+ All Categories
Home > Documents > Create Actual Assessment 11

Create Actual Assessment 11

Date post: 02-Jan-2016
Category:
Upload: gautam-gopalan
View: 76 times
Download: 11 times
Share this document with a friend
Popular Tags:
30
Create Actual Assessment 11/12/07 (via KSU5) (KSU1) Purpose Use this Assessment transaction, to create a cycle to be executed typically at the end of a month (and at year-end), for the allocation of costs incurred by one or more cost center/s to many other cost centers. As an example, Financial Reporting would use this cycle to assess wireless service costs to schools and departments. Important Note : Since the basis of charging out costs to various Receivers could be different (e.g. Long distance phone costs - Actual; Other telephone costs - based on number of phones at say $20 per phone, each month), Assessment Cycles are also created differently to meet these specific cost distribution needs. Trigger Perform this transaction and related steps when there is a chargeback/cost allocation to be carried out from one or more Sender Cost Center/s to many Receiver cost centers. Prerequisites Master data used in the creation of the assessment cycle, such as Cost Centers, Orders, Functional Areas, Statistical Key Figures, etc., must exist. Menu Path You cannot directly go the KSU1 transaction. Therefore use the following menu path(s) to begin this transaction: Select SAP menu Accounting Controlling Cost Center Accounting Period End Closing Single Functions Allocations KSU5 - Assessment In the KSU5 main screen select Extras Cycle Create or Shift+F5. Transaction Code KSU1 Helpful Hints From within T-code KSU5 (Execute Assessment), it is possible to access following related T-codes: KSU1 - Create Assessment
Transcript
Page 1: Create Actual Assessment 11

Create Actual Assessment 11/12/07 (via KSU5) (KSU1)

 

Purpose

Use this Assessment transaction, to create a cycle to be executed typically at the end of a month (and at year-end), for the allocation of costs incurred by one or more cost center/s to many other cost centers. As an example, Financial Reporting would use this cycle to assess wireless service costs to schools and departments.

Important Note: Since the basis of charging out costs to various Receivers could be different (e.g. Long distance phone costs - Actual; Other telephone costs - based on number of phones at say $20 per phone, each month), Assessment Cycles are also created differently to meet these specific cost distribution needs.

Trigger

Perform this transaction and related steps when there is a chargeback/cost allocation to be carried out from one or more Sender Cost Center/s to many Receiver cost centers.

Prerequisites

Master data used in the creation of the assessment cycle, such as Cost Centers, Orders, Functional Areas, Statistical Key Figures, etc., must exist.

Menu Path

You cannot directly go the KSU1 transaction. Therefore use the following menu path(s) to begin this transaction:

         Select SAP menu  Accounting  Controlling  Cost Center Accounting  Period End Closing  Single Functions  Allocations  KSU5 - Assessment

         In the KSU5 main screen select Extras Cycle Create or Shift+F5.

Transaction Code

KSU1

Helpful Hints

From within T-code KSU5 (Execute Assessment), it is possible to access following related T-codes: KSU1 - Create Assessment Cycles, KSU2 - Change Assessment Cycles, KSU3 - Display Assessment Cycles, and KSU4 - Delete Assessment.

Note: No menu path is available for this transaction; therefore, you can also access it by entering KSU1 in the command field.

Page 2: Create Actual Assessment 11

Procedure

1.       Start the transaction using the menu path or transaction code KSU5.

      SAP Easy Access

SAP Easy Access

 

Page 3: Create Actual Assessment 11

    No menu path is available for this transaction; therefore, you can also access it by entering KSU1 in the command field.

 

2.       Double-click .

      Execute Actual Assessment: Initial Screen

3. The transaction code to create an Assessment Cycle is not available through the CO module; therefore, to access KSU1, select Extras Cycle Create or Shift+F5.

Execute Actual Assessment: Initial Screen

Page 4: Create Actual Assessment 11

 

      Create Actual Assessment Cycle: Initial Screen

Create Actual Assessment Cycle: Initial Screen

 

Page 5: Create Actual Assessment 11

4.       As required, complete the following fields:

Field Definitions

Field Name R/O/C Description

Cycle R A collection of rules for cost allocation. A specific cycle can contain a number of segments.

