIGH POINTS, AND DRAINS AT ALL PIPING LOW POINTS, REGARDLESS OF WHETHER SHOWN ORNOT.
DUE TO EXTENSIVE OCCURRENCE OF HAZARDOUS MATERIALS USED IN THE ORIGINAL CONSTRUCTION OF THE BUILDING (I.E. LEAD-BASEDPAINT, ASBESTOS INSULATION, AND TRANSITE EXHAUST DUCTWORK), THE CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THEABATEMENT CONTRACTOR. EFFORTS HAVE BEEN MADE TO SHOW THE MAJORITY OF THIS DEMOLITION ON THE PLANS, BUT CLEARLY, THEEXACT LOCATION AND EXTENT OF THIS DEMOLITION MUST BE FULLY COORDINATED. NOTE: FOR ALL INSTANCES WHERE EXISTINGHAZARDOUS MATERIALS WERE REMOVED FROM EXISTING PIPING SYSTEMS WHICH WILL REMAIN IN PLACE FOLLOWING THIS PROJECT,CONTRACTOR SHALL INSTALL NEW INSULATION ON EXISTING EXPOSED PIPING MEETING INSULATION SPECIFICATIONS. DO NOT LEAVEANY EXISTING PIPING UNINSULATED.
ALL DUCTWORK SHALL COMPLY WITH "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE," SMACNA LATEST EDITION,EXCEPT WHERE MORE RESTRICTIVE REQUIREMENTS ARE SPECIFIED. ANY PLAN REFERENCES TO "SMACNA FIGURE ---" REFERS TO THISSTANDARD. SEE SPECIFICATIONS FOR SCHEDULE OF DUCT PRESSURE CLASS AND SEAL CLASS.
IT IS THE INTENT OF THESE DRAWINGS THAT A MANUAL BALANCING DAMPER BE PROVIDED AT EVERY INDIVIDUAL DUCTED CONNECTIONTO AN AIR DEVICE. NOTE, UNLESS A BALANCING DAMPER IS SCHEDULED TO BE FURNISHED WITH AIR DEVICE. PROVIDE A MANUALBALANCING DAMPER IN EACH INDIVIDUAL BRANCH DUCT SERVING AN AIR DEVICE BETWEEN THE CONNECTION TO THE DUCT SERVINGMULTIPLE DEVICES AND THE AIR DEVICE WHEN HARD DUCTED AND AT EACH POINT OF CONNECTION OF FLEX DUCT RUNOUT TO BRANCHDUCT (AT THE SPIN-IN FITTING) WHERE FLEX DUCT IS USED.VAV BOXES WITH SINGLE DIFFUSERS ARE NOT REQUIRED TO HAVE ABALANCING DAMPER.
COORDINATE WITH OWNER'S REPRESENTATIVE TO VERIFY ALL EXISTING OWNER SALVAGED AND OWNER REMOVED CONTROLS WORK ISCOMPLETE. ALL EXISTING TEMPERATURE CONTROLS THAT ARE BEING DEMOLISHED OR DISABLED AS WORK OF THIS CONTRACT SHALLBE COMPLETELY REMOVED FROM THIS PROJECT WORK AREA. REMOVE ALL EXISTING CONTROL WIRING, PNEUMATIC TUBING ANDRELATED CONTROLS AND ALL ACCESSORIES MADE OBSOLETE BY THE WORK OF THIS PROJECT. PROVIDE A BRASS COMPRESSION CAPTYPE FITTING AT ALL UNUSED TERMINATIONS. DO NOT PINCH-OFF TUBING.
THE CONTRACTOR SHALL CONNECT THE NEW HVAC CONTROL SYSTEM TO THE OWNER'S EXISTING BUILDING CONTROL SYSTEM. REFER TOTHE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
THE WORK OF SECTION 230900 SHALL INCLUDE THE FOLLOWING ELECTRICAL WORK, COMPLYING WITH REQUIREMENTS OF DIVISION26 SECTIONS:
A. CONTROL WIRING BETWEEN FIELD-INSTALLED CONTROLS, INDICATING DEVICES, AND UNIT CONTROL PANELS.
B. INTERLOCK WIRING BETWEEN ELECTRONICALLY OPERATED EQUIPMENT UNITS AND BETWEEN EQUIPMENT AND FIELD INSTALLEDCONTROL DEVICES.
C. POWER SUPPLY WIRING FROM POWER SOURCES TO POWER CONNECTION ON CONTROLS AND/OR UNIT CONTROL PANELS,INCLUDING, BUT NOT LIMITED TO, AIR TERMINAL UNIT CONTROLLERS, DDC PANELS, DAMPER ACTUATORS, AND VALVE ACTUATORS.
IT SHOULD BE NOTED THAT EXHAUST SYSTEMS MAY BE REQUIRED TO BE BALANCED MORE THAN ONCE TO ASSURE DESIGNAIRFLOWS ARE PROVIDED.
THE SCOPE OF WORK FOR THIS PROJECT IS LOCATED ON FLOORS 1 THROUGH 5 OF THE MEDICAL SCIENCE BUILDING. IT ISSTRONGLY ENCOURAGED THAT THE CONTRACTOR VISITS THE SITE PRIOR TO SUBMITTING HIS OR HER BIDS. CONTRACTOR SHALLINCLUDE IN HIS OR HER BID ALL COSTS TO DISASSEMBLE AND REASSEMBLE NEW EQUIPMENT IN ORDER TO MOVE IT INTO PLACE.COSTS SHALL INCLUDE MANUFACTURER SUPERVISION THAT IS REQUIRED TO MAINTAIN EQUIPMENT WARRANTIES IN FULL. EQUIPMENTIS NOT ALLOWED TO BE CUT TO BE BROUGHT INTO PLACE. CONTRACTOR SHALL PROTECT STAIR AND SERVICE ELEVATOR TO NOTDAMAGE DURING CONSTRUCTION. ALL DAMAGE SHALL BE AT THE COST OF THE CONTRACTOR TO REPAIR TO MATCH EXISTINGCONDITIONS. ACCESS TO THE JOB SITE IS THROUGH THE EXISTING BUILDING (EXISTING STAIRS AND SERVICE ELEVATOR). ALLEQUIPMENT AND MATERIALS SHALL BE BROUGHT TO THE WORK AREA THROUGH THESE MEANS ONLY. CONTRACTOR SHALL FIELDVERIFY SERVICE ACCESS. THE EXISTING SERVICE ELEVATOR HAS LIMITED ACCESS OF 83 INCHES TALL BY 84 INCHES DEEP BY 43
INCHES WIDE. CONTRACTOR SHALL PROTECT INTEGRITY OF ELEVATOR PER ELEVATOR PROTECTION NOTES ON THIS SHEET.
COORDINATE DRAINING AND FILLING OF CHILLED WATER SYSTEM WITH OWNER'S REPRESENTATIVE.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO VENT AIR FROM ALL COILS AFFECTED BY WORK OF THIS PROJECT. REFER TO M401FOR MORE INFORMATION AND CONSULT OWNER'S REPRESENTATIVE TO HELP ENSURE COILS ARE NOT MISSED.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
1 01/20/17 ADDENDUM 1
ROOF
SCHOOL OF NURSING
3. SPOT COOLER SHALL REMAIN IN SERVICE UNTIL NEW AHU-11 IS MAHE OPERATIONAL.
2. SPOT COOLER SHALL BE COMPATIBLE WITH STANDARD NEMA 5-15 PLUG.
1. CONTRACTOR SHALL PROVIDE SCHEDULED MAKE/MODEL OR APPROVED EQUAL. PROVIDE SPOT COOLER WITH FACTORY HOSES AND CONDENSATE PUMP
NOTES:
PLAN MARK MFR. MODEL SERVICE LOCATION
AIRFLOW(CFM) NOTES
SC 1 SPOT COOLER OFFICE PRO 12 M529 410 1, 2, 3
2
3
4
5
SC
SC
SC
SC
SPOT COOLER
SPOT COOLER
SPOT COOLER
SPOT COOLER
OFFICE PRO 12
OFFICE PRO 12
OFFICE PRO 12
OFFICE PRO 12
M528
M526
M531
M533
M529
M528
M526
M531
M533
410
410
410
410
TOTAL COOLINGCAPACITY (MBH)
12.0
12.0
12.0
12.0
12.0
V/PH/HZ
120 / 1 /60
120 / 1 /60
120 / 1 /60
120 / 1 /60
120 / 1 /60
ELECTRICAL DATA
1, 2, 3
1, 2, 3
1, 2, 3
1, 2, 3
TEMPORARY SPOT COOLER SCHEDULE
RESEARCHLABORATORY
M531
RESEARCHOFFICE
M533
RESEARCHOFFICE
M530
RESEARCHOFFICE
M526
COOLER
M525
RESEARCHLABORATORY
M529
MEN'SREST.
M536
WOMEN'SREST.
M535
CORRIDOR
M517
RESEARCHLABORATORY
M523
RESEARCHLABORATORY
M522
MECHANICALROOM
M524
TISSUECULTURE
M521
CELLCULTURE
M519A
RESEARCHOFFICE
M520
RESEARCHLABORATORY
M519
RESEARCHLABORATORY
M518
MICROSCOPELAB
M518B
MICROSCOPELAB
M518C
OFFICE
M517C
M516A
RESEARCHLABORATORY
M514
RESEARCHLABORATORY
M512
RESEARCHOFFICE
M512A
M511
RESEARCHLABORATORY
M509
LABSERV
M508
RESEARCHLABORATORY
M506M505
RESEARCHOFFICE
M503A
RESEARCHLABORATORY
M504
RESEARCHLABORATORY
M503
RESEARCHLABORATORY
M538
RESEARCHLABORATORY
M537
MICROSCOPELAB
M518A
OFFICE
M516B
OFFICE
M516C
OFFICE
M516D
OFFICE
M516E
OFFICE
M516F
OFFICE
M516
OFFICESERVICE
OFFICE
RESEARCHOFFICE
RESEARCHLAB
M528
1
3
2 2 2 2 2 2 2 2 2 2 2 2 2 2
222222222
1
1
SC
4
SC
5
SC
1
SC
2
SC
3
4
6
6
7
7
8
5
5
1
1
9
5
5
10
11
11
12
12
1
2
3
CONTRACTOR SHALL REFER TO CONSTRUCTIONPHASING NOTES ON SHEET M000 FOR INFORMATIONREGARDING REQUIREMENTS AND RESTRICTIONS ONANY CONSTRUCTION ACTIVITIES IMPACTING BUILDINGOPERATIONS AND SYSTEMS.
CONTRACTOR SHALL INSTALL TEMPORARY FRAMEDPLASTIC CONSTRUCTION BARRIER(S) TO CONTAINDUST AND DEBRIS ASSOCIATED WITHCONSTRUCTION ACTIVITIES. BARRIER(S) SHALL BEDESIGNED TO MAINTAIN ACCESS TO REGULARLYOCCUPIED SPACES. BARRIER(S) SHALL BECONSTRUCTED PRIOR TO DEMOLITION AND SHALLREMAIN IN PLACE UNTIL CONSTRUCTION ISCOMPLETE. INSTALL STICKY MATS PADS IN FRONTOF ALL TEMPORARY DOORS ASSOCIATED WITHCONSTRUCTION BARRIER(S). REFER TO DIVISON 1SPECIAL CONDITIONS FOR MORE INFORMATION.
FOR ALL WORK IN OCCUPIED LAB AND OFFICESPACES, CONTRACTOR SHALL COMPLETELY COVERALL BENCHTOPS, SHELVING, CABINETS, FURNITURE,AND EQUIPMENT WITH PROTECTIVE PLASTICSHEETING TO PREVENT DAMAGE. TEMPORARYPROTECTIVE COVERING SHALL REMAIN IN PLACEPRIOR TO DEMOLITION THROUGH COMPLETION OFWORK WITHIN THE SPACE. UPON COMPLETION OFWORK, CONTRACTOR SHALL WIPE DOWNCOUNTERS, TABLES, AND FURNITURE, AND VACUUMAS NECESSARY TO RETURN SPACE TO ORIGINALCONDITION PRIOR TO CONSTRUCTION.
GENERAL NOTES:
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:4
3 P
M
505-106
M001
DPP
FIFTH FLOOR TEMPORARYCOOLING AND
CONSTRUCTION PHASINGPLAN
JCS
01/11/2017
1/8" = 1'-0"1
FIFTH FLOOR TEMPORARY COOLING ANDCONSTRUCTION PHASING PLAN
KEYED NOTES:
1 CONTRACTOR SHALL PROVIDE TEMPORARY SPOTCOOLER TO SERVE SPACE. CONTRACTOR TOTEMPORARILY ROUTE PUMPED CONDENSATE LINE TONEARBY SINK OR FLOOR DRAIN. DRAIN LINE SHALL BEROUTED IN A MANNER TO AVOID CREATING A TRIPHAZARD FOR BUILDING OCCUPANTS. ROUTE SPOTCOOLER HOT VENT HOSE TO NEAREST RA DUCT.PATCH RA DUCT AIRTIGHT ONCE SPOT COOLER ISREMOVED FROM SERVICE.
2 OWNER-FURNISHED WINDOW AC UNIT. CONTRACTORSHALL COORDINATE WITH OWNER'S REPRESENTATIVETO OBTAIN WINDOW UNITS SALVAGED FROM THELATHROP AND LAWS DEMOLITION PROJECT TOPROVIDE TEMPORARY COOLING FOR SPACES SERVEDBY AHU-11. CONTRACTOR SHALL PROVIDE ANDINSTALL PLYWOOD PANELS TO SUPPORT WINDOWUNIT AND BLANK-OFF REMAINING WINDOW OPENINGFOLLOWING UNIT INSTALLATION. WINDOW UNITSSHALL REMAIN IN SERVICE UNTIL NEW AHU-11 IS MADEOPERATION. WINDOW UNITS SHALL BE RETURNED TOOWNER'S REPRESENTATIVE IN GOOD WORKINGORDER. FOLLOWING REMOVAL OF WINDOW UNIT,CONTRACTOR SHALL PATCH / PAINT WINDOW FRAMINGAND SURROUNDING SURFACES TO REPAIR ANYDAMAGE CAUSED BY INSTALLATION OF UNIT ANDSURROUNDING PLYWOOD SUPPORT.
3 CONTRACTOR SHALL INSTALL A TEMPORARYWALL-MOUNTED PROPELLER EXHAUST FAN ONEXISTING LOUVER TO EXHAUST AND NEGATIVELYPRESSURIZE THE CONSTRUCTION AREA.CONTRACTOR SHALL CONSTRUCT TEMPORARYCONSTRUCTION ZONE PARTITIONS TO PREVENTMITIGATION OF DUST TO THE ADJACENT OCCUPIEDSPACES. EXHAUST FAN SHALL EXHAUST MINIMUM 500CFM. FAN SHALL REMAIN OPERATIONAL UNTIL AHU-11IS MADE OPERATIONAL.
4 EXISTING OPENING IN CMU WALL BETWEENMECHANICAL ROOM AND CORRIDOR PUT IN PLACE ASWORK OF A PRIOR PROJECT. INSTALLATION OF DOORIS PENDING. AT THE DISCRETION OF THECONTRACTOR, THE EXISTING CMU WALL MAY BEREMOVED AS NECESSARY TO FACILITATE THE WORK.WALL MUST BE REPLACED TO MATCH EXISTING IFREMOVED.
5 ALL WORK WITHIN THIS HATCHED REGION CONSISTINGOF NORTH HALF OF CORRIDOR, OFFICE M526, AND LABM528 SHALL BE COMPLETED IN A 1 WEEK WINDOW,START TO FINISH.
6 ALL WORK WITHIN THIS HATCHED REGION CONSISTINGOF LAB M529 AND OFFICE M530 SHALL BE COMPLETEDIN A 1 WEEK WINDOW, START TO FINISH. SOUTH HALFOF LAB SHALL REMAIN OPERATIONAL THROUGHOUTENTIRE DURATION OF WORK IN THIS AREA.
7 ALL WORK WITHIN THIS HATCHED REGION CONSISTINGOF LAB M531 AND OFFICE M533 SHALL BE COMPLETEDIN A 2 WEEK WINDOW, START TO FINISH. NORTH HALFOF LAB SHALL REMAIN OPERATIONAL THROUGHOUTENTIRE DURATION OF WORK IN THIS AREA.
8 A FULL HEIGHT DUST PARTITION SHALL BE INSTALLEDHERE TO SEPARATE THIS LAB INTO TWO SEPARATEZONES TO ALLOW FOR PHASED CONSTRUCTION.
9 A FULL HEIGHT DUST PARTITION WITH ACCESS DOORSHALL BE INSTALLED HERE TO SEPARATE THECORRIDOR INTO TWO SEPARATE ZONES TO ALLOWFOR PHASED CONSTRUCTION.
10 ALL WORK WITHIN LAB M521 SHALL BE COMPLETED INA 1 WEEK WINDOW, START TO FINISH.
11 ALL WORK WITHIN THIS HATCHED REGION CONSISTINGOF SOUTH HALF OF CORRIDOR SHALL BE COMPLETEDIN A 1 WEEK WINDOW, AFTER COMPLETION OFCONSTRUCTION IN NORTH HALF OF CORRIDOR.
