    CENTRAL POWER RESEARCH INSTITUTE

    REGIONAL TESTING LABORATORY

    NOIDA

    Sub: DTL Sub-Stations Field Testing Summary

    Date: 2.2.2014

    Mont: February- 2014

    Work done as per W.O.No.: P.O.No.L.D.T.L/!"/#ana$er%T&Ser'()es/!*+*,/Oprns.C-##/", d.*.!*.!*,

    S. INS Dae Na0e o1 DTL S23+sa(ons Capa)(an)e - Tan dea 0eas2re0en S4RA E5)(a(on T2rn+Ra(o LC#No. No. Wd$. B2s6(n$s CTs C7Ts GC )2rren T/4 C7Ts

    1 *!! 2".01.14 220 #$ S7S Lodi-(oad 3 6 3 3 1 3 3

    2 *!* 2.01.14 220 #$ S7S Lodi-(oad 3 6 3 3 1 3 3

    3 *! 30.01.14 220 #$ S7S Lodi-(oad 4 2 6

    4 *!, 31.01.14 220 #$ S7S Lodi-(oad 4 1 2 6

    + *!" 3.02.14 220 #$ S7S (oini + 3 6

    6 *!8 +.2.14 220 #$ S7S (oini + 6 1 6

    *!9 6.2.14 220 #$ S7S (oini 3 6 6 3 1 3 3

    " *! .2.14 220 #$ S7S (oini 3 6 6 6 3 6

    *!; 1.2.14 220 #$ S7S (oini 6 6 6

    10 *!< 21.2.14 220 #$ '&''&*#&L&*-2 3 6 12 1 3

    11 **! 24.2.14 220 #$SS *&(&%*& 3 6 6 3

    12 *** 26.2.14 220 #$ SS S&L%M&(,&) 4 6 6 2 6

    13 112 2.2.14 220 #$ SS S&L%M&(,&) 3

    Total measured 5uantity 40 ++ 60 3 0 11 3 0 36

    (ates7Measurement8(s. 3000 202+ 202+ 202+ 22+0 2+000 22+0 2000 20+0 1

    &mount8(s 120000 1113+ 121+00 "+ 0 2+000 "+0 0 3"00 12

    Toa A0o2n=Rs ;;!"!!

    PO No.+";!!!!"!

    En$(neer(n$+O11()er Gr+

  • 8/9/2019 CPRI Works Details With PO Nos.

    4/16

    3328+.0022+8000.00

    428000.00

    +8+.00

    4132.1

    6380.1

  • 8/9/2019 CPRI Works Details With PO Nos.

    5/16

    CENTRAL POWER RESEARCH INSTITUTE

    REGIONAL TESTING LABORATORY

    NOIDA

    Sub: DTL Sub-Stations Field Testing Summary

    Date: 2.1.2014

    Mont: anuary- 2014

    Work done as per W.O.No.: P.O.No.L.D.T.L/!"/#ana$er%T&Ser'()es/!*+*,/Oprns.C-##/", d.*.!*.!*,

    S. INS Dae Na0e o1 DTL S23+sa(ons Capa)(an)e - Tan dea 0eas2re0en S4RA E5)(a(on T2rn+Ra(o LC#No. No. Wd$. B2s6(n$s CTs C7Ts GC )2rren T/4 C7Ts

    1 ; 30.12.13 220 #$ S7S Sarita 9iar 6 6 6

    2 ;; 1.1.14 220 #$ S7S Sarita 9iar 6 3 3

    3 ;< 2.1.14 220 #$ S7S Sarita 9iar + 3 2 6

    4

    +

  • 8/9/2019 CPRI Works Details With PO Nos.

    6/16

    CENTRAL POWER RESEARCH INSTITUTE

    REGIONAL TESTING LABORATORY

    NOIDA

    Sub: DTL Sub-Stations Field Testing Summary

    Date: 2+.0+.2013

    Mont: &7 S/S BAWANA= 32 3 0(sake

    ( @as no )o2ned (n 6e In'o()e ra(sed 1or 6e 0on6 o1 4e3+*,.

    & A/C o dea(s 0en(oned a S.No. = 6ree nos. C7T @ere sed on !*.!,.*, a ! >7 S/S Sa3(0and(= 32 3 0(sake

    ( @as no )o2ned (n 6e In'o()e ra(sed 1or 6e 0on6 o1 #ar)6+*,.

    PO No.+";!!!!"!;