    The naming convention for Assessment cycles will be maintained by the Financial Reporting office. The convention is structured as follows:

         First Character - Alpha character to identify the location (F=Food Service, E=ETS, B=BECON).

         Second and Third Characters - The last two digits of the ending fiscal year (2007=07).

         Fourth through Sixth - Consecutive numbers.

Example:         E07001

Start Date R Date from which the first recurring entry is to be carried out.

     Enter the date this cycle will begin. It is usually July 1st for each fiscal year, as Cycles are usually set up annually and executed throughout the year.

Example:         07/01/2006

Cycle O A collection of rules for cost allocation. A specific cycle can contain a number of segments.

     In the Copy from section, the parameters from an existing cycle can be used as the basis to create a new cycle. In this example an existing cycle will not be copied.

Example:        

Start Date O Date from which the first recurring entry is to be carried out.

    Enter the Start Date of the existing Cycle.

Example:        

Controlling Area O The Controlling area in SAP is a high-level organizational data sub-division that facilitates cost accounting internally to an organization. In accounting terms, it represents another ledger that is posted with information together with the FI ledger, and

    Enter the Controlling Area of the existing cycle - SBBC's Controlling Area is SBBC.

Example:        

Page 6: Create Actual Assessment 11

 

5.       Click  to proceed with the creation of an Assessment Cycle.

        Create Actual Assessment Cycle: Header Data

Create Actual Assessment Cycle: Header Data

 

Page 7: Create Actual Assessment 11

6.       As required, complete/review the following fields:

        Field Definitions

Field Name R/O/C Description

To (date) R Description of the To.

     It is highly recommended that the validity of an assessment cycle be effective throughout the end of the current fiscal year.

Example:         06/30/2007

Text R Text field for transaction information.

     Enter the title of the cycle.

Example:         ETS - Allocation of Svc Charge

Cumulative O Description of the Cumulative.

     The Cumulative option can be used to execute the distribution for more than one period. However, it is recommended that the distribution be executed period by period.

Example:        

Return to procedure

    Make sure to uncheck the  field as this will default. If left checked, this iteration option will be repeated until each sender is fully credited (a small remainder may be left over in some cases).

 

      Create Actual Assessment Cycle: Header Data

Create Actual Assessment Cycle: Header Data

Page 8: Create Actual Assessment 11

 

    The options enclosed in red in the above screen shot are not used in SBBC.

 

7.       Click  to set up each segment of the new Cycle.

        Create Actual Assessment Cycle: Segment

Create Actual Assessment Cycle: Segment

Page 9: Create Actual Assessment 11

 

    Segments are set up to segregate the various financial structures, such as Fund-based segments or Functional Area segments.

 

8.       As required, complete the following fields:

         Field Definitions

Page 10: Create Actual Assessment 11

Field Name R/O/C Description

Segment Name R Title of segment.  Each segment denotes a group of senders/receivers which are processed according to the same distribution rule.

    Enter the Segment's name.

Example:         E07001-001

Segment Description

R Description of the Segment Description.

    Enter the Segment's description.

Example:         ETS - Aircard Service Charges

Return to procedure

    By selecting the Lock Indicator , the segment will not process in the cycle. You may use this when there is no data to select in that fund or suppress a segment from execution. If the cycle containing no data is executed, the system will display a warning and not execute the cycle.

 

9.       As required in the  section of the tab, complete/review the following fields:

        Create Actual Assessment Cycle: Segment

Create Actual Assessment Cycle: Segment

Page 11: Create Actual Assessment 11

 

Field Definitions

Assessment CEle R A secondary cost element for costs that are assessed between Controlling objects.

    Enter the Assessment Cost Element. This cost element is the secondary cost element used for assessments. The cost element can be selected using

the drop down icon  to view available selection options.

Example:         99105001

Page 12: Create Actual Assessment 11

Sender rule R Description of the Sender rule.

    Select appropriate Sender rule from the drop-down

menu .

        Posted amounts - cycle will total, costs posted to the sender.

        Fixed amounts - the department/Financial Reporting will maintain the amount to be distributed.

