City of Lebanon, NHCSO Contract 10Public Meeting
April 1, 2014
3/31/2014
2
Contract 10 Locations
• North Main Street1,000 FeetDana to Estabrook Cir.
• Dana Street250 FeetMain to Prospect
• Highland Avenue925 FeetProspect to Green West
• Prospect Street West600 Feet
• Pearl Street600 Feet
• Winter Street West675 Feet
• Green Street West960 Feet
• Timothy Avenue500 Feet
June 15, 2013Walkabout
• Conducted site walkabout on June 15, 2013
• Discussed resident concerns
• City willing to meet resident at property in the future to discuss concerns
3/31/2014
3
October 23, 2013First Public Meeting
• Discussed project design and schedule
• Discussed protection of trees
• Reviewed design drawings
• Discussed resident concerns
Protection of Trees
• Walkabout with arborist will be conducted.
• Invites via mailing will be forthcoming.
• Contact City staff if you have a concern about a particular tree or planting.
3/31/2014
4
Schedule
• 50% Design – December 2013
• 90% Design – March 2014
• Final Construction Documents – May 2014*
• Bid Period – June 2014
• Start Construction – July 2014
• End Construction – September 2015
* Final Public Meeting
Project Contacts
• Christina Hall, City [email protected]
603.448.3112
• Mike Lavalla, Director of Public [email protected]
603.448.3112
• Ryan Wingard, Wright-Pierce Project [email protected]
603.430.3728
3/31/2014
5
Small Group Sessions
North Main Street
Component Existing Proposed
Width 28’ 28’
Esplanade 2’-4’ (west) no change (west) 4’-9’ (east) no change (east)
Sidewalk 3.5’-5.5’ (both) no change (both)
Drainage Vert. Curb/CBs Vert. Curb/CBs
3/31/2014
6
3/31/2014
7
Highland AvenueProspect to MapleComponent Existing Proposed
Width 20’-22’ 22’
Esplanade None None
Sidewalk None 5’ (south)
Drainage None Vert. Curb/CBs
3/31/2014
8
HIGHLAND AVE
3/31/2014
9
Highland AvenueMaple to Green Street WestComponent Existing Proposed
Width 22’-24’ 24’
Esplanade 1’-2’ (south) 2’ (south)
Sidewalk 3.5’-5.0’ (south) 5’ (south)
Drainage Vert. Curb/CBs Vert. Curb/CBs
3/31/2014
10
HIGHLAND AVE
Prospect Street West
Component Existing Proposed
Width 18’-29’ 22’
Esplanade 1’-5’ (east) 4’ (east)
Sidewalk 4.5’-5.5’ (east) 5’ (east)
Drainage None Vert. Curb/CBs
3/31/2014
11
3/31/2014
12
3/31/2014
13
Pearl Street
Component Existing Proposed
Width 21’-25’ 22’
Esplanade 1’-4’ (east) 3’ (east) 2’-4’ (west)
Sidewalk 4’-6’ (east) 5’ (east)4’-5.5’ (west)
Drainage CBs Curb/CBs
Pervious Pavement
3/31/2014
14
3/31/2014
15
Timothy Avenue
Component Existing Proposed
Width 22’-30’ 22’
Esplanade None None
Sidewalk None None
Drainage Curb/CBs Sloped Curb/CBs
TIMOTHY AVE/WINTER ST WEST
3/31/2014
16
TIMOTHY AVE
Winter Street West
Component Existing Proposed
Width 22’-24’ 22’
Esplanade None None
Sidewalk None None
Drainage None Sloped Curb/CBs
Pervious Pavement
3/31/2014
17
TIMOTHY AVE/WINTER ST WEST
WINTER ST WEST
3/31/2014
18
Green Street West
Component Existing Proposed
Width 19’-23’ 22’
Esplanade None None
Sidewalk None None
Drainage None Sloped Curb/CBs
3/31/2014