DRIVE SYSTEM TOTAL WEIGHT ADDITIONAL REACTION WEIGHT CPT RAM THRUST CAPACITY MAXIMUM PENETRATION PERFORMANCE RATES TYPICAL SITES FOR THIS RIG SMALL TRACKED SYSTEM 3.5 TONNES HYDRAULICALLY DRIVEN SCREW ANCHORS 20 TONNES 10-30M DEPENDING ON THE GROUND CONDITIONS AND REACTION FROM SCREW ANCHORS. 50-100M OF TESTING A DAY, DEPENDING ON ACCESS TO POSITIONS. SPECIALISES ON SOFT GROUND SITES. CAN BE MOUNTED ON MARINE JACK-UPS AND RAIL TRAILERS. CPT RIG DETAILS RIGS INSITUSI.COM CPT RIG DIMENSIONS TOTAL WIDTH = 1200MM TOTAL LENGTH = 2900MM TOTAL HEIGHT = 2850MM 3.5 TONNE CPT TRACK MOUNTED RIG (CPT003) We have a variety of rigs giving us the capacity to meet our clients’ needs and specifications for each individual project. This rubber tracked mini rig weighs 3.5 tonnes and is able to push up to a depth of 10-30 metres, depending on the ground conditions. Its hydraulically driven screw anchors enable it to have a 20 tonne ram thrust capacity. It can be attached to marine jack-ups and rail trailers or craned into areas of restricted access making this rig ideal for confined locations. M62 Queen Elizabeth, London Big Ben, London
Transcript
  • DRIVE SYSTEM

    TOTAL WEIGHT

    ADDITIONAL REACTION WEIGHT

    CPT RAM THRUST CAPACITY

    MAXIMUM PENETRATION

    PERFORMANCE RATES

    TYPICAL SITES FOR THIS RIG

    SMALL TRACKED SYSTEM

    3.5 TONNES

    HYDRAULICALLY DRIVEN SCREW ANCHORS

    20 TONNES

    10-30M DEPENDING ON THE GROUND CONDITIONS AND REACTION FROM SCREW ANCHORS.

    50-100M OF TESTING A DAY, DEPENDING ON ACCESS TO POSITIONS.

    SPECIALISES ON SOFT GROUND SITES. CAN BE MOUNTED ON MARINE JACK-UPS AND RAIL TRAILERS.

    CPT RIG DETAILS

    RIGS

    INSITUSI.COM

    CPT RIG DIMENSIONS

    TOTAL WIDTH = 1200MMTOTAL LENGTH = 2900MM

    TOTA

    L HE

    IGHT

    = 2

    850M

    M

    3.5 TONNE CPT TRACK MOUNTED RIG (CPT003)

    We have a variety of rigs giving us the capacity to meet our clients’ needs and specifications for each individual project.

    This rubber tracked mini rig weighs 3.5 tonnes and is able to push up to a depth of 10-30 metres, depending on the groundconditions. Its hydraulically driven screw anchors enable it to have a 20 tonne ram thrust capacity. It can be attached tomarine jack-ups and rail trailers or craned into areas of restricted access making this rig ideal for confined locations.

    M62

    Queen Elizabeth, London

    Big Ben, London

    IN SITU - CPT003 [26.01.18].qxp_Layout 1 29/01/2018 09:15 Page 1

  • RIGS

    INSITUSI.COM

    IN SITU SITE INVESTIGATIONPenetration House, 13 Vale Road, Battle,E Sussex, TN33 0HE, United Kingdom

    T: +44 (0) 845 862 0558F: +44 (0) 845 862 0559

    PROJECT REVIEW

    ALBERT DOCKS, LIVERPOOLIn Situ Site Investigation completed a specialist water project withinthe Albert Docks in Liverpool. Our Mini Rig, CPT 003, was craned ontoa spud leg multi cap vessel and transported across the dock tocomplete tests over the water. Proposed redevelopment of the arearequired significant geological testing and by utilising our mini riganchored onto a vessel, our client was saved the cost and time ofdraining the dock in order to assess the ground conditions.

    A total of 3 MOSTAPs, 7 shear vanes and 14 CPTs were completedwithin the 5 day window given. We successfully used our newelectronic shear vane testing equipment to measure the in situstrength of the ground. The CPTs went to a target depth ofapproximately 3 metres through the soft sediment before stoppingat the bedrock.

    CANTERBURYThe redevelopment of an old bank in Canterbury required the use ofour Mini Rig for the investigation carried out in its basement. This sitewas particularly restricted and required careful management andprecision to get the rig into position. The rig was trackedapproximately 200m in order to enter the building. Once inside, therig was craned into a pre-made hole and lowered down into thedepths of the basement. An exhaust extractor was connected toremove fumes inside the confined space and testing commenced.

    For this project, we utilised our combined cone, which allows us tocomplete a UXO survey and carry out CPTs at the same time. 10 CPTswere completed to a depth of 8-10 meters and went into underlyingclay over sand.

    Hastings

    Liverpool

    Liverpool

    Bedford

    Canterbury

    IN SITU - CPT003 [26.01.18].qxp_Layout 1 29/01/2018 09:15 Page 2

    /ColorImageDict > /JPEG2000ColorACSImageDict > /JPEG2000ColorImageDict > /AntiAliasGrayImages false /CropGrayImages true /GrayImageMinResolution 300 /GrayImageMinResolutionPolicy /OK /DownsampleGrayImages true /GrayImageDownsampleType /Bicubic /GrayImageResolution 300 /GrayImageDepth -1 /GrayImageMinDownsampleDepth 2 /GrayImageDownsampleThreshold 1.50000 /EncodeGrayImages true /GrayImageFilter /DCTEncode /AutoFilterGrayImages true /GrayImageAutoFilterStrategy /JPEG /GrayACSImageDict > /GrayImageDict > /JPEG2000GrayACSImageDict > /JPEG2000GrayImageDict > /AntiAliasMonoImages false /CropMonoImages true /MonoImageMinResolution 1200 /MonoImageMinResolutionPolicy /OK /DownsampleMonoImages true /MonoImageDownsampleType /Bicubic /MonoImageResolution 1200 /MonoImageDepth -1 /MonoImageDownsampleThreshold 1.50000 /EncodeMonoImages true /MonoImageFilter /CCITTFaxEncode /MonoImageDict > /AllowPSXObjects false /CheckCompliance [ /None ] /PDFX1aCheck false /PDFX3Check false /PDFXCompliantPDFOnly false /PDFXNoTrimBoxError true /PDFXTrimBoxToMediaBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXSetBleedBoxToMediaBox true /PDFXBleedBoxToTrimBoxOffset [ 0.00000 0.00000 0.00000 0.00000 ] /PDFXOutputIntentProfile () /PDFXOutputConditionIdentifier () /PDFXOutputCondition () /PDFXRegistryName () /PDFXTrapped /False

    /CreateJDFFile false /Description > /Namespace [ (Adobe) (Common) (1.0) ] /OtherNamespaces [ > /FormElements false /GenerateStructure false /IncludeBookmarks false /IncludeHyperlinks false /IncludeInteractive false /IncludeLayers false /IncludeProfiles false /MultimediaHandling /UseObjectSettings /Namespace [ (Adobe) (CreativeSuite) (2.0) ] /PDFXOutputIntentProfileSelector /DocumentCMYK /PreserveEditing true /UntaggedCMYKHandling /LeaveUntagged /UntaggedRGBHandling /UseDocumentProfile /UseDocumentBleed false >> ]>> setdistillerparams> setpagedevice


Recommended