        Fixed rates - the department will maintain the rates to be distributed (i.e. duplicating copies).

Example:         Fixed rates

Share in % R Description of the Share in %.

     Enter the overall percentage allocated to this Receiver fund.

Example:         100.00

Return to procedure

    The  field is defaulted in the cycle, as an actual assessment is performed. Moreover CO - Planning is not implemented in SBBC as all planning functions are handled by Budget Department.

 

10.     In the  section of the  tab, complete/review the following fields:

Field Definitions

Field Name R/O/C Description

Receiver rule R Determines how receiving tracing factors are determined.

     Enter the Receiver rule using the drop-down menu

 to select from the available options. In this example, "Variable portions" is selected as the basis is going to be Actual SKF of the Receivers.

Example:         Variable portions

Page 13: Create Actual Assessment 11

Field Name R/O/C Description

Var.portion type R Description of the Var.portion type.

     The Variable portion type will only appear if the Receiver rule is selected "Variable portions". Select an appropriate variable by using the drop-down

menu  to view the available options.

Example:         Actual Statistical Key Figures

Return to procedure

    Selecting Sender & Receiver rules will determine other rules and types. For example, when you choose fixed amounts for the Receiver Rule, the selection fields and tabs in subsequent screens will change accordingly.

 

11.     As required in the  tab, complete/review the following fields:

      Create Actual Assessment Cycle: Segment

Create Actual Assessment Cycle: Segment

Page 14: Create Actual Assessment 11

 

11.1        In the  section of the  tab, complete/review the following fields:

Field Definitions

Page 15: Create Actual Assessment 11

Field Name R/O/C Description

Cost Center R An organizational unit within a controlling area that represents a defined location of cost incurrence.

     Enter the Cost Center where costs were initially incurred and are to be assessed from.

Example:         2600097770

Functional Area R Cross-organization FM object used to divide organizational costs according to functional aspects, activities or programs to meet legal or internal reporting requirements.

     Select the appropriate Functional Area associated with this cost center, as this Sender attribute is essential to for the cycle to determine the "sending amounts". In few other cycles, this is not required.

Example:         6400000000000000

Fund R A fiscal and accounting entity having a self-balancing set of accounts, recording cash and other financial resources together with all related liabilities and residual equities or balances, which are segregated for the purpose of carrying out specific activities in accordance with specific regulations, restrictions or limitations.

     Enter the Fund associated with Sender Cost center/amounts.

Example:         1000

Grant R Grants can be defined in SAP as any external reimbursement or funding.

     Enter the Grant number. In many cases on the sender, it will be "Not Relevant", as most Senders are in the General Fund.

Example:         not relevant

Cost Element O Primary Cost Elements will be created automatically for each revenue/expense GL account. Secondary Cost Elements have no corresponding GL accounts in FI, but they are used in CO for internal cost allocation and reporting.

     If posted amounts of Cost Elements are used in assessments, then enter the Cost Element.

Example:         53720000

Return to procedure

Page 16: Create Actual Assessment 11

    All of the fields in the above table offer the capability to enter value ranges by

completing the  and  fields, or to enter groups by completing the

 field. In addition you can also use the dropdown menu  to select the appropriate value.

11.2        In the  section of the  tab, complete/review the following fields:

         Field Definitions

Field Name R/O/C Description

Order O Description of the Order.

     Enter the Internal Order number to which the costs are to be distributed as Receivers. In this example, orders are not the receivers.

Example:        

Cost Center O An organizational unit within a controlling area that represents a defined location of cost incurrence.

     Enter the Cost Center where costs were initially incurred and are to be assessed from. In this example, a Group is selected as the receiver.

Example:         ETS_ALLOC

Functional Area O Cross-organization FM object used to divide organizational costs according to functional aspects, activities or programs to meet legal or internal reporting requirements.

     In general, it is not necessary to select the Functional Area associated with Receiver cost center. One exception is when the Receiver rule is "Actual Costs" based on postings in the Receiver Cost Centers, for which it is necessary to specify to search the appropriate Receiver Functional Areas. Therefore, in few specific cycles, this is required to be specified.

