S UMMARY Creative Village PD Project Description Lot D in the Creative Village PD is located west of N Terry Ave., east of N. Parramore Avenue, south of W. Amelia St. and north of the W. Livingston St. The proposed central energy plant building development will consists of a 9,221 sq. ft. building with condenser water pumps and cooling towers located outside. Project Background 1989—Amway Arena constructed. 2006—The Mayor appointed a Creative Village Concept Team to identify a vision for redevelopment of the Centroplex Area. May 2010—Creative Village Development LLC (CVD) was selected as the City’s partner in redeveloping the Creative Village. July 2010—The City changed the future land use from Public/Recreational/Institutional to Urban Activity Center. October 2010—New Amway Center opened on Church Street, and the former Amway Arena closed. February 2011—The City and CVD entered into a Master Development Agreement (MDA) describing responsibilities of each partner (CC Doc #110207701) August 2012– Second reading and adoption of the Creative Village Planned Development Ordinance by City Council (Ord.#2012-9) March 2017– Second reading and adoption of the Creative Village Planned Development Amendment by City Council (Ord.#2017-18) July 24, 2018 Case Number MPL2018-10029 ARB2018-10022 Applicant Maria C. Hockman, A.I.A Registered Architect RLF Architecture Engineer- ing Interiors Owner University of Central Florida Requested Action Request for Master Plan ap- proval to develop a 9,221 sq. ft. central cooling system building with condenser water pumps and cooling towers located outside. Recommendation Approval, based on the conditions in the staff re- port. Project Planner TeNeika Neasman Planner II Doug Metzger, AICP, LMT Appearance Review Official Updated: July 20, 2018 A GENDA I TEM 1 — UCF Central Energy Plant Creative Village Design Report Creative Village Design Review Committee Staff Report
Transcript
Page 1: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

S U M M A R Y

Creative Village PD

Project Description Lot D in the Creative Village PD is located west of N Terry Ave., east of N. Parramore Avenue, south of W. Amelia St. and north of the W. Livingston St. The proposed central energy plant building development will consists of a 9,221 sq. ft. building with condenser water pumps and cooling towers located outside. Project Background • 1989—Amway Arena constructed. • 2006—The Mayor appointed a Creative

Village Concept Team to identify a vision for redevelopment of the Centroplex Area.

• May 2010—Creative Village Development LLC (CVD) was selected as the City’s partner in redeveloping the Creative Village.

• July 2010—The City changed the future land use from Public/Recreational/Institutional to Urban Activity Center.

• October 2010—New Amway Center opened on Church Street, and the former Amway Arena closed.

• February 2011—The City and CVD entered into a Master Development Agreement (MDA) describing responsibilities of each partner (CC Doc #110207701)

• August 2012– Second reading and adoption of the Creative Village Planned Development Ordinance by City Council (Ord.#2012-9)

• March 2017– Second reading and adoption of the Creative Village Planned Development Amendment by City Council (Ord.#2017-18)

July 24, 2018

Case Number

MPL2018-10029 ARB2018-10022

Applicant

Maria C. Hockman, A.I.A Registered Architect RLF Architecture Engineer-ing Interiors

Owner

University of Central Florida

Requested Action

Request for Master Plan ap-proval to develop a 9,221 sq. ft. central cooling system building with condenser water pumps and cooling towers located outside.

Recommendation

Approval, based on the conditions in the staff re-port.

Project Planner

TeNeika Neasman Planner II Doug Metzger, AICP, LMT Appearance Review Official

Updated: July 20, 2018

AGENDA ITEM 1 — UCF Central Energy Plant

Creative Village Design Review Committee Staff Report

Creative Village Design Review Committee Staff Report

Page 2: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

Page 2

P R O J E C T O V E RV I E W

MPL2018-00029, ARB2018-10022—UCF Centra l Energy Plant MPL

The Creative Village Planned Development was established in 2012 to provide development criteria to ensure compatible de-velopment as the site is developed and build upon the presence of the University of Central Florida’s Center for Emerging Me-dia and the Florida Interactive Entertainment Academy (FIEA), Development within the Planned Development shall be urban, mixed use development which takes advantage of its location and physical assets to create a diverse, energetic, and innova-tive community. The proposed central energy plant is consistent with the land use (primarily educational) designated for the site.

The applicant is requesting Specific Parcel Master Plan approval to develop a 9,221 sq. ft. central energy plant building with condenser water pumps and cooling towers located outside.

