Date post: | 06-Apr-2018 |
Category: |
Documents |
Upload: | saroj-yadava |
View: | 225 times |
Download: | 0 times |
of 42
8/3/2019 Csr CD Policy 2010
1/42
Trans forming lives
NTPC LimitedNew Delhi
INDIA
N T P CCo m m u n i t y De v e l o p m e n t ( CD) P o l ic y
NTPCCommunity Development (CD) Policy
August, 2010
8/3/2019 Csr CD Policy 2010
2/42
Trans forming lives
NTPC LimitedNew Delhi
INDIA
N T P CCo m m u n i t y De v e l o p m e n t ( CD) P o l ic y
NTPCCommunity Development (CD) Policy
August , 2010Augus t, 2010
8/3/2019 Csr CD Policy 2010
3/42
8/3/2019 Csr CD Policy 2010
4/42
Transforming lives
INDEX
1. PREAMBLE 01
2. MULTI-PRONGED APPROACH 03
3. CONCEPT, SCOPE, AND OBJECTIVES 05
4. INSTITUTIONAL SET-UP 07
5. PLANNING 11
6. BUDGET AND FUND ALLOCATION 15
7. IMPLEMENTATION 17
8. MONITORING AND EVALUATION 19
9. REPORTING AND OUTREACH 21
I. A Model ToR For VDAC i
II. Indicative lists of possible areas of interventions ii
III. Template for medium term project plan(CDAP) to be submitted
by the operating stations iii
IV. An illustrative list of parameters for judging effectiveness of
various Community Development activities in village vi
V. Ongoing National level major rural development programmes
in India ix
VI. Template for reporting of CDAP and Annual Action Plan xi
VII. Abbreviation xiv
ANNEXURES:
8/3/2019 Csr CD Policy 2010
5/42
Transforming lives
8/3/2019 Csr CD Policy 2010
6/42
1
Transforming lives
1. PREAMBLE
The NTPC Ltd is one of the Maharatnacompanies, involved in different aspects of electricity
generation to meet the electricity demand at the national level and contributing to energysecurity. The company has operations spread across several states, and most of its
projects/stations are located in remote rural areas, where basic infrastructure is inadequate.
NTPC has always endeavored to be a leader in community development (CD) and corporate
performance, which can be measured in terms of economic, social, and environmental
impacts.
Further, specifically on CD, NTPC is governed by the following:
1.1 NTPC resolves to be a socially responsible corporate entity and to lead the sector in the
areas of resettlement and rehabilitation with thrust on CD; environment protection,
including effective ash utilization; and energy conservation.
1.2 NTPC resolves to contribute towards sustainable power development by discharging
corporate social responsibilities (CSR) that would positively impact on customers,
employees, shareholders, communities, and the environment in various aspects of its
operations. However, activities and expenditure related to staff benefits are not counted
as CSR.
1.3 In the process of establishing any new projects, NTPC attempts to improve the lives of
project affected persons (PAPs) through the initial community development (ICD) plan
formulated under the ICD policy and the rehabilitation action plan (RAP) formulated
under the rehabilitation and resettlement (R&R) policy. In addition to developing basic
infrastructure in the PAPs, NTPC also focuses on developing infrastructure and
undertaking CD activities in the surrounding areas.
1.4 NTPC is a member of Global Compact, a UN initiative launched by the UN Secretary-
General. It is committed to adhering to its 10 principles in the areas of human rights,
labour, environment, and anti-corruption.
1.5 NTPC CD policy also conforms to the guidelines on CSR for central public sector
enterprises, issued by the Department of Public Enterprises, Ministry of Heavy
Industries, and Public Enterprises, Government of India.
8/3/2019 Csr CD Policy 2010
7/42
Transforming lives
2
8/3/2019 Csr CD Policy 2010
8/42
3
Transforming lives
2. MULTI-PRONGED APPROACH ON CSR
2.1 ICD policy: NTPC's ICD policyprovides guidelines for preparing the ICD plan for
improving quality of life in areas where NTPC proposes to establish new plant/operational unit at the pre-project stage as pre-R&R activities.
2.2 Rehabilitation and resettlement policy: R&R policy provides for preparation and
execution of the rehabilitation action plan (RAP) for project-affected persons, which
includes CD plan for affected villages, resettlement colonies, and adopted villages.
2.3 Community development policy: CD policy provides for guiding principles on
preparation, execution, and documentation of community development activities in the
target villages, which should be a continuation of the RAP phase. The target villages in
the policy refer to project-affected villages, resettlement colonies, adopted villages and
peripheral villages, as identified under the CD project.
2.4 NTPC Foundation: Planning, monitoring, evaluation, and documentation of
community development projects at national level are taken up by NTPC through the
NTPC Foundation, a trust registered under the Trust Act.
2.5 Disaster preparedness: NTPC shall focus on the areas of Preparedness and
capacity building of the community in disaster management processes through a
dedicated Safety Group. The same shall be an important area of focus, particularly in
disaster-prone areas. NTPC, shall partner with government and private agencies to
strengthen and formalize their role in the disaster management process for ensuring
preparedness of the communities towards disaster resilience.
2.6 Environment act iv it ies : Environment-related initiatives are taken up by NTPC
through dedicated groups in NTPC Energy Technology Research Alliance (NETRA),
Engineering & EMG Group under the respective policies. Considering the fact that
NTPC is a member of UN Global Compact Program, the objectives of CD activities shall
also relate to the United Nations Global Compact Programme on Environment. NTPC
shall take all necessary precautions to minimize damage to the environment due to its
operations, and in case any such damage takes place, shall make all necessary efforts
to restore/ provide compensation for the same.