12 AFTER COMPLETION OF WORK IN SOUTH CORRIDOR,CONTRACTOR SHALL PROVIDE A TEMPORARY FULLHEIGHT DUST PARTITION (SIZED APPROXIMATELY ASSHOWN BY HATCHED REGION) WITH ACCESS DOOR TOPROTECT OCCUPIED SPACES FROM CONSTRUCTIONDUST AND DEBRIS WHILE STILL ALLOWING LABOCCUPANTS TO ENTER LAB M531 AND OFFICE M533.
#
NORTH
KEY PLAN
EAST WINGWEST WING
NORTHWESTWING
NORTHEASTWING
SOUTHWING
SCOPEAREA
LOCATIONOF SERVICEELEVATOR
1
1
1
1 01/20/17 ADDENDUM 1
DN
LOCKERS LOCKERSLOCKERS LOCKERS
LOCKERS
LOCKERS
LOCKERS
LOCKERS
LOCKERS LOCKERS
LOCKERS
526
527
EXTERIOR STAIR
(STAIRWAY TAKENOUT OF SERVICE)
CW
R
CW
S
HWRHWS
LPSLPSLPS
EX 6"HWSEX 6"HWR
LP
S
2 1/2" HWS2 1/2"HWR
6" CWS6" CWR
2 1
/2"H
WR
2 1
/2"H
WS
6" CWS6" CWR
6" CWS6" CWR
6" CWS
6" CWR
ABANDONEDPIPING
EXISTING LPSTO REMAIN
EXISTING LPSTO REMAIN
EX 2 1/2"HWSEX 2 1/2"HWREX 4" CWSEX 4" CWR
2 1/2" HWS2 1/2" HWR
6" CWS
6" CWR
INSTRUCTIONAL LABGROSS ANATOMY
M148
LAB ENTRY
M144
UNEMBALMEDLAB
M144C6" HWSUP/DOWN6" HWRUP/DOWN
12" CWSUP/DOWN12" CWRUP/DOWN
10" HWSFROMBELOW
EMBALMEDLAB
M144B
INSTRUCTIONALLAB
M134
INSTRUCTIONALLAB
M133
INSTRUCTIONALLAB
M132
INSTRUCTIONALLAB
M131
INSTRUCTIONALLAB
M126
STORAGE
M125A
STORAGE
M125B
STORAGE
M125
ELECSTO
MY100A
6" HWR6" HWS
2
1
1
1
2
2
2
2
2
2
2
2
1
2
EXISTING CWS/CWRTO REMAIN
EXISTING CWS/CWRTO REMAIN
EXISTING CWS/CWRTO REMAIN
3
CORR
M145
2
DRESSROOM
M144A
CHEMSTOR
M144B-1
CAP
CAP
EXISTINGABANDONEDDUCTS
4
10" HWRDN
8"x12"
30"x12"
3
3
3
5
66
7 7
7 7
8 8
88
78
1
1.
2.
3.
SEE M000 FOR GENERAL NOTES.
ALL PIPING SHOWN DASHED SHALL BECOMPLETELY REMOVED ALONG WITH ALLASSOCIATED HANGERS AND SUPPORTS.
CONTRACTOR SHALL REFER TO CONSTRUCTIONPHASING NOTES ON SHEET M000 FORINFORMATION REGARDING REQUIREMENTS ANDRESTRICTIONS ON ANY CONSTRUCTION ACTIVITIESIMPACTING BUILDING OPERATIONS AND SYSTEMS
GENERAL NOTES:
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:5
1 P
M
505-106
MD101
DPP
FIRST FLOOR DEMOLITIONPLAN
JCS
01/11/2017
NORTH
1/8" = 1'-0"1
FIRST FLOOR DEMOLITION PLAN
KEYED NOTES:
1 NO CEILING EXISTS IN THIS SPACE.
2 REMOVE AND REINSTALL EXISTING ACOUSTICALCEILING TILES AND GRID IN THIS ROOM TO ALLOWFOR DEMOLITION OF EXISTING PIPING. STORETILES IN SAFE PLACE, FREE OF OBSTRUCTION TOMINIMIZE DAMAGE. REPLACE ANY DAMAGED GRIDAND CEILING TILES TO THE SATISFACTION OF THEOWNER.
3 DEMO EXISTING HEATING HOT WATER PIPING BACKTO EXISTING 10-INCH SHUTOFF VALVES, ALONGWITH ALL ASSOCIATED HANGERS AND SUPPORTS.
4 DEMOLISH SECTION OF EXISTING ABANDONEDDUCTWORK BACK TO NEAREST JOINT TO PROVIDECLEAR PATH FOR NEW HEATING HOT WATERRISERS. CAP OPEN ENDS OF DUCTS AIRTIGHTFOLLOWING DEMOLITION.
5 REMOVE SECTION OF CHILLED WATER PIPING.ALONG WITH EXISTING SHUTOFF VALVES.
6 EXISTING CHILLED WATER SHUTOFF VALVES ACTAS THE PRIMARY MEANS OF SHUTTING OFF THECHILLED WATER SYSTEM. COORDINATE ALLSYSTEM SHUTDOWNS WITH OWNER'SREPRESENTATIVE. SEE M000 FOR MOREINFORMATION.
7 WORK WITHIN THIS BOUNDARY SHALL BEPERFORMED ONLY WHEN MEDICAL SCIENCESBUILDING IS SCHEDULED TO BE UNOCCUPIEDBETWEEN MARCH 4, 2017 AND MARCH 12, 2017.REFER TO CONSTRUCTION PHASING NOTE #1 ONM000 FOR MORE INFORMATION.
8 FOR ALL SPACES WITHIN THIS BOUNDARY, PRIORTO DEMOLITION CONTRACTOR SHALLCOMPLETELY COVER ALL FURNITURE,COUNTERTOPS, BENCES, AND EQUIPMENT WITHPROTECTIVE PLASTIC SHEETING TO PREVENTDAMAGE. TEMPORARY PROTECTIVE COVERINGSHALL REMAIN IN PLACE UNTIL COMPLETION OFWORK IN THIS AREA. UPON COMPLETION OF WORK,CONTRACTOR SHALL WIPE DOWN COUNTERS,TABLES, AND FURNITURE, AND VACUUM ASNECESSARY TO RETURN SPACE TO ORIGINALCONDITION PRIOR TO CONSTRUCTION.
#
KEY PLAN
EAST WINGWEST WING
NORTHWESTWING
NORTHEASTWING
SOUTHWING
SCOPEAREA
LOCATIONOF SERVICEELEVATOR
1
1 01/20/17 ADDENDUM 1
UP
1
MD103
58"x10"COLD
(BOTTOM)
58"x9"HOT
(TOP)
30"x9" HOT (TOP)30"x10" COLD(BOTTOM)
RESEARCHLABORATORY
M531
RESEARCHOFFICE
M533
RESEARCHOFFICE
M530
RESEARCHOFFICE
M526
COOLER
M525
RESEARCHLABORATORY
M529
MEN'SREST.
M536
WOMEN'SREST.
M535
CORRIDOR
M517
RESEARCHLABORATORY
M523
RESEARCHLABORATORY
M522
MECHANICALROOM
M524
38"x7" COLD(BOTTOM)
38"x6" HOT(TOP)
(BOTTOM)(TOP) (BOTTOM)(TOP) (BOTTOM)(TOP) (BOTTOM)(TOP)
TISSUECULTURE
M521
CELLCULTURE
M519A
RESEARCHOFFICE
M520
RESEARCHLABORATORY
M519
RESEARCHLABORATORY
M518
MICROSCOPELAB
M518B
MICROSCOPELAB
M518C
OFFICE
M517C
M516ARESEARCH
LABORATORY
M514
RESEARCHLABORATORY
M512
RESEARCHOFFICE
M512A
M511
RESEARCHLABORATORY
M509LABSERV
M508
RESEARCHLABORATORY
M506M505RESEARCHOFFICE
M503A
RESEARCHLABORATORY
M504
RESEARCHLABORATORY
M503
RESEARCHLABORATORY
M538 RESEARCHLABORATORY
M537
MICROSCOPELAB
M518A
OFFICE
M516B
OFFICE
M516C
OFFICEM516D
OFFICE
M516E
OFFICE
M516F
OFFICE
M516
OFFICESERVICEOFFICE
RESEARCHOFFICE
RESEARCHLAB
M528
14" EA UP (VR-103)
12" EA UP (VR-105)
10" EA UP (VR-104)
14" EA DN
14" EA UP (VR-49)
12" EA UP (VR-58)
12" EA DN
14" EA DN
10" EA UP(VR-47)
10"x6" DN
10" EA UP(VR-55)
14" EA UP(VR-50)
14" EA DN
14" EA UP (VR-51)
10" EA UP (VR-107)
16" EA UP (VR-43)
14" EA DN
16" EA DN
16" EA DN
16" EA UP (VR-44)
16" EA UP (VR-48)
12" EA UP (VR-110)
10" EA UP (VR-109)
14" EA UP (VR-53)
14" EA DN
14" EA UP (VR-52)
10" EA UP (VR-108)
24"x24" EA UP
14" DUCTCAPPED
1
1
1
1
1
1
1
EX FUMEHOOD TOREMAIN
EX FUMEHOOD TOREMAIN
EX FUMEHOOD TOREMAIN
EX FUMEHOOD TOREMAIN
EX FUME HOODTO REMAIN
2
2
2
40"x9" HOT 40"x10" COLD 32"x9" HOT 32"x10" COLD 30"x9" HOT 30"x10" COLD35"x9" HOT 36"x10" COLD
12"ø EA
16"ø EA
16"ø EA10"ø EA10"ø EA
28"x10" RA 20"x10" RA34"x11" RA
48"x11" RA
48"x
10"
RA
48"x10" RA
14"ø EA12"ø EA
10"ø
EA
16"ø EA
14"ø EA 12"ø EA
14"ø EA
12"ø EA
14"ø
EA
32"x10" RA36"x10" RA
32"x12" RA
30"x12" RA
11"x14" RA
12"x6" RA
12"x6" RA
12"x8"
12"x
4"
RA
18"x
6"
RA
18"x
8"
RA
10"ø EA12"ø EA
14"ø EA
16"x12" EA
3
4
4
1
1
1
T
T
T
T
1.
2.
3.
4.
5.
SEE M000 FOR GENERAL NOTES.
EXISTING EXHAUST DUCTWORK IS CONSTRUCTED OFTRANSITE, AN ASBESTOS CONTAINING MATERIAL.CONTRACTOR SHALL COORDINATE WITH THE ABATEMENTCONTRACTOR REGARDING THE DISCONNECTION ANDREMOVAL OF ASBESTOS-CONTAINING MATERIAL. ABATEMENTCONTRACTOR SHALL ASSUME FULL RESPONSIBILTY ANDLIABILITY FOR COMPLIANCE WITH ALL APPLICABLE FEDERAL,STATE, AND LOCAL REGULATIONS PERTAINING TO WORKPLACES, NOTIFICATIONS, HAULING, DISPOSAL, ANDPROTECTION OF WORKERS, VISITORS TO THE SITE, ANDPERSONS OCCUPYING AREAS ADJACENT TO THE SITE
ALL MECHANICAL DEMOLITION MATERIAL SHALL BE REMOVEDFROM THE BUILDING VIA SERVICE ELEVATOR LOCATED IN THEWEST WING (SEE KEY PLAN). PRIOR TO TRANSPORTING ANDDISPOSING OF DEMOLITION DEBRIS, COORDINATE WITHABATEMENT CONTRACTOR TO ENSURE BULK MATERIAL ISCOMPLETELY WRAPPED AND CONTAINED.
OPEN ENDS ON ALL EXISTING DUCTWORK SHALL BETEMPORARILY COVERED TO PREVENT MITIGATION OF DUSTFOLLOWING DEMOLITION.
CONTRACTOR SHALL REFER TO CONSTRUCTION PHASINGNOTES ON SHEET M000 AND FIFTH FLOOR CONSTRUCTIONPHASING PLAN ON SHEET M001 FOR INFORMATION REGARDINGREQUIREMENTS AND RESTRICTIONS ON ANY CONSTRUCTIONACTIVITIES IMPACTING BUILDING OPERATIONS AND SYSTEMS.
GENERAL NOTES:
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:5
2 P
M
505-106
MD102
DPP
FIFTH FLOOR DEMOLITIONPLAN
JCS
01/11/2017
1/8" = 1'-0"1
FIFTH FLOOR DUCTWORK DEMOLITIONPLAN
KEYED NOTES:
1 DEMOLISH EXISTING DUAL DUCT AIR TERMINAL UNIT ANDASSOCIATED DUCTWORK AS SHOWN. REMOVE ALL HANGERSAND SUPPORTS ASSOCIATED WITH DUCTWORK TO BEDEMOLISHED. REMOVE ASSOCIATED PNEUMATIC CONTROLSAND CAP MAIN AIRTIGHT WITH A BRASS COMPRESSION CAPTYPE FITTING. DO NOT PINCH OFF TUBING.
2 DEMOLISH EXISTING HOT AND COLD DECK MAIN DUCTS(STACKED) IN CORRIDOR AS SHOWN.
3 REMOVE SECTION OF HOT AND COLD SA DUCTWORK TOALLOW FOR INSTALLATION OF NEW MANUAL VOLUMEDAMPER.
4 REMOVE EXISTING SECTION OF TRANSITE DUCTWORK BACKTO NEAREST JOINT IN ACCORDANCE WITH GENERAL NOTE#2.
NORTH
KEY PLAN
EAST WINGWEST WING
NORTHWESTWING
NORTHEASTWING
SOUTHWING
SCOPEAREA
LOCATIONOF SERVICEELEVATOR
#
1
1 01/20/17 ADDENDUM 1
UPDN
18"x
8"
RA
84"x9"
84"x10"
66"x
9"
16"x66"
64"x
11"
RA
36"x10"
36"x10"
36"x
10"
SA
16"x8"
16"x8"
16"x8"
30"x14" RA
(BELOW)
48"x18" OA UP
36"x10" SA36"x9" SA
84"x10" SA84"x9" SA
(COLD TOP)
(HOT BOTTOM)
78"x
10"
24"x18" EA UP
42"x10" SA
90"x36" OA UP70"x30" OA UP
EXISTINGAHU-11
24"x
18"
30"x
14"
(BE
LO
W)
(BE
LO
W)
(CO
LD
)
42"x
9"
SA
24"x
9"
SA
42"x18" OA UP
12"x18" OA UP
MECH RM.
M524
(HO
T)
12"x66" RA
EXISTING OAPLENUM
RESEARCHLABORATORY
M531
RESEARCHLABORATORY
M531
RESEARCHOFFICE
M531
RESEARCHOFFICE
M530
RESEARCHOFFICE
M526
COOLER
M525
LAB
M534
MEN'SREST.
M536
WOMEN'SREST.
M535
RESEARCHLABORATORY
M523
1
2
3
4
5
6
7
8
3
4
7
(COLD)
(ABOVE)
EXISTING EADUCT TO REMAIN
14"x14" EA
16"x16" EA
7
24"x6" RA
1
ABANDONED EARISERS TO REMAIN(TYP 4)
EXISTING OALOUVER TO REMAIN
EXISTING OALOUVER TO REMAIN
EXISTING OALOUVER TO REMAIN
5
5
5
3
EA
RA
13
12" EA UP(VR-106)
14" EA UP(VR-101)
(COLD)
38"x
8"
24"x
8"
14"x
8"
14
14
14
14
TEMPORARILY CAPDUCT FOLLOWINGDEMOLITION
21
21
36"x9"(HOT)
12
12
12
WE
LD
ED
-SS
T D
UC
T
48"x12" RA
48"x
12"
RA
48"x
12"
RA
64"x11" RA
58"x9" SA30"x
9"
SA
T
T
T
T
1.
2.
3.
4.
5.
6.
SEE M000 FOR GENERAL NOTES.
CONTRACTOR SHALL REMOVE ALL EXISTING PNEUMATICCONTROLS ASSOCIATED WITH AHU-11. REMOVE ALLPNEUMATIC AIR TUBING WITHIN EXISTING MECHANICALROOM AND CAP MAIN AIRTIGHT WITH A BRASSCOMPRESSION CAP TYPE FITTING. DO NOT PINCH OFFTUBING.
EXISTING EXHAUST DUCTWORK IS CONSTRUCTED OFTRANSITE, AN ASBESTOS CONTAINING MATERIAL.ADDITIONALLY, EXISTING HVAC PIPING IS INSULATED WITHASBESTOS CONTAINING MATERIAL. CONTRACTOR SHALLCOORDINATE WITH THE ABATEMENT CONTRACTORREGARDING THE DISCONNECTION AND REMOVAL OFASBESTOS-CONTAINING MATERIAL. ABATEMENTCONTRACTOR SHALL ASSUME FULL RESPONSIBILTY ANDLIABILITY FOR COMPLIANCE WITH ALL APPLICABLEFEDERAL, STATE, AND LOCAL REGULATIONS PERTAINING TOWORK PLACES, NOTIFICATIONS, HAULING, DISPOSAL, ANDPROTECTION OF WORKERS, VISITORS TO THE SITE, ANDPERSONS OCCUPYING AREAS ADJACENT TO THE SITE
ALL MECHANICAL DEMOLITION MATERIAL SHALL BEREMOVED FROM THE BUILDING VIA SERVICE ELEVATORLOCATED IN THE WEST WING (SEE KEY PLAN). PRIOR TOTRANSPORTING AND DISPOSING OF DEMOLITION DEBRIS,COORDINATE WITH ABATEMENT CONTRACTOR TO ENSUREBULK MATERIAL IS COMPLETELY WRAPPED AND CONTAINED.
