Monthly Management Report CRW Directors and Staff December 2018 As of December 12, 2018 Ensure Financial Stability Reconciled Bank Account Balances Refer to attached Reconciled Bank Account Balances as of 11/30/2018. Monthly Financial Statements Provided separately to Board of Directors. AP Check Reconciliation Register Provided separately to Board of Directors. 2016 and 2017 Capital Improvement Projects for Drinking Water Provided separately to Board of Directors. 2016 and 2017 Capital Improvement Projects for Wastewater Provided separately to Board of Directors. 2019 Budget 2019 Budgets are complete and the continuing disclosure requirements under the Trust Indentures have been satisfied. 2019 Rate Study 2019 Rate Study is complete and will be posted to the website the week of 12/10/2018. 2018 Audit 2018 Audit preliminary work will begin late January 2019. Fieldwork is tentatively scheduled to begin early May 2019. It is expected that the Audit will take six to eight weeks to complete. Financing PENNVEST loan for $11.1M closed 11/20/2018. Staffing Update CRW is interviewing candidates for the position of CFO. Procurement The Pcard Program rollout has been completed for Operations. Admin Pcards will be rolled out before 12/31/2018. Centralized and Decentralized requisition process training has been completed for Operations. Munis Upgrade Grant Management Refer to attached Grant Management Report. Ensure Revenues are Consistent with System Usage Water Shutoffs Drinking Water Division staff performed 74 water shutoffs for non-payment. Water was restored to 44 properties. Repair/Replace Meters/MXUs/Batteries Drinking Water Division staff replaced 25 water meters, 118 batteries, and 16 MXUs. Reduce Wet Weather Impacts to Infrastructure, Community, and Receiving Waters Negotiate with PADEP/US EPA/DOJ on Past and Future Practices No update. Develop Necessary Planning for Implementation of Green Infrastructure No update. Joint Pollutant Reduction Plan - Collaborate with Suburban Partners on MS4 No update. Obtain and Comply with Individual MS4 Permit No update. 1
Transcript
Page 1: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Monthly Management ReportCRW Directors and Staff

December 2018As of December 12, 2018

Ensure Financial StabilityReconciled Bank Account Balances Refer to attached Reconciled Bank Account Balances as of 11/30/2018.Monthly Financial Statements Provided separately to Board of Directors. AP Check Reconciliation Register Provided separately to Board of Directors.

2016 and 2017 Capital Improvement Projects for Drinking Water

Provided separately to Board of Directors.

2016 and 2017 Capital Improvement Projects for Wastewater

Provided separately to Board of Directors.

2019 Budget 2019 Budgets are complete and the continuing disclosure requirements under the Trust Indentures have been satisfied.2019 Rate Study 2019 Rate Study is complete and will be posted to the website the week of 12/10/2018.2018 Audit 2018 Audit preliminary work will begin late January 2019. Fieldwork is tentatively scheduled to begin early May 2019. It is expected that the Audit

will take six to eight weeks to complete.Financing PENNVEST loan for $11.1M closed 11/20/2018.Staffing Update CRW is interviewing candidates for the position of CFO.Procurement The Pcard Program rollout has been completed for Operations. Admin Pcards will be rolled out before 12/31/2018.

Centralized and Decentralized requisition process training has been completed for Operations.Munis Upgrade

Grant Management Refer to attached Grant Management Report.

Ensure Revenues are Consistent with System UsageWater Shutoffs Drinking Water Division staff performed 74 water shutoffs for non-payment. Water was restored to 44 properties. Repair/Replace Meters/MXUs/Batteries Drinking Water Division staff replaced 25 water meters, 118 batteries, and 16 MXUs.

Reduce Wet Weather Impacts to Infrastructure, Community, and Receiving WatersNegotiate with PADEP/US EPA/DOJ on Past and Future Practices

No update.

Develop Necessary Planning for Implementation of Green Infrastructure

No update.

Joint Pollutant Reduction Plan -Collaborate with Suburban Partners on MS4

No update.

Obtain and Comply with Individual MS4 Permit

No update.

1

Page 2: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Monthly Management ReportCRW Directors and Staff

December 2018As of December 12, 2018

Operate Facilities with a High Standard of CareThe Drinking Water Division met all Primary and Secondary Safe Drinking Water Act required permit parameters for the month. AWTF met all required NPDES monthly permit parameters in November. Five overflows resulting from snow melt were classified as "Dry Weather Overflows" by PADEP and were reported. Details are provided in the Wastewater Division Monthly Report.No violations were received by the Drinking Water Division for the month.No violations were received by the Wastewater Division for the month of November.The Drinking Water Division Maintenance Department conducted all scheduled preventative maintenance for the month to the Treatment Plant equipment. Other facility maintenance activities are outlined within the Drinking Water Division Monthly Report.

Wastewater Maintenance performed preventative maintenance on Heat Exchanger Number 1 at the Primary Digesters by replacing all sludge pipes. All other regularly scheduled preventative maintenance was completed.

CCTV Wastewater crews flushed 6,192 LF of pipe and performed CCTV assessment of 11,870 LF (2.2 miles) of sewer mains during the month ofNovember. The Drinking Water Distribution Department responded to one emergency water main break and addressed several customer / contractor emergencies throughout the month.

Wastewater responded to 12 customer back-up complaints during the month of November. CRW was found to be responsible for two with one resulting in an SSO.

GIS Began using 1MARK PA One Call ticketing system to provide GIS data for all "Design" one calls. Completed typical sewer edits to the GIS mapping based on staff field investigations utilizing the Cityworks interface.

Cityworks Work continues for the Cityworks plant implementation. Workshops were held on 11/01/18 and 11/29/18 to review initial configurations within the Cityworks platform. Workshop set for 12/13/18 to refine and finalize GIS schema for plant asset registries.

Asset Management Water Main Condition Assessment Pilot final summary report with recommendations on how to implement the data is due by end of the year. Meeting to be scheduled in January for final project review.

• Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains caused termination of the investigation. Due to this knowledge, Phase 2 of the refined testing plan has been cancelled. Final document due by 12/31/2018.

• Echologics Technology: Received technology report and geodatabase file of field data.

Collection System Asset Management Plan: Preliminary review of the current Levels of Service (LOS) and key performance indicators identified within the Asset Management Roadmap to be reviewed during a meeting on 12/14/2018.

Kendrick Maholtz, Data/GIS Analyst started 12/03/2018.

Development Review Summary No update.

Permit Compliance

Incident Response

Notice of Violations (NOVs)

Preventive Maintenance

2

Page 3: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Monthly Management ReportCRW Directors and Staff

December 2018As of December 12, 2018

Undertake Capital Improvement Projects - Refer to attached Capital Improvement Projects ReportProfessional Services No update.AWTF Headworks Screening No update.AWTF Primary Digesters Rehabilitation No update.AWTF Primary Clarifiers Rehabilitation No update. Front Street Pumping Station Improvements

No update.

2018 Water Main Replacement No update.2019 Water Main Replacement No update. 2019 Street Restoration No update.WSC Generator Installation No update. WSC Chlorine Scrubber Installation No update.WSC Fluoride Conversion No update.Cameron Street Water Main Lining No update. Upper Reservoir Inspection/Rehab No update.2019 Sewer Replacement No update. Market Street Sewer Replacement No update.

Undertake Renewal and Replacement ProjectsPaxton Creek Interceptor Rehabilitation No update.

Arsenal Boulevard Sewer Improvements No update.Front Sreet Interceptor Rehabilitation - Phase 1

Utility conflicts are affecting progress. We are waiting on costs from the contractor to perform the work with changed conditions.

Front Sreet Interceptor Rehabilitation - Phase 2

No update.

Asylum Run Interceptor Rehabilitation No update.Water Facility Maintenance The Operations and Maintenance Department completed a significant in-house Lighting Upgrade Project by replacing most of the aged facility

lighting with energy conserving LED technology as outlined in the monthly report. Wastewater Facility Maintenance Facility Maintenance performed repairs to various process units and pump stations in November, but focused heavily on major renovations to

the AWTF Conference and Lunch Rooms. These rooms are being combined to form one multipurpose room with sufficient capacity to host the entire staff. A comprehensive list of completed projects can be found in the Wastewater Division Monthly Report for November.

Sinkhole Program Investigated four reported sinkholes in November and made remediations to several sites that were previously reported.Inlet Cleaning Wastewater Field Operations cleaned 109 stormwater inlets in November.

3

Page 4: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Monthly Management ReportCRW Directors and Staff

December 2018As of December 12, 2018

Operate as an Efficient, Sustainable and Resilient Water UtilityDeHart Property Stewardship Final review and recording of the Boundary Survey is underway to aid in the final round of the Conservation Easement. Department of Defense

funding request has been made on behalf of CRW. Closing anticipated 1st Quarter of 2019.

Notice to Proceed provided on 12/05/2018 for DeHart Managment Unit 9 timber harvest. Associated outreach materials have been created/distributed.

Sustainability Update of the Drinking Water Rules & Regulations continues with emphasis on Leak Adjustment and Water Shutoff policies. Development of four Energy Conservation Measures to modify AWTF operations are underway.

Internal Communications Staff are developing a CReW News newsletter to be released in January.

Inform and Listen to Customers and Encourage Stewardship of our SystemsMedia Relations Issued press release announcing 2019 Budgets and Drinking Water and Sewer Rates on 11/29/2018. Press release covered by TheBurg and

Central Penn Business Journal.Community Relations Community Ambassador Meeting: Community Ambassador Meeting scheduled for 12/19/2018 to tour the Capital Area Greenbelt Association's

Spring Creek stream restoration projects.

Community Events: CRW attended and provided information at the following events: • Litter cleanup on 12/12/2018 in partnership with the Bethesda Mission Community Center and Clean and Green Harrisburg

Tours: Facility tours were given to the following organizations:• Messiah College students on 11/28/2018.

CBH2O: No update.

Training: Community Liaison attended community outreach training organized by NeighborWorks America on 12/5 - 12/7/2018.

Public Communications Communications over the previous month covered the following topics: budgets and rates, preventing frozen water pipes, proper disposal of grease, and the street sweeping winter schedule. January's bill insert will educate customers about combined sewer overflows, among other topics.

K2Career Pipeline Several partner meetings were held with: HACC, Penn State Extension, Harrisburg School District, and Thadeous Stevens. Meetings with Marshall Math & Science School to develop a stormwater education project were held on 11/27/2018 and 12/11/2018.

4

Page 5: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Monthly Management ReportCRW Directors and Staff

December 2018As of December 12, 2018

AdministrativeGeneral Information No update.Risk Management CRW's employee First Aid AED/CPR training has been scheduled with UPMC Pinnacle on 1/16/2019 for AWTF; 2/14/2019 for Drinking Water and

2/15/2019 for the Administrative location.

On 11/29/2018, CRW's Risk Manager was presented with CRW's annual Stewardship Report regarding CRW's Workers' Compensation Insurance Program. The carrier, Eastern Alliance Insurance Group, and CRW's insurance broker, Murray Securus, presented past program performances, along with future cost projections.

CRW's Risk Manager participated in the South Central Task Force of PA Security Symposium in Hershey, PA.

Human Resources Open Enrollment: All elections will be completed by 12/14/2018 and files sent to insurance broker at that point. Completing FSA elections the week of 12/17/2018.

Reviews: Switching to a calendar year for employees' annual reviews in 2019. Working to wrap up all reviews for 2018.

Employment Policies: Compiling necessary and recommended updates and additions to CRW's Employment Policies for the Personnel Committee's review and consideration.

Dependent Audit: Signing agreement with BMI to perform the Dependent Audit. Process will begin the second week of January 2019.

Continued work: Working to wrap up all signatures on the Collective Bargaining Agreement (CBA). Interviewing companies for compensation studies.

Recruiting: Main focus right now. Refer to attached Recruiting Report.

Information Technologies (IT)

5

Page 6: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Monthly Management ReportCRW Directors and Staff

December 2018As of December 12, 2018

Office Management Street/Sidewalk-Cut Permits: Four new water-related street-cut permit requests from separate contractors were processed from the City of Harrisburg's Engineer. Awaiting receipt of photo documentation from contractors of finished restorations for 10 Drinking Water, and five Wastewater outstanding permits so final inspections by CRW can be completed.