8/3/2019 Csr CD Policy 2010
9/42
Transforming lives
4
8/3/2019 Csr CD Policy 2010
10/42
8/3/2019 Csr CD Policy 2010
11/42
Transforming lives
6
8/3/2019 Csr CD Policy 2010
12/42
Transforming lives
4. INSTITUTIONAL SET-UP
4.1 Internal organizational structure
The following three-tier structure is responsible for implementing CD activities:
?Corporate centre
?Regional headquarters
?Operating stations in each region
Corporate centre: The CD cell at corporate centre shall be responsible for policymatters, compilation of information and preparation of annual reports. It shall also beresponsible for designing the training programmes for CD staff, approval of CommunityDevelopment Actions Plans (CDAPs) and facilitating the process of allocation of fundsto stations. The Corporate centre shall monitor the CD projects through regional
headquarters, once in every six months.
Regional headquarters: The regional set-up established for the implementation ofR&R activities shall continue to take up the responsibility of implementing CD activities.A nodal officer from the CD cell at regional headquarter shall coordinate and monitor theCD projects at operating stations and shall compile the quarterly and annual CD reportfor submission to the Corporate centre. The regional set-up shall form an advisorycommittee for planning and monitoring the unit-level CD projects and may include therepresentatives of concerned state/local governments and independent experts. Theregional headquarters shall monitor and review formulation and implementation ofCDAP and budget utilization of the operating stations under their control on quarterly
basis.Operating s tations: After construction and commissioning of a station, a dedicated CDcell shall be set up in each of the stations. The CD cell shall be responsible for needsassessment of the villages based on baseline developed during R&R stage,preparation of CDAP, implementation and reporting on the physical and financialprogress of the strategic interventions planned for the term on monthly basis. Theoperating station shall be responsible for monitoring of the CD projects to reviewprogress as per plan on monthly basis.
4.2 CD staff
4.2.1 In order to maintain the continuity of programmes that were initiated under the R&Rstage, some of the R&R staff need to be continued in the CD cell of those operatingstations.
1137
8/3/2019 Csr CD Policy 2010
13/42
Transforming lives
4.2.2 NTPC shall appoint/involve dedicated CD staff (in addition to the already engaged R&R
staff) comprising development experts/professionals at all levels corporate centre,
regional headquarters, and operating stations.
4.2.3 Depending on specific areas/activities that each operating station focuses on,
experts/professionals can also be engaged on a contract basis for planning and1
implementation of these activities.
4.3 Public Information Centre (PIC)
To maintain transparency and keep the PAPs and community informed, the Public
Information Centre (PIC) established during RAP shall be continued for the entire
period of formulation and implementation of CD projects.
4.4 Consultation and participation of R&R group
The closing report of RAP and first CDAP report shall make a single document. The data
for socio-economic status of the PAPs and infrastructural status of the affected villagesat the end of the RAP phase shall be the baseline for the formulation of CDAP.
Thereafter, the CD group shall work in close proximity with R&R group, and the plans
and periodic reports shall be shared among the two groups, if applicable.
4.5 Volunteering
Volunteering by NTPC employees (other than the CD staff) and family members of
employees shall be promoted. The volunteers shall also facilitate planning and
implementation of the identified CD projects.
4.6 Village development advisory committees
For institutionalizing community and local administrations' participation for preparation,
implementation and monitoring of ICD, R&R and CD projects, NTPC shall establish
village development advisory committees (VDACs). The VDAC shall be established
during the ICD phase or before initiating R&R planning and shall be continued during
R&R and CD phase. The members of VDAC shall include PAPs, Gram Panchayats,
representatives of district administration and NGOs. VDAC members shall meet every
quarter. The minutes of the meetings shall be documented and shared among all the
VDAC members, and if applicable, with R&R group. A model ToR is included in
Annexure I.
8
1Example: In areas where an NTPC station focuses on undertaking education-related activities, education
experts may be hired.
8/3/2019 Csr CD Policy 2010
14/42
9
Transforming lives
4.7 Training and capacity bui lding
4.7.1 All level of s taff
NTPC shall generate awareness among all levels of their staff on CD projects so as to
integrate its social processes with the business processes.4.7.2 CD staff at all levels
NTPC shall focus on training and capacity building of its CD staff on a continuous basis.
Training/orientation programmes on community engagement, with emphasis on
concepts of CD planning, stakeholder mapping, mobilization and motivation,
relationship building, transparency, shared decision-making, and monitoring and
evaluation techniques shall be organized from time to time for all the CD staff. The CD
staff shall be exposed to successful CD projects of various other public sector2
undertakings (PSUs) and corporate entities.
4.7.3 EVOICE staffThe EVOICE staff shall be provided exposure to CD projects, successful models/stories
3executed by other corporate entities and NGOs. NTPC shall also lay emphasis on
formal capacity building of EVOICE staff on periodic basis. The capacity building shall
focus towards the latest challenges in education, health, sanitation, veterinary services,
new learning methods, planning implementation and monitoring techniques.
4.7.4 Village development advisory committee (VDAC) members
NTPC shall focus on capacity building of VDAC members through training workshops
and on-job training. NTPC shall share knowledge and experience of CD projects, in
particular on implementation and monitoring aspect. NTPC CD staff shall alwaysprovide knowledge support to the VDAC members through a defined mechanism.