OPEN ENDS ON ALL EXISTING DUCTWORK SHALL BETEMPORARILY COVERED TO PREVENT MITIGATION OF DUSTFOLLOWING DEMOLITION.
CONTRACTOR SHALL REFER TO CONSTRUCTION PHASINGNOTES ON SHEET M000 FOR INFORMATION REGARDINGREQUIREMENTS AND RESTRICTIONS ON ANY CONSTRUCTIONACTIVITIES IMPACTING BUILDING OPERATIONS AND SYSTEMS
GENERAL NOTES:
MECHANICALROOMNE300
MECHANICALROOM
NE300A
8"LPS
EXISTINGAHU-22
44"x18"RELIEF
DUCTCAP
44"x40"RELIEF
9
10
9
EXISTINGABANDONEDEXHAUSTRISERS
6" CWR
6" CWS
20
20
WOMEN'SRESTROOM
M239
MECHANICALROOM
M236
JANITORSCLOSET
M237
EXISTINGAHU-36
EXISTINGEXPANSIONTANK
EXISTINGEXHAUSTRISERS
36"x30" EA
24"x30" EA
11
11
HWS/HWRRISERS
11
3" LPR UP/DN8" LPS UP6" CWR UP6" CWS FROM ABOVE
EXISTING AHU-11
15 16
MECHANICALROOM
M523
EX
IST
. 6"
LP
S
EX
IST
. 4"
CW
R
EX
IST
. 4"
CW
S
16
15
16
15
17
17
1 1
/2"L
PR
BLOWERROOMNE400
BLOWERROOM
NE400A
8"LPS
EXISTING AHU-16
44"x18"
44"x40"RELIEF
RELIEF
9
10
EXISTINGABANDONEDEXHAUSTRISERS (TYP 4)
18
24"x24"EA
6" CWSUP/DN
6" CWRUP/DN
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:5
3 P
M
505-106
MD103
DPP
ENLARGED DEMOLITIONPLANS
JCS
01/11/2017
KEYED NOTES:
1 REMOVE SECTION OF 24x18 EA DUCT TO ALLOW FORINSTALLATION OF NEW CWS/R AND HWS/R RISERS.COORDINATE TEMPORARY SHUTDOWN OF EXHAUST SYSTEMWITH OWNER'S REPRESENTATIVE WITH MINIMUM TWO (2)WEEKS ADVANCE NOTICE.
2 DEMOLISH EXISTING AIR HANDLING UNIT ALONG WITHASSOCIATED HOT AND COLD DECK SUPPLY AIR, OUTSIDEAIR, AND RETURN AIR DUCTWORK AS SHOWN. CONTRACTORSHALL COMPLETELY REMOVE ALL HANGERS AND SUPPORTSASSOCIATED WITH DEMOLISHED DUCTWORK.
3 REMOVE RETURN AIR DUCTWORK RUNNING BENEATHOUTSIDE AIR PLENUM. TEMPORARILY CAP DUCT FOLLOWINGDEMOLITION.
4 TEMPORARILY BLANK OFF EXISTING LOUVERS FOLLOWINGREMOVAL OF OUTSIDE AIR PLENUM.
5 CAP EXISITNG OUTSIDE AIR DUCT AT SLAB.
6 EXISTING TEMPERATURE CONTROL PANEL ANDCONTROLLER TO BE REMOVED BY OWNER PRIOR TODEMOLITION. OWNER SHALL HAVE SALVAGE RIGHTS TO ALLFIELD CONTROL DEVICES ASSOCIATED WITH EXISTING AHUPRIOR TO START OF DEMOLITION. CONTRACTOR SHALLREMOVE ALL AHU-11 CONTROLS COMPONENTS NOTSALVAGED BY OWNER. REMOVE EXISTING PNEUMATICCONTROLS HARDWARE AND DEVICES IN ACCORDANCE WITHGENERAL NOTE 2.
7 DEMOLISH SECTION OF EXISTING RETURN AIR DUCTWORKAS SHOWN. CAP DUCT AT WALL AS SHOWN ON SECTION CON M301.
8 REMOVE SECTION OF DUCTWORK TO ALLOW FORINSTALLATION OF NEW MANUAL VOLUME DAMPER.
9 REMOVE EXISTING RELIEF AIR DUCTWORK AND ALLASSOCIATED HANGERS AND SUPPORTS. CAP REMAININGSECTION OF DUCT AT WALL.
10 PERMANENTLY BLANK OFF EXISTING RELIEF AIR LOUVERWITH AN INSULATED BLANK OFF PANEL. BLANK OFF PANELSHALL BE PAINT GRIP SHEET METAL PAINTED FLAT BLACKFACING EXTERIOR WITH 2" RIGID POLYISOCYANURATEBOARD INSULATED ENCAPSULATED BY A SECOND PIECE OFPAINT GRIP SHEET METAL PAINTED FLAT BLACK FACINGMECHANICAL ROOM SO NO INSULATION IS EXPOSED.INSULATION FLAME AND SMOKE SHALL MEET 25/50 RATINGS.PROVIDE AIRTIGHT SEAL BETWEEN BLANK OFF PANEL ANDLOUVER.
11 DEMOLISH EXISTING ABANDONED AIR HANDLING UNIT AH-36AND ALL ASSOCIATED DUCTWORK, PIPING, VALVES ANDOTHER HYDRONIC ACCESSORIES, AND ALL HANGERS ANDSUPPORTS. DEMOLISH ALL ASSOCIATED PNEUMATICTEMPERATURE CONTROLS INCLUDING ALL ACCESSIBLEPNEUMATIC TUBING. CAP EXISTING PNEUMATIC TUBING ATMAIN WITH A BRASS COMPRESSION CAP TYPE FITTING; DONOT PINCH OFF TUBING. DEMOLISH ASSOCIATED HWS/HWRPIPES DOWN TO FLOOR AND CAP. COORDINATE ANYREQUIRED OUTAGE OF STEAM SYSTEM WITH OWNER'SREPRESENTATIVE.
12 REMOVE SECTION OF EXISTING TRANSITE DUCTWORK BACKTO POINT OF CONNECTION WITH WELDED-SST DUCTWORKALONG WITH ASSOCIATED GRILLES, HANGERS, ANDSUPPORTS IN ACCORDANCE WITH GENERAL NOTE #3.
13 REMOVE EXISTING ABANDONED FLEX DUCT.
14 DEMOLISH EXISTING DUAL DUCT AIR TERMINAL UNIT ANDASSOCIATED DUCTWORK AS SHOWN. REMOVE ALL HANGERSAND SUPPORTS ASSOCIATED WITH DUCTWORK TO BEDEMOLISHED. REMOVE ASSOCIATED PNEUMATIC CONTROLSAND PROVIDE AN AIRTIGHT CAP AT MAIN CONTROL AIR LINE.
15 DEMO ALL EXISTING LPS AND LPR PIPING BACK TO MAIN ANDCAP. REMOVE ALL ASSOCIATED VALVES, TRAPS, ANDACCESSORIES, AND ALL ASSOCIATED HANGERS ANDSUPPORTS. COORDINATE ANY REQUIRED OUTAGE OF STEAMSYSTEM WITH OWNER'S REPRESENTATIVE. NOTE THATEXISTING STEAM SHUTOFF VALVE IS IN POOR CONDITION. IFVALVE IS UNABLE TO COMPLETELY SHUTOFF STEAMSUPPLY, STOP DEMOLITION WORK AND NOTIFY OWNER'SREPRESENTATIVE IMMEDIATELY.
16 DEMO EXISTING CHILLED WATER PIPING BACK TO MAIN,ALONG WITH ALL ASSOCIATED HANGERS AND SUPPORTS.CAP PIPES AT MAIN.
17 DEMOLISH EXISTING AIR HANDLING UNIT ALONG WITH ALLASSOCIATED COIL AND DRAIN PIPING, SUPPORTS, VALVES,AND APPURTENANCES.
18 DEMOLISH LENGTH OF EXISTING EXHAUST DUCT ASREQUIRED TO MAKE NEW CONNECTION. SEE M201 FOR NEWDUCTWORK.
19 REMOVE CWS/R RISER AND DISCONNECT AHU-16 BRANCHPIPING. DEMOLITION SHALL TERMINATE AT UNDERSIDE OF5TH FLOOR SLAB. PREPARE PIPE FOR NEW CONNECTION.
20 REMOVE CWS/R RISER AND DISCONNECT AHU-22 BRANCHPIPING. INFILL OPENINGS IN SLAB.
21 DEMOLISH EXISTING HOT AND COLD DECK MAIN DUCTS(STACKED) IN CORRIDOR AS SHOWN.
1/4" = 1'-0"1
ENLARGED FIFTH FLOOR DUCTWORKDEMOLITION PLAN
NORTH
#
KEY PLAN
EAST WINGWEST WING
NORTHWESTWING
NORTHEASTWING
SOUTHWING
SCOPEAREA
LOCATIONOF SERVICEELEVATOR
1/8" = 1'-0"4
PARTIAL THIRD FLOOR DEMOLITION PLAN
1/4" = 1'-0"3
PARTIAL SECOND FLOOR DEMOLITION PLAN
NORTH
NORTH
1/4" = 1'-0"2
FIFTH FLOOR PIPING DEMOLITION PLAN
NORTH
1/8" = 1'-0"5
PARTIAL FOURTH FLOOR DEMOLITION PLAN
NORTH
19
19
1
1 01/20/17 ADDENDUM 1
DN
LOCKERS LOCKERSLOCKERS LOCKERS
LOCKERS
LOCKERS
LOCKERS
LOCKERS
LOCKERS LOCKERS
LOCKERS
526
527
EXTERIOR STAIR
(STAIRWAY TAKENOUT OF SERVICE)
UPDN
CW
R
CW
S
LPSLPSLPS
EX 6"HWSEX 6"HWR
INSTRUCTIONAL LABGROSS ANATOMY
M148
INSTRUCTIONALLAB
M134
INSTRUCTIONALLAB
M133
INSTRUCTIONALLAB
M132
INSTRUCTIONALLAB
M131
INSTRUCTIONALLAB
M126
JANITOR
M125A
TELECOM
M125
ELECSTO
MY100A
EX 2 1/2"HWSEX 2 1/2"HWREX 4" CWSEX 4" CWR
6" HWSUP/DOWN6" HWRUP/DOWN
12" CWSUP/DOWN12" CWRUP/DOWN
10" HWRUP/DOWN10" HWSUP/DOWN
EXISTING LPSTO REMAIN
EXISTING LPSTO REMAIN
6"CWS
6" HWR6" HWS
NEW PIPERISERS6" HWS6" HWR6" CWS6" CWR
ABANDONEDPIPING
#2
2 2
2
2
2
2 2
2
3
3
3
3
6" CWS6" CWR
6" CWS6" CWR
6" CWS6" CWR
6" CWS
6" CWR
6" CWS
6" CWR
1 LAB ENTRY
M144
UNEMBALMEDLAB
M144C
EMBALMEDLAB
M144B
DRESSROOM
M144A
CHEMSTOR
M144B-1
2
2
CORR
M1452
CORR
M122
STORAGE
M125B
6"HWR6"HWS
6"HWR6"HWS
5
6
6
7
8
8
9
12
12
6"CWR
6"CWS13
EXABANDONEDDUCTS
15
15
20
20
20 20EXISTINGSERVICEELEVATOR
WOMEN'SRESTROOM
M239
MECHANICALROOM
M236
JANITORSCLOSET
M237
3
3
6"CWR
6"CWS
6"HWS
UP
UP
FROMABOVE
FROMABOVE
6"CWRDN
6"CWSFROMBELOW
DN
6"HWR
DN
6"HWS
4
4
4
4
16
17
17
MECHANICALROOM
NE300
MECHANICALROOM
NE300A
6"C
WS
6"C
WR
6"CWR
6"CWS
6"HWR
6"HWS
FROMABOVE
UP
UP
FROMABOVE
8"LPSEX
EX CWS/RTO AH-22
10
10 UP
4
EXISTING AHU-22
4
SECURE PIPES TOWALL. ROUTERISERS CLOSE TOWALL MAXIMUMACCESS IN MECHRM
6"CWS FROM ABOVE6"CWR UP
BLOWERROOM
NE400
BLOWERROOM
NE400A
3
8"LPSEX
4
EX CWS/R TO AHU-16
UP/DN
6"HWR
FROM BELOW
DN
EXISTING AHU-16
6"H
WS
6"H
WR
2 1/2"HWS
2 1/2"HWR
2-1/2" HWS/R UPTO AHU-11
6"HWS
6"HWR
6"HWS
6" HWS/R UP TO MECHRM 524 ABOVE
11
11
6"CWR UP
6"CWS FROM ABOVE
1010
18
18
6"CWSDN
6"CWRFROMBELOW
1919
1
1.
2.
SEE M000 FOR GENERAL NOTES.
CONTRACTOR SHALL REFER TO CONSTRUCTIONPHASING NOTES ON SHEET M000 FOR INFORMATIONREGARDING REQUIREMENTS AND RESTRICTIONS ONANY CONSTRUCTION ACTIVITIES IMPACTING BUILDINGOPERATIONS AND SYSTEMS
GENERAL NOTES:
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:4
5 P
M
505-106
M101
DPP
PIPING NEW WORK PLANS
JCS
01/11/2017
1/8" = 1'-0"1
FIRST FLOOR PIPING NEW WORK PLAN
KEY PLAN
EAST WINGWEST WING
NORTHWESTWING
NORTHEASTWING
SOUTHWING
SCOPEAREA
LOCATIONOF SERVICEELEVATOR
NORTH
#
1/4" = 1'-0"2
PARTIAL SECOND FLOOR PIPING NEWWORK PLAN
NORTH
1/4" = 1'-0"3
PARTIAL THIRD FLOOR PIPING NEW WORKPLAN
NORTH
1/4" = 1'-0"4
PARTIAL FOURTH FLOOR PIPING NEWWORK PLAN
NORTH
KEYED NOTES:
1 PROVIDE 10" TO 6" TRANSITION TO CONNECT TOEXISTING 10" SHUTOFF VALVES.
2 REMOVE AND REINSTALL EXISTING ACOUSTICALCEILING TILES AND GRID IN THIS ROOM TO ALLOWFOR INSTALLATION OF NEW PIPING. STORE TILES INSAFE PLACE, FREE OF OBSTRUCTION TO MINIMIZEDAMAGE. REPLACE ANY DAMAGED TILES TO THESATISFACTION OF THE OWNER.
3 NO CEILING EXISTS IN THIS SPACE.
4 4-INCH VALVED AND CAPPED CONNECTION FORFUTURE USE.
5 ROUTE PIPES VERTICALLY STACKED THROUGHWALL.
6 ROUTE PIPES THROUGH PATH OF EXISTINGABANDONED DUCTWORK DEMOLISHED AS WORK OFTHIS PROJECT. PATCH WALL OPENING TO INFILLVOID LEFT BY DEMOLISHED DUCTWORK FOLLOWINGINSTALLATION OF NEW PIPES.
7 OFFSET PIPES TO AVOID EXISTING DUCTWORK.ROUTE PIPE OVER DUCTWORK.
8 HOLD PIPES TIGHT TO STRUCTURE.
9 PROVIDE NEW SHUTOFF VALVES AT LOCATIONSHOWN PER SPEC. PROVIDE 6" TO 4" REDUCER JUSTUPSTREAM OF VALVES.
10 EXTEND NEW AHU BRANCH PIPING TO NEW CHILLEDWATER RISERS AS SHOWN. FIELD VERIFY EXISTINGPIPE SIZE.
11 PROVIDE 3/4" VALVED HOSE END DRAIN FOR 5THFLOOR PIPING.
12 PROVIDE 3/4" VALVED HOSE END DRAINCONNECTION FOR NEW RISERS.
13 ROUTE NEW HWS/R PIPES BENEATH EXISTINGABANDONED DUCTWORK AS SHOWN.
14 WORK WITHIN THIS BOUNDARY SHALL BEPERFORMED ONLY WHEN MEDICAL SCIENCESBUILDING IS SCHEDULED TO BE UNOCCUPIEDBETWEEN MARCH 4, 2017 AND MARCH 12, 2017.REFER TO CONSTRUCTION PHASING NOTE #1 ONM000 FOR MORE INFORMATION.
15 PROVIDE 6" TO 2-1/2" REDUCER TO CONNECT NEWAND EXISTING PIPING.
16 ROUTE PIPE AS CLOSE TO WALL AS POSSIBLE TOAVOID RESTRICTING ACCESS TO JANITORS CLOSET.
17 ALL HORIZONTAL PIPING IN THIS SPACE SHALL BEINSTALLED AS HIGH AS POSSIBLE, TIGHT TOSTRUCTURE.
18 CONNECT NEW 6" RISER TO EXISTING ATUNDERSIDE OF 5TH FLOOR SLAB.
19 HOLD NEW PIPING TIGHT TO SLAB
20 FOR ALL SPACES WITHIN THIS BOUNDARY,CONTRACTOR SHALL COMPLETELY COVER ALLFURNITURE, COUNTERTOPS, AND EQUIPMENT WITHPROTECTIVE PLASTIC SHEETING TO PREVENTDAMAGE. TEMPORARY PROTECTIVE COVERINGSHALL REMAIN IN PLACE UNTIL COMPLETION OFWORK IN THIS AREA. UPON COMPLETION OF WORK,CONTRACTOR SHALL WIPE DOWN COUNTERS,TABLES, AND FURNITURE, AND VACUUM ASNECESSARY TO RETURN SPACE TO ORIGINALCONDITION PRIOR TO CONSTRUCTION.