The External Affairs Manager will be notifying surrounding residents that seven delinquent restorations will not be restored until the Spring of 2019.

Diversity • 11/16/2018 Small Business Sub-Committee Meeting• 11/19/2018 Meeting with Impact Harrisburg• 11/20/2018 Fluoride Feed Pre-Bid Meeting• 11/21/2018 Professional Services Workshop Planning Meeting • 11/28/2018 M/W/DBE Plan Meeting with MT Johnson Group• 11/29/2018 Cosmos Technologies Meeting (MBE)• 12/04/2018 DGS Small Diverse Business Meeting• 12/07/2018 Fluoride Feed & SAH GSI Bid Openings • 12/11/2018 MT Johnson Bid Review

6

Page 7: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Monthly Management ReportCRW Directors and Staff

December 2018As of December 12, 2018

CRW received three Right-to-Know requests and responded to three Right-to-Know Requests during the period 11/22/2018 through 12/19/2018 as follows:RTK 2018-028 - J.C. Garner. Requesting any contract for DBi Services - Hazelton, PA. Response provided 11/27/2018.RTK 2018-029 - Philip C. Brown. (1) Requesting why there were no actions taken to collect water bills associated with 1416 State Street, Harrisburg for a period of approximately 43 months or that a Notice of Termination would be posted on the property that resulted in Municipal Lien 2017-CV-8700-MU; (2) What is the current policy regarding delinquent bills & the posting of a Notice of Termination? (3) Why does a request for an Informal hearing have to be notarized? (4) What policies are in place if the owner of the property is outside the United States & there are no notaries available or that understand English (as in Peru)? (5) Please provide a one page summary of water bills from July 25, 2017 thru Nov. 30, 2018 for 1416 State Street, Harrisburg; (6) Do the employees of CRW get extra commission or other additional compensation for converting a delinquent account to a Payment Plan? (7) What is the relationship of the City of Harrisburg and CRW? (8) Does the City Solicitor attend Board Meetings or other activities of CRW? (9) Is the City solicitor compensated for their attendance and how much? What services do they provide? Response due: 12/7/2018. Response provided 12/7/2018 for notice of 30-day extension until 1/7/2019.

RTK 2018-030 - Philip C. Brown. (1) Requesting an itemized 1 or 2 page summary of the water bills associated with Municipal Lien 2017-CV-8700-MU filed against property at 1416 State Street, Harrisburg which is owned by Philip C. Brown. Make sure dates, usage & monthly charges are noted. (2) Please provide a copy of the items included in the letter that was served to 1416 State Street on or about December 15, 2017 associated with this Municipal Lien. (3) What due diligence was done to suggest that Philip C. Brown resided at this address? (4) Was Wendy Shollenberger or anyone else associated with CRW aware or had been advised that:1. Philip C. Brown's private residence was not Harrisburg but Lima, Peru?2. Mr. Brown's email was available if there were questions about his residence status?3. Mr. Brown had a Lima, Peru that was a local call for Harrisburg if there were questions about his residence status.4. Mr. Brown's residence status was on record with the Prothonotary of Dauphin County & others. Response due: 12/7/2018. Response provided 12/7/2018 for notice of 30-day extension until 1/7/2019.

Right-to-Know Requests

7

Page 8: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Reconciled Bank Account Balances 11/30/18

Balance Interest APY Bank

Business Checking 568,108.79$ 0.75% 0.50% First National Bank

Project Fund 421,082.89$ 0.75% 0.50% First National Bank

Certificate of Deposit – Nat’l Civil War Museum 250,000.00$ 0.20% 0.20% First National Bank Restricted $250,000 min/$500,000 max

Lockbox 69,853.63$ 0.00% 0.00% PNC Bank

General Account 278,174.92$ 0.00% 0.00% First National Bank

Solid Waste Revenue Fund 3.26$ 0.75% 1.51% First National Bank

Water Revenue Fund 23,322,383.21$ 0.75% 0.50% First National Bank

Water Operation Reserve Account 1,644,572.97$ 0.75% 0.50% First National Bank Req'd Balance $685,132.00 (adjusts)

Water Contingency Account 1,383,590.33$ 0.75% 0.50% First National Bank

Water Contingency Subaccount 1,799,065.76$ 0.75% 0.50% First National Bank

Sewer Revenue Account 36,906,208.47$ 0.75% 0.50% First National Bank

Bank Statements (reconciled accounts)

ADMIN

WATER

SEWER

Page 9: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Grant Management Report

Funding Program Project Proposal Due DateAnticipated

Announcement DateDate of Notification

Request Amount

Request Type (Cash vs. Loan)

CRW Matching Amount

CRW Matching Type$$$ Awarded Rationale/Notes

$11,136,900 $0

PENNVEST Infrastructure (Projects) Front Street Pump Station Upgrade 3-May-18 18-Jul-18 18-Jul-18 $11,136,900 Loan $0 $0 $11,136,900

PENNVEST Infrastructure (Projects) AWTF Headworks PENNVEST Loan COMPLETED 15-Oct-17 15-Oct-17 $5,500,000 Loan $0 0 $3,577,394 Bid lower than anticipated. Reduced loan accordingly. Project underway

Impact Harrisburg (iH) Infrastructure (Projects) City of Harrisburg's Multimodal (COH-MC) Project 10-Jun-16 Unknown 22-Jul-16 $3,000,000 Cash $5,098,000 Cash & GSI EscrowAccount

$2,743,645

DEP Local Stormwater BMP Implementation Grant Downspout Planter Pilot Project COMPLETED 14-Dec-15 30-Jun-16 $100,000 Cash $30,000 In-Kind $40,800 Received Extension approval. Date extended to March 30, 2019

Dauphin County Public Infrastructure Funds Drinking Water Emergency Generator Purchase & Installation Project COMPLETED 1-Dec-16 15-Dec-16 $812,622 Cash $596,378 Cash $812,622 Grant funding received. Water Emergency Generator Project in process.

DEP Environmental Education Grant K2Career Pipeline Project COMPLETED 22-Apr-16 1-Apr-17 $50,000 Cash $29,500 In-Kind $48,032 Pending. Agreements under review by legal

$4,232,382 $5,881,583 $3,914,443

Dauphin County Local Share Gaming Grant Mobile Drinking Water Station Project 1-Sep-16 1-Feb-17 1-Mar-17 $47,475 Cash $5,275.00 Cash $0 Not Awarded

HUD/Rockefeller Foundation NDRC Sewer Interceptor Rehabilitation Project, Storm Sewer Rehabilitation Project, Community Outreach

COMPLETED Jan-16 20-Feb-16 $50,000 Cash $50,000 Cash $0 Waiting to hear from Dauphin County for the rationale.

EPA Urban Water Small Grants City Beautiful H2O Green Schools Clean Water Education Program COMPLETED 3-May-16 3-May-16 $53,194 Cash $7,167.62 In-Kind $0

Impact Harrisburg (iH) Infrastructure (Contingency) Arsenal Boulevard Sewer Rehabilitation (ABSR) Project 10-Jun-16 Unknown 5-Jul-16 $500,000 Cash $1,000,000 Cash

Chesapeake Bay Trust 2016-2017 Mini Grant Program Raindrop to River Educator Workshops 5-Aug-16 30-Sep-16 $5,000 Cash $2,416 In-Kind

$603,194 $1,057,168N:\CRW\Financial\Grants\Grant & Funding Management Reports\2018-06-30 Grant Management Report.xlsx Page 1 of 1

Capital Region Water's Awarded Grant, Loan and Bond Proceeds

SUB TOTALSCapital Region Water's Not Awarded Grants & Loans

SUB TOTALS

GRANT OVERVIEW

Capital Region Water's Future Grant Applications

SUB TOTALSCapital Region Water's Pending Grant & Loan Applications

SUB TOTALS

Page 10: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Drinking Water Capital Improvement Projects Report

Actual Expenditure YTD % Budget Expended 2018 Budget

MUNIS Project Code Description Status Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec60800801-80100-00008 WSC Filter Media Replaceme DESIGN -$ -$ -$ -$ -$ -$ -$ -$ -$ 1,380 1,380$ 1% 215,138$ 60800801-80100-00045 Chlorine Scrubber Project DESIGN -$ -$ 4,540$ 6,680$ 2,280$ -$ 12,253$ 17,259$ 2,410 36,462 81,883$ 21% 395,050$ 60800801-80100-00046 Mountain Line Clearing DESIGN -$ 586$ -$ -$ 1,149$ 268$ 13,407$ 2,949$ 758 2,888 22,004$ 11% 200,000$ 60800801-80100-00092 Liquid Fluoride Chem Feed Sy DESIGN -$ -$ 4,973$ -$ -$ -$ 17,217$ 15,480$ 43,975 15,561 97,205$ 45% 215,400$ 60800801-80100-00016 Water Main Replacement Eng BID/AWARD -$ -$ -$ -$ -$ -$ -$ -$ 36,400$ 57,831 94,231$ 47% 200,000$ 60800801-80100-00015 Water Main Replacement Const CONSTRUCTION 11,801$ 37,197$ 24,153$ -$ 56,870$ 4,842$ 44,591$ 12,939$ 12,186$ 11,375 215,952$ 37% 590,950$ 60800801-80100-00081 Cameron Street Water Main Li CONSTRUCTION 542$ -$ 40,806$ -$ -$ 4,630$ -$ -$ - - 45,978$ 2% 1,912,200$ 60800801-80100-00012 Inspect Upper Reservoir CONSTRUCTION -$ -$ -$ 39,424$ 25,303$ -$ 98,539$ 3,325$ 1,774$ 6,534 174,899$ -$ 60800801-80100-00014 Line/Rehabilitate Upper Re CONSTRUCTION -$ -$ 1,290$ -$ 74,015$ 147,783$ 788,986$ 40$ 244,316$ 322,475 1,578,905$ 70% 2,261,400$ 60800801-80100-00007 WSC Emergency Generator CONSTRUCTION 31,505$ 374,321$ 91,987$ -$ -$ 2,247$ 2,055$ 1,825$ 2,890$ 6,824 513,654$ 49% 1,045,464$ 60800801-80100-00009 WSC Tube Settler Replaceme CONSTRUCTION 7,216$ 282,919$ 197,030$ 408,796$ 19,690$ 11,624$ 121,467$ 2,400$ 2,707$ 935 1,054,784$ 122% 864,008$ 60800801-80100-00050 DeHart Evaluation - PROF SERVI CONSTRUCTION 37,548$ 14,290$ -$ 51,512$ 38,399$ -$ 209,517$ 66,939$ 25,730 22,640 466,573$ 85% 550,000$

Actual Monthly Expenditure 88,611$ 709,313$ 364,779$ 506,411$ 217,706$ 171,393$ 1,308,031$ 123,155$ 373,146$ 484,904$ -$ -$ 4,347,449$ 51.5% 8,449,610

Actual CUMULATIVE Expenditure 88,611$ 797,924$ 1,162,702$ 1,669,113$ 1,886,820$ 2,058,213$ 3,366,244$ 3,489,398$ 3,862,544$ 4,347,449$

ACTUAL EXPENDITURE (from Finance)

$-

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

$7,000,000

$8,000,000

$9,000,000

$10,000,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Cum

ulat

ive

Expe

nditu

re

Month

2018 Drinking Water Capital Improvement Projects ExpenditureActual

N:\CRW\Monthly Reports\Management\Draft\2018-12-12 CIP Project Expenditure to Board.xlsx

Page 11: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Wastewater Capital Improvement Projects Report

