1
CREATING Multiple Baseline SINGLE-‐SUBJECT DESIGN GRAPHS IN MICROSOFT EXCEL FOR MAC 2008
2
Step 1: Set up the Variables Multiple Baseline Design (MB)
3
Step 1: Set up the Variables X-Axis for Multiple Baseline Design
4
Step 1: Set up the Variables X-Axis
5
Step 1: Set up the CONDITION LABELS
6
Step 1: For Variables Across behaviors
7
Step 2: Enter the data X-‐Axis
8
Step 2: Enter the Data Y-Axis (Multiple Baseline Design)
9
Creating the Line Graphs
10
Step 3: Create the Line Graph for the First AB design
11
Step 3: Create the Line Graph for the first AB Design
12
Step 3: Create the Line Graph for the first AB Design
13
Step 4: Formatting the first line Graph
14
Step 4: Formatting the First Line Graph
15
Step 4: Formatting First line Graph
16
Step 4: formatting the First line Graph
Repeat this for the rest of data series
17
Step 4: Formatting First Line Graph
18
Step 5: Adjusting the X-Axis
19
Step 5: Adjusting the X-Axis
20
Step 6: Adjusting the Y-Axis
Move the 1st graph to the bottom before creating the 2nd.
21
Step 8: Creating the Second AB Graph
Follow this for the 2nd exception
22
Step 9: Creating the Third Line Graph
23
Step 10: Creating Chart Title
24
Step 11: Eliminating Grid and Chart Border Lines
25
Step 12: Drawing Phase Change Lines
26
Step 12: Drawing Phase Change Lines
27
Step 12: Drawing Phase Lines
28
Step 13: Changing the Format of the Phase Change Lines
29
Step 14: Label the Phase and the Y-‐Axis
30
Step 14: Label the Phase and the Y-‐Axis
31
Step 15: Covering the -‐1 on the Y-‐Axis
32
FINAL