Preinstallation Guide Crescent/30 or 40 and Escort/30 C RESCENT 30 OR 40 Laser Imager ä E SCORT /30 Auto Film Loader ä Pre-installation Site Preparation Guide
Transcript
Page 1: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

CRESCENT 30 OR 40Laser ImagerESCORT/30Auto Film Loader

Pre-installationSite Preparation Guide

Page 2: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Part Number 414 110 005 Rev. F, August, 2000

© Copyright 2000 Barco Graphics N.V, Gent, Belgium

All rights reserved. This material, information and instructions for use contained herein are the property of Barco Graphics N.V.The material, information and instructions are provided on an AS IS basis without warranty of any kind. There are no warrantiesgranted or extended by this document. Furthermore Barco Graphics N.V. does not warrant, guarantee or make anyrepresentations regarding the use, or the results of the use of the software or the information contained herein. Barco GraphicsN.V. shall not be liable for any direct, indirect, consequential or incidental damages arising out of the use or inability to use thesoftware or the information contained herein.

The information contained herein is subject to change without prior notice. Revisions may be issued from time to time to adviseof such changes and/or additions.

No part of this document may be reproduced, stored in a data base or retrieval system, or published, in any form or in any way,electronically, mechanically, by print, photoprint, microfilm or any other means without prior written permission from BarcoGraphics N.V.

This document supersedes all previous dated versions.

Trademarks

All product names cited are trademarks or registered trademarks of their respective owners. Correspondence regarding thispublication should be forwarded to:

Barco ETSTramstraat 69B-9052 Gent

For more informationBarco ETS web site: www.barco.com/etsE-mail: [email protected]

HelpdeskEurope, Middle East,Africa, Latin America

Asia Pacific North America

Monday - Thursday:09.00 AM - 17.00 PM METFriday:09.00 AM - 16.00 PM MET +32 9 21 69 366

Contact your local dealerduring support workinghours

Monday - Friday:8:00 AM - 8:00 PM EST +1 (888) 257-2264

General support issues:[email protected] issues:[email protected]™ HYPERTOOL issues:[email protected] information:[email protected]

General support issues:[email protected] issues:[email protected]™ HYPERTOOL issues:[email protected] information:[email protected]

General support issues:[email protected] issues:[email protected]™ HYPERTOOL issues:[email protected] information:[email protected]

Page 3: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

WARNING

Before installing your Crescent/30 or40 or Escort/30 please read,understand, and follow all safetyinstructions in the documentationaccompanying these systems.

Page 4: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Table of Contents

Introduction..................................................................................1

Assignment of Responsibilities....................................................3

Environmental Requirements.......................................................4

Electrical Requirements ...............................................................7

Room Requirements...................................................................10

Receiving ...................................................................................17

Preinstallation Site Inspection Checklist ...................................19

Page 5: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

Page 6: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative
Page 7: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

Introduction 1

IntroductionThank you for purchasing the Crescent/30 or Crescent/40 Laser Imager.This guide has been designed to help you plan for installation and verifythat the site is ready for installation. The specifications outlined in thisguide are extremely critical to the operation of the Crescent/30 or 40.

Note: Unless otherwise indicated, all information provided in this guideapplies equally to both the Crescent/30 and Crescent/40.

How to use this guide

To ensure efficient, trouble-free installation of your equipment, please:

1. Review this guide carefully and make all the preparations itdescribes.

2. Prior to the scheduled shipping date, a certified Barcorepresentative will contact you to review preinstallationrequirements and to complete the workflow questionnaire.

3. When you have completed preparations but at least three weeksbefore installation, contact Barco Service Department at 860-291-7016 to schedule a preinstallation site inspection. A Barco serviceengineer will complete the Preinstallation Inspection Report andWorkflow Questionnaire at the end of this guide and discuss thefindings with you. The service engineer may schedule a follow-upinspection if exceptions or problems are noted. Satisfactorycompletion of this inspection is extremely important to asuccessful installation and to the performance of the system.Discrepancies will be recorded in the installation report.