2Example: AMUL, Tata, and Hindalco
3Example: Azim Premji Foundation, Pratham, Pradan, BASIX, Sulabh International, SEHAT
8/3/2019 Csr CD Policy 2010
15/42
Transforming lives
10
8/3/2019 Csr CD Policy 2010
16/42
11
Transforming lives
5. PLANNING
5.1 Identification of CD projects
Planning for CD shall be done along with R&R activities. The first step of planning shallbe identification of broad activities. The broad activities shall be closely linked with thelong-term CD goal and objectives and adhere to the practice of sustainabledevelopment. An indicative list of possible areas of intervention is placed at Annexure II.The list is only indicative and not exhaustive. However, the key focus of CD projectsshall be on facilitating infrastructure provision for qualitative improvement in health,education, access to water/sanitation, and improved roads.
5.2 Identification of CD project area
The geographical area for implementation of the CD project shall be in the targetvillages.
5.3 Baseline/existing status survey
The CD projects shall be framed with a long-term objective of provision for basicinfrastructure and civic facilities, along with attendant maintenance mechanisms. At theend of project period, the impacts shall be quantified based on the baseline data andshall be compared with CD goals, state and national development goals, and MDGs.Thus, fresh data on existing status shall be mandatory before planning for CD projects.The initial baseline survey conducted under socio-economic studies carried out whilepreparing the RAP shall be considered as baseline.
5.4 Need assessment: bottom-up approach
The bottom-up approach shall be adopted in planning CD projects. The CD projects foreach of the NTPC operating stations shall be formulated based on need assessmentsurveys (NAS). NAS will involve in-depth villagestakeholder consultation and gapidentifications based on surveys and analysis.
Information collected at the household level shall focus on demography, literacy levels,socio-economic status, and occupation pattern. Based on the survey, a detailed projectprioritizing needs of PAPs, community and target villages shall be prepared withspecific deliverables, time-frame and budget. NAS shall attempt to capture the needs ofthe most vulnerable of the community.
5.5 Synchronizing with development plans of state and central governmentsThe overall quantifiable deliverables of the CD projects shall be framed based on thegaps between the development goals framed at state and national level, and theexisting situation of the CDAP area.
8/3/2019 Csr CD Policy 2010
17/42
12
Transforming lives
The CD projects shall be formulated so as they synergize with the national developmentgoals. Effort shall be made to contribute to the national and state plan targets.
5.6 Preparation of action plans
Action plan would involve empowering PAPs, community and the target villages in aphased manner and for an identified planned period. This could involve the basic andimmediate needs of the PAPs, community and target villages, such as roads, school,health, sanitation and drinking water-related plans, and projects.
A three phased plan shall be prepared:
Long-term plan: Long-term perspective plan for 20 years, which shall be inaccordance with the long-term corporate plan. The plan shall include the overalldevelopment of the identified project area. There shall be only one long-term plan underone operating station.
Medium-term plan (CDAP): Medium-term project plan for five years, which shall be incoherence with the NTPC business plan. The plan shall consider different sector-specific projects such as education, health, and infrastructure development in theproject area. However, there shall be only one medium-term plan (CDAP) under oneoperating station.
Short-term plan: Short-term action plan for one year which shall be in accordance withNTPC's annual target plan. The plan shall include the activities to be undertaken in aparticular year under the medium term plans.
5.7 Flexible, dynamic, and incremental shor t-term plans
Each year, the achievements shall build on the work undertaken in previous year, so
that the final CDAP objectives can be achieved in an incremental manner. The long andmedium plan shall be periodically reviewed and shall have enough flexibility toincorporate changes as and when necessary.
5.8 Entry points activities
To get the project popularized in the project villages, entry point activities (EPAs) shallbe conducted. Action plan to mitigate social risks shall be planned and implemented forestablishing rapport with the community. Programme promotion activities shall beidentified as per the need and suitability of the local communities and publicrepresentatives from time to time, depending on assessment and perception of social
risks.Activities associated with vermin-composting beds, veterinary camps, getting soil
8/3/2019 Csr CD Policy 2010
18/42
13
Transforming lives
testing, infertility camps, orchard competition and exposure visits are some examples ofEPAs. Activities relating to mass awareness on various social issues related to womenand children, health, sanitation and environment/climate change, AIDS awareness,organizing cultural programmes and those supporting cultural and social harmony can
be part of such action plans. Further, activities such as formation of self-help groups(SHGs) or common interest groups (CIGs) and engaging them in livelihood activitieslike handicraft, stitching, mushroom cultivation, and bamboo growing, which could alsodovetail with the activities of the medium-term plan, after providing the necessarytraining can also be considered.
5.9 Contents of CDAP
The CDAP shall cover title, goal, objectives, map demarcating project area, baselinescenario, needs assessment, community participation, linkages with national goals,project implementation mechanism, associated risks and mitigation measures,deliverables, output, outcome, organization and staffing, institutional tie-ups, timeline,
specific start and end dates, estimated budget, financial plan, monitoring andevaluation mechanism. A template for CDAP is placed at Annexure III.
Survey, need prioritization, and development of a long-term action plan would beprerequisites for allocation of resources under the CDAP.
5.10 Quantifiable targets
The plan shall clearly enunciate targets that are proposed to be achieved over the planperiod. For each activity, a set of quantifiable indicators shall be developed for reporting
4on achievement.
The specific targets, indicators and benchmarks shall be identified based on national andstate goals, local needs and existing situations. An illustrative list of parameters forjudging effectiveness of various community development activities in a village (basicnorms and benchmarks related to key infrastructure) have been provided in Annexure IV.
5.11 Linked to government development schemes
The plans based on the thrust areas need to identify specific government programmesthat can be dovetailed to achieve the desired targets. An illustrative list of majorgovernment programmes has been provided in Annexure V. Such dovetailing can focuson complementing both financial and human resources. Preference shall be given toactivities that benefit the state government/local administration/ panchayat provide
matching budgets/grants.Adequate care shall be taken to ensure that there is no duplication of CD projects with
4Example: If 10% of households have access to toilets, the plan can envision covering 100% households over the
plan period.