Actual Expenditure YTD % Budget Expended 2018 Budget

MUNIS Project Code Description Status Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec80800801-80100-00023 Cogeneration Improvments St DESIGN -$ -$ -$ -$ -$ -$ -$ -$ 45,557$ -$ 45,557$ 6% 750,000$ 80800801-80100-00024 Primary Clarifier Improvement DESIGN 2,895$ 832$ 18,310$ 3,013$ 6,166$ -$ -$ -$ -$ -$ 31,216$ -$ 80800801-80100-00061 Arsenal Boulevard Sewer Improvements DESIGN 7,495$ 15,407$ 9,322$ 21,985$ 42,587$ -$ 4,158$ -$ -$ -$ 100,953$ -$ 80800801-80100-00065 Other Multi-Modal CCTV Investi DESIGN -$ -$ -$ -$ 769$ -$ 3,276$ 6,515$ 47,855$ -$ 58,415$ 8% 750,000$ 80800801-80100-00070 GSI Design DESIGN -$ -$ 18,400$ -$ -$ 2,001$ 10,304$ 40$ 29,265$ 101,198$ 161,209$ 40% 400,000$ 80800801-80100-00073 Wet Weather Services DESIGN 4,927$ 255,824$ $ 30,304 175,681$ 37,962$ 8,428$ 41,213$ 27,880$ 48,355$ 34,730$ 665,305$ 48% 1,379,360$ 80800801-80100-00086 Summit Terrce Neighbrhd GSI DESIGN -$ -$ 63,014$ 76,300$ 36$ 9,910$ 81,754$ 6,528$ 72,627$ 2,052$ 312,221$ 64% 488,350$ 80800801-80100-00088 MulDer Square GSI DESIGN -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 0% 300,000$ 80800801-80100-00089 2018 South Allison Hill GSI DESIGN 480$ -$ 66,652$ 52,533$ 6,456$ -$ 7,660$ -$ 10,518$ 3,669$ 147,968$ 21% 711,388$ 80800801-80100-00090 2nd/7th Strts Multimoda GSI DESIGN -$ -$ 200$ -$ -$ -$ -$ -$ 1,710$ -$ 1,909$ 0% 400,000$ 80800801-80100-00091 Pax Crk TMDL Joint PRP MS4 DESIGN -$ -$ -$ -$ 2,580$ -$ -$ -$ -$ -$ 2,580$ 1% 377,200$ 80800801-80100-00025 Front St Pump Sta Design/Co CONSTRUCTION -$ -$ 186$ 4,225$ 1,630$ -$ 2,828$ 45$ 39,586$ 5,902$ 54,401$ 2% 2,561,000$ 80800801-80100-00085 2018 City Parks GSI CONSTRUCTION -$ -$ 216,457$ 120,000$ 310,941$ -$ 99,871$ -$ 378,186$ -$ 1,125,455$ 127% 884,014$ 80800801-80100-00059 Asylum Run Interceptor Improv CONSTRUCTION 1,138$ 31,794$ 3,318$ 4,754$ 6,049$ 58$ 27,793$ 17,480$ 553,115$ 16,206$ 661,704$ 43% 1,551,200$ 80800801-80100-00029 Front Street Interceptor Rehabilitation - Ph I CONSTRUCTION 5,229$ 2,568$ 4,040$ 5,535$ 10,803$ -$ 4,625$ 57,179$ 53,544$ -$ 143,524$ 13% 1,071,605$ 80800801-80100-00026 Collection System Rehabilitation CONSTRUCTION 204,612$ 446,755$ 246,062$ 168,628$ 54,188$ 4,690$ 119,564$ 61,857$ 37,060$ 678,659$ 2,022,073$ 74% 2,722,950$ 80800801-80100-00020 Anaerobic Digester Roof Rep CONSTRUCTION 35,086$ 43,136$ 17,832$ 26,414$ 180,903$ -$ 17,503$ 50,667$ 280,449$ 241,732$ 893,722$ 16% 5,513,985$ 80800801-80100-00019 Headworks Screen Design/Con CONSTRUCTION 409,597$ 30,511$ 930,464$ 242,768$ 36,045$ 413,336$ 507,453$ 28,170$ 166,550$ 107,299$ 2,872,194$ 80% 3,586,474$ 80800801-80100-00028 Paxton Creek Interceptor Re CONSTRUCTION -$ 24,223$ 311,367$ 123,171$ 119,613$ 648,571$ 527,016$ 587,778$ 297,778$ 351,248$ 2,990,765$ 41% 7,274,254$ 80800801-80100-00084 3rd Street Multimodal GSI CONSTRUCTION -$ 111,213 40,554$ 14,554$ 10,010$ -$ 36,403$ -$ -$ 67,594$ 280,327$ 18% 1,555,515$

Actual Monthly Expenditure 671,459$ 962,263$ 1,976,480$ 1,039,560$ 826,740$ 1,086,994$ 1,491,420$ 844,139$ 2,062,156$ 1,610,288$ -$ -$ 12,571,500$ 38.9% 32,277,295$

Actual CUMULATIVE Expenditure 671,459$ 1,633,722$ 3,610,202$ 4,649,762$ 5,476,502$ 6,563,496$ 8,054,917$ 8,899,056$ 10,961,212$ 12,571,500$

ACTUAL EXPENDITURE (from Finance)

-$1,000,000

$1,000,000

$3,000,000

$5,000,000

$7,000,000

$9,000,000

$11,000,000

$13,000,000

$15,000,000

$17,000,000

$19,000,000

$21,000,000

$23,000,000

$25,000,000

$27,000,000

$29,000,000

$31,000,000

$33,000,000

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Cum

ulat

ive

Expe

nditu

re

Month

2018 Wastewater Capital Improvement Projects ExpenditureActual

N:\CRW\Monthly Reports\Management\Draft\2018-12-12 CIP Project Expenditure to Board.xlsx

Page 12: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

N:\CRW\Human Resource\Reports\Monthly Recruiting Reports\2018-12-12 Recruiting Status Report.docx

RECRUITING STATUS Renee Kolacek, HR Manager

December 12, 2018

Page 1 of 1

New Hires Position Employee Effective Date

Laborer – Operations, Wastewater Nathan Freysinger 11/26/2018 GIS/Data Analyst Kendrick Maholtz 12/3/2018

Transfers

Employee Former Position New Position Effective Date

Retirements Position Employee Effective Date

Resignations/ Terminations Position Employee Effective Date

Open Positions Position Status

CEO Posting with recruiting firm; currently reviewing resumes and conducting interviews.

CFO Posting with recruiting firm; currently reviewing resumes and conducting interviews.

Project Engineer Externally Posted – Accepting Resumes Customer Service Representative Internal candidate interviewed. Decision to be

made by 12/14/18 Meter Account Supervisor Accepting resumes and conducting interviews. HR Generalist Reviewing Resumes Laborer/Entry Level Maintenance Assistant – Wastewater

Verbal Offer Extended – Candidate to start on 01/07/2019

Laborer/Entry Level Maintenance – Wastewater Operations

Verbal Offer Extended – Candidate to start on 11/26/18

Page 13: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

DRINKING WATER DIVISION

MONTHLY REPORT

The First Water Main Break response of this cold weather season.

November 2018

100 Pine Drive, Harrisburg, PA 17103 | 888-510-0606 capitalregionwater.com

Page 14: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

N:\CRW\Monthly Reports\Operations\Drinking Water\Final Drafts\2018-11-00 Monthly Report\2018-11-00 Monthly Report Text.docx

Page 1 of 2

Drinking Water Division Monthly Report November 2018

Plant Operations The Capital Region Water (CRW) Drinking Water Division met all Federal Safe Drinking Water Act Water Quality Standards for the month of November. Specific water quality results are summarized in Exhibit A. A total of 195 million gallons (MG) was withdrawn from the water supply sources for treatment. The DeHart water source was in service 30 days. The DeHart Watershed had above average rainfall in November (Exhibit C) and the DeHart Reservoir water level increased (Exhibit D). An estimated 2,758.6 MG of water was released from DeHart Reservoir to Clark Creek, averaging 92 MGD for the month. This down stream flow, which is received by remote flow monitoring from the Weir location and actual staff gauge readings, was in compliance with the flow required by the State Water Allocation Permit (Exhibit E). During the month of November, the Hydro-Turbine Generator was in service for 7 days and generated 4,497 kwh with an anticipated savings of $247 (Exhibit G). The Operation Department switched fully to the A side of the Plant and performed a cleaning of the B side flocculation and sedimentation basins. Work within the Plant on several projects moved forward including the Backwash Variable Frequency Drive installation, HMI System Improvements, and LED Lighting Upgrade Project. The Operators also completed a pre-winter cleanup of the entire facility that included a top to bottom cleaning and organizing. As a result of a Project Construction Meeting, a tentative Emergency Generator startup date has been established for the end of February. A Prebid Meeting was held for the Fluoride project and the project is currently out to bid. Staff began temporary Fluoride feed system setup to accommodate that project. The Chlorine Scrubber Project is now underway with submittals currently in the review process.

Plant Maintenance During the month of November, the Maintenance Department performed all scheduled preventative maintenance for the treatment plant equipment. Maintenance staff also assisted JMT with a DeHart boundary survey and rewired the first floor of the DeHart Control Room. The Maintenance Department completed a comprehensive interior and exterior Lighting Upgrade to the Water Facilities using in-house staff and expertise. The project was identified as an Energy Conservation Measure opportunity in CRW’s Energy Audit of 2017. It took several weeks of effort to replace the existing lighting fixtures with energy efficient LED technology. The maintenance and operations staff have installed 54 flat panel lights, 144 strip lights, 46 wall packs lights, and 16 parking light lamps, at four different water facilities. The total cost of materials was approximately $15,300. An accurate payback period is difficult to calculate, but the project was anticipated in the

Page 15: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

N:\CRW\Monthly Reports\Operations\Drinking Water\Final Drafts\2018-11-00 Monthly Report\2018-11-00 Monthly Report Text.docx

Page 2 of 2

Drinking Water Division Monthly Report November 2018

audit to produce a significant savings in energy consumption and cost. The project has benefits beyond electricity cost savings. However, the operational and security benefits are significant in themselves.

Distribution The Distribution Department completed 266 Cityworks Work Orders for distribution and metering activities. The Distribution Department finished street restoration work during the month of November due to the temperature change. Only two CRW created street restorations remain to be repaired. Five contractor street restorations also need completed by CRW due to contractor non-responsiveness. All street restorations will be completed in the Spring of 2019. Distribution staff also worked with the contractor to facilitate the Front Street Water System Improvements Project to install a new 12-inch water main in the 300 block of South Front Street. Substantial completion will be by mid-December with street restoration of this project getting finished in the spring of 2019. The Distribution staff also geared up for this winter in preparation of water main breaks, frozen customer meters and emergencies due to stolen customer water pipes which all increase this time of year. The Valve Exercising Program has identified approximately 20 valves that will be scheduled for repair or replacement in the next few months.

Water Quality The Water Quality Administrator conducted a filter inspection of Filter 408 in conjunction with the Operations Department. The filter media was examined to determine if there are any inconsistencies in the filter bed. Samples of the filter media were taken for additional laboratory testing to compare with the original specifications of the filter. One of the new regulatory requirements under the Chapter 109 – General Update and Fees Rule is to “Develop and implement a filter bed evaluation program”. CRW developed such a program in advance of the requirement deadline and is fine-tuning the procedures with each filter inspected.