Page 8: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

2 Introduction

You will find the following information in this guide:

Assignment of ResponsibilitiesDefines the responsibilities of both Barco and the Purchaser in preparingthe site for installation.

Environmental RequirementsOutlines temperature and humidity requirements.

Electrical RequirementsDefines the electrical requirements that must be met for safe and properoperation.

Room RequirementsDiscusses space and other requirements.

ReceivingOutlines procedures for receiving the Crescent/30 or 40 and theEscort/30.

WARNING: The Crescent/30 or 40 and the Escort/30 must beunpacked and installed only by Barco personnel or Barco authorizedrepresentatives.

Preinstallation Site Inspection ReportProvides a checklist to verify all requirements have been met.

Workflow QuestionnaireCaptures information about the hardware, software, and processes thatfeed work to the Crescent 30 or 40.

Should you have questions on site preparation, please contact the BarcoTechnical Support Department Manager by phone at 860-291-7016 orby fax at 860-291-7021.

Page 9: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

Responsibilities 3

Assignment of ResponsibilitiesBarco RepresentativeResponsibilities

1. Identify all site requirements and make site planningrecommendations.

2. Identify Purchaser personnel responsible for:

facility planning network workflow

3. Inspect the site, complete the Preinstallation Site Inspection Reportat the end of this guide., and inform the Purchaser of discrepancies.

4. Prior to installation, obtain confirmation from the Purchaser that allPreinstallation Site Inspection discrepancies have been resolved.

Note: Installation cannot proceed without Purchaser confirmation ofcomplete resolution of Preinstallation Site Inspection discrepancies.

5. Unpack and install system and conduct standard Barco operationverification tests.

Purchaser Responsibilities1. Prepare the site to meet requirements defined in this guide.

2. Coordinate with the certified Barco representative to complete thePreinstallation Site Inspection Report enclosed in this guide.

3. Receive and deliver the system to the site.

4. Provide secure, environmentally controlled, indoor storage toaccommodate coordinated shipments.

5. Provide labor to assist Barco personnel with uncrating andpositioning of the system.

6. Provide unlimited access to the site and system for one weekcommencing with unpacking for installation and operator training.Purchaser personnel must be available for up to three days at the endof the installation period for training.

Page 10: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

4 Environmental Requirements

Environmental RequirementsProper temperature, humidity, and room cleanliness are extremelyimportant to the proper functioning of the Crescent/30 or 40 and Escort30. This section defines these requirements.

RequirementsTemperature and humidity

Operating range:

60° - 80° F (16° - 26° C) 40 - 60% (non-condensing) humidity

Requirements for achieving accuracy specifications*:

68° ± 1°F (20° ± 0.5°C) 50% ±5 % humidity

*Accuracy and repeatability specifications are achieved only under theseenvironmental conditions and when imaging on film.

Air SupplyNote: Air is required only for the Escort/30 Auto Film Loader.

85 psi (5.9 kg/cm2 [6.03 bar]) per minute 5µ filter 5 CFM (142 l/minute)

Note: The air supply must be free of all contaminating fluids, oil, andwater, whether liquid or vapor.

The Purchaser must provide an air supply line with a 1/4" (6.3 mm) insidediameter. The following connector is supplied with the Escort/30 toconnect it to the air supply line:

Nipple, quick disconnect, 1/4 - 18NPT Parker #20-3BP

Note: Shop air may be used to fill the air reservoirs for the air bladders.If shop air is not available on site, an air compressor will be shipped withthe imager to be used to fill the air bladder reservoirs.

Page 11: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

Environmental Requirements 5

Heat ProductionAll heat is dissipated into the room.

Component Btu/hr Kcal/hrCrescent/30 or 40 504 2,890Escort/30 1,500 378Workstation 480 121

Total 3,270 824

Planning GuidelinesAlthough a clean room environment is not required, cleanliness isextremely important to reliable system performance. The spinner mirrorlocated in the imager is exposed to open air and can collect a significantamount of dust if particulate matter is in the air. In addition, dustsettling on film will leave holes that will render images useless.