8/3/2019 Csr CD Policy 2010
19/42
14
Transforming lives
that of programmes run by central, state, and/or local governments.
5.12 Use of local resources and low-cost technologies
Interventions for the area shall be planned with a focus on making use of local
resources/materials, particularly to minimize the cost without compromising on quality.Such local resources and low-cost technologies shall be identified consultation withVADC.
5.13 Participation of panchayat, communi ties and local authorities
5.13.1 The PAPs, targeted communities and local authority shall be closely involved in theplanning, implementation, and monitoring and evaluation of CD activities to the extentpossible.
5.13.2 The PIC and VDAC established during ICD phase shall be continued, and VDAC shallbe consulted while formulating and implementation of CDAP.
5.14 Contribution of panchayat, communi ties and local authorities
Facilities provided under the CDAP in the target villages shall be preferably on partialcost-sharing basis. The contribution may be either in cash or kind. The percentage ofcommunity contribution shall be clearly indicated in the CDAP. Since the communitycontribution is an index of community's readiness to own and sustain the facilities,preference shall be given to those activities where the community is willing to contributerelatively a higher amount.
5.15 Operation and maintenance
If the medium-term project comprises development of infrastructure, then NTPC shall
work out a mechanism through the VDAC for operation and maintenance of theinfrastructure/facilities. After the end of the medium-term project period, NTPC CD cellshall take up the responsibility of periodic maintenance of the infrastructure.
5.16 Withdrawal
During the withdrawal phase, the community shall be made responsible for theoperation and maintenance of the project. However, CD staff shall undertakehandholding of the community and periodic maintenance of the infrastructuredeveloped till withdrawal.
8/3/2019 Csr CD Policy 2010
20/42
15
Transforming lives
6. BUDGET AND FUND ALLOCATION
6.1 The CD activities for the stations declared under commercial operation shall be planned
under operation and maintenance (O&M) budgets of CSR. In case of new projects andexpansion projects that are under construction /commissioning, the CD activities to beplanned under capital budget for R&R.
6.2 CD processes to be synergized with business processes.
6.3 Plants/ stations shall be allocated separate CD budgets under the annual budgetallocations to be spent by them on CD activities under CD project.
6.4 Provision shall be kept for maintenance of developed infrastructure. The utilization ofmaintenance fund shall be based on collective decision of the VDAC.
6.5 Fund allocation shall be on the basis of long-term CD plans. It is envisaged that 65% of
the funds shall be earmarked for long-term incremental plans, 15% shall be available forentry point and other activities, including activities related to continuation of R&R actionplan that may not be necessarily governed by the plan and 20% shall be available formaintenance of infrastructure developed.
6.6 For ensuring effective delivery, all CDAPs shall be financed in a phased manner. Fundsshall be committed for long-term projects and shall be disbursed on a yearly installmentbasis.
8/3/2019 Csr CD Policy 2010
21/42
Transforming lives
16
8/3/2019 Csr CD Policy 2010
22/42
17
Transforming lives
7. IMPLEMENTATION
7.1 NTPC shall make an effort to decentralize and devolve implementation of CDAPs to
local NGOs and local institutions in a systematic and planned manner.7.2 NTPC shall identify and collaborate with credible local institutions/ national specialized
5institutions . The specialized agencies could be made to work singly or in tandem withother agencies.
7.3 NTPC CD cell at the corporate centre shall develop a mechanism to verify the reliabilityand credibility of the specialized agencies identified for implementation of CD projects.The team may develop a panel of such credible agencies or may select from panelsmaintained by government, semi-government, autonomous organizations or from thenational CSR hub, and so on.
7.4 CD cell shall involve NTPC suppliers, wherever possible, in order to ensure that thesupply chain also follows the CD guidelines. CD group shall try and implement some ofthe CD activities jointly with the major suppliers.
5Examples: Community development organizations (CBOs) (whether formal or informal), elected local bodiessuch as panchayats, voluntary agencies (NGOs), institutes/ academic institutions, trusts, missions, SHGs,government, semi-government and autonomous organizations, Standing Conferences of Public Enterprises(SCOPE), mahila mandals/ samities, contracted agencies for civil works, professional consultancy organizations
8/3/2019 Csr CD Policy 2010
23/42
Transforming lives
18
8/3/2019 Csr CD Policy 2010
24/42
19
Transforming lives
8. MONITORING AND EVALUATION
A two-tier monitoring mechanism for the CD projects would be developed:
?Internal monitoring
?External evaluation by a independent and credible agency
8.1 Internal monitoring
8.1.1 A joint committee comprising VDAC representatives, the local government (the
collector's representative) and the CD representative shall be formed to evaluate the
CD projects on quarterly basis. This active participation of local stakeholders inculcates
a sense of ownership among the community, and is essential from the point of view of
sustainability.
8.1.2 The CD staff of the operating station shall monitor the CD projects on monthly basis.
8.1.3 Social audit:The CD staff from one operating station shall conduct annual social audits
of another station's CD projects and vice versa, and report following relevant guidelines
on yearly basis.
8.1.4 The CD cell at regional headquarters shall monitor the CD projects implemented by the
CD cell at operating stations on quarterly basis.
8.1.5 At the corporate level, the outcome of the meeting of regional heads of CSR shall be
deliberated for suggesting suitable policy interventions. The director (HR) shall review
the progress on half-yearly basis. The details shall be presented to the NTPC
management on half yearly basis.
8.2 External evaluation
The effectiveness of the CD projects shall be evaluated through credible external
agencies for providing required feed back and inputs to formulate and improve the
projects in future. Each station shall get reviewed/ evaluated its CD projects by a third
party at least once every two years. And this evaluation shall be both concurrent and
final.