Page 16: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Drinking Water Exhibits

Page 17: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

EXHIBIT A

Water Quality Anaylsis - 2018

PARAMETERS JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Average MCL Limits

Total Coliform: Presence/Absence

DeHart Influent P P P P P NA NA NA P P P P NA

Susquehanna Influent NA NA NA NA NA NA NA NA NA NA NA NA NA

Distribution System A A A A A A A A A A 1% P A 5% P

Chlorine Residual, mg/L Free

Filter Plant Effluent 1.73 1.54 1.52 1.62 1.74 1.68 1.50 1.68 2.13 1.76 1.77 1.70 0.2 - 4.0

Distribution System 1.24 1.08 1.00 1.05 1.18 1.20 0.92 0.95 1.26 1.28 1.27 1.13 <0.02

Turbidity, NTU

Influent from DeHart 0.49 0.42 0.51 0.95 1.55 0.87 0.87 0.66 1.19 1.14 0.85 0.86 NA

Influent from Susquehanna NA NA NA NA NA NA NA NA NA 14.8 NA NA NA

Filter Plant Effluent 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.03 0.04 0.30

pH, Std Units

Influent from DeHart 6.6 6.4 6.4 6.4 6.3 6.2 6.0 5.8 5.7 6.0 6.2 6.2 NA

Influent from Susquehanna NA NA NA NA NA NA NA NA NA 7.8 NA NA NA

Filter Plant Effluent 7.9 7.9 7.8 7.9 7.8 7.8 8.0 8.1 8.3 7.9 7.8 7.9 6.5 - 8.5*

Distribution System 7.4 7.3 7.3 7.3 7.4 7.3 7.5 7.5 7.6 7.3 7.4 7.4 6.5 - 8.5*

Total Alkalinity, mg/L as CaCO3

Influent DeHart 5 6 5 6 6 5 5 5 5 5 4 5 NA

Influent fromSusquehanna NA NA NA NA NA NA NA NA NA 47 NA NA NA

Filter Plant Effluent 11 13 13 12 12 12 15 18 21 26 14 15 <15*

Distribution System 10 13 13 13 12 12 14 17 20 23 15 15 <15*

Temperature, degrees C

Influent from DeHart 6.6 7.2 7.3 8.7 12.2 14.7 17.0 18.0 17.7 16.6 12.5 12.6 NA

Influent from Susquehanna NA NA NA NA NA NA NA NA NA 14.8 NA NA NA

Filter Plant Effluent 7.1 7.5 7.3 8.8 12.0 14.1 15.2 16.8 17.6 16.3 13.1 12.3 NA

Distribution System 12.7 12.7 13.3 13.4 18.3 20.2 23.0 23.4 22.6 20.2 15.4 17.7 NA

Fluoride, mg/L

Filter Plant Effluent 0.69 0.70 0.67 0.67 0.64 0.64 0.68 0.74 0.73 0.69 0.76 0.69 2

Aluminum, mg/L

Filter Plant Effluent 0.02 0.02 0.02 0.02 0.01 0.01 0.01 0.04 NA 0.01 0.01 0.02 0.2*

Iron, mg/L

Influent from DeHart 0.15 0.12 0.08 0.06 0.06 0.06 0.08 0.19 0.47 0.85 0.49 0.24 NA

Influent from Susquehanna NA NA NA NA NA NA NA NA NA 0.36 NA NA NA

Filter Plant Effluent 0.02 0.02 0.02 0.02 0.02 0.01 0.03 0.02 0.05 0.02 0.02 0.02 0.3*

Distribution System 0.03 0.03 0.03 0.03 0.04 0.03 0.05 0.03 0.03 0.12 0.03 0.04 0.3*

Total Dissolved Solids, mg/L

Influent from DeHart 16 17 17 17 16 16 16 16 14 14 13 16 NA

Influent from Susquehanna NA NA NA NA NA NA NA NA NA 75 NA NA NA

Filter Plant Effluent 32 32 33 34 31 31 32 36 36 53 31 35 500*

Distribution System 32 37 34 34 33 33 33 36 37 47 33 35 500*

Total Hardness, mg/L

Influent from DeHart 8 8 8 8 8 8 8 8 8 8 8 8 NA

Influent from Susquehanna NA NA NA NA NA NA NA NA NA 82 NA NA NA

Filter Plant Effluent 15 15 15 14 14 13 9 8 8 27 8 13 NA

Distribution System 14 14 14 14 13 13 9 8 7 16 9 12 NA

Orthophosphate, mg/L

Filter Plant Effluent 1.07 1.05 1.07 1.04 1.04 0.98 0.98 1.06 1.23 1.51 1.30 1.12 0.7 - 1.3*

Distribution System 1.08 1.03 1.07 1.06 1.02 0.96 0.98 1.10 1.20 1.37 1.31 1.11 0.7 - 1.3*

**Total Trihalomethanes, mg/L

Distribution System 0.025 NA NA 0.025 NA NA 0.049 NA NA 0.120 NA 0.055 0.080

**Total Haloacetic Acids, mg/L

Distribution System 0.014 NA NA 0.027 NA NA 0.045 NA NA 0.066 NA 0.038 0.060

Total Organic Carbon, mg/L

Influent from DeHart 1.80 NA NA 1.90 NA NA NA 3.20 NA NA 2.89 2.45 NA

Influent from Susquehanna NA NA NA NA NA NA NA NA NA NA NA NA NA

Filter Plant Effluent 1.20 NA NA 0.98 NA NA NA 1.70 NA NA 1.18 1.27 NA

Average Filter Run, Hours 88.7 90.0 89.9 89.8 96.0 99.8 96.6 109.2 107.8 115.3 136.1 101.7 NA

* Values are related to DEP Secondary MCL

** Running Annual Quarterly Average

2018-11-00 WSC Monthly Report Exhibit A Process Control/Water Quality Analysis

Page 18: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

January 268.027 8.646 0.000 0.000 268.027 8.646 253.855 8.189 14.540 0.469 239.315 7.720

February 227.724 8.133 0.000 0.000 227.724 8.133 214.933 7.676 13.505 0.482 201.428 7.194

March 234.203 7.555 0.000 0.000 234.203 7.555 222.161 7.166 13.436 0.433 208.725 6.733

April 227.900 7.597 0.000 0.000 227.900 7.597 210.100 7.003 14.300 0.477 195.800 6.527

May 233.691 7.538 0.000 0.000 233.691 7.538 219.614 7.084 14.664 0.473 204.950 6.611

June 233.946 7.798 0.000 0.000 233.946 7.798 217.544 7.251 14.553 0.485 202.991 6.766

July 254.993 8.226 0.000 0.000 254.993 8.226 237.795 7.671 16.408 0.529 221.387 7.142

August 242.654 7.828 0.000 0.000 242.654 7.828 231.308 7.462 16.213 0.523 215.095 6.939

September 226.400 7.547 0.000 0.000 226.400 7.547 216.296 7.210 15.368 0.512 200.928 6.698

October 187.121 6.036 44.305 1.429 231.426 7.465 204.375 6.593 15.818 0.510 188.557 6.082

November 195.006 6.500 0.000 0.000 195.006 6.500 194.282 6.476 15.791 0.526 178.491 5.950

December

Total 2531.665 44.305 2575.970 2422.263 164.596 2257.667

Average 230.151 7.582 4.028 0.130 234.179 7.712 220.206 7.253 14.963 0.493 205.242 6.760

Peak Day Water Use 11/6/2018 6.962 MG (MG) = Million GallonsMinimum Day Water Use 11/1/2018 5.817 MG (MGD) = Million Gallons per Day

EXHIBIT B

Water Production Data 2018

DeHart Withdrawl River Withdrawl Total Withdrawl Treated Water Process Water Finished Water

Month Total (MG)Average (MGD)

Total (MG)Average (MGD)

Total (MG)Average (MGD)

Total (MG)Average (MGD)

Total (MG)Average (MGD)

Total (MG)Average (MGD)

2018-11-00 WSC Monthly Report Exhibit B Flow Monitoring And Water Withdrawal Information

Page 19: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

EXHIBIT C

Rainfall at the DeHart Reservoir - 2018(inches)

Date January February March April May June July August September October November DecemberAnnual

Total

2018 Total 3.46 6.65 3.00 4.17 4.86 9.60 18.72 8.77 8.13 2.76 5.63 75.75

Daily Average 0.112 0.237 0.096 0.139 0.156 0.320 0.603 0.282 0.271 0.089 0.188 2.49

Ten Year Average 3.29 2.62 3.62 4.68 3.84 5.59 4.96 4.25 5.50 5.34 3.84 4.31 51.84

2017 Total 2.49 1.19 4.15 3.71 6.13 2.86 7.39 7.10 2.78 7.30 1.46 1.44 48.00

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

January February March April May June July August September October November December AnnualTotal

Rainfall Trends2018

2018 Total Ten Year Average 2017 Total

2018-11-00 WSC Monthly Report Exhibit C Rainfall At The DeHart Reservoir

Page 20: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

EXHIBIT D

Water Level at the DeHart Reservoir - 2018(Inches from Spillway)

Date January February March April May June July August September October November December

2018 AVG 0.1 5.0 4.0 4.0 3.8 2.8 6.0 4.6 3.2 3.3 6.6

Ten Year AVG -43.6 -41.1 -31.0 -16.6 -14.4 -17.0 -29.0 -45.5 -64.0 -76.8 -81.4 -68.7

2017 AVG -153.5 -163.9 -166.9 -95.3 -46.0 -32.5 -22.5 -15.0 0.3 -1.2 2.5 0.1

-180.0

-160.0

-140.0

-120.0

-100.0

-80.0

-60.0

-40.0

-20.0

0.0

20.0

January February March April May June July August September October November December

DeHart Reservoir Water Level Trends2018

2017 AVG Ten Year AVG 2018 AVG

2018-11-00 WSC Monthly Report Exhibit D Water Level At The DeHart Reservoir

Page 21: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

EXHIBIT E

Daily Conservation Release - 2018

051015202530354045505560

1 7 13 19 25 31 37 43 49 55 61 67 73 79 85 91 97 103

109

115

121

127

133

139

145

151

157

163

169

175

181

187

193

199

205

211

217

223

229

235

241

247

253

259

265

271

277

283

289

295

301

307

313

319

325

331

337

343

349

355

361

Flow

Pas

t Wei

r (M

GD

)

Time (months)

Flow Past WeirDaily Trend Summary - 2001

Carsonville Weir Flow

Target

Target conservation release is 6.5 million gallons per day ; this corresponds to 6.8 MGD indicated reading at the weir.

051015202530354045505560

01/0

…01

/0…

01/1

…01

/1…

01/2

…01

/3…

02/0

…02

/1…

02/1

…02

/2…

03/0

…03

/0…

03/1

…03

/1…

03/2

…03

/3…

04/0

…04

/1…

04/1

…04

/2…

04/3

…05

/0…

05/1

…05

/1…

05/2

…05

/3…

06/0

…06

/1…

06/1

…06

/2…

06/2

…07

/0…

07/1

…07

/1…

07/2

…07

/2…

08/0

…08

/1…

08/1

…08

/2…

08/2

…09

/0…

09/0

…09

/1…

09/2

…09

/2…

10/0

…10

/0…

10/1

…10

/2…

10/2

…11

/0…

11/0

…11

/1…

11/2

…11

/2…

12/0

…12

/0…

12/1

…12

/2…

12/2

Flow

Pas

t Wei

r (M

GD

)

Time (months)

Flow Past WeirDaily Trend Summary - 2001

Series1

Series2

Target conservation release is 6.5 million gallons per day ; this corresponds to 6.8 MGD indicated reading at the weir.

051015202530354045505560

1 7 13 19 25 31 37 43 49 55 61 67 73 79 85 91 97 103

109

115

121

127

133

139

145

151

157

163

169

175

181

187

193

199

205

211

217

223

229

235

241

247

253

259

265

271

277

283

289

295

301

307

313

319

325

331

337

343

349

355

361Flow

Pas

t Wei

r (M

GD

)

Time (months)

Flow Past WeirDaily Trend Summary - 2001

Carsonville Weir Flow

Target

Target conservation release is 6.5 million gallons per day ; this corresponds to 6.8 MGD indicated reading at the weir.

Target conservation release is 6.5 million gallons per day ; this corresponds to 6.8 MGD indicated reading at the weir.