Please follow these guidelines in preparing the imager room.

1. If a processor is located in the same room as the imager, thegases produced by the processor must be vented out of the room.If not properly vented, processor gases will condense on the lensand other surfaces inside the imager and Escort 30, ruiningexposures and causing premature equipment failure. If avent/fan kit is available for the processor, it should be installed.

2. Discharges from the processor or any other machine must notempty into a sump inside the imager room. Emptying dischargewithin the imager room will introduce corrosive gases and raisehumidity to unacceptable levels.

3. If the processor is connected directly to the Escort 30, theprocessor must be operated with negative air pressure to preventfumes from entering the Crescent 30 and Escort 30.

4. The air flow from an air conditioning unit should not be directedat the system.

5. It is essential that filters used in the air conditioning system becleaned and changed on a regular basis.

6. The imager room should have a solid surface floor, such aslinoleum or concrete that can be wet-mopped to control dust.

7. If the room has ceiling tiles, they should be of the type that willnot flake and drop particulate matter.

Page 12: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

6 Environmental Requirements

8. The easiest way to keep a room clean is to prevent dust fromentering the room by maintaining higher pressure in the imagerroom than in any nearby room. Put a lone supply duct in theimager room with the return duct in a neighboring room. This isextremely important if corrosive chemicals or particulate matterare in the air. If these contaminants are allowed to enter theimager room, over time permanent damage could result to thespinner assembly reflective surface.

Page 13: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

Electrical Requirements 7

Electrical RequirementsCAUTION: Barco exercises strict design control over the electricalrequirements of its systems. Electrical service that does not meet the statedrequirements can seriously affect the performance and reliability of thesystems and may, in some cases, cause damage to the electronics. There areno short cuts to meeting the electrical requirements.

Crescent/30 orCrescent/40

Escort/30 PRISM-NTWorkstation

Power 120 VAC ±10%50/60 Hz ±0.5%

120 VAC ±10%50/60 Hz ±0.5%

120 VAC ±10%50/60 Hz ±0.5%

Service 20 amp dedicated(2 wire plusground)1

20 amp dedicated(2 wire plusground)1

20 amp dedicated(2 wire plusground)1

Peak Current 6 amps 4 amps 5 amps

AverageOperatingCurrent

4 amps 2.5 amps 4 amps

AveragePowerConsumption

480 watts 300 watts 480 watts

1 An uninterruptible safety earth ground connection of no more than 1Ωimpedance should be provided to the system.

Page 14: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

8 Electrical Requirements

Electrical service requirements High frequency transients, impulses, sags, and surges should not be

present on the input line.

A dedicated power line, from the same power distribution subpanel,is required for all major components being purchased.

If a neutral wire is used, there must be a separate, full size neutraland ground wires for each outlet. Do not daisy-chain neutrals orgrounds.

Do not use conduit for grounding purposes.

The voltage differential between neutral and earth ground should notexceed 1V RMS when measured at the system power line inputterminals. The fluctuation of this value should not exceed 25 mVpeak to peak.

Planning GuidelinesTo achieve maximum reliability, Barco recommends the following:

The power outlets for the Crescent/30-40 and Escort/30, which arethe primary power disconnect devices, and the power cordconnections to the systems must be easily accessible.

A power cut-off device such as a remote trip switch or circuitbreaker to shut off power to all system components in the event of anemergency should be provided. This device should be readilyaccessible to the operator near a principal exit to the room housingthe system.

Electrical and air service should be dropped as close as possible tothe input panel to minimize the hazard of cabling and hose on thefloor.

An uninterruptible power supply (UPS) should be provided for thePRISM-NT to ensure data integrity. Barco can recommend anappropriate size.

Outlets RequiredNote: The AC power outlets must be easily accessible because they arethe primary power disconnect devices.

The following outlets are required:

Page 15: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

Electrical Requirements 9

For the Crescent/30 or 40:one standard duplex 120 VAC, 20 amp receptacle.

For the Escort/30:one standard duplex 120 VAC, 20 amp receptacle.