8.3 Grievance Redressal
Provision shall be made for a system of grievance redressal and feedback through Lok
Adalator Jan Sunvayeetype of arrangement for all its CD projects. This mechanismcan be on a fortnightly or monthly basis. This system can address all the grievances ofthe community from the beginning (at the implementation stage) of the project itself so
8/3/2019 Csr CD Policy 2010
25/42
Transforming lives
that mid-term review of projects is facilitated and necessary alterations can be made as
and when deemed necessary. VDAC representatives, CD staff, R&R staff (if required)
and head of the project shall be present during the Lok Adalats/ Jan Sunvaiye. In case
the PAP or the beneficiary is not satisfied by the action taken by the head of the project,
he/ she may appeal to the Executive Director of the region, whose decision, however,will be final and binding.
20
8/3/2019 Csr CD Policy 2010
26/42
21
Transforming lives
9. REPORTING AND OUTREACH
9.1 Reporting
All the operating stations of NTPC shall follow a synchronized reporting format. Thereporting format for CD projects is placed at Annexure VI.
9.2 Quantification of impacts
9.2.1 The impact made by CD projects shall be quantified by NTPC to the best possible extentwith the baseline data/existing status surveys developed before the start of any CDproject.
9.2.2 The operating stations shall identify detailed indicators in consultation with the regionalheadquarters and corporate centre to report on CD projects. These indicators shall bein accordance with long-term CD goals, and state and national development goals as
mentioned in Annexure IV.9.3 Periodicity
NTPC shall carry out periodic reviews of the programmes on a quarterly basis.Quarterly review reports shall be prepared by the operating stations, shared with thecommunity and the staff, and the feedback shall be sought and incorporated into thesubsequent action plans as well as in the final annual reports.
9.4 Dissemination/ outreach
9.4.1 NTPC shall incorporate a separate chapter/paragraph on the various CD activitiesundertaken including the facts relating to physical and financial progress into it's annual
report.
9.4.2 NTPC shall make available the detailed documentation of the CD projects inclusive ofapproaches, processes, expenditure, procurement, impact in the public domain suchas internet.
9.4.3 NTPC shall make information of their CD projects available to their stakeholdersthrough appropriate media.
9.4.4 The company shall regularly send out press releases about CD projects, particularly inthe local vernacular languages, so that the public is in the loop on the company'sactivities on a sustained basis.
9.4.5 NTPC shall develop an interactive portal on CD projects. The same will add to thetransparency of the CD process in addition to facilitating monitoring and documentation
of the CD processes.
8/3/2019 Csr CD Policy 2010
27/42
Transforming lives
9.4.6 NTPC shall develop a centralized data management system under the Enterprise
Resource Plan, related to CD, as prevailing for R&R. The data management system
shall develop systems for maintaining archives and updated information which shall be
accessible to all the operating stations, regional headquarters and corporate centre.
22
8/3/2019 Csr CD Policy 2010
28/42
i
Transforming lives
ANNEXURE I
A Model ToR for VDAC
The village development advisory committee (VDAC) is formed with an objective to
institutionalize participation of PAPs, gram panchayats, representatives of district
administration and NGOs in the planning, implementation and monitoring process of initial
community development (ICD), rehabilitation action plan (RAP) and community development
action plan (CDAP).
Mode of operation of the VDAC
1. The VDAC shall have a minimum 10 members.
2. VDAC shall have representation of both male and female PAPs from each of the
category; general, scheduled caste (SC), scheduled tribe (ST), minority, other backward
castes (OBCs), below poverty line (BPL), physically challenged, and destitute women.
3. The other members of the VDAC shall represent officers from district administration, local
NGOs, and local educational institutes. The list is indicative and not exhaustive.
4. The representative of CD cell shall also be the member of VDAC.
5. The VDAC members shall meet on quarterly basis to monitor the ICD, RAP and CD
projects.
6. The minutes of the meetings shall be documented and circulated among the members.
7. The VDAC meetings shall be coordinated by CD cell.
8. All members of the VDAC shall be equally treated irrespective of gender, caste and
economic status.
Functions of VDAC members
1. The VDAC members shall provide information and suggestions to best of their
knowledge while preparation of CDAP as done for ICD and RAP.
2. The VDAC members shall be responsible for monitoring of different components of
CDAP on periodic basis during implementation phase.
3. The VDAC members shall submit their monitoring reports to the CD cell of the operating
stations.4. Each member of the VDAC shall be an interface between the CD cell, community and the
district administration.