3
14
14 14
14
14
1
1
1 01/20/17 ADDENDUM 1
ROOF
SCHOOL OF NURSING
18"x
8"
RA
16"x8" SA16"x8" SA16"x8" SA16"x8" SA30"x
9"
SA
58"x10"(BOTTOM)
58"x9"(TOP)
30"x9" (TOP)30"x10" (BOTTOM)
42"x
9"
SA
24"x
9"
SA
60"x10" SARHC
5-1
66"x9" SA
RESEARCHLABORATORY
M531
RESEARCHOFFICE
M533
RESEARCHOFFICE
M530
RESEARCHOFFICE
M526
COOLER
M525
RESEARCHLABORATORY
M529
MEN'SREST.
M536
WOMEN'SREST.
M535
CORRIDOR
M517
RESEARCHLABORATORY
M523
RESEARCHLABORATORY
M522
MECHANICALROOM
M524
MD
1
30"x10"(BOTTOM)
30"x9"(TOP)
30"x10"(BOTTOM)
30"x9"(TOP)
1
M201
34"x11" RA 28"x10" RA 20"x10" RA 12"x6" RA
48"x10" RA
48"x12" RA
48"x
12"
RA
10"ø
EA
16"x
16"
RA
16"x
16"
RA
10"ø EA16"ø EA
16"ø EA
12"ø EA
14"ø EA
12"ø EA14"ø EA
14"ø EA
40"x9" SA 32"x9" SA 36"x9" SA 30"x9" SA40"x10" SA 32"x10" SA 36"x10" SA 30"x10" SA
36"x10" RA 32"x10" RA
32"x12" RA
(BOTTOM)(TOP) (BOTTOM)(TOP) (BOTTOM)(TOP) (BOTTOM)(TOP)
6"ø SA
(TYP 2)
155CFM
155CFM
8"ø
SA
VAV
550
VAV
551
24"x14" SA
600CFM
60"x10" SA
TISSUECULTURE
M521
CELLCULTURE
M519A
RESEARCHOFFICE
M520
RESEARCHLABORATORY
M519
RESEARCHLABORATORY
M518
MICROSCOPELAB
M518B
MICROSCOPELAB
M518C
OFFICE
M517C
M516ARESEARCH
LABORATORY
M514
RESEARCHLABORATORY
M512
RESEARCHOFFICE
M512A
M511
RESEARCHLABORATORY
M509LABSERV
M508
RESEARCHLABORATORY
M506
M505RESEARCHOFFICE
M503A
RESEARCHLABORATORY
M504
RESEARCHLABORATORY
M503
RESEARCHLABORATORY
M538
RESEARCHLABORATORY
M537
MICROSCOPELAB
M518A
OFFICE
M516B
OFFICE
M516C
OFFICEM516D
OFFICE
M516E
OFFICE
M516F
OFFICE
M516
OFFICESERVICEOFFICE
RESEARCHOFFICE
RESEARCHLAB
M528
450CFM
450CFM
E-1
500
E-1
500
E-3
250
E-1
450
E-2
150
10"ø EA
8"ø EA
12"x
4"
RA
14" EA UP (VR-103)
12" EA UP (VR-105)
10" EA UP (VR-104)
14"ø EA
12"ø EA10"ø EA
14" EA DN
12" EA UP (VR-106)
14" EA UP (VR-101)
14" EA UP (VR-49)
12" EA UP (VR-58)
12" EA DN
14" EA DN
10" EA UP(VR-47)
10"x6" DN
10" EA UP(VR-55)
14" EA UP(VR-50)
14" EA DN
14" EA UP (VR-51)
10" EA UP (VR-107)
16" EA UP (VR-43)
14" EA DN
16" EA DN
14"ø
EA
16"ø
EA
16" EA DN
16" EA UP (VR-44)
16" EA UP (VR-48)
12" EA UP (VR-110)
10" EA UP (VR-109)
14" EA UP (VR-53)
14" EA DN
14" EA UP (VR-52)
10" EA UP (VR-108)
24"x24" EA UP
E-1
500
E-1
500
E-4
60010"ø EA
14" FLEXDUCT
800CFM
E-1
500
500CFM
450CFM
E-1
550
1
500CFM
250CFM
250CFM
2
400CFM
3
3
3
12"ø EA
4
4
4
4
P
5
6
7
8
P
12"x8" SA
VAV
553
24"x12" SA
20"x
10"
SA
S-2
335
S-2
3359
9VAV
554
40"x
12"
SA
VAV
557
S-3
250
S-3
250
150CFM
10
S-2
40014"x14" SA
9
12"ø SA
S-4
400
100CFM
10
3
3
10S-4
4009
VAV
556
VAV
555
VAV
558
CORRIDOR
M529
14"x12" SA
12"x8" SA
10
20"x10" SA
S-2
300
11
11
(SST) (SST)12"ø EA
12"ø EA(SST)
22"x8" EA (SST)
10"ø EA(SST)
1
1
31
16"x
8"
SA
1
12
12
8"ø SA(TYP 2)
1
2
3
4
5
6
SEE M000 FOR GENERAL NOTES.
WORK OF THIS PROJECT INVOLVES CONVERTINGTHE AHU-11 AIR HANDLING SYSTEM FROM MINIMUMOUTSIDE AIR TO 100% OUTSIDE AIR. FOLLOWINGINSTALLATION OF NEW AHU, ALL EXISTING RETURNAIR DUCTWORK WILL ACT AS EXHAUST AIRDUCTWORK.
BALANCE EXISTING AND NEW EXHAUST DEVICES TOAIRFLOWS NOTED ON PLAN. REFER TO SHEET M103FOR BALANCING OF INDIVIDUAL EXHAUST RISERS.
UNLESS NOTED OTHERWISE, ALL SPACES HAVE NOCEILING (EXPOSED STRUCTURE).
CONTRACTOR SHALL REFER TO CONSTRUCTIONPHASING NOTES ON SHEET M000 AND FIFTH FLOORCONSTRUCTION PHASING PLAN ON SHEET M001FOR INFORMATION REGARDING REQUIREMENTSAND RESTRICTIONS ON ANY CONSTRUCTIONACTIVITIES IMPACTING BUILDING OPERATIONS ANDSYSTEMS.
FOR EACH LAB SERVED BY AHU-11, EXISTINGSUPPLY AIRFLOW SHALL BE MEASURED ANDADJUSTED AS NECESSARY TO ENSURE THAT LAB ISNEGATIVELY PRESSURIZED (MINIMUM 100 CFMOFFSET BETWEEN SA AND EA). LAB SUPPLYAIRFLOW SHALL BE MEASURED DOWNSTREAM OFEACH EXISTING DUAL DUCT TERMINAL UNIT.
GENERAL NOTES:
NOTE:FITTINGS SHALL BE PROVIDED BY DIV 23AND INSTALLED BY ABATEMENT CONTRACTOR.
STAINLESSSTEELDRAWBANDS
SEALANT AROUND DUCT ATEACH END OF SLEEVE ANDALONG LONGITUDINAL SEAM
1" OVERLAP
FASTENERS AT TOP ANDBOTTOM OF SST FITTING(TYP BOTH SIDES)
SST SHEETMETALSADDLE FITTINGS
TRANSITE DUCTNEW DUCT PERSPECIFICATION
EXISTINGTRANSITE DUCT
NEW DUCT PERSPECIFICATION
EXISTINGTRANSITE DUCT
1
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:4
6 P
M
505-106
M102
DPP
FIFTH FLOOR DUCTWORKNEW WORK PLAN
JCS
01/11/2017
1/8" = 1'-0"1
FIFTH FLOOR DUCTWORK NEW WORK PLAN
NORTH
KEY PLAN
EAST WINGWEST WING
NORTHWESTWING
NORTHEASTWING
SOUTHWING
SCOPEAREA
LOCATIONOF SERVICEELEVATOR
KEYED NOTES:
1 REMOVE EXISTING 18x10 EA GRILLE, EXPANDOPENING IN DUCT, AND INSTALL NEW E-1 GRILLE ASSHOWN.
2 EXISTING MANUAL VOLUME DAMPER. BALANCEDUCT TO AIRFLOWS NOTED ON PLAN.
3 REMOVE AND REINSTALL EXISTING ACOUSTICALCEILING TILES AND GRID IN THIS ROOM TO ALLOWFOR INSTALLATION OF NEW DUCTWORK. STORETILES IN SAFE PLACE, FREE OF OBSTRUCTION TOMINIMIZE DAMAGE. REPLACE ANY DAMAGED GRIDAND CEILING TILES TO THE SATISFACTION OF THEOWNER.
4 BALANCE EXISTING FUME HOOD TO AIRFLOW NOTEDON PLAN. COORDINATE WITH OWNER'SREPRESENTATIVE FOR BALANCING ANDCERTIFICATION OF FUME HOODS.
5 LOCATION FOR NORTH SA DUCT STATIC PRESSURESENSOR.
6 LOCATION FOR SOUTH HOT AND COLD DUCT STATICPRESSURE SENSORS.
7 MOTORIZED DAMPER SHALL BE FURNISHED WITHVERTICAL BLADES AND BOTTOM ACTUATOR.
8 INSTALL NEW MANUAL VOLUME DAMPERS IN HOTAND COLD DECK SA DUCTS AS SHOWN.
9 PROVIDE MANUAL VOLUME DAMPER IN 12" VERTICALTAP.
10 BALANCE EXISTING AIR DEVICE TO AIRFLOW NOTEDON PLAN.
11 ROUTE NEW SA MAIN AS HIGH AS POSSIBLE TOALLOW SUFFICIENT SPACE FOR NEW HWS/R PIPESTO PASS UNDERNEATH.
12 PROVIDE SHEETMETAL ESCUTCHEOON AT WALLPENETRATION. PATCH AND PAINT WALL TO MATCHEXISTING, IF DAMAGED. COORDINATE PAINT COLORWITH OWNER'S REPRESENTATIVE.
EA
EA EA
EAEAEAEA
EA
EA
EA
EA
EA
EA
EA
#
NO SCALE2
EXHAUST DUCT FITTING DETAIL
1
1 01/20/17 ADDENDUM 1
M
M
UP
18"x
8"
RA
64"x
11"
RA
16"x8" SA16"x8" SA16"x8" SA16"x8" SA
30"x
9"
SA
36"x10" SA
36"x10" SA
30"x14" RA
24"x18" EA UP
42"x10" SA
58"x10"(BOTTOM)
58"x9"(TOP)
42"x
9"
SA
24"x
9"
SA
(HOT)
66"x18" SA
70"x16" SA
RHC
5-1
30"x86" OA
24"x
86"
OA
EXISTING ELECTRICALBUS DUCT TO REMAIN
(VR-2)
58"x9" SA
40"x
12"
SA
16"x40" EAUP TO 7TH FLOOR. SEEPLAN #4 ON THIS SHEETFOR CONTINUATION
ABANDONED EARISERS TO REMAIN(TYP 4)
16"x56" RA
66"x9" SA
COOLER
M525
RESEARCHLABORATORY
M523
MECHANICALROOM
M524
18"x8" RA
14"x10" RA68"x60" OA
FC
FC
66"x10" SA
46"x14" RA
(BELOW)
(ABOVE)
MD
1
1
2
48"x60" OA
3
3
4
5
5
16"x56" RA
12"x66" RA
EA
EA
EA
EA
EA
EA
EA
(COLD)
EA
EA
(HO
T)
(HO
T)
(HO
T)
(HOT)(COLD) (COLD)
HOT
COLD
COLD
(COLD)
(CO
LD
)
66"x18" SA(COLD)
76"x10" SA(ABOVE)
B
M301
A
M301
AHU
11
C
M301
VAV
551
8"ø
SA
6"ø SA
60"x
10"
SA
6
7
D
M301
11
3,600 CFMEA
12
66"x10" SA (COLD)
15
S-1
250
14"x10" SA
(BELOW)VAV
552
E-1
250
14"x10" RA
POSITION PLENUM TOAVOID EXISTING PLUMBINGPIPES IN THIS AREA. SEEP-SERIES SHEETS.
16
16
16
PLE
NU
M
PLENUM
MD
2
MD
317
17
18
18
18
EA
18x18 BOTTOMACCESS DOOR
AD
40"x12" SA
E-1
500
14"ø
EA
VAV
558
19
19
S-4
400
1
66"x10" SA
SHOETAP
1
1' -
2"
22
14"x24" EA(BELOW)
BLOWERROOM
NE400
MECHRM
NE400A
18"x
24"
EA
UP
HOLD DUCT TIGHTTO STRUCTURE
36"x30" EA24"x30" EA
18"x24" EA
8"x24" EA
SEE PLAN #1 ON THISSHEET FOR CONTINUATION
EXISTINGAHU-16
RESEARCHLABORATORY
M531
RESEARCHLABORATORY
M531
RESEARCHOFFICE
M533
RESEARCHOFFICE
M530
RESEARCHOFFICE
M526
RESEARCHOFFICE
M527
RESEARCHLABORATORY
M529
LAB
M534
MEN'SREST.
M536
WOMEN'SREST.
M535
COOLER
M525
MECHANICALROOM
M523
COOLING COIL
HUMIDIFIER
PREHEAT COIL
RHC
5-1
2"L
PS
4"C
WR
4"C
WS
1 1/2"HWR
1 1/2"HWS
1 1
/2"H
WR
1-1/2"HWS/R
FD
2"D
10
10
T
EXISTING LAB UTILITYPIPING TO REMAIN
HWRP
11
B
M301
A
M301
VAV
551
1 1/2"LPR
1"HWR
1"HWS
3/4
"HW
R
3/4
"HW
S
3/4"HWR
3/4"HWS
T
T
2-1/2" HWSFROM BELOW
2-1/2" HWR DN
1"LPR
1"LPR
4"ST
4"D
8
8"LPS
6"CWS
6"CWR
FROM BELOW
FROM BELOW
DN
13
13
14
DISCHARGEPLENUM
VAV
552
T
3/4"
1 1
/2"H
WS
T
T
TT
T
T
VAV
557
VAV
556
VAV
555
VAV
554
VAV
553
VAV
558
VAV
550
1 1/2"HWS1 1/2"HWR
1 1
/2"H
WS
1 1
/2"H
WR
1 1
/2"H
WS
1 1
/2"H
WR
3/4
"HW
S
3/4
"HW
R
1"HWR
1"HWS
3/4"HWR
3/4"HWS
20
6"HWR
6"HWS FROM BELOW
UP
1 1/2"HWS
1 1/2"HWR
RHC 5-1SHUTOFFVALVES
6"HWR
6"HWS
FROMABOVE
UP21
21
2 1/2"HWR
2 1/2"HWS
1
24"x18" EA
24"x18" EA
24"x24" EAUP TO ROOF
24"x24" EAUP TO ROOF
STAIRS
MW700
FACULTYOFFICE
M712
CORRIDOR
M723
D
M301
24"x24" EA
18"x18" EA
18"x18" EA
16"x40" EA
FROMBELOW
9
24"x18"EA DN
24"x18"EA DN
1
2
3
4
SEE M000 FOR GENERAL NOTES.
WORK OF THIS PROJECT INVOLVES CONVERTINGTHE AHU-11 AIR HANDLING SYSTEM FROM MINIMUMOUTSIDE AIR TO 100% OUTSIDE AIR. FOLLOWINGINSTALLATION OF NEW AHU, ALL EXISTING RETURNAIR DUCTWORK WILL ACT AS EXHAUST AIRDUCTWORK.
CONTRACTOR SHALL REFER TO CONSTRUCTIONPHASING NOTES ON SHEET M000 AND FIFTH FLOORCONSTRUCTION PHASING PLAN ON SHEET M001FOR INFORMATION REGARDING REQUIREMENTSAND RESTRICTIONS ON ANY CONSTRUCTIONACTIVITIES IMPACTING BUILDING OPERATIONS ANDSYSTEMS.
HWS AND HWR RUNOUTS TO AIR TERMINAL UNITSSHALL MEASURE MINIMUM 3/4".
