Part iX Sanitary engineering Sedimentation مين الدلي و د. غساحمد يونساد د. م اعدPage 1 Type of sedimentation: 1- Plain sedimentation: no chemical is used 2- Chemical sedimentation: chemical is used to enhance the efficiency Critical Settling Velocity & settling Velocity (Overflow rate) - Settling velocity Vs or as called overflow rate Particles move horizontally with the fluid (all particles have the same horizontal velocity) Particles move vertically with terminal settling velocity(different for particles with different size, shape and density) All particle with V s,o >V c will be completely settled. All particle with V s,o <V c will be removed in the ratio V p /V c
Transcript
  • Part iX Sanitary engineering Sedimentation

    Page 1 اعداد د. محمد يونس و د. غسان الدليمي

    Type of sedimentation:

    1- Plain sedimentation: no chemical is used

    2- Chemical sedimentation: chemical is used to enhance the efficiency

    Critical Settling Velocity & settling Velocity (Overflow rate)

    - Settling velocity Vs or as called overflow rate

    Particles move horizontally with the fluid (all particles have the same horizontal

    velocity)

    Particles move vertically with terminal settling velocity(different for particles

    with different size, shape and density)

    All particle with Vs,o>Vcwill be completely settled.

    All particle with Vs,o

  • Part iX Sanitary engineering Sedimentation

    Page 2 اعداد د. محمد يونس و د. غسان الدليمي

    Example 1:

    Find the terminal settling velocity of a spherical discrete particle (sand) with diameter

    0,02 mm and specific gravity of 2.65settling through water at 200C?

    If Vs = 3.6 × 10−4 𝑚/𝑠 Then using a safety factor of 1.4 (to account for inlet and outlet looses) determine the required grit chamber area (rectangular tank) to remove

    the sand particle if the flow rate is 0.1 m3/s

    𝜌𝑤𝑎𝑡𝑒𝑟 = 998.2 kg/m3

    µ𝑤𝑎𝑡𝑒𝑟 = 1.002 × 10−3 𝑁𝑠/𝑚2

    Solution:

    Vs = 9.81

    18×1.002 ×10−3 × (2650 − 998.2) × (0.02 × 10−3)2 = 3.6 × 10−4

    𝑚

    𝑠

    Re = 𝜌 𝐷 𝑣𝑠

    µ = =

    1000×2.2×10−3 ×0.02×10

    1.002×10−3

    −3

    = 0.04 thus the flow is laminar

    Since Q = Vs * A

    Then the area = 0.1

    3.6×10−4 = 277.8 m

    2

    Using the safety factor the required area = 1.4* 277.8= 389 m2

    Thus tank dimension (taking width to length ratio = 1:4)

  • Part iX Sanitary engineering Sedimentation

    Page 3 اعداد د. محمد يونس و د. غسان الدليمي

    Area: = W* L = W* 4W = 4W2

    Thus Width = 10m;

    length = 40m

    Assume detention time = 3hrs

    H = t*V0 = (3*3.6 × 10−4m

    s ) × 3600= 3.8m ~ 4m............ water level in the tank

    •Vh= Q/(L*W) = 0.1

    40×10 = 2.5 × 10−4

    m

    s= 0.9 m/hr

    •Take weir loading rate = 250 m3/m.d:

    L weir = Q/Wload = 0.1× 24 × 60 × 60/250 = 34.5m , Use suspended troughs inside

    the tank

  • Part iX Sanitary engineering Sedimentation

    Page 4 اعداد د. محمد يونس و د. غسان الدليمي

    Example: Repeat the previous example using circular tank.

    Note: the maximum tank diameter is 45 m

    Solution:

    𝑉𝑠 = 3.6 × 10−4

    𝑚

    𝑠= 31.1𝑚/𝑑𝑎𝑦

    *Area = 389m2

    since the tank is circular :

    •As = πD2/4= 389 m

    2 D = 22.25 m ≈22.5 m < 45 m

    Assume detention time = 3hrs

    H = t*V0 = (3*3.6 × 10−4m

    s ) × 3600= 3.8 m ~ 4m............ water level in the tank

    Check horizontal velocity at the beginning and end of settling zones:

    •Vh = Q/(π Din H) = 0.1/(π× 3.8 × 3.8) = 0.132 m/ min(End of inlet zone) •Vh = Q/(π DoutH) = 0.1/(π× 26.05 × 3.8) = 0.02 m/min (beginning of outlet zone)

    •Take weir loading rate = 250 m3/m.d:

    L weir = Q/Wload = 0.1× 24 × 60 × 60/250 = 34.5m , Use suspended troughs inside

    the tank.

    Max Dtotal = 45m ...ok since the design Dtotal = 30.1m

    Available Length = πD total = π(2H + D) =π *(2*3.8+22.25) = 93.8m> 45

    AvailableWload =0.1/93.8= 92.1 m3/m.d< 250 m3/m day ......O.K

    Available length = Circumference

    of Circleمحيط الدائرة

  • Part iX Sanitary engineering Sedimentation

    Page 5 اعداد د. محمد يونس و د. غسان الدليمي

    Typical sedimentation tanks design dimensions :

    A- RectangularTank - depth: 3-5 m - length: 15-90 m - width: 3-24 m

    B- Circular Tank - depth: 3-5 m - diameter: 4-60 m

    C- Retention time 2-4 hr D- Tank bottom slope 1-2%in rectangular tank; 2-4% in circular tank E- The weir (الهدارات) length should be 1/7 of total tank length

    F- Surface Load Rate (S.L.R) = Q/ (total surface area) = 𝑄

    𝑛.𝐴 = over flow rate

    = 20-40m3/m

    2/d

    Where n = number of tanks

    G- Hydraulic load Rate (H.L.Rate) on outlet weir = weir loading rate = over load =

    H.L =𝑄/(𝑛. 𝐿𝑤) = 150 − 300 m3/𝑚/𝑑

    H- Horizontal velocity ≤ 0.3 𝑚/𝑚𝑖𝑛

  • Part iX Sanitary engineering Sedimentation

    Page 6 اعداد د. محمد يونس و د. غسان الدليمي

    Example:

    a circular clarifier (sedimentation tank) will be used to treat 3000m3hourly, assume

    the surface area of the tank is 2400 m2

    estimate the tank dimensions?