8/3/2019 Csr CD Policy 2010
29/42
ii
Transforming lives
ANNEXURE - II
Indicative List of Possible Areas of Interventions
1. Drinking water facility
2. Education
3. Improving the quality of life of girl child
4. Improving lives of vulnerable persons such as physically challenged, destitute women,widow
5. Improving lives of scheduled caste and scheduled tribe people
6. Electricity
7. Solar lighting system
8. Health and family welfare
9. Irrigation facilities
10. Sanitation and public health
11. Animal care
12. Promotion of sports and games
13. Promotion of art and culture
14. Promotion of livelihood for economically weaker sections through forward and backwardlinkages
15. Relief of victims of natural calamities like earthquake, cyclone, drought, flood situation inany country
16. Supplementing development programs of the government
17. Construction of community centres/ night shelters/ old age homes
18. Imparting vocational training
19. Setting up of skill development centres
20. Adoption of villages
21. Scholarships to meritorious students belonging to SC, ST, OBC and disabled categories
22. Adoption or construction of hostels (especially those for SC/ST and girls)
23. Skill training, entrepreneurship development and placement assistance programs foryouth
24. Building roadways, pathways, and bridges
25. Entrepreneurship development programmes
26. Activities related to continuation of R&R action plan
27. Capacity building of the project affected persons to improve their employability
8/3/2019 Csr CD Policy 2010
30/42
iii
Transforming lives
ANNEXURE III
Template for medium- term project plan (CDAP) to be
submitted by the operating stationsCover page:
Operating station:
Sectors of interventions:
Start date (Month/ Year):
End date (Month/ Year):
Total cost of the project:
Table of contents:
1. Project area
2. Situation analysis
3. Identification of projects
4. Project strategy
i. Health
ii. Education
iii. Drinking water
iv. Sanitation
v. Infrastructure
vi. Any other
5. Project results and resource framework
6. Project management
7. Tentative budget
8. Reporting
9. Timeline
Part A: Identification of project area1. Name of the villages
2. Boundary and resource map of the identified villages
3. Demographic summary
8/3/2019 Csr CD Policy 2010
31/42
iv
Transforming lives
Part B: Situation analysis
1. Baseline data collection methodology and analysis
2. Community needs assessment methodology and analysis
3. Identified problems
4. Summary of existing situation
Part C: Identification of projects
1. Identified sectors of intervention
2. Justification for the proposed interventions
Part D: Project strategy
Sub-project (sub-project code): Health(Example: Providing urban health facilities inthe target villages)
1. National norms and indicators with regard to the identified sector
2. National policy/strategy to deal with the above situation at macro level
3. Proposed strategy to deal with the above situation at the identified villages
4. Strategy to dovetail with existing government schemes, if any
5. Project goal and objectives
6. Relevance of the objectives to NTPC's business plan/ annual target
Sub-project (sub-project code): Education(Example: Empowering girl child through
education)1. National norms and indicators with regard to the identified sector
2. National policy/strategy to deal with the above situation at macro level
3. Proposed strategy to deal with the above situation at the identified villages
4. Strategy to dovetail with existing government schemes, if any
5. Project goal and objectives
6. Relevance of the objectives to NTPC's business plan/ annual target
Subproject (sub-project code): Sanitation(Example: Construction of pi t toilets in all
the households in the target village)1. National norms and indicators with regard to the identified sector
2. National policy/strategy to deal with the above situation at macro level
3. Proposed strategy to deal with the above situation at the identified villages
4. Strategy to dovetail with existing government schemes, if any
5. Project goal and objectives
6. Relevance of the objectives to NTPC's business plan/ annual target
8/3/2019 Csr CD Policy 2010
32/42
v
Transforming lives
Sub-project (sub-project code): Infrastructure(Example: Construction of shorterroad to the health centre from the concerned villages)
Part E: Project results and resource framework
Part F: Project management
1. Project staff and responsibilities
2. Institutional tie ups
3. Stakeholders participation
4. Community organization (VDACs) and their responsibilities
5. Monitoring and evaluation mechanism
Part G: Tentative budget
Part H: Report ing
Part I: Timeline
Projectcode
Indicator PresentStatus
Intendedoutput
Activities toachieve the
mentioned
output
Budget Duration Start andend dates
Sub projectcode
Year 1 Year 2 Year 3 Year 4 Year 5
8/3/2019 Csr CD Policy 2010
33/42
113vi
Transforming lives
ANNEXURE IV
An illustrative list of parameters for judging effectiveness of
various Community Development activities in a villageEducation: primary schoolinfrastructure
?Primary school should be located within 1km and middle of the settlement.
2?Ideally, the area should be of 1 acre; in no case should be less than 1000 m .
?Not to be located near hazardous area or sources of noise like highways, rail tracks, andfactories.
?Building structure should be pucca one with sufficient class rooms (one room per onesection each) and with an 8 ft. high boundary wall.
?Number of students per section is 40 with teach student ration of 1:40.
?Uninterrupted electricity for functioning of lights, fans and computers during school hours.
?Adequate availability of filtered/safe drinking water.
?Separate toilet blocks for boys and girls with adequate water supply and cleaningarrangements.
?Playground with all necessary facilities.
?A minimum of 80% attendance rate each both for students and teachers.
?Dropout rate of students should be less than 5%.
?Scholarship/incentives for the students from the poor/BPL households.
?A minimum of three weeks annual training programme for the teachers.
Rural roadsinfrastructure
?100% of all villages with population above 1000 and 75% of all villages with population of5001000.
?All villages must be covered with all-weather roads with necessary culverts and cross-drainage structures.
?All rural roads except those in an arid region with annual rainfall less than 500 mm and traffic
up to motorized vehicles per day (except two wheelers) are required to be bituminous.
?All roads to be placed in excavation sloping downwards with cross drainage structures.
?Cement concrete, modified bitumen, fly ash as well as soil stabilization techniques and
8/3/2019 Csr CD Policy 2010
34/42
vii
Transforming lives
other new technologies/methodologies needs to be used.
?Adequate fund should be made available to the panchayat for annual repair andmaintenance of roads
Potable water supplyinfrastructure?The entire population in all the habitations, including the main habitation, should be
provided with drinking water that is affordable to all.
?Access to drinking water should be within 500 meters in plains.
?In case of distant water taps, maximum travel time for fetching water should be 20 minutes.
?Minimum availability of 40 litres per capita per day (LPCD) water (drinking-3, cooking-5,bathing-15, washing utensils and house-7, ablution-10)
?One standpost for every 20 households or 100 persons
?
One handpump for 50300 persons?Drinking water is defined as safe if it is free from bacteria and chemical contamination like
fluoride, iron, arsenic, nitrate, and brackishness in access or beyond permissible limit.
?Safe potable water through the use of technology like filtration and chlorination.
