Curis Resources Ltd. Changing the Way Copper is Made
October 2013
SWVP-023361
SWVP-0631
Why Choose Curis as an Investment Opportunity?
Copper is essentially the nervous system of modern society and can be found in everything we touch and use
Our goal as a company is to be the lowest cost and most progressive, sustainable and innovative copper mining company in the world
We believe in creating value – for our investors, for our employees and for the communities in which we operate
2
SWVP-023362
Florence Copper is a Near Term Copper Producer
Advanced stage in-situ copper recovery (ISCR) development project in centre of Historic Arizona “Copper Corridor”
Lowest quartile projected capital and operating costs
All major power, transportation, road and rail infrastructure in place
Curis is 100% owner of 1,342-acre private patented and lease (160 acres) land package
Majority of Phase I operating permits in place and amending existing commercial operating permits for near term production
Over $100 million spent on project by former owners Conoco, Magma and BHP Copper Inc.
Prefeasibility and successful pilot test confirming project safety and economics by BHP Copper in 1998
3
SWVP-023363
Florence Deposit Mineral Reserves and Resources
4
All Oxide in Bedrock
Class Millions tons %TCu Grade Million lb Copper
Reserves Probable 340 0.36 2,420
Resources
Measured 296 0.35 2,100
Indicated 133 0.28 741
M + I 429 0.33 2,841
Inferred 63 0.27 496
Based on 577,317 feet of drilling in 502 holes Mineral Reserves and Mineral Resources at a 0.05% TCu cutoff QP for the 2011 resource estimate is Russell White, RM-SME, RG QP for the 2013 reserve estimate is Michael Young, RM-SME, Haley & Aldrich Mineral reserves are contained within the measured and indicated mineral resources. Mineral resources that are not mineral
reserves do not have demonstrated economic viability
SWVP-023364
Florence Copper Projected Commercial Production Profile
Base Case Capital and Operating Costs and Expected Annual Production of Copper Cathode
Initial capital cost of US $208 million
Payback of capital 2.6 years (pre-tax)
Cash operating cost of US $0.80/pound
Total estimated operating cost of US $1.11/pound
27,500 tons/55 million pounds average annual production (years 1–6)
42,000 tons/85 million pounds average annual production (years 7–21)
Long mine life of 25 years
5
Base case uses 70% copper recovery Source: March 2013 Prefeasibility Study independent qualified persons include Richard Zimmerman, RM-SME, M3 Engineering & Technology Corp.
(U.S.), Terrence McNulty, PhD, PE, TP McNulty and Associates, Michael Young, RM-SME, Haley & Aldrich, Corolla Hoag, CPG, RM-SME, of SRK Consulting, Dennis Tucker, PE, ARCADIS and Richard Frechette, PE, Knight Piésold
SWVP-023365
Florence Copper has Robust Economics
US $727 million pre-tax NPV and 36% Internal Rate of Return (IRR) @ a 7.5% discount rate and US $2.75/lb Cu
Net Present Value (NPV) Analysis
Copper price US$/lb Pre-tax NPV / IRR Post-tax NPV / IRR
$3.00 US $849 Million / 38% US $585 Million / 31%
$2.75 US $727 Million / 36% US $503 Million / 29%
6
Source: NI 43-101 Prefeasibility Study for the Florence Project, March 2013
SWVP-023366
Curis Peer Benchmarking – Initial Capital Costs / Project Pre-Tax NPV
7
At an initial capital cost to pre-tax NPV ratio of 26%, Curis has the lowest ratio versus its base metal developers peer group
26%
0%
50%
100%
150%
200%
250%
300%C
uris
Augu
sta
Han
a
Qua
terra
WR
N
Nev
ada
Cop
per
Yello
whe
ad
Entre
e
Abac
us
Chi
efta
in
Cop
per F
ox
Init
ial C
apit
al C
osts
/ P
re-T
ax N
PV8%
Average: 169%
635%
(3)
(1)
(2)
(1)
(2)
(4)
(2)
(1)
(1)
(2)
(4)
(1)
(2)
(OP
& U
G S
cena
rio)
Note: Based on each company’s most recent NI43-101 Technical Reports & disclosure within most recent corporate presentations Note: Average excludes Curis (1) Base case Cu price range of $2.50 - $2.99/lb (2) Base case Cu price range of $3.00 - $3.49/lb (3) Base case Cu price range of $3.50 - $4.00/lb (4) Quaterra & Entree based on the MacArthur Project & the Ann Mason Project, respectively
Source: National Bank Financial Markets
SWVP-023367
Curis Peer Benchmarking – Initial Capital Costs
8
At US $208 million, Curis has the lowest estimated initial capital cost requirement versus its base metal developers peer group
Average: $1,181MM
Note: Based on each company’s most recent NI43-101 Technical Reports & disclosure within most recent corporate presentations Note: Average excludes Curis (1) Quaterra & Entree based on the MacArthur Project & the Ann Mason Project, respectively
