+ All Categories
Home > Documents > CS-110 (11-17) PAYMENT AUTHORIZATION FILL OUT … · PAYMENT AUTHORIZATION FOR MATERIAL STORED OR...

CS-110 (11-17) PAYMENT AUTHORIZATION FILL OUT … · PAYMENT AUTHORIZATION FOR MATERIAL STORED OR...

Date post: 23-May-2018
Category:
Upload: phamduong
View: 214 times
Download: 1 times
Share this document with a friend
1
PAYMENT AUTHORIZATION FOR MATERIAL STORED OR ON HAND Reference: Pub. 408, Section 110.06 FILL OUT COMPLETELY Original to be retained with project records. CC: District Office Contractor Supplier S.R.: _____________ Sec.: _____________ County: _____________ District: _______________ Date: ____________ ECMS No.:_________________________ Contractor: ________________________ Supplier: _________________________ Storage Location: On Site (Location) Vicinity of Project ___________________________________________________________(Location) Off-Site ___________________________________________________________________(Location) ____________________________________________________________________________ (Reason) Approval Section: Attachments: Approval Disapproval Contractor's Letter of Request Storage Location ....................... Invoices Certification & Shipment, Section 106.03(b) . . . Material Certifications Storage of Material, Section 106.05 ......... CS-430 Notification of Inspection Material Identified & Set Apart ............. CS-4171 Certificate of Compliance Reason(s) for Disapproval(s): ________________________________________________________________________________ __________________________________________________________________________________________________________ Inspected By: ______________________________________________________________________________________________ Signature Title Date Inspected Item Chart: Estimated Item 90% Item Item Amount Date of Contract Contract Amount No. Invoiced Useage Value Value* Payable * 75% of Item Value for fabricated structural steel that is to receive a protective coating. 90% of Invoice amount for Force Transfer Units. Total Previously Requested: _______________________________ Subtotal: _________________________________________ 25% Current Contract Amount: _____________________________ Total Payable: _____________________________________ CS-110 (11-17) Approvals: Inspector-In-Charge: ______________________________________________________ Date: __________________________ Asst. Const. Engr./Mgr.: ____________________________________________________ Date: __________________________
Transcript
Page 1: CS-110 (11-17) PAYMENT AUTHORIZATION FILL OUT … · PAYMENT AUTHORIZATION FOR MATERIAL STORED OR ON HAND Reference: Pub. 408, Section 110.06 FILL OUT COMPLETELY Original to be retained

PAYMENT AUTHORIZATIONFOR

MATERIAL STORED OR ON HANDReference: Pub. 408, Section 110.06

FILL OUT COMPLETELYOriginal to be retained with project records.CC: ❏ District Office ❏ Contractor ❏ Supplier

S.R.: _____________ Sec.: _____________ County: _____________ District: _______________ Date: ____________

ECMS No.: _________________________ Contractor: ________________________ Supplier: _________________________

Storage Location: ❏ On Site (Location)

❏ Vicinity of Project ___________________________________________________________(Location)

❏ Off-Site ___________________________________________________________________(Location)

____________________________________________________________________________ (Reason)

Approval Section: Attachments: Approval Disapproval ❏ Contractor's Letter of Request Storage Location . . . . . . . . . . . . . . . . . . . . . . .❏ ❏ ❏ Invoices Certification & Shipment, Section 106.03(b) . . .❏ ❏ ❏ Material Certifications Storage of Material, Section 106.05 . . . . . . . . .❏ ❏ ❏ CS-430 Notification of Inspection Material Identified & Set Apart . . . . . . . . . . . . .❏ ❏ ❏ CS-4171 Certificate of Compliance

Reason(s) for Disapproval(s): ________________________________________________________________________________

__________________________________________________________________________________________________________

Inspected By: ______________________________________________________________________________________________ Signature Title Date Inspected

Item Chart: Estimated Item 90% Item Item Amount Date of Contract Contract Amount No. Invoiced Useage Value Value* Payable

* 75% of Item Value for fabricated structural steel that is to receive a protective coating. 90% of Invoice amount for Force Transfer Units.

Total Previously Requested: _______________________________ Subtotal: _________________________________________

25% Current Contract Amount: _____________________________ Total Payable: _____________________________________

CS-110 (11-17)

Approvals:

Inspector-In-Charge: ______________________________________________________ Date: __________________________

Asst. Const. Engr./Mgr.: ____________________________________________________ Date: __________________________

Recommended