Land Development—TeNeika Neasman Lots D have an underlying zoning of AC-2 with a maximum building height of 150 feet. The following footnotes apply to devel-opment on this lot: 1. Ancillary retail/commercial space is allowed. Section 3.12(b) of the PD states: At least 70% of the building wall must meet the maximum setback of 15 ft. Staff recom-mends approval of a Modification to allow the building wall to be set back 15 ft. from the back of curb and approve the pro-posed setbacks from the property line. Approval of this request is inline with the approved streetscape and conceptual open space plan for this portion of the planned development. The University of Central Florida (UCF) Downtown Central Energy Plant at Creative Village application complies with height, FAR, and buffering of outdoor use requirements as outlined in the Planned Development Ordinance. Staff recommends approval of the site plan for this development with the conditions in this staff report. Appearance Review Board — Doug Metzger, AICP, LMT Typically, a central energy plant [CEP] for a facility wouldn’t raise much concern because they are typically located in the rear or off in a low visibility corner of a project site. That isn’t the case with the proposed UCF Central Energy Plant. The UCF CEP sits front and center on the downtown UCF campus with a front door that faces the future Terry Avenue extension and facing the central campus pedestrian path between the campus bookstore and the Dr. Phillips Academic Commons on the east side of Terry Ave. Additionally, our Land Development Code [LDC] and Creative Village PD Ordinance stress screening mechanical equipment from view. That also isn’t the case since the UCF CEP is front and center not only on campus, but on an important future street. Because of the significant location of the UCF CEP, ARB staff has reviewed this application atypically. If the UCF CEP location is going to be front and center, the design should be celebrated and put on display, not minimized. Therefore, there should be an emphasis on transparency and architectural detail. There is a good amount of transparency on the north façade which faces the central pedestrian corridor of the campus. The transparent garage doors on the east, Terry Ave. facing façade, provide views into the interior of the space. However, the south façade which will, once Terry Ave. is connected to the south, be one of the primary gateways into campus and it has no transparency. Additional transparency should be added to this façade, whether it is through the use of real windows or span-drel glass faux windows. ARB staff is also recommending that brise soleils or sunshades be installed above the garage doors on the east façade, above the first floor windows on the north façade and above the new first floor “windows” on the south façade. Finally, the east façade is visually out-of-balance. Either the northern garage door should be moved to the center of the mod-ule it is located in, or the vertical scoring between the two garage doors on the east façade should be moved to the optical cen-ter between the 2 doors.

CVDRC S TA F F O V E RV I E W

Page 3: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

Page 3 MPL2018-00029, ARB2018-10022—UCF Centra l Energy Plant MPL

CVDRC staff has reviewed the request for a Specific Parcel Master Plan approval to develop a 9,221 sq. ft. UCF Central Energy Plant with exterior condenser water pumps and cooling towers and recommends approval with the following conditions. Land Development 1. Scope of Master Plan- This use shall operate only as described within this report. All of the improvements shown in the attached

site plan (and as amended by any conditions found herein) are required as a condition of approval. Any changes in the use of the site, the operation of the project, or the site plan as described herein may require a new or amended Master Plan (see “Minor Modifications” condition below). This approval is not transferable to another property.

2. Modifications- Minor modifications and design changes including but not limited to fences, signs, landscaping, interior altera-tions, and other minor changes, that are required beyond those previously reviewed by the Creative Village Design Review Com-mittee, may be approved by the Planning Official without further review by the Creative Village Design Review Committee. Major changes shall require additional review by the Creative Village Design Review Committee.

3. Approval Compliance– Modifications to the approved plans and/or conditions of approval for this project will require additional CVDRC review and approval. Substantial modifications may require CVDRC board approval.

4. General Code Compliance- Development of the proposed project shall be consistent with the conditions in this staff report and all codes and ordinances of the City of Orlando, the State of Florida, and all other applicable regulatory agencies.

5. Land Use and Zoning- Except as provided herein, development of the property shall be consistent with the allowed uses and de-velopment standards of the Creative Village Planned Development zoning designation, AC-2 default zoning district designation.

6. Master Plan Expiration- Upon approval of the Master Plan By City Council, a building permit shall be obtained for any new work to the site within two (2) years of approval of the Master Plan, or the Master Plan shall expire (the applicant would then need to apply for a new Master Plan). If a building permit for the work requiring said Master Plan expires, then the Master Plan is no longer valid and the applicant must apply for a new Master Plan or a new master plan amendment. However, the Planning Offi-cial may extend the time limit for the Master plan for one period of up to 12 Months for good cause shown, upon written applica-tion filed 30 days prior to the expiration date of said Master plan.

7. Height- The height must not exceed 150 ft. 8. Impervious Surface Ratio- The applicant shall identify the amount of pervious surface that is to remain, and must provide a cu-

mulative total for all approved Master Plans. The master stormwater system for the Creative Village is being designed to accom-modate 0.95 ISR for Property and shall be calculated on a project wide basis, per section 3.12(e).