(OP
& U
G S
cena
rio)
Source: National Bank Financial Markets
$208.0
$0
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500C
uris
Qua
terra
Han
a
Chi
efta
in
Abac
us
Yello
whe
ad
Nev
ada
Cop
per
Augu
sta
Entre
e
WR
N
Cop
per F
ox
Init
ial C
apit
al C
osts
(U
S$M
)
(1)
(1)
SWVP-023368
Jobs, Taxes and Economic Activity from Florence Copper
9
SWVP-023369
Development of Florence Copper
Phase 1 Development Program 24 well injection and recovery system
State of the art Solvent Extraction / Electrowinning (SX/EW) facility
Will operate for 18 months
Construction scheduled to begin in early 2014
Capital cost estimated at $35 million
Phase 2 Commercial Operations Commercial scale injection and recovery
well field
Expanded SX/EW facility capable
Permitting to be completed in 2015
Start of full commercial operations in 2017
Life of project is 25 years
Estimated Initial Capital Cost is US $208 million
10
SWVP-023370
ISR is a low cost environmentally sound process of extracting minerals
Very low comparable capital and operating costs
Used extensively for decades around the world for recovering metals and salts
30% of world wide and 90% of current U.S. U3O8 production utilizes ISR technology
Currently 26 known U3O8 and Copper ISR projects in operation or under development globally
11
In-Situ Recovery – Well Understood, Proven Technology
Example of an operating ISR Project in Wyoming, USA
SWVP-023371
Florence Project In-Situ Recovery Process
12
Injection and recovery wells are drilled deep into the bedrock where the oxide copper mineralization is
Wells are concrete encased and sealed to protect water quality
Low pH solution, similar in strength to household vinegar or lemon juice, is pumped under low pressure through the injection wells to gently dissolve the copper
Copper rich solution is pumped to surface through recovery wells for processing into pure copper cathode sheets
Perimeter and observation wells are monitored continuously to ensure hydraulic control of fluids is maintained at all times and water quality is protected
In-situ recovery well field arrangement
SWVP-023372
Recent Drill Core Intersections – Florence Deposit
13
The high frequency of prolific fracture patterns and densities observed during the most recent drilling program further confirm that the Florence copper oxide deposit represents the ideal conditions for in-situ recovery of copper
The porous nature of the deposit creates significant hydraulic communication across geologic structures and rock types throughout the oxide deposit
Average copper grade in recent three drill holes was 0.47% CuT; this compares favorably with calculated model grades of 0.43% CuT (see August 16, 2011 Curis Press Release)
Photos of recent PQ and HQ size core obtained from Florence Deposit
SWVP-023373
Protecting Groundwater Quality
14
SWVP-023374
Conceptual Florence Project Plant Design
15
SX/EW technology has been in use for 40 + years worldwide
Virtually zero air emissions and fully enclosed process
Production of pure copper cathode significantly lowers treatment and transportation costs
Florence Project Solvent Extraction / Electrowinning Plant Layout
SWVP-023375
16
Infrastructure, Water and Land
Florence Copper is well served by on-site infrastructure and water rights
POWER New 500 kV powerline that traverses
western boundary of Curis property 125 kV powerline on site Low power costs
INFRASTRUCTURE
Copper Basin Railway that connects directly to Asarco Hayden Smelter, traverses northern boundary of property
Hunt highway (County) adjacent to property
Natural gas line traverses property
WATER All water rights in place for commercial
operations
LAND 100% owned 1,182-acre private patented
land. 160 acre State Mineral Lease held by Curis
100% owned mineral rights to Florence Copper Deposit
SWVP-023376
BHP Production Test Results (1998)
17
BHP Copper undertook an ISCR production test at Florence in 1998. Results from the test included the following:
Extensively fractured bedrock, confirmed that chrysocolla mineralization and saturated nature of deposit make it ideal for ISCR extraction
Confirmed ability to maintain full “hydraulic control” of solutions in ground
Confirmed environmental safety of full life cycle of operations including closure
Demonstrated ability to protect water quality during and after operations (14 years of subsequent water quality monitoring confirm process is safe)
Photo of existing ISCR well field at Florence Site
ISCR well field arrangement at Florence Site
SWVP-023377
18
Things are beginning to happen…..