For service:at least two standard 120 VAC receptacles for US installations (240VAC for international installations) within 6 feet (1.8 m) of theCrescent/30 or 40 rear panel.

For the PRISM-NT:at least two standard duplex 120 VAC receptacles for US installations(240 VAC for international installations) and perhaps additional outletsfor external devices).

For the Pressurization Unit Option:the unit comes with a power cord that plugs in to the Crescent 30/40outlet strip inside the machine. The pressurization hose connects to aflange on the rear of the machine.

Note: A multi-outlet strip is provided with new systems.

For the on-line processor, refer to the processor manufacturer’sinstructions.

Page 16: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

10 Room Requirements

Room RequirementsThis section contains dimensions and other information that will permityou to plan the facility. Equipment and room dimension requirements areillustrated in this section.

Equipment Dimensions

Crescent/30 or 40

only

Crescent/30or 40with

Escort/30

PRISM-NT

Tower

PRISM-NT

Monitor

Length 48"(1219 mm)

62"(1575 mm)

17"(432mm)

16"(41 cm)

Width 34"(864 mm)

34"(864 mm)

8"(203mm)

16"(41 cm)

Height 64"(1626 mm)

60"(1530 mm)

16"(406mm)

18"(45 cm)

Weight 825 lb*(375 kg)

1225 lb**(556 kg)

20 lb(9 kg)

40 lb(18 kg)

*Distributed evenly on four casters.**Distributed evenly on eight casters.

Load Cassette Unload CassetteLength 29"

(734 mm)37"

(940 mm)Width 23"

(584 mm)30.5"

(775 mm)Depth 14"

(356 mm)3.5"

(89 mm)Weight(empty)

30 lb(14 kg)

40 lb(18 kg)

Page 17: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

Room Requirements 11

Overall Floor Space RequirementsNote: Floor space requirements do not include an online processor.

StandaloneCrescent/30 or 40

Crescent/30 or 40with Escort/30 and

unload cassette8'10" x10'

(2.7 m x 3.1 m)10'3" x 15'11"

(3.3 m x 4.9 m)

CablesAside from the power cord, all cables are provided with the RIP or frontend, not with the Crescent/30 or 40.

The PRISM-NT is supplied with a 15-foot (4.6 m) communication cable,3 feet (914 mm) of which runs inside the Crescent cabinet. The PRISM-NT thus must be located within 12 feet (3.7 m) of the Crescent. See thefloor plan diagrams on the next pages for additional information.

Optional cables are available to permit the PRISM-NT monitor, mouseand keyboard to be located up to 100 feet (30.5 m) from the computertower.

Planning Guidelines A minimum height of 5'6" (168 cm) is required for all doorways and

passages through which the Crescent/30 or 40 and Escort/30 mustpass.

A minimum width of 3' (92 cm) is required for all doorways andpassages through which the Crescent/30 or 40 and Escort/30 mustpass.

A 3' (914 mm) clearance must be maintained on all sides of theCrescent/30 or 40. to permit access.

If a Purchaser-supplied, inline processor is separated from theCrescent by a wall, the wall must be located so as to permit access tothe conveyor from the Crescent side of the wall. See thedimensioned elevation drawings next.

When using the unload cassette, a minimum of 61" (155 cm)clearance is required for removal from Escort/30.

The operator of the Escort/30 will be required to handle the load andunload cassette assemblies. It is recommended that a four-wheel cartbe available to transport these assemblies to and from the darkroom.

A level, smooth floor surface is required and must be approved byBarco prior to installation.

Page 18: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

12 Room Requirements

Do not use rugs, carpets, or carpet tiles, especially in the vicinity ofmagnetic devices and computers. Static electricity is harmful tothese devices.

The Crescent/30 or 40 must be operated in a room equipped with asafelight appropriate for the media when loading and unloading film.

For Crescent/30 or 40 imagers used with the Escort/30, a separatelight-safe darkroom to be used for loading and unloading media fromthe cassette is strongly recommended. The darkroom shouldaccommodate a table for holding the cassette assemblies and mediaduring loading and unloading.