?Ensure regular testing of water quality
?Adequate fund and staff for regular repair and maintenance of borewell/ handpumps andpipelines.
Primary healthinfrastructure
?
One subcentre for population of 2000 (within 3 km of the habitation) and one primary healthcentre for a population of 30,000 (within 10 km of the habitation).
?Laboratory facilities for investigations like haemoglobin estimation, urine for albumin andsugar.
?Labour room with equipment for safe delivery, as well as immunization, contraceptiveservices, first aid, emergency care, water-quality testing, and blood smear collection.
?Accommodation for the ANM/ male health worker will be available on rent in the village.
?Adequate toilet facilities (separate for staff and public as well as for male and female) withregular water supply.
?Uninterrupted power supply has to be ensured, for which inverter facility / solar power facilityis to be provided.
8/3/2019 Csr CD Policy 2010
35/42
113viii
lives
?Adequate and safe potable water through the use of technology like filtration andchlorination.
?Adequate fund and staff members for repair and maintenance all the facilities.
Sanitation and sewerageinfrastructure?Access to pit latrines in rural areas to be 100 per cent.
?Community public toilets and bathroom facilities with provision of water and minimum of onetoilet/one bathroom for 2050 persons.
?Sewerage design: provision sanitary individual lines for households with undergroundshallow sewerage system.
?Toilet blocks in institutional and public buildings such as panchayat ghar, communitybuilding, marriage hall, shopping complex.
?Soak pits with proper drainage facilities around the tubewell/ handpumps.
?Cemented well compound with proper drainage.
?Ghat for cleaning clothes and taking baths in the ponds.
?Adequate fund and staff members for cleaning and maintenance of drains and public toilet.
Electricityinfrastructure
?All households in the village should be connected with electricity (minimum life lineconsumption of 1 unit) within affordable range.
?All households should have metered connection.
?
One distribution transformer in each habitation of every village or hamlet.?Street lighting poles 30m apart, on all major roads, with an average of 20 posts for 1ha.
?Substation 33/11 kV or 66/11 kV substation would be set up in each block.
?Where grid supply is not possible, alternative renewable energy sources (solar lighting,domestic as well as street, water pumping, and cooking systems.) should be provided.
?Arrangement for adequate fund and staff members for repair and maintenance of streetlights to the panchayats
8/3/2019 Csr CD Policy 2010
36/42
ix
Transforming lives
ANNEXURE - V
Ongoing National level major Rural Developmentprogrammmes in India
Pradhan Mantri Gram Sadak Yojna
The primary objective of the PMGSY is to provide connectivity by way of an all-weather road
(with necessary culverts and cross-drainage structures, which is operable throughout the
year), to the eligible unconnected habitations in rural areas, in such a way that all unconnected
habitations with a population of 1000 persons and above are covered in three years (2000-03)
and all unconnected habitations with a population of 500 persons and above by the end of the
Tenth Plan Period (2007). In respect of the hill states (North East, Sikkim, Himachal Pradesh,Jammu & Kashmir, Uttarakhand) and the desert areas (as identified in the Desert
Development Programme) as well as the tribal (Schedule V) areas, the objective would be to
connect habitations with a population of 250 persons and above. States may, each year,
distribute the state's allocation among the districts giving 80% on the basis of road length
required for providing connectivity to unconnected habitations and 20% on the basis of road
length requiring upgradation under the PMGSY. Details are available at http://pmgsy.nic.in.
Swarnjayanti Gram Swarojgar Yojna
The objective of the Swarnjayanti Gram Swarozgar Yojana (SGSY) is to bring the assisted
poor families (Swarozgaries) above the poverty line by ensuring appreciable sustained level of
income over a period of time. This objective is to be achieved by inter alia organizing the rural
poor into self-help groups (SHGs) through the process of social mobilization, their training and
capacity building, and provision of income-generating assets. The SHG approach helps the
poor to build their self-confidence through community action. This process would ultimately
lead to the strengthening and socio-economic empowerment of the rural poor as well as
improve their collective bargaining power. Swarnjayanti Gram Swarozgar Yojana is a centrally
sponsored scheme and the financing of the programme will be shared between theCentre and
the states in the ratio of 75:25. The details are available at http://www.rural.nic.in/sgsy.htm.
Rural Housing
The Indira Awaas Yojana (IAY) is a flagship scheme of the Ministry of Rural Development to
provide houses to the poor in rural areas. The objective of the Indira Awaas Yojana is primarily
to help construction/ upgradation of dwelling units of members of SCs/STs, freed bondedlabourers and others below the poverty line, and non-SC/ST rural households by providing
them a lumpsum financial assistance. The Indira Awaas Yojana is a centrally sponsored
scheme funded on cost-sharing basis between the Government of India and the state
governments in the ratio of 75:25. In case of union territories, the entire funds under this
scheme are provided by the Government of India. Details are available at
http://rural.nic.in/iaygd2.htm.
8/3/2019 Csr CD Policy 2010
37/42
x
Transforming livesTransforming lives
Mahatma Gandhi National Rural Employment Guarantee Programme
The NREGA is an act and can be amended only by the Parliament. It directs state governments
to implement NREG "schemes". Under NREGA, the central government meets the cost
towards the payment of wage, 3/4th of material cost and some percentage of theadministrative cost. State governments meet the cost of unemployment allowance, 1/4 of
material cost and administrative cost of state council. Since the state governments pay
unemployment allowance, they are heavily incentivized to offer employment to workers.
However, it is up to the state government to decide the amount of unemployment allowance,
subject to the stipulation that it not be less than 1/4th the minimum wage for the first 30 days,
and not less than 1/2 the minimum wage thereafter. Hundred days of employment (or
unemployment allowance) per household must be provided to able and willing workers every
financial year. Details are available at http://nrega.nic.in.