GENERAL NOTES:
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:4
8 P
M
505-106
M201
DPP
ENLARGED NEW WORKPLANS
JCS
01/11/2017
1/4" = 1'-0"1
ENLARGED FIFTH FLOOR DUCTWORK NEWWORK PLAN
1/4" = 1'-0"3
PARTIAL FOURTH FLOOR DUCTWORK NEWWORK PLAN
KEYED NOTES:
1 CAP END OF EXISTING RETURN DUCT (BELOW)AIRTIGHT.
2 TRANSITION DUCT TO 66x10 TO MAKE ROOM FORRHC 5-2 HWS/R PIPING.
3 CONNECT NEW OA DUCTWORK TO EXISTING60-INCH TALL LOUVER.
4 CONNECT NEW 24x18 EA DUCT TO EXISTING RISER.
5 EXPOSED LOUVER AREA ADJACENT TO EXISTINGRA DUCT SHALL BE COVERED WITH AN INSULATEDBLANK-OFF PANEL. BLANK-OFF PANEL SHALL BEPAINT GRIP SHEET METAL PAINTED FLAT BLACKFACING EXTERIOR WITH 2" RIGIDPOLYISOCYANURATE BOARD INSULATIONENCAPSULATED BY A SECOND PIECE OF PAINTGRIP SHEET METAL PAINTED FLAT BLACK FACINGMECHANICAL ROOM SO NO INSULATION ISEXPOSED. INSULATION FLAME AND SMOKE SHALLMEET 25/50 RATINGS. PROVIDE AIRTIGHT SEALBETWEEN DUCT, BLANK-OFF PANEL, ADJACENTOUTSIDE AIR DUCT, AND LOUVER.
6 PROVIDE 2-FT WIDE BY 7-FT TALL INSULATEDACCESS DOOR AT END OF INSULATED OA PLENUM.
7 UNIT SHALL SIT DIRECTLY ON FACTORY 10-INCHTALL BASE RAIL.
8 EMCS PANEL. MAINTAIN 42" CLEAR IN FRONT OFPANEL.
9 CONNECT NEW 18x18 EA DUCT TO EXISTINGOPEN-ENDED 18x18 EA DUCT.
10 COIL PULL CLEARANCE. KEEP AREA FREE OFOBSTRUCTION.
11 NEW RA MANUAL BALANCE DAMPER. BALANCEDUCT TO 1,050 CFM.
12 BALANCE DUCT TO 2,000 CFM.
13 PIPE CONDENSATE DRAIN LINE AT 1% SLOPE TOEXISTING FLOOR DRAIN. TURN PIPE DOWN TODISCHARGE INTO DRAIN.
14 4-INCH VALVED AND CAPPED CONNECTION FORFUTURE USE. COORDINATE LOCATION WITH RHC5-1 RUNOUTS SO VALVES ARE EASILYACCESSIBLE.
15 BALANCE DUCT TO 300 CFM.
16 OFFSET DUCTWORK TO AVOID EXISTING STORMDRAIN, WASTE LINE, AND FIRE MAIN. SEE P- ANDFP-SERIES SHEETS.
17 SURFACE MOUNT OA DAMPER IN PLENUM SOACTUATOR IS ACCESSIBLE FROM PLENUM.
18 FLOOR OF OUTSIDE AIR PLENUM SHALL BE RATEDFOR 250 LBS MINIMUM.
19 ROUTE NEW SA MAIN AS HIGH AS POSSIBLE TOALLOW SUFFICIENT SPACE FOR NEW HWS/R PIPESTO PASS UNDERNEATH.
20 PROVIDE AUTOFLOW BALANCE VALVE SET TO 1.0GPM.
21 PROVIDE 6-INCH VALVED AND BLIND FLANGEDCONNECTION FOR FUTURE USE TO SERVEFLOORS ABOVE.
22 MAINTAIN MAXIMUM CLEARANCE BETWEEN 14x24EA DUCT AND EXISTING BUS RISER TO ALLOW FORPOSSIBLE FUTURE INSTALLATION OF MAXIMUMALLOWABLE BUS PLUG. 14x24 EA DUCT SHALLTRANSITION BACK TO 24x18 AS HIGH AS POSSIBLE.
1/4" = 1'-0"2
ENLARGED FIFTH FLOOR PIPING NEWWORK PLAN
NORTH
NORTH
NORTH
1/4" = 1'-0"4
PARTIAL SEVENTH FLOOR DUCTWORK NEWWORK PLAN
NORTH
SUPPLY AIR FROM AHU-11: 12,000 CFM (LIMITED VIA EMCS - SEE M701)
EXHAUST AIR FROM EXISTING RISERS: -8,550 CFM
EXHAUST AIR FROM NEW EA RISER IN MECH ROOM M524: -3,600 CFM________________________________________________________________
FIFTH FLOOR EAST: -150 CFM WITH RESPECT TO ADJACENT CORRIDOR
FIFTH FLOOR EAST AIR BALANCE
KEY PLAN
EAST WINGWEST WING
NORTHWESTWING
NORTHEASTWING
SOUTHWING
SCOPEAREA
LOCATIONOF SERVICEELEVATOR
#
1
1 01/20/17 ADDENDUM 1
Level 553' - 0"
Level 664' - 3"
Level 5 Btm of Beam63' - 0"
B
M301
13"x50" RA
4"ST
AHU
11
66"x18" SA
EXISTINGLOUVER
FLOOR MOUNTEDDUCT SUPPORTSBY MC
MECHANICALROOM
M524
2"D
1 1/2"HWR
1 1/2"HWS
EA
14x10 EA
10"x6" SA
PLENUM SHALLSIT ON BASERAIL EXTENSION
24"x86" OA PLENUM
3"F
4"D
MD
2
1
1
1
Level 553' - 0"
Level 664' - 3"
Level 5 Btm of Beam63' - 0"
A
M301
T
AHU
11
4" CWS/R TOAHU-11 CC
2" LPS TOAHU-11HUMIDIFIER
1"LPR
2 1
/2"H
WS
2 1
/2"H
WR
HWRP
11
4"S
T
4"D
2"D
2" CONDENSATEDRAIN OVER FD
18"x66" SA(BEYOND)
14"x10" RA
20"x80" SA
FACTORY 10-INCHBASE RAIL
3"L
PR
3"L
PR
8"L
PS
6"C
WS
6"C
WR
4"CWS
8" LPS DN6" CWR FROM BELOW6" CWS DN
EA
MECHANICALROOM
M524
2 1/2" HWSFROM BELOW2 1/2" HWR DN
6"F
Level 553' - 0"
Level 664' - 3"
Level 5 Btm of Beam63' - 0"
46"x14" RA
56"x16" RA
14"x46" RA
40"x16" EA14"x30" RA
16"x70" SA
2"LPS4"CWS
4"CWR
66"x12" RA
2 1/2"HWR
CAP EXISTINGRA DUCT ATWALL
EA
EA
EA
EA
EA
MECHANICALROOM
M524
E-1
250
8"x22" EA
1 1/2"HWR
1 1/2"HWS 6"HWR
6"HWS
Level 553' - 0"
Level 664' - 3"
Level 5 Btm of Beam63' - 0"
Level 777' - 3"
ROOF TOP90' - 3"
24"x
18"
EA
24"x18" EA (VR-2)
18"x18" EA
40"x
16"
EA
1 1/2"LPR
ABANDONEDEA RISERS
30"x14" RAEA
MECHANICALROOM
M524
TC
PA
NE
L B
YD
IV 2
3
PA
NE
LB
OA
RD
BY
DIV
26
DISCONNECT SWITCH.SEE E-SERIES SHEETS EXISTING
VERTICALBUS WAY
(BEYOND)
14"x24" EA
1' - 2"
2
2
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:4
9 P
M
505-106
M301
DPP
SECTIONS
JCS
01/11/2017
1/4" = 1'-0"A
MECHANICAL ROOM SECTION #1
1/4" = 1'-0"B
MECHANICAL ROOM SECTION #2
1/4" = 1'-0"C
MECHANICAL ROOM SECTION #3
1/4" = 1'-0"D
EXHAUST RISER SECTION
KEYED NOTES:
1 FLOOR OF OUTSIDE AIR PLENUM SHALL BE RATEDFOR 250 LBS MINIMUM.
2 MAINTAIN MAXIMUM CLEARANCE BETWEEN 14x24 EADUCT AND EXISTING BUS RISER TO ALLOW FORPOSSIBLE FUTURE INSTALLATION OF MAXIMUMALLOWABLE BUS PLUG. 14x24 EA DUCT SHALLTRANSITION BACK TO 24x18 AT UNDERSIDE OF SIXTHFLOOR SLAB.
#
1
1 01/20/17 ADDENDUM 1
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
FIFTH FLOOR
SIXTH FLOOR
SEVENTH FLOOR
MECHANICAL PENTHOUSE
AHU-79
EX 12" CWS/RRISERS IN MY100AELEC STOR
AHU-11
AHU-16
AHU-22
4" CWS/R TOSERVE AHU-69
4" CWS
4" CWR
6" CWS
6" CWR
6"
CW
S
6"
CW
R
6"
CW
S
6"
CW
R
6"
CW
S
6"
CW
R
6" CWR
6" CWS
8" CWR
8" CWS
10"
CW
R
10"
CW
S
10"
CW
R
10"
CW
S
10"
CW
R
10"
CW
S
4" CWS/R TOSERVE AH-11
4" CWS/R TAPS FORFUTURE CONNECTION
4" CWS/R TAPS FORFUTURE CONNECTION
ROOF
INSTALL SHUTOFF VALVES ABOVEEXISTING AHU-16 RUNOUTSDURING CHILLED WATER SYSTEMSHUTDOWN TO ALLOW VERTICALRISERS TO BE INSTALLEDWITHOUT SHUTTING DOWN ENTIRECHILLED WATER SYSTEM. VALVEINSTALLATION SHALL COINCIDEWITH 1ST FLOOR PIPING WORK.
INSTALL TAPS AND SHUTOFFVALVES FOR VERTICAL RISERSDURING CHILLED WATER SYSTEMSHUTDOWN TO ALLOW RISERS TOBE INSTALLED WITHOUT SHUTTINGDOWN ENTIRE CHILLED WATERSYSTEM. VALVE INSTALLATIONSHALL COINCIDE WITH 1ST FLOORPIPING WORK.
1
EX 10" CWS/R RISERS IN UTILITYCHASE IN M168A MECH RM,ADJACENT TO M168 JAN CLOSET
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
FIFTH FLOOR
SIXTH FLOOR
10" HWS/R TOBASEMENT
AHU-11
4" CWS/R TOSERVE AHU-69
2-1/2" HWS
2-1/2" HWR
6"
HW
S
6"
HW
R
2-1/2" HWS/R TOSERVE AHU-11
EX 6" HWS/R
6" HWS
6" HWR
4" HWS/R TAPS FORFUTURE CONNECTION
4" HWS/R TAPS FORFUTURE CONNECTION
4" HWS/R TAPS FORFUTURE CONNECTION
4" HWS/R TAPS FORFUTURE CONNECTION
6" HWS/R TAPSTO SERVEFLOORS ABOVE.
2-1
/2"
HW
R
2-1
/2"
HW
S
6"
HW
S
6"
HW
R
4" HWS/R TAPS TO SERVEFUTURE FIFTH FLOORTERMINAL UNITS
2-1/2" HWS/R TO SERVEFIFTH FLOOR TERMINALHEATING COILS
1
NOTE THAT WORK OCCURS IN M148INSTRUCTIONAL LAB GROSSANATOMY. COORDINATE ACCESSWITH OWNER'S REPRESENTATIVE.
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:4
9 P
M
505-106
M401
DPP
HYDRONIC FLOW DIAGRAMS
JCS
01/11/2017
NOT TO SCALE1
CHILLED WATER FLOW DIAGRAM
NOT TO SCALE2
HEATING HOT WATER FLOW DIAGRAM
1
1 01/20/17 ADDENDUM 1
AHU-11 SECTION VIEW11
AHU-11 PLAN VIEW10
FILTER INLET PLENUM WITH BACK INLET,
WITH 2" MERV 8 PREFILTER, 12" MERV 15
INTERMEDIATE FILTER, AND 18" WIDE
ACCESS DOOR.
PREHEAT COIL SECTION
24" ACCESS SECTION (DUAL 19" WIDE
ACCESS DOORS).
COMBINATION COOLING COIL AND
HUMIDIFIER SECTION (HUMIDIFIER
DIRECTLY AFTER COOLING COIL)
24" ACCESS SECTION (19" WIDE ACCESS
DOOR)
SUPPLY FAN SECTION. FAN ARRAY WITH
DUAL DIRECT DRIVE PLENUM FANS.
DISCHARGE PLENUM WITH FRONT
CONNECTION.
1
2
3
4
5
6
7
1 2 3 4 5 6 7
AHU-11 AIR
SCALE: NTS
COMPONENTS
HANDLING UNIT
SCALE: NTS
AP AP AP AP
6'-8"
16'-2" MAX LENGTH
10"
7'-4"
MA
X H
EIG
HT
BASE RAIL
PRESSURE INDEPENDENT 2-WAYMODULATING CONTROL VALVE
CHILLED WATERRETURN
AIRFLOW
STRAINER WITH BLOWOFFCONNECTION, 3/4" SHUTOFF VALVE,3/4" HOSE BIB CONNECTION AND CAP.
CHILLEDWATERSUPPLY
REDUCER (TYP)
MANUAL AIR VENT (TYP) AT HIGH POINTBETWEEN ISOLATION VALVE AND COIL(TYP) EACH COIL IN MULTI-COIL BANK
M
M
THERMOMETER (TYP)
UNION OF FLANGE (TYP)SEE "HYDRONIC PIPING" SPECFOR TYPE
SHUTOFF VALVE (TYP)SEE VALVE SPEC FOR TYPE
MANUAL AIR VENT (TYP)INSTALL AT HIGH POINTBETWEEN ISOLATIONVALVE AND COIL (TYP)
M
M
PRESSURE/TEMPERATURE PORT FORPRESSURE MEASUREMENT (TYPICAL FOREACH COIL). INSTALL AT SAME ELEVATION.PROVIDE EXTENSIONS ON TAPS SO ALL PTPORTS ARE EXTENDED THROUGH THICKNESSOF INSULATION. IF PROVIDED BY UNITMANUFACTURER ADDITIONAL P&T PORTS ARENOT REQUIRED.
3/4" COIL DRAIN VALVE, 3/4" HOSE BIBCONNECTION, AND CAP, AT EACH COILIN MULTIPLE BANKS. DRAIN SHALL BEEXTENDED TO EXTERIOR OF UNITCABINET (TYP).
P&T
P&T
P&T
P&T
PROVIDE CALIBRATED BALANCING VALVEIN CWR PIPING TO EACH COIL SECTION INMULTI-COIL BANK.
NOTES:
1. BRANCH PIPING SHALL TAP OFF THE TOP OF THE MAINS.
2. LOCATE SHUT-OFF VALVES AND UNIONS/FLANGES TO ALLOW FOR REMOVAL OFCOIL WITHOUT SHUTTING DOWN HYDRONIC SYSTEM.
3. PROVIDE VENT ON BOTH SUPPLY AND RETURN AT HIGH POINTS.
4. PROVIDE FLANGE OR UNION AT EACH CONNECTION TO EACH COIL (TYPICAL).
5. PROVIDE REDUCER AT COIL CONNECTION WHERE REQUIRED.
6. ALL VENT AND DRAINS SHALL BE LOCATED OUTSIDE OF AIR HANDLING UNITCABINET.
7. THIS DETAIL IS FOR ALL STACKED TWO-WAY COILS IN AIR HANDLING UNITS.
OFFSET PIPING TO CLEARCOIL PULL SPACE
CHECK VALVE
4"
4"
3"
3"
HOT WATER RETURN
UNION (TYP)
SHUTOFF VALVE (TYP)
HOT WATER SUPPLYREDUCER (TYP)
M
CHECK VALVE
THERMOMETER (TYP)
AIR HANDLING UNITPREHEAT COILS
M
INLINE RECIRCULATING PUMP(SEE DETAIL 6 THIS SHEET)
2-WAY MODULATING 0-10VDCPROPORTIONAL CONTROL VALVE
PROVIDE CALIBRATED BALANCING VALVE INHWR PIPING TO EACH COIL SECTION INMULTI-COIL BANK
NOTES:
1. BRANCH PIPING SHALL TAP OFF THE TOP OF THE MAINS.
2. LOCATE SHUT-OFF VALVES AND UNIONS/FLANGES TO ALLOW FOR REMOVAL OF COILWITHOUT SHUTTING DOWN HYDRONIC SYSTEM.
3. PROVIDE VENT ON BOTH SUPPLY AND RETURN AT HIGH POINTS.
4. PROVIDE FLANGE OR UNION AT EACH CONNECTION TO EACH COIL (TYPICAL).
5. PROVIDE REDUCER AT COIL CONNECTION WHERE REQUIRED.
6. ALL VENT AND DRAINS SHALL BE LOCATED OUTSIDE OF AIR HANDLING UNITCABINET.
7. THIS DETAIL IS FOR ALL STACKED TWO-WAY COILS IN AIR HANDLING UNITS.
STRAINER WITH BLOWOFFCONNECTION, 3/4" SHUTOFF VALVE,3/4" HOSE BIB CONNECTION AND CAP.
MANUAL AIR VENT (TYP) AT HIGH POINTBETWEEN ISOLATION VALVE AND COIL(TYP) EACH COIL IN MULTI-COIL BANK
MANUAL AIR VENT (TYP)INSTALL AT HIGH POINTBETWEEN ISOLATIONVALVE AND COIL (TYP)
PRESSURE/TEMPERATURE PORT FOR PRESSUREMEASUREMENT (TYPICAL FOR EACH COIL).INSTALL AT SAME ELEVATION. PROVIDEEXTENSIONS ON TAPS SO ALL PT PORTS AREEXTENDED THROUGH THICKNESS OF INSULATION.IF PROVIDED BY UNIT MANUFACTURERADDITIONAL P&T PORTS ARE NOT REQUIRED.