0.00

50.00

100.00

150.00

January February March April May June July August September October November December

Flow

Pas

t W

eir

(MG

D)

Clark Creek Weir FlowDaily Summary

2018

Conservation Release Target

2018-11-00 WSC Monthly Report Exhibit E Maintenance of Minimum Daily Conservation Release

Page 22: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

EXHIBIT F

Utility Usage - 2018

Location / Utility January February March April May June July August September October November December Average Total

Water Services Center Electric Total, kwH 210,600 151,200 167,400 151,200 118,000 115,000 127,500 158,400 162,000 175,000 154,800 153,736 1,691,100.00 Average, kwH/Day 6,794 5,400 5,400 5,040 3,806 3,710 4,113 5,110 5,226 5,645 5,160 5,037 55,403.23 Cost, Dollars $12,644.81 $6,177.00 $7,904.52 $6,100.00 $6,252.35 $6,214.36 $6,324.45 $2,452.41 $4,350.00 $5,745.21 $8,259.23 $6,584 $72,424.34 Natural Gas Total, Cu Ft 1,053,300 960,000 800,450 569,000 275,000 250,000 225,300 67,800 147,300 175,000 515 411,242 4,523,665.00 Average, Cu Ft/Day 33,977 34,286 28,588 18,967 8,871 8,333 7,268 2,187 4,752 5,645 17 13,899 152,890.38 Cost, Dollars $3,832.04 $3,682.00 $3,256.00 $2,819.96 $1,325.98 $1,200.25 $1,115.53 $678.95 $1,135.25 $1,289.14 $509.49 $1,895 $20,844.59 Potable Water Total, Gal 8,700 7,200 8,700 10,300 86,000 354,000 540,800 653,700 266,700 70,200 7,700 183,091 2,014,000 Average, Gal/Day 281 232 281 332 2,774 11,419 17,445 21,087 8,603 2,265 257 5,907 64,976.02 Cost, Dollars $82.30 $68.11 $82.30 $97.44 $813.56 $3,348.84 $5,115.97 $6,184.00 $2,522.98 $664.09 $72.84 $1,732.04 $19,052.44

Reservoir Park Pump Station Electric Total, kwH 84,000 93,200 81,600 81,600 82,400 85,600 82,800 83,600 86,800 82,500 78,400 83,864 922,500 Average, kwH/Day 2,710 3,329 2,632 2,720 2,658 2,853 2,671 2,697 2,800 2,661 2,613 2,759 30,344 Cost, Dollars $2,367.76 $3,329.22 $2,961.52 $2,194.59 $3,037.26 $1,091.71 $3,055.23 $990.61 $966.61 $955.45 $2,987.85 $2,176 $23,937.81 Natural Gas Total, Cu Ft 21,500 51,500 48,000 46,300 23,000 10,000 7,516 2,759 2,500 15,269 * 22,834 228,343 Average, Cu Ft/Day 694 1,839 1,548 1,494 742 323 242 89 81 493 754 7,544 Cost, Dollars $107.15 $717.09 $962.35 $365.27 $162.48 $87.25 $13.16 $15.22 $225.36 $98.36 $275.37 $2,753.69 Potable Water 0.00 Total, Gal 10,000 0 0 0 140,000 10,000 0 10,000 70,000 0 10,000 22,727 250,000 Average, Gal/Day 323 0 0 0 4,516 323 0 323 2,258 0 333 734 8,075.27 Cost, Dollars $8.51 $4.73 $90.82 $1.89 $27.43 $0.95 $7.57 $177.85 $643.28 $297.71 $87.51 $122.57 $1,348.24

Susquehanna River Pump Station Electric Total, kwH 1,800 600 1,200 600 1,200 600 891 1,200 1,200 43,500 40,200 8,454 92,991 Average, kwH/Day 58 21 39 20 39 20 29 39 39 1,403 1,340 277 3,046 Cost, Dollars $142.85 $32.43 $54.43 $77.97 $55.76 $74.41 $37.35 $100.41 $81.90 $569.58 $1,153.64 $216.43 $2,380.73 Natural Gas Total, Cu Ft 24,750 76,000 64,000 61,400 33,100 5,000 4,500 0 12,500 17,825 * 29,908 299,075 Average, Cu Ft/Day 798 2,714 2,065 1,981 1,068 161 145 0 403 575 991 9,910 Cost, Dollars $137.00 $961.07 $347.97 $490.45 $869.69 $200.00 $198.25 $40.48 $428.14 $527.94 $420.10 $4,200.99 Potable Water Total, Gal 900 500 9,600 200 2,900 100 800 18,800 68,000 31,470 9,250 12,956 142,520 Average, Gal/Day 29 16 310 6 94 3 26 606 2,194 1,015 308 419 4,607 Cost, Dollars $8.51 $4.73 $90.82 $1.89 $27.43 $0.95 $7.57 $177.85 $643.28 $297.71 $87.51 $122.57 $1,348.24

Union Square Booster Station Electric Total, kwH 3,988 3,435 3,582 3,173 750 651 650 269 320 350 1,327 1,681 18,495 Average, kwH/Day 129 123 116 106 25 22 21 9 10 11 44 56 615 Cost,Dollars $213.63 $229.92 $146.80 $98.84 $90.25 $86.27 $90.00 $66.53 $77.67 $81.45 $155.05 $121.49 $1,336.41

DeHart Facilities Electric Total, kwH 3,404 913 6,000 5,046 4,000 4,385 4,992 4,859 4715 5,000 6,011 4,484 49,325 Average, kwH/Day 110 33 194 168 129 146 166 157 152 161 200 147 1,616 Cost, Dollars $139.57 $71.58 $220.02 $220.45 $200.56 $84.85 $253.87 $147.70 $148.02 $165.36 $272.07 $174.91 $1,924.05 Fuel Oil Total, Gals. 750 800 650 250 25 25 15 15 15 250 1000 345 3,795 Average, Gals/Day 24 29 21 8 1 1 1 1 1 8 33 12 127 Cost, Dollars $2,565.00 $2,736.00 $2,223.00 $855.00 $85.50 $85.50 $42.75 $42.75 $42.75 $115.57 $2,170.00 $996.71 $10,963.82

City Island Heat Trace Electric Total, kwH 765 1,801 2,258 557 557 321 300 303 338 350 311 715 7,861 Average, kwH/Day 25 64 81 19 18 10 10 10 11 11 10 24 269 Cost, Dollars $171.28 $124.98 $127.39 $101.43 $22.17 $66.44 $60.45 $62.84 $62.86 $71.46 $96.40 $87.97 $967.70

Expenditures YTD $22,420.42 $18,138.86 $18,467.93 $13,425.18 $12,970.43 $12,541.77 $16,322.14 $11,137.60 $11,328.10 $10,879.02 $15,851.59 $0.00 $13,623.59 $163,483.06

* No Data at Time of ReportTotal Electric $102,971.04

Total Gas $27,799.27Total Water $21,748.93Total Fuel Oil $10,963.82Total Utilities $163,483.06

2018-11-00 WSC Monthly Report EXHIBIT F Utility Usage

Page 23: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Month Kilowatt-hour (KWH) Anticipated Savings *January 71,454 $3,930

February 38,755 $2,132

March 16,349 $899

April 60,706 $3,339

May 57,688 $3,173

June 58,794 $3,234

July 60,507 $3,328

August 76,815 $4,225

September 39,312 $2,162

October 24,259 $1,334

November 4,497 $247December

Average 46,285 $2,546Year to Date 509,136 $28,002

P

Exhibit G

Hydro-Turbine Generator Performance 2018

* Anticipated savings based on electrical rate of $0.055 per KWH

$0

$2,000

$4,000

$6,000

$8,000

$10,000

$12,000

$14,000

$16,000

$18,000

0

20,000

40,000

60,000

80,000

100,000

120,000

140,000

160,000

KWH

Savings

2018-11-00 WSC Monthly Report Exhibit G Hydro-Turbine Generator Performance

Page 24: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Chemical January February March April May June July August September October November December Average Total

Chlorine Total Chlorine, Lbs. 5,929 4,839 5,003 4,381 5,316 5,480 5,926 7,054 7,437 7,606 7,021 5,999 65,992 Average, Chlorine Lbs./Day 191 173 161 146 171 183 191 228 248 245 234 197.4

Average, Chlorine Dose, mg/L 2.8 2.7 2.7 2.5 2.9 3.0 3.0 3.7 4.1 4.5 4.3 3.2

Chlorine, Cost, $/Lbs. $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30

Chlorine Total Cost, Dollars $1,778.72 $1,451.74 $1,501.05 $1,314.16 $1,594.80 $1,644.00 $1,777.80 $2,116.20 $2,231.10 $2,281.80 $2,106.30 $1,799.79 $19,797.67

Alum 48.5% Total Lbs. 25,410 21,507 22,238 20,150 19,443 18,063 18,621 22,359 22,814 34,168 25,124 22,718 249,898 Average, Alum, Lbs./Day 820 768 717 672 627 602 601 721 760 1,102 837 748.0

Average, Alum, mg/L 12.0 12.0 12.0 11.5 10.6 10.0 9.4 11.6 12.6 20.0 15.5 12.5

Alum Cost, $/Lbs. $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14

Alum Total Cost, Dollars $3,557.44 $3,011.01 $3,113.29 $2,821.07 $2,722.02 $2,528.82 $2,606.94 $3,130.26 $3,193.96 $4,783.52 $3,517.36 $3,180.52 $34,985.69

Lime Total Ca(OH)2, Lbs. 12,705 10,754 11,119 10,513 10,989 10,886 0 0 0 0 0 6,088 66,966 Average Lime, Lbs./Day 410 384 359 350 354 363 0 0 0 0 0 201.9

Average, Lime Dose, mg/L 6.0 6.0 6.0 6.0 6.0 6.0 0.0 0.0 0.0 0.0 0.0 3.3

Lime Cost, $/Lbs. $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10 $0.10

Lime Total Cost, Dollars $1,270.52 $1,075.36 $1,111.89 $1,051.33 $1,098.95 $1,088.59 $0.00 $0.00 $0.00 $0.00 $0.00 $608.78 $6,696.63

Soda Ash Total Na2CO3, Lbs. 3,176 3,047 12,045 10,513 10,074 10,299 11,747 11,174 11,405 10,772 12,734 9,726 106,987 Average Soda Ash, Lbs./Day 102 109 389 350 325 343 379 360 380 347 424 319.1

Average, Soda Ash Dose, mg/L 1.5 1.7 6.5 6.0 5.5 5.7 5.9 5.8 6.3 6.3 7.9 5.4

Soda Ash Cost, $/Lbs. $0.28 $0.28 $0.28 $0.28 $0.28 $0.28 $0.28 $0.28 $0.28 $0.28 $0.28 $0.28 $0.28

Soda Ash Total Cost, Dollars $889.36 $853.12 $3,372.73 $2,943.73 $2,820.72 $2,883.72 $3,289.16 $3,128.72 $3,193.40 $3,016.16 $3,565.52 $2,723.30 $29,956.33

Fluoride Total 59.8 wt. % Na2SiF6 Lbs 1,600 1,400 1,600 1,550 1,600 1,550 1,700 1,700 1,650 1,700 1,650 1,609 17,700 Average, Fluoride Lbs./Day 52 50 52 52 52 52 55 55 55 55 55 53.0

Average, Fluoride (F-) Dose, mg/L 0.8 0.8 0.9 0.9 0.9 0.9 0.9 0.9 0.9 1.0 1.0 0.9

Fluoride Cost, $/Lbs. $0.48 $0.48 $0.48 $0.48 $0.48 $0.48 $0.48 $0.48 $0.48 $0.48 $0.48 $0.48 $0.48

Fluoride Total Cost, Dollars $768.00 $672.00 $768.00 $744.00 $768.00 $744.00 $816.00 $816.00 $792.00 $816.00 $792.00 $772.36 $8,496.00

Sodium Hydroxide 50% Total NaOH 50% wet Lbs. 16,631 11,517 9,703 8,341 10,148 16,154 37,414 54,762 65,010 52,385 29,920 28,362 311,984 Average NaOH 50%, wet Lbs./Day 536 411 313 278 327 538 1,207 1,767 2,167 1,690 997 930

Average, NaOH 50%, mg/L 7.9 6.4 5.2 4.8 5.5 8.9 18.9 28.4 36.0 30.7 18.5 15.6

NaOH 50% Cost, wet $/Lbs $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14

NaOH 50% Total Cost, Dollars $2,328.34 $1,612.39 $1,358.43 $1,167.68 $1,420.72 $2,261.56 $5,237.95 $7,666.66 $9,101.38 $7,333.90 $4,188.80 $3,970.71 $43,677.80

Zinc Orthophosphate Total Zn3(PO4)2, wet Lbs. 5,189 4,367 4,525 4,246 4,125 4,063 4,646 4,851 5,334 6,306 4,827 4,771 52,480 Average Zn3(PO4)2, wet Lbs./Day 167 156 146 142 133 135 150 156 178 203 161 157.1