SWVP-023378
SX/EW Plant Crane Installation
SWVP-023379
SX/EW Plant Leach Solution Tanks
SWVP-023380
Well Casing for the Phase 1 ISR Well Field
21
SWVP-023381
Site Improvements
22
SWVP-023382
Curis Permitting Completed Milestones
23
Government Agency Permit/Authorization
Arizona Department of State Land Mineral Lease Agreement Arizona Department of Water Resources
Permit to Withdraw Groundwater for Mineral Extraction & Metallurgical Processing for Commercial Operations
Pinal County Air Quality Control District
Air Quality Permit for Commercial Operations
Pinal County Change of Use Permit Pinal County Sewage Permit Pinal County C.A.P Canal Turn Out Agreement Arizona Department of Environmental Quality (ADEQ) Aquifer Protection Permit for Phase I
SWVP-023383
Curis Permitting Expected Milestones
24
Government Agency Permit/ Authorization Status Expected Date
of Completion
United States Environmental Protection Agency (EPA)
Underground Injection Control Permit (UIC)
Commercial operating permit and aquifer exemption was granted to BHP Copper in June 1997
Area wide aquifer exemption permit remains in effect All required documentation for permit amendment was
submitted by Curis in March 2011 All technical issues have been addressed and currently in
final stage of discussions prior to issuance
Final Draft for Public Comment
Q4 2013
Final UIC Issued Following 45 Days
Public Comment Period
Government Agency Permit/ Authorization Status Expected Date
of Completion
Arizona Department of Environmental Quality (ADEQ)
Aquifer Protection Permit (APP)
Commercial operating permit was granted to BHP Copper in January 1997
Significant amendment of existing APP is required prior to start of commercial operations (Phase II)
Majority of required documentation has been submitted to ADEQ and is currently under review
2015
United States Environmental Protection Agency (EPA)
Underground Injection Control Permit (UIC)
Commercial operating permit and aquifer exemption was granted to BHP Copper in June 1997
Area wide aquifer exemption determination remains in effect Permit amendment, update and transfer to Curis request is
now under review
2015
Phase I Operations
Phase II Operations
SWVP-023384
Share Capitalization, Financial Position, and Analyst Coverage
25
Share Structure
Basic Shares Outstanding 63.1 million
Fully Diluted 68.1 million
HDI, Insider & Management Ownership 21%
Stock Performance $CAD Symbol TSX - CUV
52 Week Low | High $0.58 | $1.29
Recent Price $0.65
Market Capitalization $41 million
Cash on Hand & Committed Funds $22 million
(As at Sept 26th, 2013)
Analyst Coverage
Raymond Goldie Salman Partners Inc.
Steve Parsons National Bank Financial
Matt O’ Keefe Mackie Research Capital Corporation
SWVP-023385
Near Term Catalyst Opportunities
26
Receive Phase I EPA Underground Injection Control (UIC) Permit
Start of Phase I construction Phase I plant commissioning and first copper cathode production
SWVP-023386
Curis Management and Directors
27
Russell Hallbauer (Co-Chairman) Russell Hallbauer has more than 30 years of senior experience in the mining industry, is a Registered Professional Engineer and CEO of Taseko Mines Limited. He is also a director and former Chairman of the Mining Association of B.C. David Copeland (Co-Chairman) Dave Copeland is a geological engineer with thirty years’ experience in advancing mineral projects through feasibility, permitting, engineering design and initial development phases. Michael McPhie (President and CEO) Michael McPhie is a senior mining executive with more than 20 years of financial, operational and project development experience. He has worked internationally with a number of major and junior mining companies, was formerly the CEO of the Mining Association of BC and a senior director with the Government of Canada. He holds Bachelor and Master of Science degrees and is a Qualified Environmental Professional (QEP). Michael serves on several private and public company boards and is currently Chair of the Board of the Association for Mineral Exploration of British Columbia (AMEBC). Brian Causey (Chief Financial Officer) Brian Causey has more than 20 years experience in financial and operations management, with particular emphasis on equipment and project finance, taxation, and operational management in private and public companies. Prior to joining HDI, Mr. Causey was a partner of KPMG LLP.