3/4" COIL DRAIN VALVE, 3/4" HOSE BIBCONNECTION, AND CAP, AT EACH COILIN MULTIPLE BANKS. DRAIN SHALL BEEXTENDED TO EXTERIOR OF UNITCABINET (TYP).
AUTOFLOWBALANCEVALVE
AIRFLOW
M
M
P&T
P&T
P&T
P&T
2-1/2"
2-1/2"
2"
2"
2-1/2"
NOTES
DISPERSION TUBEASSEMBLY
UNION OR FLANGE (TYP), SEESTEAM PIPING SPEC FOR TYPE
STRAINER WITH BLOWDOWN VALVE,NIPPLE, AND CAP (SEE NOTE 2)
LPS
SECURELY FASTEN DISPERSION TUBEACCORDING TO THEMANUFACTURER'S INSTRUCTIONS.
MODULATING CONTROL VALVE, 2-POSITION CONTROL VALVE, TRAP ANDSTRAINER SHALL BE PROVIDED BYTHE HUMIDIFIER MANUFACTURER.
TRAP - 3/4" INVERTED BUCKET TYPE.
PROVIDE HUMIDITY HIGH LIMIT ANDPRESSURE DIFFERENTIAL SWITCHESDOWNSTREAM FROM DISPERSIONTUBE.
BRANCH PIPE SHALL CONNECT TO TOPOF MAIN.
6" LONG DIRT LEG
SHUT-OFF VALVE (TYP)SEE SPEC FOR TYPE
LPR
MODULATING STEAMCONTROL VALVE (TYP)(SEE NOTE 2)
STEAM TRAP(NOTES 2 AND 3)
SEE NOTE 5
CHECK VALVE (TYP)
1.
2.
3.
4.
5.
AIR FLOW
STEAM SUPPLY TOHEAT EXCHANGER
STEAM SUPPLY TOHUMIDIFIER GRID
2-POSITION ISOLATIONVALVE (SEE NOTE 2)
M
P&T
P&T
3/4" COIL DRAIN VALVE,3/4" HOSE BIBCONNECTION AND CAP AT EACH COIL AND EACHMANUFACTURER PROVIDED DRAIN.
OFFSET PIPING TO CLEARCOIL PULL SPACE ASREQUIRED.
HYDRONIC COIL
MANUAL AIR VENT (TYP)
REDUCER (TYP)
HYDRONIC SUPPLY MAIN
SHUTOFF VALVE (TYP)SEE VALVE SPEC FOR TYPE
UNION OF FLANGE (TYP)SEE "HYDRONIC PIPING" SPECFOR TYPE
PROVIDE FLANGE, OR UNION AT EACHCONNECTION TO COIL (TYP)
AIRFLOW
HYDRONIC RETURN MAIN
SEE NOTE 1
M
PRESSURE INDEPENDENT 2-WAY MODULATING CONTROLVALVE
STRAINER WITH BLOWOFFCONNECTION, 3/4" SHUTOFF VALVE,3/4" HOSE BIB CONNECTION AND CAP.
PRESSURE/TEMPERATURE PORT FOR PRESSUREMEASUREMENT. INSTALL AT SAME ELEVATION. PROVIDEEXTENSIONS ON TAPS SO ALL PT PORTS ARE EXTENDEDTHROUGH THICKNESS OF INSULATION. IF PROVIDED BYUNIT MANUFACTURER ADDITIONAL P&T PORTS ARE NOTREQUIRED.
NOTE:
1. BRANCH PIPES SHALL TAP OFF THE TOP OF MAINS.
2. DETAIL APPLIES TO AIR TERMINAL UNIT HEATING COILS AND DUCT MOUNTEDREHEAT COILS (RHC).
STRAINER WITHBLOW-DOWNVALVE
DRIP LEG 6"MIN
TOCONDENSATERETURN PIPE
SHUT-OFF VALVE
UNION
CHECK VALVE
12" MINIMUM
STEAM MAIN
T
3/4" INVERTED BUCKETSTEAM TRAP
NOTES:
1. SEE PLAN FOR PIPE SIZE.2. INDEPENDENTLY SUPPORT PUMP AND PIPING.
3/8" BALL VALVE (TYP.) -USE TAPS ON PUMPVOLUTE, IF AVAILABLE
SHUT-OFFVALVE (TYPICAL)
PRESSUREGAUGE
INLINEHORIZONTALHOTWATERRECIRCULATINGPUMP
HANGERS (TYP)
VIBRATIONISOLATOR (TYP)
MANUAL AIR VENT
THREADED OR WELDEDOUTLET FITTING (TYP)
3/4" HOSE END DRAIN VALVE AND CAP
INSTALL VENT AT ALL PIPING HIGH
POINTS AND AT TOP OF EVERY HYDRONIC
RISER. REFER TO HYDRONIC FLOW
DIAGRAMS.
INSTALL DRAIN AT ALL PIPING
LOW POINTS
TYPICAL PIPE MAINOR BRANCH
3/4" BALL VALVE
BOTTOM OF AHUCABINET.
PIPE FULL SIZE OF AIRHANDLING UNIT DRAINCONNECTION
AHU BASE RAIL
1 REMOVABLE CAP
1 REMOVABLE CAP
4 FLOW
3
2.5-INCH
5-INCH
NOTE:
2
4
3
1 LOCATE TRAPS SO AS TO BE ACCESSIBLE FOR CLEANING.
ROUTE TO NEAREST SANITARY (FLOOR) DRAIN, SLOPE AT 1/8" PER FOOT.
2
MANUFACTURERAIRFLOW SENSOR
EXTERNALLY INSULATEDTERMINAL INLET DUCT, SIZEAS INDICATED ON VAV BOXSCHEDULE
3.0 MINIMUM
INLET DIAMETERS
36" DEEP BY 30" WIDECLEARANCE ATSIDE OF DIGITAL CONTROLPANEL.
MA
IN S
UP
PLY
AIR
DU
CT
1SUSPEND FROM STRUCTURE IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS. HANGERS & BRACING SHALL NOT OBSTRUCT
ACCESS PANELS AND/OR SERVICE SPACE. DO NOT OBSTRUCT ACCESS
PANELS AND/OR SERVICE SPACE. REFER TO MANUFACTURER'S
RECOMMENDED UNIT INSTALLATION MANUAL.
INSTALL TERMINAL UNIT PLUMB AND LEVEL, WITH SERVICE SPACE FOR
CONTROLS.
WHERE POSSIBLE PROVIDE 4'-0" OF DUCTWORK DOWNSTREAM OF VAV
BOX PRIOR TO FIRST TAP.
MANUFACTURER PROVIDED HEATING COIL. REFER TO DETAIL 4 ONSHEET M501 FOR PIPING. CONTRACTOR SHALL COORDINATERIGHT/LEFT HAND HOT WATER COIL CONNECTION WITH EXISTINGFIELD CONDITIONS PRIOR TO ORDERING UNITS. (REFER TOSCHEDULE SHEETS FOR UNITS REQUIRING AUXILIARY HEATINGCOILS.) RETURN BENDS OF COIL MUST BE INSULATED.
MANUFACTURER PROVIDED ACCESSDOOR SECTION WITH SLIP AND DRIVE CONNECTIONS.
1
DIGITALCONTROLPANEL
2
1
NOTES:
2
18X18 ACCESS PANEL IN SUPPLY AIR DUCTWORK
3
3
EXTERNALLY WRAPPED SUPPLY AIRDUCT. SIZE AS INDICATED ON PLANS.INSULATION SHALL FULLY COVER/WRAPREHEAT COIL TUBE BENDS. SEALINSULATION TO UNIT CASING.
PROVIDE ADDITIONAL INLET DUCT2" LARGER THAN TERMINAL UNITINLET SIZE
AIR
FLO
W
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:5
0 P
M
505-106
M501
DPP
DETAILS
JCS
01/11/2017
NTS1
AIR HANDLING UNIT COOLING COIL WITH2-WAY VALVE DETAIL
NTS2
AIR HANDLING UNIT PRE-HEAT COIL PIPINGDETAIL
NTS3
AHU HUMIDIFIER DETAIL
NTS4
COIL CONNECTION WITH 2-WAY (PIC) VALVEDETAIL
NTS6
TYPICAL STEAM CONDENSATE DRIP TRAPASSEMBLY DETAIL
NTS7
INLINE RECIRCULATING PUMP
NTS5
HVAC DRAIN AND VENT DETAIL
NTS8
CONDENSATE DRAIN TRAP
NTS9
SUPPLY AIR TERMINAL UNIT INSTALLATION
NOTE: UNIT SHALL BE FURNISHED WITH MULTIPLESHIPPING SPLITS SIZED TO ALLOW UNIT TO BEBROUGHT INTO BUILDING THROUGH EXISTINGSERVICE ELEVATOR. CONTRACTOR SHALL FIELDVERIFY EXISTING CONDITIONS PRIOR TO SUBMITTINGSHOP DRAWINGS. ELEVATOR DIMENSIONS ARE 83
INCHES TALL BY 84 INCHES DEEP BY 43 INCHES WIDE.IF ANY COMPONENT REQUIRES DISASSEMBLY TOMOVE INTO BUILDING, UNIT MANUFACTURER SHALLWITNESS DISASSEMBLY AND REASSEMBLY TOMAINTAIN MANUFACTURER'S WARRANTY ANDSCHEDULED PERFORMANCE.
1
1
1 01/20/17 ADDENDUM 1
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:5
0 P
M
505-106
M601
DPP
SCHEDULES
JCS
01/11/2017
AIR HANDLING UNIT SCHEDULE CONTINUED
CHILLED WATER COIL
HUMIDIFIERTAG
FILTERS MAX SOUND POWER RATING (RADIATED / DISCHARGE / INLET) - SEE NOTE 2 ELECTRICAL DATA - SEE NOTE 1
NOTES
CAPACITY (MBH)
MAX FACE VEL(FPM)
EAT LAT
WATER FLOW(GPM) EWT (°F) LWT (F°) ROWS
MAX PD PRE- INTERMEDIATE OCTAVE BAND (HZ)
HP V/PH/HZTOTAL SENS. DB (°F) WB (°F) DB (F°) WB (F°) AIR (IN WC) WATER (FT) TYPEDESIGN APD
(IN WC) TYPEDESIGN APD
(IN WC) 63 125 250 500 1000 2000 4000 8000
1416.7 725.8 525 95 78 53 52.5 202.4 46 60 8 2.2 15 H-11 2" MERV 8 0.5 12" MERV 15 1.0 81 / 86 / 81 75 / 80 / 75 72 / 80 / 78 77 / 85 / 85 67 / 83 / 71 57 / 79 / 66 47 / 78 / 59 51 / 71 / 51 (2) 15 HP 480 / 3 / 60 3, 4, 6, 7
2. DAMPER SHALL INCLUDE VERTICAL BLADES AND BOTTOM ACTUATOR.
1. ACTUATOR SHALL BE FURNISHED AND INSTALLED AS WORK OF 230900.
NOTES:
MOTORIZED DAMPER SCHEDULE
PLAN MARKMFR. MODEL LOCATION SERVICE
BLADECONFIGURATION
CONTROLACTION FAIL POSITION SIZE W x H MOUNTING NOTES
MD 1 GREENHECK VCD-23 CORR M517 HOT DECK OPPOSED BLADE MODULATING OPEN 60x10 DUCT 1, 2
MD 2 GREENHECK VCD-23 MECH M524 OUTSIDE AIR OPPOSED BLADE MODULATING OPEN 68x60 DUCT 1
MD 3 GREENHECK VCD-23 MECH M524 OUTSIDE AIR OPPOSED BLADE MODULATING OPEN 48x60 DUCT 1
2. PROVIDE FLANGED CONNECTIONS.
1. DIMENSIONS CORRESPOND TO FINNED AREA.
NOTES:
DUCT MOUNTED HEATING COIL SCHEDULE
PLAN MARK MFR. TYPE LOCATION SERVICE COIL SIZE APD (IN WC)
HOT WATER HEATING
NOTESMBH EAT (F) EWT (F) LWT (F) FLOW (GPM) MAX WPD (FT)
RHC 5-1 USA COIL & AIR DUCT-MOUNTED MECH M524 HOT DECK 56x24 0.25 382.7 55 180 140 19.1 5 1, 2
HUMIDIFIER SCHEDULE
PLAN MARK MFR. MODEL LOCATION
OUTPUTCAPACITY(LBS/HR)
EAT LATAIRFLOW
(CFM)
STEAM SUPPLY
NOTESDB RH DB RH LOAD PRESS (PSIG)
H 11 DRISTEEM ULTRA-SORB MODEL XV AHU-11 299.3 53 5 55 54 16000 299.3 10 1, 2
1. SEE EQUIPMENT DATA SCHEDULE(S) FOR ELECTRICAL INFORMATION.
NOTES:
PUMP SCHEDULE
PLAN MARK MFR. MODEL TYPE LOCATION SERVICEWATER FLOW
(GPM) TDH (FT)
MIN INLET /OUTLET SIZES
(IN)MAX NPSHREQD (FT) MIN EFF (%)
MOTOR SPEED(RPM)
ELECTRICAL DATA
NOTESHP V/PH/HZ
HWRP 11 BELL & GOSSETT 2.5x2.5x7B INLINE MECH M524 AHU-11 PREHEAT COIL 56.0 25 2.5 / 2.5 4.4 57 1750 1.0 480/3/60
7. UNIT SHALL BE FURNISHED WITH FACTORY HUMIDIFIER GRID. SEE HUMIDIFIER SCHEDULE FOR PERFORMANCE REQUIREMENTS.
IF ANY COMPONENT REQUIRES DISASSEMBLY TO MOVE INTO BUILDING, UNIT MANUFACTURER SHALL WITNESS DISASSEMBLY AND REASSEMBLY TO MAINTAIN MANUFACTURER'S WARRANTY AND SCHEDULED PERFORMANCE.
6. UNIT SHALL BE FURNISHED WITH MULTIPLE SHIPPING SPLITS SIZED TO ALLOW UNIT TO BE BROUGHT INTO BUILDING THROUGH EXISTING SERVICE ELEVATOR. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING SHOP DRAWINGS. ELEVATOR DIMENSIONS ARE 83 INCHES TALL BY 84 INCHES DEEP BY 43 INCHES WIDE.
5. MAXIMUM UNIT DIMENSIONS ARE AS FOLLOWS: WIDTH: 80 INCHES; LENGTH: 194 INCHES; HEIGHT: 88" INCLUDING 10" BASE RAIL.
4. PROVIDE WITH MINIMUM 10" TALL BASE RAIL.
3. PROVIDE WITH INVERTER-READY OR INVERTER-DUTY MOTOR FOR VARIABLE SPEED OPERATION. REFER TO DIV 23 MOTOR SPECIFICATION FOR MOTOR REQUIREMENTS.
2. SOUND POWER LEVEL RATINGS SHOWN IN DECIBELS, REFER TO 10(-12) WATTS CALCULATED PER AMCA STANDARD 301.
1. SEE EQUIPMENT DATA SCHEDULE FOR ELECTRICAL INFORMATION.
NOTES:
AIR HANDLING UNIT SCHEDULE
PLAN MARK MFR. MODEL TYPE LOCATION SERVICE MIN. OA (CFM)MAX SIZE(LxWxH)
MAXOPERATING
WEIGHT (LBS)
SUPPLY FAN HOT WATER PREHEAT COIL
TOTALAIRFLOW
(CFM)
STATIC PRESSURE
TYPE DRIVEMAX WHEEL
SIZE (IN)MAX FAN
SPEED (RPM)MAX MOTORSPEED (RPM)
CAPACITY(MBH)
MAX FACE VEL(FPM) EAT (°F) LAT
WATER FLOW(GPM) EWT (°F) LWT ROWS
MAX PD
TSP (IN WC) ESP (IN WC) AIR (IN WC) WATER (FT)
AHU 11 DAIKIN VISION INDOORMODULAR
MECH M524 5TH FLOOREAST
16000 SEE NOTE 5 6200 16000 6.6 2.5 PLENUM (1x2FAN ARRAY)
DIRECT 18.25 3150 3500 1123.2 550 0 65 56.2 180 140 2 0.2 5
3. PROVIDE WITH OPTIONAL BOTTOM ACCESS DOOR PER THE SPECFICATIONS.
2. PROVIDE THE NUMBER OF COIL ROWS AS REQUIRED TO MEET SCHEDULED PERFORMANCE AND STILL FALL WITHIN REHEAT COIL PRESSURE DROP LIMITATION.