Average, Zn3(PO4)2 Dose, mg/L 2.6 2.6 2.6 2.6 2.4 2.4 2.5 2.7 3.2 4.0 3.2 2.8

Zn3(PO4)2 Cost, wet $/Lbs. $0.35 $0.35 $0.35 $0.35 $0.35 $0.35 $0.35 $0.35 $0.35 $0.35 $0.35 $0.35 $0.35

Zn3(PO4)2 Total Cost, Dollars $1,816.14 $1,528.51 $1,583.91 $1,486.18 $1,443.75 $1,422.05 $1,626.10 $1,697.85 $1,866.90 $2,207.10 $1,689.45 $1,669.81 $18,367.94

Potassium Permanganate Total KMnO4, Lbs. 0 0 0 0 0 0 0 0 0 646 0 59 646 Average KMnO4, Lbs./Day 0 0 0 0 0 0 0 0 0 50 0 4.5

Average, KMnO4 Dose, mg/L 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 0.2

KMnO4 Cost, $/Lbs. $2.02 $2.02 $2.02 $2.02 $2.02 $2.02 $2.02 $2.02 $2.02 $2.02 $2.02 $2.02 $2.02

KMnO4 Total Cost, Dollars $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,304.92 $0.00 $118.63 $1,304.92

Expenditure $12,408.53 $10,204.12 $12,809.29 $11,528.14 $11,868.96 $12,572.74 $15,353.95 $18,555.69 $20,378.74 $21,743.40 $15,859.43 $0.00 $14,843.91 $163,282.98Average Treated Cost per (MG) $48.88 $47.48 $57.66 $54.87 $54.04 $57.79 $64.57 $80.22 $94.22 $106.39 $81.63 #DIV/0! $1,996.63 $67.41Total Treated Flow (MGD) 253.855 214.933 222.161 210.100 219.614 217.544 237.795 231.308 216.296 204.375 194.282 0.000 225.143 2,422.263Average Treated Flow (MGD) 8.189 7.676 7.166 7.003 7.084 7.251 7.671 7.462 7.210 6.593 6.476 0.000 7.434 220.206

EXHIBIT H

Treatment Chemical Usage - 2018

2018-11-00 WSC Monthly Report Exhibit H Treatment Chemical Usage

Page 25: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Activity Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Total Average

PA One Call Locates 332 319 280 424 411 446 460 357 442 648 345 0 4464 372

Street Restorations 0 0 0 0 0 0 15 16 14 12 18 0 75 6

Leak Detection AssessmentPercent of Distribution System

8 8 8 8 8 8 8 8 8 8 0 0 80 7

Main Break Repair - Detected Non-Surfacing 0 1 1 1 1 0 0 0 0 0 0 0 4 0

Main Breaks Repaired - Emergency 7 2 0 1 2 0 0 0 0 0 1 0 13 1

Service Line Leaks Detected 8 5 5 2 11 6 5 7 4 4 3 0 60 5

Service Line Leaks Repaired 4 4 7 3 6 2 1 3 6 1 2 0 39 3

Valves - Exercised 0 110 15 10 10 41 30 69 92 12 10 0 399 33

Valves - Replaced 0 0 0 0 1 1 0 2 0 0 0 0 4 0

Hydrant Flow Tests 0 0 2 1 1 4 0 2 3 41 0 0 54 5

Hydrants Returned to Service 4 8 5 6 5 19 4 7 2 1 6 0 67 6

Water Tap - Disconnected 1 8 2 1 1 4 1 4 4 10 0 0 36 3

Water Tap - New Connection 1 1 1 0 1 1 0 2 1 0 0 0 8 1

Water Shutoffs - Delinquent Accounts 43 19 37 72 29 58 23 32 120 102 74 0 609 51

Water Shutoffs - Other 44 46 18 8 4 4 2 0 0 0 0 0 126 11

Water Restorations 42 24 28 64 41 116 30 16 43 46 44 0 494 41

EXHIBIT I

DISTRIBUTION DIVISION ACTIVITIES 2018

Goal

100 Percent Received

< 10 over 180 days> 180 days;0

100 Percent Annually

NA

NA

NA

NA

100 Monthly

NA

NA

NA

< 5 Out of ServiceOut of Service; 1

NA

NA

NA

NA

2018-11-00 WSC Monthly Report Exhibit I Distribution Division Activities

Page 26: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Board Monthly Report Distribution Monthly Report

Activity Activity Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Total Average Goals

Meter Installations

Missing 9 5 8 9 5 4 5 3 7 6 11 72 7 NA

Leaking 0 0 5 7 3 5 5 6 5 9 3 48 4 NA

Frozen 84 11 14 7 9 5 3 1 3 3 5 145 13 NA

Non-registering 2 1 5 8 8 2 4 7 2 3 4 46 4 NA

Incompatible 0 3 1 1 1 5 1 0 4 2 2 20 2 NA

New Service New Installation 0 1 1 0 1 1 0 2 0 0 0 6 1 NA

Meter Service NA

MXU's Replaced MXU's Replaced 7 9 4 10 13 5 10 19 9 16 16 118 11 NA

Batteries Replaced Batteries Replaced 29 146 67 55 15 33 20 19 35 8 118 545 50 NA

Meter Pits Serviced Meter Pits Serviced 0 0 0 0 0 0 0 0 0 0 0 0 0 NA

Meter Calibrations NA

Large Meters1 Calibrated meters (Large) 0 0 0 9 6 0 0 0 0 0 0 15 1 15 per year

Small Meters2 Calibrated meters (Small) 0 0 10 7 8 0 0 0 0 0 0 25 2 20 per year

1 Large Meters are Meters 3" or greater that are calibrated at the customer's location by a contracted calibration service, assisted and witnessed by CRW staff

2 Small Meters are Meters 2" or less that are calibrated at the Water Services Center by CRW staff on a certified calibration stand

EXHIBIT J

Metering Activities 2018

Replacement

2018-11-00 WSC Monthly Report Exhibit J Distribution Division Activities

Page 27: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Category of Water Use Description Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Total Average

Process Water Process Water 724,897 748,098 720,721 567,751 788,736 773,939 549,977 954,715 762,064 561,146 621,425 0 7,773,469 647,789

Billed Metered Exported Bulk Water Hauling 53,200 69,900 201,100 465,900 882,800 997,100 555,400 327,800 62,000 0 0 0 3,615,200 301,267

Billed Metered Hydrant Connections 0 17,700 33 29,478 4,737 371 150,339 6,074 124,133 249,972 273,242 0 856,079 71,340

Billed Unmetered Hydrant Flow Tests 0 0 3,800 2,380 2,000 2,740 0 7,528 2,320 55,975 0 0 76,743 6,395

Unbilled UnmeteredHydrant Flushing

(and Unbilled Authorized)24,890 15,175 52,510 46,668 26,007 36,573 38,545 62,415 21,140 41,215 55,260 0 420,398 35,033

Unauthorized Water Theft TBD TBD TBD TBD 302,000 TBD TBD TBD TBD TBD TBD 0 302,000 151,000

Leakage on Distribution Mains

Main Leaks 8,316,947 4,118,299 444,427 4,134,902 2,308,165 0 0 0 0 0 77,095 0 19,399,835 1,616,653

Leakage on Service Lines Service Leaks 976,743 175,680 1,130,710 890,698 5,517,216 135,360 2,213,707 142,618 922,039 2,070,720 30,614 0 14,206,105 1,183,842

Leakage on Storage Tanks High Reservoir Leakage 121,614 139,193 204,528 121,613 75,819 103,575 91,945 223,640 0 0 0 0 1,081,927 90,161

Total 10,218,291 5,284,045 2,757,829 6,259,390 9,907,480 2,049,658 2,305,652 366,258 922,039 2,070,720 107,709 0 42,249,071 3,520,756

EXHIBIT K

Miscellaneous Water Usage (gals) 2018

2018-11-00 WSC Monthly Report Exhibit K Distribution Division Activities

Page 28: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

WASTEWATER DIVISION MONTHLY REPORT

With Roof Removed, Contractor Prepares for Demolition of Draft Tubes for Primary Digester #2

November 2018

1662 S. Cameron Street, Harrisburg, PA 17104 | 888-510-0606 capitalregionwater.com

Page 29: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

N:\CRW\Monthly Reports\Operations\Wastewater\Final Drafts\2018-11-00 AWTF Monthly Report.docx

AWTF Monthly Report November 2018

Page 1 of 3

Operations During the month of November, the AWTF met all monthly average NPDES permit requirements. Three Dry Weather Overflows (DWOs) were reported. Details are contained in the Field Operations section below. Hydraulic loading to the AWTF averaged 39.8 million gallons per day (MGD), the highest monthly average of 2018. The treatment process achieved removal reductions of 93.9 percent CBOD, 93.0 percent Suspended Solids, 64.1 percent Phosphorus, 92.3 percent Ammonia. Data for Nitrogen was not available at the time of this Report. (Exhibit A). Revenue of the Contract Waste Hauling Program collected $67,189.34 in revenue from 2,311,027 gallons discharged (Exhibit G). Revenue from this Program has totaled $683,604.16 through November. The Cogeneration Facility had minimal runtime in November due to repeated mechanical failures of the methane gas compression system. Revenue is estimated at $2,757.74 on 39,600 kilowatt-hours produced.

Laboratory • Completed second series of industrial user compliance sampling at The Ames Companies, Inc.,

Harrisburg Dairies, Inc. and the Hershey Creamery Company. • Submitted data request information to PADEP Bureau of Laboratories for the upcoming

laboratory inspection.

Pretreatment • Received self monitoring reports submitted for October 2018. • Completed the third quarter 2018 significant noncompliance evaluation of permitted industrial

users. • Investigated seven street sweeping complaints and entered findings into Cityworks.

Plant Maintenance Facility Maintenance staff spent considerable time making major renovations to the AWTF’s Conference and Lunch Rooms. As the number of Wastewater employees has gradually increased since taking ownership of Harrisburg’s collection system, many of the AWTF’s employee facilities have been overcrowded. This project combines the old lunch and conference rooms to create one

Page 30: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

N:\CRW\Monthly Reports\Operations\Wastewater\Final Drafts\2018-11-00 AWTF Monthly Report.docx

AWTF Monthly Report November 2018

Page 2 of 3

large multipurpose room which can be utilized for meetings and training sessions for the entire staff to attend. Most structural and cosmetic work has been completed at the time of reporting. The following are additional projects undertaken by the Maintenance Staff during the month of November:

• Replaced Teflon grids on the Belt Filter Press. • Installed a natural gas heater in the Chlorine Building as a temporary measure until a major

HVAC replacement can take place. • Repaired a broken bar screen chain at the Front Street Pump Station. • Repaired corner sweep spring assembly at the Final Clarifiers. • Removed and replaced the peristaltic hose for Pump Number 2 in the Main Building Basement. • Replaced curb stop on the watermain to the Main Building. • installed new drinking fountain/bottle filling station in the Maintenance Building. • Removed and replaced drive belts for Grit Removal Unit Number 2. • Continued annual oil changes and lubrication throughout the plant. • Repaired air release valves for Pump Number 3 at the Spring Creek Pump Station. • Performed seven vehicular related repairs.

Field Maintenance • Milled and recessed six steel street plates throughout the City to ensure safe snow plowing

during the winter season. • Removed five street plates and performed street restoration using number 3 stone and cold

patch. • Replaced a flood chamber frame and grating to accommodate a standard style frame and grate. • Repaired 18 storm inlets at various locations throughout the City. • Repaired the steps for CSO chamber at Front and Market Streets. • Made repairs to three manholes at various locations. • Assisted plant staff with several projects at the AWTF.

Field Operations • On Monday, November 12th, CRW Field Operations Division was notified of a Sanitary Sewer

Overflow (SSO) in Penbrook between Wilson Taylor Park and the Capital Area Greenbelt along a sewer main previously unrecorded in CRW’s GIS database. A large accumulation of grease and tree roots had formed a restriction large enough to cause a manhole to surcharge wastewater onto the surrounding area. Field crews immediately took measures to relieve the blockage, then spent the next several days cleaning several hundred feet of the newly discovered pipe. A full report was submitted to PADEP.

