K.T.Knöpfle MPI Kernphysik, Heidelberg [email protected] GERDA Collaboration Meeting at Cracow 18 - 20 February 2008 Cryogenic Vessel & Infrastructure Status Report for TG04
Transcript
  • K.T.KnöpfleMPI Kernphysik, Heidelberg

    [email protected]

    GERDA Collaboration Meeting at Cracow18 -

    20 February 2008

    Cryogenic Vessel & InfrastructureStatus Report for TG04

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 2

    Outline• cryostat fabrication

    schedule v6installation makrolon

    / superinsulation

    inner/outer vessel integrationtests:

    pressure, He leak, loads, evaporation, Rn

    emanation

    mounting tool for copper shield

    • cyrogenic

    infrastructure

    status of tendering

    • conlusions

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 3

    schedule: rev 6 of Nov 15

    page 1/2

    02/07/07 – 25/10/07* |

    23/07/07 – 23/11/07* |

    * rev 5 of Sep 21 – ‘final’

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 4

    schedule: rev 6 of Nov 15

    page 2/2

    toda

    y

    major milestones

    new item

    * rev 5 of Sep 21 – ‘final’

    31/01/08 – 13/02/08* |

    26/11/07 – 24/01/08* |

    not accepted by MPI – keep !

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 5

    t

    26nov07

    He leak test inner vesselafter pressure test on 12nov

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 6

    t

    26nov07

    skirt

    part of outervessel

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 704dec07

    inst

    alla

    tion

    supe

    rinsu

    latio

    n

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 8

    a few details

    06dec07

    bolt for Makrolon

    fixation

    Teflon spacer

    Makrolon

    installed below SI:9 pcs: 1811x1396x6 mm9 pcs: 2001x1396x6 mm

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 9

    parallel to SI installation

    Rn emanation test-

    more in Hardy’s talk -

    05dec07

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 10

    cryostat integration

    12dec07

    inner / outer vessel i

    ntegration

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 11

    t

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 12

    cryostat integration

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 13

    concrete design of 6dec07

    ceiling

    almost

    too lo

    w

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 14

    t

    verify(a)

    alignment of top and bottom pads

    (b) equal load distribution on all 8 pads

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 15

    t

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 16

    t

    access

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 17

    t

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 18

    centering of pads

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 19

    Bosche

    type KSB 2000 (kg) load cells

    Al plate

    preparations for load test

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 20

    Al plate

    bottom of outer vessel

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 21

    t

    load test in progress

    12dec07

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 22

    load test

    Al plate

    bottom of outer vessel

    stiffness of Belleville springs:59 kN

    / mm each

    results

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 23

    cryostat integration

    13dec07

    neck covered with SI

    ring to generate cylindrical shape

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 24

    end of 2007

    20dec07

    vess

    el h

    eigh

    t 25

    mm

    less

    than

    spe

    cifie

    d

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 25

    2008

    pum

    ping

    for a

    ccep

    tabl

    e is

    olat

    ion

    vacu

    um

    14jan08

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 26

    mounting tool for copper shield

    ‘tripod’

    copper shield segment

    tent

    rotatable arm

    platform 4x4 m2

    internal platform

    internal platform

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 27

    bottom

    14jan08

    view from platform

    tripod

    copper shield segment in frame

    for evap test

    for evap test

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 28

    mounting tool -

    parts

    motor driven

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 29

    t

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 30

    installation thru neck

    installation thru neck

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 31

    t

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 32

    tinstallation test of large segment

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 33

    t

    installation test of large segment

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 34

    t

    installation test of large segment

    one of 20 Al dummies

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 35

    t

    installation test of small segment

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 36

    t

    mounting tool test: (almost) all ok !

    new, other paint

    bolt too thick

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 37

    He leak test –

    isolation vacuumHe leak test of isolation vacuum volume

    small problem fixed with Terostat15jan08

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 38

    setup for evaporation test

    heater

    temp & pressure gauges

    GN2 flow meter (MPI) safety valve

    distribution of thermo couplescontrol of

    cool down (ok)fill level (not ok)

    Mo/Tu cool downTu/We fillingWe/Th settlingFr/Mo measureMo/We drainageTh/Mo warm-up

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 39

    evaporation test

    23jan08

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 40

    evaporation test

    GN2

    flow meter

    heater

    LN225 m3LN2

    23jan08

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 41

    evaporation test

    23jan08

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 42

    evaporation test

    TC feed-thrus

    to pump

    24jan08

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 43

    evaporation test

    pump stand

    W10

    24jan08

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 44

    evaporation test23jan08

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 45

    evaporation test

    600 m3/h ‘ambientair vaporizer’

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 46

    evaporation test

    spec.: ~ 4m3 N2@20deg ( = 300W)

    24jan08 9:07

    25jan08 12:14

    very nice result !

