Stand Back from the Platform Edge! Sharing Geographic Information on a Construction Project
Stand Back from the Platform Edge!Sharing Geographic Information on a Construction ProjectDan IrwinGIS Manager
NameCrossrail / BentleyBrief History2
Victoria Eight 1,000 tonne tunnelling machines have bored 26 miles or 42 km of new 6.2m diameterFarringdon3
OverviewWhat is Crossrail?ChallengesWhere does GIS fit in?Agenda
SharingWhy Share?StakeholdersImplementationArchitectureDeliveryCustomisationsWhats Next?
4
OVERVIEWSection 1:
1World class railway
5Tunnel main drives
19Boroughs passed through
40Upgraded or new stations
2x21KM of tunnel under LondonOverview: What is Crossrail?
#
Crossrail is the largest civil engineering project in Europe at the moment:
8 new sub-surface, 14.8bn funding envelope90km surface network upgradedIt will increase Londons rail capacity by10%,
6
EngineeringContractualOverview: Challenges (Complexity)
Complexity Engineering / tunnels 40m below urban landscapeComplexity Contractual / Transport for London 120 contracts?Complexity engineering design, assets, utilities, property, monitoring and traffic 7
Overview: Challenges (Accuracy)
London Survey Grid
50cm
Overview: How does GIS fit in?
SHARINGSection 2:
Sharing: Why Share?Integrated DeliveryBetter Decision MakingOpennessCollaboration
Data, Information, Knowledge
Traditional Process
Lifecycle Information Management
Sharing: StakeholdersPublic Access (~7bn)Third Parties (~5,000)Internal Staff (~500)GI Power Users (~10)GIS Team (4)
IMPLEMENTATIONSection 3:
Implementation: Architecture
Implementation: Delivery (Portal)
Implementation: Crossrail Maps Portal
Federated Server / PortalAccessibilityAppsMobilityPublic AccessNear YouOpen Data Portal
15
Implementation: Internal Delivery53 Services300 map layers12 Maps8 Apps80 Named users250 Anonymous Users / month
Federated Server / PortalAccessibilityAppsMobilityPublic AccessNear YouOpen Data Portal
16
Implementation: Delivery (Mobile)
Implementation: Mobile GIS
Federated Server / PortalAccessibilityAppsMobilityPublic AccessNear YouOpen Data Portal
17
Implementation: Delivery (Public)
Implementation: Near You
Parliamentary commitment to share informationDeveloped with web hosting partner
18
Implementation: Delivery (Public)
Implementation: Open Data Portal
Parliamentary commitment to share informationDeveloped with web hosting partner
19
Near You35 Map Services2 Maps23,000 Visitors/monthOpen Data Portal4 Datasets
Implementation: Public Delivery
Parliamentary commitment to share informationDeveloped with web hosting partner
20
Implementation: CustomisationsLondon Survey GridEmbedded as well known projectionPart of core product from 10.5Enables sharing of LSG data sources
London Survey GridEmbedded as well known projectionPart of core product from 10.4.1Enables sharing of LSG data sourcesCustom WidgetsDynamic App ContentGround Settlement Reporting
21
Implementation: Customisations
Widgets: Dynamic App Layers
Custom WidgetsDynamic App Content
22
Implementation: Customisations
Widgets: Ground Movement Reporting
Custom WidgetsGround Settlement Reporting
23
Implementation: TimelineOn-board new vendorJan 2015PilotJun 2015Public Web Maps Jul 2015Open Data PortalOct 2015App Migration / Mobile Apps Dec 2015Main RolloutFeb 2016
Whats Next?Section 4:
Whats Next: Linear Referencing
New DataLinear Referencing / Schematics3D / SpacesNew FunctionalityRail StreetviewVerification AssuranceHandoverProvision for London UndergroundIntegration with Rail for London
26
Whats Next?
Whats Next: 3D Model Integration
New DataLinear Referencing / Schematics3D / SpacesNew FunctionalityRail StreetviewVerification AssuranceHandoverProvision for London UndergroundIntegration with Rail for London
27
Whats Next: Facility Spaces
New DataLinear Referencing / Schematics3D / SpacesNew FunctionalityRail StreetviewVerification AssuranceHandoverProvision for London UndergroundIntegration with Rail for London
28
Whats Next?
Whats Next: Web Scene Integration
New DataLinear Referencing / Schematics3D / SpacesNew FunctionalityRail StreetviewVerification AssuranceHandoverProvision for London UndergroundIntegration with Rail for London
29
Whats Next: HandoverNew FunctionalityRail StreetviewSite Verification ProcessHandoverProvision for London UndergroundGI Integration with Rail for London
New FunctionalityRail StreetviewVerification AssuranceHandoverProvision for London UndergroundIntegration with Rail for London
30
Thank You for your time!
Questions?
31