    Solution :

    Water depth =

    Assume tank diameter = 30m thus number of tank =

    No of tank = n× 𝜋 × 302

    4= 2400

    Thus n = 3.4 take 3 tanks

    Modify the required diameter :

    3× 𝜋 × 𝑑

    2

    4= 2400 d = 32m

    S.L.R (over flow) = 3000×24

    3×𝜋 × 322

    4

    = 29.8 m3/m

    2/d within the range (20:40)

    Hydraulic Load Rate (H.L.R)= Q/Lw = 3000×24

    3×𝜋 ×32 = 238 m3/m/d within the

    range (150:300) .OK

  • Part iX Sanitary engineering Sedimentation

    Page 7 اعداد د. محمد يونس و د. غسان الدليمي

    Sludge :

    - It is the settleable solids separated from liquids during processing

    When suspended solids (S.S) precipitate at the tank bottom its concentration is usually

    2-5%.

    This solid should be removed to keep the tank storage capacity using sludge cleaning

    process.

    This process is repeated 3-4 times daily, the solid density 1.05 : 2.1 ton/m3

  • Part iX Sanitary engineering Sedimentation

    Page 8 اعداد د. محمد يونس و د. غسان الدليمي

    Design of sludge Hopper

    Sludge = water + [2-5% solids]

    Assume the SS inlet the sedimentation tank = X mg/l (if not given)

    Removal Ration (R.R) in the sedimentation tank and = 60-85%

    Thus the amount of sludge that removed daily (Y) = 𝑄 (

    𝑚3

    𝑑)×𝑋 (𝑔/𝑚3

    106 (𝑔/𝑡) × 𝑅. 𝑅 = 𝑡𝑜𝑛/𝑑

    But sludge contain SS concentration (C) = 2-5% only t

    hus the amount of Solid sludge Z (t/day) = Y/ C%

    Assume the sludge specific gravity ( γ) = 1.05 – 2.1

    Thus the sludge volume (m3/day) =

    𝑍

    γ

    Volume of Sludge hopper :

    For Rectangular tank:

    Hopper volume =(𝑎+𝑏

    2× h) × l

    For Circular tank :

    Volume = Aav× h

    Aav = (A1 + A2)/2

    =

    𝜋

    4 (𝐷1

    2+𝐷22)

    2

    Usually D1 = 2:3m; D2 = 1:2m ; h = 1:2m

  • Part iX Sanitary engineering Sedimentation

    Page 9 اعداد د. محمد يونس و د. غسان الدليمي

    Design of Sludge pipe:

    It is used to drain the sludge out of the sedimentation tank

    Withdraw time 5:15min , velocity 1:1.5 m/s

    Pipe diameter minimum = 150mm

    Example:

    Design the plain rectangular sedimentation tank for a water purification of an hourly

    output 5000m3 , then get the amount if the sludge in the S.S if the raw wastewater has

    SS concentration 80ppm and the sludge specific gravity is 1.1?

    Solution:

    Assume S.L.R = 30 m3/m

    2/day

    Assume retention time = 4hr (2:4hr)

    Thus the minimum total volume = 4 * 5000 = 20,000 m3 = n.w.l.d

    Thus total tank area = 5000 * 24 / 30 = 4000 m2

    =No. of tank * length* width of tank

    4000m2 = n.l.w

    Then the water depth = 20,000/ 4,000 = 5m.

    Assume number of tank = 8 then each tank area = 500 m2

    then the tank width = =√500

    4 = 11.2 make the width = 10m

    then the length = 50m ,

    then each tank volume = 10*50*5 = 2,500 m3

    actual total volume = 2,500 * 8 = 20,000 m3

    Check:

    Actual Retention time = 20,000/5000 = 4hr .ok

    Actual SLR = (5000/4000)*24 = 30 m3/m

    2/d . ok

    H.L = 5000 ×24

    8 ×50 = 300 m3/m/d .ok

  • Part iX Sanitary engineering Sedimentation

    Page 10 اعداد د. محمد يونس و د. غسان الدليمي

    Sludge Amount:

    S.S = 80 mg/l ; assume R.R = 80%

    Then the amount of sludge per day = Y 9ton/day)

    = 5000 × 24 (m3/d) ×80 ×0.8

    106 = 7.68 ton/day

    Assume the S.S concentration in the sludge = 3%

    Thus the total amount of sludge (water + SS) = 7.68/0.03 = 256 ton/day

    Thus the total sludge volume = 256/1.1 = 232 m3/day

    Sludge Stabilization:

    Refer to power point lecture that submitted at LandMark Amman – 24/nov.

    2016

  • Part iX Sanitary engineering Sedimentation

    Page 11 اعداد د. محمد يونس و د. غسان الدليمي

  • Part iX Sanitary engineering Sedimentation

    Page 12 اعداد د. محمد يونس و د. غسان الدليمي

    Flocculent Sedimentation ( type 2 and 3):

    - The design procedure for sedimentation tanks of type 2 and 3 are the same as type 1.

    - The difference is mainly in the overflow rate (vs)???

    - The following table gives the design criteria of these two types.

    sizes change shape change specific gravity change


Recommended