Although the Escort/30 is designed to operate in a daylightenvironment, the room should be equipped with a safelightappropriate for the media for use when loading or unloading filmand when performing preventive or corrective maintenance on thesystem. Some examples of safelight requirements are:

Dupont IPCRL Green/Cyan T20/ND.75Kodak ERF-7 Green/Cyan T20/ND.75Kodak SO411 Green/Cyan T30/ND1.03Agfa RLS3/HTR3 Green/Cyan T20/ND.75

Refer to the media manufacturer’s instructions for your filmselection safelight specifications.

For servicing the Crescent/30 or 40 and Escort/30, white light shouldbe provided.

Emergency lighting should be provided in all rooms. A light table capable of viewing a 30"x 24" (762mm x 610mm) film

should be available to facilitate on site measurements of servicerelated images.

A phone and/or phone jack (single line) should be located near thesystem’s front end.

Cabinets for the storage of media, documentation, and suppliesshould be provided. Cabinets provide protection from dustcontamination. Disks and magnetic tapes should be stored in acontrolled environment.

Page 19: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

Room Requirements 13

Crescent\30 or 40 and Escort/30 Elevations

1575 mm

381 mm 140 mm

178 mm

1626mm

940mm

114 mm

64”

4.5” Front View

Conveyor toprocessor

1219 mm

48” 114 mm

864 mmEscort/30C/30

orC/40

Top View

32”813mm

62”

34”

4.5”

15”Side View

Page 20: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

14 Room Requirements

Floor Plan - Standalone Crescent/30 or 40

Crescent/30or

Crescent/40

48"1219 mm

34"864 mm

RIP

SCSI12 feet (max)

3.7 m

Pwr20 feet (max)

6.1 m

Pwr10 feet (max)

3.1 m

36"914 mm

36"914 mm

36"914 mm

Monitor

100 feet (max)30.5 m

(optional cable)

Pwr20 feet (max)

6.1 m

AC

8'10"2.7 m

10'3.1 m

36"914 mm

Page 21: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Prei

nsta

llatio

n G

uide

Cre

scen

t/30

or 4

0 an

d Es

cort

/30

Roo

m R

equi

rem

ents

15

Floo

r Pla

n - C

resc

ent/3

0 or

40

with

Esc

ort/3

0

Cres

cent

/30

orCr

esce

nt/4

0Es

cort

/30

32"

813

mm

48"

1219

mm

62"

1575

mm

34"

864

mm

Unl

oad

cass

ette

Load

cass

ette

37"

940

mm

31"

787

mm

29"

734

mm

31"

787

mm

RIP

SCSI

12 fe

et (m

ax)

3.7

m

Pwr

20 fe

et (m

ax)

6.1

m

Pwr

20 fe

et (m

ax)

6.1

m

Pwr

10 fe

et (m

ax)

3.1

m

Pwr

10 fe

et (m

ax)

3.1

m

61"

1549

mm

45"

1143

mm

36"

914

mm

36"

914

mm

Mon

itor10

0 fe

et (m

ax)

30.5

m(o

ptio

nal c

able

)

Pwr

20 fe

et (m

ax)

6.1

m

AC

AC

10'3

"3.

3 m

15'1

1"4.

9 m

Page 22: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

16 Room Requirements

Crescent/30 or 40 Heat exhaust location

REAR VIEW

6" Cooling fan exhaust

64"

(1,6

26 m

)

D-C3002.WPG

Note: For the Pressurization Unit option, thecooling fan is removed, a flange is installedand the pressurization hose is connected tothis flange.

Page 23: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

Receiving 17

ReceivingPlanning Guidelines

1. The Purchaser must provide an adequate loading/receiving dock andtruck platform and receiving area protected from adverse weatherconditions to receive the system from the truck. If the Purchaser doesnot have a loading/receiving dock, the Purchaser must notify Barco attime of order or as soon as possible thereafter to request a truckequipped with a loading ramp and/or power lift platform.