1. MAX TOTAL PRESSURE DROP SHALL INCLUDE BOX AND REHEAT COIL (WHERE APPLICABLE).
NOTES:
AIR TERMINAL UNIT SCHEDULE
PLAN MARK MFR. MODEL TYPE SERVICE LOCATIONINLET DUCT
SIZE (IN RND)
PRIMARY AIRFLOW (CFM) DESIGN INLETSTATIC PRESSURE
(IN WC)
MAXPRESSURE
DROP (IN WC)OUTLET DUCTSIZE WxD (IN)
AUXILIARY HOT WATER HEATNG COIL MAX NC LEVEL @ MAX CFM
NOTESMAX MINAIRFLOW
(CFM)CAPACITY
(MBH) EAT (°F) LAT (°F) EWT (°F) FLOW (GPM) ROWSMAX WPD (FT
HD)MAX APD(IN
WC)CONTROL
VALVE DISCHARGE RADIATED
VAV 550 TITUS DESV PRESSURE INDEPENDENT M531 RESEARCH LAB M531 RESEARCH LAB 8 600 600 1.5 0.75 12x10 600 25.9 55 95 180 2.6 SEE NOTE 2 2.0 0.25 2-WAY 30 30 1, 3
VAV 551 TITUS DESV PRESSURE INDEPENDENT M533 RESEARCH OFFICE M533 RESEARCH OFFICE 6 310 310 1.5 0.75 12x8 310 13.4 55 95 180 1.3 SEE NOTE 2 2.0 0.25 2-WAY 30 30 1, 3
VAV 552 TITUS DESV PRESSURE INDEPENDENT M524 MECHANICAL ROOM M524 MECHANICAL ROOM 6 250 250 1.5 0.75 12x8 250 8.1 55 85 180 0.8 SEE NOTE 2 2.0 0.25 2-WAY 30 30 1, 3
VAV 553 TITUS DESV PRESSURE INDEPENDENT M530 RESEARCH OFFICE M530 RESEARCH OFFICE 6 150 150 1.5 0.75 12x8 150 6.5 55 95 180 0.6 SEE NOTE 2 2.0 0.25 2-WAY 30 30 1, 3
VAV 554 TITUS DESV PRESSURE INDEPENDENT M529 RESEARCH LAB M529 RESEARCH LAB 14 1000 1000 1.5 0.75 20x17 1/2 1000 43.2 55 95 180 4.3 SEE NOTE 2 2.0 0.25 2-WAY 30 30 1, 3
VAV 555 TITUS DESV PRESSURE INDEPENDENT M539 CORRIDOR M539 CORRIDOR 10 500 500 1.5 0.75 14x12 1/2 500 16.2 55 85 180 1.6 SEE NOTE 2 2.0 0.25 2-WAY 30 30 1, 3
VAV 556 TITUS DESV PRESSURE INDEPENDENT M528 RESEARCH LAB M528 RESEARCH LAB 8 400 400 1.5 0.75 12x10 400 17.3 55 95 180 1.7 SEE NOTE 2 2.0 0.25 2-WAY 30 30 1, 3
VAV 557 TITUS DESV PRESSURE INDEPENDENT M526 RESEARCH OFFICE M526 RESEARCH OFFICE 8 750 500 1.5 0.75 12x10 500 21.6 55 95 180 2.2 SEE NOTE 2 2.0 0.25 2-WAY 30 30 1, 3
VAV 558 TITUS DESV PRESSURE INDEPENDENT M539 CORRIDOR M539 CORRIDOR 8 400 400 1.5 0.75 12x10 400 13.0 55 85 180 1.3 SEE NOTE 2 2.0 0.25 2-WAY 30 30 1, 3
NOTES:
1. MAXIMUM ACCEPTABLE ABSORPTION DISTANCE SHALL BE 12-INCHES.2. PROVIDE WITH OPTIONAL INLET STRAINER, 2-POSITION SHUTOFF VALVE, MODULATED STEAM CONTROL VALVE, STEAM TRAP, AND FLOAT SWITCH. VALVES AND FLOAT SWITCH
SHALL BE CAPABLE OF BEING CONTROLLED VIA EMCS.
2. LOUVERED AREA SHALL BE MINIMUM 18x18.
1. PROVIDE WITH BACKPAN WITH SQUARE TO ROUND ADAPTER TO ACCOMMODATE SCHEDULED NECK SIZE.
NOTES:
AIR DEVICE SCHEDULE
PLAN MARK MFR. MODEL TYPE LOCATION NECK SIZE (IN) FACE SIZE (IN x IN) MATERIAL FINISHMAX TPD (IN
WC) MAX NOISE (NC)
MAX CFM @LISTED
CONDITIONSMIN THROW(FT) 50 FPM NOTES
S-1 TITUS 300RL LOUVERED FACE DUCT 12x8 14x10 STEEL WHITE 0.1 30 250 30
S-2 TITUS TMRA ADJUSTABLE ROUND EXPOSED 12 27 INCH RND STEEL WHITE 0.1 30 350 10
S-3 TITUS TDC SQUARE PLAQUE CEILING 8 24x24 STEEL WHITE 0.1 30 300 15 1, 2
S-4 TITUS TDC SQUARE PLAQUE CEILING 12 24x24 STEEL WHITE 0.1 30 500 18 1, 2
E-1 TITUS 350RL LOUVERED FACE DUCT 22x8 24x10 STEEL WHITE 0.1 30 600 -
E-2 TITUS 350RL LOUVERED FACE CEILING 8 24x24 STEEL WHITE 0.1 30 190 - 1
E-3 TITUS 350RL LOUVERED FACE CEILING 12 24x24 STEEL WHITE 0.1 30 430 - 1
E-4 TITUS 350RL LOUVERED FACE CEILING 14 24x24 STEEL WHITE 0.1 30 630 - 1
CONTROL VALVE SCHEDULE
NOTES:1. REFER TO APPROPRIATE SCHEDULE FOR FLOW INFORMATION2. MAXIMUM PRESSURE DROP AT FULL OPEN POSITION3. PRESSURE INDEPENDENT 2-WAY MODULATING CONTROL VALVE. SEE SPEC 230900.4. VALVE SHALL FAIL NORMALLY OPEN.5. VALVE SHALL FAIL NORMALLY CLOSED.6. CONTROL VALVE FLOW RATE SHALL BE ADJUSTED TO MATCH EQUIPMENT SHOP DRAWING SUBMITTAL VALUES.
UNIT SERVED SERVICE MAX PRESSURE DROP(PSIG) SEE NOTE 2
MAX FLOW (GPM/PPH)
CLOSE-OFFPRESSURE (PSI)
NOTES:
AHU-11
AHU-11
RHC (ALL)
VAV (ALL)
CHILLED WATER
HOT WATER
HOT WATER
HOT WATER
5.0
5.0
5.0
5.0
SEE NOTE 1
SEE NOTE 1
SEE NOTE 1
SEE NOTE 1
SEE SPEC
SEE SPEC
SEE SPEC
SEE SPEC
3, 5, 6
3, 4, 6
3, 5, 6
3, 4, 6
1
1
1 01/20/17 ADDENDUM 1
SEQUENCES OF OPERATION
GENERAL NOTES:1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING CONTROL POINT NUMBERS FOR CONTROL POINTS INDICATED ON THESE DRAWINGS.
GENERAL:
THE CONTRACTOR SHALL SUBMIT ENGINEERED CONTROL DRAWINGS, WIRING DIAGRAMS, EQUIPMENT SCHEDULES, ETC., AS
REQUIRED FOR A COMPLETE CONTROL SYSTEM. THE CONTRACTOR WILL BE EXPECTED TO WORK OUT THE DETAILS OF
CONTROLLER ACTION, CONTROL LOOP TUNING, NORMALLY OPEN/NORMALLY CLOSED CONNECTIONS, EXACT EQUIPMENT
REQUIREMENTS, ETC., TO PROVIDE A WORKING CONTROL SYSTEM TO ACHIEVE THE SEQUENCES OF OPERATION BELOW. THE
WRITTEN SEQUENCE OF OPERATION SHALL BE THE CRITERION USED TO JUDGE THE FINAL PERFORMANCE OF THE CONTROL
SYSTEM. ALL FUNCTIONS IN THE SEQUENCE WILL BE REQUIRED EVEN IF THE REQUIRED EQUIPMENT AND CONNECTIONS ARE
NOT DEPICTED ON THESE DRAWINGS.
THE CONTRACTOR SHALL COORDINATE THE LOCATIONS OF BUILDING CONTROL PANELS WITH THE OWNER'S
REPRESENTATIVE.
THE UNIVERSITY OF MISSOURI - COLUMBIA UTILIZES JOHNSON CONTROLS EQUIPMENT FOR THEIR CAMPUS ENERGY
MANAGEMENT CONTROL SYSTEM (EMCS). NEW DDC CONTROL SYSTEM SHALL FULLY INTERFACE WITH THE CAMPUS JOHNSON
CONTROLS METASYS SYSTEM.
THE FOLLOWING RESPONSIBILITIES EXIST FOR THIS PROJECT REGARDING CONNECTION TO THE CAMPUS ENERGY
MANAGEMENT CONTROL SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR ALL OTHER CONTROL ELEMENTS REQUIRED AS A
PART OF THESE SEQUENCES OF OPERATION, EXCEPT AS SPECIFICALLY INDICATED BELOW:
OWNER:
1. THE OWNER WILL PROVIDE THE JOHNSON CONTROLS METASYS PANEL(S) THAT IS REQUIRED FOR THE POINTS INDICATED.
2. THE OWNER WILL PROVIDE ALL PROGRAMMING OF THE NEW METASYS PANEL(S).
3. THE OWNER WILL ADDRESS START-UP OF THE NEW METASYS PANEL(S) AS IT RELATES TO THE NEW CONTROL AND
MONITORING POINTS AND WILL TERMINATE WIRING WITHIN THE METASYS PANEL(S).
NOTE: THE OWNER'S RESPONSIBILITIES ARE LIMITED TO WORK ASSOCIATED WITH THE METASYS PANELS ONLY, AND ONLY AS
INDICATED ABOVE, AND SHALL NOT EXTEND BEYOND THAT.
CONTRACTOR:
1. THE CONTRACTOR SHALL MOUNT THE METASYS PANEL(S) FURNISHED BY THE OWNER.
2. THE CONTRACTOR SHALL ROUTE ALL WIRING TO THE METASYS PANEL(S) FOR THE FIELD MOUNTED SENSORS/EQUIPMENT
AS REQUIRED TO ACHIEVE THE SEQUENCE OF OPERATION. NOTE THAT TERMINATION OF THE WIRING IS BY THE OWNER AT
THE METASYS PANEL.
3. THE CONTRACTOR SHALL PROVIDE POWER TO THE METASYS CONTROL PANEL(S) AND CONTROL SENSORS/METERS
REQUIRING SAME.
CENTRAL STATION AIR HANDLING UNIT AHU-11 AND RECIRCULATING PUMP HWRP-11:
THE AIR HANDLING UNIT SHALL BE UNDER THE CONTROL OF THE ENERGY MANAGEMENT CONTROL SYSTEM (EMCS). VARIABLE
SPEED FANS (2 TOTAL) SHALL BE UTILIZED TO SUPPLY 100% OUTSIDE AIR TO THE BUILDING SPACES SERVED BY THE AIR
HANDLING UNIT. UNIT SUPPLY FANS SHALL OPERATE ONLY WHEN THE NORMALLY CLOSED OUTSIDE AIR DAMPER IS PROVEN
OPEN VIA END SWITCH.
SUPPLY FAN CONTROL: UPON RECEIVING A SIGNAL FROM THE EMCS TO BEGIN OPERATION, THE SUPPLY FANS IN THE AIR
HANDLING UNIT SHALL BE ACTIVATED. THE FANS SHALL NOT START UNLESS THE OUTDOOR AIR DAMPER END SWITCHES ON
THE DAMPERS HAVE BEEN PROVEN OPEN (HARDWIRED INTERLOCK). THE EMCS SHALL THEN READ THE STATIC PRESSURE IN
THE COLD DECK SUPPLY DUCTWORK VIA TWO (2) STATIC PRESSURE SENSORS, COMPARING THE SIGNAL TO THE
PREDETERMINED SETPOINT (INITIALLY 1.5 IN W.C., ADJUSTABLE). THE SUPPLY FAN VARIABLE FREQUENCY DRIVE SHALL VARY
THE SPEED OF THE SUPPLY FAN MOTORS IN UNISON TO MAINTAIN THE COLD DECK SUPPLY AIR STATIC PRESSURE SETPOINT.
UPON RECEIVING A SIGNAL TO START THE UNIT, THE COLD DECK DAMPERS SHALL FULLY OPEN AND THE HOT DECK DAMPERS
SHALL OPEN TO 50% UNTIL THE SUPPLY FANS HAVE REACHED THEIR COMMANDED SPEED. ONCE THE FANS HAVE REACHED
THEIR COMMANDED SPEED, THE COLD AND HOT DECK DAMPERS SHALL BE FULLY CONTROLLED.
NOTE: AN UPPER LIMIT SPEED SETPOINT SHALL BE ASSIGNED TO THE SUPPLY FAN VFD TO LIMIT SUPPLY AIRFLOW. SET UPPER
LIMIT AT 12,000 CFM (ADJ). UPPER LIMIT SHALL REMAIN SET UNTIL AHU-11 SERVICE AREA IS CONVERTED TO VARIABLE AIR
VOLUME OPERATION IN THE FUTURE.
HOT DECK DAMPER CONTROL: HOT DECK DAMPERS SHALL MODULATE TO MAINTAIN THE HOT DECK STATIC PRESSURE
SETPOINT ESTABLISHED DURING TESTING AND BALANCING.
COLD DECK DAMPER CONTROL: IF THE HOT DECK DAMPER IS FULLY OPEN AND THE HOT DECK SUPPLY DUCT STATIC
PRESSURE IS LESS THAN SETPOINT, THE VARIABLE FREQUENCY DRIVE SHALL VARY THE SPEED OF THE SUPPLY FAN MOTORS
IN UNISON TO MAINTAIN THE HOT DECK STATIC PRESSURE SETPOINT AND THE COLD DECK DAMPER SHALL MODULATE TO
MAINTAIN THE COLD DECK SUPPLY DUCT STATIC PRESSURE SETPOINT.
PREHEAT COIL CONTROL: WHEN OUTSIDE AIR TEMPERATURE (OA-T) DROPS BELOW 53 DEGREES F, THE EMCS SHALL
MODULATE THE PRE-HEATING COIL CONTROL VALVE (PHT-O) TO MAINTAIN SUPPLY AIR TEMPERATURE SETPOINT (53 DEGREES
F, ADJUSTABLE). WHEN OUTSIDE AIR TEMPERATURE DROPS BELOW 40 DEGREES F, THE EMCS SHALL ACTIVATE THE PREHEAT
COIL RECIRC PUMP (HWRP-11), AND IT SHALL RUN AT CONSTANT SPEED UNTIL OUTSIDE AIR TEMPERATURE RISES ABOVE 40
DEGREES.
COOLING COIL CONTROL: WHEN OUTSIDE AIR TEMPERATURE (OA-T) IS ABOVE 50 DEGREES F, THE EMCS SHALL MONITOR THE
SUPPLY AIR TEMPERATURE (SA-T) AND MODULATE THE COOLING COIL CONTROL VALVE (CLG-VLV) AS REQUIRED TO MAINTAIN
SUPPLY AIR TEMPERATURE SETPOINT (53 DEGREES F, ADJUSTABLE).
HUMIDIFIER CONTROL: PROVIDE DUCT-MOUNTED HUMIDITY SENSOR IN SUPPLY AIR DUCTWORK AS SHOWN ON AHU-11
CONTROL DIAGRAM. MODULATE HUMIDIFIER OUTPUT TO MAINTAIN WINTER SUPPLY AIR DUCT HUMIDITY SETPOINT (55% RH,
ADJUSTABLE) TO ACHIEVE 70 DEG-F / 30% RH IN THE SPACE. PROVIDE HIGH-LIMIT SENSOR IN SUPPLY AIR DUCTWORK TO LIMIT
SUPPLY AIR HUMIDITY TO NOT MORE THAN 80% RH (ADJUSTABLE).
A NORMALLY CLOSED TWO-POSITION CONTROL VALVE SHALL BE PROVIDED UPSTREAM OF THE HUMIDIFIER. UPON CALL FOR
HUMIDITY THE TWO-POSITION CONTROL VALVE SHALL OPEN, ALLOWING STEAM TO FLOW TO HUMIDIFIER. THE VALVE SHALL
CLOSE WHEN THE HUMIDITY LEVEL IS WITHIN SETPOINT LIMITS. VALVE SHALL BE LOCKED OUT WHEN OUTSIDE AIR
TEMPERATURE IS ABOVE 60 F (ADJUSTABLE).
THE HUMIDIFIER HIGH LIMIT SWITCH SHALL BE HARD PIPED WITH THE CONTROL SIGNAL SERVING THE HUMIDIFIER CONTROL
VALVE. WHEN THE HIGH LIMIT SWITCH TRIPS THE SIGNAL TO THE HUMIDIFIER SHALL BE INTERRUPTED AUTOMATICALLY
STOPPING HUMIDIFICATION.
A FACTORY FLOAT SWITCH SHALL BE PROVIDED IN THE HUMIDIFIER HEADER. IN THE EVENT OF A FLOODED HEADER, THE
FLOAT SWITCH SHALL OPEN AND THE MODULATING STEAM VALVE SHALL CLOSE AND AN ALARM SHALL BE ANNUNCIATED AT
THE OPERATOR'S WORKSTATION.
ALARM AT THE EMCS UPON SUPPLY HUMIDITY OUT-OF-LIMIT (INITIALLY BELOW 25% RH, ADJUSTABLE) .
ALARM AT THE EMCS IF SUPPLY AIR HUMIDITY REACHES 85% RH (ADJUSTABLE).
SAFETIES: THE FOLLOWING DEVICES SHALL BE HARDWIRED TO STOP THE SUPPLY FAN WHEN ACTIVATED, AND SHALL
REQUIRE A MANUAL RESET AT THE DEVICE FOR A RETURN TO NORMAL OPERATION.