Page 31: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

N:\CRW\Monthly Reports\Operations\Wastewater\Final Drafts\2018-11-00 AWTF Monthly Report.docx

AWTF Monthly Report November 2018

Page 3 of 3

• On November 19th and 20th, Capital Region Water observed five overflows at various sites along the Front Street and Paxton Creeks interceptors. These overflows were of a hydraulic nature and resulted from rapid snow melt from an 8-inch snowstorm on November 15th. However, being that the overflows occurred more than 48-hours after the precipitation event, PADEP classified these events as Dry Weather Overflows. CRW submitted a required notification letter to document these events but contested their classification. A follow up letter was also issued requesting clarification to the definition of a “Dry Weather Overflow” and citation of the 48-hour benchmark. CRW is awaiting a response at the time of reporting.

• Responded to and investigated four sinkhole calls. • Investigated 12 complaints of basement backups. CRW was responsible for two with one

resulting in a Sanitary Sewer Overflow (SSO). • Cleaned 6,192 feet of sewer pipe. • Performed CCTV assessment of over 2.2 miles of pipe. • Cleaned 109 stormwater inlets. • Assisted plant staff with several projects at the AWTF.

Page 32: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Wastewater Exhibits

Page 33: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

EXHIBIT A

CAPITAL REGION WATERADVANCED WASTEWATER TREATMENT FACILITY

Process Control - 2018

NPDESParameters January February March April May June July August September October November December Average Limits

Volume, MGD 21.3 33.8 26.5 26.3 27.6 20.5 31.9 29.3 34.0 21.8 39.8 28.4 37.7

Carbonaceous Biochemical Oxygen Demand Influent, mg/L 164 101 136 141 147 172 109 91 83 120 73 122 ----- Effluent, mg/L 2 3 3 3 3 2 4 3 4 2 4 3 25 Percent Removal, % 98.0 96.0 97.1 97.5 96.9 98.5 94.7 96.2 94.0 97.8 93.9 96.4 ----- Effluent Loading, lb/d 507 989 763 753 828 441 1,283 790 1,175 447 1,244 838 7,860

Suspended Solids: Influent, mg/L 175 160 250 241 214 278 175 158 133 179 105 188 ----- Effluent, mg/L 5 5 5 5 5 4 8 5 10 4 7 6 30 Percent Removal, % 96.7 96.1 96.7 97.6 96.9 98.5 93.4 96.3 91.1 97.6 93.0 95.8 ----- Effluent Loading, lb/d 994 1,624 1,354 1,236 1,201 684 2,588 1,351 3,050 730 2,401 1,565 9,433

Nitrogen Total-N Influent, mg/L 26 16 26 21 21 25 17 23 17 21 21 ----- Effluent, mg/L 6.9 6.6 7.8 7.7 8.9 8.9 6.8 7.9 5.4 7.3 7 Monitor Percent Removal, % 73.6 59.5 70.1 63.8 57.6 64.0 59.8 65.0 67.5 65.6 64.6 ----- Effluent Loading, lb/d 1,299 1,778 1,510 1,817 1,879 1,511 1,623 1,825 1,593 1,300 1,614 ----- NH3-N Influent mg/L 15 10 12 12 10 13 9 9 8 12 7 10 ----- Effluent, mg/L 2.7 1.9 2.2 1.5 0.3 0.6 0.6 0.8 0.7 1.5 0.5 1 11 (2) Percent Removal, % 82.2 80.4 81.2 87.4 96.9 95.3 93.3 91.3 91.0 87.6 92.3 89.0 ----- Effluent Loading, lb/d 467 527 454 331 73 107 164 182 171 257 161 263 4,716

Phosphorus: Influent, mg/L 3.7 2.3 2.8 3.4 3.2 4.3 2.7 2.6 2.3 3.4 1.7 2.9 ----- Effluent, mg/L 0.8 0.7 1.0 0.8 0.9 1.2 1.0 0.9 0.9 1.0 0.6 0.9 2.0 Percent Removal, % 76.8 67.4 64.7 72.4 68.4 67.0 58.8 65.1 59.7 68.7 64.1 66.6 ----- Effluent Loading, lb/d 133 184 199 171 199 208 223 204 227 183 184 192 629

pH: Influent, Std. Units 7.2 7.2 7.1 7.2 7.2 7.1 7.1 7.2 7.1 7.3 7.2 7.2 ----- Effluent, Std. Units 6.7 6.6 6.7 6.6 6.6 6.6 6.8 7.0 7.0 7.1 7.0 6.8 6.0 - 9.0

Dissolved Oxygen: Effluent Minimum, mg/L 7.7 7.7 7.9 7.7 7.3 7.8 6.1 6.7 5.4 7.3 6.7 7.1 5.0 Min.

Fecal Coliform: Effluent, No./100 ml 2 13 5 3 2 3 4 5 11 15 11 7 200/100 ml (1)

Chlorine Residual: Effluent, mg/L 0.45 0.45 0.23 0.24 0.38 0.42 0.41 0.41 0.42 0.18 0.25 0.35 0.50

(1) Seasonal limit 2,000/100 ml Oct. 1 to Apr. 30 and 200/100 ml May 1 to Sept. 30.(2) Seasonal Limit May 1 to Nov.1.

PROCESS2018-A.xls 7

Page 34: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

EXHIBIT B

CAPITAL REGION WATERADVANCED WASTEWATER TREATMENT FACILITY

Flow Monitoring Information, MGD - 2018

TotalTotal Precip

Month Flow City Suburbs 1 2 3 4 5 6 7 8 9 10 inches

January 21.300 9.110 12.190 7.491 0.185 0.238 1.030 0.166 1.400 4.266 2.129 4.077 0.318 2.910February 34.000 15.979 18.021 13.788 0.258 0.353 1.085 0.495 1.500 6.467 2.964 6.440 0.650 5.100March 26.500 12.120 14.380 9.995 0.211 0.351 1.311 0.252 1.600 4.986 2.429 4.692 0.673 2.490April 26.300 11.634 14.666 9.753 0.230 0.372 1.094 0.185 1.600 4.949 2.649 4.874 0.594 4.370May 27.600 12.636 14.964 10.460 0.225 0.403 1.333 0.215 1.800 4.949 2.583 5.038 0.594 5.650June 20.500 9.245 11.255 7.578 0.132 0.331 1.057 0.147 1.600 3.865 1.517 3.920 0.353 3.850July 31.900 13.474 18.426 10.960 0.258 0.407 1.377 0.472 2.100 6.444 2.964 6.362 0.556 13.420August 29.300 13.084 16.216 10.585 0.241 0.349 1.541 0.368 2.100 5.542 2.774 5.340 0.460 5.970September 34.000 14.473 19.527 11.579 0.258 0.375 1.560 0.701 2.300 6.264 2.964 6.080 1.919 8.250October 21.800 9.180 12.620 7.353 0.185 0.252 1.208 0.182 1.700 4.258 2.129 4.169 0.364 2.360November 39.800 16.923 22.877 14.389 0.312 0.439 1.106 0.677 2.400 8.778 3.587 7.559 0.553 8.310December 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Average 28.45 12.53 15.92 5.70Percent 100.00 44.04 55.96 62.68

City

City Regions Suburb Regions

0

5

10

15

20

25

30

35

40

45

1 2 3 4 5 6 7 8 9 10 11 12

Flow

, MG

D

Time, months

Flow Data2018

Total

City

Suburbs

44%

56%

Twelve Month ConsecutiveDec. 2017 THRU Nov...2018

City

Suburbs

FLOW2018-B.xls 8

Page 35: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

EXHIBIT C

CAPITAL REGION WATERADVANCED WASTEWATER TREATMENT FACILITY

Treatment Utility and Chemical Usage - 2018

Utility / Chemical January February March April May June July August September October November December Average Total

Electric Total, kwH 1,145,400 1,118,700 1,217,400 1,176,600 1,057,500 1,135,800 1,120,500 1,023,000 1,125,600 1,039,200 1,031,400 1,108,282 12,191,100 Average, kwH/Day 36,948 39,954 39,271 39,220 34,113 37,860 36,145 33,000 37,520 33,523 34,380 36,539 ------- Cost, Dollars $69,480.98 $65,741.12 $62,180.08 $63,433.10 $58,123.21 $60,914.71 $62,716.32 $57,672.78 $61,506.93 $56,397.14 $55,469.27 $61,239.60 $673,635.64

Natural Gas

Total, Cu Ft 436.7 522.9 370.7 63.6 0.5 1.5 0.3 32.7 57.0 * * 135 1,486 Average, Cu Ft/Day 14 19 12 2 0 0 0 1 2 * * 6 ------- Cost, Dollars $3,995.68 $4,926.32 $3,564.95 $663.72 $93.13 $89.88 $80.62 $365.43 $1,663.50 * * $1,403.93 $15,443.23

Water

Total, Gal. 1,320,000 1,093,000 1,189,000 1,070,166 1,081,347 1,106,376 1,119,157 1,116,337 1,683,926 1,395,000 * 1,217,431 12,174,309 Average, Gal./Day 42,581 39,036 38,355 35,672 34,882 36,879 36,102 36,011 56,131 45,000 * 40,065 ------- Cost, Dollars $15,545.20 $14,419.46 $14,305.94 $13,181.77 $13,287.54 $13,524.32 $13,645.22 $13,618.55 $18,987.94 $16,254.70 * $13,342.79 $146,770.64

Methanol Total, Gal. 4,108 1,757 2,553 3,308 3,049 2,957 2,863 2,221 2,055 2,188 1,930 2,635 28,990 Average, Gal./Day 133 63 82 110.3 101.6 98.6 92.4 71.7 68.5 70.6 64.3 87 ------- Cost, Dollars 5,833 2,495 3,626 4,697 4,330 4,199 4,065 3,154 2,918 3,108 2,740 $3,742.32 $41,165.56

Sodium Hydroxide Total, Gal. 0 0 0 0 0 0 0 0 0 0 0 0 0 Average, Gal./Day 0 0 0 0 0 0 0 0 0 0 0 0 ------- Cost, Dollars 0 0 0 0 0 0 0 0 0 0 0 $0.00 $0.00

Chlorine Disinfection Total, Lbs. 9,920 12,385 6,920 6,557 11,395 9,332 11,987 12,050 11,585 5,798 11,413 9,940 109,342 Average, Lbs./Day 320 442 223 218 368 311 387 388 386 187 380 328 ------- Avg Residual, mg/L 0.45 0.45 0.45 0.24 0.38 0.42 0.41 0.41 0.42 0.18 0.25 0.37 ------- Cost, $/Lbs. $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 $0.30 ------- Total Cost, Dollars $2,976.00 $3,715.50 $2,076.00 $1,967.10 $3,418.50 $2,799.60 $3,596.10 $3,615.00 $3,475.50 $1,739.40 $3,423.90 $2,982.05 $32,802.60

Phosphorous Removal Total FeCl3, Gals. 2,331 2,982 3,199 3,148 3,406 3,027 4,730 2,683 3,070 3,345 3,251 3,197 35,172 Avg FeCl3, Gals./Day 75 106 103 105 110 101 153 87 102 108 108 105 ------- FeCl3 Cost, $/Gal. $0.98 $0.98 $0.98 $0.98 $0.98 $0.98 $0.98 $0.98 $0.98 $0.98 $0.98 $0.98 ------- FeCl3 Total Cost, Dollars $2,283.99 $2,922.11 $3,135.22 $3,085.04 $3,337.88 $2,966.46 $4,635.40 $2,629.34 $3,008.60 $3,278.10 $3,185.98 $3,133.46 $34,468.11

* No data at time of report

MAIN PLANT UTILITY & CHEM C-2018.xls 9

Page 36: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

Percent Daily Avg Kilowatt Hours EstimatedPeriod Run Time Kilowatt Produced Revenue