Trevor Thomas (Secretary) Trevor Thomas has practiced in the areas of corporate commercial, corporate finance, securities and mining law since 1995, both in private practice and in-house positions. Previously, Mr. Thomas served as in-house legal counsel to Placer Dome Inc. Robert Schafer (Director) Robert Schafer is a Certified Professional Geologist with advanced degrees in geology and mineral economics who has worked internationally with major and junior mining companies including Kinross Gold Corporation, BHP Billiton. James Kerr (Director) James Kerr is a CA with extensive experience in public practice, and actively involved with audit committees of mining and energy companies, providing advice on accounting and compliance issues based on a risk assessment approach. Rene Carrier (Director) Rene Carrier is a past Vice-President of Pacific International Securities Inc. and a director of a number of public companies. Gordon Fretwell (Director) Gordon Fretwell holds Bachelor of Commerce and Bachelor of Law degrees. Formerly a partner in a large law firm, he has been a self-employed solicitor since 1991 practicing primarily in the areas of corporate and securities law.
SWVP-023387
Florence Project Management and Senior Advisors
28
Dan Johnson BSc, MSc, PE Vice President, Environmental & Technical Services and General Manager Dan Johnson is a native Arizonan with a career spanning over 23 years of environmental management, hydrological engineering and project management experience in the state’s mining industry. He is a graduate of the University of Arizona, and is a registered Geologist, Hydrologist, and Professional Engineer.
Rita P. Maguire MBA, JD Executive Vice President and General Counsel Rita Maguire is a recognized expert on western water policy. She holds three degrees from Arizona State University: a Bachelor of Science, a Masters in Business Administration, and a Juris Doctorate. Her career highlights include founding Maguire & Pearce PLLC, founding President of the Arizona Center for Public Policy, Director of the Arizona Department of Water Resources and Deputy Chief of Staff for Governor Fife Symington.
Doug Nicholson BSc, PE Executive Vice President, Project Development, HDI Doug has a career that spans more than 25 years as an executive, senior engineer and project manager. He was most recently CEO of Oracle Mining Corporation, and before that President of the Donlin Creek JV with Nova Gold Resources and Barrick.
Loren H. Locher Director, Communications and Community Affairs Mr. Locher brings more than 15 years of experience in public and government affairs, project management and stakeholder outreach to Florence Copper. He oversees community and public affairs outreach and plays a key role in coordinating Florence Copper’s stakeholder relations program. Locher also leads the development and implementation of Florence Copper’s communication strategies and supplements Curis’ ongoing engagement with local and regional regulatory authorities. Before joining Florence Copper, Locher served as regional director for government affairs and stakeholder outreach at the El Paso Corporation in Houston. During this time, Locher directed government and stakeholder outreach, and focused on legislative activities, political monitoring and relationship building.
Glenn Hoffmeyer BS Met Eng Manager, Metallurgy & Mineral Processing Glenn Hoffmeyer is a native Arizonan and graduate of Michigan Technology University. His careers spans over 20 years of senior level metallurgical and mineral processing engineering in the US copper industry. He has extensive experience in hydrometallurgical operations, process development and project management focused primarily in the south-western United States.
Greg Phillips Process Superintendent Mr. Greg Phillips is a graduate of Eastern Arizona College and has over 14 years of experience in the fields of mineral processing and solvent extraction and electrowinning (SX/EW) plant operations, and comes to Curis from the nearby Carlota Copper operation. In the new role of Process Superintendent, Greg will be responsible for the planning, implementation and supervision of Plant Process and Maintenance and reclamation activities at Florence Copper. Ian Ream BSc Senior Hydrogeologist Ian is a Senior Hydrogeologist with over 12 years experience in a wide variety of projects. Ian started his career in municipal water development and has spent the last 5 years working as a consultant to mining projects with Schlumberger Water Services. At the Florence Copper project Ian is currently responsible for design, procurement, and construction oversight for the PTF wellfield, abandonment of existing core holes, compliance well installation, potable water system development, and other projects relating to irrigation wells on the site.
John Kline BSc, MS Senior Advisor, ISCR Operations John Kline has 25+ years of experience in in-situ recovery operations. He was formally a Chief Metallurgist and Project Manager for Magma Copper and then BHP Copper at both the San Manuel and Florence Copper in-situ recovery projects.