TEMPERATURE LOW LIMIT (FREEZE STAT)
DUCT-MOUNTED SMOKE DETECTOR (FURNISHED AND INSTALLED AS WORK OF DIVISION 26)
HIGH STATIC ALARM
LOW STATIC ALARM
WHEN ANY OF THE ABOVE SAFETY DEVICES ARE TRIPPED, THE HARDWIRED SAFETY CIRCUIT SHALL STOP THE SUPPLY FAN
AND CLOSE THE OUTSIDE AIR DAMPER.
VAV TERMINAL UNITS:
VAV TERMINAL UNITS SHALL BE UNDER THE CONTROL OF THE EMCS. REFER TO SHEET M702 FOR SPECIFIC RESPONSIBILITIES
OF THE OWNER AND CONTRACTOR REGARDING INSTALLATION OF CONTROLS FOR THESE UNITS. VAV TERMINAL UNITS SHALL
UTILIZE DDC MICROPROCESSOR BASED LOGIC TO ACHIEVE ALL CONTROL FUNCTIONS.
COOLING MODE: VAV TERMINAL UNITS SHALL OPERATE AS CONSTANT VOLUME UNITS AND SHALL CONTINUOUSLY MODULATE
THE AIR DAMPER POSITION TO MAINTAIN THE AIRFLOW NOTED ON THE SCHEDULE.
HEATING MODE: WHEN SPACE TEMPERATURE IS BELOW SETPOINT, THE VAV TERMINAL UNIT CONTROLLER SHALL MODULATE
THE HEATING HOT WATER CONTROL VALVE TO MAINTAIN SPACE TEMPERATURE SETPOINT (72 DEGRESS F, ADJUSTABLE).
REHEAT COIL (RHC 5-1 AND 5-2):
THE EMCS SHALL MODULATE THE HEATING COIL CONTROL VALVE TO MAINTAIN HOT DECK SUPPLY AIR TEMPERATURE
SETPOINT (90 DEGREES F, ADJUSTABLE)..
RCT
24 VAC CONTROL RELAYCURRENT TRANSFORMER(SWITCH)
(SEE SPECS):
DEVICESKEEP ALL LOW VOLTAGE CONTROL WIRING (UNDER 25V) AND LOW VOLTAGE
POWER WIRING (OVER 25V) SEPARATED. (RUN IN SEPARATE CONDUIT.)
GET POWER FOR 24V TRANSFORMER FROM LINE SIDE OF MOTOR STARTER OR
VFD DISCONNECT. DO NOT POWER EXTERNAL DEVICES WITH VFD OR STARTER
CONTROL POWER.
PROVIDE RELAYS WITH MULTIPLE CONTACTS AS REQUIRED.
1.
2.
3.
GENERAL NOTES:
100% OA WITH VFD
METASYS(SF-SC)
ES CONTACTS ON R1
CONTACTS ON R3
METASYS(SF-S)
METASYS(LT-A)
METASYS(HS-A)
FREEZESTAT AUX
CONTACTS
CONTACTS R4
ST-CC
IV-CC
F-CC
SF VFD
METASYS(SF-C)
SUPPLYFAN CT R3
STATUSRELAY
R2 ST/SPRELAY
DMPRELAY
R1
HTGVALVERELAY
FA
CONTACTS R5
FRZSTA
T
24 VAC
R4 HSRELAY
HIGHSTATICSWITCH
(IF REQUIRED)
ON R3CONTACTSRESET
RESTART
S1 ON R2
BYPASS SIDE OFAUX CONTACTS ON
VFD I O B SWITCH
2
CONTACTS
1
TD
3
CONTACTS ON R2
117
SF
-S-2
VFD
M
119
HWR
HWS
NC
LT
-A
SMK
112
PH
T-O
M
123118
PH
P-S
PH
P-C
111
CLG
-O
CO
OL
ING
CWS
CWR
NC
CO
IL
35 F
102
PH
T-T
121
SF
-C
DM
ES
110
SF
-O
FILTERS
LS
-A
DPS
122
PR
EH
EA
T
CO
IL
OUTSIDEAIR
SEE AHU START CIRCUIT DETAIL ON SHEET THIS SHEET.
LOCATE AS SHOWN ON SHEET M102.
1. SEE SPECIFICATIONS FOR DEVICE SPECIFICATIONS.
2.ANY DEVICE REQUIRING POWER MUST BE POWERED BY
CONTRACTOR.
GENERAL NOTES:
KEYED NOTES:1
1
1
113
ST
M-O
ST
EA
M
LPS
NC
HU
MID
IFIE
R
SF#2
107
SA
-PR
S1
DPT
2
104
CLG
-T
124
ST
M-I
SO
109
SA
-PR
S3
DPT
NORTH COLDSUPPLY AIR DUCTTO SERVE NEW VAVTERMINAL UNITS
2
2
TAG #100101102103104105106107108109110111112113114115116117118119120121122123124
TYPEAIAIAIAIAIAIAIAIAIAIAOAOAOAOAOAOBIBIBIBIBIBIBOBOBO
POINT NAMESA-RHOA-TPHT-TRHT-TCLG-TSA-TSA-RH-HLSA-PRS1SA-PRS2SA-PRS3SF-OCLG-OPHT-OSTM-ORHT-OSAD-O-HDSF-S-1SF-S-2PHP-SLT-AHS-ALS-ASF-CPHP-CSTM-ISO
DESCRIPTIONSUPPLY AIR HUMIDITYOUTSIDE AIR TEMPPREHEAT AIR TEMPREHEAT COIL AIR TEMPCOOLING AIR TEMPSUPPLY AIR TEMPSUPPLY AIR HUMIDITY HIGH LIMITSUPPLY AIR STATIC PRESSURESUPPLY AIR STATIC PRESSURESUPPLY AIR STATIC PRESSURESUPPLY FAN SPEED OUTPUTCOOLING OUTPUTHEATING OUTPUTSTEAM OUTPUTREHEAT OUTPUTSUPPLY HD DAMPER OUTPUTSUPPLY FAN STATUS #1SUPPLY FAN STATUS #2PREHEAT PUMP STATUSLOW TEMP ALARMHIGH STATIC ALARMLOW STATIC ALARMSUPPLY FAN COMMANDPREHEAT PUMP COMMANDHUMIDIFIER ISOLATION VALVE
DEVICEHUMIDITY SENSORSOFTWARE INPUTRTD/DUCT AVERAGINGRTD/DUCT AVERAGINGRTD/DUCT AVERAGINGRTD/DUCT AVERAGINGHUMIDITY SENSORPRESSURE TRANSMITTERPRESSURE TRANSMITTERPRESSURE TRANSMITTERVFDELECT ACTUATOR W/SPRING RETURNELECT ACTUATOR W/SPRING RETURNELECT ACTUATOR W/SPRING RETURNELECT ACTUATOR W/SPRING RETURNELECT ACTUATOR W/SPRING RETURNCURRENT SWITCHCURRENT SWITCHCURRENT SWITCHFREEZE STATPRESSURE SWITCHPRESSURE SWITCHCONTROL RELAYCONTROL RELAYELECT ACTUATOR W/SPRING RETURN
SM
K
105SA-T
120HS-A
DP
S
1
106SA-RH-HL
HU
M
108
SA
-PR
S2
DPT
2
114
RH
T-O
HE
AT
ING
HWS
HWR
NC
CO
IL
SA
D-O
-HD
DM
118103
RH
T-T
MSF#1
SOUTH COLD DECKSUPPLY AIR
SOUTH HOT DECKSUPPLY AIR
100SA-RH
HU
M
116SF-S-1
1
1
NOTES
FRONT VIEW
DDC CONTROLLERS ARE SUPPLIED BY OWNER AND MOUNTED BY
CONTRACTOR.
KEEP ALL LOW VOLTAGE CONTROL WIRING ( UNDER 25V) AND LOW
VOLTAGE POWER WIRING (OVER 25V) SEPARATED. (RUN IN SEPARATE
CONDUIT).
PLYWOOD SIZE IS BASED ON THE NUMBER OF CONTROLLERS IN EACH
LOCATION. COORDINATE WITH OWNERS REPRESENTATIVE.
4/0 BOX WITH PULL CHAIN.18W LED LIGHT WITH GUARD.
4'x4'x3/4" PLYWOOD (MIN)(PAINT FRONT AND
ENDS MACHINE GRAY.)
1-1/2" UNISTRUTCHANNEL (2)
1.
2.
3.
6" x 6" WIRE TROUGH
FLOOR
3/4" CONDUIT
120 VAC INPUT POWER
DEDICATED 15A CIRCUIT
1" CONDUITMINIMUM
I/O
6"x6" WIRETROUGH
FLOOR
EXP. ANCHORS
1-1/2" UNISTRUTCHANNEL (2)
4'x4'x3/4" PLYWOOD (MIN)(PAINT FRONT AND ENDSMACHINE GRAY)
3/4" CONDUIT
4/0 BOX WITHPULL CHAIN. 18WLED WITH GUARD.
WA
LL
ASC ASC
BY DIVISION 26
2" MIN. CONDUIT (2)
3'-6
" T
YP
ICA
L
3' MIN DISTANCE
POSTBASE (2)
BRACEFITTING (2)
OPTIONAL FLOOR MOUNT
SIDE VIEW
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:5
1 P
M
505-106
M701
DPP
CONTROLS
JCS
01/11/2017
NTS2
AHU START CIRCUIT DIAGRAM
NTS1
AHU-11 CONTROL DIAGRAM
NTS3
ASC PANEL MOUNTING DETAIL
1 01/20/17 ADDENDUM 1
A
B
C
VAV BOX WITH REHEAT CONTROL DIAGRAM
500 VA POWER SUPPLY DIAGRAM
FC BUS SCHEMATIC DIAGRAM
NO SCALE
NO SCALE
NO SCALE
FC COMMUNICATION BUSWIRE DAISY CHAINED TOPREVIOUS VMA CNTRLR
LOW VOLTAGEWIRE
AIR FLOWMEASURING
TAPS
AIR IN
FC COMMUNICATION BUSWIRE DAISY CHAINED TONEXT VMA CONTROLLER
DDC VMA
CONTROLLER
HWR HWS
SUPPLY AIRSENSOR
AIR OUT
AIR VALVEDAMPER
NETWORKSENSOR
T
M
ELECTRICACTUATOR
NC
SA BUSWIRE
100 VA
PSH500A
100 VA
100 VA
100 VA
100 VA
DISCONNECT
SWITCH
24V
COM
24V
COM
24V
COM
24V
COM
24V
COM
480
277
240
120
COM
OFF
ON
OFF
ON
OFF
ON
OFF
ON
OFF
ON
RIB AC
BREAKER
SWITCH
ENCLOSED AC POWER SUPPLY
POWER
SUPPLY/TRANSFORMER
(FUSE)
AH-11AH-10
VAV VAVEXIST
MR M576 MR M524
S
OCCUPANCYSENSORS
KEYED NOTES:
GENERAL NOTES: KEYED NOTES:
GENERAL NOTES:
CONTROLLER WILL BE PROVIDED AND INSTALLED BY OWNER.
CONTROLLER WILL BE JCI MODEL MS-VMA-1620 SERIES. PROGRAMMING
AND COMMISSIONING WILL BE DONE BY OWNER.
NETWORK SENSOR WILL BE FURNISHED BY OWNER & INSTALLED BY
CONTRACTOR. NETWORK SENSOR WILL BE JCI NS SERIES.
FC COMMUNICATION BUS WIRE SHALL BE 22 AWG, PLENUM RATED,
TWISTED SHIELDED, 3 CONDUCTOR, WITH BLUE OUTER CASING,
DESCRIPTED AS 22-03 OAS STR PLNM NEON BLU JK DISTRIBUTED BY WINDY
CITY WIRE CONSTRUCTED BY CABLE-TEK, OR APPROVED EQUIVALENT.
SA BUS WIRE SHALL BE 22 AWG, PLENUM RATED, TWISTED SHIELDED, 4
CONDUCTOR.
PRESSURE INDEPENDENT CONTROL VALVE WITH PROPORTIONAL 0-10 VOLT
ACTUATOR.
CONTROLLER MUST HAVE A MINIMUM OF 18 INCHES OF ACCESSIBLE
CLEARANCE.
VAV SUPPLY TEMP SENSOR 1000 OHM PLATINUM RTD LOCATED APPROX. 8
FT. FROM VAV BOX DISCHARGE. PROVIDE, INSTALL AND WIRED TO
CONTROLLER BY CONTRACTOR.
FUSE LOCATED WITHIN 2 FT. OF VMA CONTROLLER.
LOW VOLTAGE WIRE BY DIVISION 23. SEE ELECTRICAL DRAWINGS FOR
SOURCE.
OCCUPANCY SENSOR(S) PROVIDED AND INSTALLED BY CONTRACTOR
WHERE INDICATED ON E-SERIES SHEETS.
1
2
3
4
5
6
7
8
9
2
4
4
7
9
3
8
1
5
6
3
EACH SECONDARY OUTPUT LINE CAN POWER 3-5 VAV CONTROLLERS
MAXIMUM. (100 VA).
PRIMARY LINE INFO: 480/277/240/120 Vac, #12 AWG MINIMUM.
SECONDARY LINE INFO: 24 Vac, #12-26 AWG, 100 VA. MAX LENGTH 175 FEET
USING #14 AWG.
DISCONNECT SWITCH REQUIRED, EXTERNALLY MOUNTED WITHIN 12
INCHES OF RIB POWER SUPPLY.
500VA POWER SUPPLY - RIB MODEL# PSMN500A OR APPROVED
EQUIVALENT.
ALL SECONDARY LINES MUST BE LABELED IN ENCLOSURE AS TO WHICH
VAV'S THEY POWER PRIOR TO ENERGIZING POWER SUPPLY.
A SEPARATE 3 AMP FUSE IS REQUIRED WITHIN 3 FEET OF EACH VAV.
1. SECONDARY LINE CAN BE RAN IN SAME CONDUIT AS FC.
2. ENCLOSED POWER SUPPLY MUST BE LOCATED IN ELECTRICAL ROOM,
MECHANICAL ROOM, OR JANITOR'S CLOSET AND BE ACCESSIBLE. ANY OTHER
LOCATION MUST BE APPROVED BY THE OWNER'S REPRESENTATIVE.
1
2
3
4
5
6
7
5
67
3
2
4
1
FC BUS TO BE CONTINUOUS DAISY CHAIN. SEE PLANS
FOR QUANTITY AND LOCATIONS OF VAV/FCU
CONTROLLERS.
OWNER WILL MAKE TERMINATION CONNECTIONS AT
PANELS. LOCATE PANELS IN SAME ROOM AS
EQUIPMENT SERVED.
FC COMMUNICATION BUS WIRE SHALL BE 22 AWG,
PLENUM RATED, TWISTED SHIELDED, 3 CONDUCTOR,
WITH BLUE OUTER CASING, DESCRIPTED AS 22-03 OAS
STR PLNM NEON BLU JK DISTRIBUTED BY WINDY CITY
WIRE, CONSTRUCTED BY CABLE-TEK, OR APPROVED
EQUIVALENT.
COORDINATE FIELD ROUTING WITH OWNERS
REPRESENTATIVE.
1.
2.
3.
4.
10
10
SA BUS WIRE
FIFTH FLOOR
1
1
6 S
OU
TH
OL
D O
RC
HA
RD
ST
. LO
UIS
, M
O 6
31
19
T 3
14
.91
8.8
383
F 31
4.9
18.1
766
ww
w.r
ossba
r.com
CHECKED BY:
© ROSS & BARUZZINI, INC 2017
ISSUE DATE:
R&B PROJ. NO.:
DESIGNED BY:
DRAWING TITLE:
DRAWING NO.:
WHEN THIS DRAWING IS
REPRODUCED AT ORIGINAL
SCALE THIS BAR = 1 INCH
REVISIONS:
ROSS & BARUZZINI
MISSOURI STATE CERTIFICATE OF
AUTHORITY #000148
1 INCH
DATE DESCRIPTION
ME
DIC
AL S
CIE
NC
E B
UIL
DIN
GR
EP
LA
CE
AH
U-1
1M
U P
RO
JE
CT
NU
MB
ER
CP
161791
CO
LU
MB
IA, M
O
UN
IVE
RS
ITY
OF
MIS
SO
UR
I
The Professional Engineer, whose signature andpersonal seal appear on this document, assumesresponsibility only for what appears hereon, anddisclaims responsibility for all other plans,specifications, estimates, reports, documents orinstruments not sealed by the ProfessionalEngineer relating to, or intended to be used for,any part or parts of the engineering project towhich this document refers. Prints sealed by theEngineer bear the embossed or wet seal of theEngineer across the signature and date. Copies ofthis document, as signed and sealed, have beenretained by the Professional Engineer. TheProfessional Engineer will not be responsible forsubsequent changes to this document, unless thechanges are made by the Engineer or with theEngineer's written authorization.
MU PROJ. NO.: CP161791
JEFFREY R. CRAWFORDMO LICENSE NO. E-27507
1/2
0/2
017 4
:15:5
1 P
M
505-106
M702
DPP
CONTROLS
JCS
01/11/2017
1 01/20/17 ADDENDUM 1