2. If delivery by a standard tractor trailer truck cannot be accommodatedin the receiving area, the Purchaser must notify Barco at time of orderor as soon as possible thereafter to request delivery in a short bay truckor flat bed truck. The system can also be delivered to a localwarehouse equipped to handle computer equipment and transferred tothe Purchaser’s facility.

CAUTION: The system must not be stored in a damp, humid, oruncontrolled environment. If the system is stored for any lengthof time, the storage facility must provide a clean, controlledenvironment to safeguard the system from damage due to dust,humidity, and extreme temperature variations.

3. The Purchaser must notify the carrier if there are any restrictions ondelivery time or location.

Receiving Guidelines

1. The Purchaser receiving department must conduct a thoroughinspection of all incoming equipment and cartons.

The number of packages must match the number listed on thebill of lading.

There should be no signs of abuse, mishandling, or damage dueto shipping.

Page 24: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

18 Receiving

Note: Do not open boxes requiring unpacking prior to installation.These must be opened and inventoried by Barco personnel. Barco is notresponsible for losses, damage, or missing items from boxes opened byunauthorized personnel

2. If damage or discrepancies are detected, make the followingnotifications immediately:

1. Driver of the delivery vehicle. Make note of the damage ordiscrepancies on the bill of lading.

2. Shipping carrier.

3. Your insurance company.

4. The carrier’s insurance company.

5. Barco Service Department or your Barco sales representative.

Page 25: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

Preinstallation Site Inspection Report 19

Crescent/30 or 40 and Escort/30Preinstallation Site Inspection Checklist

A certified Barco representative must complete the followingquestionnaire at your facility at least three weeks prior to shipping.Installation may be postponed until this inspection is completedsatisfactorily.

1. If not ready now, approximate date the facility will be ready.

2. Can separate parts of a coordinated shipment be stored temporarilyuntil all parts are received?

Yes No

If no, what storage arrangements have been made?

3. Is a loading dock available?

Yes No

4. Are passageways large enough to allow equipment movement to site?

Yes No

Note height and width of narrowest opening:

Page 26: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

20 Preinstallation Site Inspection Report

5. Have the size and weight of the system been adequately planned for?

Yes No

6. Will a forklift and pallet jack with 4-foot (1,219mm) forks beavailable at the site?

Yes No (see question 7)

7. If the forklift cannot have access to the final equipment site, will aJohnson Bar or similar lever and dollies be available to place theequipment in its final position?

Yes No

8. Has the customer allowed for the specified clearance around thesystem?

Yes No

9. Has the customer provided the required electrical service?

Yes No

10. Has the transformer been planned for?

Yes No

10. Have environmental requirements been met?

Yes No

11. Is the room temperature stable?

Yes No

If no, what is the degree/hour variation?

12. Is there a phone line near the system?

Yes No

Page 27: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

Preinstallation Site Inspection Report 21

13. Is an analog phone line available near the system for service?

Yes No

14. Can the imager room be made light-tight?

Yes No

15. What is the primary language used by the operators?

16. Has a UPS been ordered?

Yes No

If yes, please describe:

17. Is a light table appropriate for the media type and size to be imagedavailable?

Yes No

18. Are the proper safelights installed?

Yes No

19. Indicate film type to be used:

Dupont Kodak 3M Agfa Polychrome

20. Indicate film sizes to be used.

Page 28: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

22 Preinstallation Site Inspection Report

21. Indicate processing chemicals to be used.

22. What will be used to measure plots?

23. What type of floor is used?

24. List the exceptions and problems. Attach additional sheets ifnecessary.

Page 29: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Preinstallation Guide Crescent/30 or 40 and Escort/30

Preinstallation Site Inspection Report 23

25. Have you reviewed with the Purchaser all problems, which need tobe corrected prior to installation?

Yes No

26. What is the agreed upon follow-up date?

Page 30: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

PRISM-NTWorkflow Questionnaire

This questionnaire has been designed to capture information about theworkflow leading to the PRISM-NT. Please complete and return it toBarco at least three weeks prior to scheduled shipping.