Example:         7301000000000000

Fund R A fiscal and accounting entity having a self-balancing set of accounts, recording cash and other financial resources together with all related liabilities and residual equities or balances, which are segregated for the purpose of carrying out specific activities in accordance with specific regulations, restrictions or limitations.

     Enter the Fund associated with Sender Cost center/amounts.

Example:         1000

Page 17: Create Actual Assessment 11

Field Name R/O/C Description

Grant R Grants can be defined in SAP as any external reimbursement or funding.

     Enter the Grant number. Except the Grant Fund segment, this value will be "Not Relevant".

Example:         not relevant

Return to procedure

    All of the fields in the above table offer the capability to enter value ranges in the

 and  fields. Also, this can be done by entering groups and completing

the  field. In addition you can also use the dropdown menu  to select the appropriate value.

11.3        If you are using a group for any of the fields in the  tab, you must double click on the entered value (in this example, on the cost center group ) to ensure the system has properly established the necessary relationships.

      Display Cost Center Group

Display Cost Center Group

Page 18: Create Actual Assessment 11

 

    If new groups are required, you have additional facility of creating them by naming a new group and then selecting Extras Create groups.

 

12.     Click  to exit Cost Center group result screen.

13.     As required in the  tab, complete/review the following fields:

        Create Actual Assessment Cycle: Segment

Create Actual Assessment Cycle: Segment

Page 19: Create Actual Assessment 11

 

    Note that this screen will change according to the Segment Header criteria selected.

Field Definitions

Page 20: Create Actual Assessment 11

Field Name R/O/C Description

Price R Description of the Price.

    Enter the Price which is to be distributed to the receivers. In this example, $48.00 per SKF unit is to be distributed.

Example:         48.00

Return to procedure

 

14.     Click  to specify tracing factors for the Receiver Cost Centers.

        Create Actual Assessment Cycle: Segment

Create Actual Assessment Cycle: Segment

Page 21: Create Actual Assessment 11

 

    Note that this screen will change according to the Segment Header criteria selected.

 

15.     In the  section of the  tab, complete the following fields:

Field Definitions

Page 22: Create Actual Assessment 11

Field Name R/O/C Description

Stat. key fig. R Description of Stat. key fig.

    Enter the Statistical Key Figure to be used for the calculation of the distribution.

Example:         WIRE1

Activity Type C A unit in a controlling area that classifies the activities performed in a cost center.

    Enter the Activity to be used for the calculation of the assessment. In this example, an Activity Type is not being used.

Example:        

Return to procedure

    All of the fields in the above table offer the capability to enter value ranges in the

 and  fields. Also, this can be done by entering groups and completing

the  field. In addition you can also use the dropdown menu  to select the appropriate value.

 

16.     CAUTION for next step : Only in some cycles, click  to view the receiver weighting factors in the cycle. The screen shot below illustrates the cost centers in the

 group that will get 100% of total posted costs. As seen in this case, the combination of Fund, Functional Area, Grant and Cost Centers specified as possible Receivers results in 64 combinations. In some other cycles, this may lead to numerous possible combinations, due to which the system will take a long amount of time to display the Receiver Weighting factors, and in some cases the transaction may "hang up". The user is advised to exercise caution in this step.

        Create Actual Assessment Cycle: Segment

Create Actual Assessment Cycle: Segment

Page 23: Create Actual Assessment 11

 

    Please read the details in step 16 before clicking on .

 

17.     Click  to validate the segment.

      E07004-001: Display messagesE07004-001: Display messages

Page 24: Create Actual Assessment 11

 

    The message indicates that the cost element entered does not exist. In order to proceed with the next steps, you must now correct the error(s). In this case you must correct the cost element.

18.     Click  to exit the message window

19.     Click  to save when you have completed entering the details of the cycle.

      Create Actual Assessment Cycle: Segment

Create Actual Assessment Cycle: Segment

Page 25: Create Actual Assessment 11

 

    The system displays the message, "Cycle E07001, starting date 07/01/2006 has been saved."

 

20.     Click  to return to SAP main menu.

21.     You have completed this transaction.

Page 26: Create Actual Assessment 11

Result

You have created an assessment cycle.

Comments

None.


Recommended