+ All Categories
Home > Documents > CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... ·...

CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... ·...

Date post: 29-Jun-2020
Category:
Upload: others
View: 0 times
Download: 0 times
Share this document with a friend
21
CSE’s Existing work & next steps in Uttar Pradesh Support for Mainstreaming Citywide Sanitation & Effective Faecal Sludge & Septage Management Lucknow, Uttar Pradesh 22 October, 2018
Transcript
Page 1: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

CSE’s Existing work & next steps

in Uttar Pradesh

Support for

Mainstreaming Citywide Sanitation &

Effective Faecal Sludge & Septage Management

Lucknow, Uttar Pradesh

22 October, 2018

Page 2: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

Uttar Pradesh : The Challenge• Population density: Uttar Pradesh is India’s most

populous state with about 200 million people.

• Weak Enabling Framework : poverty, absence of a robust sanitation strategy

• Limited capacities and resources with ULBs : have also resulted in little regulation of

maintenance

86.73% of excreta either mixes with the water bodies or is disposed of in the agricultural land or domestic environment in the state.

• No city is completely sewered,-

dependence on OSS.

• No designated site for disposal, the emptied faecalsludge ends up in open drains/nullahs/open fields,

which eventually lead to polluting the Ganga.

• Main stem of the river receives 121.52 tonnes per day of BOD load from domestic sewage generated in Uttar Pradesh.

Page 3: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

Faecal Flow Diagram – SFD of Uttar Pradesh

Page 4: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

April 2016CSE Sensitisation

Workshop on Preparing CSPs

Sept 2016CSE CSP HH 1

Sept 2016CSE CSP HH 1 (Patna, Bihar)

Dec 2016CSE CSP HH 2

(Lucknow, UP) & NFEV 1

Feb, 2017NFSSM Policy

2015UP SAAP Issued

June, 2017CSE Septage

Practitioner Guides Released and send to

UP cities

June, 2017FSM component

included in Swachh Survekshan

March, 2017International Exposure

Visit to Malaysia (repeat in Aug for UP)

Sept, 2017CSE CSP HH 3

Sept, 2017Co-treatment initiates

in UP

Feb, 2018CSE submits State

FSM Guidelines to UP State

Jan, 2018

CSE and DoUDsign MoU

May, 2018CSE PMU Set up

in Lucknow

Oct, 2018SLTC approved 31

FSTPs & 21 Co treatment

UP State : FSSM Trajectory State Journey

Page 5: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

Uttar Pradesh : The Opportunity

CSE Project:

Capacitating Urban Local Bodies in for developing city sanitation plans U.P & Bihar – in partnership with SBM, AMRUT, Namami Gange

and respective state govt.

Supported by Bill & Melinda Gates Foundation - BMGF

Page 6: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

Plan for Capacity Building

5 Stage Handholding Process

Page 7: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

90 State

and ULB officials trained in Phase I

Workshop

CSP Trainings

National / intlexposure visits

media workshop

Page 8: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

International Exposure Visit to Malaysia

National Exposure Visit

Training on preparation of CSP –III

Page 9: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

Creating Models of Stakeholder Intervention

All 4 model cities – Chunar, Gangaghat, Bijnor and Ramnagar have set up and notified their City Sanitation Task Force / Swachh Bharat City Level Task Force.

CSTF has to be constituted in the ULB and it has to organize a multi-stakeholder, multi-party meeting in the preparatory stage, and take a formal resolution to make the city 100% sanitized.

Page 10: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

Media Coverage100 Articles published on CSP process from Sept 2016 in

Uttar Pradesh

Page 11: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

To Create Enabling State Level Framework

i) Completing sanitation chain with containment, extraction, transportation, treatment, and disposal / re-use of all faecal sludge/ septage and other liquid waste.

ii) Define roles and responsibilities of government entities and agencies, and of other key stakeholders

Page 12: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

FSSM Approach for Urban Areas in Uttar Pradesh

Page 13: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

CSE Septage Management Practitioner’s Guide - in English & Hindi

Toolkit on : How to plan, design and Implement

effective FSSM ?

Page 14: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

Phase II: Capacitating Urban Local bodies in the Ganga basin on small

scale, onsite wastewater and septage management systems

National Mission Clean Ganga

Page 15: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

Technical Support Unit : Bijnor

Model CSP which consists of:

i) Long, medium and short term action plan for sanitation sector

ii) Funding action plan for the next 15 years

iii) Detailed dataset of baseline data (GIS Maps), data gap analysis and prioritization

Model CSP

CSP endorse

d by CSTF

Model pilot

DWWTs

Model city for

citywide sanitatio

n

Page 16: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

Preparation of GIS maps

Page 17: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

Model Pilot Projects- Bijnor & ChunarDWWTs Pilot Project-BijnorDPR prepared for Bijnor Nagar Palika Parishandwith capacity of 10 KLD

FSTP Pilot Project-ChunarDPR under preparation

Aimi) Decentralized and less energy intensive solutions for both septage and liquid waste management

ii)Demonstration and monitoring of the implemented projects

Page 18: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

CSE Forum of cities that Manage Septage in Uttar Pradesh / India

• Developing a knowledge exchange platform for participating cities

• Training & capacity building on interventions across the sanitation chain and citywide sanitation

• Tracking and assessing the progress of cities• Identifying ‘pioneer cities’ which can handhold other

cities and act as centre to learn key aspects of FSSM and citywide sanitaition

• Collating feedback and inputs from Forum cities and policy relevant information to state govt. and Centre on FSSM

• Documentation of best practices

Page 19: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

Office Address3/17 Vikas Khand

Gomti Nagar, Lucknow 226010

ProgrammeManager & Coordinator :Rahul Mankotia:

Naveen KumarDeputy Programme Manager

Hemant AroraProgramme Officer

Sarim AnsariProgramme Officer

CSE PMU Office

Page 20: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

Next steps: Our common agenda

1. Work together on the guidelines/bylaws for management and enforcement of septage management

2. Implement model projects for septage treatment (Bijnor/Chunar)

3. Scale up through convergence other cities for transport and treatment of septage

4. Learn and innovate on treatment systems so that they are cost-effective and designed for reuse

Page 21: CSE’s Existing work & next stepscdn.cseindia.org/attachments/0.32351500_1542093995... · 2020-05-01 · CSE’s Existing work & next steps in Uttar Pradesh ... tonnes per day of

Thank You


Recommended