1. What is data output format from the front end?

RS274-D RS274-X RPD CSI Autoplot DPF

Optrotech Image Orbotech Expert DXF

2. Is the output from CAM plotter ready? In other words, is filemerging, rotation, mirror, and scaling performed on the CAM front end?

Yes No

If yes, PRISM-NT can be setup to run seamlessly with the CAMfront end.

If No, PRISM View will be used to manipulate plot data prior tooutput. Depending on level of shop personnel, separate PRISM Viewtraining may be required. See question number 3 below. This will helpdetermine the amount of PRISM View usage and training requirement.

3. Are any of these products currently used? PRISM View is based onthis product line. If these are currently used, PRISM View will be easierto learn.

CAM 350 ECAM PCGerber GerberView

4. If this is a C/30 or C/40 system upgrade, describe the current datatransfer procedure (i.e., Sun/Sparc 20, Image Buffer, GPC/GPQ, C/40,E/30).

________________________________________________

________________________________________________

Page 31: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

CAM Workstations

(Check all that apply)

1. What front end workstations will be sending data to PRISM-NT?

HP Sun Intel DEC

Other __________

2. What front end operating systems will be used for sending data toPRISM-NT?

HP-UX Sun OS/Solaris

Other Unix ________________________

MS DOS MS Windows∗ MS NT OS/2

*If MS-Windows, indicate all types. (i.e., Windows95, Windows forWorkgroups, Windows 3.1, etc.) _________________

3. What front end application software will be used to output data toPRISM-NT?

Valor Tibor Darvas Orbotech Barco

I-Mark ACT Graphicode Lavenir

Wise IGI GPC

Other______________________

List specific product names and version:

____________________________________________________

____________________________________________________

____________________________________________________

Page 32: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Network

1. Is there currently a network in use?

Yes (Please completely fill out ALL network information requested.)

No (Suggest simple peer to peer network. For customer PC toPRISM-NT connection, recommend PC network card and TCP/IPsoftware 2300-495).

Don’t know (May require application/technical support)

2. Describe the current network configuration.

___________________________________________________

___________________________________________________

___________________________________________________

3. What is the network hardware?

Ethernet (Compatible with GSC products)

Other (explain)

________________________________________________

4. What is the network protocol? (Check all that apply)

Novell IPX Microsoft NetBEUI

TCP/IP* [ FTP]

(All three of the above are included with PRISM-NT.)

NFS (Requires Intergraph Diskshare; GPN# 881010002)

Lantastic (Usually on DOS or Windows 3.1 systems and may requirecustomer to upgrade to Windows for Workgroups to use a NetBEUIprotocol.) (Check with Technical Support for instructions.)

Novell IPX with the server acting as a router. (May be hard to routeNetBEUI)

Page 33: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Other (please indicate)____________________________________________________

____________________________________________________

* If TCP/IP is checked, and requires a UNIX workstation to connect toPrism-NT, the customer needs the NFS package.

5. What is the network cabling?

10BaseT (Included with DEC and Intel)

100BaseT (Included with DEC, 2300-495-000-01 for Intel)

Thinnet or Thicknet (Requires combo card; 9650-495-000-02 forDEC or 2300-496-000-02 for Intel)

Network Interface Card:_______________________________

PRISM View Training:________________________________

Additional items:_____________________________________

Additional Comments:

____________________________________________________

____________________________________________________

____________________________________________________

____________________________________________________

Page 34: CRESCENT 30 OR 40 Laser Imager ESCORT/30 Auto Film Loader · Preinstallation Guide Crescent/30 or 40 and Escort/30 Responsibilities 3 Assignment of Responsibilities Barco Representative

Inspection completed by.

Customer:

Name: ________________________________________

Title: _________________________________________

Company: _____________________________________

Telephone:_____________________________________

Fax:___________________________________________

Certified Barco Representative:

Name: ________________________________________

Date: ______________________

Directions for the Barco representative:

1. Review the contents of this report with the Purchaser and schedule afollow up.

2. Distribute three copies of this report: One copy to the Purchaser site manager. One copy to the Barco Regional Service Manager. One copy to Barco Application Support Manager.


Recommended