Rebecca Rios BA, MA Senior Advisor, Community & Government Affairs Rebecca Rios is a lifelong Arizonan and former elected official for the Arizona Legislature and Senate. Serving in the Arizona House of Representatives (1995-2000) and the Arizona State Senate (2004-2010), Ms. Rios is a highly regarded and influential spokesperson on environmental and economic development issues in Central Arizona.
SWVP-023388
Hunter Dickinson and Curis
29
Global Experience and Reach – More than 25 years of experience successfully discovering, building and operating mining projects
SWVP-023389
Cautionary and Forward Looking Statements
30
CAUTION REGARDING FORWARD-LOOKING INFORMATION This presentation includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address exploration drilling, test results, exploitation activities and events or developments that the Company expects to occur, are forward-looking statements. Although the Company believes that the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking statements. These include but are not limited to uncertainties and costs related to the Company’s exploration and development activities, such as those associated with continuity of mineralization, or determining whether mineral resources or reserves exist on a property; uncertainties related to the accuracy of our estimates of mineral reserves, mineral resources; expected production rates, the timing of expected production, the geotechnical or hydrological nature of mineral deposits, and diminishing quantities or grades of mineral resources; uncertainties related to the ability to obtain necessary environmental, land use, and other licenses, permits, approvals, surface rights and title for development projects; uncertainties and delays related to judicial or regulatory proceedings; changes in, and the effects of, laws, regulations and government policies affecting our exploration, development and mining operations, particularly laws, regulations and policies in jurisdictions in which our projects are located, relating to environmental protection and associated compliance costs, land use, effective future tax rates, the protection of the health and safety of mine workers, and mineral rights ownership; changes in general economic, market or business conditions, the financial markets and in the demand and market price for copper, gold, and other minerals and commodities, such as diesel fuel, steel, concrete, electricity and other forms of energy, mining equipment, and fluctuations in exchange rates, particularly with respect to the value of the U.S. dollar and Canadian dollar, and the continued availability of capital and financing on terms acceptable to the Company; the ability of the Company to achieve fulfillment of all conditions for drawdown under its loan agreement with RK Mine Finance Trust I; the risk of inadequate insurance or inability to obtain insurance to cover all risks associated with the exploration, development or mining of the Company’s projects; the risk of loss of key employees; changes in accounting policies and methods we use to report our financial condition, including uncertainties associated with critical accounting assumptions and estimates; environmental issues and liabilities associated with mining including processing ore; and labour strikes, work stoppages, or other interruptions to, or difficulties in, the employment of labour in markets in which we operate mineral projects or mines, or environmental hazards, industrial accidents or other events or occurrences, including third party interference that interrupt the production of minerals in our mines. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. For more information on the Company, a more detailed description of the assumptions used to develop the forward-looking statements and the risk factors that may cause actual results to differ materially from forward-looking statements, investors should review the Company's continuous disclosure filings, copies of which are available at www.sedar.com.
CAUTIONARY NOTE TO U.S. INVESTORS CONCERNING RESERVE ESTIMATES The mineral reserves disclosed in this presentation have been estimated in accordance with Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”), as required by Canadian securities regulatory authorities. The Company is not subject to the reporting requirements of section 13(a) of section 15(d) of the United States Securities Exchange Act of 1934, as amended (the “Exchange Act”). However, the Company’s U.S. investors are cautioned that SEC Industry Guide 7 under the Exchange Act, as interpreted by Staff of the SEC, applies different standards in order to classify mineralization as a reserve. As a result, the definitions of proven and probable reserves used in NI 43-101 differ from the definitions in the SEC Industry Guide 7. Under SEC standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. Among other things, all necessary permits would be required to be in hand or issuance imminent in order to classify mineralized material as reserves under the SEC standards. Accordingly, mineral reserve estimates contained in this news release may not qualify as “reserves” under SEC standards. In addition, disclosure of “contained ounces” is permitted disclosure under Canadian regulations; however, the SEC only permits Exchange Act reporting companies to report reserves in ounces, and requires reporting of mineralization that does not qualify as reserves as in place tonnage and grade without reference to unit measures.
SWVP-023390
31
Contact Information
Florence Copper Curis Resources Head Office 15th Floor 1040 W. Georgia St. Vancouver, BC Canada V6E 4H1
Investor Services Susie Bell [email protected] TF: 800.667.2114 Ph: 604.684.6365
Florence Office 1575 W. Hunt Hwy. Florence, AZ 85132 Ph: 520.374.3984 Fx: 520.374.3999
SWVP-023391