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 47

    why GERDA cryostat not on photo?

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 48

    why ?

    ! W10 !

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 49

    weld W10

    modification by TÜV -however, previous design(45 deg at cylinder) also

    accepted

    parts of TÜV approved weld map

    Fillet

    weld

    (‚Kehlnaht‘) not

    allowed

    by

    AD2000!

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 50

    WPS of 11 Dec 07

    com

    mun

    icat

    ed 1

    1feb

    08

    20dec07

    20dec07 no indication of V shape

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 51

    latest development

    SIMIC (Dr. A.C.) on Thursday 14 Feb 08, 17:45, by phone:

    1) W10 weld is fillet weld (‘Kehlnaht’)2) fillet weld can be certified according to ASME3) little delay since SIMIC is familiar with procedure4) detailed calculations to follow

    No official

    written

    statement

    by

    SIMIC available

    until

    now.

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 52

    cryogenic infrastructure

    tender for supply contract:

    submitted 08Jan21published 08Jan31 TED document 2008-27384

    time-limit for receipt of tenders:08Mar17

    tender documents incl. Tech Specs:

    www.mpi-hd.mpg/GERDA/tender(so far, more than 5 requests)

    http://www.mpi-hd.mpg/GERDA/tender

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 53

    PID for tender

    further optimized

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 54

    cryogenic infrastructure

    PID for lock which is relevant forsystem aspects

    Keep it simple & safe!

    to be discussed in integration session

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 55

    cryogenic infrastructurefurther progress:

    • design & layout further optimized • part of hardware (vacuum) bought (T)• quote for manifold available• heater not in tender, new development:LNGS indicates ok for 2000 m3/h device

    open issues:

    • Rn

    emanation of safety valves (cast stainless steel) not yet shown to be ok.

    drawings from ‘Technical Specifications’

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 56

    conclusions -

    1

    inner/outer vessel pickled, passivated, rinsed with de-ionized water

    12 Nov

    inner vessel: pressure test passed (with water @ 3.6 bar)26 Nov

    inner vessel: He leak test passed (sensitivity a few 10-9 mbar ℓ

    / s )

    w48

    Makrolon

    installedw49

    major part of superinsulation

    installed

    05Dec

    1st extraction for Rn

    emanation measurement (23m3) : ~15 mBq06Dec

    2nd extraction for Rn

    emanation measurement (30m3) : ~30 mBq

    w50

    inner / outer vessel integration12Dec

    load test / optical inspection passed

    13Dec

    neck covered with superinsulationw51

    top outer vessel head welded, cryostat on skirt

    summary of fabrication & test history

    2007 (since 05 November)

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 57

    conclusions –

    1 cont.

    w2

    pumping isolation vacuumw3

    test of mounting tool for copper shield passed

    15Jan

    isolation vacuum

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 58

    conclusions -

    2

    • at LNGS:1) Rn

    emanation test

    2) evaporation test 3) mounting of copper shield► schedule & sequence still unclear –

    however,

    agreement that items 2 & 3 shall not interfere with WT construction

    • evaluation of quotes for cryogenic infrastructure on Monday, March 17, order asap

    • evaluate Ar

    exhaust gas heater options, tender, order asap

    next steps(assuming final pressure test is done)

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 59

    end

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 60

    schedule: rev 5 of Sep 21

    page 1/2

    done, to be corrected

    due items

  • 2008 Feb 18 TG04 Status - K.T.Knöpfle 61

    page 2/2

    delivery to Hall A: 13 Feb 08

    now scheduled for12 Nov 07

    due items

    schedule: rev 5 of Sep 21

    Foliennummer 1Foliennummer 2Foliennummer 3Foliennummer 4Foliennummer 5Foliennummer 6Foliennummer 7Foliennummer 8Foliennummer 9Foliennummer 10Foliennummer 11Foliennummer 12Foliennummer 13Foliennummer 14Foliennummer 15Foliennummer 16Foliennummer 17Foliennummer 18Foliennummer 19Foliennummer 20Foliennummer 21Foliennummer 22Foliennummer 23Foliennummer 24Foliennummer 25Foliennummer 26Foliennummer 27Foliennummer 28Foliennummer 29Foliennummer 30Foliennummer 31Foliennummer 32Foliennummer 33Foliennummer 34Foliennummer 35Foliennummer 36Foliennummer 37Foliennummer 38Foliennummer 39Foliennummer 40Foliennummer 41Foliennummer 42Foliennummer 43Foliennummer 44Foliennummer 45Foliennummer 46Foliennummer 47Foliennummer 48Foliennummer 49Foliennummer 50Foliennummer 51Foliennummer 52Foliennummer 53Foliennummer 54Foliennummer 55Foliennummer 56Foliennummer 57Foliennummer 58Foliennummer 59Foliennummer 60Foliennummer 61