Accelerated Rural Water Supply Programme
The Accelerated Rural Water Supply Programme (ARWSP) was introduced in 197273 by the
Government of India to assist the states and union territories (UTs) to accelerate the pace of
coverage of drinking water supply. The entire programme was given a mission approach withthe launch of the Technology Mission on Drinking Water and Related Water Management in
1986. Later, in 1999, Department of Drinking Water Supply was formed to give more emphasis
on Rural Water Supply programme. Details are available at http://ddws.gov.in/arwsp.htm.
Total Sanitation Campaign
The Total Sanitation Campaign is a comprehensive programme to ensure sanitation facilities
in rural areas with the broader goal to eradicate the practice of open defecation. TSC as part of
reform principles was initiated in 1999, when the Central Rural Sanitation Programme was
restructured, making it demand-driven and people-centred. It follows a principle of low to no
subsidy, where a nominal subsidy in the form of incentive is given to rural poor households for
construction of toilets. TSC lays strong emphasis on information, education and
communication (IEC), capacity building and hygiene education for effective behaviour change
with involvement of Panchayati Raj institutions (PRIs), community-based organizations
(CBOs), and NGOs. The key intervention areas are individual household latrines (IHHL),
school sanitation and hygiene education (SSHE), community sanitary complex, Anganwadi
toilets supported by rural sanitary marts (RSMs) and production centres (PCs). The main goal
of the Government of India (GoI) is to eradicate the practice of open defecation by 2010. To
give fillip to this endeavor, GoI has launched the Nirmal Gram Puraskar to recognize efforts interms of cash awards for fully covered PRIs and those individuals and institutions who have
contributed significantly in ensuring full sanitation coverage in their area of operation. The
project is being implemented in rural areas taking district as a unit of implementation. Details
are available at http://ddws.gov.in/tsc_index.htm.
8/3/2019 Csr CD Policy 2010
38/42
xi
Transforming lives
ANNEXURE VI
Template of reporting of CDAP and Annual Action Plan
Part A: Cover pageOperating station:
Reporting period:
Geographical area of intervention: name of the villages, map of the villages:
Summary of projects being reported:
Part B: Achievements
Challenges: (Challenges shall incorporate the reasons of deviations in the indented andachieved/ accomplished outputs/activities)
Part C: Sector-wise achievement analysis
Name of the sub
project/ sub projectcode
Intended
outputs
Outputs
achieved
Intended
activities
Activities
accomplished
Xxx
Sub project/ subproject code
Break up of budget allocatedfor the reporting duration
Break up of amount spentfor the reporting duration
Reasons fordeviation
Xxx xxx
Sub project Quantindicators/deliverables
ifiable Situation asper baselinesurvey
Situation asper previousreport
Presentsituation
Remarks onachievement/challenges
rogress/
Eg. EducationEg. Health Eg. Sanitation
8/3/2019 Csr CD Policy 2010
39/42
Transforming lives
xiiiixii
Part D: Status of beneficiaries
Part E: Partic ipation level of the beneficiaries
Cont. ...
Subproject/code
Type of beneficiaries Activities
participated Number of persons fromthe category participated
Remarks
Infants
Children (1- 5 years)
Girls (6-14 years)
Boys (6-14 years)
Males (15-35 years)
Males (36-60 years)
Females (15-35 years)
Females (36-60 years)
Subprojectcode
Type ofbeneficiaries
Quantifiableindicators
Situationas per
baseline
survey
Situation
in thelast
report
Presentsituation
Remarks onprogress/
achievement
/ challengesInfants
Children (1 - 5years)
Girls (6-14 years)
Boys (6- 14 years)
Males (15 -35years)
Females (15 - 35years)
Males (36 - 60years)Females (36 - 60years)
People (above 60years)
Destitute women
WidowsPhysically
challenged
SC
STOBC
People (above 60 years)
8/3/2019 Csr CD Policy 2010
40/42
Transforming lives
Part F: Publicity and outreach
Part G: Support received from the local authori ties/government
Part H: Case studies / success stories
Part I: Lessons learnt
Part J: Intended outputs and activit ies for the next reporting period
Destitute women
WidowsPhysically challenged SC ST OBC
Subproject/code
Type of beneficiaries Activities
participated Number of persons fromthe category participated
Remarks
xiii
8/3/2019 Csr CD Policy 2010
41/42
Transforming lives
ANNEXURE - VII
ABBREVIATIONS
BPL Below Poverty LineCBO Community-Based Organization
CD Community Development
CDAP Community Development Action Plan
CIG Common Interest Group
CSR Corporate Social Responsibility
EMG Energy Management Group
EVOICE Employee Voluntary Organization For Initiative In Community Empowerment
GoI Government Of India
HR Human Resources
ICD Initial Community Development
MDG Millennium Development Goals
NAS Needs Assessment Survey
NETRA NTPC Energy Technology Research Alliance
NGO Non-Governmental Organization
NREGA Mahatma Gandhi National Rural Employment Guarantee Programme
O&M Operation And Maintenance
PAP Project-Affected People
PSU Public Sector Undertaking
PIC Public Information Centre
RAP Rehabilitation Action Plan
R&R Rehabilitation And Resettlement
SHG Self-Help Groups
ToR Terms Of Reference
VDAC Village Development Advisory Committee
xiiiixiv
8/3/2019 Csr CD Policy 2010
42/42
Transforming lives
NTPC LIMITED(A Govt. of India Enterprise)
Scope Complex, 7 Institutional Area,
Design&
Printedby:DELUXEPRINTERY(m