9. Floor Area Ratio. The density must not exceed the proposed .30 Floor Area Ratio per acre as propose. 10. Setback Modification– 70% of the building wall must meet the minimum setback. The building is setback 15 ft. from the curb

along Parramore Ave., Concord St., and Ameila St. The building is setback 19 ft. from the back of curb along the Alley Way or Tertiary Street. (Correct, Parramore Ave., Concord St, and Amelia St street names on Master Site Plan)

11. ARB Major Certificate of Appearance Approval – The applicant must obtain an ARB Major Certificate of Appearance Review from the Creative Village Design Review Committee upon approval of the CVDRC meeting minutes by the Orlando City Council.

12. Statute- In accordance with subsection 166.033(5), Florida Statutes, it is hereby made a condition of this permit that all applica-ble local, state or federal permits and approvals be obtained before commencement of construction.

Transportation Planning– John Rhoades 1. Compactor Operations—A turning movement analysis for the trash compactor operation must be submitted to CVDRC staff prior

to approval of state building permits to confirm full operational vehicle access to the compactor. Public Works—Nicki Wesson 1. Engineering/Public Works review is preliminary in nature, and is intended to assist the applicant with understanding City require-

ments. The design will be reviewed in detail for compliance with the Engineering Standards Manual during the review of any City engineering permits, if required.

For questions regarding Site Engineering/Public Works Plan Review issues contact Nicki Wesson at (407) 246-3264 or [email protected]. Water Reclamation– David Breitrick 1. The existing conditions plan depicts an incomplete network of existing gravity sewer mains, lift station and force main on the

subject property. Please contact the Water Reclamation Division (WRD) for records about the existing sanitary sewer system. 2. The site work construction plans will need to include a demolition plan that will depict the removal and/or proper abandonment

of all existing sanitary sewer facilities on the property. The WRD records indicate a network of gravity sewer mains, a City lift sta-tion, and force main. The force main discharges into another network of gravity mains directed to the north.

3. Decommissioning of the existing City lift station (LS 190) may need to be a separate engineering permit.

CVDRC C O N D I T I O N S O F A P P ROVA L

Page 4: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

Page 4 MPL2018-00029, ARB2018-10022—UCF Centra l Energy Plant MPL

Appearance Review Board 1. Terry Avenue—A design for Terry Avenue from W. Livingston St. to the southern Creative Village PD property line must be devel-

oped and reviewed by staff prior to the issuance of a Certificate of Occupancy for the UCF Central Energy Plant. The Terry Avenue design must meet the requirements of the Creative Village Streetscape Design Guidelines.

2. Streetscape—Per the Creative Village Streetscape Design Guidelines a minimum 15-foot streetscape zone from the back-of-curb must be provided along the future Terry Avenue street in front of the UCF Central Energy Plant.

3. Transparency—Additional windows or spandrel glass faux windows must be added to the eastern portion of the south façade. 4. Brise Soleils—In order to provide additional architectural detailing and interest brise soleils or sunshades should be added above

the garage doors on the east façade and above the first floor windows on the north, east and south facades. 5. East Façade—The east façade is visually out-of-balance, The score lines on the façade should be moved to the optical center

between the two garage doors. 6. Security Windows—At a minimum, every exterior door must include a minimum 4”x6” security window. 7. Final Elevations—Final building elevations and colors must be submitted for CVDRC staff approval to confirm compliance with

these conditions of approval prior to submittal of state building permits for the CEP. 8. Landscape Plan—A landscape plan for the CEP area, including the east, south and west portions of the CEP site, must be submit-

ted to CVDRC staff for review and approval prior to submittal of state building permits. 9. Master Sign Plan—Prior to the completion of the CEP construction a master sign plan for the entire UCF campus must be submit-

ted for CVDRC and CVDRC staff approval. 10. Modifications—Any modifications to the approved CVDRC plans and elevations must be submitted to CVDRC staff approval. Sub-

stantial changes may require additional CVDRC board approval.

Orlando Police Department 1. The Orlando Police Department has reviewed the plans for the UCF Power Plant located at 325 N. Parramore Ave., applying

CPTED (Crime Prevention Through Environmental Design) principles. CPTED emphasizes the proper design and effective use of the built environment to reduce crime and enhance the quality of life. There are overlapping strategies in CPTED that apply to any development: Natural Surveillance, Natural Access Control, Territorial Reinforcement, Target Hardening, and Maintenance and Management.

For questions regarding Orlando Police Department plan review, please contact Audra Rigby at 407.246.2454 or [email protected]. Fire 1. TRC fire code review is preliminary in nature and is not considered a full life safety or architectural review. It is intended to ex-

pose or prevent evident design deficiencies with State and City Fire Codes. The building design, floor plans, egress system, fire protection systems and MEP will be reviewed in detail for State and City Fire Code compliance at the time of permit application.