January 2017 27 1,365 42,300 $2,945.77February 2017 64 3,889 108,900 $7,583.80March 2017 77 4,035 125,100 $8,711.96April 2017 77 4,530 135,900 $9,464.08May 2017 43 2,439 75,600 $5,264.78June 2017 57 2,700 81,000 $5,640.84July 2017 53 2,439 75,600 $5,264.78August 2017 47 2,061 63,900 $4,450.00September 2017 58 2,490 74,700 $5,202.11October 2017 74 3,106 96,300 $6,706.33November 2017 64 2,760 82,800 $5,766.19December 2017 75 3,571 110,700 $7,709.15

Total - 2017 1,072,800 $74,709.79 Monthly Average - 2017 60 2,949 89,400 $6,225.82

January 2018 72 3,281 101,700 $7,082.39February 2018 74 3,150 88,200 $6,142.25March 2018 52 2,148 66,600 $4,638.02April 2018 38 1,770 53,100 $3,697.88May 2018 42 1,945 60,300 $4,199.29June 2018 82 2,790 83,700 $5,828.87July 2018 53 1,684 52,200 $3,635.21August 2018 56 1,481 45,900 $3,196.48September 2018 0 0 0 $0.00October 2018 56 2,003 62,100 $4,324.64November 2018 36 1,320 39,600 $2,757.74December 2018 $0.00

Total - 2018 653,400 $45,502.78 Monthly Average - 2018 51 1,961 59,400 $3,791.90

EXHIBIT D

CAPITAL REGION WATERADVANCED WASTEWATER TREATMENT FACILITY

Cogeneration Electrical Production: 2017-2018

010002000300040005000600070008000900010000

J F M A M J J A S O N D J F M A M J J A S O N D

Rev

enue

, Dol

lars

Month2017 2018

COGEN2018-D.xls 10

Page 37: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

EXHIBIT E

CAPITAL REGION WATERADVANCED WASTEWATER TREATMENT FACILITY

Sludge Handling Information - 2018

Process January February March April May June July August September October November December Average Total

Solids Removal

Process, Lbs. 770,466 726,161 826,026 945,159 916,861 812,503 790,880 748,599 675,990 719,902 832,482 796,821 8,765,030 CWH Program, Lbs. 194,900 133,835 278,008 147,484 253,692 257,536 85,712 194,721 134,800 184,054 186,474 1,864,743 Total Solids, Lbs. 965,366 859,997 1,104,034 1,092,643 1,170,552 1,070,039 876,592 943,321 810,790 903,956 832,482 966,343 10,629,772

Sludge Dewatering

Feed Volume, Gals. 3,493,000 3,093,000 3,563,000 4,060,000 3,968,000 4,782,000 4,225,000 4,147,000 3,649,000 4,649,000 3,067,000 3,881,455 42,696,000 Feed Solids, % 2.0 2.0 2.1 2.0 2.1 1.9 1.6 2.1 2.3 1.7 2.3 2.0 - Labor, Hours 529 419 523 577 565 560 575 607 477 493 410 521 5,735 Operations, Hours 723 783 960 1,112 979 1,087 1,001 926 686 922 770 904 9,948 Total Cake, Dry Tons 194 220 240 284 311 355 252 318 239 244 171 257 2,828 Total Cake, Wet Tons 1,070 1,222 1,342 1,567 1,607 1,836 1,332 1,384 1,141 1,205 866 1,325 14,572 Cake TS, % 18.1 18.1 17.9 18.2 19.5 19.3 19.1 22.9 20.9 20.3 19.7 19.5 - Press Rate, Lbs./Hour 2,961 3,120 2,797 2,817 3,284 3,378 2,662 2,990 3,327 2,614 2,250 2,927 32,201 Polymer Dosage, Lbs 2,558 3,166 3,606 4,682 5,355 6,175 3,948 4,496 3,591 4,332 3,153 4,097 45,062 Polymer Dosage, Lbs/Dry Ton 12.9 15.3 16.1 16.6 17.7 18.1 16.1 14.7 15.0 20.4 19.9 16.6 -

Disposal Cost

Labor, Dollars $10,175.07 $8,053.18 $10,052.06 $11,091.86 $10,861.22 $10,768.97 $11,047.66 $11,664.62 $9,162.17 $9,471.62 $7,878.28 $10,020.61 $110,226.70 Electrical,Dollars $318.03 $344.70 $422.18 $489.46 $430.63 $478.32 $440.31 $407.26 $301.80 $405.59 $338.67 $397.90 $4,376.94 Polymer, Dollars $4,911.36 $6,078.72 $6,923.52 $8,989.44 $10,281.60 $11,856.00 $7,580.16 $8,632.32 $6,894.72 $8,317.44 $6,053.76 $7,865.37 $86,519.04 Disposal, Dollars $7,205.23 $34,621.30 $25,947.50 $51,176.10 $68,676.10 $51,826.86 $21,185.16 $30,004.31 $27,753.80 $40,019.50 $16,269.70 $34,062.32 $374,685.55 Total Cost, Dollars $22,609.69 $49,097.90 $43,345.26 $71,746.86 $90,249.55 $74,930.15 $40,253.28 $50,708.51 $44,112.49 $58,214.15 $30,540.41 $52,346.20 $575,808.24 Cost Per Dry Ton, Dollars $116.57 $223.17 $180.61 $252.63 $290.19 $211.07 $159.74 $159.46 $184.57 $238.58 $178.60 $203.61

SLUDGE2018-E.xls 11

Page 38: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

EXHIBIT F

CAPITAL REGION WATERADVANCED WASTEWATER TREATMENT FACILITY

Conveyance Utility Usage - 2018

Location / Utility January February March April May June July August September October November December Average Total

Front Street Pump Station

Electric Total, kwH 114,000 148,800 189,000 138,600 139,800 104,400 103,800 208,800 169,800 160,200 * 147,720 1,477,200 Average, kwH/Day 3,677 5,314 6,097 4,620 4,510 3,480 3,348 6,735 5,660 5,168 * 4,861 ----- Cost, Dollars $7,894.87 $7,558.58 $8,418.07 $8,045.93 $7,446.88 $6,197.93 $6,439.49 $10,076.33 $8,493.67 $7,663.55 * $7,823.53 $78,235.30 Fuel Oil Total, Gals. 0 0 0 0 0 0 0 0 0 0 0 0 0 Average, Gals./Day 0 0 0 0 0 0 0 0 0 0 0 0 ----- Cost, Dollars $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00

Water Total, Gals. 95,000 100,000 155,000 195,000 145,000 75,000 105,000 175,000 215,000 150,000 * 141,000 1,410,000 Average, Gal./Day 3,065 3,571 5,000 6,500 4,677 2,500 3,387 5,645 7,167 4,839 * 4,635 ----- Cost, Dollars $1,535.93 $1,583.23 $2,103.53 $2,481.93 $2,008.93 $1,346.73 $1,630.53 $2,292.73 $2,671.13 $2,056.23 * $1,971.09 $19,710.90

Spring Creek Pump Station

Electric Total, kwH 39,360 40,640 68,480 43,520 40,320 47,680 40,000 79,680 55,040 62,400 60,800 52,538 577,920 Average, kwH/Day 1,270 1,451 2,209 1,451 1,301 1,589 1,290 2,570 1,835 2,013 2,027 1,728 ----- Cost, Dollars $2,929.27 $3,421.95 $3,674.20 $2,717.93 $3,008.11 $3,202.56 $3,396.00 $4,860.88 $3,803.52 $3,745.46 $3,948.94 $3,518.98 $38,708.82 Fuel Oil Total, Gals. 0 0 0 0 0 0 0 0 0 0 0 0 0 Average, Gals./Day 0 0 0 0 0 0 0 0 0 0 0 0 ----- Cost, Dollars $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Water Total, Gals. 1,417 5,583 3,000 1,000 1,000 0 7,000 1,500 19,500 0 * 4,000 40,000 Average, Gal./Day 46 199 97 33 32 0 233 48 650 0 * 134 ----- Cost, Dollars $82.92 $122.34 $97.90 $78.98 $78.98 $69.52 $135.74 $83.71 $253.99 $69.52 * $107.36 $1,073.60

Market Street Pump Station

Electric Total, kwH 10,680 7,800 6,600 5,640 5,040 1,920 1,320 1,200 720 480 480 3,807 41,880 Average, kwH/Day 345 279 213 188 163 64 43 39 24 15 16 126 ----- Cost,Dollars $1,042.95 $659.39 $444.23 $422.33 $329.79 $317.62 $277.84 $267.54 $211.84 $207.18 $203.63 $398.58 $4,384.34 Fuel Oil Total, Gals. 0 0 0 0 0 0 0 0 0 0 0 0 0 Average, Gals./Day 0 0 0 0 0 0 0 0 0 0 0 0 ----- Cost, Dollars $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

City Island Pump Station

Electric Total, kwH 400 320 320 320 200 200 200 120 0 0 * 208 2,080 Average, kwH/Day 13 11 10 11 6 7 6 4 0 0 * 7 ----- Cost, Dollars $107.15 $99.24 $93.88 $94.68 $90.69 $91.06 $86.58 $83.12 $68.72 $18.63 * $83.38 $833.75

* No Data at time of report

PUMP STATIONS UTILITIES F-2018.xls 12

Page 39: CRW Directors and Staff - Capital Region Water · • Aquam Technology: Received draft of Phase 1 final project report on 12/11/2018. Heavy tuberculation in hydrant laterals and mains

EXHIBIT G

CAPITAL REGION WATERADVANCED WASTEWATER TREATMENT FACILITY

Contract Waste Hauling Program 2017 - 2018

TotalMonth Gallons Revenue Gallons Revenue Gallons Revenue

January 464,600 $16,107.30 30,000 $1,080.00 494,600 $17,187.30February 667,500 $23,733.00 10,000 $360.00 677,500 $24,093.00March 498,400 $19,790.10 30,000 $1,080.00 528,400 $20,870.10April 639,140 $26,306.04 72,000 $2,592.00 711,140 $28,898.04May 709,900 $32,263.60 40,000 $1,440.00 749,900 $33,703.60June 462,750 $17,331.90 90,000 $3,240.00 552,750 $20,571.90July 376,590 $14,772.24 70,000 $2,520.00 446,590 $17,292.24August 545,900 $18,807.30 82,000 $2,952.00 627,900 $21,759.30September 316,800 $12,670.60 133,000 $4,788.00 449,800 $17,458.60October 776,112 $32,354.52 113,000 $4,068.00 889,112 $36,422.52November 930,686 $30,903.86 68,000 $2,448.00 998,686 $33,351.86December 1,355,740 $43,658.64 55,000 $1,980.00 1,410,740 $45,638.64

Total - 2017 7,744,118 $288,699.10 793,000 $28,548.00 8,537,118 $317,247.10Monthly Average - 2017 645,343 $24,058.26 66,083 $2,379.00 711,427 $26,437.26

January 1,161,037 $40,430.98 17,000 $612.00 1,178,037 $41,042.98February 834,202 $27,840.84 0 $0.00 834,202 $27,840.84March 2,206,654 $69,370.76 145,750 $5,229.00 2,352,404 $74,599.76April 1,228,041 $39,231.22 183,750 $6,570.00 1,411,791 $45,801.22May 1,359,171 $53,762.34 236,350 $8,236.80 1,595,521 $61,999.14June 1,955,124 $65,780.22 292,050 $9,829.80 2,247,174 $75,610.02July 747,864 $21,569.15 197,450 $6,892.20 945,314 $28,461.35August 3,481,113 $97,107.66 296,200 $10,393.86 3,777,313 $107,500.86September 2,184,195 $62,148.47 175,850 $6,159.60 2,360,045 $68,308.07October 2,385,509 $72,789.18 356,250 $12,461.40 2,741,759 $85,250.58November 2,094,327 $59,575.34 216,700 $7,614.00 2,311,027 $67,189.34December

Total - 2018 19,637,237 $609,606.16 2,117,350 $73,998.66 21,754,587 $683,604.16Monthly Average - 2018 1,785,203 $55,418.74 192,486 $6,727.15 1,977,690 $62,145.83

Process Septic

0

20000

40000

60000

80000

100000

120000

J F M A M J J A S O N D J F M A M J J A S O N D

Rev

enue

, Dol

lars

Month2017 2018

Septic

Process

CWH2018-G.xls 13


Recommended