2. Be advised that any new construction must adhere to the requirements of the Florida Fire Prevention Code, Sixth Edition, and The City of Orlando Fire Prevention Code Chapter 24.

3. Design of buildings must account for fire department access. The access road itself must extend 50ft. from at least one exterior doorway to allow access to the building’s interior. Any portion of the building or exterior wall of the first story shall be located not more than 150 ft from the fire department access road as measured by an approved route around the exterior of the building or facility. The distance can be increased to 450ft. if the building is protected by an automatic sprinkler system. [NFPA 1.18.2.3.2.2 and NFPA 1.18.2.3.2.2.1]

4. An approved turnaround shall be provided for fire apparatus where an access road is a dead end in access of 150 ft, and road-ways shall have all-weather driving surface, capable of supporting the load of fire apparatus, a minimum 20 ft. in width, and a minimum vertical clearance of at least 13 ft. 6 in. [NFPA 1 18.2.2.5.4 and NFPA 1 18.2.3.4.1.1 ]

5. The plan indicates fire hydrants will be required. Because building information is not provided, fire hydrant location and spacing will be reviewed at the time of building permitting. All portions of an unsprinkled building must be within 300 ft hose lay distance of a fire hydrant. All portions of a sprinkled building must be within 500 ft hose lay distance of a fire hydrant. City Code ch 24.27(f).

For questions regarding Orlando Fire Department plan review, please contact Charles Howard at 407.246.2143 or [email protected].

I N F O R M AT I O N A L C O M M E N T S

CVDRC C O N D I T I O N S O F A P P ROVA L

Page 5: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

Page 5 MPL2018-00029, ARB2018-10022—UCF Centra l Energy Plant MPL

S U RV E Y

Page 6: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

Page 6 MPL2018-00029, ARB2018-10022—UCF Centra l Energy Plant MPL

M A S T E R P L A N

N Parramore Ave

CSX

Rai

lroa

d T

rack

s

Con

cord

St

Page 7: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

Page 7 MPL2018-00029, ARB2018-10022—UCF Centra l Energy Plant MPL

L A N D S C A P I N G P L A N S

Page 8: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

Page 8 MPL2018-00029, ARB2018-10022—UCF Centra l Energy Plant MPL

O V E R A L L UCF AC A D E M I C S I T E P L A N

Aca

dem

ic

Bui

ldin

g

Pro

pose

d

Bui

ldin

g CE

M B

uild

ing–

UC

F

Par

king

G

arag

e

Page 9: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

Page 9 MPL2018-00029, ARB2018-10022—UCF Centra l Energy Plant MPL

N O R T H B U I L D I N G E L E VAT I O N

Add

bri

se s

olei

ls o

ver

firs

t flo

or w

indo

ws

CV

DR

C S

ub

mit

tal

CV

DR

C S

taff

Con

dit

ion

s

Page 10: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

Page 10 MPL2018-00029, ARB2018-10022—UCF Centra l Energy Plant MPL

S O U T H B U I L D I N G E L E VAT I O N

Add

rea

l or

span

drel

fau

x w

indo

ws

to th

e so

uth

faça

de.

Add

bri

se s

olei

ls o

ver

firs

t flo

or w

indo

ws

CV

DR

C S

ub

mit

tal

CV

DR

C S

taff

Con

dit

ion

s

Page 11: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

Add

bri

se s

olei

ls o

ver

gara

ge d

oors

and

fir

st f

loor

w

indo

ws

CV

DR

C S

ub

mit

tal

CV

DR

C S

taff

Con

dit

ion

s

Mov

e sc

ore

line

s to

opt

ical

cen

ter

betw

een

gara

ge d

oors

Page 11 MPL2018-00029, ARB2018-10022—UCF Centra l Energy Plant MPL

E A S T B U I L D I N G E L E VAT I O N

Page 12: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

CV

DR

C S

ub

mit

tal

Page 12 MPL2018-00029, ARB2018-10022—UCF Centra l Energy Plant MPL

W E S T B U I L D I N G E L E VAT I O N

Page 13: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

Page 13 MPL2018-00029, ARB2018-10022—UCF Centra l Energy Plant MPL

3D R E N D E R I N G

Page 14: Creative Village Design Creative Village Design Review Committee … · 2018-07-26 · Page 4 MPL2018-00029, ARB2018-10022—UCF Central Energy Plant MPL Appearance Review Board 1.

Page 14 MPL2018-00029, ARB2018-10022—UCF Centra l Energy Plant MPL

3D R E N D E R I N G


Recommended